Rhonda Ascierto
Andy Lawrence
Rabih Bashroush
Kevin Heslin
Uptime Institute
November 2019
Ten data center industry trends for 2020
This report is an excerpt of a comprehensive report available to
Uptime Institute Network members. This document includes the
highlights of the material contained in the larger original. For more
information about membership, see: www.UptimeInstitute.com/UI-
Network
Abstract
Uptime Institute’s examination of some of the top trends in data centers in 2020 shows an industry that that is
confidently expanding, especially at the edge, attracting new investors and increasingly embracing new
technologies. But it also faces some challenges — particularly in the areas of resiliency, staffing, environmental
impact and energy use.
Introduction
The digital infrastructure industry continues to grow and change at a striking price. Across the world, a thriving
community of investors, designers, owners and operators are grappling with many of the same issues:
resiliency and risk, the impact of cloud, the move to the edge, rapid innovation, and unpredictable (although
mostly upward) demand.
What should stakeholders in this industry expect in 2020? Which innovations will make a difference — and
which have been exaggerated? Is the challenge of distributed resiliency being solved, or is it getting worse?
What are regulators likely to do?
The ten trends the Uptime Institute Intelligence team has identified show an industry that is confidently
expanding toward the edge, that is attractive to many new investors, and that is embracing new technologies
and architectures — but one that is also running against some headwinds. Resiliency concerns, premature
expectations about the impact of 5G, climate change, environmental impact and increasingly watchful
regulators are among the hazards that must be successfully navigated.
Ten data center industry trends in 2020
Outages drive authorities and businesses to act
Big IT outages are occurring with growing regularity, many with severe consequences. Executives, industry authorities
and governments alike are responding with more rules, calls for more transparency and a more formal approach to end-
to-end, holistic resiliency.
The internet tilts toward the edge
In the coming years, significant data will be generated by many more things and much more will be processed away
from the core, especially in regional data centers. Many different types of data centers and networking approaches will
be needed.
Data center energy use goes up and up
Energy use by data centers and IT will continue to rise, putting pressure on energy infrastructure and raising questions
about carbon emissions. The drivers for more energy use are simply too great to be offset by efficiency gains.
Capital inflow boosts the data center market
Data centers are no longer a niche or exotic investment among mainstream institutional buyers, which are swarming to
the sector. New types of capital investors, with deep pockets and long return timelines, could boost the sector overall.
More data, more automated data centers
Many managers are wary of handing key decisions and operations to machines or outside programmers. But recent
advances, including the broad adoption of data center infrastructure management systems and the introduction of
artificial intelligence-driven cloud services, have made this much more likely. The case for more automation will become
increasingly compelling.
Data centers without generators: More pilots, more deployments
Most big data centers cannot contemplate operating without generators, but there is a strong drive to do so.
Technological alternatives are improving, and the number of good use cases is proliferating. The next 24 months are
likely to see more pilots and deployments.
Pay-as-you-go model spreads to critical components
As enterprises continue to move from a focus on capital expenditures to operating expenditures, more critical
infrastructure services and components — from backup energy and software to data center capacity — will be
consumed on a pay-as-you-go, “as a service” basis.
Micro data centers: An explosion in demand, in slow motion
The surge in demand for micro data centers will be real, and it will be strong — but it will take time to arrive in force.
Many of the economic and technical drivers are not yet mature; and 5G, one of the key underlying catalysts, is in its
infancy. Demand will grow faster from 2022.
Staffing shortages are systemic and worsening
The data center sector’s staffing problem is systemic and long term, and employers will continue to struggle with talent
shortages and growing recruitment costs. To solve the crisis, more investment will be needed from industry and
educators.
Climate change spurs data center regulations
Climate change awareness is growing, and attitudes are hardening. Although major industry players are acting, legislators,
lobbyists and the public are pressing for more. More regulations are on the way, addressing energy efficiency, renewable
energy and waste reduction.
About the Authors
Rhonda Ascierto is Uptime Institute’s Vice President of Research. She has spent nearly two decades at the crossroads of
IT and business as an analyst, speaker, adviser, and editor covering the technology and competitive forces that shape
the global IT industry. Contact: rascierto@uptimeinstitute.com
Andy Lawrence is Uptime Institute’s Executive Director of Research. Mr. Lawrence has built his career focusing on
innovative new solutions, emerging technologies, and opportunities found at the intersection of IT and infrastructure.
Contact: alawrence@uptimeinstitute.com
Dr. Rabih Bashroush is Uptime Institute’s Research Director. An international authority in the field of information and
communication technology digital infrastructure and consultant for various European governments (including the
European Commission), Dr. Bashroush has led numerous research programs designed to provide a better understanding
of digital infrastructure, its impact, and how it can operate more effectively. Contact:
rbashroush@uptimeinstitute.com
Kevin Heslin is Chief Editor and Director of Ancillary Projects, Uptime Institute. Kevin served as editor of The Uptime
Institute Journal, where he authored and co-authored numerous papers, including case studies involving Uptime
Institute Tier-certified facilities. Kevin has had a more than 30-year career examining energy and sustainability issues
from the end-user perspective. In that regard, he has worked in academic, nonprofit and standards organizations, in
addition to serving as editor of various print publications. Contact: kheslin@uptimeinstitute.com
Want more detail?
Become an Uptime Institute Network member! It’s easy and provides a wealth of information needed to own and/or
operate your infrastructure most effectively, reduce downtime and create a predictable hybrid computing
infrastructure.
Uptime Institute is the world’s global authority on the design and operations of data centers and has more than 25 years
of experience helping customers understand what it takes to keep their data centers running smoothly and efficiently.
Uptime Institute brings together thousands of data center professionals who wish to continue to refine their
organization’s IT service delivery proficiency as well as their own personal skills. Membership in Uptime Institute’s
community program profiles the essential tools, knowledge and experience to assure business continuity, disaster
preparedness and operational efficiency. Members of Uptime Institute experience fewer disruptions, lower costs of
operations, reduced unplanned downtime and can defend their IT choices.
Full versions of this and many other reports, roundtable discussions, face to face meetings with like-minded peers, data
center tours and access to online incident research tools are available to members of Uptime Institute. See:
https://uptimeinstitute.com/ui-network for more information about joining the industry’s most respect community of
data center professionals and practitioners.

Mais conteúdo relacionado

Mais de Sergey Yrievich

Toshiba Rechargeable Battery SCiB™
Toshiba Rechargeable Battery SCiB™Toshiba Rechargeable Battery SCiB™
Toshiba Rechargeable Battery SCiB™Sergey Yrievich
 
Eaton 9 sx UPS user manual ru
Eaton 9 sx UPS user manual ruEaton 9 sx UPS user manual ru
Eaton 9 sx UPS user manual ruSergey Yrievich
 
Инструкция пользователя ИБП GXT2 10кВА 230
Инструкция пользователя ИБП GXT2 10кВА 230Инструкция пользователя ИБП GXT2 10кВА 230
Инструкция пользователя ИБП GXT2 10кВА 230Sergey Yrievich
 
«Вперше в Україні – унікальна система автоматизованого контролю прав на об’єк...
«Вперше в Україні – унікальна система автоматизованого контролю прав на об’єк...«Вперше в Україні – унікальна система автоматизованого контролю прав на об’єк...
«Вперше в Україні – унікальна система автоматизованого контролю прав на об’єк...Sergey Yrievich
 
Кабельная трасса, схема обвязки оборудования 0,4кВ
Кабельная трасса, схема обвязки оборудования 0,4кВКабельная трасса, схема обвязки оборудования 0,4кВ
Кабельная трасса, схема обвязки оборудования 0,4кВSergey Yrievich
 
Техническая спецификация, гибридный инвертор резервного электропитания
Техническая спецификация, гибридный инвертор резервного электропитанияТехническая спецификация, гибридный инвертор резервного электропитания
Техническая спецификация, гибридный инвертор резервного электропитанияSergey Yrievich
 
21.04.2017 резервное электропитание
21.04.2017 резервное электропитание21.04.2017 резервное электропитание
21.04.2017 резервное электропитаниеSergey Yrievich
 
ДСТУ IEC 62040-3:1999 IDT
ДСТУ IEC 62040-3:1999 IDTДСТУ IEC 62040-3:1999 IDT
ДСТУ IEC 62040-3:1999 IDTSergey Yrievich
 
Электронные Стабилизаторы
Электронные СтабилизаторыЭлектронные Стабилизаторы
Электронные СтабилизаторыSergey Yrievich
 
Электронные Стабилизаторы часть вторая
Электронные Стабилизаторы часть втораяЭлектронные Стабилизаторы часть вторая
Электронные Стабилизаторы часть втораяSergey Yrievich
 
Октаэдры с эмос
Октаэдры с эмосОктаэдры с эмос
Октаэдры с эмосSergey Yrievich
 
Инфраструктура ЦОД Tier Standard: Operational Sustainability
Инфраструктура ЦОД Tier Standard: Operational SustainabilityИнфраструктура ЦОД Tier Standard: Operational Sustainability
Инфраструктура ЦОД Tier Standard: Operational SustainabilitySergey Yrievich
 
On-Line Against Delta Technology
On-Line Against Delta Technology On-Line Against Delta Technology
On-Line Against Delta Technology Sergey Yrievich
 
Victron Netpro 600 1500
Victron Netpro 600 1500 Victron Netpro 600 1500
Victron Netpro 600 1500 Sergey Yrievich
 
Отчет Audit report RAPID7
 Отчет Audit report RAPID7 Отчет Audit report RAPID7
Отчет Audit report RAPID7Sergey Yrievich
 
Отчет Executive penetration RAPID 7
Отчет Executive penetration RAPID 7Отчет Executive penetration RAPID 7
Отчет Executive penetration RAPID 7Sergey Yrievich
 
Отчет Executive overview RAPID7
Отчет  Executive overview RAPID7Отчет  Executive overview RAPID7
Отчет Executive overview RAPID7Sergey Yrievich
 
Отчет Csa report RAPID7
Отчет  Csa report RAPID7Отчет  Csa report RAPID7
Отчет Csa report RAPID7Sergey Yrievich
 

Mais de Sergey Yrievich (20)

Toshiba Rechargeable Battery SCiB™
Toshiba Rechargeable Battery SCiB™Toshiba Rechargeable Battery SCiB™
Toshiba Rechargeable Battery SCiB™
 
Eaton 9 sx UPS user manual ru
Eaton 9 sx UPS user manual ruEaton 9 sx UPS user manual ru
Eaton 9 sx UPS user manual ru
 
Инструкция пользователя ИБП GXT2 10кВА 230
Инструкция пользователя ИБП GXT2 10кВА 230Инструкция пользователя ИБП GXT2 10кВА 230
Инструкция пользователя ИБП GXT2 10кВА 230
 
«Вперше в Україні – унікальна система автоматизованого контролю прав на об’єк...
«Вперше в Україні – унікальна система автоматизованого контролю прав на об’єк...«Вперше в Україні – унікальна система автоматизованого контролю прав на об’єк...
«Вперше в Україні – унікальна система автоматизованого контролю прав на об’єк...
 
Кабельная трасса, схема обвязки оборудования 0,4кВ
Кабельная трасса, схема обвязки оборудования 0,4кВКабельная трасса, схема обвязки оборудования 0,4кВ
Кабельная трасса, схема обвязки оборудования 0,4кВ
 
Техническая спецификация, гибридный инвертор резервного электропитания
Техническая спецификация, гибридный инвертор резервного электропитанияТехническая спецификация, гибридный инвертор резервного электропитания
Техническая спецификация, гибридный инвертор резервного электропитания
 
21.04.2017 резервное электропитание
21.04.2017 резервное электропитание21.04.2017 резервное электропитание
21.04.2017 резервное электропитание
 
ДСТУ IEC 62040-3:1999 IDT
ДСТУ IEC 62040-3:1999 IDTДСТУ IEC 62040-3:1999 IDT
ДСТУ IEC 62040-3:1999 IDT
 
Электронные Стабилизаторы
Электронные СтабилизаторыЭлектронные Стабилизаторы
Электронные Стабилизаторы
 
Электронные Стабилизаторы часть вторая
Электронные Стабилизаторы часть втораяЭлектронные Стабилизаторы часть вторая
Электронные Стабилизаторы часть вторая
 
Октаэдры с эмос
Октаэдры с эмосОктаэдры с эмос
Октаэдры с эмос
 
Tier Standard Topology
Tier Standard TopologyTier Standard Topology
Tier Standard Topology
 
Инфраструктура ЦОД Tier Standard: Operational Sustainability
Инфраструктура ЦОД Tier Standard: Operational SustainabilityИнфраструктура ЦОД Tier Standard: Operational Sustainability
Инфраструктура ЦОД Tier Standard: Operational Sustainability
 
On-Line Against Delta Technology
On-Line Against Delta Technology On-Line Against Delta Technology
On-Line Against Delta Technology
 
Victron Netpro 600 1500
Victron Netpro 600 1500 Victron Netpro 600 1500
Victron Netpro 600 1500
 
Отчет Audit report RAPID7
 Отчет Audit report RAPID7 Отчет Audit report RAPID7
Отчет Audit report RAPID7
 
Отчет Executive penetration RAPID 7
Отчет Executive penetration RAPID 7Отчет Executive penetration RAPID 7
Отчет Executive penetration RAPID 7
 
Отчет Executive overview RAPID7
Отчет  Executive overview RAPID7Отчет  Executive overview RAPID7
Отчет Executive overview RAPID7
 
Отчет Csa report RAPID7
Отчет  Csa report RAPID7Отчет  Csa report RAPID7
Отчет Csa report RAPID7
 
Report PAPID 7
Report PAPID 7Report PAPID 7
Report PAPID 7
 

Último

Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 

Último (20)

Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 

Ten data center industry trends for 2020

  • 1. 2019 Rhonda Ascierto Andy Lawrence Rabih Bashroush Kevin Heslin Uptime Institute November 2019 Ten data center industry trends for 2020 This report is an excerpt of a comprehensive report available to Uptime Institute Network members. This document includes the highlights of the material contained in the larger original. For more information about membership, see: www.UptimeInstitute.com/UI- Network
  • 2. Abstract Uptime Institute’s examination of some of the top trends in data centers in 2020 shows an industry that that is confidently expanding, especially at the edge, attracting new investors and increasingly embracing new technologies. But it also faces some challenges — particularly in the areas of resiliency, staffing, environmental impact and energy use. Introduction The digital infrastructure industry continues to grow and change at a striking price. Across the world, a thriving community of investors, designers, owners and operators are grappling with many of the same issues: resiliency and risk, the impact of cloud, the move to the edge, rapid innovation, and unpredictable (although mostly upward) demand. What should stakeholders in this industry expect in 2020? Which innovations will make a difference — and which have been exaggerated? Is the challenge of distributed resiliency being solved, or is it getting worse? What are regulators likely to do? The ten trends the Uptime Institute Intelligence team has identified show an industry that is confidently expanding toward the edge, that is attractive to many new investors, and that is embracing new technologies and architectures — but one that is also running against some headwinds. Resiliency concerns, premature expectations about the impact of 5G, climate change, environmental impact and increasingly watchful regulators are among the hazards that must be successfully navigated. Ten data center industry trends in 2020 Outages drive authorities and businesses to act Big IT outages are occurring with growing regularity, many with severe consequences. Executives, industry authorities and governments alike are responding with more rules, calls for more transparency and a more formal approach to end- to-end, holistic resiliency. The internet tilts toward the edge In the coming years, significant data will be generated by many more things and much more will be processed away from the core, especially in regional data centers. Many different types of data centers and networking approaches will be needed. Data center energy use goes up and up Energy use by data centers and IT will continue to rise, putting pressure on energy infrastructure and raising questions about carbon emissions. The drivers for more energy use are simply too great to be offset by efficiency gains. Capital inflow boosts the data center market Data centers are no longer a niche or exotic investment among mainstream institutional buyers, which are swarming to the sector. New types of capital investors, with deep pockets and long return timelines, could boost the sector overall.
  • 3. More data, more automated data centers Many managers are wary of handing key decisions and operations to machines or outside programmers. But recent advances, including the broad adoption of data center infrastructure management systems and the introduction of artificial intelligence-driven cloud services, have made this much more likely. The case for more automation will become increasingly compelling. Data centers without generators: More pilots, more deployments Most big data centers cannot contemplate operating without generators, but there is a strong drive to do so. Technological alternatives are improving, and the number of good use cases is proliferating. The next 24 months are likely to see more pilots and deployments. Pay-as-you-go model spreads to critical components As enterprises continue to move from a focus on capital expenditures to operating expenditures, more critical infrastructure services and components — from backup energy and software to data center capacity — will be consumed on a pay-as-you-go, “as a service” basis. Micro data centers: An explosion in demand, in slow motion The surge in demand for micro data centers will be real, and it will be strong — but it will take time to arrive in force. Many of the economic and technical drivers are not yet mature; and 5G, one of the key underlying catalysts, is in its infancy. Demand will grow faster from 2022. Staffing shortages are systemic and worsening The data center sector’s staffing problem is systemic and long term, and employers will continue to struggle with talent shortages and growing recruitment costs. To solve the crisis, more investment will be needed from industry and educators. Climate change spurs data center regulations Climate change awareness is growing, and attitudes are hardening. Although major industry players are acting, legislators, lobbyists and the public are pressing for more. More regulations are on the way, addressing energy efficiency, renewable energy and waste reduction. About the Authors Rhonda Ascierto is Uptime Institute’s Vice President of Research. She has spent nearly two decades at the crossroads of IT and business as an analyst, speaker, adviser, and editor covering the technology and competitive forces that shape the global IT industry. Contact: rascierto@uptimeinstitute.com Andy Lawrence is Uptime Institute’s Executive Director of Research. Mr. Lawrence has built his career focusing on innovative new solutions, emerging technologies, and opportunities found at the intersection of IT and infrastructure. Contact: alawrence@uptimeinstitute.com Dr. Rabih Bashroush is Uptime Institute’s Research Director. An international authority in the field of information and communication technology digital infrastructure and consultant for various European governments (including the European Commission), Dr. Bashroush has led numerous research programs designed to provide a better understanding of digital infrastructure, its impact, and how it can operate more effectively. Contact: rbashroush@uptimeinstitute.com Kevin Heslin is Chief Editor and Director of Ancillary Projects, Uptime Institute. Kevin served as editor of The Uptime Institute Journal, where he authored and co-authored numerous papers, including case studies involving Uptime Institute Tier-certified facilities. Kevin has had a more than 30-year career examining energy and sustainability issues
  • 4. from the end-user perspective. In that regard, he has worked in academic, nonprofit and standards organizations, in addition to serving as editor of various print publications. Contact: kheslin@uptimeinstitute.com Want more detail? Become an Uptime Institute Network member! It’s easy and provides a wealth of information needed to own and/or operate your infrastructure most effectively, reduce downtime and create a predictable hybrid computing infrastructure. Uptime Institute is the world’s global authority on the design and operations of data centers and has more than 25 years of experience helping customers understand what it takes to keep their data centers running smoothly and efficiently. Uptime Institute brings together thousands of data center professionals who wish to continue to refine their organization’s IT service delivery proficiency as well as their own personal skills. Membership in Uptime Institute’s community program profiles the essential tools, knowledge and experience to assure business continuity, disaster preparedness and operational efficiency. Members of Uptime Institute experience fewer disruptions, lower costs of operations, reduced unplanned downtime and can defend their IT choices. Full versions of this and many other reports, roundtable discussions, face to face meetings with like-minded peers, data center tours and access to online incident research tools are available to members of Uptime Institute. See: https://uptimeinstitute.com/ui-network for more information about joining the industry’s most respect community of data center professionals and practitioners.