Freeze Protection Planning Guide
and Inventory Checklist
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
Introduction
Anticipating freezing conditions and protecting buildings, equipment, and grounds against freeze
damage is a vital part of a Facility Maintenance Program. A good freeze protection plan includes
steps for inspection, preventative maintenance, and corrective maintenance prior to the beginning of
cold weather conditions. This guide is designed to make the planning process easier for you.
Contact M.S. Jacobs at 800-348-0089 or visit www.msjacobs.com for all your Briskheat freeze
protection products.
Table of Contents
Introduction................................................................................................................................................................2
Section A: General Freeze Protection Preparation Steps..........................................................................................3
Section B: Testing and Periodic Inspection Record for Heating Cable ......................................................................6
Periodic Heating Cable Inspection Record .............................................................................................................6
Heating Cable Insulation Resistance Test...............................................................................................................7
Section C: Inventory Checklist for Pipe Lines and Valves That Need Heat................................................................8
Section D: Inventory Checklist for Containers Stored in Unheated Areas or Susceptible to Freezing......................9
Drums / Pails...........................................................................................................................................................9
Intermediate Bulk Containers (IBC) / Tote Tanks................................................................................................ 10
Gas Cylinders ....................................................................................................................................................... 10
Section E: Inventory Checklist for Large Permanent Tanks, Vessels, and Hoppers in Unheated Areas or
Susceptible to Freezing............................................................................................................................................ 11
Section F: Inventory Checklist for Roof and Gutter Deicing................................................................................... 12
Roofs that Need Heat..............................................................................................Error! Bookmark not defined.
Downspouts that Need Heat...................................................................................Error! Bookmark not defined.
Section G: Inventory Checklist for Personal Safety / Slip Prevention..................................................................... 13
Walkways Susceptible to Icy Conditions ............................................................................................................. 13
Stairs Susceptible to Icy Conditions..................................................................................................................... 14
Section H: Inventory Checklist for Damaged Heaters That Need to Be Replaced.................................................. 15
Section I: Inventory Checklist for Temporary De-icing Heaters ............................................................................. 16
HSTAT Heating Tapes with Adjustable Thermostat Control Order Sheet........................................................... 16
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
Section A: General Freeze Protection Preparation Steps
These are general freeze protection planning steps we found useful through research and personal maintenance
experience. These steps are not all-inclusive and we recommend that you consult a trained professional and
review your corporate policies and local /national codes prior to implementing your plan.
Item Assigned to
Date
Complete
Sign-off
□ Clean, service, and functionally test all heating systems.
□ Roof and gutter: Inspect, remove debris, and
patch/repair (if needed): roof drains, scuppers, canals,
gutters, down spouts before first frost. Inspect and
functionally test installed roof and gutter heat trace
system.
□ Identify and test main water supply cutoffs for each
facility. Ensure these areas are readily available to
emergency personnel responding to a freeze/thaw
incident.
□ Inspect wet-pipe sprinkler systems for areas susceptible
to freezing. Apply heat in susceptible areas.
□ Identify materials that are susceptible to freeze damage
in outside storage pads and unheated storage areas.
Develop plan to ensure these materials can be easily
heated and thawed to maintain production.
Tip: Think about materials that might be delivered
during the cold season in unheated vehicles. BriskHeat
offers plug-and-play portable heaters that easily wrap
around and heat drums, pails, and tanks to thaw frozen
or slow flowing materials.
□ Check and place antifreeze used in cooling systems as
necessary.
□ Protect heating system power and temperature controls
against inadvertent deactivation.
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
Item Assigned to
Date
Complete
Sign-off
□ Drain and remove water from all seasonal cooling
systems (unless protected by heating tapes or
antifreeze).
□ Inspect, test, and stage portable auxiliary heaters.
□ Inspect conditions of all surface heaters such as heating
tapes, heating cable, drum heaters, IBC heaters, tank
heaters, and pipe heaters. Verify operation and
temperature settings and test ground-fault equipment
protection.
Tip: Look for damaged insulation on all exposed portions
of the power cord. If possible, check both ends of the
cord for loose connections. An exposed conductor may
come in contact with personnel during maintenance
activities resulting in sparks or injury.
□ Inspect, test, and repair heat trace heating cable located
on cooling tower supply and return lines.
□ Inspect and identify remaining water and air lines
susceptible to freezing. Install appropriate heat and
insulation.
Tip: Pay special attention to valves. This is a major
choke point and susceptible to damage. BriskHeat offers
a safe and effective flexible heating tape (HSTAT series)
that can be used as preventative maintenance or used to
thaw out a valve quickly. See section I for more
information.
□ For steam systems: Blow down drip legs, clean
strainers, test temperature sensing devices for
actuation of control valves and dampers, check steam
traps, control actuators/valves, face and bypass
dampers, linkages, and temperature controllers. Ensure
that a vacuum breaker is installed and in working order
on all preheat and heating coils which may be exposed
to freezing conditions.
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
Item Assigned to
Date
Complete
Sign-off
□ For ventilation systems: Test and calibrate all
temperature sensing devices, and check operation of
valves, dampers, linkages, control actuators, and
temperature controllers.
□ Identify areas where personal safety is at risk due to icy
conditions. Develop a slip prevention maintenance
plan. See section G for ideas.
□ Identify control panels and electronic devices
susceptible to condensation. Install enclosure heaters
to prevent short-outs and corrosion.
□ Institute a facility-wide awareness plan to identify and
report any suspected problems with heating or other
cold weather protection equipment during the cold
season.
□ Have plan in place to remove temporary cold weather
protection items after the cold weather season.
Special Consideration: Hazardous Materials
• Ensure that all containers used for hazardous or toxic materials are properly stored, and inspect them
for deterioration prior to handling. If containers become brittle (due to the combination of chemical
attack, freezing temperatures, and ultraviolet light) they may break when moved.
• Liquids should not be permitted to remain in unheated process lines during periods when production
has been stopped. All lines should be drained and purged to prevent future line breakage due to
freezing temperatures.
• Ensure that piping, tanks, and valves in systems that carry hazardous or toxic substances are properly
insulated and/ or heated. Install heaters such as heating blankets, insulators, heating tapes, heating
jackets, and heating cable as appropriate.
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
Section B: Testing and Periodic Inspection Record for Heating Cable
Periodic Heating Cable Inspection Record
Instructions:
1) One sheet per circuit. – This inspection form allows for up to five inspections to be compared for an individual
circuit.
2) Maintenance Check Frequency:
Freeze Protection Circuits: Prior to the first freeze
Temperature Maintenance Circuits: At least twice per year
Maintenance Check Date (Month/Year)
(mm/yy) (mm/yy) (mm/yy) (mm/yy) (mm/yy)
Visual inspection inside connection box
corrosion, moisture, etc.
Initial
Damage or cracks (leaks) in insulation
seals at valves, hangers, pumps, etc.
Initial
Heating cable properly connected and grounded.
Heating cable and connections insulated from
connection box.
Initial
Thermostat checked for moisture, corrosion,
set point, switch operation, and sensor damage.
Set Point
Initial
Megger tests performed at power connection
with both bus wires disconnected from power
wiring.
Reading
Initial
Circuit voltage at power connection. Reading
Circuit amperage after 5 minutes. Reading
Pipe temperature at time amps were measured. Reading
Watts/Ft.
Volts x Amps = w/ft.
feet
Watts/Ft.
Initial
All connections, boxes, and thermostats
have been resealed.
Initial
End seals, covered splices and tees marked on
insulation cladding.
Initial
Remarks & Comments
Circuit Number
Heater Type
Circuit Length
PeriodicInspectionRecordForm
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
Heating Cable Insulation Resistance Test
The insulation resistance test is used to check for damage to extruded jackets. Connections for the megger are
made as shown in Figures 1 & 2.
Figure 1
Note: Test should use at least a 500 VDC megger. Do not use a megger with an excess of 2500 VDC. Minimum acceptable
readings should be 20 megohms per circuit, regardless of length.
500 VDC MEGGER
Figure 2
A record should be kept of the readings taken from the time the cable is first installed on the pipe. A history of
the insulation resistance reading can be helpful in spotting moisture ingress into the electrical system by seeing
a gradual decline in the insulation resistance or physical damage to the heating cable (sharp decline in the
insulation resistance). See the previous page for a sample record.
FOR HEATING CABLES WITH
BRAID
Test from heating cable bus to braid
FOR HEATING CABLES WITH BRAID AND OUTER JACKET
Test A - (solid lines) from heating cable bus wires to braid.
Test B - (dotted lines) from braid to metal pipe.
500 VDC MEGGER
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
Section C: Inventory Checklist for Pipe Lines and Valves That Need Heat
Use this checklist to identify the pipe lines that need heat. Your local distributor or BriskHeat will help you
determine the proper type and amount of heating cable, insulation, and accessories necessary for your
application.
Pipe / Valve
Location
Where Heat is
Needed
Length of
Pipe / Size of
Valve Where
Heat is
Needed
O.D. of Pipe
/ Valve
Temperature
Required
Available
Voltage
Supply and
Circuit
Breaker Size
Hazardous
Location?
(Y/N)
If Yes,
Classification?
Insulation is
Needed?
(Y/N)
Insulation
Thickness?
Example of a Heating Cable Installation
Power Connection Kit - PLT-BC or LT-BC use with
cable power seal kit - LT-MP, LT-SP or LT-HSP.
End Seal – SLTE-2, LT-SE or LT-E
In-line splice under insulation (shown) -
LT-SS or LT-HSS. Above insulation -
Heater cable loopPLT-BS or LT-BS.
Tee splice under insulation (shown) - LT-ST or LT-HST
Above insulation - PLT-BY or LT-BY.
Pipe Clamps
Heater Cable
Fiberglass Tape Insulation
SLCBL: Self-Regulating Heating Cable SpeedTrace: Self-Regulating Heating Cable
Pre-Assembled with 30” Cord and Plug.
InsulLock®DS: Closed Cell Elastomeric
Thermal Insulation
Power Connection Kit
End Seal
In-line splice under insulation
Tee splice under insulation
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
Section D: Inventory Checklist for Containers Stored in Unheated Areas or Susceptible
to Freezing
Containers such as drums, pails, tote tank / IBCs, and gas cylinders contain materials that either freeze or need a
specific flow rate to maximize production. Utilizing a portable plug-and-play electrical surface heater on the
container prior to and during production is a cost-effective and simple way to thaw and improve the flow rate of
the material within the container.
Drums / Pails
Container Size
(Make a special note if the container will be
in a hazardous environment)
Qty of
Containers that
Need Heat
Container Outer
Material
(metal, plastic, etc.)
Available Voltage
Supply for Heater
(120V or 240V)
55 gallon (208 litre) drums / barrels
30 gallon (114 litre) drums / barrels
15 & 16 gallon (57 & 60 litre) pails
5 gallon (19 litre) pails
Tip: For faster heat-up, use multiple silicone rubber band heaters at one time or a full-coverage insulated drum heater.
Recommended Solutions:
• For Drums and Pails:
o DHCS series: Heavy-Duty Silicone Rubber Band Heater - Great all-purpose choice:
economical, moisture & chemical resistant and long lasting. Includes built-in
adjustable thermostat control. 120V model includes standard 3-prong (NEMA 5-
15) grounded plug.
o FGDH series: Full-Coverage Insulated Drum Heater - Fully insulated and more
wattage for faster and more energy-efficient heat-ups. Includes built-in digital
temperature controller. 120V model includes standard 3-prong (NEMA 5-15)
grounded plug.
DHCS: Heavy-Duty
Silicone Rubber Drum Heater
TOTE: Wrap-Around Tote Tank /
IBC Heater
GCW: Gas Cylinder Warmer FGDH: Full-Coverage
Insulated Drum Heater
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
Intermediate Bulk Containers (IBC) / Tote Tanks
Tank
Height
(Not including pallet
or support stand)
Tank
Length
Tank
Width
Qty
of Tanks that
Need Heat
Tank Outer
Material
(metal, plastic, caged,
etc.)
Available
Voltage Supply
for Heater
(120V or 240V)
Recommended Solution:
• For Tote Tanks / IBCs:
o TOTE series – Adjustable Wrap-Around Tote Tank / IBC Heater – Fully
insulated blanket heater wraps around tote tank / IBC without
contaminating or scorching your product. Adjustable straps allow it to fit
multiple container widths. Includes dual adjustable thermostat control:
50 to 160°F (10 to 71°C).
 240V is recommended for fastest heat-up. It offers double the wattage (2880 watts)
compared to 120V version (1440 watts).
 Do not forget the insulated top. It minimizes heat loss and improves heater efficiency.
Gas Cylinders
Cylinder
Diameter
Cylinder
Height
Qty of
Cylinders that
Need Heat
Hazardous Location?
(Y/N)
If Yes, Classification?
Available Voltage
Supply for Heater
(120V or 240V)
Recommended Solutions:
• For Gas Cylinder Warmers
o If Ordinary Location: GCW series- Ordinary Location Gas Cylinder Warmer –
2” (50mm) thick insulation and self-regulating heating element. No extra
temperature control necessary. 120V model includes standard 3-prong
(NEMA 5-15) grounded plug.
o If Hazardous-Area Location: HCW series- Hazardous-Area Gas Cylinder
Warmer – Same as above except it is suitable for Class I Division 1 Groups
B, C, and D. No plug is included.
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
Section E: Inventory Checklist for Large Permanent Tanks, Vessels, and Hoppers in
Unheated Areas or Susceptible to Freezing
Use this checklist to identify the tanks, vessels, and hoppers that are susceptible to freezing. Your local
distributor or BriskHeat will help recommend exactly how much heat you need to prevent freezing or improve
flow as well as which style of heater, insulation, and temperature control is right for you.
Vessel Location
(Make a special note if
it is in a Hazardous
Location)
Vessel Type
(Cylindrical Tank,
Rectangular Tank,
Hopper, etc.)
Vessel Size
Vessel
Outer
Material
(metal, plastic,
etc.)
Content
Stored in
Vessel
Process
Temperature
Available
Voltage
Supply and
Circuit
Breaker Size
NEW! SRL-ADJ Series: Silicone Rubber Heating Blankets with Control.
True plug-and-play silicone rubber heating blanket with Built-in Adjustable
Thermostat Control. Many sizes to choose from. See BriskHeat product
catalog or visit www.briskheat.com for additional information.
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
Section F: Inventory Checklist for Roof and Gutter Deicing
When gutters and downspouts freeze, major damage can occur to your building’s roof and façade. We
recommend roof and gutter self-regulating heating cable as the solution.
BriskHeat's SpeedTrace Roof & Gutter De-Icing Kits are designed to prevent the formation of ice Dams on
rooftops by using an electric self-regulating heating cable system. The heating cable melts away excessive ice
and snow from the roof, gutters, and downspouts to ensure proper draining.
Kits include: SpeedTrace Roof & Gutter Heating Cable (pre-assembled with 30” cord and plug), Heavy Duty Roof
Clips, Downspout Hanger Brackets, UV Resistant Cable Ties.
Measuring Heating Cable Length for Roof & Gutter De-Icing
Use the equation below to calculate heating cable length:
Cable Required for Roof = (R x M) + G + D
(R) Roof Edge Length (linear length of roof to protect)
(M) Multiplier from table below
(G) Gutter Length
(D) Downspout Length (x2 if heating cable returns back to gutter)
Roof
Overhang
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
Section G: Inventory Checklist for Personal Safety / Slip Prevention
Looking for a safer, cleaner, and better alternative to calcium chloride? Snow Melting Mats continuously melt
snow and ice, helping keep surfaces constantly clear and safe. They are portable and easy-to-install. These
durable rubber heating mats lie on top of existing surfaces. Simply plug them into any standard 120V or 240V
outlet. A GFCI is included.
Ideal for entranceways, stairs, loading docks, handicap ramps, rooftops, and freezer floors.
Walkways Susceptible to Icy Conditions
Walkway Location Walkway Length Walkway Width
Available Voltage
Supply for Heater
(120V or 240V)
Qty of Snow
Melting Mats
Needed
HTM: HeatTrak® Snow Melting Walkway Mats
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
Stairs Susceptible to Icy Conditions
Stair Location Stair Width Stair Length
# of Stairs in
Location
Available Voltage
Supply for Heater
(120V or 240V)
Ordered as a set: Indicate number of stairs per set at time of order. A set of stair mats is connected with 18” (45cm) long connector
cables.
HRT: HeatTrak® Snow Melting Stair Mats:
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
Section H: Inventory Checklist for Damaged Heaters That Need to Be Replaced
Use this checklist to identify any heaters that need to be replaced due to damage.
HeaterLocationHeaterTypeIssue
QtyofHeaters
thatNeedto
beReplaced
Heater
Size
Heater
Voltage
Heater
Wattage
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
Section I: Inventory Checklist for Temporary De-icing Heaters
It is always a good idea to have a few flexible multi-purpose heaters on hand in the event of emergency de-icing.
HSTAT flexible heating tapes with built-in adjustable temperature controls are ideal to prevent freezing or thaw
out frozen valves, pipes, and many other objects. Unlike dangerous blow torches, these heaters are safe, make
direct contact with the object to be heated, are moisture and chemical resistant, and can be run unsupervised.
Do not be left without a few of these lifesavers in the toolbox when freezing occurs.
HSTAT Heating Tapes with Adjustable Thermostat Control Order Sheet
Heating Tape
Width
Heating Tape
Length
Wattage
Part Number
(120V)
Part Number
(240V)
Qty of
Heaters Needed
1” (25mm) 2ft (0.6m) 144 HSTAT101002 HSTAT102002
1” (25mm) 4ft (1.2m) 288 HSTAT101004 HSTAT102004
1” (25mm) 6ft (1.8m) 432 HSTAT101006 HSTAT102006
1” (25mm) 8ft (2.4m) 576 HSTAT101008 HSTAT102008
1” (25mm) 10ft (3.1m) 720 HSTAT101010 HSTAT102010
Other widths and lengths are available upon request.
Tips:
• Circle Part Number to indicate voltage preference
• Have at least one of each size on hand so that you have the right size when you need it. Shorter lengths
are typically used for valves, bearings, pumps, and actuators. Longer lengths are typically used for pipe
runs.
• When estimating heating tape lengths, keep in mind that the heating tape cannot be overlapped upon
itself. That will cause damage to the heater.
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
References
The following references were used in the development of this document.
• Conduct of Maintenance (P950) Operations and Maintenance Manual for Freeze Protection, Criterion
401 R.3, Los Alamos National Laboratory
• Valve Thawing Application Note, BriskHeat Corporation
• BriskHeat Self-Regulating Heating Cable Installation and Maintenance Manual, Part # 11248-06,
BriskHeat Corporation
• 13th
BriskHeat Product Catalog, 13th
Edition Rev A, BriskHeat Corporation
BriskHeat® Corporation
World Headquarters
4800 Hilton Corporate Drive
Columbus, OH 43232
1-800-848-7673 (U.S. and Canada)
1-614-294-3376 (Worldwide)
Email: bhtsales1@briskheat.com
Web site: www.briskheat.com
Copyright ©2012 by BriskHeat® Corporation
RevA
M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com

Mais conteúdo relacionado

Mais procurados

Rwc, Reliance Water Controls Caremix H3 - Deck Mounted 2 Hole TMV3 Thermostat...
Rwc, Reliance Water Controls Caremix H3 - Deck Mounted 2 Hole TMV3 Thermostat...Rwc, Reliance Water Controls Caremix H3 - Deck Mounted 2 Hole TMV3 Thermostat...
Rwc, Reliance Water Controls Caremix H3 - Deck Mounted 2 Hole TMV3 Thermostat...
Thorne & Derrick UK
 
Solar Tempering Valve & Thermostatic Mixing Valve - Spec Sheet
Solar Tempering Valve & Thermostatic Mixing Valve - Spec SheetSolar Tempering Valve & Thermostatic Mixing Valve - Spec Sheet
Solar Tempering Valve & Thermostatic Mixing Valve - Spec Sheet
Thorne & Derrick UK
 
Heatguard Planar Group Thermostatic Mixing Valve - Spec Sheet
Heatguard Planar Group Thermostatic Mixing Valve - Spec SheetHeatguard Planar Group Thermostatic Mixing Valve - Spec Sheet
Heatguard Planar Group Thermostatic Mixing Valve - Spec Sheet
Thorne & Derrick UK
 
Water Matters - Who, What, Why, When & How of WRAS Approval
Water Matters - Who, What, Why, When & How of WRAS ApprovalWater Matters - Who, What, Why, When & How of WRAS Approval
Water Matters - Who, What, Why, When & How of WRAS Approval
Thorne & Derrick UK
 
Industrial Furnaces Energy Efficiency
Industrial Furnaces Energy EfficiencyIndustrial Furnaces Energy Efficiency
Industrial Furnaces Energy Efficiency
SOLO Swiss SA
 
Mvhr installation guide_final_11_02_11
Mvhr installation guide_final_11_02_11Mvhr installation guide_final_11_02_11
Mvhr installation guide_final_11_02_11
Rui Pedro Sousa
 
AHS-SS-Solutions-Brochure-Single-Web-V3
AHS-SS-Solutions-Brochure-Single-Web-V3AHS-SS-Solutions-Brochure-Single-Web-V3
AHS-SS-Solutions-Brochure-Single-Web-V3
Peter Adams
 
Michael Nortje CV 2014
Michael Nortje CV 2014Michael Nortje CV 2014
Michael Nortje CV 2014
Michael Nortje
 
Thermon Industrial Hazardous Area Trace Heating - General Information
Thermon Industrial Hazardous Area Trace Heating - General InformationThermon Industrial Hazardous Area Trace Heating - General Information
Thermon Industrial Hazardous Area Trace Heating - General Information
Thorne & Derrick UK
 
Euromixer® Group Thermostatic Mixing Valve - Spec Sheet
Euromixer® Group Thermostatic Mixing Valve - Spec SheetEuromixer® Group Thermostatic Mixing Valve - Spec Sheet
Euromixer® Group Thermostatic Mixing Valve - Spec Sheet
Thorne & Derrick UK
 

Mais procurados (20)

Rwc, Reliance Water Controls Caremix H3 - Deck Mounted 2 Hole TMV3 Thermostat...
Rwc, Reliance Water Controls Caremix H3 - Deck Mounted 2 Hole TMV3 Thermostat...Rwc, Reliance Water Controls Caremix H3 - Deck Mounted 2 Hole TMV3 Thermostat...
Rwc, Reliance Water Controls Caremix H3 - Deck Mounted 2 Hole TMV3 Thermostat...
 
Solar Tempering Valve & Thermostatic Mixing Valve - Spec Sheet
Solar Tempering Valve & Thermostatic Mixing Valve - Spec SheetSolar Tempering Valve & Thermostatic Mixing Valve - Spec Sheet
Solar Tempering Valve & Thermostatic Mixing Valve - Spec Sheet
 
Thermojet - Apresentação de serviços - Livro 6/10
Thermojet - Apresentação de serviços - Livro 6/10Thermojet - Apresentação de serviços - Livro 6/10
Thermojet - Apresentação de serviços - Livro 6/10
 
Heatguard Planar Group Thermostatic Mixing Valve - Spec Sheet
Heatguard Planar Group Thermostatic Mixing Valve - Spec SheetHeatguard Planar Group Thermostatic Mixing Valve - Spec Sheet
Heatguard Planar Group Thermostatic Mixing Valve - Spec Sheet
 
Water Matters - Who, What, Why, When & How of WRAS Approval
Water Matters - Who, What, Why, When & How of WRAS ApprovalWater Matters - Who, What, Why, When & How of WRAS Approval
Water Matters - Who, What, Why, When & How of WRAS Approval
 
Airius in Manufacturing & Engineering
Airius in Manufacturing & EngineeringAirius in Manufacturing & Engineering
Airius in Manufacturing & Engineering
 
Industrial Furnaces Energy Efficiency
Industrial Furnaces Energy EfficiencyIndustrial Furnaces Energy Efficiency
Industrial Furnaces Energy Efficiency
 
Introduction to Air Barriers
Introduction to Air BarriersIntroduction to Air Barriers
Introduction to Air Barriers
 
Empteezy - Drum & IBC Storage, Spill Containment & Control - Brochure
Empteezy - Drum & IBC Storage, Spill Containment & Control - BrochureEmpteezy - Drum & IBC Storage, Spill Containment & Control - Brochure
Empteezy - Drum & IBC Storage, Spill Containment & Control - Brochure
 
Mvhr installation guide_final_11_02_11
Mvhr installation guide_final_11_02_11Mvhr installation guide_final_11_02_11
Mvhr installation guide_final_11_02_11
 
AHS-SS-Solutions-Brochure-Single-Web-V3
AHS-SS-Solutions-Brochure-Single-Web-V3AHS-SS-Solutions-Brochure-Single-Web-V3
AHS-SS-Solutions-Brochure-Single-Web-V3
 
SANER TANJU ATIS_MMS
SANER TANJU ATIS_MMSSANER TANJU ATIS_MMS
SANER TANJU ATIS_MMS
 
Precise drying
Precise dryingPrecise drying
Precise drying
 
TeamCapabilitiesBro
TeamCapabilitiesBroTeamCapabilitiesBro
TeamCapabilitiesBro
 
Testo - Industry
Testo - IndustryTesto - Industry
Testo - Industry
 
Michael Nortje CV 2014
Michael Nortje CV 2014Michael Nortje CV 2014
Michael Nortje CV 2014
 
Thermon Industrial Hazardous Area Trace Heating - General Information
Thermon Industrial Hazardous Area Trace Heating - General InformationThermon Industrial Hazardous Area Trace Heating - General Information
Thermon Industrial Hazardous Area Trace Heating - General Information
 
zshan updated cv
zshan updated cvzshan updated cv
zshan updated cv
 
Euromixer® Group Thermostatic Mixing Valve - Spec Sheet
Euromixer® Group Thermostatic Mixing Valve - Spec SheetEuromixer® Group Thermostatic Mixing Valve - Spec Sheet
Euromixer® Group Thermostatic Mixing Valve - Spec Sheet
 
Hot air-oven
Hot air-ovenHot air-oven
Hot air-oven
 

Semelhante a BriskHeat Freeze Protection Planning Guide

Trace Heating Cables Self Regulating - Installation Manual
Trace Heating Cables Self Regulating - Installation ManualTrace Heating Cables Self Regulating - Installation Manual
Trace Heating Cables Self Regulating - Installation Manual
Thorne & Derrick UK
 
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
fjsjfkskefmem
 
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
fujsefkskekmm
 
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
fjkskekdmmenm
 
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
ufjjjdjkkskme
 
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
ujjfjkskekmme
 
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
fujsked9dikdkd
 
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...
jiuliu14811471
 

Semelhante a BriskHeat Freeze Protection Planning Guide (20)

Unit-III Safety in process.pptx
Unit-III Safety in process.pptxUnit-III Safety in process.pptx
Unit-III Safety in process.pptx
 
Refrigeration natural disaster planning and recovery
Refrigeration natural disaster planning and recoveryRefrigeration natural disaster planning and recovery
Refrigeration natural disaster planning and recovery
 
Mastering the Art of Water Heater Installation A Comprehensive Guide.pdf
Mastering the Art of Water Heater Installation A Comprehensive Guide.pdfMastering the Art of Water Heater Installation A Comprehensive Guide.pdf
Mastering the Art of Water Heater Installation A Comprehensive Guide.pdf
 
MET 214 Module 6
MET 214 Module 6MET 214 Module 6
MET 214 Module 6
 
Episode 34 : Project Execution Part (5)
Episode 34 :  Project Execution Part (5)Episode 34 :  Project Execution Part (5)
Episode 34 : Project Execution Part (5)
 
Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION
 
Hot Water Heat Tracing - Maintenance and Troubleshooting Guide
Hot Water Heat Tracing - Maintenance and Troubleshooting GuideHot Water Heat Tracing - Maintenance and Troubleshooting Guide
Hot Water Heat Tracing - Maintenance and Troubleshooting Guide
 
Trace Heating Cables Self Regulating - Installation Manual
Trace Heating Cables Self Regulating - Installation ManualTrace Heating Cables Self Regulating - Installation Manual
Trace Heating Cables Self Regulating - Installation Manual
 
Manual filtro pentair
Manual filtro pentair Manual filtro pentair
Manual filtro pentair
 
Boiler recommissioning procedure after capital overhaul
Boiler recommissioning procedure after capital overhaul Boiler recommissioning procedure after capital overhaul
Boiler recommissioning procedure after capital overhaul
 
Mech manager
Mech managerMech manager
Mech manager
 
SunMaxx Installation Manual - StorMaxx Solar Hot Water Storage Tanks
SunMaxx Installation Manual - StorMaxx Solar Hot Water Storage TanksSunMaxx Installation Manual - StorMaxx Solar Hot Water Storage Tanks
SunMaxx Installation Manual - StorMaxx Solar Hot Water Storage Tanks
 
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
 
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
 
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
 
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
 
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
Caterpillar cat 973 c track loader (prefix ldx) service repair manual (ldx000...
 
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
 
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual (LDX0000...
 
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...
Caterpillar Cat 973C TRACK LOADER (Prefix LDX) Service Repair Manual Instant ...
 

Último

VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 

BriskHeat Freeze Protection Planning Guide

  • 1. Freeze Protection Planning Guide and Inventory Checklist M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
  • 2. Introduction Anticipating freezing conditions and protecting buildings, equipment, and grounds against freeze damage is a vital part of a Facility Maintenance Program. A good freeze protection plan includes steps for inspection, preventative maintenance, and corrective maintenance prior to the beginning of cold weather conditions. This guide is designed to make the planning process easier for you. Contact M.S. Jacobs at 800-348-0089 or visit www.msjacobs.com for all your Briskheat freeze protection products. Table of Contents Introduction................................................................................................................................................................2 Section A: General Freeze Protection Preparation Steps..........................................................................................3 Section B: Testing and Periodic Inspection Record for Heating Cable ......................................................................6 Periodic Heating Cable Inspection Record .............................................................................................................6 Heating Cable Insulation Resistance Test...............................................................................................................7 Section C: Inventory Checklist for Pipe Lines and Valves That Need Heat................................................................8 Section D: Inventory Checklist for Containers Stored in Unheated Areas or Susceptible to Freezing......................9 Drums / Pails...........................................................................................................................................................9 Intermediate Bulk Containers (IBC) / Tote Tanks................................................................................................ 10 Gas Cylinders ....................................................................................................................................................... 10 Section E: Inventory Checklist for Large Permanent Tanks, Vessels, and Hoppers in Unheated Areas or Susceptible to Freezing............................................................................................................................................ 11 Section F: Inventory Checklist for Roof and Gutter Deicing................................................................................... 12 Roofs that Need Heat..............................................................................................Error! Bookmark not defined. Downspouts that Need Heat...................................................................................Error! Bookmark not defined. Section G: Inventory Checklist for Personal Safety / Slip Prevention..................................................................... 13 Walkways Susceptible to Icy Conditions ............................................................................................................. 13 Stairs Susceptible to Icy Conditions..................................................................................................................... 14 Section H: Inventory Checklist for Damaged Heaters That Need to Be Replaced.................................................. 15 Section I: Inventory Checklist for Temporary De-icing Heaters ............................................................................. 16 HSTAT Heating Tapes with Adjustable Thermostat Control Order Sheet........................................................... 16 M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
  • 3. Section A: General Freeze Protection Preparation Steps These are general freeze protection planning steps we found useful through research and personal maintenance experience. These steps are not all-inclusive and we recommend that you consult a trained professional and review your corporate policies and local /national codes prior to implementing your plan. Item Assigned to Date Complete Sign-off □ Clean, service, and functionally test all heating systems. □ Roof and gutter: Inspect, remove debris, and patch/repair (if needed): roof drains, scuppers, canals, gutters, down spouts before first frost. Inspect and functionally test installed roof and gutter heat trace system. □ Identify and test main water supply cutoffs for each facility. Ensure these areas are readily available to emergency personnel responding to a freeze/thaw incident. □ Inspect wet-pipe sprinkler systems for areas susceptible to freezing. Apply heat in susceptible areas. □ Identify materials that are susceptible to freeze damage in outside storage pads and unheated storage areas. Develop plan to ensure these materials can be easily heated and thawed to maintain production. Tip: Think about materials that might be delivered during the cold season in unheated vehicles. BriskHeat offers plug-and-play portable heaters that easily wrap around and heat drums, pails, and tanks to thaw frozen or slow flowing materials. □ Check and place antifreeze used in cooling systems as necessary. □ Protect heating system power and temperature controls against inadvertent deactivation. M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
  • 4. Item Assigned to Date Complete Sign-off □ Drain and remove water from all seasonal cooling systems (unless protected by heating tapes or antifreeze). □ Inspect, test, and stage portable auxiliary heaters. □ Inspect conditions of all surface heaters such as heating tapes, heating cable, drum heaters, IBC heaters, tank heaters, and pipe heaters. Verify operation and temperature settings and test ground-fault equipment protection. Tip: Look for damaged insulation on all exposed portions of the power cord. If possible, check both ends of the cord for loose connections. An exposed conductor may come in contact with personnel during maintenance activities resulting in sparks or injury. □ Inspect, test, and repair heat trace heating cable located on cooling tower supply and return lines. □ Inspect and identify remaining water and air lines susceptible to freezing. Install appropriate heat and insulation. Tip: Pay special attention to valves. This is a major choke point and susceptible to damage. BriskHeat offers a safe and effective flexible heating tape (HSTAT series) that can be used as preventative maintenance or used to thaw out a valve quickly. See section I for more information. □ For steam systems: Blow down drip legs, clean strainers, test temperature sensing devices for actuation of control valves and dampers, check steam traps, control actuators/valves, face and bypass dampers, linkages, and temperature controllers. Ensure that a vacuum breaker is installed and in working order on all preheat and heating coils which may be exposed to freezing conditions. M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
  • 5. Item Assigned to Date Complete Sign-off □ For ventilation systems: Test and calibrate all temperature sensing devices, and check operation of valves, dampers, linkages, control actuators, and temperature controllers. □ Identify areas where personal safety is at risk due to icy conditions. Develop a slip prevention maintenance plan. See section G for ideas. □ Identify control panels and electronic devices susceptible to condensation. Install enclosure heaters to prevent short-outs and corrosion. □ Institute a facility-wide awareness plan to identify and report any suspected problems with heating or other cold weather protection equipment during the cold season. □ Have plan in place to remove temporary cold weather protection items after the cold weather season. Special Consideration: Hazardous Materials • Ensure that all containers used for hazardous or toxic materials are properly stored, and inspect them for deterioration prior to handling. If containers become brittle (due to the combination of chemical attack, freezing temperatures, and ultraviolet light) they may break when moved. • Liquids should not be permitted to remain in unheated process lines during periods when production has been stopped. All lines should be drained and purged to prevent future line breakage due to freezing temperatures. • Ensure that piping, tanks, and valves in systems that carry hazardous or toxic substances are properly insulated and/ or heated. Install heaters such as heating blankets, insulators, heating tapes, heating jackets, and heating cable as appropriate. M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
  • 6. Section B: Testing and Periodic Inspection Record for Heating Cable Periodic Heating Cable Inspection Record Instructions: 1) One sheet per circuit. – This inspection form allows for up to five inspections to be compared for an individual circuit. 2) Maintenance Check Frequency: Freeze Protection Circuits: Prior to the first freeze Temperature Maintenance Circuits: At least twice per year Maintenance Check Date (Month/Year) (mm/yy) (mm/yy) (mm/yy) (mm/yy) (mm/yy) Visual inspection inside connection box corrosion, moisture, etc. Initial Damage or cracks (leaks) in insulation seals at valves, hangers, pumps, etc. Initial Heating cable properly connected and grounded. Heating cable and connections insulated from connection box. Initial Thermostat checked for moisture, corrosion, set point, switch operation, and sensor damage. Set Point Initial Megger tests performed at power connection with both bus wires disconnected from power wiring. Reading Initial Circuit voltage at power connection. Reading Circuit amperage after 5 minutes. Reading Pipe temperature at time amps were measured. Reading Watts/Ft. Volts x Amps = w/ft. feet Watts/Ft. Initial All connections, boxes, and thermostats have been resealed. Initial End seals, covered splices and tees marked on insulation cladding. Initial Remarks & Comments Circuit Number Heater Type Circuit Length PeriodicInspectionRecordForm M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
  • 7. Heating Cable Insulation Resistance Test The insulation resistance test is used to check for damage to extruded jackets. Connections for the megger are made as shown in Figures 1 & 2. Figure 1 Note: Test should use at least a 500 VDC megger. Do not use a megger with an excess of 2500 VDC. Minimum acceptable readings should be 20 megohms per circuit, regardless of length. 500 VDC MEGGER Figure 2 A record should be kept of the readings taken from the time the cable is first installed on the pipe. A history of the insulation resistance reading can be helpful in spotting moisture ingress into the electrical system by seeing a gradual decline in the insulation resistance or physical damage to the heating cable (sharp decline in the insulation resistance). See the previous page for a sample record. FOR HEATING CABLES WITH BRAID Test from heating cable bus to braid FOR HEATING CABLES WITH BRAID AND OUTER JACKET Test A - (solid lines) from heating cable bus wires to braid. Test B - (dotted lines) from braid to metal pipe. 500 VDC MEGGER M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
  • 8. Section C: Inventory Checklist for Pipe Lines and Valves That Need Heat Use this checklist to identify the pipe lines that need heat. Your local distributor or BriskHeat will help you determine the proper type and amount of heating cable, insulation, and accessories necessary for your application. Pipe / Valve Location Where Heat is Needed Length of Pipe / Size of Valve Where Heat is Needed O.D. of Pipe / Valve Temperature Required Available Voltage Supply and Circuit Breaker Size Hazardous Location? (Y/N) If Yes, Classification? Insulation is Needed? (Y/N) Insulation Thickness? Example of a Heating Cable Installation Power Connection Kit - PLT-BC or LT-BC use with cable power seal kit - LT-MP, LT-SP or LT-HSP. End Seal – SLTE-2, LT-SE or LT-E In-line splice under insulation (shown) - LT-SS or LT-HSS. Above insulation - Heater cable loopPLT-BS or LT-BS. Tee splice under insulation (shown) - LT-ST or LT-HST Above insulation - PLT-BY or LT-BY. Pipe Clamps Heater Cable Fiberglass Tape Insulation SLCBL: Self-Regulating Heating Cable SpeedTrace: Self-Regulating Heating Cable Pre-Assembled with 30” Cord and Plug. InsulLock®DS: Closed Cell Elastomeric Thermal Insulation Power Connection Kit End Seal In-line splice under insulation Tee splice under insulation M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
  • 9. Section D: Inventory Checklist for Containers Stored in Unheated Areas or Susceptible to Freezing Containers such as drums, pails, tote tank / IBCs, and gas cylinders contain materials that either freeze or need a specific flow rate to maximize production. Utilizing a portable plug-and-play electrical surface heater on the container prior to and during production is a cost-effective and simple way to thaw and improve the flow rate of the material within the container. Drums / Pails Container Size (Make a special note if the container will be in a hazardous environment) Qty of Containers that Need Heat Container Outer Material (metal, plastic, etc.) Available Voltage Supply for Heater (120V or 240V) 55 gallon (208 litre) drums / barrels 30 gallon (114 litre) drums / barrels 15 & 16 gallon (57 & 60 litre) pails 5 gallon (19 litre) pails Tip: For faster heat-up, use multiple silicone rubber band heaters at one time or a full-coverage insulated drum heater. Recommended Solutions: • For Drums and Pails: o DHCS series: Heavy-Duty Silicone Rubber Band Heater - Great all-purpose choice: economical, moisture & chemical resistant and long lasting. Includes built-in adjustable thermostat control. 120V model includes standard 3-prong (NEMA 5- 15) grounded plug. o FGDH series: Full-Coverage Insulated Drum Heater - Fully insulated and more wattage for faster and more energy-efficient heat-ups. Includes built-in digital temperature controller. 120V model includes standard 3-prong (NEMA 5-15) grounded plug. DHCS: Heavy-Duty Silicone Rubber Drum Heater TOTE: Wrap-Around Tote Tank / IBC Heater GCW: Gas Cylinder Warmer FGDH: Full-Coverage Insulated Drum Heater M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
  • 10. Intermediate Bulk Containers (IBC) / Tote Tanks Tank Height (Not including pallet or support stand) Tank Length Tank Width Qty of Tanks that Need Heat Tank Outer Material (metal, plastic, caged, etc.) Available Voltage Supply for Heater (120V or 240V) Recommended Solution: • For Tote Tanks / IBCs: o TOTE series – Adjustable Wrap-Around Tote Tank / IBC Heater – Fully insulated blanket heater wraps around tote tank / IBC without contaminating or scorching your product. Adjustable straps allow it to fit multiple container widths. Includes dual adjustable thermostat control: 50 to 160°F (10 to 71°C).  240V is recommended for fastest heat-up. It offers double the wattage (2880 watts) compared to 120V version (1440 watts).  Do not forget the insulated top. It minimizes heat loss and improves heater efficiency. Gas Cylinders Cylinder Diameter Cylinder Height Qty of Cylinders that Need Heat Hazardous Location? (Y/N) If Yes, Classification? Available Voltage Supply for Heater (120V or 240V) Recommended Solutions: • For Gas Cylinder Warmers o If Ordinary Location: GCW series- Ordinary Location Gas Cylinder Warmer – 2” (50mm) thick insulation and self-regulating heating element. No extra temperature control necessary. 120V model includes standard 3-prong (NEMA 5-15) grounded plug. o If Hazardous-Area Location: HCW series- Hazardous-Area Gas Cylinder Warmer – Same as above except it is suitable for Class I Division 1 Groups B, C, and D. No plug is included. M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
  • 11. Section E: Inventory Checklist for Large Permanent Tanks, Vessels, and Hoppers in Unheated Areas or Susceptible to Freezing Use this checklist to identify the tanks, vessels, and hoppers that are susceptible to freezing. Your local distributor or BriskHeat will help recommend exactly how much heat you need to prevent freezing or improve flow as well as which style of heater, insulation, and temperature control is right for you. Vessel Location (Make a special note if it is in a Hazardous Location) Vessel Type (Cylindrical Tank, Rectangular Tank, Hopper, etc.) Vessel Size Vessel Outer Material (metal, plastic, etc.) Content Stored in Vessel Process Temperature Available Voltage Supply and Circuit Breaker Size NEW! SRL-ADJ Series: Silicone Rubber Heating Blankets with Control. True plug-and-play silicone rubber heating blanket with Built-in Adjustable Thermostat Control. Many sizes to choose from. See BriskHeat product catalog or visit www.briskheat.com for additional information. M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
  • 12. Section F: Inventory Checklist for Roof and Gutter Deicing When gutters and downspouts freeze, major damage can occur to your building’s roof and façade. We recommend roof and gutter self-regulating heating cable as the solution. BriskHeat's SpeedTrace Roof & Gutter De-Icing Kits are designed to prevent the formation of ice Dams on rooftops by using an electric self-regulating heating cable system. The heating cable melts away excessive ice and snow from the roof, gutters, and downspouts to ensure proper draining. Kits include: SpeedTrace Roof & Gutter Heating Cable (pre-assembled with 30” cord and plug), Heavy Duty Roof Clips, Downspout Hanger Brackets, UV Resistant Cable Ties. Measuring Heating Cable Length for Roof & Gutter De-Icing Use the equation below to calculate heating cable length: Cable Required for Roof = (R x M) + G + D (R) Roof Edge Length (linear length of roof to protect) (M) Multiplier from table below (G) Gutter Length (D) Downspout Length (x2 if heating cable returns back to gutter) Roof Overhang M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
  • 13. Section G: Inventory Checklist for Personal Safety / Slip Prevention Looking for a safer, cleaner, and better alternative to calcium chloride? Snow Melting Mats continuously melt snow and ice, helping keep surfaces constantly clear and safe. They are portable and easy-to-install. These durable rubber heating mats lie on top of existing surfaces. Simply plug them into any standard 120V or 240V outlet. A GFCI is included. Ideal for entranceways, stairs, loading docks, handicap ramps, rooftops, and freezer floors. Walkways Susceptible to Icy Conditions Walkway Location Walkway Length Walkway Width Available Voltage Supply for Heater (120V or 240V) Qty of Snow Melting Mats Needed HTM: HeatTrak® Snow Melting Walkway Mats M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
  • 14. Stairs Susceptible to Icy Conditions Stair Location Stair Width Stair Length # of Stairs in Location Available Voltage Supply for Heater (120V or 240V) Ordered as a set: Indicate number of stairs per set at time of order. A set of stair mats is connected with 18” (45cm) long connector cables. HRT: HeatTrak® Snow Melting Stair Mats: M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
  • 15. Section H: Inventory Checklist for Damaged Heaters That Need to Be Replaced Use this checklist to identify any heaters that need to be replaced due to damage. HeaterLocationHeaterTypeIssue QtyofHeaters thatNeedto beReplaced Heater Size Heater Voltage Heater Wattage M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
  • 16. Section I: Inventory Checklist for Temporary De-icing Heaters It is always a good idea to have a few flexible multi-purpose heaters on hand in the event of emergency de-icing. HSTAT flexible heating tapes with built-in adjustable temperature controls are ideal to prevent freezing or thaw out frozen valves, pipes, and many other objects. Unlike dangerous blow torches, these heaters are safe, make direct contact with the object to be heated, are moisture and chemical resistant, and can be run unsupervised. Do not be left without a few of these lifesavers in the toolbox when freezing occurs. HSTAT Heating Tapes with Adjustable Thermostat Control Order Sheet Heating Tape Width Heating Tape Length Wattage Part Number (120V) Part Number (240V) Qty of Heaters Needed 1” (25mm) 2ft (0.6m) 144 HSTAT101002 HSTAT102002 1” (25mm) 4ft (1.2m) 288 HSTAT101004 HSTAT102004 1” (25mm) 6ft (1.8m) 432 HSTAT101006 HSTAT102006 1” (25mm) 8ft (2.4m) 576 HSTAT101008 HSTAT102008 1” (25mm) 10ft (3.1m) 720 HSTAT101010 HSTAT102010 Other widths and lengths are available upon request. Tips: • Circle Part Number to indicate voltage preference • Have at least one of each size on hand so that you have the right size when you need it. Shorter lengths are typically used for valves, bearings, pumps, and actuators. Longer lengths are typically used for pipe runs. • When estimating heating tape lengths, keep in mind that the heating tape cannot be overlapped upon itself. That will cause damage to the heater. M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com
  • 17. References The following references were used in the development of this document. • Conduct of Maintenance (P950) Operations and Maintenance Manual for Freeze Protection, Criterion 401 R.3, Los Alamos National Laboratory • Valve Thawing Application Note, BriskHeat Corporation • BriskHeat Self-Regulating Heating Cable Installation and Maintenance Manual, Part # 11248-06, BriskHeat Corporation • 13th BriskHeat Product Catalog, 13th Edition Rev A, BriskHeat Corporation BriskHeat® Corporation World Headquarters 4800 Hilton Corporate Drive Columbus, OH 43232 1-800-848-7673 (U.S. and Canada) 1-614-294-3376 (Worldwide) Email: bhtsales1@briskheat.com Web site: www.briskheat.com Copyright ©2012 by BriskHeat® Corporation RevA M.S. Jacobs & Associates, Inc. | 800-348-0089 | www.msjacobs.com