FACADE PROJECT			LIAM BAINES		ASSIGNMENT 3			SARC321			15 OCTOBER 2014
PLAN				LIAM BAINES		ASSIGNMENT 3			SARC321			15 OCTOBER 2014	
Joint project, however this
document contains my Indi-
vidual contribution; facade
design.
Typical ground floor plan
and core layout for the office
block.
West, South and East Ele-
vations are all to have Alu-
cobond facades, while the
North Elevation is to make
maximum use of the sunlight
with a glass curtain wall.
GSEducationalVersion
+3,700
2 Ground Floor
+3,700
2 Ground Floor
+7,400
3 1st Floor
+7,400
3 1st Floor
+11,100
4 2nd Floor
+11,100
4 2nd Floor
+14,800
5 3rd Floor
+14,800
5 3rd Floor
+18,500
6 4th Floor
+18,500
6 4th Floor
+22,200
7 5th Floor
+22,200
7 5th Floor
+25,900
8 6th Floor
+25,900
8 6th Floor
+29,600
9 7th Floor
+29,600
9 7th Floor
+33,300
10 8th Floor
+33,300
10 8th Floor
+37,000
11 9th Floor
+37,000
11 9th Floor
1 North Elevation 1:200
	NORTH ELEVATION			LIAM BAINES		ASSIGNMENT 3			SARC321			15 OCTOBER 2014	
Curtain Wall facade
with opaque glass
along the slab and
column segments.
Allows deepest light
penetration into the
office block.
GSEducationalVersion
1 2 3 4 5
+3,700
Ground Floor
+3,700
Ground Floor
+7,400
1st Floor
+7,400
1st Floor
+11,100
2nd Floor
+11,100
2nd Floor
+14,800
3rd Floor
+14,800
3rd Floor
+18,500
4th Floor
+18,500
4th Floor
+22,200
5th Floor
+22,200
5th Floor
+25,900
6th Floor
+25,900
6th Floor
+29,600
7th Floor
+29,600
7th Floor
+33,300
8th Floor
+33,300
8th Floor
+37,000
9th Floor
+37,000
9th Floor
1 West Elevation 1:200
	WEST ELEVATION			LIAM BAINES		ASSIGNMENT 3			SARC321			15 OCTOBER 2014	
Alucobond facade
with windows above
desk height, and
Alucobond Cassette
System along the
slab and column seg-
ments.
GSEducationalVersion
1 Alucobond Detail 1:50
2 Section AA 1:50
Selected 600x600mm
20mm Ceiling tile w/
selected Aluminium
suspended ceiling grid
Alucabond cassette
System
R2.8 Fibreglass
Insulation
90x45 H1.2 timber
framing construction
600x600mm Cast
Insitu RC column w/
steel reinforcing to
Engineers design
10mm Membrane
to top of ecoply
Carpet
75mm RC topping w/
reinforcing as per
engineers design
Stresscrete 200mm RC
precast plank floor system
w/20mm H3.2 plywood
infill
Selected 600x600mm
20mm Ceiling tile w/
selected Aluminium
suspended ceiling grid
Thermosash 40mm double
glazing
Commercial
Aluminium window
Joinery
R2.8 Fibreglass Insulation
Ecoply Rigid Air Barrier
90x45 H1.2 timber framing
construction
Alucobond casette
system over 7mm
Ecoply Rigid Air
Barrier w/
proprietary tape.
The Ecoply barrier
is fixed to 90x45
H1.2 timber
framing w/R2.8
fibreglass
insulation. The
timber framing is
then fixed to RC
concrete
construction w/
M16 Bolts
2/ 10mm GIB Fyreline wall
lining
7mm Ecoply rigid
air barrier
R2.8 fibreglass
insulation
90x45 H1.2 timber
framing @ 600mm
ctrs w/ dwangs @
800mm vertical
centres
600x600mm Cast Insitu RC
column w/ steel reinforcing
to Engineers design
Thermosash 40mm
double glazing
Commercial
Aluminium window
Joinery
	 ALUCOBOND DETAIL		 LIAM BAINES		ASSIGNMENT 3			SARC321			15 OCTOBER 2014
GSEducationalVersion
1 Curtainwall Detail 1:50
2 Section BB 1:50
Selected 600x600mm
20mm Ceiling tile w/
selected Aluminium
suspended ceiling grid
600x600mm Cast
Insitu RC column w/
steel reinforcing to
Engineers design
Carpet
75mm RC topping w/
reinforcing as per
engineers design
Stresscrete 200mm RC
precast plank floor system
w/20mm H3.2 plywood
infill
Selected 600x600mm
20mm Ceiling tile w/
selected Aluminium
suspended ceiling grid
Thermosash 40mm double
glazing
Thermosash
curtain facade
system suspended
in front of slab on
10mm mild steel
bracket attaching
vertical mullions to
the slab
Frosted glazing on
slab layer
600x600mm Cast Insitu RC
column w/ steel reinforcing
to Engineers design
Thermosash curtain
wall stick system w/
double glazing
Aluminium facade
system window
Joinery
Frosted glazing on
slab layer
Fire safing
	 CURTAIN WALL DETAIL		 LIAM BAINES		ASSIGNMENT 3			SARC321			15 OCTOBER 2014

Mais conteúdo relacionado

Mais procurados

O2 Arena Booklet
O2 Arena BookletO2 Arena Booklet
O2 Arena Booklet
eileen_0692
 
Bsc acoustic
Bsc acoustic Bsc acoustic
Bsc acoustic
WC Yan
 

Mais procurados (20)

O2 Arena Booklet
O2 Arena BookletO2 Arena Booklet
O2 Arena Booklet
 
Curtain walls
Curtain wallsCurtain walls
Curtain walls
 
Commerzbank headquarters
Commerzbank headquartersCommerzbank headquarters
Commerzbank headquarters
 
Timber roof
Timber roofTimber roof
Timber roof
 
Steel portal frames
Steel portal framesSteel portal frames
Steel portal frames
 
Surface active systems
Surface active systems Surface active systems
Surface active systems
 
Presentation on Flat Roof Double in Safari Roof House
Presentation on Flat Roof Double in Safari Roof HousePresentation on Flat Roof Double in Safari Roof House
Presentation on Flat Roof Double in Safari Roof House
 
Arches - Form Active Structure System
Arches - Form Active Structure SystemArches - Form Active Structure System
Arches - Form Active Structure System
 
Kinectic structures
Kinectic structuresKinectic structures
Kinectic structures
 
Structural glazing final
Structural glazing finalStructural glazing final
Structural glazing final
 
Cable systems - form active structure system
Cable systems - form active structure systemCable systems - form active structure system
Cable systems - form active structure system
 
Ferrocement roof
Ferrocement roofFerrocement roof
Ferrocement roof
 
Vierendeel truss bs5
Vierendeel truss bs5Vierendeel truss bs5
Vierendeel truss bs5
 
03 Curtain-wall Presentation
03 Curtain-wall Presentation03 Curtain-wall Presentation
03 Curtain-wall Presentation
 
Space frame
Space frameSpace frame
Space frame
 
Space frames1
Space frames1Space frames1
Space frames1
 
Shell structure
Shell structureShell structure
Shell structure
 
High rise
High rise High rise
High rise
 
Domes Basics and It's Future from it's origin
Domes Basics and It's Future from it's originDomes Basics and It's Future from it's origin
Domes Basics and It's Future from it's origin
 
Bsc acoustic
Bsc acoustic Bsc acoustic
Bsc acoustic
 

Destaque

APA Letter -liam-reference
APA Letter -liam-referenceAPA Letter -liam-reference
APA Letter -liam-reference
Liam Baines
 
LiamBaines_Construction_OFFICECORE
LiamBaines_Construction_OFFICECORELiamBaines_Construction_OFFICECORE
LiamBaines_Construction_OFFICECORE
Liam Baines
 
MARK THORNTON DETAIL AND DESIGN EXHIBITION POSTER
MARK THORNTON DETAIL AND DESIGN EXHIBITION POSTERMARK THORNTON DETAIL AND DESIGN EXHIBITION POSTER
MARK THORNTON DETAIL AND DESIGN EXHIBITION POSTER
Mark Thornton
 
MARK THORNTON EXHIBITION DRAWING
MARK THORNTON EXHIBITION DRAWINGMARK THORNTON EXHIBITION DRAWING
MARK THORNTON EXHIBITION DRAWING
Mark Thornton
 
Glass work details
Glass work detailsGlass work details
Glass work details
JpRawat
 
Acoustical materials
Acoustical materialsAcoustical materials
Acoustical materials
shahzeb163
 

Destaque (16)

CURTAIN WALL
CURTAIN WALLCURTAIN WALL
CURTAIN WALL
 
curtain wall -skin of building
 curtain wall -skin of building curtain wall -skin of building
curtain wall -skin of building
 
Splendid Hotel, Glass Partition Wall Cross Section
Splendid Hotel, Glass Partition Wall   Cross SectionSplendid Hotel, Glass Partition Wall   Cross Section
Splendid Hotel, Glass Partition Wall Cross Section
 
Buildings
BuildingsBuildings
Buildings
 
Facade - presentation
Facade - presentationFacade - presentation
Facade - presentation
 
APA Letter -liam-reference
APA Letter -liam-referenceAPA Letter -liam-reference
APA Letter -liam-reference
 
LiamBaines_Construction_OFFICECORE
LiamBaines_Construction_OFFICECORELiamBaines_Construction_OFFICECORE
LiamBaines_Construction_OFFICECORE
 
MARK THORNTON DETAIL AND DESIGN EXHIBITION POSTER
MARK THORNTON DETAIL AND DESIGN EXHIBITION POSTERMARK THORNTON DETAIL AND DESIGN EXHIBITION POSTER
MARK THORNTON DETAIL AND DESIGN EXHIBITION POSTER
 
MARK THORNTON EXHIBITION DRAWING
MARK THORNTON EXHIBITION DRAWINGMARK THORNTON EXHIBITION DRAWING
MARK THORNTON EXHIBITION DRAWING
 
AIA Chicago Presentation
AIA Chicago PresentationAIA Chicago Presentation
AIA Chicago Presentation
 
Glass work details
Glass work detailsGlass work details
Glass work details
 
Curtain Walls
Curtain WallsCurtain Walls
Curtain Walls
 
Structural glazing
Structural glazingStructural glazing
Structural glazing
 
Acp and glazing
Acp and glazingAcp and glazing
Acp and glazing
 
Curtain Wall Systems
Curtain Wall SystemsCurtain Wall Systems
Curtain Wall Systems
 
Acoustical materials
Acoustical materialsAcoustical materials
Acoustical materials
 

Semelhante a LiamBaines_Construction_FACADES

Product catalogue .JIELI Roof
Product catalogue .JIELI RoofProduct catalogue .JIELI Roof
Product catalogue .JIELI Roof
Jenny Qiao
 
Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - Portfolio
Jack Lambourne
 
2013-08-29 econogrid WEB
2013-08-29 econogrid WEB2013-08-29 econogrid WEB
2013-08-29 econogrid WEB
Janine Course
 
SJN Portfolio - Abbreviated 005 reduced
SJN Portfolio - Abbreviated 005 reducedSJN Portfolio - Abbreviated 005 reduced
SJN Portfolio - Abbreviated 005 reduced
Steve Newman
 
I-Joist Manual 12-2015 ESP-RSB Copyrights Issue Ver 2.3
I-Joist Manual 12-2015 ESP-RSB Copyrights Issue Ver 2.3I-Joist Manual 12-2015 ESP-RSB Copyrights Issue Ver 2.3
I-Joist Manual 12-2015 ESP-RSB Copyrights Issue Ver 2.3
Charles Willis-Dixon
 
Liming Company presentation
Liming Company presentationLiming Company presentation
Liming Company presentation
Gary G. HYCOMB
 
John Curry 26.05.2015 Final BIM Submission merged pdfs
John Curry 26.05.2015 Final BIM Submission merged pdfsJohn Curry 26.05.2015 Final BIM Submission merged pdfs
John Curry 26.05.2015 Final BIM Submission merged pdfs
John Curry
 
Andrea Gino - Portfolio (Low Res)
Andrea Gino - Portfolio (Low Res)Andrea Gino - Portfolio (Low Res)
Andrea Gino - Portfolio (Low Res)
Andrea Gino
 

Semelhante a LiamBaines_Construction_FACADES (20)

Product catalogue .JIELI Roof
Product catalogue .JIELI RoofProduct catalogue .JIELI Roof
Product catalogue .JIELI Roof
 
Mẫu thiết kế profile Công ty Tôn thép Đông Á bằng tiếng Anh
Mẫu thiết kế profile Công ty Tôn thép Đông Á bằng tiếng AnhMẫu thiết kế profile Công ty Tôn thép Đông Á bằng tiếng Anh
Mẫu thiết kế profile Công ty Tôn thép Đông Á bằng tiếng Anh
 
Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - Portfolio
 
GITAU JOHN PORTFOLIO
GITAU JOHN PORTFOLIOGITAU JOHN PORTFOLIO
GITAU JOHN PORTFOLIO
 
2013-08-29 econogrid WEB
2013-08-29 econogrid WEB2013-08-29 econogrid WEB
2013-08-29 econogrid WEB
 
K House Manufacturer - Epack Prefab.pptx
K House Manufacturer - Epack Prefab.pptxK House Manufacturer - Epack Prefab.pptx
K House Manufacturer - Epack Prefab.pptx
 
K House Manufacturer - EPACK Prefab
K House Manufacturer - EPACK PrefabK House Manufacturer - EPACK Prefab
K House Manufacturer - EPACK Prefab
 
SJN Portfolio - Abbreviated 005 reduced
SJN Portfolio - Abbreviated 005 reducedSJN Portfolio - Abbreviated 005 reduced
SJN Portfolio - Abbreviated 005 reduced
 
IBS Factory Report Assignment
IBS Factory Report AssignmentIBS Factory Report Assignment
IBS Factory Report Assignment
 
A PPT.pptx
A PPT.pptxA PPT.pptx
A PPT.pptx
 
Atrium Details
Atrium DetailsAtrium Details
Atrium Details
 
I-Joist Manual 12-2015 ESP-RSB Copyrights Issue Ver 2.3
I-Joist Manual 12-2015 ESP-RSB Copyrights Issue Ver 2.3I-Joist Manual 12-2015 ESP-RSB Copyrights Issue Ver 2.3
I-Joist Manual 12-2015 ESP-RSB Copyrights Issue Ver 2.3
 
DRT Portfolio Works
DRT Portfolio WorksDRT Portfolio Works
DRT Portfolio Works
 
MLP-Brochure-WEB-FEB16
MLP-Brochure-WEB-FEB16MLP-Brochure-WEB-FEB16
MLP-Brochure-WEB-FEB16
 
Amiya......project
Amiya......projectAmiya......project
Amiya......project
 
Genesis Roofings (A Division Of Flexituff Industries), Mumbai, Polycarbonate ...
Genesis Roofings (A Division Of Flexituff Industries), Mumbai, Polycarbonate ...Genesis Roofings (A Division Of Flexituff Industries), Mumbai, Polycarbonate ...
Genesis Roofings (A Division Of Flexituff Industries), Mumbai, Polycarbonate ...
 
Liming Company presentation
Liming Company presentationLiming Company presentation
Liming Company presentation
 
John Curry 26.05.2015 Final BIM Submission merged pdfs
John Curry 26.05.2015 Final BIM Submission merged pdfsJohn Curry 26.05.2015 Final BIM Submission merged pdfs
John Curry 26.05.2015 Final BIM Submission merged pdfs
 
Smartfix Presentation
Smartfix PresentationSmartfix Presentation
Smartfix Presentation
 
Andrea Gino - Portfolio (Low Res)
Andrea Gino - Portfolio (Low Res)Andrea Gino - Portfolio (Low Res)
Andrea Gino - Portfolio (Low Res)
 

LiamBaines_Construction_FACADES

  • 1. FACADE PROJECT LIAM BAINES ASSIGNMENT 3 SARC321 15 OCTOBER 2014
  • 2. PLAN LIAM BAINES ASSIGNMENT 3 SARC321 15 OCTOBER 2014 Joint project, however this document contains my Indi- vidual contribution; facade design. Typical ground floor plan and core layout for the office block. West, South and East Ele- vations are all to have Alu- cobond facades, while the North Elevation is to make maximum use of the sunlight with a glass curtain wall.
  • 3. GSEducationalVersion +3,700 2 Ground Floor +3,700 2 Ground Floor +7,400 3 1st Floor +7,400 3 1st Floor +11,100 4 2nd Floor +11,100 4 2nd Floor +14,800 5 3rd Floor +14,800 5 3rd Floor +18,500 6 4th Floor +18,500 6 4th Floor +22,200 7 5th Floor +22,200 7 5th Floor +25,900 8 6th Floor +25,900 8 6th Floor +29,600 9 7th Floor +29,600 9 7th Floor +33,300 10 8th Floor +33,300 10 8th Floor +37,000 11 9th Floor +37,000 11 9th Floor 1 North Elevation 1:200 NORTH ELEVATION LIAM BAINES ASSIGNMENT 3 SARC321 15 OCTOBER 2014 Curtain Wall facade with opaque glass along the slab and column segments. Allows deepest light penetration into the office block.
  • 4. GSEducationalVersion 1 2 3 4 5 +3,700 Ground Floor +3,700 Ground Floor +7,400 1st Floor +7,400 1st Floor +11,100 2nd Floor +11,100 2nd Floor +14,800 3rd Floor +14,800 3rd Floor +18,500 4th Floor +18,500 4th Floor +22,200 5th Floor +22,200 5th Floor +25,900 6th Floor +25,900 6th Floor +29,600 7th Floor +29,600 7th Floor +33,300 8th Floor +33,300 8th Floor +37,000 9th Floor +37,000 9th Floor 1 West Elevation 1:200 WEST ELEVATION LIAM BAINES ASSIGNMENT 3 SARC321 15 OCTOBER 2014 Alucobond facade with windows above desk height, and Alucobond Cassette System along the slab and column seg- ments.
  • 5. GSEducationalVersion 1 Alucobond Detail 1:50 2 Section AA 1:50 Selected 600x600mm 20mm Ceiling tile w/ selected Aluminium suspended ceiling grid Alucabond cassette System R2.8 Fibreglass Insulation 90x45 H1.2 timber framing construction 600x600mm Cast Insitu RC column w/ steel reinforcing to Engineers design 10mm Membrane to top of ecoply Carpet 75mm RC topping w/ reinforcing as per engineers design Stresscrete 200mm RC precast plank floor system w/20mm H3.2 plywood infill Selected 600x600mm 20mm Ceiling tile w/ selected Aluminium suspended ceiling grid Thermosash 40mm double glazing Commercial Aluminium window Joinery R2.8 Fibreglass Insulation Ecoply Rigid Air Barrier 90x45 H1.2 timber framing construction Alucobond casette system over 7mm Ecoply Rigid Air Barrier w/ proprietary tape. The Ecoply barrier is fixed to 90x45 H1.2 timber framing w/R2.8 fibreglass insulation. The timber framing is then fixed to RC concrete construction w/ M16 Bolts 2/ 10mm GIB Fyreline wall lining 7mm Ecoply rigid air barrier R2.8 fibreglass insulation 90x45 H1.2 timber framing @ 600mm ctrs w/ dwangs @ 800mm vertical centres 600x600mm Cast Insitu RC column w/ steel reinforcing to Engineers design Thermosash 40mm double glazing Commercial Aluminium window Joinery ALUCOBOND DETAIL LIAM BAINES ASSIGNMENT 3 SARC321 15 OCTOBER 2014
  • 6. GSEducationalVersion 1 Curtainwall Detail 1:50 2 Section BB 1:50 Selected 600x600mm 20mm Ceiling tile w/ selected Aluminium suspended ceiling grid 600x600mm Cast Insitu RC column w/ steel reinforcing to Engineers design Carpet 75mm RC topping w/ reinforcing as per engineers design Stresscrete 200mm RC precast plank floor system w/20mm H3.2 plywood infill Selected 600x600mm 20mm Ceiling tile w/ selected Aluminium suspended ceiling grid Thermosash 40mm double glazing Thermosash curtain facade system suspended in front of slab on 10mm mild steel bracket attaching vertical mullions to the slab Frosted glazing on slab layer 600x600mm Cast Insitu RC column w/ steel reinforcing to Engineers design Thermosash curtain wall stick system w/ double glazing Aluminium facade system window Joinery Frosted glazing on slab layer Fire safing CURTAIN WALL DETAIL LIAM BAINES ASSIGNMENT 3 SARC321 15 OCTOBER 2014