Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Draw die wizard
1. System of projection of
draw dies on forming
machine of double operation
Sergey Fomin
The engineer - designer
sa.fomin@mail.ru
2. The Note
• This system was developed for projection
of dies which working parts are made on
cavityless casting.
• The equipment (forming machine ) on
which dies are designed should be strictly
double operation, i.e. have internal and
external slide blocks.
3. The positive sides from application
of system is:
• Maximizes productivity through automation designMaximizes productivity through automation design
process.process.
• Automation of tedious and time consuming tasks.Automation of tedious and time consuming tasks.
• It is much easier to visualize the 3D model than on a 2DIt is much easier to visualize the 3D model than on a 2D
drawing.drawing.
• Significantly shortens the design time.Significantly shortens the design time.
• 3D modeling is more accurate and useful than with 2D
design.
4. Requirements shown to
operation in system*
• The user should know a base training course on work in
system Unigraphics (the nobility of a basis of modelling,
drafting, and work in a context of assembly).
• The user should have an experience of a die design.
• Presence of a database of standard elements applied in
die design.
• Presence of a database of equipment (forming machine ).
5. Input data*
Model of draw
operation
Contour of preform
Punch profile
The coordinate system
defining direction of
operation
6. Technological constructions
Model for the lower
working parts (lower
binder)
Model for the upper
working parts (punch and
upper draw die)
Zone of
technological
constructions
7. File of a part with the prepared
input data *
Sheet body for the
lower working parts
(цвет RED)
Sheet body for the
upper working parts
(PURPLE)
Absolute coordinate
system Contour of preform
Punch profile
The coordinate system
defining direction of
operation
File with input data
8. Work in system
The definition of
parameters of the
project:
- The name of the project
- Placement of the project
on a disk
9.
10. Work in system
- Definition of layout of a die (escort
with a picture representation)
- Choice of the equipment (forming
machine )
- There is an opportunity of a
choice of presence of plates of fast
fastening
- Choice of a standard size of
directing tiles in a zone of a
direction of top of a dies concerning
a bottom.
11.
12. Work in system
The menu of a choice of
geometrical data for
operation of system
The high-altitude size (БАЗА) describing
position of model of draw operation in a cavity
of a die on height is defined
There is an opportunity of inspection of the
selected profile for their self-intersection.
13. Work in system
The menu of a choice of geometrical data
- Choice of data for the upper working parts such as a punch, a hold-down tool
(upper draw die ).
- A choice of data for the lower working parts such as insertion, an a matrix
(lower binder).
- A choice of data for lead of a contour of preform.
- A choice of data for lead of a punch profile.
- A choice of data for lead of a inside hold-down tool.
(by option)
- A choice of data for lead of a contour of insertion.
(At presence of an insertion in earlier defined layout)
- The choice of a coordinate system, axis Z which characterizes a direction of
draw operation.
15. As a result of
operation of system
will be received
assembly part of a
draw die which will
consist of templates of
components which
have been defined at
a stage of layout of a
dies.
Result of construction of system
23. The basic menu
of editing of the
project
The automatic editing of the project
24. The menu for
editing parameters
of a part of a lower
binder
The automatic editing of the project
25. The menu for
editing parameters
of a part of a upper
draw die.
The automatic editing of the project
26. The menu for
editing parameters
of a part of a punch.
The automatic editing of the project
27. Condition of the project after the
automatic editing
The assembly part of a
draw die without plates
of fast fastening
28. Condition of the project after the
automatic editing
The assembly part of a
lower binder of a draw
die
29. Condition of the project after the
automatic editing
The assembly part of
upper draw die of a draw
die
30. Condition of the project after the
automatic editing
The assembly part of
upper draw die of a draw
die (bottom view)
31. Condition of the project after the
automatic editing
The part of upper draw die
of a draw die
32. Condition of the project after the
automatic editing
The part of punch of a
draw die
33. The user adaptation of the project
• The further development cycle of the project is
the analysis and editing of templates by the user.
• The analysis and editing are made by standard
means of module " Modeling " UG.
• At the same stage the user adds the standard
and normalized details in the project.
• There is an opportunity to add original details.
These details should contain in original parts files,
is in a directory with the detail design, at a top
part file of the project to be present as separate
components.
34. The user adaptation of the project
Editing of templates of
working parts by the user
we shall consider on an
example of a punch
35. The user adaptation of the project
Make a part with a mask
of a punch displayed.
Defined with a standard
size of a directing plate,
and also their amount.
Punch profile
36. The user adaptation of the project
Plates directing load as
components concerning an
absolute coordinate system.
37. The user adaptation of the project
Plates directing are
positioned, concerning a
punch, by standard
means of system.
Punch profile
Plates directing
Plates directing
38. The user adaptation of the project
Positioning of plates
directing on height,
concerning a plane of
support of a punch.
In a context of
assembly make plates
by a working part.
Automatically the
geometry of a punch
in the locations of
plates (support
platforms, holes under
fixture are attached,
the thread is
displayed) varies.
39. The user adaptation of the project
Defined with a
standard size of a
elements for
transportation, and
also their amount.
40. The user adaptation of the project
Elements for
transportation are
positioned, concerning
a punch, by standard
means of system.
41. The user adaptation of the project
Automatically the
geometry of a punch
in the locations of
elements for
transportation
(support platforms,
holes under fixture
are attached, the
thread is displayed)
varies.
Empty
reference
set
42. The user adaptation of the project
Additional constructions
are made by standard
commands UG of
module " Modeling "
Segment of a punch
after user adaptation
43. Final a condition of the project
The assembly part of a
lower binder of a draw
die (front view)
44. Final a condition of the project
The assembly part of a
lower binder of a draw
die (back view)
45. Final a condition of the project
The assembly part of a
lower binder of a draw
die (The mechanism
for removal of a detail
from a die)
46. Final a condition of the project
The assembly part of
upper draw die of a draw
die
47. Final a condition of the project
The assembly part of
upper draw die of a
draw die
without plates of fast
fastening
48. Final a condition of the project
The assembly part of
upper draw die of a
draw die
49. Final a condition of the project
The assembly part of
upper draw die of a
draw die (bottom view)
50. Final a condition of the project
The assembly part of
punch of a draw die
51. Final a condition of the project
The assembly part of
punch of a draw die
(bottom view)