1. Welcome to the Presentation
MD. Mustafijur Rahman
Operation Department
EPYLLION Style LTD, Banglabazar,
Gazipur, Bangladesh.
M: +88-01733484867
.
2. Epyllion Group started its journey as a house of Ready-made Garments (RMG)
engaged in manufacturing and exporting of Knit Apparels since 1994 and has
been considered today as one of the emerging pioneer in RMG sector with
substantial establishment of its backward linkage of all kinds of knit garments,
textile, wet processing & garments accessories. It has the state of art vertically
integrated garments manufacturing facility which ensures one stop service to the
buyers. We have established ourselves as an important garments manufacturer for
a number of renowned brand apparels of Europe, USA, Asia & Africa.
Epyllion Group
4. Knitting section
Objectives:
To produce fabric from yarn
Products:
Single jersey fabric
Double jersey fabric
Fleece fabric
Derivatives of above (polo pique , single lacoste ,double lacoste etc)
Core Jobs
Maximum use of yarn and best quality product production with the
maximum efficiency.
Maximum use of manpower.
Epyllion Fabrics Ltd.
5. Machines:
Circular knitting machine
Flat bed machine
Relation with the other departments:
Store
Dyeing, Finishing, Q.A
Garments.
Strength-:
Skilled Man-power
Team Work
Q.A
Knitting section (contd.)
6. Weakness:
Insufficient light entrance at the floor.
Sometimes machines are not in separate core which may cause fabric
contamination.
If there is lack of power supply at the very first knitting is made to stop.
Fabric width & GSM variation.
Knitting section (contd.)
7. Objectives:
Coloration of fabric,collar,cuff etc.
Core Jobs:
Dyeing related all activities such as-
Maintain specific Shade
Hand feel
GSM
Relation with the other departments:
Knitting, Store, Batch Section, Finishing, Quality, Planning, Cutting etc.
Dyeing section
8. Strength:
Auto dosing m/c
Skilled and Hard working manpower
Weakness:
Unfavorable working condition,
Toxic chemicals
Too high temperature
Dyeing section (contd.)
9. Objective:
To treat effluent and dispatched it in pure condition as possible.
Strength:
Digital screen to see the PH level. Generally 7.5
Application of the law of fluid mechanics to control temperature.
Continuous circulation of oxygen.
Reuse of sludge.
Weakness:
PH level is little bit in the higher region.
Effluent Treatment Plant(ETP)
10. Objective:
To wash the Garments, fabric,
For required appearance.
To add value & maintain quality as well as style as per buyer
requirement.
Washing Section
11. Washing section (Contd.)
Machine Name No. of Machines/Operation Capacity (In Use)
Belly Machine 10 Pcs 40 kg each
Dryer Small (12 Pcs) 40 kg each
Medium (2 Pcs) 60 kg each
Tumbler Dryer 80 – 100 kg
Sample Dryer Belly m/c (1Pcs)
E- Flow Machine Spray operation 25 kg
Front Loading Machine All in One
(Washing, Hydro, dryer)
12. Product & Service:
Silicon wash
Fixation/ Bleed
control
Enzyme wash
Bleach wash
Acid wash
Over dyeing
Burn out
Dip bleach
Dip dyeing
Oil wash
Washing Section (Contd.)
Strength:
Skilled Man-power
Crucial operations performed
Weakness:
Short space that’s why handling problem.
Very few software based machines.
Poor drainage system.
No CCTV camera.
No size wise monitoring.
13. Objective:
To produce accessories for garments.
Production Units:
Epyllion Ltd
Units
Carton Auto Carton
Semi- Auto Carton
Poly
Gum Tape
Label & Price Ticket
Narrow Fabric Elastic
Draw String
Twill Tape
Printing Press
Ball Press/ Butterfly
16. Strength:
Shorter lead time
Nice working environment
Generally low rejection of final products
PPE in use at gum tape section & other noisy areas.
Weakness:
Idle machine.
Lack of basic knowledge in root level.
Violation of NOISH lifting rules.
Epyllion Ltd (Contd.)
17. Basic Manufacturing Process
Epyllion Style LTD
Fabric
Receive
Inspection
Cutting
Sewing
Non-Wash Wash
Send to
Washing plant
Finishing
Embellishment
18. Objectives:
• Fabric cutting in order to produce cut panels.
• Grouping or bundling
• Quality check.
Machines:
Auto spreader
Auto cutter(CAM machine)
Straight knife machine(30-35 Pcs)
In cutter machine(8 Pcs)
Fusing machine(2 PCS)
Over lock machine(6 Pcs)
Band knife machine(2 Pcs)
Cutting Section
19. Relaxation
Table
preparation
Measurement Layout Moving
Cutting
Sorting Numbering Rack
Numbering
General Process Flow of Cutting Section &
Fabric Relaxation Time
Fabric Type Relaxation time (hr)
Lycra fleece 48
Lycra mix other fabrics 24
Interlock 24
Pique 24
Viscos 24
Polyester 48
20. Thick & thin
Uneven brush effect
Contamination
Crease mark
Pin holes
Miss yarn
Needle line
Oil spot
Lycra out/damage
Knot
AOP print defect
Fabric Defects
Slab
Hole
Panel shape out
Running shade
Slant
Improper cut mark
Set up
Dirty spot
Softener spot
Sinker mark
22. Machines:
Lock stitch m/c
Over lock m/c
Flat lock m/c
Kansai m/c
Feed of act arm
Button hole m/c
Button attach m/c
Bar teck m/c
Snap button m/c
Smoke m/c
Chain stitch m/c
Sewing section
Objectives:
Sewing of cut panels to form garments.
Strength:
High production rate (49 sewing lines)
In line inspection & final inspection.
Flexible machines.
Continuous monitoring.
Weakness:
Non-uniform rejection rate.
Line balancing (insufficient).
Tendency of skipping work.
23. Objectives:
Packing garments after final inspection and finishing work(if needed).
Finishing section
Strength:
Secure workspace protected from general’s entry.
Proactive workforce.
Effective monitoring.
Weakness:
Rejection alarm at the last moment.
Lack of communication.
25. Units Department Key Feature
ESL Merchandising • Order finalize with buyer
• Price negotiation
• Material requirement
identification
• Overall order shipment
monitoring.
ESL Planning • Making & follow up T&A
calendar.
• Fast react(Planning software).
Corporate Supply chain • Take necessary steps to provide
tools after requisition.
ESL MCD • Performs same as inventory.
• Quality inspection.
Brief Discussion on some Departments
26. Objectives of IE:
To set target and submit balance report within schedule time.
To spread production planning information.
Activities:
1.Discuss with planning about new style.
2. Collect sample and discuss with PO and technician about it.
3. Prepare operation bulletin
4. Prepare lay out & handover it to PO, LC & technician
5. Arrange pre- flight meeting.
6. Monitoring line feeding.
7. Line balancing.
8. Make QCO report.
9. Set target.
Day to day object & activities of IE
30. Collect & maintain material booking calculation & P.O sheet from
merchandiser.
Arrange Pre Production(PP) Meeting.
Maintain 'Input-Output sheet' before PP meeting for proper size wise
monitoring.
Maintain Input-Output panel.
Directly monitor each & every process to find out process wise wastage%
Maintain “Fabric Study report” to calculate actual fabric wastage%
Communicate with textile for extra fabric if fabric wastage is more than
allowed%
Cut maximum & ship maximum with the received fabric quantity.
Communicate with Merchandiser if extra raw material required to ship
maximum quantity.
Maintain required MIS.
Job Responsibility