September 16, 2016
Ms. Kimberly D. Bose, Secretary
Federal Energy Regulatory Commission
888 First Street, NE
Washington, DC 20426
Re: Algonquin Gas Transmission, LLC, Docket No. CP14-96-000
Response to September 9 Letter, OEP/DG2E/Gas 2
Dear Ms. Bose:
On March 3, 2015, the Federal Energy Regulatory Commission (“Commission”) issued
its Order Issuing Certificate and Approving Abandonment in the above-referenced docket
authorizing Algonquin Gas Transmission, LLC (“Algonquin”) to construct, own, operate and
maintain the Algonquin Incremental Market Project (“AIM Project”).1
On September 9, 2016,
the Commission staff issued a letter advising Algonquin that Commission staff had determined
that Algonquin failed to comply with certain environmental conditions in the March 3 Order
(“September 9 Letter”). The September 9 Letter set forth several questions which Algonquin
was directed to answer. Algonquin hereby submits in the attachment hereto responses to the
Commission staff’s questions.
Algonquin acknowledges the importance of complying with the Commission’s directives
and Algonquin will continue to work with Commission staff to address this matter to the
Commission staff’s satisfaction. The event discussed in the attachment was inconsistent with
Algonquin’s construction procedures, and is neither representative of Algonquin’s past practices
nor acceptable to Algonquin. As described in the attached responses, Algonquin is
implementing additional measures to ensure future compliance with all Commission orders,
regulations and policies, as well as other applicable permits and authorizations.
1
Algonquin Gas Transmission, LLC, 150 FERC ¶ 61,163 (2015) (“March 3 Order”).
20160916-5187 FERC PDF (Unofficial) 9/16/2016 4:21:47 PM
September 16, 2016
Page 2 of 2
If you have any questions regarding this filing, please contact me at (713) 627-5368 or
Chris Harvey, Director, Rates and Certificates, at (713) 627-5113.
Respectfully submitted,
/s/ Richard J. Kruse
Richard J. Kruse
Vice President, Regulatory and
FERC Chief Compliance Officer
cc: Ann F. Miles, Director, Office of Energy Projects
Alisa Lykens, Gas Branch 2 Chief
Maggie Suter, Environmental Project Manager
Greg Kenney, Spectra Energy, Vice President, Project Execution – East Region
20160916-5187 FERC PDF (Unofficial) 9/16/2016 4:21:47 PM
RESPONSE TO SEPTEMBER 9, 2016 LETTER
FROM COMMISSION STAFF
a) an explanation of why Algonquin proceeded with disturbing a wetland without advance
notification or approval of any agency;
The Hudson River horizontal direction drill (“HDD”) is a complicated drill due to its location
and the geology in the area. After approximately 9 months of work at the HDD drill site to
prepare the bore hole, Algonquin commenced the HDD pullback activities on August 26, 2016.
Algonquin was informed by its contractor on the night of Saturday, August 27, 2016, that the
drill stem had become disconnected from the pipe during the HDD pullback and that the
contractor needed to move quickly to locate and repair the break in order to complete the
pullback or commence retraction of the pipe if the contractor was unable to locate and repair the
drill stem. For reasons provided in response c) below, construction personnel made the
assessment that the drill stem became separated from the pullback string on the west side of the
Hudson River in the vicinity of a recent drilling mud release1
(approximate Sta. 160+10).
Because Algonquin personnel had misinterpreted communications with the onsite FERC
Compliance Monitor and this incident occurred over the weekend when real time communication
with FERC Staff and other agencies is not always possible, Algonquin mistakenly undertook
activities on the west side of the Hudson River prior to receiving written approval or attempting
to contact FERC Staff other than the onsite FERC Compliance Monitor in the field. Specifically,
Algonquin communicated with the onsite FERC Compliance Monitor on Sunday morning
regarding the disconnection of the drill stem. Algonquin described the urgency of the situation
and the importance of moving the pipe as soon as possible as there was a concern that if the pipe
was not moved immediately it could get permanently stuck or the bore hole could be lost. At
the time, Algonquin anticipated that it had sufficiently communicated its plan with the onsite
FERC Compliance Monitor. Based on these conversations with the FERC Compliance Monitor,
Algonquin personnel expected the Monitor to return to the site early Sunday afternoon and due
to the exigent circumstances of this situation, Algonquin personnel made the incorrect
assumption that work could be initiated prior to obtaining written authorization. In retrospect,
Algonquin made an incorrect decision and should have waited until written approvals were
received prior to performing the work.
Algonquin and its contractor, however, acted with due diligence and in good faith and minimized
impacts to the affected resources during its work. The encroachment into wetland A14-SPLR-
W100 was limited to an area of 381 square feet. Algonquin also notified the appropriate
agencies about the emergency excavation via email as soon as the Environmental Manager
returned to his home computer on Sunday afternoon, August 28, 2016, which was followed-up
with email and telephone communications with the New York State Department of
Environmental Conservation (“NYSDEC”) and U.S. Army Corps of Engineers (“COE”) on
Monday morning, August 29, 2016. Algonquin continues to coordinate with the agencies and
provide periodic updates on the Hudson River HDD activities.
1
As noted in Algonquin’s AIM Weekly Construction Report No. 66 filed on September 13, 2016, Algonquin
communicated this inadvertent mud release to the FERC Compliance Monitor and received a variance approval
prior to commencing cleanup work for the mud release.
20160916-5187 FERC PDF (Unofficial) 9/16/2016 4:21:47 PM
As is described in response b), in the future Algonquin will not proceed with work which has not
been authorized by the FERC certificate, agency permits, or easement rights based on verbal
conversations alone. Written approval will be obtained in advance of conducting work requiring
a variance.
b) any measures Algonquin will put in place to ensure that further noncompliance will not
occur;
Algonquin has reinforced the gravity of this situation with internal staff working on the AIM
Project. If such a situation presents itself again on the AIM Project, Algonquin personnel have
been informed that they may not proceed with any work that is not authorized by the
Commission, the landowner, and applicable permitting agencies until such time as Algonquin
has obtained appropriate written authorization to do so. Algonquin has also directed staff
working on the project that, if they should become aware that any unauthorized activity has been
started, such activity must be stopped immediately and a direct line of communication must be
initiated between Algonquin’s Environmental Manager, the FERC Project Manager and the
FERC Compliance Monitor. In addition, Algonquin has initiated or will be initiating the
following measures to reinforce on a project-wide basis, the need for environmental compliance.
Measure Taken by Algonquin
1. Evaluation of Communications Protocols – Algonquin has completed a reevaluation of
its project communications plan and created a new written protocol for the decision
making process which emphasizes the importance of maintaining open lines of
communication between construction, environmental and management personnel.
Irrespective of the seriousness of any situation, Algonquin will document all
communications, both internally and externally, to avoid miscommunications that occur
when multiple personnel are communicating with FERC compliance personnel. In
addition, Algonquin Regulatory and Legal Staff will be notified of all variances going
forward prior to any work being done that is subject to variance approval.
2. Environmental Compliance Reinforcement with Contractor – Algonquin provided a
copy of the September 9 Letter to the Vice President of Henkels & McCoy, the pipeline
contractor working on the HDD, and Algonquin has spoken with senior management for
the contractor and reinforced the need for environmental compliance at all levels.
3. Environmental Awareness Training – Algonquin has held environmental awareness
training for all Algonquin staff and contractor foremen. At this training, Algonquin
reviewed the project environmental requirements and reinforced the importance of
compliance at all levels.
Measure Planned by Algonquin
 Reevaluation of Communication with FERC and Compliance Monitoring Staff –
Algonquin will be requesting a conference call with FERC Staff and third party
compliance monitoring staff to reevaluate communications flow going forward for all
20160916-5187 FERC PDF (Unofficial) 9/16/2016 4:21:47 PM
project issues that require consultation with FERC Staff, especially for situations that
arise on weekends.
c) the calculations Algonquin made to assume the drill stem was within the wetland;
At the time of the disconnection of the drill stem, 101 joints of the drill string were in the hole
with 54 joints remaining. Based on this 65% completion rate, Algonquin’s construction team
determined there was a good chance the drill stem was on the west side of the river in the
proximity of the wetland. The directional drill contractor advised Algonquin that whenever the
mud pumps were turned on drill mud came up directly and instantaneously at the caved in area
within the wetland, which was reasonably assumed to indicate that the break or disconnect had
occurred at that caved-in location. The geology of this wetland area also led the directional drill
contractor to make the assessment that the drill stem disconnection was within this area as it was
full of cobble, boulders, sinkholes, etc. that create conditions more likely to induce tooling
failures. In addition, in order to get the drill pipe string back across the hole after the
disconnection, this area needed to be excavated.
d) copies of all relevant permits and authorizations for impacting this wetland; and
Algonquin provided email notification to the NYSDEC and the COE on Sunday, August 28,
2016, and followed up with telephone calls and additional emails on Monday, August 29, 2016.
Algonquin continues to coordinate with and provide updates to the FERC, the NYSDEC, and the
COE on the status of activities related to the HDD. Relevant correspondence between
Algonquin and the agencies is provided in Attachment A hereto.
e) a detailed plan for restoring the wetland.
Algonquin is anticipating that the second attempt to complete the HDD pullback will occur
within the next three to four weeks. Once the HDD pullback is complete, all disturbed areas
(including the 381 square feet of wetland) will be restored in accordance with the permit
requirements as described in full below.
During the excavation of 381 square feet of wetland A14-SPLR-W100, the wetland subsoil and
topsoil contained within the wetland area were segregated and stored adjacent to the wetland
excavation. Upland soils were stored onsite in an adjacent upland area. Some material was also
hauled offsite to a construction yard for temporary storage until the material could be brought
back to the construction work area to be used as backfill material in the disturbed upland
area. Following the successful completion of the HDD pullback operations, the excavation at
the wetland and upland areas will be restored. The adjacent upland area will be backfilled with
upland material which was stockpiled onsite in an upland area, seeded with an upland seed mix,
with other stabilization measures installed as necessary. The wetland will be backfilled with the
segregated wetland subsoil and topsoil.
If the segregated wetland and topsoil stored onsite is not sufficient to restore the wetland
contours, clean sand material will be imported and placed within the wetland at the wetland
subsoil elevation. Weed -free and seed-free topsoil may be imported to ensure that a minimum
of 12-inches of topsoil exists through the disturbed wetland area. The wetland would then be
planted with a wetland seed mix which the project has been using in New York as part of the
20160916-5187 FERC PDF (Unofficial) 9/16/2016 4:21:47 PM
NYSDEC-approved Storm Water Pollution Prevention Plan as well as with a minimum of ten
red maple saplings. Erosion controls will be installed as appropriate in the disturbed areas. The
seed mix for this wetland restoration effort is included below. As required by the NYSDEC,
upon completion of the restoration of the wetland, Algonquin will submit a final report to the
NYSDEC (and other interested agencies as necessary) documenting the restoration activities.
Wetlands Mix (minimum application rate of 30 lbs./acre pure live
seed)
% by weight
Fox Sedge (Carex culpinoidea), PA ecotype 25%
Lurid Sedge (Carex lurida), PA ecotype 15%
Hop Sedge (Carex lupulina ex Willd.), PA ecotype 8%
Soft Rush (Juncus effusus) 10%
Blunt Broom Sedge (Carex tribuloides), PA ecotype 7%
Deer Tongue “Tioga” (Dichanthelium clandestinum) 15%
Green Bulrush (Scirpus atrovirens), PA ecotype 5%
Eastern Bur Reed (Sparganium americanum) 5%
Giant Bur Reed (Sparganium eurycarpum), PA ecotype 5%
Woolgrass (Scirpus cyperinus), PA ecotype 5%
Annual Ryegrass (Lolium perenne var. multiflorum) or Winter Rye
(Secale cereale) applied at 10 lbs./acre pure live seed
For temporary
stabilization within
wetland areas
20160916-5187 FERC PDF (Unofficial) 9/16/2016 4:21:47 PM
Attachment A:
Documentation of Communication with the New York State Department of
Environmental Conservation, the New York State Historic Preservation
Office, and the U.S. Army Corps of Engineers
20160916-5187 FERC PDF (Unofficial) 9/16/2016 4:21:47 PM
1
Tyrrell, Michael
From: Higgins, Michael T (DEC) <michael.higgins@dec.ny.gov>
Sent: Wednesday, September 07, 2016 11:19 AM
To: Tyrrell, Michael; Gierloff, Heather S (DEC)
Cc: Doyle, Terrance W; Jason Blackwell; Stephen Marquardt; O'Brien, Timothy C; Van Horn, Jasun
Subject: AIM Hudson River HDD Pullback - UPDATE
Mike, 
 
The Department acknowledges receipt of your August 28, 2016 notification regarding the horizontal directional drill (HDD) under the Hudson River which commenced on August 26, 2016.  Once the HDD process is complete, all disturbed areas must be 
restored in accordance with the Water Quality Certification (WQC) issued on May 5, 2015, including restoration of topsoil, the replanting of red maple saplings.  Upon completion of the restoration of the wetland, Algonquin Gas shall submit a final report to 
the Department documenting the restoration activities of all disturbed areas also as required in the May 5, 2015 WQC.  
 
Please feel free to contact me if you have any questions. 
 
Mike Higgins 
 
 
Michael T. Higgins
Project Manager, Division of Environmental Permits
New York State Department of Environmental Conservation
625 Broadway, Albany, NY 12233
P: (518) 402-9179 | F: (518) 402-9168 | michael.higgins@dec.ny.gov
 
www.dec.ny.gov |   |      
 
 
 
 
 
From: Tyrrell, Michael [mailto:MTyrrell@trcsolutions.com]  
Sent: Tuesday, August 30, 2016 5:56 PM 
To: Higgins, Michael T (DEC) <michael.higgins@dec.ny.gov>; Gierloff, Heather S (DEC) <heather.gierloff@dec.ny.gov> 
Cc: Doyle, Terrance W <TWDoyle@spectraenergy.com>; Jason Blackwell <blackwell.jason.dean@gmail.com>; Stephen Marquardt <marquardt.stephen@gmail.com>; O'Brien, Timothy C <tcobrien@spectraenergy.com>; Van Horn, Jasun 
<JVanHorn@spectraenergy.com> 
Subject: RE: AIM Hudson River HDD Pullback ‐ UPDATE 
 
ATTENTION: This email came from an external source. Do not open attachments or click on links from unknown senders or unexpected emails.
Hi Mike and Heather, 
 
We completed a survey of the west side of the Hudson River HDD to verify the extent of temporary wetland impact that occurred on Sunday from the emergency excavation (see attached). The survey more accurately depicts the impact (381 sf) than the 
estimated numbers I reported yesterday.  No spoil was stockpiled in the wetland.   
 
I hope this information is helpful.  Please keep me informed if you require anything further. 
 
Thanks 
 
Mike 
20160916-5187FERCPDF(Unofficial)9/16/20164:21:47PM
2
 
From: Tyrrell, Michael  
Sent: Monday, August 29, 2016 4:09 PM 
To: 'Higgins, Michael T (DEC)' <michael.higgins@dec.ny.gov>; 'Gierloff, Heather S (DEC)' <heather.gierloff@dec.ny.gov> 
Cc: 'Doyle, Terrance W' <TWDoyle@spectraenergy.com>; 'Jason Blackwell' <blackwell.jason.dean@gmail.com>; 'Stephen Marquardt' <marquardt.stephen@gmail.com>; 'O'Brien, Timothy C' <tcobrien@spectraenergy.com>; Van Horn, Jasun 
<JVanHorn@spectraenergy.com> 
Subject: RE: AIM Hudson River HDD Pullback 
 
Hi Mike,  
 
Here is an update on the HDD pullback.   I am copying Heather as well.  
 
The emergency excavation that occurred yesterday that was the result of a disconnect in the drill string used to pull the 42‐inch diameter gas pipe through the HDD.  The excavation was necessary to attempt to find the disconnect along the drill string close 
to the drill rig on the west side of the Hudson.  At the location, the drill string is approximately 20‐25 feet deep at its deepest point (outside the wetland).  The encroachment into wetland A14‐SPLR‐W100 was limited to an area about 20 feet by 30 feet, with 
some additional area disturbed for the temporary storage of the wetland topsoil.  In total, approximately 1,400 square feet of wetland was temporarily disturbed outside the limits of our approved workspace, including the removal of five trees (see attached 
sketch and photograph). I am also attaching a picture of the initial pullback activities that were occurring on Saturday when the pipe string was being pulled through the drill hole to give you some perspective on the situation. 
 
Unfortunately, the contactor was unable to find the separation point along the drill stem.  As a result, the contractor is now in the process of removing the pipeline from the drill hole (approximately 3,000 feet of pipe) from the east side of the river. Once 
that is complete, the contractor will reestablish the drill hole and recommence the pullback operations. Once complete, all disturbed areas will be restored per our permit.  The wetland will be restored and the topsoil replaced. In addition, Algonquin will 
replant the area with red maple saplings and our approved wetland seed mix. As a reported in yesterday's email, our environmental inspectors and the FERC's inspector have been on site.   
  
FERC is looking for some type of approval or acknowledgement from the NYSDEC for the minor wetland encroachment.  The wetland in question is not a state‐mapped wetland, but is 404 regulated.  I’ve been coordinating with the COE on this and sent them 
a similar update a few minutes ago. 
 
Please let me know if you require anything further. I will keep you posted on further developments regarding the pullback activities. 
 
Thanks 
 
Mike 
 
 
From: Tyrrell, Michael  
Sent: Sunday, August 28, 2016 8:31 PM 
To: 'Higgins, Michael T (DEC)' <michael.higgins@dec.ny.gov> 
Cc: 'Doyle, Terrance W' <TWDoyle@spectraenergy.com>; 'Jason Blackwell' <blackwell.jason.dean@gmail.com>; Stephen Marquardt <marquardt.stephen@gmail.com>; 'O'Brien, Timothy C' <tcobrien@spectraenergy.com> 
Subject: RE: AIM Hudson River HDD Pullback 
 
Hi Mike, 
 
The HDD pullback continued through the weekend.  However, we encountered a problem this morning on the west side of the river.  While we are still evaluating the details with the contractor, the drill string that was connected to the pipeline pullback 
section became separated.  Based on the number of joints pulled into the hole, the contractor believes that the separation occurred in the area between Wetland A14‐SPLR‐W100 and the drill rig on the west side of the river. This would put it west of the 
railroad tracks and away from the river itself.  Today, the contractor began excavating in this area in an attempt to find the drill string. This requires a large excavation beginning from the area of Wetland A14‐SPLR‐W100 back to the drill rig.  Some limited 
worked had to occur outside the workspace and slightly within the wetland.  We have our environmental inspector onsite.  In addition, FERC’s inspector was onsite most of the day today and agreed that this was necessary and appropriate given the 
circumstances.  The contractor is using E&S controls as necessary and we are closely monitoring any dewatering that may be necessary.  I will report more details in the morning and will send some photographs.  We are working closely with the contractor to 
resolve this situation as quickly as possible.  Excavation will continue through the night tonight.  
 
I’ll send more details in the morning. 
 
Thanks 
 
Mike 
 
20160916-5187FERCPDF(Unofficial)9/16/20164:21:47PM
3
 
From: Tyrrell, Michael  
Sent: Friday, August 26, 2016 8:38 AM 
To: Higgins, Michael T (DEC) <michael.higgins@dec.ny.gov> 
Subject: AIM Hudson River HDD Pullback 
 
Hi Mike,  
 
After some delays, the pullback commenced earlier this morning and will continue through the weekend.  
 
Mike 
Mike Tyrrell
Principal, Energy Services
670 N. Commercial Street, Suite 203
Manchester, NH 03101
603.801.4140 cell
603.263.9383 office
mtyrrell@trcsolutions.com
 
20160916-5187FERCPDF(Unofficial)9/16/20164:21:47PM
Division for Historic Preservation
P.O. Box 189, Waterford, New York 12188-0189 • (518) 237-8643 • www.nysparks.com
ANDREW M. CUOMO ROSE HARVEY
Governor Commissioner
August 30, 2016
Mr. Gregory Dubell
Energy Projects Manager
The Public Archaeology Laboratory, Inc.
26 Main Street
Pawtucket, RI 02860
Re: FERC
Algonquin Gas Transmission - Algonquin Incremental Market (AIM)
13PR02820
FERC Docket No. CP14-96-000
Dear Mr. Dubell:
Thank you for requesting the comments of the New York State Historic Preservation Office
(SHPO). We have reviewed the submitted materials in accordance with Section 106 of the
National Historic Preservation Act of 1966. These comments are those of the SHPO and relate
only to Historic/Cultural resources. They do not include other environmental impacts to New
York State Parkland that may be involved in or near your project. Such impacts must be
considered as part of the environmental review of the project pursuant to the National
Environmental Policy Act and/or the State Environmental Quality Review Act (New York State
Environmental Conservation Law Article 8).
I have reviewed the materials submitted regarding the Hudson River HDD Workspace Addition
in Stony Point, NY (your letter dated August 29, 2016). I concur with our recommendation that
the proposed work associated with the retrieval of the separated drill string will have no effect
on properties in or eligible for inclusion in the National Register of Historic Places.
If further correspondence is required regarding this project, please refer to the SHPO Project
Review (PR) number noted above. If you have any questions I can be reached at 518-268-
2186.
Sincerely,
Tim Lloyd, Ph.D., RPA
Scientist - Archaeology
timothy.lloyd@parks.ny.gov via e-mail only
20160916-5187 FERC PDF (Unofficial) 9/16/2016 4:21:47 PM
1
Tyrrell, Michael
From: Youhas, Robert NAN <Robert.Youhas@usace.army.mil>
Sent: Friday, September 02, 2016 8:35 AM
To: Tyrrell, Michael; Blackwell, Jason; TWDoyle@spectraenergy.com; tcobrien@spectraenergy.com; marquardt.stephen@gmail.com
Cc: Yan, Jun NAN1; Pinzon, Ronald R NAN02; Mallery, Christopher S NAN02; Ryba, Stephan A NAN02; DeMartino, Bart NAN02
Subject: RE: AIM Project - Hudson River HDD Pullback
Hello Mike:   
 
Thank you for keeping us informed of the pipeline installation work and the recent excavation that was carried out in an effort to recover portions of the disconnected drill string.  At this time, no additional information or action is required.  Please continue 
to keep us informed of the project's progression. 
 
Thanks. 
 
Robert Youhas 
Regulatory Branch, Eastern Section 
U.S. Army Corps of Engineers New York District 
26 Federal Plaza, Room 1937 
New York, NY 10278 
Phone: 917‐790‐8715 
Fax: 212‐264‐4260 
 
‐‐‐‐‐Original Message‐‐‐‐‐ 
From: Tyrrell, Michael [mailto:MTyrrell@trcsolutions.com]  
Sent: Tuesday, August 30, 2016 5:56 PM 
To: Youhas, Robert NAN <Robert.Youhas@usace.army.mil>; Blackwell, Jason <JBlackwell@trcsolutions.com>; TWDoyle@spectraenergy.com; tcobrien@spectraenergy.com; marquardt.stephen@gmail.com 
Cc: Yan, Jun NAN1 <Jun.Yan@usace.army.mil>; Pinzon, Ronald R NAN02 <Ronald.R.Pinzon@usace.army.mil>; Mallery, Christopher S NAN02 <Christopher.S.Mallery@usace.army.mil>; Ryba, Stephan A NAN02 <Stephan.A.Ryba@usace.army.mil>; DeMartino, 
Bart NAN02 <Bart.Demartino@usace.army.mil> 
Subject: [EXTERNAL] RE: AIM Project ‐ Hudson River HDD Pullback 
 
Hi Robert,  
 
We completed a survey of the west side of the Hudson River HDD to verify the extent of temporary wetland impact that occurred on Sunday from the emergency excavation (see attached). The survey more accurately depicts the impact (381 sf) than the 
estimated numbers I reported yesterday.  No spoil was stockpiled in the wetland.   
 
I hope this information is helpful.  Please keep me informed if you require anything further. 
 
Thanks 
 
Mike 
 
‐‐‐‐‐Original Message‐‐‐‐‐ 
From: Tyrrell, Michael  
Sent: Monday, August 29, 2016 4:01 PM 
To: 'Youhas, Robert NAN' <Robert.Youhas@usace.army.mil>; Blackwell, Jason <JBlackwell@trcsolutions.com>; TWDoyle@spectraenergy.com; tcobrien@spectraenergy.com; marquardt.stephen@gmail.com 
Cc: Yan, Jun NAN1 <Jun.Yan@usace.army.mil>; Pinzon, Ronald R NAN02 <Ronald.R.Pinzon@usace.army.mil>; Mallery, Christopher S NAN02 <Christopher.S.Mallery@usace.army.mil>; Ryba, Stephan A NAN02 <Stephan.A.Ryba@usace.army.mil>; DeMartino, 
Bart NAN02 <Bart.Demartino@usace.army.mil> 
Subject: RE: AIM Project ‐ Hudson River HDD Pullback 
 
20160916-5187FERCPDF(Unofficial)9/16/20164:21:47PM
2
Hi Robert, 
  
The emergency excavation that occurred yesterday that was the result of a disconnect in the drill string used to pull the 42‐inch diameter gas pipe through the HDD.  The excavation was necessary to attempt to find the disconnect along the drill string close 
to the drill rig on the west side of the Hudson.  At the location, the drill string is approximately 20‐25 feet deep at its deepest point (outside the wetland).  The encroachment into wetland A14‐SPLR‐W100 was limited to an area about 20 feet by 30 feet, with 
some additional area disturbed for the temporary storage of the wetland topsoil.  In total, approximately 1,400 square feet of wetland was temporarily disturbed outside the limits of our approved workspace, including the removal of five trees (see attached 
sketch and photograph). I am also attaching a picture of the initial pullback activities that were occurring on Saturday when the pipe string was being pulled through the drill hole to give you some perspective on the situation. 
  
Unfortunately, the contactor was unable to find the separation point along the drill stem.  As a result, the contractor is now in the process of removing the pipeline from the drill hole (approximately 3,000 feet of pipe) from the east side of the river. Once 
that is complete, the contractor will reestablish the drill hole and recommence the pullback operations. Once complete, all disturbed areas will be restored per our permit.  The wetland will be restored and the topsoil replaced. In addition, Algonquin will 
replant the area with red maple saplings and our approved wetland seed mix. As a reported in yesterday's email, our environmental inspectors and the FERC's inspector have been onsite.   
  
Please let me know if you require anything further. I will keep you posted on further developments regarding the pullback activities and schedule for wetland restoration.  
  
Thanks 
  
Mike 
 
‐‐‐‐‐Original Message‐‐‐‐‐ 
From: Youhas, Robert NAN [mailto:Robert.Youhas@usace.army.mil]  
Sent: Monday, August 29, 2016 3:12 PM 
To: Tyrrell, Michael <MTyrrell@trcsolutions.com>; Blackwell, Jason <JBlackwell@trcsolutions.com>; TWDoyle@spectraenergy.com; tcobrien@spectraenergy.com; marquardt.stephen@gmail.com 
Cc: Yan, Jun NAN1 <Jun.Yan@usace.army.mil>; Pinzon, Ronald R NAN02 <Ronald.R.Pinzon@usace.army.mil>; Mallery, Christopher S NAN02 <Christopher.S.Mallery@usace.army.mil>; Ryba, Stephan A NAN02 <Stephan.A.Ryba@usace.army.mil>; DeMartino, 
Bart NAN02 <Bart.Demartino@usace.army.mil> 
Subject: RE: AIM Project ‐ Hudson River HDD Pullback 
 
All: 
 
Please provide an update regarding the depth of the excavation and approximately how many square feet/acres of wetland disturbance is occurring at the drill string recovery location. 
 
Thanks. 
 
Robert Youhas 
Regulatory Branch, Eastern Section 
U.S. Army Corps of Engineers New York District 
26 Federal Plaza, Room 1937 
New York, NY 10278 
Phone: 917‐790‐8715 
Fax: 212‐264‐4260 
 
***PLEASE USE THE ABOVE 18‐CHARACTER FILE NUMBER ON ALL CORRESPONDENCE WITH THIS OFFICE***  
 
‐‐‐‐‐Original Message‐‐‐‐‐ 
From: Youhas, Robert NAN  
Sent: Monday, August 29, 2016 8:16 AM 
To: 'MTyrrell@trcsolutions.com' <MTyrrell@trcsolutions.com> 
Cc: 'JBlackwell@trcsolutions.com' <JBlackwell@trcsolutions.com>; 'TWDoyle@spectraenergy.com' <TWDoyle@spectraenergy.com>; 'tcobrien@spectraenergy.com' <tcobrien@spectraenergy.com>; 'marquardt.stephen@gmail.com' 
<marquardt.stephen@gmail.com>; Yan, Jun NAN1 <Jun.Yan@usace.army.mil>; Ronald R NAN02 Pinzon (Ronald.R.Pinzon@usace.army.mil) <Ronald.R.Pinzon@usace.army.mil>; Mallery, Christopher S NAN02 <Christopher.S.Mallery@usace.army.mil>; Ryba, 
Stephan A NAN02 <Stephan.A.Ryba@usace.army.mil> 
Subject: RE: AIM Project ‐ Hudson River HDD Pullback 
 
Michael: 
 
20160916-5187FERCPDF(Unofficial)9/16/20164:21:47PM
3
Approximately how deep are you excavating and approximately how many square feet/acres of wetland disturbance will occur? 
 
Thanks. 
 
Robert Youhas 
Regulatory Branch, Eastern Section 
U.S. Army Corps of Engineers New York District 
26 Federal Plaza, Room 1937 
New York, NY 10278 
Phone: 917‐790‐8715 
Fax: 212‐264‐4260 
 
‐‐‐‐‐Original Message‐‐‐‐‐ 
From: Yan, Jun NAN1  
Sent: Monday, August 29, 2016 7:39 AM 
To: Youhas, Robert NAN <Robert.Youhas@usace.army.mil> 
Cc: Pinzon, Ronald R NAN02 <Ronald.R.Pinzon@usace.army.mil> 
Subject: FW: AIM Project ‐ Hudson River HDD Pullback 
 
FYI 2 
 
‐‐‐‐‐Original Message‐‐‐‐‐ 
From: Tyrrell, Michael [mailto:MTyrrell@trcsolutions.com]  
Sent: Sunday, August 28, 2016 8:30 PM 
To: Yan, Jun NAN1 <Jun.Yan@usace.army.mil> 
Cc: Blackwell, Jason <JBlackwell@trcsolutions.com>; Doyle, Terrance W <TWDoyle@spectraenergy.com>; O'Brien, Timothy C <tcobrien@spectraenergy.com>; Stephen Marquardt <marquardt.stephen@gmail.com> 
Subject: [EXTERNAL] RE: AIM Project ‐ Hudson River HDD Pullback 
 
Hi Jun, 
 
  
 
The HDD pullback continued through the weekend.  However, we encountered a problem this morning on the west side of the river.  While we are still evaluating the details with the contractor, the drill string that was connected to the pipeline pullback 
section became separated.  Based on the number of joints pulled into the hole, the contractor believes that the separation occurred in the area between Wetland A14‐SPLR‐W100 and the drill rig on the west side of the river. This would put it west of the 
railroad tracks and away from the river itself.  Today, the contractor began excavating in this area in an attempt to find the drill string. This requires a large excavation beginning from the area of Wetland A14‐SPLR‐W100 back to the drill rig.  Some limited 
worked had to occur outside the workspace and slightly within the wetland.  We have our environmental inspector onsite.  In addition, FERC's inspector was onsite most of the day today and agreed that this was necessary and appropriate given the 
circumstances.  The contractor is using E&S controls as necessary and we are closely monitoring any dewatering that may be necessary.  I will report more details in the morning and will send some photographs.  We are working closely with the contractor to 
resolve this situation as quickly as possible.  Excavation will continue through the night tonight.  
 
  
 
I'll send more details in the morning. 
 
  
 
Thanks 
 
  
 
Mike 
 
  
20160916-5187FERCPDF(Unofficial)9/16/20164:21:47PM
4
 
From: Tyrrell, Michael  
Sent: Friday, August 26, 2016 4:38 PM 
To: 'Yan, Jun NAN1' <Jun.Yan@usace.army.mil> 
Cc: Blackwell, Jason <JBlackwell@trcsolutions.com>; Doyle, Terrance W <TWDoyle@spectraenergy.com> 
Subject: AIM Project ‐ Hudson River HDD Pullback 
 
  
 
Hi Jun, 
 
  
 
Hope all is well.  We have begun the pullback of the Hudson River HDD which is a major milestone for us (see picture).  In the final stages of the drilling operation, an inadvertent release of drilling fluid occurred on the west side of the Hudson River in 
Wetland A14‐SPLR‐W100 (see attached map showing the location). The release was discovered early last Sunday morning.  In accordance with the approved Best Drilling Practices, Monitoring and Clean‐up of Horizontal Directional Drilling Inadvertent 
Returns Plan we filed with the FERC, Corps and other agencies, we took immediate action and installed hay bales and silt fence to contain the drilling mud. Additional silt fence and hay bales were installed on Monday and Tuesday as we monitored the 
situation and to further contain potential drilling mud releases in this area as the pullback is initiated.   In addition, pumps were installed at the drilling mud release area to relay drilling mud back to the drilling mud recycling unit and/or vacuum trucks as the 
pullback moves forward. Backup pumps are staged onsite to ensure the prompt response should the situation change. Upon completion of the pullback (anticipated early next week), the area will be restored and the pumps removed.  
 
  
 
The FERC monitor and NYSDEC staff have been notified as well. 
 
  
 
Let me know if you have any questions. 
 
 
Thanks 
 
  
 
Mike 
 
  
 
  
 
Mike Tyrrell 
Principal, Energy Services 
 
  
 
 
 
  
 
670 N. Commercial Street, Suite 203 
Manchester, NH  03101  
 
603.801.4140  cell 
 
20160916-5187FERCPDF(Unofficial)9/16/20164:21:47PM
Document Content(s)
AIM Project-Response to Staff Notice of Violation.PDF.................1-15
20160916-5187 FERC PDF (Unofficial) 9/16/2016 4:21:47 PM

Mais conteúdo relacionado

Semelhante a Algonquin Gas Transmission response to FERC letter re Wetland Encroachment Along Hudson River

Submission by Lake Ontario Waterkeeper for the Darlington Nuclear Relicensing...
Submission by Lake Ontario Waterkeeper for the Darlington Nuclear Relicensing...Submission by Lake Ontario Waterkeeper for the Darlington Nuclear Relicensing...
Submission by Lake Ontario Waterkeeper for the Darlington Nuclear Relicensing...LOWaterkeeper
 
Charlotte UAV : An Ideal Partner for Mecklenburg County
Charlotte UAV : An Ideal Partner for Mecklenburg CountyCharlotte UAV : An Ideal Partner for Mecklenburg County
Charlotte UAV : An Ideal Partner for Mecklenburg CountyBretten Smith
 
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...LOWaterkeeper
 
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPARange Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPAMarcellus Drilling News
 
Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...
Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...
Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...LOWaterkeeper
 
ANALYSIS OF EIA FOR AN ENERGY PROJECT - ASSIGNMENT
ANALYSIS OF EIA FOR AN ENERGY PROJECT - ASSIGNMENTANALYSIS OF EIA FOR AN ENERGY PROJECT - ASSIGNMENT
ANALYSIS OF EIA FOR AN ENERGY PROJECT - ASSIGNMENTDoug Robertson
 
Fink_NEW FORMAT resume (General)
Fink_NEW FORMAT resume (General)Fink_NEW FORMAT resume (General)
Fink_NEW FORMAT resume (General)Russell Fink, EIT
 
Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...
Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...
Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...LOWaterkeeper
 
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion ProjectFERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion ProjectMarcellus Drilling News
 

Semelhante a Algonquin Gas Transmission response to FERC letter re Wetland Encroachment Along Hudson River (14)

Submission by Lake Ontario Waterkeeper for the Darlington Nuclear Relicensing...
Submission by Lake Ontario Waterkeeper for the Darlington Nuclear Relicensing...Submission by Lake Ontario Waterkeeper for the Darlington Nuclear Relicensing...
Submission by Lake Ontario Waterkeeper for the Darlington Nuclear Relicensing...
 
Charlotte UAV : An Ideal Partner for Mecklenburg County
Charlotte UAV : An Ideal Partner for Mecklenburg CountyCharlotte UAV : An Ideal Partner for Mecklenburg County
Charlotte UAV : An Ideal Partner for Mecklenburg County
 
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
Lake Ontario Waterkeeper's submissions for Pickering Waste Management Facilit...
 
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPARange Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
Range Resources Voluntary Plan to Close Yeager Wastewater Impoundment in SWPA
 
Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...
Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...
Submission of Lake Ontario Waterkeeper - Relicensing hearing before the Canad...
 
Gas Line Near Indian Point Nuclear Power Plant
Gas Line Near Indian Point Nuclear Power PlantGas Line Near Indian Point Nuclear Power Plant
Gas Line Near Indian Point Nuclear Power Plant
 
publication
publicationpublication
publication
 
CV~PW~02-02-16 Opus
CV~PW~02-02-16 OpusCV~PW~02-02-16 Opus
CV~PW~02-02-16 Opus
 
ANALYSIS OF EIA FOR AN ENERGY PROJECT - ASSIGNMENT
ANALYSIS OF EIA FOR AN ENERGY PROJECT - ASSIGNMENTANALYSIS OF EIA FOR AN ENERGY PROJECT - ASSIGNMENT
ANALYSIS OF EIA FOR AN ENERGY PROJECT - ASSIGNMENT
 
FERC Downeast LNG Rejection Notice
FERC Downeast LNG Rejection NoticeFERC Downeast LNG Rejection Notice
FERC Downeast LNG Rejection Notice
 
Fink_NEW FORMAT resume (General)
Fink_NEW FORMAT resume (General)Fink_NEW FORMAT resume (General)
Fink_NEW FORMAT resume (General)
 
EnbridgeResponse
EnbridgeResponseEnbridgeResponse
EnbridgeResponse
 
Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...
Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...
Waterkeeper's Review of CNSC's Regulatory Oversight Report for Uranium and Nu...
 
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion ProjectFERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
FERC Order Denying Stay of Kinder Morgan's Broad Run Expansion Project
 

Mais de Marcellus Drilling News

Five facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strongFive facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strongMarcellus Drilling News
 
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)Marcellus Drilling News
 
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA CountriesDOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA CountriesMarcellus Drilling News
 
LSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. ManufacturingLSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. ManufacturingMarcellus Drilling News
 
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...Marcellus Drilling News
 
Report: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental ExternalitiesReport: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental ExternalitiesMarcellus Drilling News
 
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015Marcellus Drilling News
 
U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015Marcellus Drilling News
 
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids PlantsVelocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids PlantsMarcellus Drilling News
 
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...Marcellus Drilling News
 
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...Marcellus Drilling News
 
PA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsPA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsMarcellus Drilling News
 
US EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy OutlookUS EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy OutlookMarcellus Drilling News
 
Northeast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical GuideNortheast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical GuideMarcellus Drilling News
 
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee AuditPA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee AuditMarcellus Drilling News
 
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...Marcellus Drilling News
 
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final ReportClyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final ReportMarcellus Drilling News
 
Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...
Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...
Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...Marcellus Drilling News
 
Final Environmental Impact Statement for NEXUS Gas Transmission Project
Final Environmental Impact Statement for NEXUS Gas Transmission ProjectFinal Environmental Impact Statement for NEXUS Gas Transmission Project
Final Environmental Impact Statement for NEXUS Gas Transmission ProjectMarcellus Drilling News
 
Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...
Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...
Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...Marcellus Drilling News
 

Mais de Marcellus Drilling News (20)

Five facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strongFive facts about shale: it’s coming back, and coming back strong
Five facts about shale: it’s coming back, and coming back strong
 
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
Quarterly legislative action update: Marcellus and Utica shale region (4Q16)
 
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA CountriesDOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
DOE Order Granting Elba Island LNG Right to Export to Non-FTA Countries
 
LSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. ManufacturingLSE Study: Fracking is Revitalizing U.S. Manufacturing
LSE Study: Fracking is Revitalizing U.S. Manufacturing
 
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
Letter From 24 States Asking Trump & Congress to Withdraw the Unlawful Clean ...
 
Report: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental ExternalitiesReport: New U.S. Power Costs: by County, with Environmental Externalities
Report: New U.S. Power Costs: by County, with Environmental Externalities
 
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
U.S. Crude Oil and Natural Gas Proved Reserves, Year-end 2015
 
U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015U.S. EIA's Drilling Productivity Report - December 2015
U.S. EIA's Drilling Productivity Report - December 2015
 
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids PlantsVelocys Plan to "Build the Business" - Gas-to-Liquids Plants
Velocys Plan to "Build the Business" - Gas-to-Liquids Plants
 
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
PA DEP Revised Permit for Natural Gas Compression Stations, Processing Plants...
 
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
PA DEP Permit for Unconventional NatGas Well Site Operations and Remote Piggi...
 
PA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas OperationsPA DEP: Methane Reduction Strategies for Natural Gas Operations
PA DEP: Methane Reduction Strategies for Natural Gas Operations
 
US EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy OutlookUS EIA's December 2016 Short-Term Energy Outlook
US EIA's December 2016 Short-Term Energy Outlook
 
Northeast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical GuideNortheast Gas Association's 2016 Statistical Guide
Northeast Gas Association's 2016 Statistical Guide
 
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee AuditPA PUC Responses to Auditor General's Act 13 Impact Fee Audit
PA PUC Responses to Auditor General's Act 13 Impact Fee Audit
 
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
Pennsylvania Public Utility Commission Act 13/Impact Fees Audit by PA Auditor...
 
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final ReportClyde Mine Discharge/Tenmile Creek Water Quality Final Report
Clyde Mine Discharge/Tenmile Creek Water Quality Final Report
 
Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...
Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...
Sixth Circuit Court of Appeals Decision in Harper v Muskingum Watershed Conse...
 
Final Environmental Impact Statement for NEXUS Gas Transmission Project
Final Environmental Impact Statement for NEXUS Gas Transmission ProjectFinal Environmental Impact Statement for NEXUS Gas Transmission Project
Final Environmental Impact Statement for NEXUS Gas Transmission Project
 
Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...
Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...
Schedule 13D - Stone Energy Corporation - Largest Shareholder Opposes Bankrup...
 

Último

Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceDelhi Call girls
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...Axel Bruns
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadershipanjanibaddipudi1
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...Diya Sharma
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxjohnandrewcarlos
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKISHAN REDDY OFFICE
 
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Axel Bruns
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfFahimUddin61
 
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...Muhammad Shamsaddin Megalommatis
 
Minto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxMinto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxAwaiskhalid96
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfLorenzo Lemes
 
25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdf25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceDelhi Call girls
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxlorenzodemidio01
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...AlexisTorres963861
 
N. Chandrababu Naidu Receives Global Agriculture Policy Leadership Award
N. Chandrababu Naidu Receives Global Agriculture Policy Leadership AwardN. Chandrababu Naidu Receives Global Agriculture Policy Leadership Award
N. Chandrababu Naidu Receives Global Agriculture Policy Leadership Awardsrinuseo15
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...narsireddynannuri1
 

Último (20)

Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
Dynamics of Destructive Polarisation in Mainstream and Social Media: The Case...
 
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Indirapuram Escorts >༒8448380779 Escort Service
 
29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdf
 
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
Beyond Afrocentrism: Prerequisites for Somalia to lead African de-colonizatio...
 
Minto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptxMinto-Morley Reforms 1909 (constitution).pptx
Minto-Morley Reforms 1909 (constitution).pptx
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdf
 
25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdf25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdf
 
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
 
N. Chandrababu Naidu Receives Global Agriculture Policy Leadership Award
N. Chandrababu Naidu Receives Global Agriculture Policy Leadership AwardN. Chandrababu Naidu Receives Global Agriculture Policy Leadership Award
N. Chandrababu Naidu Receives Global Agriculture Policy Leadership Award
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
 

Algonquin Gas Transmission response to FERC letter re Wetland Encroachment Along Hudson River