July 3, 2014
ANR PIPELINE COMPANY
ANR EAST PROJECT
NON-BINDING OPEN SEASON
Due to growing market demand and the continuing development of the Utica and Marcellus Shale
Basins, ANR Pipeline Company (“ANR”) is conducting a non-binding open season to solicit
interest for its ANR East Project (“Project”). The Project is intended to provide Marcellus and
Utica gas supplies with export capacity directly from the supply basin to the Midwest, Gulf Coast,
and Dawn, Ontario. The Project would also allow for transportation receipts of Utica Marcellus
sourced gas supply at or near Defiance Ohio, a hub of several existing and proposed 3rd
party
pipelines which offer the necessary capacity to various downstream markets.
OPEN SEASON PERIOD
This open season shall commence at 11:00 a.m. CT Thursday, July 3, 2014, and close at 5:00 p.m.
CT on Monday, July 28, 2014.
PROJECT SCOPE
ANR proposes to construct a new, large diameter 1440 psig pipeline from Clarington, Ohio
through Cadiz and Leesville, Ohio to an interconnection with ANR’s existing system at Defiance,
Ohio. As part of the Project, ANR proposes facility enhancements to expand ANR’s existing
system capacity from Defiance, Ohio to market locations in ANR’s ML7 and ML3 rate zones.
The Project is designed to provide additional export transportation capacity for shippers to move
gas supplies from Southeast Ohio or Northwest Ohio (near Defiance), to markets in the U.S.
Midwest and Gulf Coast. Based on customer interest, ANR can also provide transportation
service to Dawn, Ontario via seamless arrangements with its pipeline affiliates Great Lakes Gas
Transmission (“Great Lakes”) and TransCanada Pipeline.
ANR East is offering to provide any one of the following transportation options to provide access
to a diverse market portfolio:
Option A – Receipt of gas at Clarington, Cadiz, and/or Leesville, Ohio with delivery to ANR and
others near Defiance, Ohio; or
Option B – Receipt of gas by ANR near Defiance, Ohio, with delivery to existing market locations
and pipeline interconnections in ANR’s ML7 and/or ML3 rate zones; or
Option C – Receipt of gas at Clarington, Cadiz, and/or Leesville, Ohio with delivery to existing
market locations and pipeline interconnections in ANR’s ML7 and/or ML3 rate zones.
Upon request, ANR will also consider (i) the construction of facilities to receive gas at locations
other than Clarington, Cadiz, or Leesville; (ii) new or expanded interconnections with markets
and pipelines crossing the ANR existing system row or that of the proposed Project.
2/11
ANR EAST PROJECT ROUTE OPTIONS
PROJECT TIMING
The targeted in-service date of the Project is the 3rd
Quarter of 2017. Upon request, ANR may
phase in service for portions of the Project earlier than the 3rd
Quarter of 2017 start date, subject
to the receipt and timing of any applicable regulatory approvals.
PROJECT BENEFITS
ANR is well connected to existing markets and provides easy access to multiple liquid pricing
hubs. The ANR footprint accesses significant demand growth potential as well as on-system
storage market opportunities. Through interconnections on the existing ANR and GLGT systems,
the ANR East project provides access to 27 Bcf/d of meter capacity in the Midwest and into
Ontario.
In addition to Midwest markets ANR’s Southeast Mainline capacity provides access to 6.5 Bcf/d
in Louisiana and significant growth opportunities in the Gulf Coast, and additional meter capacity
is being developed for deliveries of supply for LNG exports in south Louisiana. ANR’s Southwest
Mainline provides access to markets to west and south.
1.15 Bcf/d
Lebanon
Texas Gas
Sandwich
ANR Mainline 3 Zone
Madisonville, KY
to Defiance, OH
ANR Mainline 7 Zone
North of Defiance, OH
and Sandwich, IL
MichCon
MichCon
MichCon
3/11
Market Demand
The project provides Utica and Marcellus supplies
unparalleled access to existing markets, including:
 Multiple liquid pricing hubs including:
o Chicago’s ANR Joliet Hub
o MichCon
o Consumers
o Dawn
o Lebanon
o ANR LA
o ANR SW
 35+ Electric and Gas Utilities
 Significant connections to LDC demand in Michigan,
Wisconsin, Illinois, Indiana, and Ohio
 Significant gas-fired power generation demand from
40 power plants across the ANR system with
nameplate capacity of 17,000+ MW
 Access to over 900+ Bcf of storage capacity, including
250 Bcf of ANR on-system storage
 Access to off-system storage, including MichCon,
Consumers, Bluewater, MGU, Peoples, Panhandle,
and Dawn
 Growing industrial markets
 Multiple LNG export markets in Louisiana and Texas
ANR Southwest
0
2000
4000
6000
8000
10000
12000
14000
2014 2017 2020 2023
Midwest Demand - Mmcf/d
Industrial
Power
R&C
Storage
0
2000
4000
6000
8000
10000
12000
14000
2014 2017 2020 2023
Louisiana Demand - Mmcf/d
LNG Exports
Industrial
Power
R&C
Storage
0
2000
4000
6000
8000
10000
12000
14000
2014 2017 2020 2023
Ontario Demand - Mmcf/d
Industrial
Power
R&C
Storage
4/11
ANR DELIVERY LOCATIONS
For convenience, a partial list of existing interconnecting parties is listed below. ANR will also
consider requests for other ML7 and ML3 delivery locations:
ML-7 Rate Zone
ANR Joliet Hub
 Alliance Pipeline
 Guardian Pipeline
 Northern Border Pipeline
 Midwestern
 NICOR
 NGPL
 Northern Indiana Public Service Company(NIPSCO)
 Peoples
 Vector Pipeline
Michigan
 MichCon
 Consumers Gas Company
 Southeastern Michigan Gas Company (SEMCO)
 Great Lakes Gas Transmission
 ANR Storage Facilities
Tie-Line (Defiance to Bridgman)
 Consumers Gas Company
 Northern Indiana Public Service Company (NIPSCO)
 Southeastern Michigan Gas Company (SEMCO)
Ohio
 Ohio Gas Company
 East Ohio Gas Company
Indiana
 Northern Indiana Public Service Company (NIPSCO)
ML-3 Rate Zone
Indiana
 Northern Indiana Public Service Company (NIPSCO)
 Proliance
 Texas Eastern Transmission
 Texas Gas Transmission
5/11
PROJECT CAPACITY1,2
As currently designed and conceived, the Project provides segment capacity up to the quantities
listed below:
Option A – Capacity from Supply Area
 From Clarington to Leesville 2,000,000 Dth/d
 Leesville to Defiance 2,400,000 Dth/d
Option B – Defiance Take Away Capacity
 Total take away capacity from Defiance 2,900,000 Dth/d
 West 2,000,000 Dth/d
o Joliet Hub 1,150,000 Dth/d
o Dawn, Ontario 350,000 Dth/d
o Tie Line Points3
2,000,000 Dth/d
o Other ML-7 Points
 South 600,000 Dth/d
o Texas Gas
o Lebanon
o Other ML-3 Points
 North 300,000 Dth/d
o MichCon 300,000 Dth/d
FOUNDATION SHIPPER STATUS
Any bidder who submits a bid for a minimum daily quantity of 250,000 Dth/day for a minimum
term of twenty (20) years shall be deemed a “Foundation Shipper.” Foundation Shippers shall pay
the Foundation Shipper Rates (as indicated below) and shall not have their capacity pro-rationed
if they execute a precedent agreement on or before July 28, 2014.
1
receipt locations in Option A.
2
If Requested, ANR will consider the inclusion of facilities necessary to expand or access
delivery points to other ML7 markets and/or locations along ANR’s SW or SE Mainline systems.
3
Including but not limited to Consumers Gas Company, Northern Indiana public Service
Company (NIPSCO), Southeastern Michigan Gas Company (SEMCO), Vector and Trunkline
Interconnect.
6/11
INDICATIVE RESERVATION RATES ($/Dth)
The following rates will be available for transportation service under ANR’s FTS-1 Rate
Schedule. The negotiated rates listed below will be available to Foundation Shippers who are
Tier I and Tier II shippers (as defined below) (“Foundation Shipper Rates”).
Tier I Foundation Shippers
o Creditworthy shippers (as determined by ANR pursuant to the Project
precedent agreement or the FTS-1 Service Agreement, as applicable) who
agree, in the event of downgrade to non-creditworthy status, to be subject to
the credit requirements applicable to Tier I non-creditworthy shippers below.
o Non-creditworthy shippers (as determined by ANR pursuant to the Project
precedent agreement or the FTS-1 Service Agreement, as applicable) who
either provide a guarantee from a creditworthy guarantor for shipper’s
contractual obligation of reservation charges for the contract term, or who post
collateral in the amount of their pro-rata share of the Project costs.
Tier II Foundation Shippers
o Creditworthy shippers (as determined by ANR pursuant to the Project
precedent agreement or the FTS-1 Service Agreement, as applicable) who
agree, in the event of downgrade to non-creditworthy status, to be subject to
the credit requirements applicable to Tier II non-creditworthy shippers below.
o Non-creditworthy shippers (as determined by ANR pursuant to the Project
precedent agreement or the FTS-1 Service Agreement, as applicable) who
either provide a guarantee from a creditworthy guarantor for shipper’s
contractual obligation of reservation charges for the contract term or who post
collateral in an amount equal to 24 months of reservation charges under their
FTS-1 Service Agreement.
7/11
INDICATIVE RESERVATION RATES ($/Dth) – (continued)
Max
Negotiated Rate Recourse Est.
($/Dth) Rate Fuel
Tier I Tier II ($/Dth) Use%
Option A
Clarington to Defiance 0.45 0.50 0.57 0.9
Leesville to Defiance 0.40 0.45 0.48 0.9
Option B4
Defiance to MichCon 0.20 0.20 0.20 1.1
ML-3 Points
(Ohio & Indiana) 0.15 0.15 0.15 0.8
Tie Line Points 0.22 0.24 0.34 0.8
Joliet Hub 0.32 0.36 0.52 1.2
Dawn 0.35 0.40 0.69 1.7
Option C4
Leesville to MichCon 0.43 0.47 0.68 2.0
ML-3 Points
(Ohio & Indiana) 0.40 0.45 0.62 1.7
Tie Line Points 0.52 0.57 0.82 1.7
Joliet Hub 0.63 0.69 1.00 2.1
Dawn 0.69 0.73 1.17 2.6
Clarington to MichCon 0.48 0.53 0.77 2.0
ML-3 Points
(Ohio & Indiana) 0.45 0.50 0.71 1.7
Tie Line Points 0.58 0.64 0.91 1.7
Joliet Hub 0.68 0.76 1.09 2.1
Dawn 0.74 0.82 1.26 2.6
ESTIMATED PROJECT FUEL USE
Fuel Rates as shown above are estimated for facilities and services as currently designed and
conceived and will ultimately be dependent on the final configuration of the Project scope and
design.
4
Negotiated rate shippers receive all secondary deliveries locations east of ANR’s Joliet Hub
within ANR’s ML7 Zone at no incremental charge.
8/11
NON-BINDING NATURE OF OPEN SEASON
Participation in this Open Season shall be considered non-binding on both the participants and on
ANR. The purpose of the Open Season is to allow ANR to evaluate the market interest,
economics, and design parameters for the Project to effectively meet the needs of its customers.
Based upon the results of the Open Season, ANR will, in its sole discretion, determine whether or
not to proceed with the proposed Project, the Project’s scope, the possibility of an expansion of
the Project’s scope to accommodate all interested parties, or the reduction in scope, in part or in
whole, and whether an additional binding open season is necessary. ANR may, in its sole
discretion, determine to proceed with the Project but not hold a binding open season. In such
case, ANR would enter into discussions with participants in this Open Season for the purpose of
executing precedent agreements. Although this Open Season is non-binding, only those who
participate in the Open Season will be guaranteed consideration for service under the Project.
ANR may, in its sole discretion, and on a not unduly discriminatory basis, consider requests
received after the close of the Open Season, including requests to modify or clarify a party’s
initial bid, subject to the requirement that the modification of a bid may not decrease the NPV of
such bid.
ACKNOWLEDGEMENT OF BIDS
ANR will acknowledge receipt of all Non-Binding Bid Forms (“Bids”). A copy of the ANR East
Project Non-Binding Open Season Bid Form is attached.
ANR reserves the right to reject any Bid that is incomplete, contains or reflects modifications to
the terms and/or conditions of this Open Season, conflicts with ANR’s FERC Gas Tariff, or is
outside the scope of the Project, as determined by ANR in its sole discretion. If a Bidder desires a
modification to the Non-Binding Bid(s) Form to address a special or unique situation, ANR
encourages the Bidder to present any such modification to ANR for consideration/negotiation as
soon as possible in advance of the close of the Open Season. However, ANR shall not be
precluded from considering appropriate clarifications or modifications to a Bidder’s Non-Binding
Bid Form following the close of the Open Season.
This Open Season is subject to all applicable laws, orders, rules, and regulations and authorities
having jurisdiction.
BID EVALUATION PROCESS
ANR’s review of all Non-Binding Bid Form(s) will be performed with reasonable promptness. A
net present value (NPV) analysis will be performed on each qualifying Bid. The revenue stream
for each Bid will be discounted at an annual discount rate of 3.25% in order to determine its NPV.
For purposes of awarding capacity, ANR will consider the combination of shipper bids that result
in the highest total NPV for the project.
9/11
PRO-RATIONING OF CAPACITY
With the exception of those Foundation Shippers who have executed a precedent agreement prior
to the close of this Open Season, all other Bidders shall be subject to capacity pro-rationing. If
total non-binding Bid(s) exceed proposed initial and/or expanded Project capacity, and if more
than one non-binding Bid has the same NPV, then capacity shall be pro-rated among Bidders with
matching NPV Bids such that the highest aggregate NPV is achieved. In the event of a tie,
Bidders interested in this capacity should specify a minimum acceptable pro-rata MDQ in their
Bid. As an alternative to such a proration, ANR reserves the right to agree to alternate points of
delivery.
SOLICITATION OF TURNBACK CAPACITY
ANR requests that any shipper who currently holds firm transportation capacity along the paths
mentioned in this Open Season notify ANR in writing, by the end of this Open Season, if it
wishes to turn back its capacity (“Turnback Capacity”). Such notification must specify the
contract number, primary receipt and delivery points, and the volume the shipper is offering to
turn back. ANR will consider and evaluate offers of Turnback Capacity which satisfy services
similar to those proposed herein in terms of location, term, and price.
CREDITWORTHINESS
If ANR determines to proceed with the proposed Project, prospective Bidders shall be subject to
the creditworthiness requirements of the Project precedent agreement when receiving service
under the resulting Firm Transportation Agreement. Prospective bidders may contact Rita Homan
at (832) 320-5449 if they have any questions relating to creditworthiness.
BID PROCESS
Interested parties wishing to submit Bids during the Open Season must submit a completed Non-
Binding Bid Form (as attached) by mail, by email attachment or by facsimile. All Bids must be
received by ANR prior to the close of the Open Season described above. Bids must be mailed,
emailed or faxed to:
MAIL: ANR PIPELINE COMPANY
717 TEXAS STREET
HOUSTON, TX 77002-2761
ATTN: DAN ANDRUCCIOLI – ROOM 25386
ANR BUSINESS DEVELOPMENT
E-mail: daniel_andruccioli@transcanada.com
Fax: (832) 320-6451
Please contact Daniel Andruccioli at (832) 320-5451 or Erik Anderson at (832) 320-5606 with
any questions regarding the ANR East Project Open Season.
10/11
ANR EAST PROJECT
NON-BINDING OPEN SEASON
BID FORM
Send to: ANR Pipeline Company
717 Texas Street
Houston, TX 77002
Attn: Mr. Dan Andruccioli
Room No. 25386
Via e-mail to daniel_andruccioli@transcanada.com, or via fax, to Dan Andruccioli at
(832) 320-6451 no later than 5:00 p.m. CT Monday, July 28, 2014.
Note: A separate Bid must be submitted for each transportation path requested.
1. For questions or comments please contact Daniel Andruccioli at (832) 320-5451 or
Erik Anderson at (832) 320-5606.
2. Bidder Information:
Name: ____________________________
Address: ____________________________
Telephone: ____________________________
Facsimile: ____________________________
3. Name and title of duly authorized officer:
Name: ____________________________
Title: _____________________________
4. Service Commencement Date Requested: ___________________
Service End Date Requested: ___________________
5. Type of Service Requested: FTS-1
6. Maximum Daily Quantity Requested: __________ Dth/d
7. Minimum Acceptable Pro-rata Quantity: __________ Dth/d
11/11
ANR EAST PROJECT
NON-BINDING OPEN SEASON
BID FORM (CONT.)
8. Daily Demand Rate: _____________________/Dth
9. Receipt Point(s):
Location MDQ (Dth/day)
Clarington __________________________
Leesville __________________________
Defiance __________________________
Other __________________________
10. Delivery Point(s):
Location MDQ (Dth/day)
11. Additional information/comments in support of request:
______________________________________________________________
THIS BID FORM IS HEREBY SUBMITTED:
By: __________________________________________________________
Title: ________________________________________________________
Company: ____________________________________________________
Telephone Number: ____________________________________________
Email Address: ________________________________________________
Facsimile Number: _____________________________________________
Date: _________________________________________________________

Mais conteúdo relacionado

Mais de Marcellus Drilling News

U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015Marcellus Drilling News
 
U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015Marcellus Drilling News
 
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids PlantsVelocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids PlantsMarcellus Drilling News
 
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...Marcellus Drilling News
 
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...Marcellus Drilling News
 
PA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsPA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsMarcellus Drilling News
 
US EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy OutlookUS EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy OutlookMarcellus Drilling News
 
Northeast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical GuideNortheast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical GuideMarcellus Drilling News
 
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee AuditPA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee AuditMarcellus Drilling News
 
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...Marcellus Drilling News
 
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final ReportClyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final ReportMarcellus Drilling News
 
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion ProjectFERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion ProjectMarcellus Drilling News
 
Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...
Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...
Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...Marcellus Drilling News
 
Final Environmental Impact Statement for NEXUS Gas Transmission Project
Final Environmental Impact Statement for NEXUS Gas Transmission ProjectFinal Environmental Impact Statement for NEXUS Gas Transmission Project
Final Environmental Impact Statement for NEXUS Gas Transmission ProjectMarcellus Drilling News
 
Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...
Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...
Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...Marcellus Drilling News
 
Report: Analysis of Act 13 Spending by Pennsylvania Municipalities and Counties
Report: Analysis of Act 13 Spending by Pennsylvania Municipalities and CountiesReport: Analysis of Act 13 Spending by Pennsylvania Municipalities and Counties
Report: Analysis of Act 13 Spending by Pennsylvania Municipalities and CountiesMarcellus Drilling News
 
FERC Order Denying Rehearing Requested by NY AG Schneiderman re Constitution ...
FERC Order Denying Rehearing Requested by NY AG Schneiderman re Constitution ...FERC Order Denying Rehearing Requested by NY AG Schneiderman re Constitution ...
FERC Order Denying Rehearing Requested by NY AG Schneiderman re Constitution ...Marcellus Drilling News
 
Study: Fault activation by hydraulic fracturing in western Canada
Study: Fault activation by hydraulic fracturing in western CanadaStudy: Fault activation by hydraulic fracturing in western Canada
Study: Fault activation by hydraulic fracturing in western CanadaMarcellus Drilling News
 
Crestwood Equity Partners Investor Presentation for 2016 RBC Capital Markets ...
Crestwood Equity Partners Investor Presentation for 2016 RBC Capital Markets ...Crestwood Equity Partners Investor Presentation for 2016 RBC Capital Markets ...
Crestwood Equity Partners Investor Presentation for 2016 RBC Capital Markets ...Marcellus Drilling News
 
U.S. Dept. of Energy Office of Fossil Energy - LNG Monthly (Nov 2016)
U.S. Dept. of Energy Office of Fossil Energy - LNG Monthly (Nov 2016)U.S. Dept. of Energy Office of Fossil Energy - LNG Monthly (Nov 2016)
U.S. Dept. of Energy Office of Fossil Energy - LNG Monthly (Nov 2016)Marcellus Drilling News
 

Mais de Marcellus Drilling News (20)

U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
 
U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015
 
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids PlantsVelocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
 
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
 
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
 
PA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsPA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas Operations
 
US EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy OutlookUS EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy Outlook
 
Northeast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical GuideNortheast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical Guide
 
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee AuditPA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
 
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
 
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final ReportClyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
 
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion ProjectFERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
 
Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...
Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...
Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...
 
Final Environmental Impact Statement for NEXUS Gas Transmission Project
Final Environmental Impact Statement for NEXUS Gas Transmission ProjectFinal Environmental Impact Statement for NEXUS Gas Transmission Project
Final Environmental Impact Statement for NEXUS Gas Transmission Project
 
Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...
Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...
Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...
 
Report: Analysis of Act 13 Spending by Pennsylvania Municipalities and Counties
Report: Analysis of Act 13 Spending by Pennsylvania Municipalities and CountiesReport: Analysis of Act 13 Spending by Pennsylvania Municipalities and Counties
Report: Analysis of Act 13 Spending by Pennsylvania Municipalities and Counties
 
FERC Order Denying Rehearing Requested by NY AG Schneiderman re Constitution ...
FERC Order Denying Rehearing Requested by NY AG Schneiderman re Constitution ...FERC Order Denying Rehearing Requested by NY AG Schneiderman re Constitution ...
FERC Order Denying Rehearing Requested by NY AG Schneiderman re Constitution ...
 
Study: Fault activation by hydraulic fracturing in western Canada
Study: Fault activation by hydraulic fracturing in western CanadaStudy: Fault activation by hydraulic fracturing in western Canada
Study: Fault activation by hydraulic fracturing in western Canada
 
Crestwood Equity Partners Investor Presentation for 2016 RBC Capital Markets ...
Crestwood Equity Partners Investor Presentation for 2016 RBC Capital Markets ...Crestwood Equity Partners Investor Presentation for 2016 RBC Capital Markets ...
Crestwood Equity Partners Investor Presentation for 2016 RBC Capital Markets ...
 
U.S. Dept. of Energy Office of Fossil Energy - LNG Monthly (Nov 2016)
U.S. Dept. of Energy Office of Fossil Energy - LNG Monthly (Nov 2016)U.S. Dept. of Energy Office of Fossil Energy - LNG Monthly (Nov 2016)
U.S. Dept. of Energy Office of Fossil Energy - LNG Monthly (Nov 2016)
 

Último

TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadershipanjanibaddipudi1
 
29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct CommiteemenRoberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemenkfjstone13
 
25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdf25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...Ismail Fahmi
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...narsireddynannuri1
 
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Axel Bruns
 
Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Krish109503
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...Diya Sharma
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxlorenzodemidio01
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoSABC News
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docxkfjstone13
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Pooja Nehwal
 
Minto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxMinto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxAwaiskhalid96
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docxkfjstone13
 
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docxkfjstone13
 
Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024Ismail Fahmi
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...AlexisTorres963861
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKISHAN REDDY OFFICE
 

Último (20)

TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
 
29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf
 
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct CommiteemenRoberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
 
25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdf25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdf
 
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
HARNESSING AI FOR ENHANCED MEDIA ANALYSIS A CASE STUDY ON CHATGPT AT DRONE EM...
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
 
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
 
Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!Israel Palestine Conflict, The issue and historical context!
Israel Palestine Conflict, The issue and historical context!
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf
 
Referendum Party 2024 Election Manifesto
Referendum Party 2024 Election ManifestoReferendum Party 2024 Election Manifesto
Referendum Party 2024 Election Manifesto
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
 
Minto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxMinto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptx
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
 
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
 
Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024Different Frontiers of Social Media War in Indonesia Elections 2024
Different Frontiers of Social Media War in Indonesia Elections 2024
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 

TransCanada ANR East Project Non-Binding Open Season

  • 1. July 3, 2014 ANR PIPELINE COMPANY ANR EAST PROJECT NON-BINDING OPEN SEASON Due to growing market demand and the continuing development of the Utica and Marcellus Shale Basins, ANR Pipeline Company (“ANR”) is conducting a non-binding open season to solicit interest for its ANR East Project (“Project”). The Project is intended to provide Marcellus and Utica gas supplies with export capacity directly from the supply basin to the Midwest, Gulf Coast, and Dawn, Ontario. The Project would also allow for transportation receipts of Utica Marcellus sourced gas supply at or near Defiance Ohio, a hub of several existing and proposed 3rd party pipelines which offer the necessary capacity to various downstream markets. OPEN SEASON PERIOD This open season shall commence at 11:00 a.m. CT Thursday, July 3, 2014, and close at 5:00 p.m. CT on Monday, July 28, 2014. PROJECT SCOPE ANR proposes to construct a new, large diameter 1440 psig pipeline from Clarington, Ohio through Cadiz and Leesville, Ohio to an interconnection with ANR’s existing system at Defiance, Ohio. As part of the Project, ANR proposes facility enhancements to expand ANR’s existing system capacity from Defiance, Ohio to market locations in ANR’s ML7 and ML3 rate zones. The Project is designed to provide additional export transportation capacity for shippers to move gas supplies from Southeast Ohio or Northwest Ohio (near Defiance), to markets in the U.S. Midwest and Gulf Coast. Based on customer interest, ANR can also provide transportation service to Dawn, Ontario via seamless arrangements with its pipeline affiliates Great Lakes Gas Transmission (“Great Lakes”) and TransCanada Pipeline. ANR East is offering to provide any one of the following transportation options to provide access to a diverse market portfolio: Option A – Receipt of gas at Clarington, Cadiz, and/or Leesville, Ohio with delivery to ANR and others near Defiance, Ohio; or Option B – Receipt of gas by ANR near Defiance, Ohio, with delivery to existing market locations and pipeline interconnections in ANR’s ML7 and/or ML3 rate zones; or Option C – Receipt of gas at Clarington, Cadiz, and/or Leesville, Ohio with delivery to existing market locations and pipeline interconnections in ANR’s ML7 and/or ML3 rate zones. Upon request, ANR will also consider (i) the construction of facilities to receive gas at locations other than Clarington, Cadiz, or Leesville; (ii) new or expanded interconnections with markets and pipelines crossing the ANR existing system row or that of the proposed Project.
  • 2. 2/11 ANR EAST PROJECT ROUTE OPTIONS PROJECT TIMING The targeted in-service date of the Project is the 3rd Quarter of 2017. Upon request, ANR may phase in service for portions of the Project earlier than the 3rd Quarter of 2017 start date, subject to the receipt and timing of any applicable regulatory approvals. PROJECT BENEFITS ANR is well connected to existing markets and provides easy access to multiple liquid pricing hubs. The ANR footprint accesses significant demand growth potential as well as on-system storage market opportunities. Through interconnections on the existing ANR and GLGT systems, the ANR East project provides access to 27 Bcf/d of meter capacity in the Midwest and into Ontario. In addition to Midwest markets ANR’s Southeast Mainline capacity provides access to 6.5 Bcf/d in Louisiana and significant growth opportunities in the Gulf Coast, and additional meter capacity is being developed for deliveries of supply for LNG exports in south Louisiana. ANR’s Southwest Mainline provides access to markets to west and south. 1.15 Bcf/d Lebanon Texas Gas Sandwich ANR Mainline 3 Zone Madisonville, KY to Defiance, OH ANR Mainline 7 Zone North of Defiance, OH and Sandwich, IL MichCon MichCon MichCon
  • 3. 3/11 Market Demand The project provides Utica and Marcellus supplies unparalleled access to existing markets, including:  Multiple liquid pricing hubs including: o Chicago’s ANR Joliet Hub o MichCon o Consumers o Dawn o Lebanon o ANR LA o ANR SW  35+ Electric and Gas Utilities  Significant connections to LDC demand in Michigan, Wisconsin, Illinois, Indiana, and Ohio  Significant gas-fired power generation demand from 40 power plants across the ANR system with nameplate capacity of 17,000+ MW  Access to over 900+ Bcf of storage capacity, including 250 Bcf of ANR on-system storage  Access to off-system storage, including MichCon, Consumers, Bluewater, MGU, Peoples, Panhandle, and Dawn  Growing industrial markets  Multiple LNG export markets in Louisiana and Texas ANR Southwest 0 2000 4000 6000 8000 10000 12000 14000 2014 2017 2020 2023 Midwest Demand - Mmcf/d Industrial Power R&C Storage 0 2000 4000 6000 8000 10000 12000 14000 2014 2017 2020 2023 Louisiana Demand - Mmcf/d LNG Exports Industrial Power R&C Storage 0 2000 4000 6000 8000 10000 12000 14000 2014 2017 2020 2023 Ontario Demand - Mmcf/d Industrial Power R&C Storage
  • 4. 4/11 ANR DELIVERY LOCATIONS For convenience, a partial list of existing interconnecting parties is listed below. ANR will also consider requests for other ML7 and ML3 delivery locations: ML-7 Rate Zone ANR Joliet Hub  Alliance Pipeline  Guardian Pipeline  Northern Border Pipeline  Midwestern  NICOR  NGPL  Northern Indiana Public Service Company(NIPSCO)  Peoples  Vector Pipeline Michigan  MichCon  Consumers Gas Company  Southeastern Michigan Gas Company (SEMCO)  Great Lakes Gas Transmission  ANR Storage Facilities Tie-Line (Defiance to Bridgman)  Consumers Gas Company  Northern Indiana Public Service Company (NIPSCO)  Southeastern Michigan Gas Company (SEMCO) Ohio  Ohio Gas Company  East Ohio Gas Company Indiana  Northern Indiana Public Service Company (NIPSCO) ML-3 Rate Zone Indiana  Northern Indiana Public Service Company (NIPSCO)  Proliance  Texas Eastern Transmission  Texas Gas Transmission
  • 5. 5/11 PROJECT CAPACITY1,2 As currently designed and conceived, the Project provides segment capacity up to the quantities listed below: Option A – Capacity from Supply Area  From Clarington to Leesville 2,000,000 Dth/d  Leesville to Defiance 2,400,000 Dth/d Option B – Defiance Take Away Capacity  Total take away capacity from Defiance 2,900,000 Dth/d  West 2,000,000 Dth/d o Joliet Hub 1,150,000 Dth/d o Dawn, Ontario 350,000 Dth/d o Tie Line Points3 2,000,000 Dth/d o Other ML-7 Points  South 600,000 Dth/d o Texas Gas o Lebanon o Other ML-3 Points  North 300,000 Dth/d o MichCon 300,000 Dth/d FOUNDATION SHIPPER STATUS Any bidder who submits a bid for a minimum daily quantity of 250,000 Dth/day for a minimum term of twenty (20) years shall be deemed a “Foundation Shipper.” Foundation Shippers shall pay the Foundation Shipper Rates (as indicated below) and shall not have their capacity pro-rationed if they execute a precedent agreement on or before July 28, 2014. 1 receipt locations in Option A. 2 If Requested, ANR will consider the inclusion of facilities necessary to expand or access delivery points to other ML7 markets and/or locations along ANR’s SW or SE Mainline systems. 3 Including but not limited to Consumers Gas Company, Northern Indiana public Service Company (NIPSCO), Southeastern Michigan Gas Company (SEMCO), Vector and Trunkline Interconnect.
  • 6. 6/11 INDICATIVE RESERVATION RATES ($/Dth) The following rates will be available for transportation service under ANR’s FTS-1 Rate Schedule. The negotiated rates listed below will be available to Foundation Shippers who are Tier I and Tier II shippers (as defined below) (“Foundation Shipper Rates”). Tier I Foundation Shippers o Creditworthy shippers (as determined by ANR pursuant to the Project precedent agreement or the FTS-1 Service Agreement, as applicable) who agree, in the event of downgrade to non-creditworthy status, to be subject to the credit requirements applicable to Tier I non-creditworthy shippers below. o Non-creditworthy shippers (as determined by ANR pursuant to the Project precedent agreement or the FTS-1 Service Agreement, as applicable) who either provide a guarantee from a creditworthy guarantor for shipper’s contractual obligation of reservation charges for the contract term, or who post collateral in the amount of their pro-rata share of the Project costs. Tier II Foundation Shippers o Creditworthy shippers (as determined by ANR pursuant to the Project precedent agreement or the FTS-1 Service Agreement, as applicable) who agree, in the event of downgrade to non-creditworthy status, to be subject to the credit requirements applicable to Tier II non-creditworthy shippers below. o Non-creditworthy shippers (as determined by ANR pursuant to the Project precedent agreement or the FTS-1 Service Agreement, as applicable) who either provide a guarantee from a creditworthy guarantor for shipper’s contractual obligation of reservation charges for the contract term or who post collateral in an amount equal to 24 months of reservation charges under their FTS-1 Service Agreement.
  • 7. 7/11 INDICATIVE RESERVATION RATES ($/Dth) – (continued) Max Negotiated Rate Recourse Est. ($/Dth) Rate Fuel Tier I Tier II ($/Dth) Use% Option A Clarington to Defiance 0.45 0.50 0.57 0.9 Leesville to Defiance 0.40 0.45 0.48 0.9 Option B4 Defiance to MichCon 0.20 0.20 0.20 1.1 ML-3 Points (Ohio & Indiana) 0.15 0.15 0.15 0.8 Tie Line Points 0.22 0.24 0.34 0.8 Joliet Hub 0.32 0.36 0.52 1.2 Dawn 0.35 0.40 0.69 1.7 Option C4 Leesville to MichCon 0.43 0.47 0.68 2.0 ML-3 Points (Ohio & Indiana) 0.40 0.45 0.62 1.7 Tie Line Points 0.52 0.57 0.82 1.7 Joliet Hub 0.63 0.69 1.00 2.1 Dawn 0.69 0.73 1.17 2.6 Clarington to MichCon 0.48 0.53 0.77 2.0 ML-3 Points (Ohio & Indiana) 0.45 0.50 0.71 1.7 Tie Line Points 0.58 0.64 0.91 1.7 Joliet Hub 0.68 0.76 1.09 2.1 Dawn 0.74 0.82 1.26 2.6 ESTIMATED PROJECT FUEL USE Fuel Rates as shown above are estimated for facilities and services as currently designed and conceived and will ultimately be dependent on the final configuration of the Project scope and design. 4 Negotiated rate shippers receive all secondary deliveries locations east of ANR’s Joliet Hub within ANR’s ML7 Zone at no incremental charge.
  • 8. 8/11 NON-BINDING NATURE OF OPEN SEASON Participation in this Open Season shall be considered non-binding on both the participants and on ANR. The purpose of the Open Season is to allow ANR to evaluate the market interest, economics, and design parameters for the Project to effectively meet the needs of its customers. Based upon the results of the Open Season, ANR will, in its sole discretion, determine whether or not to proceed with the proposed Project, the Project’s scope, the possibility of an expansion of the Project’s scope to accommodate all interested parties, or the reduction in scope, in part or in whole, and whether an additional binding open season is necessary. ANR may, in its sole discretion, determine to proceed with the Project but not hold a binding open season. In such case, ANR would enter into discussions with participants in this Open Season for the purpose of executing precedent agreements. Although this Open Season is non-binding, only those who participate in the Open Season will be guaranteed consideration for service under the Project. ANR may, in its sole discretion, and on a not unduly discriminatory basis, consider requests received after the close of the Open Season, including requests to modify or clarify a party’s initial bid, subject to the requirement that the modification of a bid may not decrease the NPV of such bid. ACKNOWLEDGEMENT OF BIDS ANR will acknowledge receipt of all Non-Binding Bid Forms (“Bids”). A copy of the ANR East Project Non-Binding Open Season Bid Form is attached. ANR reserves the right to reject any Bid that is incomplete, contains or reflects modifications to the terms and/or conditions of this Open Season, conflicts with ANR’s FERC Gas Tariff, or is outside the scope of the Project, as determined by ANR in its sole discretion. If a Bidder desires a modification to the Non-Binding Bid(s) Form to address a special or unique situation, ANR encourages the Bidder to present any such modification to ANR for consideration/negotiation as soon as possible in advance of the close of the Open Season. However, ANR shall not be precluded from considering appropriate clarifications or modifications to a Bidder’s Non-Binding Bid Form following the close of the Open Season. This Open Season is subject to all applicable laws, orders, rules, and regulations and authorities having jurisdiction. BID EVALUATION PROCESS ANR’s review of all Non-Binding Bid Form(s) will be performed with reasonable promptness. A net present value (NPV) analysis will be performed on each qualifying Bid. The revenue stream for each Bid will be discounted at an annual discount rate of 3.25% in order to determine its NPV. For purposes of awarding capacity, ANR will consider the combination of shipper bids that result in the highest total NPV for the project.
  • 9. 9/11 PRO-RATIONING OF CAPACITY With the exception of those Foundation Shippers who have executed a precedent agreement prior to the close of this Open Season, all other Bidders shall be subject to capacity pro-rationing. If total non-binding Bid(s) exceed proposed initial and/or expanded Project capacity, and if more than one non-binding Bid has the same NPV, then capacity shall be pro-rated among Bidders with matching NPV Bids such that the highest aggregate NPV is achieved. In the event of a tie, Bidders interested in this capacity should specify a minimum acceptable pro-rata MDQ in their Bid. As an alternative to such a proration, ANR reserves the right to agree to alternate points of delivery. SOLICITATION OF TURNBACK CAPACITY ANR requests that any shipper who currently holds firm transportation capacity along the paths mentioned in this Open Season notify ANR in writing, by the end of this Open Season, if it wishes to turn back its capacity (“Turnback Capacity”). Such notification must specify the contract number, primary receipt and delivery points, and the volume the shipper is offering to turn back. ANR will consider and evaluate offers of Turnback Capacity which satisfy services similar to those proposed herein in terms of location, term, and price. CREDITWORTHINESS If ANR determines to proceed with the proposed Project, prospective Bidders shall be subject to the creditworthiness requirements of the Project precedent agreement when receiving service under the resulting Firm Transportation Agreement. Prospective bidders may contact Rita Homan at (832) 320-5449 if they have any questions relating to creditworthiness. BID PROCESS Interested parties wishing to submit Bids during the Open Season must submit a completed Non- Binding Bid Form (as attached) by mail, by email attachment or by facsimile. All Bids must be received by ANR prior to the close of the Open Season described above. Bids must be mailed, emailed or faxed to: MAIL: ANR PIPELINE COMPANY 717 TEXAS STREET HOUSTON, TX 77002-2761 ATTN: DAN ANDRUCCIOLI – ROOM 25386 ANR BUSINESS DEVELOPMENT E-mail: daniel_andruccioli@transcanada.com Fax: (832) 320-6451 Please contact Daniel Andruccioli at (832) 320-5451 or Erik Anderson at (832) 320-5606 with any questions regarding the ANR East Project Open Season.
  • 10. 10/11 ANR EAST PROJECT NON-BINDING OPEN SEASON BID FORM Send to: ANR Pipeline Company 717 Texas Street Houston, TX 77002 Attn: Mr. Dan Andruccioli Room No. 25386 Via e-mail to daniel_andruccioli@transcanada.com, or via fax, to Dan Andruccioli at (832) 320-6451 no later than 5:00 p.m. CT Monday, July 28, 2014. Note: A separate Bid must be submitted for each transportation path requested. 1. For questions or comments please contact Daniel Andruccioli at (832) 320-5451 or Erik Anderson at (832) 320-5606. 2. Bidder Information: Name: ____________________________ Address: ____________________________ Telephone: ____________________________ Facsimile: ____________________________ 3. Name and title of duly authorized officer: Name: ____________________________ Title: _____________________________ 4. Service Commencement Date Requested: ___________________ Service End Date Requested: ___________________ 5. Type of Service Requested: FTS-1 6. Maximum Daily Quantity Requested: __________ Dth/d 7. Minimum Acceptable Pro-rata Quantity: __________ Dth/d
  • 11. 11/11 ANR EAST PROJECT NON-BINDING OPEN SEASON BID FORM (CONT.) 8. Daily Demand Rate: _____________________/Dth 9. Receipt Point(s): Location MDQ (Dth/day) Clarington __________________________ Leesville __________________________ Defiance __________________________ Other __________________________ 10. Delivery Point(s): Location MDQ (Dth/day) 11. Additional information/comments in support of request: ______________________________________________________________ THIS BID FORM IS HEREBY SUBMITTED: By: __________________________________________________________ Title: ________________________________________________________ Company: ____________________________________________________ Telephone Number: ____________________________________________ Email Address: ________________________________________________ Facsimile Number: _____________________________________________ Date: _________________________________________________________