CHAPTER 1
INTRODUCTION
This industrial training is the training for the student in a period of time in
order to let them have some working experience. It is also essential for practical
evaluation to decide whether the students are worthy to receive the certificate.
Besides that, all their activities and task been given during the training session must
be recorded in the log book been provided. The chances that are given by the
University are good opportunity for the students to let them gather knowledge and
experience as much as they could in the 16 weeks of training period.
This is a better chance for them being exposed to the working experience before
graduating in their studies. Student also gets to study about safety precautions when
working in industries. They also are being exposed about the hazard of working with
the engineering professions that usually are popular for accident tragedies.
2
1.1 Objective of Industrial Training
Among the objective of industrial training are :
1. Apply engineering methods such as design and problems solving.
2. Develop understanding of the functioning and organisation of a business.
3. Develop technical, interpersonal and communication skills, both oral and
written.
4. Study the safety and hazard at workplace and the respective Personal Protective
Equipment (PPE).
5. To expose students to working environment in their respective fields, namely as
the first step for student to prepare before entering the working field after
graduate.
6. Able to be discipline and follow all the rules and regulations at work.
7. Fostering teamwork and good communication with employees in the company.
3
1.2 Industrial Training Importance
Industrial training is to expose the students to real jobs and to improve their
knowledge and skills in their respective fields as well as towards producing graduates
who are competent, ethical, professional, competent and creative. In addition, it helps
student to adapt to a challenging environment. With this, students will be more
prepared and confident in their own capabilities. In addition, students can also learn
how to work in groups effectively, and to understand the role of each team member as
well as to foster a sense of responsibility, trust and cooperation between each other..
4
1.3 GG Circuits Industries Sdn. Bhd.
The Industrial Training (INTRA) was done in GG Circuits Industries Sdn. Bhd.:
No. 18 Jalan Riang Utama, Gembira Industrial Park, Off Jalan Tampoi, 81200 Johor
Bahru, Johor.
Figure 1 : Location of GG Circuits Industries Sdn. Bhd
The position assigned was as a lab assistant Trainee and reported duty on 20th
JUNE
2016 to MLB manager, Mr Muhammad bin Md Arip. The major task given was to
assist in ensuring the chemical running at production lane always on spec that have
been set. Provide prevention and also corrective action if any problem on chemical
happen at production lane.
5
CHAPTER 2
GG Circuits Industries Sdn. Bhd
2.1 Company Background
GG Circuits Industries Sdn. Bhd. has a relatively long history and recognized tradition,
since its establishment in 1985. Previously, GG Circuits Industries was known as
Golden Glow Enterprise. Figure 2.1 below shows the company logo. Basically, this
company involved in manufacturing of printed circuits board (PCB) for industrial
electronics, automotive, home appliances and communication. Besides, this company
also known globally as one of the advanced in PCB manufacturing for electronics and
automobile industries. Figure 2.2 shows some PCB’s.
Figure 2.1: Company Logo
6
Figure 2.2: Printed Circuits Board
The achievement were supported by the company’s commitment to drive
towards manufacturing efficiency, new process development and operation capabilities
encompass state of art equipment to meet and exceed customer’s demand.
The core competence of the company includes manufacturing of Single Sided,
Double Sided and Multi-layer Printed Circuit Boards.
Furthermore, this company have experienced strong growth by being a true
partner with their customer. All GGC teams believed the long-term relationship with
their clients is their competence. The key component of their business is service to
the customer. GGC is known to provide responsive and individualized product and
services on whatever the project size and willing to fulfill client’s requirements with
the best efforts.
7
Table 2.1: Details of Company
Name of Company : GG Circuits Industries Sdn. Bhd.
Address : No. 18 Jalan Riang Utama, Gembira Industrial
Park, Off Jalan Tampoi, 81200 Johor Bahru,
Johor
Telephone No. : 07-2761288
Type of business : Manufacturing
Registration No. : 136273-M
Company’s registration date : 5 March 1985
No. of Employee : 200
Products : Printed Circuits Board
Figure 2.3: The main gate of GG Circuits Industries Sdn. Bhd.
8
4
Figure 2.4: Parking area for higher management staff
Figure 2.3 and 2.4 shows the main gate of GGC and parking area provided
for higher management staff.
9
2.2 Vision, Mission and Objective of Company
2.2.1 Vision and Mission
GGC aims to achieve total satisfaction through its vision and mission as an efficient
and reliable manufacturer of PCB. This will be accomplished by:
Vision

Continually improved the effectiveness of quality management system.
Mission

Continually delivered superior products and services to customer in the
most cost effective and timely manner.
With the total support by empowering and quality conscious workforce, all GGC teams
shall commit themselves to comply with the requirement for continuing success.
10
2.2.2 Objectives of Company
The objectives of GGC are:
1. To be a company which can give profit and achieve target sales.
2. Able to provide good life style to all GGC teams and develop
excellent manner of each GGC teams.
2.3 Organizational Chart
2.3.1 Main Organizational Chart
Managing Director
( Albert Tan )
Quality Mnagement General Manager Environmental
Representative
( CP Lim )
Management
( Mrs. Jariah )
Representative
( WY Wan )
Figure 2.5: Main Organizational Chart
11
2.3.2 Department Organizational Chart
Figure 2.6: Department Division Organizational Chart
12
2.3.3 Operation Management Organizational Chart
Figure 2.7: Operation Management Organizational Chart
2.4 Department Function
There are 8 Main departments in GGC where each department play an
important roles in contributing to company achievement. Moreover, without good
communication, cooperation and management, more profit cannot be made. Thus,
specific management plan and job scope were listed according to department
responsibility.
MLB department was placed under Operation management together with
SLB and maintenance department lead by Mr. Kumar. The general function of
operation management department were to provide good products within given
period of time. In order to achieve its function, full attention needs to be given to
each section under both MLB and SLB department.
13
2.4.1 MLB Department
MLB department specialized in manufacturing double sided PCB and multi-
layer PCB while SLB focusing on single sided PCB. There are more than 10 sections
under MLB department. Each section plays an important role in order to complete the
output. Each section was placed under specific supervision and monitor by production
manager. Figure 2.8 and 2.9 shows the general MLB process flow for double sided
and specific MLB process flow for both double sided and multi-layer PCB
respectively.
Figure 2.8: General MLB Process Flow for Double Sided PCB
14
Figure 2.9: Details MLB Process Flow for Both Double Sided and Multi-layer
PCB
15
Besides, each part number of PCB have different process flow depends on customer
order. Process flow of each part number can be refer on traveller which also known
as part number ID. Figure 2.10 shows examples of traveller.
Figure 2.10: Traveller
Laboratory Section
Previously, laboratory section was placed under engineering department.
However due to it’s important to the production line, changes have been made. Thus,
laboratory section was placed under MLB department from that time onwards.
Laboratory section are monitor by Mrs Nur Zehan and Mrs Rabiatul Adawiyah. The
main role of laboratory section are to analyse each samples from both MLB and SLB
department such as dry film, solder mask, organic solderable preservation (OSP),
copper plating, gold plating and hot air levelling (HAL).
16
CHAPTER 3
LABORATORY SECTION IN GG CIRCUIT INDUSTRIES SDN. BHD.
3.1 Understanding of Laboratory Responsibility and Scope
3.1.1 Purpose
The purpose of laboratory section is to monitor the chemicals concentration
use in each section under production line. It is important to make sure that all
chemicals were in good condition and enough to support ongoing panels. Besides, as
lab engineer we need to fully understand the method use and chemicals condition in
order to avoid accident.
Furthermore, lab section needs to follow up each samples an hour after
distributed the report or after any replenishment have been made. Sometimes, trainee
also need to follow up samples after new make-up have been made. Normally, each
section will called us and informed regarding new make-up process.
On trainee first day, trainee learned basic analysis which involved titration
method, calibration and observation. There are more than 20 samples that need to be
analysed everyday not including waste water treatment samples (WWTP). Moreover,
trainee have to get used to analyse samples as fast as trainee can since each section
need the chemicals report before run the ongoing panels.
17
3.2 Understanding of MLB Process Flow and its Function
As trainee was placed under MLB department, trainee have to understand the
process involved in PCB manufacturing. According to MLB process engineer, 4
months is not enough for trainee to completely understand every process. . Besides,
during free time trainee learn about the process and output from production lane
3.2.1 Blackhole and Dry Film Section
Panels from drilling will be send to blackhole section. In blackhole section,
panels will be clean at deburring stage before pass to conditioner tank. In conditioner
tank, the alkaline solution will clean the copper surface from through hole plating.
Then, panels enter SP starter tank which act as main blackhole chamber. It will coats
substrate material with carbon providing the means to electrolytically copper plate
the hole walls. Figure 3.1 below shows panels before and after coating with carbon.
After that, panels will be clean in microclean G5 tank before proceed to dry film
process
Figure 3.1: Panels Before and After Coating with Carbon
18
Dry film consist of lamination, pattern expose and develop stage. In this
section, panels from blackhole will be laminate. After lamination process, pattern
will be exposed on the panels. Before panels went to next section, panels will be
develop in dry film develop to any unwanted resist. Figure 3.2 below shows panels
before and after dry film developing. If panels from dry film developing have
problems and need to redo its process, panels from dry film will be strip in dry film
stripping section.
Figure 3.2: Panels Before and After Dry Film Developing
19
3.2.2 Copper Plating Section
Basically, copper plating is a process where a layer of copper is deposited on
the item to be plated using electric current. This section applied electrolysis theory.
Before copper is plated on panels, panels will be clean in acid cleaner tank. Then,
panels will be dipped in microetch G4 tank which promotes copper adhesion. After
that, panels will be dipped in copper plating tank for copper deposition. Lastly,
panels will be dipped in restin tank consist of tin solution which act as etch resist to
protect copper surface against the attack of etching media in SES later. Figure 3.3
shows the panels before and after copper deposition.
Figure 3.3: Panels Before and After Copper Deposition
20
3.2.3 SES Section
SES section stands for strip etching strip. This section consist 3 different
stage which are dry film stripping, ammonium etching and tin stripping. Figure 3.4,
3.5 and 3.6 shows panels before and after dry film striping, ammonium etching and
tin stripping, respectively.
Figure 3.4: Panels Before and After Dry Film Striping
21
Figure 3.5: Panels Before and After Ammonium Etching
Figure 3.6: Panels Before and After Tin Striping
22
3.2.4 Solder mask Pre-treatment and Develop
In solder mask pre-treatment section, panels will be clean from impurities in
microetch G5 tank. Then, panels will be provided with optimum roughness for
excellent ink adhesion in multiprep tank. Besides, anti-tarnish solution is used to
prevent copper surface from oxidation.
After undergo pre-treatment, ink will be printed on the panels before
exposing pattern on its surface. Then, unwanted ink on panels will be removed in
solder mask developing chamber. Final bake is needed in order to cure solder mask
ink. Figure 3.7 below shows solder mask final bake conveyor oven.
Figure 3.7: Solder Mask Final Bake Conveyor Oven
23
3.3 Routine Jobs
3.3.1 Taking Samples
During this industrial training, trainee need to take samples from each section
every morning, afternoon and evening. Normally, sample was collected from on
8:30 am every day. Morning samples are from blackhole, solder mask develop, dry
film and desmear. For normal production schedule, lab section will take samples
from copper plating around 11:30 am. Exception for samples from OSP, HAL, SES
and solder mask pre-treatment (multiprep), each section technician will collect
samples and send to laboratory for analysis. Figure 3.8 shows some of morning
samples.
Figure 3.8: Samples from Blackhole, Dry Film and Solder Mask
24
3.3.2 Analysis, Observation and Monitoring Samples
Basically, samples analysis in this laboratory involved titration method.
Besides, figure 3.9 and 3.10 shows spectroscopy instruments that were used which
are UVVisible and Atomic Absorption Spectroscopy (AAS), respectively. As
laboratory engineer, colour changes of each samples analysis need to be observed
carefully. This is because, it is important to avoid using too much titrant which
overshoot the endpoint. This action can caused different result. Figure 3.11 shows
titration of some of the samples.
Figure 3.9: Atomic Absorption Spectroscopy
25
Figure 3.10: UV-Visible Spectrophotometer
Figure 3.11: Titration of Samples Analysis and Observation
26
Monitoring samples is a process which involved follow up samples and
suggesting for new make-up. Besides, we need to monitored that all chemicals
concentration are in it spec. Low concentration and high concentration chemicals can
affect the ongoing panels. For examples, if concentration of tin which is use in
copper plating section as etch resist was too high, thick layer of tin will be plated on
the panels. Hence, it will be hard to remove thick layer of tin in stripping process
later. If tin residue was present in the panels, it may cause other potential failure such
as presence of stain under solder mask and solder mask peel off. Table 3.1 shows
routine schedule of samples analysis and observation that were conducted every day.
This schedule was arranged according to each section control plan.
27
Table 3.1 Schedule of Samples Analysis and Observation per Day for Each
Section
Section Schedule of Samples Analysis and
Observation Per Day
Blackhole Once (except for Microetch G5)
Desmear Once (analysis was not conducted every
day)
Dry film Twice
Solder mask develop Twice
Solder mask pre-treatment (multiprep) Once
HAL Twice
OSP Twice
Strip Etching Strip (SES) Once
Copper plating Once
Multibond Once (analysis was not conducted every
day)
Gold plating Once (analysis was not conducted every
day)
Punching Once
28
Besides, we need to monitor etching rate and make sure that etching rate is within
specification. High etch rate indicates insufficient copper thickness due to high
concentration of chemicals concentration or high temperature. Thus, from samples
analysis we can decide whether we need to add water, add chemicals or adjust the
temperature.
3.3.3 Preparation of Standard Solution and Indicator
In order to carry out analysis, we need to prepare standard solutions and
indicator. Some of the standard solution that were used in samples analysis are 1.0N
NaOH, 1.0N Na2S2O4, 0.1N HCl, 50% HCl, 20% H2SO4 and 0.2N EDTA. While,
methyl red, PAN, bromocresol green, sodium chromate, methyl orange,
phenolphatalein, and thymolphatalein are some indicators used in samples analysis.
Before preparing standard solution and indicator, it is important to rinse all apparatus
with deionized water in order to avoid contamination. Figure 3.12 and 2.13 shows
some of the standard solution and indicator use samples analysis.
Figure 3.12: Standard Solution and Indicator Use in Samples Analysis
29
Figure 3.13: Standard Solution and Indicator Use in Samples Analysis
3.4.3 Record and Report
Two months after started industrial training, Mrs, Nur Zehan of MLB process
engineer was on maternity leave. Thus, she teaches trainee briefly about each process
for PCB manufacturing. Besides, she also teaches trainee how to do monthly yield
performance report, key in yield and reject percentage, record SPC copper plating
and solder report.
For monthly yield performance, trainee need to complete the report after 26th
of each months. Then, after finished key in and print out report, trainee need to
distribute it to each section supervisors. Yield performance report was important in
order to monitor performance of each sections. Besides, each supervisor can take
action to reduce major type of reject. Perhaps, this report can motivate all employee
to work hard to achieve target performance every month. Figure 3.14 below shows
yield performance report.
30
Figure 3.14: Yield Performance Report
Figure 3.15: SPC Copper Plating Data
Figure 3.15 above shows SPC copper plating that were record weekly in order to
monitor copper thickness after plating process.
31
CHAPTER 4
CONCLUSION AND RECOMMENDATIONS
As conclusion, trainee managed to learn new things within 16 weeks of
industrial training. Besides, trainee was able to build confidence level, teamwork and
good relationships with other employees. Within this training, trainee was able to
expand knowledge and skills on handling chemicals, quality surveyor and others.
Furthermore, exposure of industrial training give student a real working
environment. Besides, throughout this training, trainee learned to practice more
safety precaution in the industry. Industrial training also worked as basic preparation
for working life after graduate.
GGC is a good company for those who wished to experience real working life.
Moreover, GGC also concerned to produce a multi-tasking employee which able to
do various type of job
There are some recommendations that the author would like to suggest to
UniKL MICET for the next coming Industrial Training candidates to gain better
working experience and knowledge. The current months of Industrial Internship
Training Program which is four months are not sufficient enough for the trainee to
gain experience and knowledge. The author would suggest that the duration of
training which is in five to six months should implement so that more experience and
knowledge could be gained. Moreover, Student Industrial Training Unit (INTRA)
needs to prepare a list of companies that are suitable to the student’s respective
course. This is to avoid the student from undergoing training in the company that is
not related to their field of study. Student Industrial Training Unit also needs to
32
provide some general information for each company listed to help student to
understand the host company first before undergo their training there. INTRA also
need to remind the student to seek earlier the place they want to intern as this will
ease the flow for INTRA itself as it can process their form earlier. This also helps the
host company which provide a longer time for them to choose and think about the
intern they want to take. The author also reminds the student in UniKL MICET to
choose the host company based on their field of study, not referring to allowances or
place to intern. This is to prevent the difficulties in performing projects in the host
company if the company working environment is not related to the student’s field of
study. Lastly, creating more working environment activities in UniKL MICET will
helps student to gain experience, practice their work ethics and increase their
professionalism.

Mais conteúdo relacionado

Mais procurados

Internship Training Report
Internship Training ReportInternship Training Report
Internship Training ReportAman Abdullah
 
Airtech performance affraisal project airtec
Airtech performance affraisal project airtecAirtech performance affraisal project airtec
Airtech performance affraisal project airtecSHIVAKUMARKAREKYATAN
 
Vinaykumar P Desai detail job profile- June-2015 for QA QC Technical service...
Vinaykumar P Desai detail job profile- June-2015  for QA QC Technical service...Vinaykumar P Desai detail job profile- June-2015  for QA QC Technical service...
Vinaykumar P Desai detail job profile- June-2015 for QA QC Technical service...Vinay Desai
 
Corporate training1
Corporate training1Corporate training1
Corporate training1kxtan2
 
A study on_employees_perspective_towards training and development.
A study on_employees_perspective_towards training and development.A study on_employees_perspective_towards training and development.
A study on_employees_perspective_towards training and development.SHIVAKUMARKAREKYATAN
 
COST AND FINANCIAL ANALYSIS.doc
COST AND FINANCIAL ANALYSIS.docCOST AND FINANCIAL ANALYSIS.doc
COST AND FINANCIAL ANALYSIS.docSuryaRShetty
 
Building effective teams in Amdocs-TECC - project report
Building effective teams in Amdocs-TECC - project reportBuilding effective teams in Amdocs-TECC - project report
Building effective teams in Amdocs-TECC - project reportMilind Gokhale
 
AMIT-CURICULLAM_VITAE t2
AMIT-CURICULLAM_VITAE t2AMIT-CURICULLAM_VITAE t2
AMIT-CURICULLAM_VITAE t2amit nigam
 
chethan kotian resume new -1
chethan kotian resume new -1 chethan kotian resume new -1
chethan kotian resume new -1 Chethan C. Kotian
 
Enhancing nippolac paint mixturing process based on qm standards (autosaved)
Enhancing nippolac paint mixturing process based on qm standards (autosaved)Enhancing nippolac paint mixturing process based on qm standards (autosaved)
Enhancing nippolac paint mixturing process based on qm standards (autosaved)Banuka Sameera
 
Brc food (issue 7) awareness training presentation kit
Brc food (issue 7) awareness training presentation kitBrc food (issue 7) awareness training presentation kit
Brc food (issue 7) awareness training presentation kitCertification Consultant
 
Detail Work Profile_Bhargav Thakkar
Detail Work Profile_Bhargav ThakkarDetail Work Profile_Bhargav Thakkar
Detail Work Profile_Bhargav ThakkarThakkar Bhargav
 
Resume_naukri_changes(10.11.14)
Resume_naukri_changes(10.11.14)Resume_naukri_changes(10.11.14)
Resume_naukri_changes(10.11.14)PRASANTA SUR ROY
 

Mais procurados (20)

Training report
Training reportTraining report
Training report
 
Internship Training Report
Internship Training ReportInternship Training Report
Internship Training Report
 
Airtech performance affraisal project airtec
Airtech performance affraisal project airtecAirtech performance affraisal project airtec
Airtech performance affraisal project airtec
 
Vinaykumar P Desai detail job profile- June-2015 for QA QC Technical service...
Vinaykumar P Desai detail job profile- June-2015  for QA QC Technical service...Vinaykumar P Desai detail job profile- June-2015  for QA QC Technical service...
Vinaykumar P Desai detail job profile- June-2015 for QA QC Technical service...
 
Corporate training1
Corporate training1Corporate training1
Corporate training1
 
A study on_employees_perspective_towards training and development.
A study on_employees_perspective_towards training and development.A study on_employees_perspective_towards training and development.
A study on_employees_perspective_towards training and development.
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 
COST AND FINANCIAL ANALYSIS.doc
COST AND FINANCIAL ANALYSIS.docCOST AND FINANCIAL ANALYSIS.doc
COST AND FINANCIAL ANALYSIS.doc
 
Building effective teams in Amdocs-TECC - project report
Building effective teams in Amdocs-TECC - project reportBuilding effective teams in Amdocs-TECC - project report
Building effective teams in Amdocs-TECC - project report
 
AMIT-CURICULLAM_VITAE t2
AMIT-CURICULLAM_VITAE t2AMIT-CURICULLAM_VITAE t2
AMIT-CURICULLAM_VITAE t2
 
chethan kotian resume new -1
chethan kotian resume new -1 chethan kotian resume new -1
chethan kotian resume new -1
 
Resume
ResumeResume
Resume
 
ITREPORT1
ITREPORT1ITREPORT1
ITREPORT1
 
cv_latestN
cv_latestNcv_latestN
cv_latestN
 
Enhancing nippolac paint mixturing process based on qm standards (autosaved)
Enhancing nippolac paint mixturing process based on qm standards (autosaved)Enhancing nippolac paint mixturing process based on qm standards (autosaved)
Enhancing nippolac paint mixturing process based on qm standards (autosaved)
 
final intern report
final intern reportfinal intern report
final intern report
 
Brc food (issue 7) awareness training presentation kit
Brc food (issue 7) awareness training presentation kitBrc food (issue 7) awareness training presentation kit
Brc food (issue 7) awareness training presentation kit
 
Detail Work Profile_Bhargav Thakkar
Detail Work Profile_Bhargav ThakkarDetail Work Profile_Bhargav Thakkar
Detail Work Profile_Bhargav Thakkar
 
Resume_naukri_changes(10.11.14)
Resume_naukri_changes(10.11.14)Resume_naukri_changes(10.11.14)
Resume_naukri_changes(10.11.14)
 
project report
 project report  project report
project report
 

Destaque

Davtyan vdovin digital_branding
Davtyan vdovin digital_brandingDavtyan vdovin digital_branding
Davtyan vdovin digital_brandingMichael Vdovin
 
Prakhar jain class 10
Prakhar jain class 10Prakhar jain class 10
Prakhar jain class 10Prakhar Jain
 
Cuaderno interactivo-ciclo-del-agua
Cuaderno interactivo-ciclo-del-aguaCuaderno interactivo-ciclo-del-agua
Cuaderno interactivo-ciclo-del-aguaAntonella Barros
 
Oirehoito ja sen järjestäminen muilla kuin syöpäpotilailla
Oirehoito ja sen järjestäminen muilla kuin syöpäpotilaillaOirehoito ja sen järjestäminen muilla kuin syöpäpotilailla
Oirehoito ja sen järjestäminen muilla kuin syöpäpotilaillajuusohe
 
1901097rev1 apostilaeletrodosrevestidos ok
1901097rev1 apostilaeletrodosrevestidos ok1901097rev1 apostilaeletrodosrevestidos ok
1901097rev1 apostilaeletrodosrevestidos okjcmora01
 
OpenDataCourse-02-WhatIsOpenData
OpenDataCourse-02-WhatIsOpenDataOpenDataCourse-02-WhatIsOpenData
OpenDataCourse-02-WhatIsOpenDataroutetopa
 
ROUTE-TO-PA Computational Analytics in SPOD
ROUTE-TO-PA Computational Analytics in SPODROUTE-TO-PA Computational Analytics in SPOD
ROUTE-TO-PA Computational Analytics in SPODroutetopa
 
Massey ferguson Mf 8180 parts catalog
Massey ferguson Mf 8180 parts catalogMassey ferguson Mf 8180 parts catalog
Massey ferguson Mf 8180 parts catalogPartCatalogs Net
 
Nous recursos i eines per a l’aprenentatge de la ciència
Nous recursos i eines per a l’aprenentatge de la ciènciaNous recursos i eines per a l’aprenentatge de la ciència
Nous recursos i eines per a l’aprenentatge de la ciènciaMireia Güell
 

Destaque (17)

Davtyan vdovin digital_branding
Davtyan vdovin digital_brandingDavtyan vdovin digital_branding
Davtyan vdovin digital_branding
 
บางจาก
บางจากบางจาก
บางจาก
 
Selling Your Home
Selling Your HomeSelling Your Home
Selling Your Home
 
Prakhar jain class 10
Prakhar jain class 10Prakhar jain class 10
Prakhar jain class 10
 
Cuaderno interactivo-ciclo-del-agua
Cuaderno interactivo-ciclo-del-aguaCuaderno interactivo-ciclo-del-agua
Cuaderno interactivo-ciclo-del-agua
 
Tamara de lampicke
Tamara de lampickeTamara de lampicke
Tamara de lampicke
 
Gameshow dautruong
Gameshow dautruongGameshow dautruong
Gameshow dautruong
 
Khbd
KhbdKhbd
Khbd
 
Oirehoito ja sen järjestäminen muilla kuin syöpäpotilailla
Oirehoito ja sen järjestäminen muilla kuin syöpäpotilaillaOirehoito ja sen järjestäminen muilla kuin syöpäpotilailla
Oirehoito ja sen järjestäminen muilla kuin syöpäpotilailla
 
1901097rev1 apostilaeletrodosrevestidos ok
1901097rev1 apostilaeletrodosrevestidos ok1901097rev1 apostilaeletrodosrevestidos ok
1901097rev1 apostilaeletrodosrevestidos ok
 
OpenDataCourse-02-WhatIsOpenData
OpenDataCourse-02-WhatIsOpenDataOpenDataCourse-02-WhatIsOpenData
OpenDataCourse-02-WhatIsOpenData
 
ROUTE-TO-PA Computational Analytics in SPOD
ROUTE-TO-PA Computational Analytics in SPODROUTE-TO-PA Computational Analytics in SPOD
ROUTE-TO-PA Computational Analytics in SPOD
 
IISA Diploma
IISA DiplomaIISA Diploma
IISA Diploma
 
RAMP SAFETY
RAMP SAFETYRAMP SAFETY
RAMP SAFETY
 
FUEL TANK SAFETY
FUEL TANK SAFETYFUEL TANK SAFETY
FUEL TANK SAFETY
 
Massey ferguson Mf 8180 parts catalog
Massey ferguson Mf 8180 parts catalogMassey ferguson Mf 8180 parts catalog
Massey ferguson Mf 8180 parts catalog
 
Nous recursos i eines per a l’aprenentatge de la ciència
Nous recursos i eines per a l’aprenentatge de la ciènciaNous recursos i eines per a l’aprenentatge de la ciència
Nous recursos i eines per a l’aprenentatge de la ciència
 

Semelhante a faris nizam

A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...
A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...
A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...Phillip Chan
 
SMARTPHONE PRODUCTION SYSTEM
SMARTPHONE PRODUCTION SYSTEMSMARTPHONE PRODUCTION SYSTEM
SMARTPHONE PRODUCTION SYSTEMSisubalan Selvan
 
IUBAT Practicum Report BSME Main Part
IUBAT Practicum Report BSME Main PartIUBAT Practicum Report BSME Main Part
IUBAT Practicum Report BSME Main PartMd.Mehedi Hasan
 
Berger paint BD.docx
Berger paint BD.docxBerger paint BD.docx
Berger paint BD.docxSarwarIqbal7
 
SUMMER INTERNSHIP PROJECT
SUMMER INTERNSHIP PROJECTSUMMER INTERNSHIP PROJECT
SUMMER INTERNSHIP PROJECTDeepak Hbk
 
SUMMER INTERNSHIP PROJECT
SUMMER INTERNSHIP PROJECTSUMMER INTERNSHIP PROJECT
SUMMER INTERNSHIP PROJECTDeepak Hbk
 
Dhirendra_Prabhugaunker_Resume
Dhirendra_Prabhugaunker_ResumeDhirendra_Prabhugaunker_Resume
Dhirendra_Prabhugaunker_Resumedhirendra prabhu
 
1Running Head PROJECT MANAGEMENT11PROJECT MANAGEMENT.docx
1Running Head PROJECT MANAGEMENT11PROJECT MANAGEMENT.docx1Running Head PROJECT MANAGEMENT11PROJECT MANAGEMENT.docx
1Running Head PROJECT MANAGEMENT11PROJECT MANAGEMENT.docxaulasnilda
 
senior design II final project
senior design II final projectsenior design II final project
senior design II final projectAsma Qassemi
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)smumbahelp
 
Training report of Elin Electronics Ltd.
Training report  of Elin Electronics Ltd.Training report  of Elin Electronics Ltd.
Training report of Elin Electronics Ltd.adi174
 

Semelhante a faris nizam (20)

Girish kumar yadav
Girish kumar yadavGirish kumar yadav
Girish kumar yadav
 
Brc Resume
Brc ResumeBrc Resume
Brc Resume
 
JAYDEEP (1)
JAYDEEP (1)JAYDEEP (1)
JAYDEEP (1)
 
A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...
A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...
A Radical Challenge in Reliability Dynamic Life Test.pdf; Burn-In program Con...
 
Ketul Resume
Ketul ResumeKetul Resume
Ketul Resume
 
SMARTPHONE PRODUCTION SYSTEM
SMARTPHONE PRODUCTION SYSTEMSMARTPHONE PRODUCTION SYSTEM
SMARTPHONE PRODUCTION SYSTEM
 
IUBAT Practicum Report BSME Main Part
IUBAT Practicum Report BSME Main PartIUBAT Practicum Report BSME Main Part
IUBAT Practicum Report BSME Main Part
 
Royal footwear ltd
Royal footwear ltdRoyal footwear ltd
Royal footwear ltd
 
Berger paint BD.docx
Berger paint BD.docxBerger paint BD.docx
Berger paint BD.docx
 
SUMMER INTERNSHIP PROJECT
SUMMER INTERNSHIP PROJECTSUMMER INTERNSHIP PROJECT
SUMMER INTERNSHIP PROJECT
 
SUMMER INTERNSHIP PROJECT
SUMMER INTERNSHIP PROJECTSUMMER INTERNSHIP PROJECT
SUMMER INTERNSHIP PROJECT
 
Dhirendra_Prabhugaunker_Resume
Dhirendra_Prabhugaunker_ResumeDhirendra_Prabhugaunker_Resume
Dhirendra_Prabhugaunker_Resume
 
latihan industri
latihan industrilatihan industri
latihan industri
 
CV 1
CV 1CV 1
CV 1
 
1Running Head PROJECT MANAGEMENT11PROJECT MANAGEMENT.docx
1Running Head PROJECT MANAGEMENT11PROJECT MANAGEMENT.docx1Running Head PROJECT MANAGEMENT11PROJECT MANAGEMENT.docx
1Running Head PROJECT MANAGEMENT11PROJECT MANAGEMENT.docx
 
ISO_8
ISO_8ISO_8
ISO_8
 
senior design II final project
senior design II final projectsenior design II final project
senior design II final project
 
Mb0049 project management (2)
Mb0049   project management (2)Mb0049   project management (2)
Mb0049 project management (2)
 
Training report of Elin Electronics Ltd.
Training report  of Elin Electronics Ltd.Training report  of Elin Electronics Ltd.
Training report of Elin Electronics Ltd.
 
Nbs wire enamels
Nbs wire enamelsNbs wire enamels
Nbs wire enamels
 

faris nizam

  • 1. 1 CHAPTER 1 INTRODUCTION This industrial training is the training for the student in a period of time in order to let them have some working experience. It is also essential for practical evaluation to decide whether the students are worthy to receive the certificate. Besides that, all their activities and task been given during the training session must be recorded in the log book been provided. The chances that are given by the University are good opportunity for the students to let them gather knowledge and experience as much as they could in the 16 weeks of training period. This is a better chance for them being exposed to the working experience before graduating in their studies. Student also gets to study about safety precautions when working in industries. They also are being exposed about the hazard of working with the engineering professions that usually are popular for accident tragedies.
  • 2. 2 1.1 Objective of Industrial Training Among the objective of industrial training are : 1. Apply engineering methods such as design and problems solving. 2. Develop understanding of the functioning and organisation of a business. 3. Develop technical, interpersonal and communication skills, both oral and written. 4. Study the safety and hazard at workplace and the respective Personal Protective Equipment (PPE). 5. To expose students to working environment in their respective fields, namely as the first step for student to prepare before entering the working field after graduate. 6. Able to be discipline and follow all the rules and regulations at work. 7. Fostering teamwork and good communication with employees in the company.
  • 3. 3 1.2 Industrial Training Importance Industrial training is to expose the students to real jobs and to improve their knowledge and skills in their respective fields as well as towards producing graduates who are competent, ethical, professional, competent and creative. In addition, it helps student to adapt to a challenging environment. With this, students will be more prepared and confident in their own capabilities. In addition, students can also learn how to work in groups effectively, and to understand the role of each team member as well as to foster a sense of responsibility, trust and cooperation between each other..
  • 4. 4 1.3 GG Circuits Industries Sdn. Bhd. The Industrial Training (INTRA) was done in GG Circuits Industries Sdn. Bhd.: No. 18 Jalan Riang Utama, Gembira Industrial Park, Off Jalan Tampoi, 81200 Johor Bahru, Johor. Figure 1 : Location of GG Circuits Industries Sdn. Bhd The position assigned was as a lab assistant Trainee and reported duty on 20th JUNE 2016 to MLB manager, Mr Muhammad bin Md Arip. The major task given was to assist in ensuring the chemical running at production lane always on spec that have been set. Provide prevention and also corrective action if any problem on chemical happen at production lane.
  • 5. 5 CHAPTER 2 GG Circuits Industries Sdn. Bhd 2.1 Company Background GG Circuits Industries Sdn. Bhd. has a relatively long history and recognized tradition, since its establishment in 1985. Previously, GG Circuits Industries was known as Golden Glow Enterprise. Figure 2.1 below shows the company logo. Basically, this company involved in manufacturing of printed circuits board (PCB) for industrial electronics, automotive, home appliances and communication. Besides, this company also known globally as one of the advanced in PCB manufacturing for electronics and automobile industries. Figure 2.2 shows some PCB’s. Figure 2.1: Company Logo
  • 6. 6 Figure 2.2: Printed Circuits Board The achievement were supported by the company’s commitment to drive towards manufacturing efficiency, new process development and operation capabilities encompass state of art equipment to meet and exceed customer’s demand. The core competence of the company includes manufacturing of Single Sided, Double Sided and Multi-layer Printed Circuit Boards. Furthermore, this company have experienced strong growth by being a true partner with their customer. All GGC teams believed the long-term relationship with their clients is their competence. The key component of their business is service to the customer. GGC is known to provide responsive and individualized product and services on whatever the project size and willing to fulfill client’s requirements with the best efforts.
  • 7. 7 Table 2.1: Details of Company Name of Company : GG Circuits Industries Sdn. Bhd. Address : No. 18 Jalan Riang Utama, Gembira Industrial Park, Off Jalan Tampoi, 81200 Johor Bahru, Johor Telephone No. : 07-2761288 Type of business : Manufacturing Registration No. : 136273-M Company’s registration date : 5 March 1985 No. of Employee : 200 Products : Printed Circuits Board Figure 2.3: The main gate of GG Circuits Industries Sdn. Bhd.
  • 8. 8 4 Figure 2.4: Parking area for higher management staff Figure 2.3 and 2.4 shows the main gate of GGC and parking area provided for higher management staff.
  • 9. 9 2.2 Vision, Mission and Objective of Company 2.2.1 Vision and Mission GGC aims to achieve total satisfaction through its vision and mission as an efficient and reliable manufacturer of PCB. This will be accomplished by: Vision  Continually improved the effectiveness of quality management system. Mission  Continually delivered superior products and services to customer in the most cost effective and timely manner. With the total support by empowering and quality conscious workforce, all GGC teams shall commit themselves to comply with the requirement for continuing success.
  • 10. 10 2.2.2 Objectives of Company The objectives of GGC are: 1. To be a company which can give profit and achieve target sales. 2. Able to provide good life style to all GGC teams and develop excellent manner of each GGC teams. 2.3 Organizational Chart 2.3.1 Main Organizational Chart Managing Director ( Albert Tan ) Quality Mnagement General Manager Environmental Representative ( CP Lim ) Management ( Mrs. Jariah ) Representative ( WY Wan ) Figure 2.5: Main Organizational Chart
  • 11. 11 2.3.2 Department Organizational Chart Figure 2.6: Department Division Organizational Chart
  • 12. 12 2.3.3 Operation Management Organizational Chart Figure 2.7: Operation Management Organizational Chart 2.4 Department Function There are 8 Main departments in GGC where each department play an important roles in contributing to company achievement. Moreover, without good communication, cooperation and management, more profit cannot be made. Thus, specific management plan and job scope were listed according to department responsibility. MLB department was placed under Operation management together with SLB and maintenance department lead by Mr. Kumar. The general function of operation management department were to provide good products within given period of time. In order to achieve its function, full attention needs to be given to each section under both MLB and SLB department.
  • 13. 13 2.4.1 MLB Department MLB department specialized in manufacturing double sided PCB and multi- layer PCB while SLB focusing on single sided PCB. There are more than 10 sections under MLB department. Each section plays an important role in order to complete the output. Each section was placed under specific supervision and monitor by production manager. Figure 2.8 and 2.9 shows the general MLB process flow for double sided and specific MLB process flow for both double sided and multi-layer PCB respectively. Figure 2.8: General MLB Process Flow for Double Sided PCB
  • 14. 14 Figure 2.9: Details MLB Process Flow for Both Double Sided and Multi-layer PCB
  • 15. 15 Besides, each part number of PCB have different process flow depends on customer order. Process flow of each part number can be refer on traveller which also known as part number ID. Figure 2.10 shows examples of traveller. Figure 2.10: Traveller Laboratory Section Previously, laboratory section was placed under engineering department. However due to it’s important to the production line, changes have been made. Thus, laboratory section was placed under MLB department from that time onwards. Laboratory section are monitor by Mrs Nur Zehan and Mrs Rabiatul Adawiyah. The main role of laboratory section are to analyse each samples from both MLB and SLB department such as dry film, solder mask, organic solderable preservation (OSP), copper plating, gold plating and hot air levelling (HAL).
  • 16. 16 CHAPTER 3 LABORATORY SECTION IN GG CIRCUIT INDUSTRIES SDN. BHD. 3.1 Understanding of Laboratory Responsibility and Scope 3.1.1 Purpose The purpose of laboratory section is to monitor the chemicals concentration use in each section under production line. It is important to make sure that all chemicals were in good condition and enough to support ongoing panels. Besides, as lab engineer we need to fully understand the method use and chemicals condition in order to avoid accident. Furthermore, lab section needs to follow up each samples an hour after distributed the report or after any replenishment have been made. Sometimes, trainee also need to follow up samples after new make-up have been made. Normally, each section will called us and informed regarding new make-up process. On trainee first day, trainee learned basic analysis which involved titration method, calibration and observation. There are more than 20 samples that need to be analysed everyday not including waste water treatment samples (WWTP). Moreover, trainee have to get used to analyse samples as fast as trainee can since each section need the chemicals report before run the ongoing panels.
  • 17. 17 3.2 Understanding of MLB Process Flow and its Function As trainee was placed under MLB department, trainee have to understand the process involved in PCB manufacturing. According to MLB process engineer, 4 months is not enough for trainee to completely understand every process. . Besides, during free time trainee learn about the process and output from production lane 3.2.1 Blackhole and Dry Film Section Panels from drilling will be send to blackhole section. In blackhole section, panels will be clean at deburring stage before pass to conditioner tank. In conditioner tank, the alkaline solution will clean the copper surface from through hole plating. Then, panels enter SP starter tank which act as main blackhole chamber. It will coats substrate material with carbon providing the means to electrolytically copper plate the hole walls. Figure 3.1 below shows panels before and after coating with carbon. After that, panels will be clean in microclean G5 tank before proceed to dry film process Figure 3.1: Panels Before and After Coating with Carbon
  • 18. 18 Dry film consist of lamination, pattern expose and develop stage. In this section, panels from blackhole will be laminate. After lamination process, pattern will be exposed on the panels. Before panels went to next section, panels will be develop in dry film develop to any unwanted resist. Figure 3.2 below shows panels before and after dry film developing. If panels from dry film developing have problems and need to redo its process, panels from dry film will be strip in dry film stripping section. Figure 3.2: Panels Before and After Dry Film Developing
  • 19. 19 3.2.2 Copper Plating Section Basically, copper plating is a process where a layer of copper is deposited on the item to be plated using electric current. This section applied electrolysis theory. Before copper is plated on panels, panels will be clean in acid cleaner tank. Then, panels will be dipped in microetch G4 tank which promotes copper adhesion. After that, panels will be dipped in copper plating tank for copper deposition. Lastly, panels will be dipped in restin tank consist of tin solution which act as etch resist to protect copper surface against the attack of etching media in SES later. Figure 3.3 shows the panels before and after copper deposition. Figure 3.3: Panels Before and After Copper Deposition
  • 20. 20 3.2.3 SES Section SES section stands for strip etching strip. This section consist 3 different stage which are dry film stripping, ammonium etching and tin stripping. Figure 3.4, 3.5 and 3.6 shows panels before and after dry film striping, ammonium etching and tin stripping, respectively. Figure 3.4: Panels Before and After Dry Film Striping
  • 21. 21 Figure 3.5: Panels Before and After Ammonium Etching Figure 3.6: Panels Before and After Tin Striping
  • 22. 22 3.2.4 Solder mask Pre-treatment and Develop In solder mask pre-treatment section, panels will be clean from impurities in microetch G5 tank. Then, panels will be provided with optimum roughness for excellent ink adhesion in multiprep tank. Besides, anti-tarnish solution is used to prevent copper surface from oxidation. After undergo pre-treatment, ink will be printed on the panels before exposing pattern on its surface. Then, unwanted ink on panels will be removed in solder mask developing chamber. Final bake is needed in order to cure solder mask ink. Figure 3.7 below shows solder mask final bake conveyor oven. Figure 3.7: Solder Mask Final Bake Conveyor Oven
  • 23. 23 3.3 Routine Jobs 3.3.1 Taking Samples During this industrial training, trainee need to take samples from each section every morning, afternoon and evening. Normally, sample was collected from on 8:30 am every day. Morning samples are from blackhole, solder mask develop, dry film and desmear. For normal production schedule, lab section will take samples from copper plating around 11:30 am. Exception for samples from OSP, HAL, SES and solder mask pre-treatment (multiprep), each section technician will collect samples and send to laboratory for analysis. Figure 3.8 shows some of morning samples. Figure 3.8: Samples from Blackhole, Dry Film and Solder Mask
  • 24. 24 3.3.2 Analysis, Observation and Monitoring Samples Basically, samples analysis in this laboratory involved titration method. Besides, figure 3.9 and 3.10 shows spectroscopy instruments that were used which are UVVisible and Atomic Absorption Spectroscopy (AAS), respectively. As laboratory engineer, colour changes of each samples analysis need to be observed carefully. This is because, it is important to avoid using too much titrant which overshoot the endpoint. This action can caused different result. Figure 3.11 shows titration of some of the samples. Figure 3.9: Atomic Absorption Spectroscopy
  • 25. 25 Figure 3.10: UV-Visible Spectrophotometer Figure 3.11: Titration of Samples Analysis and Observation
  • 26. 26 Monitoring samples is a process which involved follow up samples and suggesting for new make-up. Besides, we need to monitored that all chemicals concentration are in it spec. Low concentration and high concentration chemicals can affect the ongoing panels. For examples, if concentration of tin which is use in copper plating section as etch resist was too high, thick layer of tin will be plated on the panels. Hence, it will be hard to remove thick layer of tin in stripping process later. If tin residue was present in the panels, it may cause other potential failure such as presence of stain under solder mask and solder mask peel off. Table 3.1 shows routine schedule of samples analysis and observation that were conducted every day. This schedule was arranged according to each section control plan.
  • 27. 27 Table 3.1 Schedule of Samples Analysis and Observation per Day for Each Section Section Schedule of Samples Analysis and Observation Per Day Blackhole Once (except for Microetch G5) Desmear Once (analysis was not conducted every day) Dry film Twice Solder mask develop Twice Solder mask pre-treatment (multiprep) Once HAL Twice OSP Twice Strip Etching Strip (SES) Once Copper plating Once Multibond Once (analysis was not conducted every day) Gold plating Once (analysis was not conducted every day) Punching Once
  • 28. 28 Besides, we need to monitor etching rate and make sure that etching rate is within specification. High etch rate indicates insufficient copper thickness due to high concentration of chemicals concentration or high temperature. Thus, from samples analysis we can decide whether we need to add water, add chemicals or adjust the temperature. 3.3.3 Preparation of Standard Solution and Indicator In order to carry out analysis, we need to prepare standard solutions and indicator. Some of the standard solution that were used in samples analysis are 1.0N NaOH, 1.0N Na2S2O4, 0.1N HCl, 50% HCl, 20% H2SO4 and 0.2N EDTA. While, methyl red, PAN, bromocresol green, sodium chromate, methyl orange, phenolphatalein, and thymolphatalein are some indicators used in samples analysis. Before preparing standard solution and indicator, it is important to rinse all apparatus with deionized water in order to avoid contamination. Figure 3.12 and 2.13 shows some of the standard solution and indicator use samples analysis. Figure 3.12: Standard Solution and Indicator Use in Samples Analysis
  • 29. 29 Figure 3.13: Standard Solution and Indicator Use in Samples Analysis 3.4.3 Record and Report Two months after started industrial training, Mrs, Nur Zehan of MLB process engineer was on maternity leave. Thus, she teaches trainee briefly about each process for PCB manufacturing. Besides, she also teaches trainee how to do monthly yield performance report, key in yield and reject percentage, record SPC copper plating and solder report. For monthly yield performance, trainee need to complete the report after 26th of each months. Then, after finished key in and print out report, trainee need to distribute it to each section supervisors. Yield performance report was important in order to monitor performance of each sections. Besides, each supervisor can take action to reduce major type of reject. Perhaps, this report can motivate all employee to work hard to achieve target performance every month. Figure 3.14 below shows yield performance report.
  • 30. 30 Figure 3.14: Yield Performance Report Figure 3.15: SPC Copper Plating Data Figure 3.15 above shows SPC copper plating that were record weekly in order to monitor copper thickness after plating process.
  • 31. 31 CHAPTER 4 CONCLUSION AND RECOMMENDATIONS As conclusion, trainee managed to learn new things within 16 weeks of industrial training. Besides, trainee was able to build confidence level, teamwork and good relationships with other employees. Within this training, trainee was able to expand knowledge and skills on handling chemicals, quality surveyor and others. Furthermore, exposure of industrial training give student a real working environment. Besides, throughout this training, trainee learned to practice more safety precaution in the industry. Industrial training also worked as basic preparation for working life after graduate. GGC is a good company for those who wished to experience real working life. Moreover, GGC also concerned to produce a multi-tasking employee which able to do various type of job There are some recommendations that the author would like to suggest to UniKL MICET for the next coming Industrial Training candidates to gain better working experience and knowledge. The current months of Industrial Internship Training Program which is four months are not sufficient enough for the trainee to gain experience and knowledge. The author would suggest that the duration of training which is in five to six months should implement so that more experience and knowledge could be gained. Moreover, Student Industrial Training Unit (INTRA) needs to prepare a list of companies that are suitable to the student’s respective course. This is to avoid the student from undergoing training in the company that is not related to their field of study. Student Industrial Training Unit also needs to
  • 32. 32 provide some general information for each company listed to help student to understand the host company first before undergo their training there. INTRA also need to remind the student to seek earlier the place they want to intern as this will ease the flow for INTRA itself as it can process their form earlier. This also helps the host company which provide a longer time for them to choose and think about the intern they want to take. The author also reminds the student in UniKL MICET to choose the host company based on their field of study, not referring to allowances or place to intern. This is to prevent the difficulties in performing projects in the host company if the company working environment is not related to the student’s field of study. Lastly, creating more working environment activities in UniKL MICET will helps student to gain experience, practice their work ethics and increase their professionalism.