Auxiliary Consumption and Savings
due to Increase in Boiler Efficiency
Manohar Tatwawadi
total output power solutions
A2-806 PALLADION, Balewadi, Pune,411045
Mob: +91 9372167165
Typical Auxiliary Consumption for
4X210 MW Power Station
Common Systems
S.N. Particulars
Energy Consumption
MWh/day
A Plant Common systems MWh=1000Kwh
1 Ash Handling Plant 45.41 MWh/d
2 Coal Handling Plant 24.53 MWh/d
3 Air Compressors 24.95 MWh/d
4 Cooling Water Systems 40.86 MWh/d
5 Water Treatment Plants 76.28 MWh/d
Total for common systems 212.03 MWh/d
11-01-2022 total output power solutions 2
HT Auxiliary Consumption Unitwise
S.N. Particulars Energy Consumption MWh/day
B Unitwise Inhouse systems
1 Boiler Feed Pumps 558.58 MWh/d
2 Cond Extraction Pumps 95.83 MWh/d
3 Induced Draft Fans 155.5 MWh/d
4 Forced Draft Fans 40.22 MWh/d
5 Primary Air Fans 153.36 MWh/d
6 Cooling Water Pump 177.36 MWh/d
7 Mills 181.85 MWh/d
Total In House H.T. 1362.7 MWh/d
11-01-2022 total output power solutions 3
Auxiliary Consumption Common
4 X 210 MW
S.N. Particulars Energy Consumption MWh/day
C Transformers and lighting Systems
1 Auxiliary Transformer Losses 25.98 MWh/d
2 Gen. Trans Losses 98.47 MWh/d
3 Unit & Station Trans Losses 15.737 MWh/d
4 Network Losses 20.82 MWh/d
5 Lighting and other Loads 28.46 MWh/d
Total of Trans and lighting loads 189.467 MWh/d
11-01-2022 total output power solutions 4
Total Auxiliary Consumption for
4 X 210 MW TPS
D Total Aux Power 1764.197 MWh/d
E Total Generation 20340.96 MWh/d
F Aux Power Cons. % 8.67%
11-01-2022 total output power solutions 5
SAVINGS DUE TO INCREASE IN
BOILER EFFICIENCY
BOILER EFFICIENCY INCREASE
For 1 Unit of 210 MW
Boiler Efficiency Increase from 80%
To 84.5% UNITS
80% 82% 83.0% 84.5% %
Generation per day 5040 5040 5040 5040 MWh/Day
Turbine Heat Rate 1940 1940 1940 1940 Kcal/KWh
Unit Heat Rate 2425.00 2365.85 2337.35 2295.86 Kcal/KWh
Reduction in Unit Heat Rate 59.15 28.50 41.49 Kcal/KWh
Fuel GCV 4500 4500 4500 4500 Kcal/Kg
Fuel Consumption Kg / Kwh 0.539 0.526 0.519 0.510 Kg/Kwh
Reduction in Fuel Cons 0.013 0.006 0.009 Kg/Kwh
Fuel consumption per day for
210 MW Load
2716 2649.76 2617.83 2571.36 Tonnes/day
Saving in daily fuel
consumption per unit
66.244 98.169 144.639 Tonnes/day
Fuel GCV, Generation and the Turbine Heat Rate is constant.
11-01-2022 total output power solutions 7
Saving in Coal Handling Plant & Milling
Plant
Considering a plant of
4X210Mw units
Boiler Efficiency Increase from 80% To
84.5% UNITS
Coal Handling 80% 82% 83.0% 84.5% %
Reduction in Coal Handling 66.244 98.169 144.639 T/day
*Aux Power Required for handling coal per ton is 0.002044 Mwh/ton
Aux Power Reduction in Coal
Handling
0.135 0.201 0.296 MWh/day
#Aux Power required for milling coal per Ton = 181.85/2716= 0.066955Mwh/T
Aux Power Reduction in
Milling
4.435 6.573 9.684 MWh/day
Total Aux power reduction
due to coal reduction
4.571 6.774 9.980 MWh/day
11-01-2022 total output power solutions 8
Savings in Ash Handling Plants
Considering a plant of
4X210Mw units
Boiler Efficiency Increase from
80% To 84.5%
UNITS
Ash Handling Plant 80% 82% 83.0% 84.5% %
*Aux. Consumption of Ash Handling per Ton Coal = 45.41/2716*4
= 0.00418MWh / T of coal (Assumption 40% Ash in Coal)
Reduction in Aux.
Consumption in ash
handling per day
-- 0.277 0.410 0.605 MWh/day
*The Total Ash Handling Plant consumption was booked to be 45.41MWh/day for total 4
units of 210 MW each.
*The consumption of coal is 2716 T/day for each unit of 210 MW.
11-01-2022 total output power solutions 9
Reduction in Aux. Consumption
Air and Flue gas Handling
Considering a plant of
4X210Mw units Air and Flue
gas Handling
Boiler Efficiency Increase from 80% To
84.5%
UNITS
80% 82% 83.0% 84.5% %
Amount of air required Theoratical Air + Excess Air
= Approx 4.83 + 1.2 = 6.00 Kg/Kg of coal
Air required to be handled 16296.00 15898.54 15706.99 15428.17 T/day
Reduction in handling of air
per day
397.46 589.01 867.83 T/day
Aux Consumption of ID, FD and Primary Air = 155.5+40.22+153.36
= 349.08 MWh/day for handled air 16296 T/day
Aux power for air handling 349.08 340.57 336.46 330.49 MWh/day
Reduction in Aux power for
handling of air per day
8.51 12.62 18.59 MWh/day
11-01-2022 total output power solutions 10
Total Savings in Rs. Per Day
Particulars
Boiler Efficiency Increase from 80% To
84.5%
UNITS
Efficiency 80% 82% 83.00% 84.50% %
Saving in daily fuel consumption
per unit --
66.244 98.169 144.639 Tonnes/day
Saving in Rs/day @ Fuel Cost Rs.
4500/- T --
298098 441760.5 650875.5 Rs./day
Total Aux power reduction due to
coal reduction --
4.571 6.774 9.98 MWh/day
Reduction in Aux. Consumption
in ash handling per day --
0.277 0.41 0.605 MWh/day
Reduction in Aux power for
handling of air per day
-- 8.51 12.62 18.59 MWh/day
Total Aux power reduction due to
increase in Efficiency --
13.358 19.804 29.175 MWh/day
Saving in Rs/day @ Elec. Cost Rs.
3000/-MWh --
40074 59412 87525 Rs./day
Total Saving in Rs/day -- 338172 501172.5 738400.5 Rs./day
11-01-2022 total output power solutions 11
11-01-2022 total output power solutions 12

Mais conteúdo relacionado

Mais procurados

Energy audit of Condenser and CW System
Energy audit of Condenser and CW SystemEnergy audit of Condenser and CW System
Energy audit of Condenser and CW SystemManohar Tatwawadi
 
Study Of LANCO 2*600 MW Udupi Thermal Power Plant
Study Of LANCO 2*600 MW Udupi Thermal Power PlantStudy Of LANCO 2*600 MW Udupi Thermal Power Plant
Study Of LANCO 2*600 MW Udupi Thermal Power PlantSUDHEER KUMAR KALYANAM
 
Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boilerKongkiert Tankayura
 
Thermal power plant efficiency
Thermal power plant efficiencyThermal power plant efficiency
Thermal power plant efficiencyManohar Tatwawadi
 
TPS Coal Mills and Fan Performance
TPS Coal Mills and Fan PerformanceTPS Coal Mills and Fan Performance
TPS Coal Mills and Fan PerformanceManohar Tatwawadi
 
210 mw turbine cycle heat rate
210 mw turbine cycle heat rate210 mw turbine cycle heat rate
210 mw turbine cycle heat rateManohar Tatwawadi
 
210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat BalanceManohar Tatwawadi
 
super critical power plant
super critical power plantsuper critical power plant
super critical power plantsridurga88
 
Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station workingRonak Thakare
 
Guide to Furnace Sootblowing
Guide to Furnace SootblowingGuide to Furnace Sootblowing
Guide to Furnace SootblowingRichard Smith
 
Improve plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater controlImprove plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater controlHossam Zein
 
Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)Jigyasa Singh
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTRajashekar Gurrala
 
TPS EFFICIENCY AND HEAT RATE
TPS EFFICIENCY AND HEAT RATE TPS EFFICIENCY AND HEAT RATE
TPS EFFICIENCY AND HEAT RATE Manohar Tatwawadi
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesBoben Anto Chemmannoor
 
Energy performance assessment of boilers
Energy performance assessment of boilersEnergy performance assessment of boilers
Energy performance assessment of boilersUtsav Jain
 

Mais procurados (20)

Energy audit of Condenser and CW System
Energy audit of Condenser and CW SystemEnergy audit of Condenser and CW System
Energy audit of Condenser and CW System
 
Study Of LANCO 2*600 MW Udupi Thermal Power Plant
Study Of LANCO 2*600 MW Udupi Thermal Power PlantStudy Of LANCO 2*600 MW Udupi Thermal Power Plant
Study Of LANCO 2*600 MW Udupi Thermal Power Plant
 
Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boiler
 
Thermal power plant efficiency
Thermal power plant efficiencyThermal power plant efficiency
Thermal power plant efficiency
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
TPS Coal Mills and Fan Performance
TPS Coal Mills and Fan PerformanceTPS Coal Mills and Fan Performance
TPS Coal Mills and Fan Performance
 
210 mw turbine cycle heat rate
210 mw turbine cycle heat rate210 mw turbine cycle heat rate
210 mw turbine cycle heat rate
 
210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance210 MW BHEL Turbine Cycle Heat Balance
210 MW BHEL Turbine Cycle Heat Balance
 
super critical power plant
super critical power plantsuper critical power plant
super critical power plant
 
Boiler light up & loading
Boiler light up & loadingBoiler light up & loading
Boiler light up & loading
 
Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station working
 
Guide to Furnace Sootblowing
Guide to Furnace SootblowingGuide to Furnace Sootblowing
Guide to Furnace Sootblowing
 
Improve plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater controlImprove plant heat rate with feedwater heater control
Improve plant heat rate with feedwater heater control
 
Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)
 
Cogeneration power plant
Cogeneration power plantCogeneration power plant
Cogeneration power plant
 
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANTSTUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
STUDY OF VARIOUS SYSTEMS IN 500MW THERMAL POWER PLANT
 
TPS EFFICIENCY AND HEAT RATE
TPS EFFICIENCY AND HEAT RATE TPS EFFICIENCY AND HEAT RATE
TPS EFFICIENCY AND HEAT RATE
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbines
 
Aprds system
Aprds systemAprds system
Aprds system
 
Energy performance assessment of boilers
Energy performance assessment of boilersEnergy performance assessment of boilers
Energy performance assessment of boilers
 

Semelhante a Auxiliary Consumption and Saving due to Increase in Boiler Efficiency

Cost Saving Hotel
Cost Saving HotelCost Saving Hotel
Cost Saving HotelZW Yap
 
WASTE HEAT RECOVERY IN CEMENT PLANTS - IDEAS
WASTE HEAT RECOVERY IN CEMENT PLANTS - IDEASWASTE HEAT RECOVERY IN CEMENT PLANTS - IDEAS
WASTE HEAT RECOVERY IN CEMENT PLANTS - IDEASKushPatel529832
 
heat pump presentation 25-8-15
heat pump presentation  25-8-15heat pump presentation  25-8-15
heat pump presentation 25-8-15Satish Joshi
 
Energy Efficiency Potential in Food & Beverage Industries in Nepal
Energy Efficiency Potential in Food & Beverage Industries in NepalEnergy Efficiency Potential in Food & Beverage Industries in Nepal
Energy Efficiency Potential in Food & Beverage Industries in Nepaleecfncci
 
Samit Jain - Advit Foundation
Samit Jain - Advit FoundationSamit Jain - Advit Foundation
Samit Jain - Advit Foundationguest17a0764
 
2016.12.14 DryFining Coal Gen presentation FINAL
2016.12.14 DryFining Coal Gen presentation FINAL2016.12.14 DryFining Coal Gen presentation FINAL
2016.12.14 DryFining Coal Gen presentation FINALSandra Broekema
 
Solar generation for APC
Solar generation for APC Solar generation for APC
Solar generation for APC Molla Morshad
 
Energy management 101
Energy management 101Energy management 101
Energy management 101Matt Shea
 
Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur Yuvraj Singh
 
Condition Monitoring of electrical machine
Condition Monitoring of electrical machine Condition Monitoring of electrical machine
Condition Monitoring of electrical machine Molla Morshad
 
SEAM Centre seminar - Sept 2010 (part 1)
SEAM Centre seminar - Sept 2010 (part 1)SEAM Centre seminar - Sept 2010 (part 1)
SEAM Centre seminar - Sept 2010 (part 1)The SEAM Centre
 

Semelhante a Auxiliary Consumption and Saving due to Increase in Boiler Efficiency (20)

Cost Saving Hotel
Cost Saving HotelCost Saving Hotel
Cost Saving Hotel
 
Conserve energy
Conserve energyConserve energy
Conserve energy
 
WASTE HEAT RECOVERY IN CEMENT PLANTS - IDEAS
WASTE HEAT RECOVERY IN CEMENT PLANTS - IDEASWASTE HEAT RECOVERY IN CEMENT PLANTS - IDEAS
WASTE HEAT RECOVERY IN CEMENT PLANTS - IDEAS
 
One-day workshop on Industrial Heating
One-day workshop on Industrial HeatingOne-day workshop on Industrial Heating
One-day workshop on Industrial Heating
 
heat pump presentation 25-8-15
heat pump presentation  25-8-15heat pump presentation  25-8-15
heat pump presentation 25-8-15
 
GrameenPhone
GrameenPhoneGrameenPhone
GrameenPhone
 
Energy Efficiency Potential in Food & Beverage Industries in Nepal
Energy Efficiency Potential in Food & Beverage Industries in NepalEnergy Efficiency Potential in Food & Beverage Industries in Nepal
Energy Efficiency Potential in Food & Beverage Industries in Nepal
 
Samit Jain - Advit Foundation
Samit Jain - Advit FoundationSamit Jain - Advit Foundation
Samit Jain - Advit Foundation
 
Hindalco Mahan CPP.pdf
Hindalco Mahan CPP.pdfHindalco Mahan CPP.pdf
Hindalco Mahan CPP.pdf
 
H2P_Energy_Final_Presentation_ENCH_531
H2P_Energy_Final_Presentation_ENCH_531H2P_Energy_Final_Presentation_ENCH_531
H2P_Energy_Final_Presentation_ENCH_531
 
linkedin
linkedinlinkedin
linkedin
 
2016.12.14 DryFining Coal Gen presentation FINAL
2016.12.14 DryFining Coal Gen presentation FINAL2016.12.14 DryFining Coal Gen presentation FINAL
2016.12.14 DryFining Coal Gen presentation FINAL
 
Bionic - From Biomass to Energy
Bionic - From Biomass to EnergyBionic - From Biomass to Energy
Bionic - From Biomass to Energy
 
13 b shukla
13 b shukla13 b shukla
13 b shukla
 
Solar generation for APC
Solar generation for APC Solar generation for APC
Solar generation for APC
 
Energy management 101
Energy management 101Energy management 101
Energy management 101
 
COAL FIRED BOILER -PRINCIPALS.pdf
COAL FIRED BOILER -PRINCIPALS.pdfCOAL FIRED BOILER -PRINCIPALS.pdf
COAL FIRED BOILER -PRINCIPALS.pdf
 
Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur Training Report DCCPP, Dholpur
Training Report DCCPP, Dholpur
 
Condition Monitoring of electrical machine
Condition Monitoring of electrical machine Condition Monitoring of electrical machine
Condition Monitoring of electrical machine
 
SEAM Centre seminar - Sept 2010 (part 1)
SEAM Centre seminar - Sept 2010 (part 1)SEAM Centre seminar - Sept 2010 (part 1)
SEAM Centre seminar - Sept 2010 (part 1)
 

Mais de Manohar Tatwawadi

Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Manohar Tatwawadi
 
Green building concepts and good building practices
Green building concepts and good building practicesGreen building concepts and good building practices
Green building concepts and good building practicesManohar Tatwawadi
 
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESCOMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESManohar Tatwawadi
 
Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Manohar Tatwawadi
 
Cooling towers in thermal power plants
Cooling towers in thermal power plantsCooling towers in thermal power plants
Cooling towers in thermal power plantsManohar Tatwawadi
 
Electrical safety in power stations
Electrical safety in power stationsElectrical safety in power stations
Electrical safety in power stationsManohar Tatwawadi
 
Cost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPSCost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPSManohar Tatwawadi
 
Environmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power StationsEnvironmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power StationsManohar Tatwawadi
 
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...Manohar Tatwawadi
 
Fuels and Combustion Equations
Fuels and Combustion EquationsFuels and Combustion Equations
Fuels and Combustion EquationsManohar Tatwawadi
 
Basics of thermal power stations
Basics of thermal power stationsBasics of thermal power stations
Basics of thermal power stationsManohar Tatwawadi
 
Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergenciesManohar Tatwawadi
 
Effect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsEffect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsManohar Tatwawadi
 
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTManohar Tatwawadi
 
Boiler Drum level measurement in Thermal Power Stations
Boiler Drum level measurement in Thermal Power StationsBoiler Drum level measurement in Thermal Power Stations
Boiler Drum level measurement in Thermal Power StationsManohar Tatwawadi
 
SCADA ... Supervisory control and data acquisition
SCADA ... Supervisory control and data acquisitionSCADA ... Supervisory control and data acquisition
SCADA ... Supervisory control and data acquisitionManohar Tatwawadi
 

Mais de Manohar Tatwawadi (20)

Power Plant Operations.pdf
Power Plant Operations.pdfPower Plant Operations.pdf
Power Plant Operations.pdf
 
Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3Frequently Asked Questions on TURBINE Part 3
Frequently Asked Questions on TURBINE Part 3
 
Green building concepts and good building practices
Green building concepts and good building practicesGreen building concepts and good building practices
Green building concepts and good building practices
 
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIESCOMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
COMPRESSED AIR SYSTEM . ENERGY CONSERVATION OPPORTUNITIES
 
FAQ on Turbines Part 2
FAQ on Turbines Part 2FAQ on Turbines Part 2
FAQ on Turbines Part 2
 
Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1Frequently asked questions on turbines Part 1
Frequently asked questions on turbines Part 1
 
Cooling towers in thermal power plants
Cooling towers in thermal power plantsCooling towers in thermal power plants
Cooling towers in thermal power plants
 
Electrical safety in power stations
Electrical safety in power stationsElectrical safety in power stations
Electrical safety in power stations
 
Cost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPSCost accounting, cost control and cost reduction in TPS
Cost accounting, cost control and cost reduction in TPS
 
Environmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power StationsEnvironmental and pollution control in Thermal Power Stations
Environmental and pollution control in Thermal Power Stations
 
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...Energy Audit & Energy  Conservation  Opportunities in  Electrical Equipments ...
Energy Audit & Energy Conservation Opportunities in Electrical Equipments ...
 
Fuels and Combustion Equations
Fuels and Combustion EquationsFuels and Combustion Equations
Fuels and Combustion Equations
 
Basics of thermal power stations
Basics of thermal power stationsBasics of thermal power stations
Basics of thermal power stations
 
Handling of turbine during emergencies
Handling of turbine during emergenciesHandling of turbine during emergencies
Handling of turbine during emergencies
 
Effect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / MillsEffect of Coal Quality and Performance of Coal pulverisers / Mills
Effect of Coal Quality and Performance of Coal pulverisers / Mills
 
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANTENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
ENERGY AUDIT METHODOLOGY FOR TURBINE CYCLE IN A POWER PLANT
 
Biomass Power Plants
Biomass Power PlantsBiomass Power Plants
Biomass Power Plants
 
Swot Analysis
Swot AnalysisSwot Analysis
Swot Analysis
 
Boiler Drum level measurement in Thermal Power Stations
Boiler Drum level measurement in Thermal Power StationsBoiler Drum level measurement in Thermal Power Stations
Boiler Drum level measurement in Thermal Power Stations
 
SCADA ... Supervisory control and data acquisition
SCADA ... Supervisory control and data acquisitionSCADA ... Supervisory control and data acquisition
SCADA ... Supervisory control and data acquisition
 

Último

AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stageAbc194748
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...Health
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 

Último (20)

AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 

Auxiliary Consumption and Saving due to Increase in Boiler Efficiency

  • 1. Auxiliary Consumption and Savings due to Increase in Boiler Efficiency Manohar Tatwawadi total output power solutions A2-806 PALLADION, Balewadi, Pune,411045 Mob: +91 9372167165
  • 2. Typical Auxiliary Consumption for 4X210 MW Power Station Common Systems S.N. Particulars Energy Consumption MWh/day A Plant Common systems MWh=1000Kwh 1 Ash Handling Plant 45.41 MWh/d 2 Coal Handling Plant 24.53 MWh/d 3 Air Compressors 24.95 MWh/d 4 Cooling Water Systems 40.86 MWh/d 5 Water Treatment Plants 76.28 MWh/d Total for common systems 212.03 MWh/d 11-01-2022 total output power solutions 2
  • 3. HT Auxiliary Consumption Unitwise S.N. Particulars Energy Consumption MWh/day B Unitwise Inhouse systems 1 Boiler Feed Pumps 558.58 MWh/d 2 Cond Extraction Pumps 95.83 MWh/d 3 Induced Draft Fans 155.5 MWh/d 4 Forced Draft Fans 40.22 MWh/d 5 Primary Air Fans 153.36 MWh/d 6 Cooling Water Pump 177.36 MWh/d 7 Mills 181.85 MWh/d Total In House H.T. 1362.7 MWh/d 11-01-2022 total output power solutions 3
  • 4. Auxiliary Consumption Common 4 X 210 MW S.N. Particulars Energy Consumption MWh/day C Transformers and lighting Systems 1 Auxiliary Transformer Losses 25.98 MWh/d 2 Gen. Trans Losses 98.47 MWh/d 3 Unit & Station Trans Losses 15.737 MWh/d 4 Network Losses 20.82 MWh/d 5 Lighting and other Loads 28.46 MWh/d Total of Trans and lighting loads 189.467 MWh/d 11-01-2022 total output power solutions 4
  • 5. Total Auxiliary Consumption for 4 X 210 MW TPS D Total Aux Power 1764.197 MWh/d E Total Generation 20340.96 MWh/d F Aux Power Cons. % 8.67% 11-01-2022 total output power solutions 5
  • 6. SAVINGS DUE TO INCREASE IN BOILER EFFICIENCY
  • 7. BOILER EFFICIENCY INCREASE For 1 Unit of 210 MW Boiler Efficiency Increase from 80% To 84.5% UNITS 80% 82% 83.0% 84.5% % Generation per day 5040 5040 5040 5040 MWh/Day Turbine Heat Rate 1940 1940 1940 1940 Kcal/KWh Unit Heat Rate 2425.00 2365.85 2337.35 2295.86 Kcal/KWh Reduction in Unit Heat Rate 59.15 28.50 41.49 Kcal/KWh Fuel GCV 4500 4500 4500 4500 Kcal/Kg Fuel Consumption Kg / Kwh 0.539 0.526 0.519 0.510 Kg/Kwh Reduction in Fuel Cons 0.013 0.006 0.009 Kg/Kwh Fuel consumption per day for 210 MW Load 2716 2649.76 2617.83 2571.36 Tonnes/day Saving in daily fuel consumption per unit 66.244 98.169 144.639 Tonnes/day Fuel GCV, Generation and the Turbine Heat Rate is constant. 11-01-2022 total output power solutions 7
  • 8. Saving in Coal Handling Plant & Milling Plant Considering a plant of 4X210Mw units Boiler Efficiency Increase from 80% To 84.5% UNITS Coal Handling 80% 82% 83.0% 84.5% % Reduction in Coal Handling 66.244 98.169 144.639 T/day *Aux Power Required for handling coal per ton is 0.002044 Mwh/ton Aux Power Reduction in Coal Handling 0.135 0.201 0.296 MWh/day #Aux Power required for milling coal per Ton = 181.85/2716= 0.066955Mwh/T Aux Power Reduction in Milling 4.435 6.573 9.684 MWh/day Total Aux power reduction due to coal reduction 4.571 6.774 9.980 MWh/day 11-01-2022 total output power solutions 8
  • 9. Savings in Ash Handling Plants Considering a plant of 4X210Mw units Boiler Efficiency Increase from 80% To 84.5% UNITS Ash Handling Plant 80% 82% 83.0% 84.5% % *Aux. Consumption of Ash Handling per Ton Coal = 45.41/2716*4 = 0.00418MWh / T of coal (Assumption 40% Ash in Coal) Reduction in Aux. Consumption in ash handling per day -- 0.277 0.410 0.605 MWh/day *The Total Ash Handling Plant consumption was booked to be 45.41MWh/day for total 4 units of 210 MW each. *The consumption of coal is 2716 T/day for each unit of 210 MW. 11-01-2022 total output power solutions 9
  • 10. Reduction in Aux. Consumption Air and Flue gas Handling Considering a plant of 4X210Mw units Air and Flue gas Handling Boiler Efficiency Increase from 80% To 84.5% UNITS 80% 82% 83.0% 84.5% % Amount of air required Theoratical Air + Excess Air = Approx 4.83 + 1.2 = 6.00 Kg/Kg of coal Air required to be handled 16296.00 15898.54 15706.99 15428.17 T/day Reduction in handling of air per day 397.46 589.01 867.83 T/day Aux Consumption of ID, FD and Primary Air = 155.5+40.22+153.36 = 349.08 MWh/day for handled air 16296 T/day Aux power for air handling 349.08 340.57 336.46 330.49 MWh/day Reduction in Aux power for handling of air per day 8.51 12.62 18.59 MWh/day 11-01-2022 total output power solutions 10
  • 11. Total Savings in Rs. Per Day Particulars Boiler Efficiency Increase from 80% To 84.5% UNITS Efficiency 80% 82% 83.00% 84.50% % Saving in daily fuel consumption per unit -- 66.244 98.169 144.639 Tonnes/day Saving in Rs/day @ Fuel Cost Rs. 4500/- T -- 298098 441760.5 650875.5 Rs./day Total Aux power reduction due to coal reduction -- 4.571 6.774 9.98 MWh/day Reduction in Aux. Consumption in ash handling per day -- 0.277 0.41 0.605 MWh/day Reduction in Aux power for handling of air per day -- 8.51 12.62 18.59 MWh/day Total Aux power reduction due to increase in Efficiency -- 13.358 19.804 29.175 MWh/day Saving in Rs/day @ Elec. Cost Rs. 3000/-MWh -- 40074 59412 87525 Rs./day Total Saving in Rs/day -- 338172 501172.5 738400.5 Rs./day 11-01-2022 total output power solutions 11
  • 12. 11-01-2022 total output power solutions 12