PROJECT HIGHLIGHTS

Demand Control
Ventilation Reduces HVAC
Load, Saves Costs

C

olumbia Property Trust has
had a longtime commitment
to ­ ustainable practices that
s
maximize energy efficiency and reduce
e
­ nvironmental impact on the community.
Its 14-story, 353,000-square-foot suburban

S
­ olutions (ACS) team for insight and
r
­ ecommendations to improve its HVAC
­system efficiency.
After thoroughly reviewing the facility,
M
­ cKenney’s recommended an innovative
approach to monitor and adjust the
building’s outside air ventilation levels
based on ASHRAE 90.1 standards. The
solution involved introducing Demand
Control Ventilation (DCV) to monitor
the amount of outside air entering the
building based on carbon dioxide (CO2)
concentrations. CO2 levels continuously fluctuate in a building as its
­population changes.

DCV continuously monitors each
floor in a building and automatically
adjusts outside air ventilation rates.
This is achieved by using controls
Photo courtesy of Columbia Property Trust
and variable frequency drive (VFD)
office building in Atlanta had already
technology as needed, while still meeting
®
achieved ENERGY STAR certification and
ASHRAE ventilation standards. By optimizing
consistently maintained a score of 87,
the amount of outside air coming into the
p
­ utting the ­ tructure in the top tier of the
s
building, there is less air that has to be
15 percent most energy-efficient buildings
heated or cooled, resulting in a reduced
in the U.S.
load on the HVAC system.
However, Columbia Property Trust still had
room for improvement. With aspirations of
achieving even greater energy efficiency,
the senior property manager approached
the McKenney’s Automation & Control

To ensure the solution was as effective as
possible for the company, the McKenney’s
ACS team installed CO2 monitors in the
building, added custom programming
for certain aspects of the project and

The content of this document is not intended as an endorsement.

For more information contact McKenney’s at 404-622-5000.
info@mckenneys.com   www.mckenneys.com
McKenney’s, Inc.    1056 Moreland Industrial Boulevard, Atlanta, Georgia 30316

Project Team
žž Owner: Columbia Property Trust
žž General Contractor:
McKenney’s, Inc.
The Challenge
žž Provide energy-saving
solutions with quick ROI
žž Maintain tenant comfort
žž Comply with ASHRAE standards
The Solution
žž Introduced DCV system to monitor
outside air entering building
žž Installed CO2 monitors
žž Custom programming and
r
­ eprogramming of controls
The Results
žž Average of 65,000 kWh per
month energy usage reduction
žž Solutions meet ASHRAE standards
žž ROI was less than four months
žž Comfortable and healthy
e
­ nvironment for tenants
r
­ eprogrammed the existing controls system
to effectively integrate the DCV solution.
Since installing the DCV system, the load on
the building’s HVAC system has been substantially reduced by an estimated 70 tons
on a 70-degree day. In turn, this solution
lowered the energy usage for the building
by an average of 65,000 kWh per month
since installation while maintaining a comfortable environment for tenants. The DCV
solution also achieved a quick return on
investment (ROI) of less than four months.

Copyright © 2013 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.

Mais conteúdo relacionado

Mais procurados

Audit Funding Program Update
Audit Funding Program UpdateAudit Funding Program Update
Audit Funding Program UpdateAnne Patenaude
 
Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NC
Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NCBuilding Goodwill Under Pressure - HVAC Rebuild in Charlotte, NC
Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NCMcKenney's Inc
 
Avanceon's Energy Management Solutions at work at Engro Fertilizer
Avanceon's Energy Management Solutions at work at Engro FertilizerAvanceon's Energy Management Solutions at work at Engro Fertilizer
Avanceon's Energy Management Solutions at work at Engro FertilizerAvanceon
 
Designing a gas program impact evaluation
Designing a gas program impact evaluationDesigning a gas program impact evaluation
Designing a gas program impact evaluationZondits
 
Energy Services Contractors - A Case Study in Energy Efficiency
Energy Services Contractors - A Case Study in Energy EfficiencyEnergy Services Contractors - A Case Study in Energy Efficiency
Energy Services Contractors - A Case Study in Energy EfficiencyMcKenney's Inc
 
An Educated Approach to HVAC
An Educated Approach to HVACAn Educated Approach to HVAC
An Educated Approach to HVACMcKenney's Inc
 
Energy Sustainability on Campus
Energy Sustainability on CampusEnergy Sustainability on Campus
Energy Sustainability on CampusPulse Energy
 
Project Fact Sheet_Final Dec 2 2013PDF
Project Fact Sheet_Final Dec 2 2013PDFProject Fact Sheet_Final Dec 2 2013PDF
Project Fact Sheet_Final Dec 2 2013PDFMichael Slowik
 
2012 Latin American HSE Conference - Cambe Site_v0
2012 Latin American HSE Conference - Cambe Site_v02012 Latin American HSE Conference - Cambe Site_v0
2012 Latin American HSE Conference - Cambe Site_v0Marcelo Costa
 
Deep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit: Deep Retrofits across Europe,Passive House InstituteDeep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit: Deep Retrofits across Europe,Passive House InstituteSustainableEnergyAut
 
Case Study: Johnson Controls and Optimum Energy
Case Study: Johnson Controls and Optimum EnergyCase Study: Johnson Controls and Optimum Energy
Case Study: Johnson Controls and Optimum EnergyOptimum Energy
 
Measuring Energy and Occupant Satisfaction, a Evidence Based Design Presentation
Measuring Energy and Occupant Satisfaction, a Evidence Based Design PresentationMeasuring Energy and Occupant Satisfaction, a Evidence Based Design Presentation
Measuring Energy and Occupant Satisfaction, a Evidence Based Design Presentationscott shell
 
Paul Southall's CP2 Presentation
Paul Southall's CP2 PresentationPaul Southall's CP2 Presentation
Paul Southall's CP2 PresentationSimon Owen FIRP
 
The Role of Incentives in Advancing Energy Efficiency Initiatives
The Role of Incentives in Advancing Energy Efficiency InitiativesThe Role of Incentives in Advancing Energy Efficiency Initiatives
The Role of Incentives in Advancing Energy Efficiency InitiativesAnne Patenaude
 
Energy management – leading by example
Energy management – leading by exampleEnergy management – leading by example
Energy management – leading by exampleTNenergy
 
Beyond Buildings: How to Incorporate Behavior Modification into Whole-House E...
Beyond Buildings: How to Incorporate Behavior Modification into Whole-House E...Beyond Buildings: How to Incorporate Behavior Modification into Whole-House E...
Beyond Buildings: How to Incorporate Behavior Modification into Whole-House E...Chris White
 
Martin Orio - Water Energy - Ground source heat pump growth opportunities in ...
Martin Orio - Water Energy - Ground source heat pump growth opportunities in ...Martin Orio - Water Energy - Ground source heat pump growth opportunities in ...
Martin Orio - Water Energy - Ground source heat pump growth opportunities in ...Christopher Williams
 

Mais procurados (20)

Audit Funding Program Update
Audit Funding Program UpdateAudit Funding Program Update
Audit Funding Program Update
 
Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NC
Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NCBuilding Goodwill Under Pressure - HVAC Rebuild in Charlotte, NC
Building Goodwill Under Pressure - HVAC Rebuild in Charlotte, NC
 
Avanceon's Energy Management Solutions at work at Engro Fertilizer
Avanceon's Energy Management Solutions at work at Engro FertilizerAvanceon's Energy Management Solutions at work at Engro Fertilizer
Avanceon's Energy Management Solutions at work at Engro Fertilizer
 
Designing a gas program impact evaluation
Designing a gas program impact evaluationDesigning a gas program impact evaluation
Designing a gas program impact evaluation
 
Energy Services Contractors - A Case Study in Energy Efficiency
Energy Services Contractors - A Case Study in Energy EfficiencyEnergy Services Contractors - A Case Study in Energy Efficiency
Energy Services Contractors - A Case Study in Energy Efficiency
 
An Educated Approach to HVAC
An Educated Approach to HVACAn Educated Approach to HVAC
An Educated Approach to HVAC
 
Energy Sustainability on Campus
Energy Sustainability on CampusEnergy Sustainability on Campus
Energy Sustainability on Campus
 
Project Fact Sheet_Final Dec 2 2013PDF
Project Fact Sheet_Final Dec 2 2013PDFProject Fact Sheet_Final Dec 2 2013PDF
Project Fact Sheet_Final Dec 2 2013PDF
 
Project report1
Project report1Project report1
Project report1
 
2012 Latin American HSE Conference - Cambe Site_v0
2012 Latin American HSE Conference - Cambe Site_v02012 Latin American HSE Conference - Cambe Site_v0
2012 Latin American HSE Conference - Cambe Site_v0
 
Deep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit: Deep Retrofits across Europe,Passive House InstituteDeep Retrofit: Deep Retrofits across Europe,Passive House Institute
Deep Retrofit: Deep Retrofits across Europe,Passive House Institute
 
Case Study: Johnson Controls and Optimum Energy
Case Study: Johnson Controls and Optimum EnergyCase Study: Johnson Controls and Optimum Energy
Case Study: Johnson Controls and Optimum Energy
 
final new c.v
final new c.vfinal new c.v
final new c.v
 
Measuring Energy and Occupant Satisfaction, a Evidence Based Design Presentation
Measuring Energy and Occupant Satisfaction, a Evidence Based Design PresentationMeasuring Energy and Occupant Satisfaction, a Evidence Based Design Presentation
Measuring Energy and Occupant Satisfaction, a Evidence Based Design Presentation
 
Paul Southall's CP2 Presentation
Paul Southall's CP2 PresentationPaul Southall's CP2 Presentation
Paul Southall's CP2 Presentation
 
Part l presentation
Part l presentationPart l presentation
Part l presentation
 
The Role of Incentives in Advancing Energy Efficiency Initiatives
The Role of Incentives in Advancing Energy Efficiency InitiativesThe Role of Incentives in Advancing Energy Efficiency Initiatives
The Role of Incentives in Advancing Energy Efficiency Initiatives
 
Energy management – leading by example
Energy management – leading by exampleEnergy management – leading by example
Energy management – leading by example
 
Beyond Buildings: How to Incorporate Behavior Modification into Whole-House E...
Beyond Buildings: How to Incorporate Behavior Modification into Whole-House E...Beyond Buildings: How to Incorporate Behavior Modification into Whole-House E...
Beyond Buildings: How to Incorporate Behavior Modification into Whole-House E...
 
Martin Orio - Water Energy - Ground source heat pump growth opportunities in ...
Martin Orio - Water Energy - Ground source heat pump growth opportunities in ...Martin Orio - Water Energy - Ground source heat pump growth opportunities in ...
Martin Orio - Water Energy - Ground source heat pump growth opportunities in ...
 

Semelhante a DCV Cuts HVAC Load 65kWh/Mo

Mastering a New System - IEC HVAC Installation
Mastering a New System - IEC HVAC InstallationMastering a New System - IEC HVAC Installation
Mastering a New System - IEC HVAC InstallationMcKenney's Inc
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedEECO2
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionKeith Beattie
 
Fast Track to Energy Savings
Fast Track to Energy SavingsFast Track to Energy Savings
Fast Track to Energy SavingsMcKenney's Inc
 
Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010Hayley Pallister
 
An Efficient, Non-invasive Relocation
An Efficient, Non-invasive RelocationAn Efficient, Non-invasive Relocation
An Efficient, Non-invasive RelocationMcKenney's Inc
 
Energy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial BuildingsEnergy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial BuildingsEnercare Inc.
 
Validating Energy Savings
Validating Energy SavingsValidating Energy Savings
Validating Energy SavingsMcKenney's Inc
 
Retrocommissioning Gets Results
Retrocommissioning Gets ResultsRetrocommissioning Gets Results
Retrocommissioning Gets ResultsMcKenney's Inc
 
Conserving Energy One Step at a Time
Conserving Energy One Step at a TimeConserving Energy One Step at a Time
Conserving Energy One Step at a TimeMcKenney's Inc
 
EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016Dennis Cody
 
Retrocommissioning (RCx) Services to Optimize Building Performance
Retrocommissioning (RCx) Services to Optimize Building PerformanceRetrocommissioning (RCx) Services to Optimize Building Performance
Retrocommissioning (RCx) Services to Optimize Building PerformanceMcKenney's Inc
 
Sbai value of commissioning
Sbai value of commissioningSbai value of commissioning
Sbai value of commissioningjeff_ranson
 
Kimberly-Clark Case Study
Kimberly-Clark Case StudyKimberly-Clark Case Study
Kimberly-Clark Case StudyApril Rogers
 
Retrocommissioning Heightens Efficiency
Retrocommissioning Heightens EfficiencyRetrocommissioning Heightens Efficiency
Retrocommissioning Heightens EfficiencyMcKenney's Inc
 
Embracing Green Building Principles
Embracing Green Building PrinciplesEmbracing Green Building Principles
Embracing Green Building PrinciplesMcKenney's Inc
 
05_GMR Hyderabad International Airport.pdf
05_GMR Hyderabad International Airport.pdf05_GMR Hyderabad International Airport.pdf
05_GMR Hyderabad International Airport.pdfshiv53296
 

Semelhante a DCV Cuts HVAC Load 65kWh/Mo (20)

Mastering a New System - IEC HVAC Installation
Mastering a New System - IEC HVAC InstallationMastering a New System - IEC HVAC Installation
Mastering a New System - IEC HVAC Installation
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy Limited
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reduction
 
Fast Track to Energy Savings
Fast Track to Energy SavingsFast Track to Energy Savings
Fast Track to Energy Savings
 
Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010
 
Integrative Design Working With Your Mep
Integrative Design Working With Your MepIntegrative Design Working With Your Mep
Integrative Design Working With Your Mep
 
Innovations in Multifamily Building Energy Savings
Innovations in Multifamily Building Energy SavingsInnovations in Multifamily Building Energy Savings
Innovations in Multifamily Building Energy Savings
 
An Efficient, Non-invasive Relocation
An Efficient, Non-invasive RelocationAn Efficient, Non-invasive Relocation
An Efficient, Non-invasive Relocation
 
Energy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial BuildingsEnergy Management Strategies for MURB & Commercial Buildings
Energy Management Strategies for MURB & Commercial Buildings
 
Validating Energy Savings
Validating Energy SavingsValidating Energy Savings
Validating Energy Savings
 
Retrocommissioning Gets Results
Retrocommissioning Gets ResultsRetrocommissioning Gets Results
Retrocommissioning Gets Results
 
Conserving Energy One Step at a Time
Conserving Energy One Step at a TimeConserving Energy One Step at a Time
Conserving Energy One Step at a Time
 
122845 Brochure Industrial Binded
122845 Brochure Industrial Binded122845 Brochure Industrial Binded
122845 Brochure Industrial Binded
 
EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016
 
Retrocommissioning (RCx) Services to Optimize Building Performance
Retrocommissioning (RCx) Services to Optimize Building PerformanceRetrocommissioning (RCx) Services to Optimize Building Performance
Retrocommissioning (RCx) Services to Optimize Building Performance
 
Sbai value of commissioning
Sbai value of commissioningSbai value of commissioning
Sbai value of commissioning
 
Kimberly-Clark Case Study
Kimberly-Clark Case StudyKimberly-Clark Case Study
Kimberly-Clark Case Study
 
Retrocommissioning Heightens Efficiency
Retrocommissioning Heightens EfficiencyRetrocommissioning Heightens Efficiency
Retrocommissioning Heightens Efficiency
 
Embracing Green Building Principles
Embracing Green Building PrinciplesEmbracing Green Building Principles
Embracing Green Building Principles
 
05_GMR Hyderabad International Airport.pdf
05_GMR Hyderabad International Airport.pdf05_GMR Hyderabad International Airport.pdf
05_GMR Hyderabad International Airport.pdf
 

Mais de McKenney's Inc

CRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GACRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GAMcKenney's Inc
 
Mission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMcKenney's Inc
 
Generating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit ProjectGenerating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit ProjectMcKenney's Inc
 
Performing a Cooling Transplant in Braselton, Georgia
Performing a Cooling Transplant in Braselton, GeorgiaPerforming a Cooling Transplant in Braselton, Georgia
Performing a Cooling Transplant in Braselton, GeorgiaMcKenney's Inc
 
Lab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory RenovationLab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory RenovationMcKenney's Inc
 
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingBlowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingMcKenney's Inc
 
Design/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GADesign/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GAMcKenney's Inc
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsMcKenney's Inc
 
Keeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementKeeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementMcKenney's Inc
 
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildA Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildMcKenney's Inc
 
Installation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionInstallation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionMcKenney's Inc
 
Covering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationCovering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationMcKenney's Inc
 
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)McKenney's Inc
 
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectTurnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectMcKenney's Inc
 
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney's Inc
 
Efficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingEfficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingMcKenney's Inc
 
Plumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsPlumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsMcKenney's Inc
 
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney's Inc
 
Creating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationCreating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationMcKenney's Inc
 
A Greener Hospital by Design
A Greener Hospital by DesignA Greener Hospital by Design
A Greener Hospital by DesignMcKenney's Inc
 

Mais de McKenney's Inc (20)

CRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GACRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GA
 
Mission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NC
 
Generating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit ProjectGenerating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit Project
 
Performing a Cooling Transplant in Braselton, Georgia
Performing a Cooling Transplant in Braselton, GeorgiaPerforming a Cooling Transplant in Braselton, Georgia
Performing a Cooling Transplant in Braselton, Georgia
 
Lab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory RenovationLab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory Renovation
 
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingBlowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
 
Design/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GADesign/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GA
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems Projects
 
Keeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementKeeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems Replacement
 
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildA Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
 
Installation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionInstallation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality Construction
 
Covering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationCovering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems Installation
 
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
 
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectTurnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
 
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
 
Efficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingEfficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate Harvesting
 
Plumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsPlumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial Buildings
 
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
 
Creating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationCreating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems Installation
 
A Greener Hospital by Design
A Greener Hospital by DesignA Greener Hospital by Design
A Greener Hospital by Design
 

Último

Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 

Último (20)

Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 

DCV Cuts HVAC Load 65kWh/Mo

  • 1. PROJECT HIGHLIGHTS Demand Control Ventilation Reduces HVAC Load, Saves Costs C olumbia Property Trust has had a longtime commitment to ­ ustainable practices that s maximize energy efficiency and reduce e ­ nvironmental impact on the community. Its 14-story, 353,000-square-foot suburban S ­ olutions (ACS) team for insight and r ­ ecommendations to improve its HVAC ­system efficiency. After thoroughly reviewing the facility, M ­ cKenney’s recommended an innovative approach to monitor and adjust the building’s outside air ventilation levels based on ASHRAE 90.1 standards. The solution involved introducing Demand Control Ventilation (DCV) to monitor the amount of outside air entering the building based on carbon dioxide (CO2) concentrations. CO2 levels continuously fluctuate in a building as its ­population changes. DCV continuously monitors each floor in a building and automatically adjusts outside air ventilation rates. This is achieved by using controls Photo courtesy of Columbia Property Trust and variable frequency drive (VFD) office building in Atlanta had already technology as needed, while still meeting ® achieved ENERGY STAR certification and ASHRAE ventilation standards. By optimizing consistently maintained a score of 87, the amount of outside air coming into the p ­ utting the ­ tructure in the top tier of the s building, there is less air that has to be 15 percent most energy-efficient buildings heated or cooled, resulting in a reduced in the U.S. load on the HVAC system. However, Columbia Property Trust still had room for improvement. With aspirations of achieving even greater energy efficiency, the senior property manager approached the McKenney’s Automation & Control To ensure the solution was as effective as possible for the company, the McKenney’s ACS team installed CO2 monitors in the building, added custom programming for certain aspects of the project and The content of this document is not intended as an endorsement. For more information contact McKenney’s at 404-622-5000. info@mckenneys.com   www.mckenneys.com McKenney’s, Inc.    1056 Moreland Industrial Boulevard, Atlanta, Georgia 30316 Project Team žž Owner: Columbia Property Trust žž General Contractor: McKenney’s, Inc. The Challenge žž Provide energy-saving solutions with quick ROI žž Maintain tenant comfort žž Comply with ASHRAE standards The Solution žž Introduced DCV system to monitor outside air entering building žž Installed CO2 monitors žž Custom programming and r ­ eprogramming of controls The Results žž Average of 65,000 kWh per month energy usage reduction žž Solutions meet ASHRAE standards žž ROI was less than four months žž Comfortable and healthy e ­ nvironment for tenants r ­ eprogrammed the existing controls system to effectively integrate the DCV solution. Since installing the DCV system, the load on the building’s HVAC system has been substantially reduced by an estimated 70 tons on a 70-degree day. In turn, this solution lowered the energy usage for the building by an average of 65,000 kWh per month since installation while maintaining a comfortable environment for tenants. The DCV solution also achieved a quick return on investment (ROI) of less than four months. Copyright © 2013 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.