BPP3613
STAKEHOLDER MANAGEMENT
BACKGROUND OF SUCCESFUL PROJECT
               (BEIJING NATIONAL STADIUM)

 The stadium was designed for use throughout the 2008 Summer Olympics and
  Paralympics.

 The capacity for this stadium can support 91,000 people.

 This project started on 24 December 2003 and opened officially on 28 June 2008.
 The stadium cost US$423 million and it’s located at Olympic, Green

 The facilities that include :
   • grass field of 7,811 square meters
   • 91,000 seat
   • Temperature and airflow of every surface were optimized
   • A shopping mall
Factor of succesfully in the implementation of stakeholder management
    The great transformation
      – Every sub project that handle from the worldwide succesfully construction
        company.

       – For example :

                  Project        Architectural firm     Estimated cost
             National Theater       Paul Andreu        US$350,000,000
                                      (France)
             National Stadium   Herzog & De            US$400,000,000
                                Meuron
                                (Switzerland)
              National Swim     PTW (Australia)        US$100,000,000
                 Center



       –
The price of olympic fame :

a) The bulk of Beijing's Olympics funds will come from the sale of sponsorship
   and broadcasting rights for the Games

b) Build-operate-transfer system, where private investors responsible for
   overseeing construction become operators for a 30-year contract period
BACKGROUND OF THE PROJECT
                           FAILURE

 Sultan Mizan Zainal Abidin Stadium also known as stadium gong badak in
  Terengganu.
 constructed by a South Korean construction firm
 owner by Terengganu State Government
 capacity 50,000 people.
 Construction cost is RM 270 million
 Duration of construction within 4 years (2006-2008)
PURPOSE
 Sport complex mostly for football.
 first major use was as the main venue for Sukma Games 2008

                              CAUSE OF PROJECT FAILURE

The major cause for the collapse of the roof was identified to be the design fault and
inappropriate material
 the project management team did not have the necessary skills and competence
  to manage a project of such magnitude and complexity.
 The faulty design with failure to take into account the support condition of the
  roof structure.
 Failed to conduct a design analysis, considering that the complex architectural
  shape and large spans made the structure very sensitive to any movement in the
  supporting structures.
 The undesirable manner in which the structure was erected and that no checks
  were done during the erection process.
PROJECT
FAILURE
BACKGROUND OF THE PROJECT
• Sultan Mizan Zainal Abidin Stadium also known as
  stadium gong badak in Terengganu.
• constructed by a South Korean construction firm
• owner by Terengganu State Government
• capacity 50,000 people.
• Construction cost is RM 270 million
• Duration of construction within 4 years (2006-2008)
purpose
• Sport complex mostly for football.
• first major use was as the main venue
  for Sukma Games 2008
Cause of project failure
The major cause for the collapse of the roof was identified to
be the design fault and inappropriate material.
• the project management team did not have the necessary
  skills and competence to manage a project of such magnitude
  and complexity.
• The faulty design with failure to take into account the support
  condition of the roof structure.
• Failed to conduct a design analysis, considering that the
  complex architectural shape and large spans made the
  structure very sensitive to any movement in the supporting
  structures.
• The undesirable manner in which the structure was erected
  and that no checks were done during the erection process.

Mais conteúdo relacionado

Mais procurados

Wind resistant structures
Wind resistant structuresWind resistant structures
Wind resistant structures
dmolik
 

Mais procurados (20)

Intelligent building
Intelligent buildingIntelligent building
Intelligent building
 
Architecture Culture & History 2 Project 2 Report
Architecture Culture & History 2 Project 2 ReportArchitecture Culture & History 2 Project 2 Report
Architecture Culture & History 2 Project 2 Report
 
Leaning Tower Pisa
Leaning Tower PisaLeaning Tower Pisa
Leaning Tower Pisa
 
Wind resistant structures
Wind resistant structuresWind resistant structures
Wind resistant structures
 
BS M'sia
BS M'siaBS M'sia
BS M'sia
 
A brief background & development history on klcc
A brief background & development history on klccA brief background & development history on klcc
A brief background & development history on klcc
 
Menara Dayabumi Analysis Report
Menara Dayabumi Analysis ReportMenara Dayabumi Analysis Report
Menara Dayabumi Analysis Report
 
Petronas twin towers malaysia
Petronas twin towers malaysiaPetronas twin towers malaysia
Petronas twin towers malaysia
 
Case Study on Belum Rainforest Resort, Malaysia
Case Study on Belum Rainforest Resort, MalaysiaCase Study on Belum Rainforest Resort, Malaysia
Case Study on Belum Rainforest Resort, Malaysia
 
Blockwork system
Blockwork systemBlockwork system
Blockwork system
 
Theorizing Architecture : Putrajaya International Convention Centre
Theorizing Architecture : Putrajaya International Convention CentreTheorizing Architecture : Putrajaya International Convention Centre
Theorizing Architecture : Putrajaya International Convention Centre
 
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAHOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
 
Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study
 
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
 
Petronas tower - Malaysia (Theory of Structures)
Petronas tower - Malaysia  (Theory of Structures)Petronas tower - Malaysia  (Theory of Structures)
Petronas tower - Malaysia (Theory of Structures)
 
Culture project-ii-finalized
Culture project-ii-finalizedCulture project-ii-finalized
Culture project-ii-finalized
 
National mosque malaysia
National mosque malaysiaNational mosque malaysia
National mosque malaysia
 
Project of traditional Malay house
Project of traditional Malay houseProject of traditional Malay house
Project of traditional Malay house
 
Report of National Mosque, KL
Report of National Mosque, KLReport of National Mosque, KL
Report of National Mosque, KL
 
Passive Design Strategies, Teksing BambooWood School, Kavre, Nepal
Passive Design Strategies, Teksing BambooWood School, Kavre, NepalPassive Design Strategies, Teksing BambooWood School, Kavre, Nepal
Passive Design Strategies, Teksing BambooWood School, Kavre, Nepal
 

Semelhante a Pp success n failure project

CAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfCAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdf
AlasAlthaher
 
Marina barrage (09/10s2)
Marina barrage (09/10s2)Marina barrage (09/10s2)
Marina barrage (09/10s2)
gn022010sem1
 
Building economic
Building economicBuilding economic
Building economic
tfkc1212
 
Construction technology i singapore gold sand marina bay hotel
Construction technology i   singapore gold sand marina bay hotelConstruction technology i   singapore gold sand marina bay hotel
Construction technology i singapore gold sand marina bay hotel
Yo Ksen
 
Construction technology i singapore gold sand marina bay hotel
Construction technology i   singapore gold sand marina bay hotelConstruction technology i   singapore gold sand marina bay hotel
Construction technology i singapore gold sand marina bay hotel
마 이환
 

Semelhante a Pp success n failure project (20)

Beijing national stadium -The Bird's nest - Presentation group.pptx
Beijing national stadium -The Bird's nest - Presentation group.pptxBeijing national stadium -The Bird's nest - Presentation group.pptx
Beijing national stadium -The Bird's nest - Presentation group.pptx
 
case study of shanghai world finance centre.
case study of shanghai world finance centre.case study of shanghai world finance centre.
case study of shanghai world finance centre.
 
IRJET- Case Study on Beijing National Stadium : Bird Nest Olympic Stadium
IRJET- Case Study on Beijing National Stadium : Bird Nest Olympic StadiumIRJET- Case Study on Beijing National Stadium : Bird Nest Olympic Stadium
IRJET- Case Study on Beijing National Stadium : Bird Nest Olympic Stadium
 
Sports Hub Project
Sports Hub ProjectSports Hub Project
Sports Hub Project
 
Stadiums That Changed The Game - Structure Development Of Stadiums
Stadiums That Changed The Game - Structure Development Of StadiumsStadiums That Changed The Game - Structure Development Of Stadiums
Stadiums That Changed The Game - Structure Development Of Stadiums
 
Project Management - Marina bay Sands
Project Management - Marina bay SandsProject Management - Marina bay Sands
Project Management - Marina bay Sands
 
CAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfCAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdf
 
Shell structure
Shell structureShell structure
Shell structure
 
LHP PROJECT.pdf
LHP PROJECT.pdfLHP PROJECT.pdf
LHP PROJECT.pdf
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
 
Capital gate abu dhabi
Capital gate abu dhabiCapital gate abu dhabi
Capital gate abu dhabi
 
Shanghai World Financial Center
Shanghai World Financial CenterShanghai World Financial Center
Shanghai World Financial Center
 
Marina barrage (09/10s2)
Marina barrage (09/10s2)Marina barrage (09/10s2)
Marina barrage (09/10s2)
 
sandy batch.pptx
sandy batch.pptxsandy batch.pptx
sandy batch.pptx
 
IABSE 2002
IABSE 2002IABSE 2002
IABSE 2002
 
Building economic
Building economicBuilding economic
Building economic
 
Stadium Negara Culture report
Stadium Negara Culture report Stadium Negara Culture report
Stadium Negara Culture report
 
Beijing National Stadium (China)
Beijing National Stadium (China)Beijing National Stadium (China)
Beijing National Stadium (China)
 
Construction technology i singapore gold sand marina bay hotel
Construction technology i   singapore gold sand marina bay hotelConstruction technology i   singapore gold sand marina bay hotel
Construction technology i singapore gold sand marina bay hotel
 
Construction technology i singapore gold sand marina bay hotel
Construction technology i   singapore gold sand marina bay hotelConstruction technology i   singapore gold sand marina bay hotel
Construction technology i singapore gold sand marina bay hotel
 

Último

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Último (20)

Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 

Pp success n failure project

  • 2. BACKGROUND OF SUCCESFUL PROJECT (BEIJING NATIONAL STADIUM)  The stadium was designed for use throughout the 2008 Summer Olympics and Paralympics.  The capacity for this stadium can support 91,000 people.  This project started on 24 December 2003 and opened officially on 28 June 2008.  The stadium cost US$423 million and it’s located at Olympic, Green  The facilities that include : • grass field of 7,811 square meters • 91,000 seat • Temperature and airflow of every surface were optimized • A shopping mall
  • 3. Factor of succesfully in the implementation of stakeholder management  The great transformation – Every sub project that handle from the worldwide succesfully construction company. – For example : Project Architectural firm Estimated cost National Theater Paul Andreu US$350,000,000 (France) National Stadium Herzog & De US$400,000,000 Meuron (Switzerland) National Swim PTW (Australia) US$100,000,000 Center –
  • 4. The price of olympic fame : a) The bulk of Beijing's Olympics funds will come from the sale of sponsorship and broadcasting rights for the Games b) Build-operate-transfer system, where private investors responsible for overseeing construction become operators for a 30-year contract period
  • 5. BACKGROUND OF THE PROJECT FAILURE  Sultan Mizan Zainal Abidin Stadium also known as stadium gong badak in Terengganu.  constructed by a South Korean construction firm  owner by Terengganu State Government  capacity 50,000 people.  Construction cost is RM 270 million  Duration of construction within 4 years (2006-2008)
  • 6. PURPOSE  Sport complex mostly for football.  first major use was as the main venue for Sukma Games 2008 CAUSE OF PROJECT FAILURE The major cause for the collapse of the roof was identified to be the design fault and inappropriate material  the project management team did not have the necessary skills and competence to manage a project of such magnitude and complexity.  The faulty design with failure to take into account the support condition of the roof structure.  Failed to conduct a design analysis, considering that the complex architectural shape and large spans made the structure very sensitive to any movement in the supporting structures.  The undesirable manner in which the structure was erected and that no checks were done during the erection process.
  • 8. BACKGROUND OF THE PROJECT • Sultan Mizan Zainal Abidin Stadium also known as stadium gong badak in Terengganu. • constructed by a South Korean construction firm • owner by Terengganu State Government • capacity 50,000 people. • Construction cost is RM 270 million • Duration of construction within 4 years (2006-2008)
  • 9. purpose • Sport complex mostly for football. • first major use was as the main venue for Sukma Games 2008
  • 10. Cause of project failure The major cause for the collapse of the roof was identified to be the design fault and inappropriate material. • the project management team did not have the necessary skills and competence to manage a project of such magnitude and complexity. • The faulty design with failure to take into account the support condition of the roof structure. • Failed to conduct a design analysis, considering that the complex architectural shape and large spans made the structure very sensitive to any movement in the supporting structures. • The undesirable manner in which the structure was erected and that no checks were done during the erection process.