1. Taking care of your
maintenance and
minor projects
as well as your major new schemes
Repair,
refurbishment
or any commercial
small build
2. case studies
Your construction partner…
Whilst we are respected for our multi-million pound factories, our
expertise in high-care environments and working on live sites also
extends to our Building Services team. Our understanding of the food
& drink, warehousing & logistics and personal care & pharmaceutical
industries ensures compliance to stringent hygiene regulations
and minimum disruption to your production. Whether you need a
simple repair, refurbishment or any small build, Chalcroft take care of
everything for you.
We enjoy long standing relationships with our
clients and our own highly skilled tradesmen
are recognised for their reliability, expertise and
good service.
As part of a large construction company,
Chalcroft Building Services have the processes
and support of our dedicated Environmental,
Health and Safety team and the experience of
in-house specialists, ensuring full safety plans,
risk assessments and method statements
are undertaken. Our excellent health and
safety procedures are recognised in our Gold
Awards from RoSPA for Occupational Health
& Safety and our accreditation to BSI OHSAS
18001, which is testament to our robust safety
management system. Chalcroft is accredited to
ISO 9001 and ISO 14001.
Chalcroft Building Services take the strain of
maintaining your site, so you can concentrate
on keeping your factory or warehouse
running. It is our mission to become your
construction partner of choice…
case studies
Examples of Building Services projects include:
• Yard repairs and maintenance
• New effluent buildings
• Supply and installation of air locks
• Installation of drainage and kerbs
• Alterations to listed buildings
• Re-roofing and roof leak repairs
• Removal of fuel tanks
• Guttering and asbestos removal
• Shop/office refurbishment
• Groundwork and foundations for racking
• Cladding, refurbishment and renewal
• Food safe panelling
• Mezzanine floors
• Extensions and new build
Princes Limited
New effluent building, air locks
and enclosed walkway
Keeping up with the latest legislation, including
food hygiene and health and safety, is a task for
any business, and one in which Chalcroft truly
supports its clients.
Chalcroft Building Services constructed
a new effluent building and air locks
for Princes Foods, and provided
a new white-walled enclosed
sloping walkway, to keep
staff safe from traffic areas.
Work also comprised of
staircase alterations,
lighting and improved
washroom facilities.
Nestlé Purina Petcare (UK) Ltd
Essential building services support
Following the successful design and build of a
production facility extension and construction of new
production areas within an existing building, Chalcroft
have continued to provide Nestlé Purina with building
services support on a day to day basis.
Projects have included tarmac and flooring repairs,
roof light protection and provision of a man-safe
system around the factory roof, drainage, resin
flooring, white-walling, all scaffolding requirements,
steel work, external cladding and yard repairs.
Chalcroft have also been instrumental in larger
projects for the business, such as the removal of
the brickwork at the end of the factory building to
enable the installation of new retorts (cookers),
followed by replacement of the wall with
white-walling and cladding.
Pinguin Foods UK Ltd
Civil works and refurbishment
Pinguin Foods specialise in the processing
and packing of frozen fruit and vegetables. Chalcroft
Building Services has worked with Pinguin Foods on
various projects, including a new access roadway,
lift shaft maintenance, drainage works and toilet
refurbishment.
When Pinguin Foods wanted to install a new pea
line, they called on Chalcroft to provide the civil
improvements required, along with bases for
machines, CCTV, ducting and yard repairs.
Chalcroft’s expertise of working on live sites within a
high-care environment has enabled Pinguin Foods
to continue production throughout the duration of
the works.
Chalcroft have provided small
works at our production site for
a number of years and I can
always rely on the Chalcroft
team for their swift response,
understanding of our business,
compliance to our stringent
Health & Safety/food hygiene
regulations and excellent
workmanship.
Matthew Bell
Process Engineering Supervisor,
Pinguin Foods UK Ltd, King’s Lynn
Case studies continue overleaf
Forestry Commission
Conversion of a redundant room into a laboratory
The Forestry Commission manage and protect
woodland and forests throughout England and
Scotland. This vital work includes research and
control of tree pests and diseases.
Chalcroft Building Services converted a redundant
room into a laboratory to analyse insects. The scope
of works involved insulating and plaster boarding the
walls, a new resin
floor with coved
up-stand, installation
of ash veneered
door and roller
shutter door.
Chalcroft have been meticulous
in producing the project on
time, to budget and to a high
standard. I have no hesitation in
recommending the management
and trade team that delivered
this project. Everything from
initial planning through to
completion has been
performed in a safe and
professional manner.
Brian Kedward
Building Surveyor,
Forestry Commission
3. case studies continued
To discuss how Chalcroft Building Services can support you, contact:
Rob Copeman 07766 417443 or robcopeman@chalcroft.co.uk
Matt Goodier 07738 547137 or mattgoodier@chalcroft.co.uk
Mark Mallet 07775 901104 or markmallet@chalcroft.co.uk
Hamlin Way
The Narrows
King’s Lynn
Norfolk
PE30 4NG
t: 01553 776543
f: 01553 767667
11 Goodwood Road
Keytec 7 Business Park
Pershore
Worcestershire
WR10 2JL
t: 01386 561965
f: 01386 550170
Norbert Dentressangle
Logistics UK Limited
Dilapidations, refurbishment and
on-going maintenance
Chalcroft Building Services have enjoyed a long-
standing relationship with leading logistics provider,
Norbert Dentressangle. Building services on multiple
sites have included dilapidations involving new roller
doors, cladding, block work and steel work repairs.
At the Long Marston depot, Chalcroft have carried
out general refurbishment work, including yard
resurfacing, new barriers and car park white-
lining, improvements to the offices, canteen and
toilets and new fire doors.
I have been the Site Manager at Long
Marston for the 10 years we have
been open. The site is situated in an
old Ministry of Defence Storage area.
Chalcroft have been my preferred civil
engineer in all this time as they have
undertaken groundwork, building repairs
and alterations completed to a very high
standard at very competitive rates. They
are fully committed to the Health & Safety
of their own team and adhere fully to the
site’s Health & Safety rules.
I have no hesitation in
recommending Chalcroft.
Simon Walliman
Site Manager, Norbert Dentressangle, Long Marston
Probrand Limited
Fit out of warehouse to provide offices
Probrand is a major supplier of top branded
computer products, servicing a wide range of
business and public sector customers throughout the
UK. An expanding company recruiting an additional
60 people, the company converted the redundant
warehouse on the ground floor of their building to
provide further office accommodation.
Chalcroft Building Services were the principal
contractor, installing the partitions, flooring, ceilings,
kitchen, toilets and providing decoration. Outside the
building, Chalcroft carried out external repairs and
redecoration.
Heinz Frozen & Chilled Foods Ltd
Refurbishment of fire damaged building
When fire damaged a section of their ready-meals
factory at Worstead, Heinz called on Chalcroft
Building Services to repair and refurbish the
building. Having previously worked with Chalcroft
to build a new food production unit, Heinz
knew they could rely on Chalcroft to get their
production back up to capacity swiftly, without
affecting production elsewhere on site. The
refurbishment works included replacement of the
existing concrete floor, drains and resin works,
modernisation of the plant room, the provision of
food safe doors, roof repairs and water proofing.
More information can be found at:
www.chalcroft.co.uk
First Floor
6270 Bishops Court
Birmingham Business Park
Birmingham
B37 7YB
t: 01386 561965