Presentation Highlights
1. “Was Rio+20 a success or a failure?”
2. Outcomes of Rio+20
3. Entry points post-Rio to post-2015
4. The Event
5. Stakeholder Consultation Initial Findings
Success or Failure?
• “Was Rio+20 a success or a failure?”
  – Simplistic and reductive
  – The answer is nuanced, therefore more than a
    superficial assessment is needed
  – Successes and failures must be itemised
  – Rio+20 was the starting point of various processes
     • Not an ending point
• Time will be the truest judge of Rio+20.
• But as we are sitting on a socio-ecological
  time bomb, time is not on our side.
Rio+20 Successes
• Para 47 – Corporate sustainability reporting
• Paras 56-74 – The Green Economy
• Paras 84-86 – Establish the high-level political
  forum (HLPF)
• Paras 88-90 – Strengthen UNEP
• Para 121 – Right to water and sanitation
• Para 226 – Adopt 10YFP on SCP
• Paras 245-251 – Establish SDGs
• Para 255 – Mobilisation of resources and finance
• Paras 48, 76, 85, 88, 204 and 276 – Strengthen
  the science-policy interface
• Paras 42-55 – Importance of participation and
  stakeholder engagement
Rio+20 Failures
• Water and Sanitation – Reaffirms commitments which
  were not universally agreed, rather than the right itself.
• Population - The right to reproductive health was removed
  due to effective lobbying.
• Subsidies – Failure to develop an action plan for
  eliminating environmentally harmful subsidies (such as
  fossil fuels).
• Implementation – Means of implementation (Section VI)
  remains weak and lacks specific measures and actions.
• Environmental Limits – Despite much discussion about
  environmental limits/planetary boundaries, there is no
  clear statement.
• High Commissioner/Ombudsperson for Future
  Generations – This was not an agreed outcome.
• Green Economy – Overall the green economy concept did
  not fare well; no clear definition or principles.
Post-Rio+20 Entry Points
1.    Intergovernmental SDG Open Working Group by ~2014 - ¶248
2.    Call for integration with post-2015 through UN Task Team - ¶ 249
3.    High level political forum (HLPF) by Sept 2013 - ¶ 84-86
4.    Finance for SD options by 2014 - ¶ 256
5.    Technology transfer recommendations by 2013 - ¶ 273
6.    10YFP on SCP adopted 2012 and to be “operationalised” - ¶ 226
7.    Strengthen UNEP by 2013 (universal membership & secure
      funding) - ¶ 88
8.    Use of oceans beyond national jurisdictions 2015 - ¶ 161 & 162
9.    Beyond GDP - ¶ 38
10.   Registry of voluntary commitments - ¶ 283
11.   Green economy policies - ¶ 56-74
12.   Integration of 3 dimensions of SD across UN - ¶ 93
13.   SG report on Future Generation/Intergenerational Solidarity
14.   SG’s Zero Hunger challenge
15.   Volunteers for SD
The Event
• Purpose: Identify entry points for stakeholders post-Rio;
  develop recommendations on how to actualize multi-
  stakeholder engagement in these processes and subsequent
  fora.
• Outcomes: Better informed stakeholder advocacy
  (moblisation and messages) aimed at decision-makers, and
  the integration of post-Rio(SDGs) and post-2015 (MDGs)
  processes with sustainable development at the heart.
• Outputs:
   – A co-chairs’ statement;
   – Recommendations and messages to UNEP Governing Council
     in February 2013 and to CSD 20 in May 2013;
   – A special edition of ‘Outreach’ capturing event outcomes for a
     wider audience;
   – Consultation Report.
Consultation Findings – Highlights

• 231 responses, mainly from the 9 Major Groups.
• 61% of respondents believe the Rio+20
  conference improved stakeholder engagement.
• 84% of respondents find it important for Major
  Groups and other stakeholders to develop
  common positions on post-Rio/post-2015
  processes.
Consultation Findings – Lowlights
• 66% of respondents believe Major Groups and
  Stakeholders need more financial support from
  the UN system to implement the Rio+20
  outcomes.
• A lack of access for Major Groups and
  stakeholders to the formal negotiations was
  widely cited as a barrier to participatory decision-
  making and a factor of the sub-optimal Rio+20
  outcome.
Consultation Findings – Thematic Areas
• The deregulation of markets and heavy emphasis
  on GDP as the measurement of social progress
  are widely perceived to be the barriers to
  implementation of national green economies.
• Widely agreed that the SDGs should be global in
  nature and universal in application.
• SDGs should incorporate the Rio Principles and
  be integrated with the MDGs.

Mais conteúdo relacionado

Destaque

George Washington University - Next Generation of modeling and Solving Tools
George Washington University - Next Generation of modeling and Solving ToolsGeorge Washington University - Next Generation of modeling and Solving Tools
George Washington University - Next Generation of modeling and Solving ToolsAlkis Vazacopoulos
 
Quiz passive voice (fatima, laura, gemma & katia)
Quiz passive voice (fatima, laura, gemma & katia)Quiz passive voice (fatima, laura, gemma & katia)
Quiz passive voice (fatima, laura, gemma & katia)eso1113enricborras
 
training-lotus
training-lotustraining-lotus
training-lotusNeo Neo
 
Word by word_clara and kholoud
Word by word_clara and kholoudWord by word_clara and kholoud
Word by word_clara and kholoudeso1113enricborras
 
Chronological Decomposition Heuristic: A Temporal Divide-and-Conquer Strateg...
Chronological Decomposition Heuristic:  A Temporal Divide-and-Conquer Strateg...Chronological Decomposition Heuristic:  A Temporal Divide-and-Conquer Strateg...
Chronological Decomposition Heuristic: A Temporal Divide-and-Conquer Strateg...Alkis Vazacopoulos
 
Session 13 case study & i pad use(1)
Session 13 case study & i pad use(1)Session 13 case study & i pad use(1)
Session 13 case study & i pad use(1)emsiau
 
Контент и конверсионный трафик. Взаимное влияние
Контент и конверсионный трафик. Взаимное влияниеКонтент и конверсионный трафик. Взаимное влияние
Контент и конверсионный трафик. Взаимное влияниеАнастасия Эебердиева
 
Kredyty, pozyczki, banki Gdansk 2012 poradnik
Kredyty, pozyczki, banki Gdansk 2012 poradnikKredyty, pozyczki, banki Gdansk 2012 poradnik
Kredyty, pozyczki, banki Gdansk 2012 poradnikAnnkopyttko
 
Technology and education 1.ppt
Technology and education 1.pptTechnology and education 1.ppt
Technology and education 1.pptchipstrahm
 
Презентація команди Васильківського НВК № 4
Презентація команди Васильківського НВК № 4Презентація команди Васильківського НВК № 4
Презентація команди Васильківського НВК № 408600 Vasilkov
 
11108135 王尉真
11108135 王尉真11108135 王尉真
11108135 王尉真真 尉
 
санкт петербург
санкт петербургсанкт петербург
санкт петербург0610elena
 

Destaque (20)

PEDAGOGIA INNOVADORA
PEDAGOGIA INNOVADORAPEDAGOGIA INNOVADORA
PEDAGOGIA INNOVADORA
 
George Washington University - Next Generation of modeling and Solving Tools
George Washington University - Next Generation of modeling and Solving ToolsGeorge Washington University - Next Generation of modeling and Solving Tools
George Washington University - Next Generation of modeling and Solving Tools
 
Quiz passive voice (fatima, laura, gemma & katia)
Quiz passive voice (fatima, laura, gemma & katia)Quiz passive voice (fatima, laura, gemma & katia)
Quiz passive voice (fatima, laura, gemma & katia)
 
training-lotus
training-lotustraining-lotus
training-lotus
 
Complete ERP System
Complete ERP SystemComplete ERP System
Complete ERP System
 
Password melany cristina lara
Password melany cristina laraPassword melany cristina lara
Password melany cristina lara
 
Word by word_clara and kholoud
Word by word_clara and kholoudWord by word_clara and kholoud
Word by word_clara and kholoud
 
Research Project Report
Research Project ReportResearch Project Report
Research Project Report
 
5 a
5 a5 a
5 a
 
Chronological Decomposition Heuristic: A Temporal Divide-and-Conquer Strateg...
Chronological Decomposition Heuristic:  A Temporal Divide-and-Conquer Strateg...Chronological Decomposition Heuristic:  A Temporal Divide-and-Conquer Strateg...
Chronological Decomposition Heuristic: A Temporal Divide-and-Conquer Strateg...
 
Session 13 case study & i pad use(1)
Session 13 case study & i pad use(1)Session 13 case study & i pad use(1)
Session 13 case study & i pad use(1)
 
Planuling & Phasing
Planuling & PhasingPlanuling & Phasing
Planuling & Phasing
 
Контент и конверсионный трафик. Взаимное влияние
Контент и конверсионный трафик. Взаимное влияниеКонтент и конверсионный трафик. Взаимное влияние
Контент и конверсионный трафик. Взаимное влияние
 
Kredyty, pozyczki, banki Gdansk 2012 poradnik
Kredyty, pozyczki, banki Gdansk 2012 poradnikKredyty, pozyczki, banki Gdansk 2012 poradnik
Kredyty, pozyczki, banki Gdansk 2012 poradnik
 
Evalucion
EvalucionEvalucion
Evalucion
 
Technology and education 1.ppt
Technology and education 1.pptTechnology and education 1.ppt
Technology and education 1.ppt
 
Mem bhee1
Mem bhee1Mem bhee1
Mem bhee1
 
Презентація команди Васильківського НВК № 4
Презентація команди Васильківського НВК № 4Презентація команди Васильківського НВК № 4
Презентація команди Васильківського НВК № 4
 
11108135 王尉真
11108135 王尉真11108135 王尉真
11108135 王尉真
 
санкт петербург
санкт петербургсанкт петербург
санкт петербург
 

Semelhante a Post-Rio to Post-2015: Planning International Stakeholder Engagement

Chantal Line Carpentier's Post-Rio to Post-2015 presentation
Chantal Line Carpentier's Post-Rio to Post-2015 presentationChantal Line Carpentier's Post-Rio to Post-2015 presentation
Chantal Line Carpentier's Post-Rio to Post-2015 presentationMatthew Reading-Smith
 
Framework for Action: Engaging with the Post Rio+20 and Post-2015 processes
Framework for Action: Engaging with the Post Rio+20 and Post-2015 processesFramework for Action: Engaging with the Post Rio+20 and Post-2015 processes
Framework for Action: Engaging with the Post Rio+20 and Post-2015 processesMatthew Reading-Smith
 
Responsible Business Forum Sustainability Report
Responsible Business Forum Sustainability ReportResponsible Business Forum Sustainability Report
Responsible Business Forum Sustainability ReportGuy Bigwood
 
2021-CEO-Water-Mandate-AGM-Presentation (1).pptx
2021-CEO-Water-Mandate-AGM-Presentation (1).pptx2021-CEO-Water-Mandate-AGM-Presentation (1).pptx
2021-CEO-Water-Mandate-AGM-Presentation (1).pptxKarikalcholan Mayavan
 
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...Iwl Pcu
 
Environmental Reporting - Forests
Environmental Reporting - ForestsEnvironmental Reporting - Forests
Environmental Reporting - ForestsCDSB
 
Summary and recommendations Scale Up Conference
Summary and recommendations Scale Up ConferenceSummary and recommendations Scale Up Conference
Summary and recommendations Scale Up ConferenceICARDA
 
Mandate_-_AP_on_Water_Presentation_(November_2017)_v2.pptx
Mandate_-_AP_on_Water_Presentation_(November_2017)_v2.pptxMandate_-_AP_on_Water_Presentation_(November_2017)_v2.pptx
Mandate_-_AP_on_Water_Presentation_(November_2017)_v2.pptxKarikalcholan Mayavan
 
Preparation of INDCs: Status and challenges
Preparation of INDCs: Status and challengesPreparation of INDCs: Status and challenges
Preparation of INDCs: Status and challengesNewClimate Institute
 
Chapter V secretariat summary
Chapter V secretariat summaryChapter V secretariat summary
Chapter V secretariat summaryuncsd2012
 
Workshop Italia 25 Feb. 2021 - Francesca Recanati | CDSB (ITA)
Workshop Italia 25 Feb. 2021 - Francesca Recanati | CDSB (ITA)Workshop Italia 25 Feb. 2021 - Francesca Recanati | CDSB (ITA)
Workshop Italia 25 Feb. 2021 - Francesca Recanati | CDSB (ITA)CDSB
 
Knowledge and awareness WP7 and Capacity development WP6_steven downey_28 aug
Knowledge and awareness WP7 and Capacity development WP6_steven downey_28 augKnowledge and awareness WP7 and Capacity development WP6_steven downey_28 aug
Knowledge and awareness WP7 and Capacity development WP6_steven downey_28 augGlobal Water Partnership
 
Key messages - The Post-2020 Biodiversity Framework by Francis Ogwal
Key messages - The Post-2020 Biodiversity Framework by Francis OgwalKey messages - The Post-2020 Biodiversity Framework by Francis Ogwal
Key messages - The Post-2020 Biodiversity Framework by Francis OgwalOECD Environment
 
Is LCA ready to answer the growing request of sustainability metrics?
Is LCA ready to answer the growing request of sustainability metrics?Is LCA ready to answer the growing request of sustainability metrics?
Is LCA ready to answer the growing request of sustainability metrics?PaoloMasoni2
 
Roadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECD
Roadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECDRoadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECD
Roadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECDOECD Environment
 
Key Messages from "Improving the Institutional Framework for Sustainable Deve...
Key Messages from "Improving the Institutional Framework for Sustainable Deve...Key Messages from "Improving the Institutional Framework for Sustainable Deve...
Key Messages from "Improving the Institutional Framework for Sustainable Deve...uncsd2012
 
Beyond GDP: international developments and emerging frameworks - 26 September...
Beyond GDP: international developments and emerging frameworks - 26 September...Beyond GDP: international developments and emerging frameworks - 26 September...
Beyond GDP: international developments and emerging frameworks - 26 September...Office for National Statistics
 

Semelhante a Post-Rio to Post-2015: Planning International Stakeholder Engagement (20)

Chantal Line Carpentier's Post-Rio to Post-2015 presentation
Chantal Line Carpentier's Post-Rio to Post-2015 presentationChantal Line Carpentier's Post-Rio to Post-2015 presentation
Chantal Line Carpentier's Post-Rio to Post-2015 presentation
 
Framework for Action: Engaging with the Post Rio+20 and Post-2015 processes
Framework for Action: Engaging with the Post Rio+20 and Post-2015 processesFramework for Action: Engaging with the Post Rio+20 and Post-2015 processes
Framework for Action: Engaging with the Post Rio+20 and Post-2015 processes
 
Responsible Business Forum Sustainability Report
Responsible Business Forum Sustainability ReportResponsible Business Forum Sustainability Report
Responsible Business Forum Sustainability Report
 
2021-CEO-Water-Mandate-AGM-Presentation (1).pptx
2021-CEO-Water-Mandate-AGM-Presentation (1).pptx2021-CEO-Water-Mandate-AGM-Presentation (1).pptx
2021-CEO-Water-Mandate-AGM-Presentation (1).pptx
 
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
 
Environmental Reporting - Forests
Environmental Reporting - ForestsEnvironmental Reporting - Forests
Environmental Reporting - Forests
 
Summary and recommendations Scale Up Conference
Summary and recommendations Scale Up ConferenceSummary and recommendations Scale Up Conference
Summary and recommendations Scale Up Conference
 
Mandate_-_AP_on_Water_Presentation_(November_2017)_v2.pptx
Mandate_-_AP_on_Water_Presentation_(November_2017)_v2.pptxMandate_-_AP_on_Water_Presentation_(November_2017)_v2.pptx
Mandate_-_AP_on_Water_Presentation_(November_2017)_v2.pptx
 
Preparation of INDCs: Status and challenges
Preparation of INDCs: Status and challengesPreparation of INDCs: Status and challenges
Preparation of INDCs: Status and challenges
 
Chapter V secretariat summary
Chapter V secretariat summaryChapter V secretariat summary
Chapter V secretariat summary
 
Workshop Italia 25 Feb. 2021 - Francesca Recanati | CDSB (ITA)
Workshop Italia 25 Feb. 2021 - Francesca Recanati | CDSB (ITA)Workshop Italia 25 Feb. 2021 - Francesca Recanati | CDSB (ITA)
Workshop Italia 25 Feb. 2021 - Francesca Recanati | CDSB (ITA)
 
Measuring the Impact of Investments on Biodiversity
Measuring the Impact of Investments on BiodiversityMeasuring the Impact of Investments on Biodiversity
Measuring the Impact of Investments on Biodiversity
 
Climate Readiness in Smallholder Agricultural Systems
Climate Readiness in Smallholder Agricultural SystemsClimate Readiness in Smallholder Agricultural Systems
Climate Readiness in Smallholder Agricultural Systems
 
Knowledge and awareness WP7 and Capacity development WP6_steven downey_28 aug
Knowledge and awareness WP7 and Capacity development WP6_steven downey_28 augKnowledge and awareness WP7 and Capacity development WP6_steven downey_28 aug
Knowledge and awareness WP7 and Capacity development WP6_steven downey_28 aug
 
Key messages - The Post-2020 Biodiversity Framework by Francis Ogwal
Key messages - The Post-2020 Biodiversity Framework by Francis OgwalKey messages - The Post-2020 Biodiversity Framework by Francis Ogwal
Key messages - The Post-2020 Biodiversity Framework by Francis Ogwal
 
7.1 FOURTH ENVIRONET-WP-STAT JOINT TASK TEAM MEETING
7.1 FOURTH ENVIRONET-WP-STAT JOINT TASK TEAM MEETING7.1 FOURTH ENVIRONET-WP-STAT JOINT TASK TEAM MEETING
7.1 FOURTH ENVIRONET-WP-STAT JOINT TASK TEAM MEETING
 
Is LCA ready to answer the growing request of sustainability metrics?
Is LCA ready to answer the growing request of sustainability metrics?Is LCA ready to answer the growing request of sustainability metrics?
Is LCA ready to answer the growing request of sustainability metrics?
 
Roadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECD
Roadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECDRoadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECD
Roadmap workshop II, Cecilia Tam, Chetna Hareesh Kumar, OECD
 
Key Messages from "Improving the Institutional Framework for Sustainable Deve...
Key Messages from "Improving the Institutional Framework for Sustainable Deve...Key Messages from "Improving the Institutional Framework for Sustainable Deve...
Key Messages from "Improving the Institutional Framework for Sustainable Deve...
 
Beyond GDP: international developments and emerging frameworks - 26 September...
Beyond GDP: international developments and emerging frameworks - 26 September...Beyond GDP: international developments and emerging frameworks - 26 September...
Beyond GDP: international developments and emerging frameworks - 26 September...
 

Post-Rio to Post-2015: Planning International Stakeholder Engagement

  • 1. Post-Rio to Post-2015: Planning International Stakeholder Engagement 20-21 October 2012 Pace University, New York Farooq Ullah Executive Director Stakeholder Forum
  • 2. Presentation Highlights 1. “Was Rio+20 a success or a failure?” 2. Outcomes of Rio+20 3. Entry points post-Rio to post-2015 4. The Event 5. Stakeholder Consultation Initial Findings
  • 3. Success or Failure? • “Was Rio+20 a success or a failure?” – Simplistic and reductive – The answer is nuanced, therefore more than a superficial assessment is needed – Successes and failures must be itemised – Rio+20 was the starting point of various processes • Not an ending point • Time will be the truest judge of Rio+20. • But as we are sitting on a socio-ecological time bomb, time is not on our side.
  • 4. Rio+20 Successes • Para 47 – Corporate sustainability reporting • Paras 56-74 – The Green Economy • Paras 84-86 – Establish the high-level political forum (HLPF) • Paras 88-90 – Strengthen UNEP • Para 121 – Right to water and sanitation • Para 226 – Adopt 10YFP on SCP • Paras 245-251 – Establish SDGs • Para 255 – Mobilisation of resources and finance • Paras 48, 76, 85, 88, 204 and 276 – Strengthen the science-policy interface • Paras 42-55 – Importance of participation and stakeholder engagement
  • 5. Rio+20 Failures • Water and Sanitation – Reaffirms commitments which were not universally agreed, rather than the right itself. • Population - The right to reproductive health was removed due to effective lobbying. • Subsidies – Failure to develop an action plan for eliminating environmentally harmful subsidies (such as fossil fuels). • Implementation – Means of implementation (Section VI) remains weak and lacks specific measures and actions. • Environmental Limits – Despite much discussion about environmental limits/planetary boundaries, there is no clear statement. • High Commissioner/Ombudsperson for Future Generations – This was not an agreed outcome. • Green Economy – Overall the green economy concept did not fare well; no clear definition or principles.
  • 6. Post-Rio+20 Entry Points 1. Intergovernmental SDG Open Working Group by ~2014 - ¶248 2. Call for integration with post-2015 through UN Task Team - ¶ 249 3. High level political forum (HLPF) by Sept 2013 - ¶ 84-86 4. Finance for SD options by 2014 - ¶ 256 5. Technology transfer recommendations by 2013 - ¶ 273 6. 10YFP on SCP adopted 2012 and to be “operationalised” - ¶ 226 7. Strengthen UNEP by 2013 (universal membership & secure funding) - ¶ 88 8. Use of oceans beyond national jurisdictions 2015 - ¶ 161 & 162 9. Beyond GDP - ¶ 38 10. Registry of voluntary commitments - ¶ 283 11. Green economy policies - ¶ 56-74 12. Integration of 3 dimensions of SD across UN - ¶ 93 13. SG report on Future Generation/Intergenerational Solidarity 14. SG’s Zero Hunger challenge 15. Volunteers for SD
  • 7. The Event • Purpose: Identify entry points for stakeholders post-Rio; develop recommendations on how to actualize multi- stakeholder engagement in these processes and subsequent fora. • Outcomes: Better informed stakeholder advocacy (moblisation and messages) aimed at decision-makers, and the integration of post-Rio(SDGs) and post-2015 (MDGs) processes with sustainable development at the heart. • Outputs: – A co-chairs’ statement; – Recommendations and messages to UNEP Governing Council in February 2013 and to CSD 20 in May 2013; – A special edition of ‘Outreach’ capturing event outcomes for a wider audience; – Consultation Report.
  • 8. Consultation Findings – Highlights • 231 responses, mainly from the 9 Major Groups. • 61% of respondents believe the Rio+20 conference improved stakeholder engagement. • 84% of respondents find it important for Major Groups and other stakeholders to develop common positions on post-Rio/post-2015 processes.
  • 9. Consultation Findings – Lowlights • 66% of respondents believe Major Groups and Stakeholders need more financial support from the UN system to implement the Rio+20 outcomes. • A lack of access for Major Groups and stakeholders to the formal negotiations was widely cited as a barrier to participatory decision- making and a factor of the sub-optimal Rio+20 outcome.
  • 10. Consultation Findings – Thematic Areas • The deregulation of markets and heavy emphasis on GDP as the measurement of social progress are widely perceived to be the barriers to implementation of national green economies. • Widely agreed that the SDGs should be global in nature and universal in application. • SDGs should incorporate the Rio Principles and be integrated with the MDGs.