Thermal Power Plant Operations
(Coal Based TPS)
Manohar Tatwawadi
total output power solutions
Pune, Maharashtra, India
Mob: +91 9372167165, Email: mtatwawadi@gmail.com
AIM / OBJECTIVE
• Bring Unit on load in optimum time
• Sequential and Parallel operations on Boiler
and Turbine side for minimum cost of
generation.
• Reduction of Fuel required for Start Up
operations before the unit is connected to the
grid
22-Mar-2022 total output power solutions 2
Power Plant Operations ..Cold
• Check the availability of Station Supply for
Water, compressors and other common aux.
• Charge the station transformers
• Make the supply available for CHP, OHP, AHP,
WT, Compressor House and the Dewatering
pumps etc.
• Make the supply available for Unit Auxiliaries
(Boiler, Turbine, Generator)
22-Mar-2022 total output power solutions 3
Readiness of Outdoor Plants
Check for the readiness of
• Oil Handling Plant for availability of Oil; FO
and LDO
• Coal Handling Plant; Coal stock, crushers,
vibrators, Bunker levels etc.
• Water Treatment Plant; availability of General
service water, DM water, etc.
• Ash Handling system
22-Mar-2022 total output power solutions 4
Readiness of Unit Aux Systems
• Firing Equipment; Ignitors, Scanners, Burners
(Oil and Coal), atomising air/steam etc.
• Boiler Auxiliaries; APH, ID Fans, FD Fans, PA
Fans, ESP, etc for cooling water and operating
oil etc.
• Turbine Auxilieries; CEP, BFP, Deaerator, LP
Heaters, HP Heaters, Gland seal system,
Lubricating oil system, etc.
22-Mar-2022 total output power solutions 5
Starting the operations
• Boiler drum filling
• Condenser Filling
• Deaerator filling
• DM Makeup Tanks
• Lubricating Oil system cooling
• Cooling for ID, FD, APH etc
• Condenser CW System
22-Mar-2022 total output power solutions 6
Unit Start Up
• PRDS Availability, Oil Heating
• Boiler Lightup, FSSS
• Lub oil system of turbine, Seal oil system of
generator
• Hydrogen Filling in Generator, Barring Gear
Turbine
• Expansion of Boiler, RH protection
• Closing of Vents, Drum and S/H.
22-Mar-2022 total output power solutions 7
Unit Start Up
• Opening of HP LP Bypass
• Raising MS Pressure, Temp. 25kg/sqcm, 2800C
• Heating of MS Lines, Turbine Casing, Rate of
heating controlled by drains.
• Rate of raising of temp of steam in Boiler.
• Admission of steam in Turbines, Rolling of
Turbine.
22-Mar-2022 total output power solutions 8
Turbine Rolling
• Turbine Soaking
• Turbovisory
• Critical Speeds
• Raising the speed to 3000 RPM
• Boiler side Extra guns taken in service
• Generator Stator water & Hydrogen coolers
are I/S
• Generator main CB OK
22-Mar-2022 total output power solutions 9
Synchronising
• Maintain the speed of Turbine to 3000 RPM
• Raise the Terminal Voltage of Generator by
Excitation system with AVR on Manual.
• Synchroscope “ON”
• When the Turbine speed is slightly more than
the grid speed, the Phase sequence is
matching and the generator TV is slightly more
than the grid voltage, synchronise the Unit
(Make the generator CB “ON”)
22-Mar-2022 total output power solutions 10
Loading of the TA Set
• Increase the Furnace Oil guns
• If the temp of the furnace is more than 6000C a
coal mill can be taken in service.
• The unit must be synchronised or HP LP Bypass
must be taken in service before taking a coal mill
in service. This ensures steam flow through the
reheater.
• The load on the unit must be raised as per the
ramp rate given by the manufacturer.
• Change over from station Transformer to Unit
Auxiliary Transformer
22-Mar-2022 total output power solutions 11
Charging of BFP
• Check the deaerator heating and deaerator
pressure
• Check the recirculation valves of BFP
• Check the balancing leak off valves of BFP
• Aux oil pump running, warm up valve open.
• BFP Motor cooling I/S
• Check the Feed water Regulating station, HP
Heaters, FW System and Start BFP .
22-Mar-2022 total output power solutions 12
Charging of LP Heaters
• LP Heaters must be evacuated before Charging
• All condensate must be drained before
charging the LP Heaters.
• LP heaters will be charged with condensate
first.
• Cascade drains to be opened for maintaining
the levels in the LP Heaters.
• LP Heaters can now be charged from steam
side. (Extractions)
22-Mar-2022 total output power solutions 13
Boiler side load raising
• PA Fans started and PA Header Pressure
Maintained on Auto
• Cold air and hot air gates for PA to mill opened
• Mill Temp and PA Flow to be put on auto
• Coal Mill shall be taken in service ensuring the
bunker level.
• Secondary air dampers of the elevation put on
auto
22-Mar-2022 total output power solutions 14
Boiler side loading
• Check the Boiler Expansion
• Take ESP In service
• Set the BA and Fly ash evacuation system in
service.
• The increase in Temp and pressure of the
steam must be in line with the Ramp rate
given by the manufacturer. (2 MW/min)
• Take another mill I/s
22-Mar-2022 total output power solutions 15
Charge HP Heaters
• HP Heaters are already Charged from Feed
side
• Open the cascade drain/drip valves and put
them on auto to maintain the level in the
Heaters
• Open the extraction Valves
• This may result in lowering the load but the
load will automatically rise as the HP heaters
are in service.
22-Mar-2022 total output power solutions 16
Start Up Curve Cold Start
22-Mar-2022 total output power solutions 17
Activities Chart
22-Mar-2022 total output power solutions 18
22-Mar-2022 total output power solutions 19

Mais conteúdo relacionado

Mais procurados

660 mw turbo generator & its auxiliaries
660 mw turbo generator & its auxiliaries660 mw turbo generator & its auxiliaries
660 mw turbo generator & its auxiliariesAshvani Shukla
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineManohar Tatwawadi
 
HP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineHP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineRAVI PAL SINGH
 
THERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONSTHERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONSManohar Tatwawadi
 
Steam Turbines
Steam Turbines Steam Turbines
Steam Turbines Amir Ayad
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesBoben Anto Chemmannoor
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerVaibhav Paydelwar
 
Heat rate of thermal power plant
Heat rate of thermal power plantHeat rate of thermal power plant
Heat rate of thermal power plantManohar Tatwawadi
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownAshvani Shukla
 
Cfbc boiler startup and shutdown
Cfbc boiler startup and shutdownCfbc boiler startup and shutdown
Cfbc boiler startup and shutdownAshvani Shukla
 
Steam Turbine Performance in TPS
Steam Turbine Performance in TPSSteam Turbine Performance in TPS
Steam Turbine Performance in TPSManohar Tatwawadi
 
POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW Manohar Tatwawadi
 
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATETHERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATEManohar Tatwawadi
 
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...Manohar Tatwawadi
 
Turbine cycle heat rate calculation
Turbine  cycle heat rate calculationTurbine  cycle heat rate calculation
Turbine cycle heat rate calculationSHIVAJI CHOUDHURY
 
Maintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINEMaintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINESAI SHARATH GAMPA
 

Mais procurados (20)

660 mw turbo generator & its auxiliaries
660 mw turbo generator & its auxiliaries660 mw turbo generator & its auxiliaries
660 mw turbo generator & its auxiliaries
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
 
Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
 
HP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineHP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam Turbine
 
THERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONSTHERMAL POWER PLANT OPERATIONS
THERMAL POWER PLANT OPERATIONS
 
Turbine safety protection
Turbine safety protectionTurbine safety protection
Turbine safety protection
 
Steam Turbines
Steam Turbines Steam Turbines
Steam Turbines
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbines
 
Construction of 500 MW Steam Boiler
Construction of 500 MW Steam BoilerConstruction of 500 MW Steam Boiler
Construction of 500 MW Steam Boiler
 
Heat rate of thermal power plant
Heat rate of thermal power plantHeat rate of thermal power plant
Heat rate of thermal power plant
 
Unit protection scheme
Unit protection schemeUnit protection scheme
Unit protection scheme
 
Unit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdownUnit lightup synchronisation & shutdown
Unit lightup synchronisation & shutdown
 
Cfbc boiler startup and shutdown
Cfbc boiler startup and shutdownCfbc boiler startup and shutdown
Cfbc boiler startup and shutdown
 
Steam Turbine Performance in TPS
Steam Turbine Performance in TPSSteam Turbine Performance in TPS
Steam Turbine Performance in TPS
 
POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW POWER PLANT SIMULATOR 210 MW
POWER PLANT SIMULATOR 210 MW
 
Boiler safety protection
Boiler  safety protectionBoiler  safety protection
Boiler safety protection
 
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATETHERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
 
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
Starting & Recommended Interlocks for AH,ID,FD,PA Fans & BD Valves for 270 MW...
 
Turbine cycle heat rate calculation
Turbine  cycle heat rate calculationTurbine  cycle heat rate calculation
Turbine cycle heat rate calculation
 
Maintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINEMaintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINE
 

Semelhante a Power Plant Operations.pdf

SUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONSUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONAMIT KUMAR
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plantGaurav Kaushik
 
Patratu thermal power ppt
Patratu thermal power pptPatratu thermal power ppt
Patratu thermal power pptkrrohit09030
 
Schneider process automation power industry solutions
Schneider process automation power industry solutionsSchneider process automation power industry solutions
Schneider process automation power industry solutionsRodney Berg
 
Large scale energy recovery ppt HRSG
Large scale energy recovery ppt HRSGLarge scale energy recovery ppt HRSG
Large scale energy recovery ppt HRSGlorenzo Monasca
 
Turbine Start Up.pptx
Turbine Start Up.pptxTurbine Start Up.pptx
Turbine Start Up.pptxssuser0cdaa1
 
Study of corrosion and erosion in boilers
Study of corrosion and erosion in boilersStudy of corrosion and erosion in boilers
Study of corrosion and erosion in boilersSajeed Mahaboob
 
POWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINEPOWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINEManohar Tatwawadi
 
Ntpc anta training presentation
Ntpc anta training presentation Ntpc anta training presentation
Ntpc anta training presentation nishant pareek
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccppDurgSingh
 
AUXILIARY POWER SUPPLY SCHEME FOR THERMAL POWER PLANT
AUXILIARY POWER SUPPLY SCHEME FOR THERMAL POWER PLANTAUXILIARY POWER SUPPLY SCHEME FOR THERMAL POWER PLANT
AUXILIARY POWER SUPPLY SCHEME FOR THERMAL POWER PLANTsheikhalfiya
 
Bhel training ppt_v[1] at bawana
Bhel training ppt_v[1] at bawanaBhel training ppt_v[1] at bawana
Bhel training ppt_v[1] at bawanaVisheshKumar55
 
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...GSE Systems, Inc.
 

Semelhante a Power Plant Operations.pdf (20)

SUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTIONSUMMER TRAINING AT NTPC DADRI GAS SECTION
SUMMER TRAINING AT NTPC DADRI GAS SECTION
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plant
 
Patratu thermal power ppt
Patratu thermal power pptPatratu thermal power ppt
Patratu thermal power ppt
 
Schneider process automation power industry solutions
Schneider process automation power industry solutionsSchneider process automation power industry solutions
Schneider process automation power industry solutions
 
Large scale energy recovery ppt HRSG
Large scale energy recovery ppt HRSGLarge scale energy recovery ppt HRSG
Large scale energy recovery ppt HRSG
 
Lecture 7-9
Lecture 7-9Lecture 7-9
Lecture 7-9
 
Turbine Start Up.pptx
Turbine Start Up.pptxTurbine Start Up.pptx
Turbine Start Up.pptx
 
Study of corrosion and erosion in boilers
Study of corrosion and erosion in boilersStudy of corrosion and erosion in boilers
Study of corrosion and erosion in boilers
 
Epa of cogen
Epa of cogenEpa of cogen
Epa of cogen
 
POWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINEPOWER PLANT SIMULATOR 210 MW LMW TURBINE
POWER PLANT SIMULATOR 210 MW LMW TURBINE
 
Industrial training
Industrial trainingIndustrial training
Industrial training
 
O&m of boiler
O&m of boilerO&m of boiler
O&m of boiler
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Kstps ppt
Kstps pptKstps ppt
Kstps ppt
 
Ntpc anta training presentation
Ntpc anta training presentation Ntpc anta training presentation
Ntpc anta training presentation
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccpp
 
AUXILIARY POWER SUPPLY SCHEME FOR THERMAL POWER PLANT
AUXILIARY POWER SUPPLY SCHEME FOR THERMAL POWER PLANTAUXILIARY POWER SUPPLY SCHEME FOR THERMAL POWER PLANT
AUXILIARY POWER SUPPLY SCHEME FOR THERMAL POWER PLANT
 
Bhel training ppt_v[1] at bawana
Bhel training ppt_v[1] at bawanaBhel training ppt_v[1] at bawana
Bhel training ppt_v[1] at bawana
 
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
 
Ppt aman
Ppt amanPpt aman
Ppt aman
 

Mais de Manohar Tatwawadi

Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Manohar Tatwawadi
 
Green building concepts and good building practices
Green building concepts and good building practicesGreen building concepts and good building practices
Green building concepts and good building practicesManohar Tatwawadi
 
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyAuxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyManohar Tatwawadi
 
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESCOMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESManohar Tatwawadi
 
Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Manohar Tatwawadi
 
Cooling towers in thermal power plants
Cooling towers in thermal power plantsCooling towers in thermal power plants
Cooling towers in thermal power plantsManohar Tatwawadi
 
Electrical safety in power stations
Electrical safety in power stationsElectrical safety in power stations
Electrical safety in power stationsManohar Tatwawadi
 
Cost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPSCost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPSManohar Tatwawadi
 
Environmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power StationsEnvironmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power StationsManohar Tatwawadi
 
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...Manohar Tatwawadi
 
Fuels and Combustion Equations
Fuels and Combustion EquationsFuels and Combustion Equations
Fuels and Combustion EquationsManohar Tatwawadi
 
Basics of thermal power stations
Basics of thermal power stationsBasics of thermal power stations
Basics of thermal power stationsManohar Tatwawadi
 
Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergenciesManohar Tatwawadi
 
Effect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsEffect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsManohar Tatwawadi
 
Thermal power plant efficiency
Thermal power plant efficiencyThermal power plant efficiency
Thermal power plant efficiencyManohar Tatwawadi
 
210 mw turbine cycle heat rate
210 mw turbine cycle heat rate210 mw turbine cycle heat rate
210 mw turbine cycle heat rateManohar Tatwawadi
 
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTManohar Tatwawadi
 

Mais de Manohar Tatwawadi (20)

Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3
 
Green building concepts and good building practices
Green building concepts and good building practicesGreen building concepts and good building practices
Green building concepts and good building practices
 
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler EfficiencyAuxiliary Consumption and Saving due to Increase in Boiler Efficiency
Auxiliary Consumption and Saving due to Increase in Boiler Efficiency
 
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESCOMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
 
FAQ on Turbines Part 2
FAQ on Turbines Part 2FAQ on Turbines Part 2
FAQ on Turbines Part 2
 
Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1
 
Cooling towers in thermal power plants
Cooling towers in thermal power plantsCooling towers in thermal power plants
Cooling towers in thermal power plants
 
Electrical safety in power stations
Electrical safety in power stationsElectrical safety in power stations
Electrical safety in power stations
 
Cost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPSCost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPS
 
Environmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power StationsEnvironmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power Stations
 
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
 
Fuels and Combustion Equations
Fuels and Combustion EquationsFuels and Combustion Equations
Fuels and Combustion Equations
 
Basics of thermal power stations
Basics of thermal power stationsBasics of thermal power stations
Basics of thermal power stations
 
Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergencies
 
Effect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsEffect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / Mills
 
Thermal power plant efficiency
Thermal power plant efficiencyThermal power plant efficiency
Thermal power plant efficiency
 
210 mw turbine cycle heat rate
210 mw turbine cycle heat rate210 mw turbine cycle heat rate
210 mw turbine cycle heat rate
 
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
 
Biomass Power Plants
Biomass Power PlantsBiomass Power Plants
Biomass Power Plants
 
Swot Analysis
Swot AnalysisSwot Analysis
Swot Analysis
 

Último

BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 

Último (20)

BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 

Power Plant Operations.pdf

  • 1. Thermal Power Plant Operations (Coal Based TPS) Manohar Tatwawadi total output power solutions Pune, Maharashtra, India Mob: +91 9372167165, Email: mtatwawadi@gmail.com
  • 2. AIM / OBJECTIVE • Bring Unit on load in optimum time • Sequential and Parallel operations on Boiler and Turbine side for minimum cost of generation. • Reduction of Fuel required for Start Up operations before the unit is connected to the grid 22-Mar-2022 total output power solutions 2
  • 3. Power Plant Operations ..Cold • Check the availability of Station Supply for Water, compressors and other common aux. • Charge the station transformers • Make the supply available for CHP, OHP, AHP, WT, Compressor House and the Dewatering pumps etc. • Make the supply available for Unit Auxiliaries (Boiler, Turbine, Generator) 22-Mar-2022 total output power solutions 3
  • 4. Readiness of Outdoor Plants Check for the readiness of • Oil Handling Plant for availability of Oil; FO and LDO • Coal Handling Plant; Coal stock, crushers, vibrators, Bunker levels etc. • Water Treatment Plant; availability of General service water, DM water, etc. • Ash Handling system 22-Mar-2022 total output power solutions 4
  • 5. Readiness of Unit Aux Systems • Firing Equipment; Ignitors, Scanners, Burners (Oil and Coal), atomising air/steam etc. • Boiler Auxiliaries; APH, ID Fans, FD Fans, PA Fans, ESP, etc for cooling water and operating oil etc. • Turbine Auxilieries; CEP, BFP, Deaerator, LP Heaters, HP Heaters, Gland seal system, Lubricating oil system, etc. 22-Mar-2022 total output power solutions 5
  • 6. Starting the operations • Boiler drum filling • Condenser Filling • Deaerator filling • DM Makeup Tanks • Lubricating Oil system cooling • Cooling for ID, FD, APH etc • Condenser CW System 22-Mar-2022 total output power solutions 6
  • 7. Unit Start Up • PRDS Availability, Oil Heating • Boiler Lightup, FSSS • Lub oil system of turbine, Seal oil system of generator • Hydrogen Filling in Generator, Barring Gear Turbine • Expansion of Boiler, RH protection • Closing of Vents, Drum and S/H. 22-Mar-2022 total output power solutions 7
  • 8. Unit Start Up • Opening of HP LP Bypass • Raising MS Pressure, Temp. 25kg/sqcm, 2800C • Heating of MS Lines, Turbine Casing, Rate of heating controlled by drains. • Rate of raising of temp of steam in Boiler. • Admission of steam in Turbines, Rolling of Turbine. 22-Mar-2022 total output power solutions 8
  • 9. Turbine Rolling • Turbine Soaking • Turbovisory • Critical Speeds • Raising the speed to 3000 RPM • Boiler side Extra guns taken in service • Generator Stator water & Hydrogen coolers are I/S • Generator main CB OK 22-Mar-2022 total output power solutions 9
  • 10. Synchronising • Maintain the speed of Turbine to 3000 RPM • Raise the Terminal Voltage of Generator by Excitation system with AVR on Manual. • Synchroscope “ON” • When the Turbine speed is slightly more than the grid speed, the Phase sequence is matching and the generator TV is slightly more than the grid voltage, synchronise the Unit (Make the generator CB “ON”) 22-Mar-2022 total output power solutions 10
  • 11. Loading of the TA Set • Increase the Furnace Oil guns • If the temp of the furnace is more than 6000C a coal mill can be taken in service. • The unit must be synchronised or HP LP Bypass must be taken in service before taking a coal mill in service. This ensures steam flow through the reheater. • The load on the unit must be raised as per the ramp rate given by the manufacturer. • Change over from station Transformer to Unit Auxiliary Transformer 22-Mar-2022 total output power solutions 11
  • 12. Charging of BFP • Check the deaerator heating and deaerator pressure • Check the recirculation valves of BFP • Check the balancing leak off valves of BFP • Aux oil pump running, warm up valve open. • BFP Motor cooling I/S • Check the Feed water Regulating station, HP Heaters, FW System and Start BFP . 22-Mar-2022 total output power solutions 12
  • 13. Charging of LP Heaters • LP Heaters must be evacuated before Charging • All condensate must be drained before charging the LP Heaters. • LP heaters will be charged with condensate first. • Cascade drains to be opened for maintaining the levels in the LP Heaters. • LP Heaters can now be charged from steam side. (Extractions) 22-Mar-2022 total output power solutions 13
  • 14. Boiler side load raising • PA Fans started and PA Header Pressure Maintained on Auto • Cold air and hot air gates for PA to mill opened • Mill Temp and PA Flow to be put on auto • Coal Mill shall be taken in service ensuring the bunker level. • Secondary air dampers of the elevation put on auto 22-Mar-2022 total output power solutions 14
  • 15. Boiler side loading • Check the Boiler Expansion • Take ESP In service • Set the BA and Fly ash evacuation system in service. • The increase in Temp and pressure of the steam must be in line with the Ramp rate given by the manufacturer. (2 MW/min) • Take another mill I/s 22-Mar-2022 total output power solutions 15
  • 16. Charge HP Heaters • HP Heaters are already Charged from Feed side • Open the cascade drain/drip valves and put them on auto to maintain the level in the Heaters • Open the extraction Valves • This may result in lowering the load but the load will automatically rise as the HP heaters are in service. 22-Mar-2022 total output power solutions 16
  • 17. Start Up Curve Cold Start 22-Mar-2022 total output power solutions 17
  • 18. Activities Chart 22-Mar-2022 total output power solutions 18
  • 19. 22-Mar-2022 total output power solutions 19