Flow Assurance Wax Study on the Ravn Field
Production System
Wood Group Kenny: Hooman Haghighi, Jamie Littler, Fujiang Zhu,
Temitope Solanke
Wintershall: Leif H. Blidegn, Amir Mofidi
2 - www.woodgroup.com
Agenda
• Introduction to the risks of wax deposition
• Ravn Field Overview
• Fluid Tuning
• Results of Infield and Export Lines
• Conclusions and recommendations
Wax deposition risks
Wax is long-chain simple hydrocarbons. Can be stable in the solid
phase at various temperatures.
Wax deposition can cause:
• Reduction in flow area
• Change in wall friction
• Blockage of the pipeline
These pictures are from public domain.
Wax management
Maintain the system temperature above the
wax appearance and/or fluid pour point.
• Insulation
• Displacement with stabilized crude,
diesel or condensate
• Active heating of the pipeline
Physical removal of wax
• Periodic scraping of the wax layer via
pigging operations.
• Heating
Chemical treatment
Blideng et al. (2011), Running-in a new Platform, 22nd
International Oil Field Chemistry Symposium
Ravn system schematic
Ravn
F3-FB Platform
4” Oil Export Line (119 km)
72m
5°C
0.34 m/s
- 10°C
54 m/s
66m
API° 38.2
Viscosity at 60°F (cP) 24.1
WAT (°C) 27.5
N-Paraffin Content (wt%) 2.625
Pour Point (°C) -51
Fluid Properties
Export T = 55°C
Ambient Conditions
FWHT= 60°C
8” Infield Line (18 km)
A6A Platform
Wax deposition (MolecularDiffusion)
• Molecular Diffusion is the dominant wax deposition mechanism
• Radial diffusion of dissolved wax molecules in the oil
• Concentration gradient between dissolved wax in the turbulent core
and the wax in solution at the pipe wall
• Dissolved wax diffuses towards the wall where it precipitates
Turbulent Core
• There are a few lab techniques available for wax
measurements:
• Viscosimetry
• Cold finger
• Differential Scanning Calorimetry (DSC)
• Cross Polarization Microscopy
• Filter Plugging
• Fourier Transform Infrared Spectroscopy (FTIR)
Wax Appearance Temperature (WAT):
The temperature below which the paraffin's start to
precipitate as wax crystals is defined as crude cloud point or
WAT.
Pour Point:
The temperature at which oil sample movement stops is
defined as the crude oil pour point.
Wax testing
These pictures are from public domain.
Wax properties
Lab Data
WAT [oC] 27.5
WDT [oC] 55
Wax Paraffinic content [wt%] NOTE1 2.625
Cold Finger Test
Note 1: C17+
Static Cold Finger Set-up
• Hayduk Minhas correlation was used to calculate the diffusion
Coefficient (9.78E-08 cm2/s)
• Wax Inhibitor from lab test was shown to reduce the deposition rate
by 40-80% (40% has been assumed as a conservative approach in
this study)
Viscosity tuning
Shear Rate Calculation-Catcher
Shear rate= 10 S-1
Temp= 15 C
μ= 22 cp
ID= 0.1016 m 4"
ρ= 834.9702 kg/m3
QLT= 1950 bpd
0.003588 m3/s
u= 0.442594 m/s
Velocity
Re= 1706.661 Re<2300 Laminar
Re>4000 Turbulent
Laminar
τ= 1.0 N/m2
s= 0.045805 S-1 Turbulent
s= 34.84989 S-1 Laminar
note: use the lab data with shear rate =10 S-1
• A shear-thinning behaviour of the fluid has been observed at low
temperature.
• The shear rate has been identified to represent the actual flowing
condition (for each flow rate) and viscosity has been tuned based on
the selected shear rate.
0
10
20
30
40
50
60
70
80
90
100
0 5 10 15 20 25 30 35 40 45 50
DynamicViscositymPa.s[cP]
Temperature °C
Steady State Dynamic Viscosity Profiles For Ravn Oil
1 s-1
10 s-1
100 s-1
non-Newtonian Behaviour at Low temperature
Fluid modelling
Effect of pressure & light end component on WAT
Note:The dynamic changes in the fluid composition(e.g. Gas Oil Ratio) in the pipeline and the effecton WAT has been
consideredin thermo-hydraulicsimulation.Howeverthe model has not taken into account the compositionchange
due to wax drop-out(conservative).
0
50
100
150
200
250
0 10 20 30 40 50 60 70 80 90
Pressure[bara]
Temperature / Wax Appearance Temperature [oC]
Wintershall Ravn Field
Fluid Modelling
in-Field Line
Wax Appearance Temperature (WAT) as a Function of GOR and Pressure
Bubble Line (Case 1+GL - GOR = 1900 Scf/bbl)
WAT (Case 1+GL - GOR = 1900 Scf/bbl)
Bubble Line (Case 2 - GOR = 533 Scf/bbl)
WAT (Case 2 - GOR = 533 Scf/bbl)
Bubble Line (Case 3+GL - GOR = 986Scf/bbl)
WAT (Case 3+GL - GOR = 986 Scf/bbl)
Risk of wax deposition (in-fieldline, early life)
-20
-10
0
10
20
30
40
50
60
70
0 2 4 6 8 10 12 14 16 18 20
Temperature[C]
Length [km]
Wintershall Ravan Field
Wax Deposition Simulation
In-field Line
Temperature and Wax Depostion Profiles (Case 1+ GL)
Fluid T
WAT
T Ambient
Wintershall Ravn Field
Wax deposition thickness (in-field,early life)
0
2
4
6
8
10
12
14
0 2 4 6 8 10 12 14 16 18 20
WaxThickness[mm]
Length [km]
Wintershall Ravn Field
Wax Deposition Simulation
In-field Line
Wax Depostion Profiles (Case 1+ GL)
30 days
20 days
10 days
Risk of Wax Depostion at the Topsides
Risk of Wax Depostion at the Subsea
0
1
2
3
4
5
6
7
8
9
10
0 5 10 15 20 25 30
TotalWaxDeposited[m3]
Time [days]
Wintershall Ravn Field
Wax Deposition Simulation
In-field Line - No Inhibitor
Volume of Wax Deposition
Case 1
Case 2
Case 3
Case 4
Total wax deposition (withoutinhibitor)
Total growthrate of wax (in-fieldpipeline) is <0.4 m3/d without inhibitor
Oil Gas Water
[m3
/d] [m3
/d] [m3
/d] [m3
/d]
1 310 29448 0 + GL
2 620 58896 0 0
3 620 58896 0 50000
4 369 39979 52 100000
Case
Production Rates
Gas Lift
0
1
2
3
4
5
6
7
8
0 5 10 15 20 25 30
TotalWaxDeposited[m3]
Time [days]
Wintershall Ravn Field
Wax Deposition Simulation
In-field Line - With Inhibitor
Volume of Wax Deposition
Case 1
Case 2
Case 3
Case 4
Total wax deposition (withinhibitor)
Total growthrate of wax (in-fieldpipeline)is <0.3 m3/d with inhibitor
Oil Gas Water
[m3
/d] [m3
/d] [m3
/d] [m3
/d]
1 310 29448 0 + GL
2 620 58896 0 0
3 620 58896 0 50000
4 369 39979 52 100000
Case
Production Rates
Gas Lift
Summary of the results (in-fieldline)
• WAT is lower at higher pressure for the live fluid
• The effect of pressure is more pronounced for the fluids with a
higher GOR (i.e. Gas Oil Ratio)
• As soon as the fluid reaches ambient temperature, no wax
deposition would occur (No heat flux to drive the wax deposition –
cold slurry flow).
• The first location for wax to deposit depends on the flow rates,
GOR, phase fractions, etc.
• After 30 days of operation <4mm and <13mm of (max) wax
thickness can be expected at seabed and topside conditions
respectively without inhibitor.
• The recommended frequency of pigging operation is every month
(based on maximum 4mm of wax deposition in the system) without
inhibitor and every 45 days with inhibitor injection (40% efficiency).
Risk of wax deposition (ExportLine)
-20
-10
0
10
20
30
40
50
60
0 20 40 60 80 100 120 140
Temperature[C]
Distance (km)
Wintershall Ravn Field
Wax Deposition Simulation - Export Line
Temperature Profile and Risk of Wax Deposition
Ambient T
WAT
1950bpd Fluid T
2500bpd Fluid T
3500bpd Fluid T
4500bpd Fluid T
Risk of Wax Depostion at the Subsea
Risk of Wax Depostion at the Topsides
Wax deposition thickness (Exportline)
0
2
4
6
8
10
12
14
0 20 40 60 80 100 120 140
WaxThickness[mm]
Length [km]
Wintershall Ravn Field
Wax Deposition Simulation
Export Line
Wax Depostion Profiles (2500 bpd)
5 days
10 days
15 days
20 days
30 days
Risk of Wax Depostion at the Topsides
Risk of Wax Depostion at the Subsea
Pressure drop vs. max wax thickness
(ExportLine)
0
5
10
15
20
25
30
35
0 2 4 6 8 10 12 14
PressureDrop[bara]
Max Wax Thickness [mm]
Wintershall Ravn Field
Wax Deposition Simulation
Export Line
Pressure Drop vs. Max. Deposition Thickness
1950 bpd
2500 bpd
3500 bpd
4500 bpd
Self insulation on wax deposition
(ExportLine)
Results are forthe topsides (i.e.the highest deposition thickness and rates)
0
2
4
6
8
10
12
14
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
0 5 10 15 20 25 30
MaxWaxThickness[mm]
MaxDepositionRate[mm/day]
Time [days]
Wintershall Ravn Field
Wax Deposition Simulation
In-Field Line
Effect of Wax Thickness on Depostion Rates
Case 1 - Deposition Rate Case 2 - Deposition Rate Case 3 - Deposition Rate Case 4 - Deposition Rate
Case 1 - Max Wax Thickness Case 2 - Max Wax Thickness Case 3 - Max Wax Thickness Case 4 - Max Wax Thickness
Summary of the results (Exportline)
• Higher flow rate leads to longer section of the export line subject
to wax deposition risk.
• Lower rate of deposition by time due to the wax self-isolation
effect.
• The maximum wax thicknesses identified for the 4 cases are
comparable, however the total wax deposited is more at higher
flow rates.
• After 22 days and 31 days of operation <4mm of (max) wax
thickness can be expected at seabed condition without and with
inhibitor (40% efficiency), respectively.
• Pigging of 4” >100 km export line is challenging and is currently
under further evaluation.
• Alternative wax mitigation strategy like wax dispersant, gas
condensates has been considered.
Other Flow Assurance challenges
• Slugging in the in-field line at the early life and during the start-up
and turn-down operations has been observed. The following
mitigation methods has been considered:
o Increased back pressure (for start-up and turn-down operations)
o Gas lift injection (if required)
• Liquid handling capacity at the topsides (~27 m3)
o High level pigging, start-up and ramp-up philosophies have been
developed
Special thanks to:
Questions?

Mais conteúdo relacionado

Mais procurados

History matching with EnKF
History matching with EnKFHistory matching with EnKF
History matching with EnKFzyedb
 
Fundamental Reservoir Fluid Behaviour
Fundamental Reservoir Fluid BehaviourFundamental Reservoir Fluid Behaviour
Fundamental Reservoir Fluid BehaviourM.T.H Group
 
Water coning in oil wells and DWS technology
Water coning in oil wells and DWS technologyWater coning in oil wells and DWS technology
Water coning in oil wells and DWS technologyshubhamsaxena2329
 
Introduction to Reservoir Engineering
Introduction to Reservoir EngineeringIntroduction to Reservoir Engineering
Introduction to Reservoir EngineeringMikeEllingham
 
Gas Lift Optimization and Troubleshooting
Gas Lift Optimization and Troubleshooting Gas Lift Optimization and Troubleshooting
Gas Lift Optimization and Troubleshooting Bailey LeRoux
 
Integrated Historical Data Workflow: Maximizing the Value of a Mature Asset
Integrated Historical Data Workflow: Maximizing the Value of a Mature AssetIntegrated Historical Data Workflow: Maximizing the Value of a Mature Asset
Integrated Historical Data Workflow: Maximizing the Value of a Mature AssetSociety of Petroleum Engineers
 
Q922+rfp+l09 v1
Q922+rfp+l09 v1Q922+rfp+l09 v1
Q922+rfp+l09 v1AFATous
 
Applied reservoir eng
Applied reservoir engApplied reservoir eng
Applied reservoir engmohamad1286
 
Nsulangi_Drives Mechanism_CUG
Nsulangi_Drives Mechanism_CUGNsulangi_Drives Mechanism_CUG
Nsulangi_Drives Mechanism_CUGNsulangi Paul
 
140717 artificial lift
140717 artificial lift140717 artificial lift
140717 artificial liftAli Okasha
 
Artificial lift methods in production
Artificial lift methods in productionArtificial lift methods in production
Artificial lift methods in productionFarida Ismayilova
 

Mais procurados (20)

History matching with EnKF
History matching with EnKFHistory matching with EnKF
History matching with EnKF
 
Presentation 2
Presentation 2Presentation 2
Presentation 2
 
Fundamental Reservoir Fluid Behaviour
Fundamental Reservoir Fluid BehaviourFundamental Reservoir Fluid Behaviour
Fundamental Reservoir Fluid Behaviour
 
EOR Methods
EOR MethodsEOR Methods
EOR Methods
 
Well Stimulation
Well StimulationWell Stimulation
Well Stimulation
 
Water coning in oil wells and DWS technology
Water coning in oil wells and DWS technologyWater coning in oil wells and DWS technology
Water coning in oil wells and DWS technology
 
Introduction to Reservoir Engineering
Introduction to Reservoir EngineeringIntroduction to Reservoir Engineering
Introduction to Reservoir Engineering
 
Gas EOR.pptx
Gas EOR.pptxGas EOR.pptx
Gas EOR.pptx
 
Polymer flooding
Polymer floodingPolymer flooding
Polymer flooding
 
Marginal oil fields
Marginal oil fieldsMarginal oil fields
Marginal oil fields
 
Gas Lift Optimization and Troubleshooting
Gas Lift Optimization and Troubleshooting Gas Lift Optimization and Troubleshooting
Gas Lift Optimization and Troubleshooting
 
Integrated Historical Data Workflow: Maximizing the Value of a Mature Asset
Integrated Historical Data Workflow: Maximizing the Value of a Mature AssetIntegrated Historical Data Workflow: Maximizing the Value of a Mature Asset
Integrated Historical Data Workflow: Maximizing the Value of a Mature Asset
 
Q922+rfp+l09 v1
Q922+rfp+l09 v1Q922+rfp+l09 v1
Q922+rfp+l09 v1
 
Applied reservoir eng
Applied reservoir engApplied reservoir eng
Applied reservoir eng
 
Nsulangi_Drives Mechanism_CUG
Nsulangi_Drives Mechanism_CUGNsulangi_Drives Mechanism_CUG
Nsulangi_Drives Mechanism_CUG
 
4 eor 4-gasmethods,
4 eor 4-gasmethods,4 eor 4-gasmethods,
4 eor 4-gasmethods,
 
Waterflood Design and Operational Best Practices
Waterflood Design and Operational Best PracticesWaterflood Design and Operational Best Practices
Waterflood Design and Operational Best Practices
 
140717 artificial lift
140717 artificial lift140717 artificial lift
140717 artificial lift
 
Polymer injection eor
Polymer injection eorPolymer injection eor
Polymer injection eor
 
Artificial lift methods in production
Artificial lift methods in productionArtificial lift methods in production
Artificial lift methods in production
 

Destaque

cross polar microscopy on crude
cross polar microscopy on crudecross polar microscopy on crude
cross polar microscopy on crudeAkshaya Mishra
 
Effect Of Hydrate Formation (A Common Problem In Wet Granulation)
Effect Of Hydrate Formation (A Common Problem In Wet Granulation)Effect Of Hydrate Formation (A Common Problem In Wet Granulation)
Effect Of Hydrate Formation (A Common Problem In Wet Granulation)shashank52
 
Gas hydrates challenge
Gas hydrates challengeGas hydrates challenge
Gas hydrates challengeStatoil
 
Gas Hydrates Problems- (36,45)
Gas Hydrates Problems- (36,45)Gas Hydrates Problems- (36,45)
Gas Hydrates Problems- (36,45)Vedant Makwana
 
Oil shale and shale gas (abdallah)
Oil shale and shale gas (abdallah)Oil shale and shale gas (abdallah)
Oil shale and shale gas (abdallah)AbdallahKhames
 
Gas hydrates Anomalies and Identifications
Gas hydrates Anomalies and IdentificationsGas hydrates Anomalies and Identifications
Gas hydrates Anomalies and IdentificationsRakesh Pandey
 
Gas hydrate formation and prevention
Gas hydrate formation and preventionGas hydrate formation and prevention
Gas hydrate formation and preventionAree Salah
 
Shale oil ppt
Shale oil pptShale oil ppt
Shale oil pptEr Kumar
 
Gas hydrates
Gas hydratesGas hydrates
Gas hydratesabhitgarg
 
Differential scanning calorimetry
Differential scanning calorimetryDifferential scanning calorimetry
Differential scanning calorimetryKhalid Hussain
 

Destaque (19)

cross polar microscopy on crude
cross polar microscopy on crudecross polar microscopy on crude
cross polar microscopy on crude
 
Effect Of Hydrate Formation (A Common Problem In Wet Granulation)
Effect Of Hydrate Formation (A Common Problem In Wet Granulation)Effect Of Hydrate Formation (A Common Problem In Wet Granulation)
Effect Of Hydrate Formation (A Common Problem In Wet Granulation)
 
Gas hydrates icci 2014
Gas hydrates icci 2014Gas hydrates icci 2014
Gas hydrates icci 2014
 
Ppt af
Ppt afPpt af
Ppt af
 
Gas hydrates challenge
Gas hydrates challengeGas hydrates challenge
Gas hydrates challenge
 
Gas Hydrates Problems- (36,45)
Gas Hydrates Problems- (36,45)Gas Hydrates Problems- (36,45)
Gas Hydrates Problems- (36,45)
 
Basic info for pilots
Basic info for pilotsBasic info for pilots
Basic info for pilots
 
Gas hydrates
Gas hydrates Gas hydrates
Gas hydrates
 
Oil shale and shale gas (abdallah)
Oil shale and shale gas (abdallah)Oil shale and shale gas (abdallah)
Oil shale and shale gas (abdallah)
 
Hydrate formation in gas pipelines
Hydrate formation in gas pipelinesHydrate formation in gas pipelines
Hydrate formation in gas pipelines
 
Gas hydrates Anomalies and Identifications
Gas hydrates Anomalies and IdentificationsGas hydrates Anomalies and Identifications
Gas hydrates Anomalies and Identifications
 
Gas hydrate formation and prevention
Gas hydrate formation and preventionGas hydrate formation and prevention
Gas hydrate formation and prevention
 
Gas hydrate
Gas hydrateGas hydrate
Gas hydrate
 
Natural Gas Hydrates
Natural Gas HydratesNatural Gas Hydrates
Natural Gas Hydrates
 
Gas Hydrate
Gas HydrateGas Hydrate
Gas Hydrate
 
Shale oil ppt
Shale oil pptShale oil ppt
Shale oil ppt
 
Gas hydrates
Gas hydratesGas hydrates
Gas hydrates
 
Methane hydrate ppt
Methane hydrate pptMethane hydrate ppt
Methane hydrate ppt
 
Differential scanning calorimetry
Differential scanning calorimetryDifferential scanning calorimetry
Differential scanning calorimetry
 

Semelhante a Flow Assurance Wax Study on the Ravn Production System_Approved

Evaluation of CO2 Storage Capacity and EOR in the Bakken Shale Oil Reservoirs
Evaluation of CO2 Storage Capacity and EOR in the Bakken Shale Oil ReservoirsEvaluation of CO2 Storage Capacity and EOR in the Bakken Shale Oil Reservoirs
Evaluation of CO2 Storage Capacity and EOR in the Bakken Shale Oil ReservoirsHamid Lashgari
 
العرض.pptxvsbbzbzbzjzbbzhzhjzjzjzjhzhxnxhhxh
العرض.pptxvsbbzbzbzjzbbzhzhjzjzjzjhzhxnxhhxhالعرض.pptxvsbbzbzbzjzbbzhzhjzjzjzjhzhxnxhhxh
العرض.pptxvsbbzbzbzjzbbzhzhjzjzjzjhzhxnxhhxhnsralmntsr350
 
ADVANCEMENTS IN SURFACE ENGINEERING PROCESSES.pptx
ADVANCEMENTS IN SURFACE ENGINEERING PROCESSES.pptxADVANCEMENTS IN SURFACE ENGINEERING PROCESSES.pptx
ADVANCEMENTS IN SURFACE ENGINEERING PROCESSES.pptxSanDeepSharma926061
 
Advancement in surface engineering processes by spraymet
Advancement  in surface engineering processes by spraymetAdvancement  in surface engineering processes by spraymet
Advancement in surface engineering processes by spraymetAnand, P T Bindagi
 
fc35paperskf.ppt [Compatibility Mode] [Repaired]
fc35paperskf.ppt [Compatibility Mode] [Repaired]fc35paperskf.ppt [Compatibility Mode] [Repaired]
fc35paperskf.ppt [Compatibility Mode] [Repaired]Pratap Ghorpade
 
Access Hire Middle East - Oil & Gas Presentation
Access Hire Middle East - Oil & Gas PresentationAccess Hire Middle East - Oil & Gas Presentation
Access Hire Middle East - Oil & Gas PresentationArtem Evgenievich
 
lab-oil-analysis
lab-oil-analysis lab-oil-analysis
lab-oil-analysis elantablee
 
FACTORY VISIT :MARDEC INDUSTRIAL LATEX
FACTORY VISIT :MARDEC INDUSTRIAL LATEXFACTORY VISIT :MARDEC INDUSTRIAL LATEX
FACTORY VISIT :MARDEC INDUSTRIAL LATEXPuteri Nur
 
KHRI-Webinar (22-04-2020)-Introduction to Performance Grade Bitumen -Er. T K ...
KHRI-Webinar (22-04-2020)-Introduction to Performance Grade Bitumen -Er. T K ...KHRI-Webinar (22-04-2020)-Introduction to Performance Grade Bitumen -Er. T K ...
KHRI-Webinar (22-04-2020)-Introduction to Performance Grade Bitumen -Er. T K ...SandipPaul46
 
Thermoplastic composites for Wind Energy
Thermoplastic composites for Wind EnergyThermoplastic composites for Wind Energy
Thermoplastic composites for Wind EnergyJohn R. Dorgan
 
TRAC Project Workshop 2 Presentation 2
TRAC Project Workshop 2 Presentation 2TRAC Project Workshop 2 Presentation 2
TRAC Project Workshop 2 Presentation 2Shanshan Cheng
 
Extra heavy oil and bitumen impact of technologies on the recovery factor -...
Extra heavy oil and bitumen   impact of technologies on the recovery factor -...Extra heavy oil and bitumen   impact of technologies on the recovery factor -...
Extra heavy oil and bitumen impact of technologies on the recovery factor -...gusgon
 
ACARP project to industrialise wall-flow DPF technology for diesel engines us...
ACARP project to industrialise wall-flow DPF technology for diesel engines us...ACARP project to industrialise wall-flow DPF technology for diesel engines us...
ACARP project to industrialise wall-flow DPF technology for diesel engines us...NSW Environment and Planning
 
Pablo Sanchez & Gabriel Triffiletti.pdf
Pablo Sanchez & Gabriel Triffiletti.pdfPablo Sanchez & Gabriel Triffiletti.pdf
Pablo Sanchez & Gabriel Triffiletti.pdfiQHub
 
Plasma Waste Vitrification
Plasma Waste VitrificationPlasma Waste Vitrification
Plasma Waste VitrificationJessica Smith
 

Semelhante a Flow Assurance Wax Study on the Ravn Production System_Approved (20)

Evaluation of CO2 Storage Capacity and EOR in the Bakken Shale Oil Reservoirs
Evaluation of CO2 Storage Capacity and EOR in the Bakken Shale Oil ReservoirsEvaluation of CO2 Storage Capacity and EOR in the Bakken Shale Oil Reservoirs
Evaluation of CO2 Storage Capacity and EOR in the Bakken Shale Oil Reservoirs
 
العرض.pptxvsbbzbzbzjzbbzhzhjzjzjzjhzhxnxhhxh
العرض.pptxvsbbzbzbzjzbbzhzhjzjzjzjhzhxnxhhxhالعرض.pptxvsbbzbzbzjzbbzhzhjzjzjzjhzhxnxhhxh
العرض.pptxvsbbzbzbzjzbbzhzhjzjzjzjhzhxnxhhxh
 
2018 CRW: How to Successfully Use Synthetics (Dennis Sherman)
2018 CRW: How to Successfully Use Synthetics (Dennis Sherman)2018 CRW: How to Successfully Use Synthetics (Dennis Sherman)
2018 CRW: How to Successfully Use Synthetics (Dennis Sherman)
 
ADVANCEMENTS IN SURFACE ENGINEERING PROCESSES.pptx
ADVANCEMENTS IN SURFACE ENGINEERING PROCESSES.pptxADVANCEMENTS IN SURFACE ENGINEERING PROCESSES.pptx
ADVANCEMENTS IN SURFACE ENGINEERING PROCESSES.pptx
 
Advancement in surface engineering processes by spraymet
Advancement  in surface engineering processes by spraymetAdvancement  in surface engineering processes by spraymet
Advancement in surface engineering processes by spraymet
 
fc35paperskf.ppt [Compatibility Mode] [Repaired]
fc35paperskf.ppt [Compatibility Mode] [Repaired]fc35paperskf.ppt [Compatibility Mode] [Repaired]
fc35paperskf.ppt [Compatibility Mode] [Repaired]
 
Access Hire Middle East - Oil & Gas Presentation
Access Hire Middle East - Oil & Gas PresentationAccess Hire Middle East - Oil & Gas Presentation
Access Hire Middle East - Oil & Gas Presentation
 
cpi mill testing.ppt
cpi mill testing.pptcpi mill testing.ppt
cpi mill testing.ppt
 
lab-oil-analysis
lab-oil-analysis lab-oil-analysis
lab-oil-analysis
 
CRAP PRESENTATION
CRAP PRESENTATIONCRAP PRESENTATION
CRAP PRESENTATION
 
FACTORY VISIT :MARDEC INDUSTRIAL LATEX
FACTORY VISIT :MARDEC INDUSTRIAL LATEXFACTORY VISIT :MARDEC INDUSTRIAL LATEX
FACTORY VISIT :MARDEC INDUSTRIAL LATEX
 
KHRI-Webinar (22-04-2020)-Introduction to Performance Grade Bitumen -Er. T K ...
KHRI-Webinar (22-04-2020)-Introduction to Performance Grade Bitumen -Er. T K ...KHRI-Webinar (22-04-2020)-Introduction to Performance Grade Bitumen -Er. T K ...
KHRI-Webinar (22-04-2020)-Introduction to Performance Grade Bitumen -Er. T K ...
 
Thermoplastic composites for Wind Energy
Thermoplastic composites for Wind EnergyThermoplastic composites for Wind Energy
Thermoplastic composites for Wind Energy
 
TRAC Project Workshop 2 Presentation 2
TRAC Project Workshop 2 Presentation 2TRAC Project Workshop 2 Presentation 2
TRAC Project Workshop 2 Presentation 2
 
Extra heavy oil and bitumen impact of technologies on the recovery factor -...
Extra heavy oil and bitumen   impact of technologies on the recovery factor -...Extra heavy oil and bitumen   impact of technologies on the recovery factor -...
Extra heavy oil and bitumen impact of technologies on the recovery factor -...
 
Ap 4 presentation
Ap 4 presentationAp 4 presentation
Ap 4 presentation
 
ACARP project to industrialise wall-flow DPF technology for diesel engines us...
ACARP project to industrialise wall-flow DPF technology for diesel engines us...ACARP project to industrialise wall-flow DPF technology for diesel engines us...
ACARP project to industrialise wall-flow DPF technology for diesel engines us...
 
Transformer Oil.ppt
Transformer Oil.pptTransformer Oil.ppt
Transformer Oil.ppt
 
Pablo Sanchez & Gabriel Triffiletti.pdf
Pablo Sanchez & Gabriel Triffiletti.pdfPablo Sanchez & Gabriel Triffiletti.pdf
Pablo Sanchez & Gabriel Triffiletti.pdf
 
Plasma Waste Vitrification
Plasma Waste VitrificationPlasma Waste Vitrification
Plasma Waste Vitrification
 

Flow Assurance Wax Study on the Ravn Production System_Approved

  • 1. Flow Assurance Wax Study on the Ravn Field Production System Wood Group Kenny: Hooman Haghighi, Jamie Littler, Fujiang Zhu, Temitope Solanke Wintershall: Leif H. Blidegn, Amir Mofidi
  • 2. 2 - www.woodgroup.com Agenda • Introduction to the risks of wax deposition • Ravn Field Overview • Fluid Tuning • Results of Infield and Export Lines • Conclusions and recommendations
  • 3. Wax deposition risks Wax is long-chain simple hydrocarbons. Can be stable in the solid phase at various temperatures. Wax deposition can cause: • Reduction in flow area • Change in wall friction • Blockage of the pipeline These pictures are from public domain.
  • 4. Wax management Maintain the system temperature above the wax appearance and/or fluid pour point. • Insulation • Displacement with stabilized crude, diesel or condensate • Active heating of the pipeline Physical removal of wax • Periodic scraping of the wax layer via pigging operations. • Heating Chemical treatment Blideng et al. (2011), Running-in a new Platform, 22nd International Oil Field Chemistry Symposium
  • 5. Ravn system schematic Ravn F3-FB Platform 4” Oil Export Line (119 km) 72m 5°C 0.34 m/s - 10°C 54 m/s 66m API° 38.2 Viscosity at 60°F (cP) 24.1 WAT (°C) 27.5 N-Paraffin Content (wt%) 2.625 Pour Point (°C) -51 Fluid Properties Export T = 55°C Ambient Conditions FWHT= 60°C 8” Infield Line (18 km) A6A Platform
  • 6. Wax deposition (MolecularDiffusion) • Molecular Diffusion is the dominant wax deposition mechanism • Radial diffusion of dissolved wax molecules in the oil • Concentration gradient between dissolved wax in the turbulent core and the wax in solution at the pipe wall • Dissolved wax diffuses towards the wall where it precipitates Turbulent Core
  • 7. • There are a few lab techniques available for wax measurements: • Viscosimetry • Cold finger • Differential Scanning Calorimetry (DSC) • Cross Polarization Microscopy • Filter Plugging • Fourier Transform Infrared Spectroscopy (FTIR) Wax Appearance Temperature (WAT): The temperature below which the paraffin's start to precipitate as wax crystals is defined as crude cloud point or WAT. Pour Point: The temperature at which oil sample movement stops is defined as the crude oil pour point. Wax testing These pictures are from public domain.
  • 8. Wax properties Lab Data WAT [oC] 27.5 WDT [oC] 55 Wax Paraffinic content [wt%] NOTE1 2.625 Cold Finger Test Note 1: C17+ Static Cold Finger Set-up • Hayduk Minhas correlation was used to calculate the diffusion Coefficient (9.78E-08 cm2/s) • Wax Inhibitor from lab test was shown to reduce the deposition rate by 40-80% (40% has been assumed as a conservative approach in this study)
  • 9. Viscosity tuning Shear Rate Calculation-Catcher Shear rate= 10 S-1 Temp= 15 C μ= 22 cp ID= 0.1016 m 4" ρ= 834.9702 kg/m3 QLT= 1950 bpd 0.003588 m3/s u= 0.442594 m/s Velocity Re= 1706.661 Re<2300 Laminar Re>4000 Turbulent Laminar τ= 1.0 N/m2 s= 0.045805 S-1 Turbulent s= 34.84989 S-1 Laminar note: use the lab data with shear rate =10 S-1 • A shear-thinning behaviour of the fluid has been observed at low temperature. • The shear rate has been identified to represent the actual flowing condition (for each flow rate) and viscosity has been tuned based on the selected shear rate. 0 10 20 30 40 50 60 70 80 90 100 0 5 10 15 20 25 30 35 40 45 50 DynamicViscositymPa.s[cP] Temperature °C Steady State Dynamic Viscosity Profiles For Ravn Oil 1 s-1 10 s-1 100 s-1 non-Newtonian Behaviour at Low temperature
  • 10. Fluid modelling Effect of pressure & light end component on WAT Note:The dynamic changes in the fluid composition(e.g. Gas Oil Ratio) in the pipeline and the effecton WAT has been consideredin thermo-hydraulicsimulation.Howeverthe model has not taken into account the compositionchange due to wax drop-out(conservative). 0 50 100 150 200 250 0 10 20 30 40 50 60 70 80 90 Pressure[bara] Temperature / Wax Appearance Temperature [oC] Wintershall Ravn Field Fluid Modelling in-Field Line Wax Appearance Temperature (WAT) as a Function of GOR and Pressure Bubble Line (Case 1+GL - GOR = 1900 Scf/bbl) WAT (Case 1+GL - GOR = 1900 Scf/bbl) Bubble Line (Case 2 - GOR = 533 Scf/bbl) WAT (Case 2 - GOR = 533 Scf/bbl) Bubble Line (Case 3+GL - GOR = 986Scf/bbl) WAT (Case 3+GL - GOR = 986 Scf/bbl)
  • 11. Risk of wax deposition (in-fieldline, early life) -20 -10 0 10 20 30 40 50 60 70 0 2 4 6 8 10 12 14 16 18 20 Temperature[C] Length [km] Wintershall Ravan Field Wax Deposition Simulation In-field Line Temperature and Wax Depostion Profiles (Case 1+ GL) Fluid T WAT T Ambient Wintershall Ravn Field
  • 12. Wax deposition thickness (in-field,early life) 0 2 4 6 8 10 12 14 0 2 4 6 8 10 12 14 16 18 20 WaxThickness[mm] Length [km] Wintershall Ravn Field Wax Deposition Simulation In-field Line Wax Depostion Profiles (Case 1+ GL) 30 days 20 days 10 days Risk of Wax Depostion at the Topsides Risk of Wax Depostion at the Subsea
  • 13. 0 1 2 3 4 5 6 7 8 9 10 0 5 10 15 20 25 30 TotalWaxDeposited[m3] Time [days] Wintershall Ravn Field Wax Deposition Simulation In-field Line - No Inhibitor Volume of Wax Deposition Case 1 Case 2 Case 3 Case 4 Total wax deposition (withoutinhibitor) Total growthrate of wax (in-fieldpipeline) is <0.4 m3/d without inhibitor Oil Gas Water [m3 /d] [m3 /d] [m3 /d] [m3 /d] 1 310 29448 0 + GL 2 620 58896 0 0 3 620 58896 0 50000 4 369 39979 52 100000 Case Production Rates Gas Lift
  • 14. 0 1 2 3 4 5 6 7 8 0 5 10 15 20 25 30 TotalWaxDeposited[m3] Time [days] Wintershall Ravn Field Wax Deposition Simulation In-field Line - With Inhibitor Volume of Wax Deposition Case 1 Case 2 Case 3 Case 4 Total wax deposition (withinhibitor) Total growthrate of wax (in-fieldpipeline)is <0.3 m3/d with inhibitor Oil Gas Water [m3 /d] [m3 /d] [m3 /d] [m3 /d] 1 310 29448 0 + GL 2 620 58896 0 0 3 620 58896 0 50000 4 369 39979 52 100000 Case Production Rates Gas Lift
  • 15. Summary of the results (in-fieldline) • WAT is lower at higher pressure for the live fluid • The effect of pressure is more pronounced for the fluids with a higher GOR (i.e. Gas Oil Ratio) • As soon as the fluid reaches ambient temperature, no wax deposition would occur (No heat flux to drive the wax deposition – cold slurry flow). • The first location for wax to deposit depends on the flow rates, GOR, phase fractions, etc. • After 30 days of operation <4mm and <13mm of (max) wax thickness can be expected at seabed and topside conditions respectively without inhibitor. • The recommended frequency of pigging operation is every month (based on maximum 4mm of wax deposition in the system) without inhibitor and every 45 days with inhibitor injection (40% efficiency).
  • 16. Risk of wax deposition (ExportLine) -20 -10 0 10 20 30 40 50 60 0 20 40 60 80 100 120 140 Temperature[C] Distance (km) Wintershall Ravn Field Wax Deposition Simulation - Export Line Temperature Profile and Risk of Wax Deposition Ambient T WAT 1950bpd Fluid T 2500bpd Fluid T 3500bpd Fluid T 4500bpd Fluid T Risk of Wax Depostion at the Subsea Risk of Wax Depostion at the Topsides
  • 17. Wax deposition thickness (Exportline) 0 2 4 6 8 10 12 14 0 20 40 60 80 100 120 140 WaxThickness[mm] Length [km] Wintershall Ravn Field Wax Deposition Simulation Export Line Wax Depostion Profiles (2500 bpd) 5 days 10 days 15 days 20 days 30 days Risk of Wax Depostion at the Topsides Risk of Wax Depostion at the Subsea
  • 18. Pressure drop vs. max wax thickness (ExportLine) 0 5 10 15 20 25 30 35 0 2 4 6 8 10 12 14 PressureDrop[bara] Max Wax Thickness [mm] Wintershall Ravn Field Wax Deposition Simulation Export Line Pressure Drop vs. Max. Deposition Thickness 1950 bpd 2500 bpd 3500 bpd 4500 bpd
  • 19. Self insulation on wax deposition (ExportLine) Results are forthe topsides (i.e.the highest deposition thickness and rates) 0 2 4 6 8 10 12 14 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 0 5 10 15 20 25 30 MaxWaxThickness[mm] MaxDepositionRate[mm/day] Time [days] Wintershall Ravn Field Wax Deposition Simulation In-Field Line Effect of Wax Thickness on Depostion Rates Case 1 - Deposition Rate Case 2 - Deposition Rate Case 3 - Deposition Rate Case 4 - Deposition Rate Case 1 - Max Wax Thickness Case 2 - Max Wax Thickness Case 3 - Max Wax Thickness Case 4 - Max Wax Thickness
  • 20. Summary of the results (Exportline) • Higher flow rate leads to longer section of the export line subject to wax deposition risk. • Lower rate of deposition by time due to the wax self-isolation effect. • The maximum wax thicknesses identified for the 4 cases are comparable, however the total wax deposited is more at higher flow rates. • After 22 days and 31 days of operation <4mm of (max) wax thickness can be expected at seabed condition without and with inhibitor (40% efficiency), respectively. • Pigging of 4” >100 km export line is challenging and is currently under further evaluation. • Alternative wax mitigation strategy like wax dispersant, gas condensates has been considered.
  • 21. Other Flow Assurance challenges • Slugging in the in-field line at the early life and during the start-up and turn-down operations has been observed. The following mitigation methods has been considered: o Increased back pressure (for start-up and turn-down operations) o Gas lift injection (if required) • Liquid handling capacity at the topsides (~27 m3) o High level pigging, start-up and ramp-up philosophies have been developed