PROJECT :
ONE UNIT SEMI-D DOUBLE STOREY (CORNER LOT)
ALWIN NG 0323596
JASON WONG 0327650
KAM PEI CHI 0327295
KENNETH TAN 0322482
LEE FONG YEN 0321976
LEE LIN HUI 0322797
LEONG LI JING 0323628
LEONG MIN HUI 0327596
CADANGAN MEMBINA SEBUAH RUMAH SEMI-D DUA TINGKAT DI LOT SDB-20, MUKIM AYER PANAS,
DAERAH JASIN, HANG TUAH JAYA, MELAKA BANDARAYA BERSEJARAH.
FOR: MR IVAN ALIAS
11, JALAN SETIA NUSANTARA, U13/22G, SETIA ECOPARK, 40170, SHAH ALAM, SELANGOR DARUL EHSAN.
ARCHITECT
ASD ARCHITECT SDN.
BHD.
NO.11-B, JASIGHN
ROAD, GEORGETOWN,
10050 PULAU PINANG,
MALAYSIA.
C&S ENGINEER
SP CONSULTING
ENGINEERS
NO.34, JALAN DALIA 2,
TAMAN MERBAU,
7510 MELAKA.
M&E ENGINEER
PPS M&E CONSULT SDN.
BHD.
NO.28, BLOCK B, TINGKAT
7, KOTA DAMANSARA,
46700 PETALING JAYA,
SELANGOR DARUL EHSAN.
QUANTITY SURVEYOR
QQ CONSULTANCY FIRM SDN.
BHD.
BLOCK B, LEVEL LG2, ROOM 6,
TAYLOR’S UNIVERSITY,
LAKESIDE CAMPUS,
NO.1 JALAN TAYLOR’S,
47500 SUBANG JAYA,
SELANGOR DARUL EHSAN.
LOCATION
LOCATION
LOCATION
LOCATION
TENDER DRAWINGS
GROUND FLOOR PLAN
TENDER DRAWINGS
FIRST FLOOR PLAN
TENDER DRAWINGS
FRONT ELEVATION
TENDER DRAWINGS
REAR ELEVATION
TENDER DRAWINGS
SIDE ELEVATION
TENDER
DOCUMENTS
FORM OF TENDER
● Latest return time and
date
● Date, name and address.
● Tender reference number.
● Price for which they are
to do the works
● Date until which the
price remains valid
● Acceptance of terms and
conditions
● Signature and tenderer
details.
● Period of time allocated
for the works
FORM OF CONTRACT (PAM CONTRACT WITH
QUANTITIES)
● Articles of agreement
- Parties to the contract have to sign
upon tender award.
- Parties have to fill in Names of
Employers and Consultants, Location
and Nature of Work, List of Drawings.
● Conditions of Contract
- Contractor’s and Employer’s obligation
- Matters related to quality of work, cost
time, insurances and others.
INSTRUCTIONS TO TENDERERS
● This document aims to inform tenderer on the
rules and procedures to comply during the
tendering process.
● Instructions to be highlighted are:-
- Tender Validity Period
- Place of collection
- Place of Tender Submission
- Tendering Period
CONDITIONS OF TENDERING
● This part of the contract states the conditions
that need to be complied with by the
tenderer during the submission of tender.
● Conditions that should be taken note of are:-
- Tender deposit: In cash/Banker’s Cheque
made payable to Quantity Surveyor
- Tender bond: In the form of Bank Guarantee
or Banker’s Cheque made payable to
employer.
- Tender Validity Period: 90 Days from the final
closing date of tender
FINAL SUMMARY OF TENDER
● Is a part for the collection of all
priced bills for all sections of the
project
● So that tenderer can insert the
sectional summary to arrive at a
total amount which ultimately
becomes the “ tender amount”.
● Needed to be sign by the tenderer
and employer representative.
PREAMBLES● summary of the work requested
● explain the project, materials needed, unit prices,
provisional sums, methods of measurement and
potential errors.
● helpful to address issues related to
unforeseeable costs associated with the project.
Example:
The Contractor shall be deemed to have read and
examined the Tender Documents before completing
the Bill of Quantities and the Schedule of Rates. The
Specifications, Schedules etc. are to be considered as
explanatory of each other and no advantage shall be
taken of any omission in tender documents.
SPECIFICATION
● describe the materials and workmanship required
for a development.
● gives the client more certainty about the end
product
Example:
- Types of glass used - low-e glass
- Stating the types of windows and doors used
- Stating the grade of the concrete - grade 25
BILLS OF
QUANTITIES
1. PRELIMINARIES
Provides a description of a project that
allows the contractor to assess costs
which, whilst they do not form a part of
any of the package of works required
by the contract, but are required by the
method and circumstances of the
works.
PRELIMINARIES
Contractor's site preliminaries, such
as; staff, welfare provisions, site
offices, plant, site waste clearance,
water, electricity, site offices,
furniture, ICT and consumables,
rates, protection of work, protective
clothing, site transport, setting out,
building control fees, and so on.
PRELIMINARIES
Requirements for insurance,
performance bonds, warranties and
product guarantees (for the
contractor and sub-contractors).
PRELIMINARIES
Safety and site waste
management
Appendix to Form of Contract
2. MAIN BUILDING
WORKS
3. PRIME COST AND
PROVISIONAL SUMS
3. PRIME COST AND
PROVISIONAL SUMS
APPENDIXES
List of Drawings
Schedule of Finishes
GROUNDFLOOR
FLOOR FINISHES - Ground Floor
200mm x 200mm x 8mm
MML Matt Ceramic Tiles
300mm x 300mm x 8mm
MML Glazed Ceramic Tiles
200mm x 200mm x 8mm
MML Matt Ceramic Tiles
100mm x 100mm x 10mm
Timber Parquet
Cement Render
FLOOR FINISHES- First Floor
100mm x 100mm x 10mm
Timber Parquet
Cement Render
200mm x 200mm x 8mm
MML Matt Ceramic Tiles
300mm x 300mm x 8mm
MML Glazed Ceramic Tiles
WALL FINISHES
- Bathrooms
200mm x 200mm x 7mm
Guocera Glazed Ceramic Tiles
CEILING FINISHES - Ground Floor
1215mm x 1825 mm x 9mm thick
"UNIPLASTER" plaster ceiling board
Plaster Coat - Internal & External
CEILING FINISHES - First Floor
1215mm x 1825 mm x 9mm thick
"UNIPLASTER" plaster ceiling board
Plaster Coat - Internal & External
Schedule of DayWork Rates
Price of basic materials
FORM OF BANK GUARANTEE FOR EARNEST
MONEY
- Standard form with pre-determined wordings
- A bank guarantee may take the form of a performance
bond or a form of letter of credit.
- Banks generally require that bank guarantees which
take the form of a performance bond include a clause
which allows the bank to pay out the bond even though
there may have been no default under the contract with
the project owner
FORM OF BANK GUARANTEE FOR PERFORMANCE
BOND
- Standard form with pre-determined wordings.
- A performance bond protects the owner from non performance and
financial exposures should the contractor default on the contract.
- It is directly tied to the underlying contract and if the contractor is
unable to perform the contract, the surety has responsibilities to the
owner and contractor for project completion.
PRE-TENDER PROGRESS SCHEDULE
THANK YOU!

Mais conteúdo relacionado

Mais procurados

Vinod Resume
Vinod ResumeVinod Resume
Vinod Resume
Vinod Rai
 
Testimonial
TestimonialTestimonial
Testimonial
Leo Tee
 
nAVEEN kUMAR 21.06.2016
nAVEEN kUMAR 21.06.2016nAVEEN kUMAR 21.06.2016
nAVEEN kUMAR 21.06.2016
B Naveen Kumar
 

Mais procurados (20)

Measurement 4 Tender Document
Measurement 4 Tender Document Measurement 4 Tender Document
Measurement 4 Tender Document
 
Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)Assignment - Tender Documentation (Presentation Slide)
Assignment - Tender Documentation (Presentation Slide)
 
MEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATIONMEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATION
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
Brochure ozr 2 rev1
Brochure ozr 2 rev1Brochure ozr 2 rev1
Brochure ozr 2 rev1
 
36758716 surat-persetujuan-pengubahsuaian rumah
36758716 surat-persetujuan-pengubahsuaian rumah36758716 surat-persetujuan-pengubahsuaian rumah
36758716 surat-persetujuan-pengubahsuaian rumah
 
Brief presentation for supervisors.
Brief presentation for supervisors.Brief presentation for supervisors.
Brief presentation for supervisors.
 
CV
CVCV
CV
 
Estimating seminar
Estimating seminarEstimating seminar
Estimating seminar
 
Contracts
ContractsContracts
Contracts
 
CV. 2015
CV. 2015CV. 2015
CV. 2015
 
Vinod Resume
Vinod ResumeVinod Resume
Vinod Resume
 
Testimonial
TestimonialTestimonial
Testimonial
 
Professional Practice 1 Presentation Slides
Professional Practice 1 Presentation SlidesProfessional Practice 1 Presentation Slides
Professional Practice 1 Presentation Slides
 
Residential building in Bangalore, Mysore, Mangalore, Karnataka, Hosur, Coimb...
Residential building in Bangalore, Mysore, Mangalore, Karnataka, Hosur, Coimb...Residential building in Bangalore, Mysore, Mangalore, Karnataka, Hosur, Coimb...
Residential building in Bangalore, Mysore, Mangalore, Karnataka, Hosur, Coimb...
 
Edward Maudsley Resume
Edward Maudsley ResumeEdward Maudsley Resume
Edward Maudsley Resume
 
nAVEEN kUMAR 21.06.2016
nAVEEN kUMAR 21.06.2016nAVEEN kUMAR 21.06.2016
nAVEEN kUMAR 21.06.2016
 
Presentation of azlan broers trading & construction company
Presentation of azlan broers trading & construction companyPresentation of azlan broers trading & construction company
Presentation of azlan broers trading & construction company
 
Final pp1
Final pp1Final pp1
Final pp1
 
Resume
ResumeResume
Resume
 

Semelhante a Measurement 4 presentation

Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
Kailyn Lee
 
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV  updated on 23.02.2016Sanjeewa_CV  updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016
Sanjeewa Mahawedage
 
Measurement 4
Measurement 4Measurement 4
Measurement 4
ahmong4
 
Resume Update-15-01-2015
Resume Update-15-01-2015Resume Update-15-01-2015
Resume Update-15-01-2015
Engineer Haque
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
Tawfig Adham
 

Semelhante a Measurement 4 presentation (20)

Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
M4 presentation
M4 presentationM4 presentation
M4 presentation
 
M4ppt
M4pptM4ppt
M4ppt
 
Fififinalnal
FififinalnalFififinalnal
Fififinalnal
 
Contract presentation
Contract presentation  Contract presentation
Contract presentation
 
Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignment
 
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV  updated on 23.02.2016Sanjeewa_CV  updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016
 
Measurement 4
Measurement 4Measurement 4
Measurement 4
 
Measurement 4 presentation slides
Measurement 4 presentation slidesMeasurement 4 presentation slides
Measurement 4 presentation slides
 
Measurement 4
Measurement 4Measurement 4
Measurement 4
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Process
 
Resume Update-15-01-2015
Resume Update-15-01-2015Resume Update-15-01-2015
Resume Update-15-01-2015
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission Lines
 
Measurement 4 Presentation (QS)
Measurement 4 Presentation (QS)Measurement 4 Presentation (QS)
Measurement 4 Presentation (QS)
 
CV Muhammad Afi Hassan 2015
CV Muhammad Afi Hassan 2015CV Muhammad Afi Hassan 2015
CV Muhammad Afi Hassan 2015
 
Presentation on Industrial Training by Mr. Balram
Presentation on Industrial Training by Mr. BalramPresentation on Industrial Training by Mr. Balram
Presentation on Industrial Training by Mr. Balram
 
NASEER CV JUNE 2015
NASEER CV JUNE 2015NASEER CV JUNE 2015
NASEER CV JUNE 2015
 
Report
ReportReport
Report
 
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
PROPOSED 4BEDROOM DUPLEX & A ONE BEDROOM SEMI-DETACHED RESIDENTIAL DEVELOMENT...
 

Mais de Lin Hui

Building Economics Presentation
Building Economics PresentationBuilding Economics Presentation
Building Economics Presentation
Lin Hui
 
Building Economics Report
Building Economics Report Building Economics Report
Building Economics Report
Lin Hui
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
Lin Hui
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016
Lin Hui
 

Mais de Lin Hui (20)

Financial Management
Financial ManagementFinancial Management
Financial Management
 
Building Economics Presentation
Building Economics PresentationBuilding Economics Presentation
Building Economics Presentation
 
Building Economics Report
Building Economics Report Building Economics Report
Building Economics Report
 
PP2 - Seminar Presentation
PP2 - Seminar Presentation PP2 - Seminar Presentation
PP2 - Seminar Presentation
 
PP2 - Group Assignment
PP2 - Group AssignmentPP2 - Group Assignment
PP2 - Group Assignment
 
Assignment - software application for qs
Assignment - software application for qs Assignment - software application for qs
Assignment - software application for qs
 
Software application report
Software application report Software application report
Software application report
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Estimating
Estimating Estimating
Estimating
 
Management science
Management scienceManagement science
Management science
 
Biodiversity Presentation - Conservation on Tapir
Biodiversity Presentation - Conservation on Tapir  Biodiversity Presentation - Conservation on Tapir
Biodiversity Presentation - Conservation on Tapir
 
Building Services 2
Building Services 2 Building Services 2
Building Services 2
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systems
 
Water treatment-for-domestic-water-supply - Report
Water treatment-for-domestic-water-supply - ReportWater treatment-for-domestic-water-supply - Report
Water treatment-for-domestic-water-supply - Report
 
Bs1 assignment semester 2016 august
Bs1 assignment   semester 2016 augustBs1 assignment   semester 2016 august
Bs1 assignment semester 2016 august
 
Water treatment-for-domestic-water-supply - Slides
Water treatment-for-domestic-water-supply - Slides Water treatment-for-domestic-water-supply - Slides
Water treatment-for-domestic-water-supply - Slides
 
M2 project assignment aug 2016
M2 project assignment aug 2016M2 project assignment aug 2016
M2 project assignment aug 2016
 
Ipoh railway station - Scientific Poster
Ipoh railway station - Scientific Poster Ipoh railway station - Scientific Poster
Ipoh railway station - Scientific Poster
 
Ms ct-bm
Ms ct-bmMs ct-bm
Ms ct-bm
 
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016
 

Último

Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
David Celestin
 
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven CuriosityUnlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Hung Le
 
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
ZurliaSoop
 

Último (20)

SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdfSOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
SOLID WASTE MANAGEMENT SYSTEM OF FENI PAURASHAVA, BANGLADESH.pdf
 
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdfAWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
AWS Data Engineer Associate (DEA-C01) Exam Dumps 2024.pdf
 
Introduction to Artificial intelligence.
Introduction to Artificial intelligence.Introduction to Artificial intelligence.
Introduction to Artificial intelligence.
 
Zone Chairperson Role and Responsibilities New updated.pptx
Zone Chairperson Role and Responsibilities New updated.pptxZone Chairperson Role and Responsibilities New updated.pptx
Zone Chairperson Role and Responsibilities New updated.pptx
 
Call Girls Near The Byke Suraj Plaza Mumbai »¡¡ 07506202331¡¡« R.K. Mumbai
Call Girls Near The Byke Suraj Plaza Mumbai »¡¡ 07506202331¡¡« R.K. MumbaiCall Girls Near The Byke Suraj Plaza Mumbai »¡¡ 07506202331¡¡« R.K. Mumbai
Call Girls Near The Byke Suraj Plaza Mumbai »¡¡ 07506202331¡¡« R.K. Mumbai
 
My Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle BaileyMy Presentation "In Your Hands" by Halle Bailey
My Presentation "In Your Hands" by Halle Bailey
 
History of Morena Moshoeshoe birth death
History of Morena Moshoeshoe birth deathHistory of Morena Moshoeshoe birth death
History of Morena Moshoeshoe birth death
 
lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.lONG QUESTION ANSWER PAKISTAN STUDIES10.
lONG QUESTION ANSWER PAKISTAN STUDIES10.
 
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
Proofreading- Basics to Artificial Intelligence Integration - Presentation:Sl...
 
Lions New Portal from Narsimha Raju Dichpally 320D.pptx
Lions New Portal from Narsimha Raju Dichpally 320D.pptxLions New Portal from Narsimha Raju Dichpally 320D.pptx
Lions New Portal from Narsimha Raju Dichpally 320D.pptx
 
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptxBEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
BEAUTIFUL PLACES TO VISIT IN LESOTHO.pptx
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar Training
 
Dreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video TreatmentDreaming Marissa Sánchez Music Video Treatment
Dreaming Marissa Sánchez Music Video Treatment
 
Digital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of DrupalDigital collaboration with Microsoft 365 as extension of Drupal
Digital collaboration with Microsoft 365 as extension of Drupal
 
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORNLITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
LITTLE ABOUT LESOTHO FROM THE TIME MOSHOESHOE THE FIRST WAS BORN
 
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven CuriosityUnlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
Unlocking Exploration: Self-Motivated Agents Thrive on Memory-Driven Curiosity
 
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
Jual obat aborsi Jakarta 085657271886 Cytote pil telat bulan penggugur kandun...
 
Ready Set Go Children Sermon about Mark 16:15-20
Ready Set Go Children Sermon about Mark 16:15-20Ready Set Go Children Sermon about Mark 16:15-20
Ready Set Go Children Sermon about Mark 16:15-20
 
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINESBIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
 
in kuwait௹+918133066128....) @abortion pills for sale in Kuwait City
in kuwait௹+918133066128....) @abortion pills for sale in Kuwait Cityin kuwait௹+918133066128....) @abortion pills for sale in Kuwait City
in kuwait௹+918133066128....) @abortion pills for sale in Kuwait City
 

Measurement 4 presentation

  • 1. PROJECT : ONE UNIT SEMI-D DOUBLE STOREY (CORNER LOT) ALWIN NG 0323596 JASON WONG 0327650 KAM PEI CHI 0327295 KENNETH TAN 0322482 LEE FONG YEN 0321976 LEE LIN HUI 0322797 LEONG LI JING 0323628 LEONG MIN HUI 0327596
  • 2. CADANGAN MEMBINA SEBUAH RUMAH SEMI-D DUA TINGKAT DI LOT SDB-20, MUKIM AYER PANAS, DAERAH JASIN, HANG TUAH JAYA, MELAKA BANDARAYA BERSEJARAH. FOR: MR IVAN ALIAS 11, JALAN SETIA NUSANTARA, U13/22G, SETIA ECOPARK, 40170, SHAH ALAM, SELANGOR DARUL EHSAN. ARCHITECT ASD ARCHITECT SDN. BHD. NO.11-B, JASIGHN ROAD, GEORGETOWN, 10050 PULAU PINANG, MALAYSIA. C&S ENGINEER SP CONSULTING ENGINEERS NO.34, JALAN DALIA 2, TAMAN MERBAU, 7510 MELAKA. M&E ENGINEER PPS M&E CONSULT SDN. BHD. NO.28, BLOCK B, TINGKAT 7, KOTA DAMANSARA, 46700 PETALING JAYA, SELANGOR DARUL EHSAN. QUANTITY SURVEYOR QQ CONSULTANCY FIRM SDN. BHD. BLOCK B, LEVEL LG2, ROOM 6, TAYLOR’S UNIVERSITY, LAKESIDE CAMPUS, NO.1 JALAN TAYLOR’S, 47500 SUBANG JAYA, SELANGOR DARUL EHSAN.
  • 13. FORM OF TENDER ● Latest return time and date ● Date, name and address. ● Tender reference number. ● Price for which they are to do the works ● Date until which the price remains valid ● Acceptance of terms and conditions ● Signature and tenderer details. ● Period of time allocated for the works
  • 14. FORM OF CONTRACT (PAM CONTRACT WITH QUANTITIES) ● Articles of agreement - Parties to the contract have to sign upon tender award. - Parties have to fill in Names of Employers and Consultants, Location and Nature of Work, List of Drawings. ● Conditions of Contract - Contractor’s and Employer’s obligation - Matters related to quality of work, cost time, insurances and others.
  • 15. INSTRUCTIONS TO TENDERERS ● This document aims to inform tenderer on the rules and procedures to comply during the tendering process. ● Instructions to be highlighted are:- - Tender Validity Period - Place of collection - Place of Tender Submission - Tendering Period
  • 16. CONDITIONS OF TENDERING ● This part of the contract states the conditions that need to be complied with by the tenderer during the submission of tender. ● Conditions that should be taken note of are:- - Tender deposit: In cash/Banker’s Cheque made payable to Quantity Surveyor - Tender bond: In the form of Bank Guarantee or Banker’s Cheque made payable to employer. - Tender Validity Period: 90 Days from the final closing date of tender
  • 17. FINAL SUMMARY OF TENDER ● Is a part for the collection of all priced bills for all sections of the project ● So that tenderer can insert the sectional summary to arrive at a total amount which ultimately becomes the “ tender amount”. ● Needed to be sign by the tenderer and employer representative.
  • 18. PREAMBLES● summary of the work requested ● explain the project, materials needed, unit prices, provisional sums, methods of measurement and potential errors. ● helpful to address issues related to unforeseeable costs associated with the project. Example: The Contractor shall be deemed to have read and examined the Tender Documents before completing the Bill of Quantities and the Schedule of Rates. The Specifications, Schedules etc. are to be considered as explanatory of each other and no advantage shall be taken of any omission in tender documents.
  • 19. SPECIFICATION ● describe the materials and workmanship required for a development. ● gives the client more certainty about the end product Example: - Types of glass used - low-e glass - Stating the types of windows and doors used - Stating the grade of the concrete - grade 25
  • 21. 1. PRELIMINARIES Provides a description of a project that allows the contractor to assess costs which, whilst they do not form a part of any of the package of works required by the contract, but are required by the method and circumstances of the works.
  • 22. PRELIMINARIES Contractor's site preliminaries, such as; staff, welfare provisions, site offices, plant, site waste clearance, water, electricity, site offices, furniture, ICT and consumables, rates, protection of work, protective clothing, site transport, setting out, building control fees, and so on.
  • 23. PRELIMINARIES Requirements for insurance, performance bonds, warranties and product guarantees (for the contractor and sub-contractors).
  • 24. PRELIMINARIES Safety and site waste management
  • 25. Appendix to Form of Contract
  • 26.
  • 28. 3. PRIME COST AND PROVISIONAL SUMS
  • 29. 3. PRIME COST AND PROVISIONAL SUMS
  • 33. FLOOR FINISHES - Ground Floor 200mm x 200mm x 8mm MML Matt Ceramic Tiles 300mm x 300mm x 8mm MML Glazed Ceramic Tiles 200mm x 200mm x 8mm MML Matt Ceramic Tiles 100mm x 100mm x 10mm Timber Parquet Cement Render
  • 34. FLOOR FINISHES- First Floor 100mm x 100mm x 10mm Timber Parquet Cement Render 200mm x 200mm x 8mm MML Matt Ceramic Tiles 300mm x 300mm x 8mm MML Glazed Ceramic Tiles
  • 35. WALL FINISHES - Bathrooms 200mm x 200mm x 7mm Guocera Glazed Ceramic Tiles
  • 36. CEILING FINISHES - Ground Floor 1215mm x 1825 mm x 9mm thick "UNIPLASTER" plaster ceiling board Plaster Coat - Internal & External
  • 37. CEILING FINISHES - First Floor 1215mm x 1825 mm x 9mm thick "UNIPLASTER" plaster ceiling board Plaster Coat - Internal & External
  • 39. Price of basic materials
  • 40. FORM OF BANK GUARANTEE FOR EARNEST MONEY - Standard form with pre-determined wordings - A bank guarantee may take the form of a performance bond or a form of letter of credit. - Banks generally require that bank guarantees which take the form of a performance bond include a clause which allows the bank to pay out the bond even though there may have been no default under the contract with the project owner
  • 41. FORM OF BANK GUARANTEE FOR PERFORMANCE BOND - Standard form with pre-determined wordings. - A performance bond protects the owner from non performance and financial exposures should the contractor default on the contract. - It is directly tied to the underlying contract and if the contractor is unable to perform the contract, the surety has responsibilities to the owner and contractor for project completion.