JMV LPS all about best practice of Electrical Equipment Instalations and safety of products Solar PV and Power Evacuation Systems(Developers/Solar EPC/Electrical Contractor/eBOP Engineering Team/CCTV/Fire and Safety/Weather Monitoring SCADA ,Consultants ,SECI/MNRE/Govt PSU,State Renewable ,Power Distribution ,Transmission,Generation under IPDS and DDUGJY Scheme Roof Top Project ,Solar Pumps Projects
2. • India Plan 100GW Solar Power in Year 2022
• Solar Power Now Changing Many Phases
• Use with Genset
• Use with Wind Power
• Use with High Energy Storage(Battery)
• Instalation on Ground/Cannel Mounted
• Instalation on Roof (Building)
• Instalation on Water (Floating)
• Instaltion on Building(BIPV Building Integrated
Transparent Photovoltaic Solar Glass
• Follow NBC2016 Follow IEC62305
• Follow IEEE 80 Follow NFC 17-102
3. Let us work to gather to Achive India Solar
Target 100GW in Year 2022
JMV LPS LTD Expert Team is ready to take Challenges for Price down& Target set by
Solar Project instalations cost along with all Technical and Electrical Safety Require by
Industries from Design Supply Instalations and Warranty after Sales and also
undertake O&M for Supplied Products.
We are extending Services apart from Earthing and Protection added CCTV ,Street
Light LED, Fire and Safety Products and Weather Monitoring and Solar Panel Dry
Cleaning Systems Equipments will be very soon.
Our all approach towards Make in India Concept into Force and Economical Cost to our
Project Engineering Team if they Consolidated all this Maximum Support from us.
Saving ,Long Life, Maintenance Free and Strong Technical Recommended products by
SECI/MNRE/Interanatioanal Solar Association
10. Step – 1
Step – 2
Step – 3
Joint all phase wire/ cable with the help of
crimping tools and lugs
Fixed the separation sheet between all wires/
cables
Close the filled Silicon enclosure from top and
bottom , complete installation is done.
Thimble
Separation Sheet
Gel / Silicon
11. Features :
Provides cable with cable connections and jointing wires in switchboard / electric boxes Being a jelly it can be
easily fit into molds of any shape and size.
Helps in safeguarding electrical connections and also protects electrical connection joints from catching fire, sparking
and leakage current.
Eradicates all the possibilities of fire, electric shocks and sparks, etc. causes due to improper electrical connection
joints and safeguards structure, equipment and person.
Offers safety to your electrical joints from ageing, corrosion, moisture and also observes leakage current.
Advantages :
Nontoxic
Insulating
Highly reliable operation
Maintenance Free
Repairable
Cost Effective
High repeat value
Elasticity
Shape retention
15. Advantages of Copper Clad Steel Over GI Flat Strip
• Better Conductivity 21%-30% 8mm Dia. in Drumroll 500Mtrs. And Fault
Current 4KA as equivalent 32X3GI Flat Strip Max Size 6Mtr in Length
• 50MW Solar DC Field Considering 1.7MW Invertor and 330W Solar Panel Total
Table 5400.
• Approx. DC Field Length may be in 40Km- 45KM
• GI Flat Qty@ 6.00Mtr . may be Strip 7000 + 800 for Joints
• 7000 Joint for Extension without Joint Count for any Connection for Structure
,Corner ,String and Invertors(Approx. 4000).
• CCS Qty. in Drum(500Mtrs) 800 Joints no Extra Conductor Require. Total Joint in
Case of CCS 4800 Extension ,T Type and X Type Joints Exothermic only.
16. Storage and Installation GI Flat
• In case of GI Flat Chance for heavy Rusting due to moisture and Transportation in
Coil Form and Flat process at site before installation require high secure logistic
because of Theft Problem.
• Very slow speed while installation so project take longer time and quality of
welding or nut bolt will problem in due course.
• Depend of Soil Corrosive Nature life of GI Strip can not assure Span life as compare
to total Plant Life Consider 25Year Plus.
• High Maintenance for testing of Joints and main reason of Failure and turnout
production Loss over period of Time.
• Conductivity Max 6-8%
• Landing Cost of DC Field GI Flat Installation for Earthing We consider From
ordering, Transportation at site and up to Installation.
17. Storage and Installation CCS
• CCS is Soft Drawn Conductor offer 21%-30% Conductivity as per ASTM B227 Recommended in IEEE80
and IEEE837 for Exothermic Weld offer very High life of Systems as comparison to GI Flat Strip.
• Exothermic Power mix of Copper Power and allow other metal to joint 100% Surface Contact achieve
through process and Resistance is less than 1.5% between two joints same or Different Metals with help
of mould Extension T and X Joint Possible with Less time as compare to Nut Bolting or Welding also
ensure all joints are perfect with life 25Year plus.
• Can be place store in open secure environment and ease Transport and Counting and speedy process as
compare to GI Important
• So if SITC Calculate with respect to GI Flat Vs. CCS Customer can install better product in same Cost of
GI Flat Installation also ensure safety higher due to fast discharging of surge and less maintenance for
Checking Joint or Loose Contact so there is saving less breakdown is power generation. May be 80%
high efficiency achieve in DC area.
• Or Saving may be 6 -7% as compare to GI Flat Strip Installation if Consider Earthing and LA in our
Scope this saving can be 15-20%. Further Consideration to String Combiner/String Monitoring this
saving can be 25-30%.
• Today best design is also one method of Saving which help 25Year to enjoy with less maintenance
Cost.
• Trunching & Laying for Soft Soil Rs.250.00 Mtr Hard Rock Rs.350.00Mtrs
• CCS 8.00mm Dia Per Mtr Inculding all Joints Exothermic for DC Array (5000 Joints)
• ESE Type LA(107 Mtrs Radius) and LA 17.20mm Dia CBREarthing (Dual) Qty 42 - 45 Sets
• DC Max 300 -450 if resitivity is above 350Ohms Considering result 02- 05 Ohms
• Electrical and Human Safety First.
• Next Slide Latest Solar PV Power Plant Specification SECI/MNRE and International Project EPC