SlideShare uma empresa Scribd logo
1 de 3
Baixar para ler offline
PROFESSIONAL SUMMARY
Lane Ransom
1035B Waverly Street
Houston, TX 77008
(832) 561-4689
Lane.Ransom@yahoo.com
SUMMARY OF EXPERIENCE:
Broad range of experience in various phases of prime contract management, subcontract administration, procurement
and material control. Positions have included Home Office, Domestic (field) and International (field) assignments. Roles
have included, but are not limited to: Contract Supervisor, Subcontract Manager, Subcontract Administrator, Materials
Manager, Buyer and Expeditor.
KELLOGG BROWN AND ROOT, LLC - KBR (January 2013 – Present)
KBR Industrial Services and Specialty Field Services Group (Operations: Home Office – Houston, TX)
October 2014 - Present
Contracts Supervisor
 Contract administration for all long term maintenance agreements, various Master Service Agreements, small cap
construction agreements, and all Specialty Field Services agreements in the United States and Canada.
 Redline Client Terms and Conditions, and present to KBR Legal for formal approval
 Successfully negotiate Terms and Conditions directly with Clients; mitigating excessive risk exposure and ensuring
contract terms are in line with corporate policies and procedures
 Work directly with sales and proposal team to craft commercial terms which alleviate downward pressure on overall
cash-flow and allow pricing flexibility through various market conditions
 Administer and coordinate all change order management relating to agreements with our Clients
 Receive and process all Purchase Orders from Clients for all Maintenance and Specialty Field Services agreements
 Develop Contractual Risk Analysis for all proposals ≥ $25,000,000
 Interface directly with project / site management to capture commercial impacts resulting from all technical
clarifications and any field changes
SATORP GMS-1 Project (Energy and Chemicals: International Field Assignment – Jubail, Saudi Arabia)
March 2013 – May 2014
Subcontracts and Procurement Manager
 Developed and issued all project specific subcontracting policies and procedures, including: SATORP GMS-1
Subcontracts and Procurement Plan, Subcontract Administration Procedures, Procedure for Procure to Pay
Process for Goods and Services, Subcontracts Tendering Plan and the SATORP GMS-1 Project Subcontract
Management Approval Matrix and DOA.
 Issued and administered subcontract agreements totaling approximately $8,500,000.00.
 Interfaced daily with client as part of the established project management team.
 Led efforts to successfully meet all Subcontracting deliverables tied to the mobilization requirements of prime
contract (first major milestone deliverable).
 Managed subcontracts team consisting of a Subcontracts Administrator and three (3) Quantity Surveyors.
 Conducted pre-qualifications for local suppliers based on KBR corporate policy and HSE requirements.
 Determined prime contract flow downs and, in conjunction with KBR Legal, developed project specific General
Conditions for all subcontract agreements based on flow down requirements.
 Created subcontract Agreement Terms template to be used as a basis for all Agreements.
 Integral part of developing all of the Scopes of Work for each of the various subcontract Agreements.
 Developed, issued and managed Invitation to Bid packages utilizing the RFx module of KBR Supplier.
 Coordinated and conducted Bid Clarification meetings to ensure continuity and understanding of the inquiry bid
package with all potential bidders.
 Successfully negotiated Terms and Conditions directly with vendors; and facilitated negotiations between KBR
Legal Department and vendors, mitigating excessive risk exposure and ensuring contract terms are in line with
project prime contract flow downs
 Conducted full commercial evaluations for proposals; including generating full Recommendation for Award’s and
commercial bid tabs.
 Orchestrated Kick-Off Meetings with selected vendors in order to achieve full alignment with requirements of the
Agreement and project deliverables.
 Issued all Agreements in SAP and Contract Management System (CMS).
 Responsible for approving subcontractor invoices in full compliance with the established Procure-to-Pay Process.
 Created and maintained all project subcontracting logs and schedules.
Special Projects Group (Operations: Home Office Assignment – Houston, TX)
January 2013 – March 2013 and May 2014 – October 2014
Sr. Subcontracts Administrator
 Executed subcontracts for various O&M Services, Consulting Agreements, Work Releases, and Proposal Support
Services
 Developed and issued Subcontract Execution Plans
 Created Man Hour Estimate for Subcontract Administration support on various projects
 Developed Executive Bid Summaries and Bid Tabs necessary complete the Recommendation to Award (RTA)
 Led subcontractor kick-off and alignment meetings
 Actively participated in client / project alignment meetings
 Interfaced directly with engineering to capture commercial impacts resulting from all technical clarifications
 Successfully negotiated Terms and Conditions directly with vendors.
 Pre-qualified vendors and developed Master Bid Lists for all potential subcontracted services during proposal
support.
 Facilitated negotiations for an exclusivity agreements with construction and uranium technology subcontractors
 Issued, received and distributed Request for Proposals
 Created and tracked bid packages in KBR Supplier
FLUOR CORPORATION (September 2008 – December 2012)
Sadara Project (Energy & Chemicals: Home Office Assignment – Houston, TX)
November 2011 – December 2012
Buyer
 Purchase mechanical engineered equipment and control systems items
 Execute successful negotiation strategies which have resulted in an estimated savings of $747,907.43, or roughly
8.63% off of all orders placed as of 24-Oct-12
 Successfully negotiate Terms and Conditions directly with vendors, as well as facilitate negotiations between
Legal Department and vendors, mitigating excessive risk exposure and ensuring Purchase Order Terms are in
line with project prime contract flow downs
 Interface directly with engineering to capture commercial impacts resulting from all technical clarifications
 Facilitate vendor kickoff meetings, clarification meetings, conference calls, and alignment meetings
 Work in conjunction with Accounts Payable to ensure timely payment of correctly rendered invoices
 Expedite vendor data to ensure timely completion of Technical and Commercial recommendations
 Act as conduit between vendors and engineering for Request for Information (RFI) and Technical
Clarification Records (TCR)
 Develop Executive Bid Summaries and Bid Tabs necessary complete the Recommendation to Award (RTA)
which allows Fluor to gain client approval to issue a Purchase Order using a selected vendor
LOGCAP IV: Task Order 005 (Government Group: International Field Assignment, Afghanistan)
July 2010 – October 2011
FOB Bagram Materials and Property Manager; Theater Construction and LHS Materials Manager
 Managed 213 employees (BOE approved for 280 total positions)
 Oversaw Bagram D01 warehouse operations as well as eleven (11) additional satellite warehouses set
up throughout FOB Bagram at designated trades areas and offices
 Maintained 34,949 lines of inventory totaling $80,177,264.36 (data accurate as of COB 10Sep11)
 Responsible for processing and monitoring all material requisitions for new construction projects.
 Managed CJOA yard, which acted as the material distribution center for all new construction projects throughout
theater
 Assisted in initiating new policy for faster delivery of materials for construction projects by enabling any material
procured for the O&M trades that was at or above 30% higher than their approved authorized stock level, or
identified as a non-stock item, to be cross-leveled from any FOB in theater
 Trained warehouse personnel on barcode scanners to enable more efficient inventory processing by eliminating
the need for another employee to have to manually upload new data into the system
 Implemented the first satellite focused distribution work practice in theater. By dedicating a person to interface
directly with each trade and directly manage their material, we cut down on unnecessary purchases, reduced
traffic at main Bagram warehouse, ensured key material was reordered before stock run outs, and increased the
general timeliness in which material requests were processed and issued out to our end users
 Collaborated with Upper Management, Field Personnel and the Government Property Administrator (GPA) to
implement and improve policies and procedures to adequately manage all Government Property present on the
contract
 Led team to scoring a perfect 100% rating on the PMSA audit conducted by DCMA
 First RDC in theater to implement and effectively execute barcode scanning technology which increased
productivity up to 4x normal output
 Received Certificate of Recognition for Superior Performance twice from Country / Project Manager for our efforts
and the tremendous outcome of the PMSA audits
 Recognized as a Good News Story for all of theater. Shortly after FOB Shkin Lilley was destroyed in a Taliban led
rocket attack, our team was able to issue out 108 of the 150 required items to get the FOB back up and running
within three hours of the distress call. We pushed out all 49,000lbs of material the same night. The next day we
also provided additional boots on the ground to help facilitate the quickest re-build of the FOB as possible, and
continue to provide service to the United States Army, Navy, Air Force, and Marines
TOTAL: Deep Conversion Project (Energy & Chemicals: Field Assignment - Port Arthur, TX)
June 2009 – July 2010
Warehousing
 Formally received material from packing slip into Matman® through the Warehouse Module
 Created Overage, Shortage, & Damage Report’s (OSD) in Matman® to track any material discrepancies that
were found during the receiving process
 Generated Material Shipping Records (MSR) and coordinated with Construction and Logistics to ship any material
out from the field to various locations for rework, resale, scrap, etc
 Created purchase requisitions for detailed spare parts orders for process equipment as well as non-permanent
plant material
 Led the Purchase Order close out initiative from the field
 Sent weekly Equipment inventory reports to client Logistics Coordinator and Quantity Surveyor
 Executed Transfer’s of Material (TOM) to transfer ownership of spare parts over to the client for startup and
commissioning
 Interfaced daily with both client and subcontractors to research and solve any material concerns
 Spurred, and actively participated in, an initiative to implement a more efficient work practice for direct shipping
pipe spools from the fabricator to construction. Effort netted large savings by decreasing wasted man and
equipment hours, and lowering the projects inventory control costs
EDUCATION:
Texas A&M University Graduated August 2008
B.S. Economics: International Trade and Policy
College Station, TX
Clemson University Graduation August 2017
M.Engr. Industrial Engineering
Clemson, SC
REFERENCES:
Dewey Brinkley – Fluor Senior Manager, Materials Management; Alvin.Brinkley@fluor.com; (713) 514-3634
Michael Cowser – Jacobs Manager of Contract Management; Michael.Cowser@jacobs.com; (832) 351-6236
Mark Cotharn – Fluor Government Group, Logistics Manager; Mark.Cotharn@fluor.com; (281) 951-4150

Mais conteúdo relacionado

Mais procurados

PP1Tutorial 5 Presentation
PP1Tutorial 5 Presentation PP1Tutorial 5 Presentation
PP1Tutorial 5 Presentation Jaey Chai
 
CV_ S Arunkumar -Procurement And Sub Contract
CV_ S  Arunkumar -Procurement And Sub ContractCV_ S  Arunkumar -Procurement And Sub Contract
CV_ S Arunkumar -Procurement And Sub ContractArunkumar Shirawalmath
 
ARLIE LLUNAR-Projects Presentations
ARLIE LLUNAR-Projects PresentationsARLIE LLUNAR-Projects Presentations
ARLIE LLUNAR-Projects PresentationsArlie Llunar
 
ICI Project 2 - Building and process & sample document
ICI Project 2 - Building and process & sample documentICI Project 2 - Building and process & sample document
ICI Project 2 - Building and process & sample documentHaziq1511
 
Army Contracting Command’s FY14 Major Accomplishments
Army Contracting Command’s FY14 Major AccomplishmentsArmy Contracting Command’s FY14 Major Accomplishments
Army Contracting Command’s FY14 Major AccomplishmentsU.S. Army Contracting Command
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationHarish Mahavar
 
Michael Keiths Professional Portfolio
Michael Keiths Professional PortfolioMichael Keiths Professional Portfolio
Michael Keiths Professional Portfoliobbascm
 

Mais procurados (11)

PP1Tutorial 5 Presentation
PP1Tutorial 5 Presentation PP1Tutorial 5 Presentation
PP1Tutorial 5 Presentation
 
CV_ S Arunkumar -Procurement And Sub Contract
CV_ S  Arunkumar -Procurement And Sub ContractCV_ S  Arunkumar -Procurement And Sub Contract
CV_ S Arunkumar -Procurement And Sub Contract
 
Van herrera cv
Van herrera   cvVan herrera   cv
Van herrera cv
 
ARLIE LLUNAR-Projects Presentations
ARLIE LLUNAR-Projects PresentationsARLIE LLUNAR-Projects Presentations
ARLIE LLUNAR-Projects Presentations
 
ICI Project 2 - Building and process & sample document
ICI Project 2 - Building and process & sample documentICI Project 2 - Building and process & sample document
ICI Project 2 - Building and process & sample document
 
Army Contracting Command’s FY14 Major Accomplishments
Army Contracting Command’s FY14 Major AccomplishmentsArmy Contracting Command’s FY14 Major Accomplishments
Army Contracting Command’s FY14 Major Accomplishments
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 
CV of Faheem _ PMO)
CV of Faheem _ PMO)CV of Faheem _ PMO)
CV of Faheem _ PMO)
 
JMC Resume V13
JMC Resume V13JMC Resume V13
JMC Resume V13
 
Boq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping stationBoq of khadeja storage tank, well, and booster pumping station
Boq of khadeja storage tank, well, and booster pumping station
 
Michael Keiths Professional Portfolio
Michael Keiths Professional PortfolioMichael Keiths Professional Portfolio
Michael Keiths Professional Portfolio
 

Semelhante a Lane Ransom - 20150716 Resume

Craig Oldaker Contracts Experience 6-3-2015
Craig Oldaker Contracts Experience 6-3-2015Craig Oldaker Contracts Experience 6-3-2015
Craig Oldaker Contracts Experience 6-3-2015Craig Oldaker
 
Melissa Doty Resume-2016 Rev 1
Melissa Doty Resume-2016 Rev 1Melissa Doty Resume-2016 Rev 1
Melissa Doty Resume-2016 Rev 1Melissa Doty
 
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERRESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERShafeek Nazar
 
CV_ S Arunkumar -Procurement And Sub Contract
CV_ S  Arunkumar -Procurement And Sub ContractCV_ S  Arunkumar -Procurement And Sub Contract
CV_ S Arunkumar -Procurement And Sub ContractArunkumar Shirawalmath
 
Resume Slideshow
Resume SlideshowResume Slideshow
Resume Slideshowjjbeck45
 
Josh Higgins Resume
Josh Higgins ResumeJosh Higgins Resume
Josh Higgins ResumeJosh Higgins
 
Cost Estimator and Consultant
Cost Estimator and ConsultantCost Estimator and Consultant
Cost Estimator and ConsultantRalph Abagis
 
ProTech training presentation
ProTech training presentationProTech training presentation
ProTech training presentationGiselle Duran
 
Steve's Resume 10-1-15 (2)
Steve's Resume 10-1-15 (2)Steve's Resume 10-1-15 (2)
Steve's Resume 10-1-15 (2)Steve Moran
 
Running head ACQUISITION STRATEGY PIEZOELECTRIC EMBEDDED TRA.docx
Running head  ACQUISITION STRATEGY  PIEZOELECTRIC EMBEDDED TRA.docxRunning head  ACQUISITION STRATEGY  PIEZOELECTRIC EMBEDDED TRA.docx
Running head ACQUISITION STRATEGY PIEZOELECTRIC EMBEDDED TRA.docxSUBHI7
 
Current Resume 1-18-16
Current Resume 1-18-16Current Resume 1-18-16
Current Resume 1-18-16Marvin Jacks
 
RobynFrank resume
RobynFrank resumeRobynFrank resume
RobynFrank resumeRobyn Frank
 

Semelhante a Lane Ransom - 20150716 Resume (20)

Craig Oldaker Contracts Experience 6-3-2015
Craig Oldaker Contracts Experience 6-3-2015Craig Oldaker Contracts Experience 6-3-2015
Craig Oldaker Contracts Experience 6-3-2015
 
Melissa Doty Resume-2016 Rev 1
Melissa Doty Resume-2016 Rev 1Melissa Doty Resume-2016 Rev 1
Melissa Doty Resume-2016 Rev 1
 
Arunkumar_Proc & Contr_25.12.2014
Arunkumar_Proc & Contr_25.12.2014Arunkumar_Proc & Contr_25.12.2014
Arunkumar_Proc & Contr_25.12.2014
 
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERRESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
 
Mohan Jha
Mohan JhaMohan Jha
Mohan Jha
 
Moph 7 5-13 (sa path)
Moph   7 5-13 (sa path)Moph   7 5-13 (sa path)
Moph 7 5-13 (sa path)
 
Moph 7 5-13 (sa path)
Moph   7 5-13 (sa path)Moph   7 5-13 (sa path)
Moph 7 5-13 (sa path)
 
CV_ S Arunkumar -Procurement And Sub Contract
CV_ S  Arunkumar -Procurement And Sub ContractCV_ S  Arunkumar -Procurement And Sub Contract
CV_ S Arunkumar -Procurement And Sub Contract
 
infyy.pptx
infyy.pptxinfyy.pptx
infyy.pptx
 
Resume Slideshow
Resume SlideshowResume Slideshow
Resume Slideshow
 
Josh Higgins Resume
Josh Higgins ResumeJosh Higgins Resume
Josh Higgins Resume
 
Ray Richards CV Resume Federal
Ray Richards CV Resume FederalRay Richards CV Resume Federal
Ray Richards CV Resume Federal
 
Cost Estimator and Consultant
Cost Estimator and ConsultantCost Estimator and Consultant
Cost Estimator and Consultant
 
ProTech training presentation
ProTech training presentationProTech training presentation
ProTech training presentation
 
Resume
ResumeResume
Resume
 
Steve's Resume 10-1-15 (2)
Steve's Resume 10-1-15 (2)Steve's Resume 10-1-15 (2)
Steve's Resume 10-1-15 (2)
 
Terrence Allison Resume 1
Terrence Allison Resume 1Terrence Allison Resume 1
Terrence Allison Resume 1
 
Running head ACQUISITION STRATEGY PIEZOELECTRIC EMBEDDED TRA.docx
Running head  ACQUISITION STRATEGY  PIEZOELECTRIC EMBEDDED TRA.docxRunning head  ACQUISITION STRATEGY  PIEZOELECTRIC EMBEDDED TRA.docx
Running head ACQUISITION STRATEGY PIEZOELECTRIC EMBEDDED TRA.docx
 
Current Resume 1-18-16
Current Resume 1-18-16Current Resume 1-18-16
Current Resume 1-18-16
 
RobynFrank resume
RobynFrank resumeRobynFrank resume
RobynFrank resume
 

Lane Ransom - 20150716 Resume

  • 1. PROFESSIONAL SUMMARY Lane Ransom 1035B Waverly Street Houston, TX 77008 (832) 561-4689 Lane.Ransom@yahoo.com SUMMARY OF EXPERIENCE: Broad range of experience in various phases of prime contract management, subcontract administration, procurement and material control. Positions have included Home Office, Domestic (field) and International (field) assignments. Roles have included, but are not limited to: Contract Supervisor, Subcontract Manager, Subcontract Administrator, Materials Manager, Buyer and Expeditor. KELLOGG BROWN AND ROOT, LLC - KBR (January 2013 – Present) KBR Industrial Services and Specialty Field Services Group (Operations: Home Office – Houston, TX) October 2014 - Present Contracts Supervisor  Contract administration for all long term maintenance agreements, various Master Service Agreements, small cap construction agreements, and all Specialty Field Services agreements in the United States and Canada.  Redline Client Terms and Conditions, and present to KBR Legal for formal approval  Successfully negotiate Terms and Conditions directly with Clients; mitigating excessive risk exposure and ensuring contract terms are in line with corporate policies and procedures  Work directly with sales and proposal team to craft commercial terms which alleviate downward pressure on overall cash-flow and allow pricing flexibility through various market conditions  Administer and coordinate all change order management relating to agreements with our Clients  Receive and process all Purchase Orders from Clients for all Maintenance and Specialty Field Services agreements  Develop Contractual Risk Analysis for all proposals ≥ $25,000,000  Interface directly with project / site management to capture commercial impacts resulting from all technical clarifications and any field changes SATORP GMS-1 Project (Energy and Chemicals: International Field Assignment – Jubail, Saudi Arabia) March 2013 – May 2014 Subcontracts and Procurement Manager  Developed and issued all project specific subcontracting policies and procedures, including: SATORP GMS-1 Subcontracts and Procurement Plan, Subcontract Administration Procedures, Procedure for Procure to Pay Process for Goods and Services, Subcontracts Tendering Plan and the SATORP GMS-1 Project Subcontract Management Approval Matrix and DOA.  Issued and administered subcontract agreements totaling approximately $8,500,000.00.  Interfaced daily with client as part of the established project management team.  Led efforts to successfully meet all Subcontracting deliverables tied to the mobilization requirements of prime contract (first major milestone deliverable).  Managed subcontracts team consisting of a Subcontracts Administrator and three (3) Quantity Surveyors.  Conducted pre-qualifications for local suppliers based on KBR corporate policy and HSE requirements.  Determined prime contract flow downs and, in conjunction with KBR Legal, developed project specific General Conditions for all subcontract agreements based on flow down requirements.  Created subcontract Agreement Terms template to be used as a basis for all Agreements.  Integral part of developing all of the Scopes of Work for each of the various subcontract Agreements.  Developed, issued and managed Invitation to Bid packages utilizing the RFx module of KBR Supplier.  Coordinated and conducted Bid Clarification meetings to ensure continuity and understanding of the inquiry bid package with all potential bidders.  Successfully negotiated Terms and Conditions directly with vendors; and facilitated negotiations between KBR Legal Department and vendors, mitigating excessive risk exposure and ensuring contract terms are in line with project prime contract flow downs  Conducted full commercial evaluations for proposals; including generating full Recommendation for Award’s and commercial bid tabs.  Orchestrated Kick-Off Meetings with selected vendors in order to achieve full alignment with requirements of the
  • 2. Agreement and project deliverables.  Issued all Agreements in SAP and Contract Management System (CMS).  Responsible for approving subcontractor invoices in full compliance with the established Procure-to-Pay Process.  Created and maintained all project subcontracting logs and schedules. Special Projects Group (Operations: Home Office Assignment – Houston, TX) January 2013 – March 2013 and May 2014 – October 2014 Sr. Subcontracts Administrator  Executed subcontracts for various O&M Services, Consulting Agreements, Work Releases, and Proposal Support Services  Developed and issued Subcontract Execution Plans  Created Man Hour Estimate for Subcontract Administration support on various projects  Developed Executive Bid Summaries and Bid Tabs necessary complete the Recommendation to Award (RTA)  Led subcontractor kick-off and alignment meetings  Actively participated in client / project alignment meetings  Interfaced directly with engineering to capture commercial impacts resulting from all technical clarifications  Successfully negotiated Terms and Conditions directly with vendors.  Pre-qualified vendors and developed Master Bid Lists for all potential subcontracted services during proposal support.  Facilitated negotiations for an exclusivity agreements with construction and uranium technology subcontractors  Issued, received and distributed Request for Proposals  Created and tracked bid packages in KBR Supplier FLUOR CORPORATION (September 2008 – December 2012) Sadara Project (Energy & Chemicals: Home Office Assignment – Houston, TX) November 2011 – December 2012 Buyer  Purchase mechanical engineered equipment and control systems items  Execute successful negotiation strategies which have resulted in an estimated savings of $747,907.43, or roughly 8.63% off of all orders placed as of 24-Oct-12  Successfully negotiate Terms and Conditions directly with vendors, as well as facilitate negotiations between Legal Department and vendors, mitigating excessive risk exposure and ensuring Purchase Order Terms are in line with project prime contract flow downs  Interface directly with engineering to capture commercial impacts resulting from all technical clarifications  Facilitate vendor kickoff meetings, clarification meetings, conference calls, and alignment meetings  Work in conjunction with Accounts Payable to ensure timely payment of correctly rendered invoices  Expedite vendor data to ensure timely completion of Technical and Commercial recommendations  Act as conduit between vendors and engineering for Request for Information (RFI) and Technical Clarification Records (TCR)  Develop Executive Bid Summaries and Bid Tabs necessary complete the Recommendation to Award (RTA) which allows Fluor to gain client approval to issue a Purchase Order using a selected vendor LOGCAP IV: Task Order 005 (Government Group: International Field Assignment, Afghanistan) July 2010 – October 2011 FOB Bagram Materials and Property Manager; Theater Construction and LHS Materials Manager  Managed 213 employees (BOE approved for 280 total positions)  Oversaw Bagram D01 warehouse operations as well as eleven (11) additional satellite warehouses set up throughout FOB Bagram at designated trades areas and offices  Maintained 34,949 lines of inventory totaling $80,177,264.36 (data accurate as of COB 10Sep11)  Responsible for processing and monitoring all material requisitions for new construction projects.  Managed CJOA yard, which acted as the material distribution center for all new construction projects throughout theater  Assisted in initiating new policy for faster delivery of materials for construction projects by enabling any material procured for the O&M trades that was at or above 30% higher than their approved authorized stock level, or identified as a non-stock item, to be cross-leveled from any FOB in theater
  • 3.  Trained warehouse personnel on barcode scanners to enable more efficient inventory processing by eliminating the need for another employee to have to manually upload new data into the system  Implemented the first satellite focused distribution work practice in theater. By dedicating a person to interface directly with each trade and directly manage their material, we cut down on unnecessary purchases, reduced traffic at main Bagram warehouse, ensured key material was reordered before stock run outs, and increased the general timeliness in which material requests were processed and issued out to our end users  Collaborated with Upper Management, Field Personnel and the Government Property Administrator (GPA) to implement and improve policies and procedures to adequately manage all Government Property present on the contract  Led team to scoring a perfect 100% rating on the PMSA audit conducted by DCMA  First RDC in theater to implement and effectively execute barcode scanning technology which increased productivity up to 4x normal output  Received Certificate of Recognition for Superior Performance twice from Country / Project Manager for our efforts and the tremendous outcome of the PMSA audits  Recognized as a Good News Story for all of theater. Shortly after FOB Shkin Lilley was destroyed in a Taliban led rocket attack, our team was able to issue out 108 of the 150 required items to get the FOB back up and running within three hours of the distress call. We pushed out all 49,000lbs of material the same night. The next day we also provided additional boots on the ground to help facilitate the quickest re-build of the FOB as possible, and continue to provide service to the United States Army, Navy, Air Force, and Marines TOTAL: Deep Conversion Project (Energy & Chemicals: Field Assignment - Port Arthur, TX) June 2009 – July 2010 Warehousing  Formally received material from packing slip into Matman® through the Warehouse Module  Created Overage, Shortage, & Damage Report’s (OSD) in Matman® to track any material discrepancies that were found during the receiving process  Generated Material Shipping Records (MSR) and coordinated with Construction and Logistics to ship any material out from the field to various locations for rework, resale, scrap, etc  Created purchase requisitions for detailed spare parts orders for process equipment as well as non-permanent plant material  Led the Purchase Order close out initiative from the field  Sent weekly Equipment inventory reports to client Logistics Coordinator and Quantity Surveyor  Executed Transfer’s of Material (TOM) to transfer ownership of spare parts over to the client for startup and commissioning  Interfaced daily with both client and subcontractors to research and solve any material concerns  Spurred, and actively participated in, an initiative to implement a more efficient work practice for direct shipping pipe spools from the fabricator to construction. Effort netted large savings by decreasing wasted man and equipment hours, and lowering the projects inventory control costs EDUCATION: Texas A&M University Graduated August 2008 B.S. Economics: International Trade and Policy College Station, TX Clemson University Graduation August 2017 M.Engr. Industrial Engineering Clemson, SC REFERENCES: Dewey Brinkley – Fluor Senior Manager, Materials Management; Alvin.Brinkley@fluor.com; (713) 514-3634 Michael Cowser – Jacobs Manager of Contract Management; Michael.Cowser@jacobs.com; (832) 351-6236 Mark Cotharn – Fluor Government Group, Logistics Manager; Mark.Cotharn@fluor.com; (281) 951-4150