SlideShare uma empresa Scribd logo
1 de 12
Baixar para ler offline
Working together
for a safer world
Methods for evaluating risk caused by ice
throw from wind turbines
Helge Ausland Refsum, Lloyd's Register Consulting
Rolv Erlend Bredesen, Kjeller Vindteknikk
Winterwind 2015, Piteå, Sweden
©Lloyd’s Register Consulting
Ice – a significant safety risk
• Falling ice fatality potential
• 40-60 J: Serious injuries to forehead
• >80 J: Serious injury to body
• Impact energy depends on ice density, mass
and velocity. Impact of 40 J corresponds to
• 200 g of ice falling from 30-50 m
• 500 g of ice falling from 5-6 m
• Special competence is needed to understand
ice build up and shedding
• Damage potential depends on surroundings
Source: TNO Greenbook, CPR 16E, TNO ,1992
Example of accumulated ice at Tryvann communication mast, Oslo, 2014.
©Lloyd’s Register Consulting
Current standard for safety distances is too simple
• Commonly used safety distance rule for icefall
from an operational wind turbine
Safety distance = 1,5 * (H+D)
where
H = hub height of wind turbine
D = rotor diameter
• Our simulations and observations have shown
that the actual safety distance may be both
longer and shorter
Source: IEA Wind 2012, Kjeller Vindteknikk
Ice chunk of around 1 kg, observed at Norwegian wind farm.
©Lloyd’s Register Consulting
Precise mapping of ice risk – site specific approach
Metrological
study
• Probability of ice in
construction
• Estimated size and
weight distribution of
falling ice
Risk
assessment
• Site risk for
personnel operating
the facility and third
parties
• Individual risk for
different exposures,
e.g. pedestrians and
vehicle passengers
Acceptance
criteria
• Proposed criteria for
different safety zones
• Based on Norwegian
Directorate for Civil
Protection (DSB)
guidelines
• Final, site specific
criteria determined by
installation owner
(or by law where
applicable)
Risk reducing
measures
• Recommendations
for risk reducing
measures
• Meteorological
forecasting of ice
throw probability
©Lloyd’s Register Consulting
Probability distribution of falling ice used to map risk of fatality
Falling ice
• Calculated
distribution of falling
ice per square meter
• Estimated energy per
ice cube
Protection
• Tunnels etc. may
provide 100%
protection
• Car: 10% risk of ice
hitting wind screen,
140 J required to
penetrate windscreen
Fatality criteria
• 10% risk of person
being hit (covers area
of ~20cm x 50cm)
per square meter
• Potentially fatal if
energy > 40 J
Risk of fatality
• Map of annual
probability for loss of
life (PLL) due to
falling ice from facility
©Lloyd’s Register Consulting
Suggested acceptance criteria for third person
• Key principle: Facility should not
increase risk to public significantly
compared to daily risk in society
• Acceptance criteria are given as
annual probability for loss of life
(PLL) caused by the facility
• Exposure time is factored into the
acceptance criteria
• Based on Norwegian Directorate for
Civil Protection (DSB) guidelines
• Higher risk may be accepted for
personnel operating the facility, given
sufficient knowledge and routines to
handle the risk
Outside outer zone:
Schools,
kindergartens,
shopping malls,
hospitals, etc.
Facility
Inner zone:
Ski tracks,
hiking areas
Middle zone:
Public roads,
industrial sites,
scattered
houses
Outer zone:
Houses,
cafés, shops,
etc
10-5
10-6
10-7
10-4
©Lloyd’s Register Consulting
Risk reducing measures
• Ice fall risk is typically concentrated to a few, short
periods per year
• Meteorological forecasting
• Ice sensors
• Risk reducing measures for third party
 Clearly visible warning signs
 Fencing around area, locked gates
 Limit public activities
 Re-routing of footpath, ski tracks etc.
• Risk reducing measures for operating personnel
 Protective grids, roofs or tunnels
 Personal protective equipment (PPE)
Warning system at Tryvann communication mast, Oslo, 2015.
©Lloyd’s Register Consulting
Benefits from our approach
Planning
• Ensure safety by design
• Optimize installation footprint
Consent
• Increased certainty and understanding of risk level
• Solid documentation of the impact on the surroundings
Operation
• Ensure a safe working environment
• Minimize negative effects on third parties
Project
developers
Installation
owners
Operators
©Lloyd’s Register Consulting
Explore our services
• Risk assessments and consequence modelling
• Recommended safety zones
• Recommendations of risk reducing measures
• Meteorological simulations
• Ice forecasting and warning systems
• Human factors and safe behaviour studies
http://www.lr.org/consulting
www.vindteknikk.no
©Lloyd’s Register Consulting
References
1. Bredesen, R.E., Harstveit, K., Refsum, H.: IceRisk: "Assessment of risks associated with ice throw and
ice fall.", Winterwind 2014.
2. Bredesen, R.E.: Antennemast Tryvann, Oslo kommune – IceRisk - Beregninger av isnedfall med
validering. KVT Report, KVT/KH/2013/R079, Revisjon 15.5.2014, Kjeller Vindteknikk, 2014.
3. Refsum, H.A.: "Risikoanalyse – Antennemast Tryvann – Vurdering av risiko tilknyttet isnedfall",
104282/R1a, Lloyd's Register Consulting, 2014.
4. Bredesen, R.E. og Harstveit, K.: "Raskiftet, kommunene Åmot og Trysil, Hedmark – Konsekvenser av
atmosfærisk ising på ferdsel", KVT/REB/2013/R047, Kjeller Vindteknikk AS, 2013.
5. Refsum, H.A.: "Risikoanalyse – Iskast fra Raskiftet vindkraftverk",
104046/R1, Scandpower AS, 2013.
6. DSB Temaveileder ”Sikkerheten rundt anlegg som håndterer brannfarlige, reaksjonsfarlige, trykksatte
og eksplosjonsfarlige stoffer: Kriterier for akseptabel risiko”, Mai 2013.
7. Bredesen, R.E.: Antennemast Tryvann, Oslo kommune – IceRisk - Beregninger av isnedfall på bilvei.
KVT Report, KVT/REB/2014/R071, Kjeller Vindteknikk, 2014
8. Kjørri, M.: "Vurdering av risiko for bilister på Tryvannsveien i forbindelse med isnedfall fra antennemast
Tryvann", 105226/R1, Lloyd's Register Consulting, 2014.
©Lloyd’s Register Consulting
Recent example of results from Norwegian wind farm
Lloyd’s Register and variants of it are trading names of Lloyd’s Register Group Limited, its subsidiaries and affiliates.
Copyright © Lloyd’s Register Consulting. 2014. A member of the Lloyd’s Register group.
Working together
for a safer world
Helge Ausland Refsum
Principal Consultant
Norway / Kjeller
T +47 95 04 90 85
E helge.refsum@lr.org
Lloyd’s Register Consulting
http://www.lr.org/consulting
Rolv Erlend Bredesen
Advisor
Norway / Kjeller
T + 47 90 12 97 89
E rolv.bredesen@vindteknikk.no
Kjeller Vindteknikk AS
www.vindteknikk.no

Mais conteúdo relacionado

Mais procurados

SAP_EHSM_at_Tata_Steel_Europe_SAP_International_Conference_2016
SAP_EHSM_at_Tata_Steel_Europe_SAP_International_Conference_2016SAP_EHSM_at_Tata_Steel_Europe_SAP_International_Conference_2016
SAP_EHSM_at_Tata_Steel_Europe_SAP_International_Conference_2016
Roy Derks
 

Mais procurados (9)

DSD-INT 2019 The Incident Management Forecasting System (IMFS) for England - ...
DSD-INT 2019 The Incident Management Forecasting System (IMFS) for England - ...DSD-INT 2019 The Incident Management Forecasting System (IMFS) for England - ...
DSD-INT 2019 The Incident Management Forecasting System (IMFS) for England - ...
 
SMS Records & Workflow Foundation
SMS Records & Workflow FoundationSMS Records & Workflow Foundation
SMS Records & Workflow Foundation
 
DSD-INT 2019 Flood forecasting in an Alpine region - Haberl
DSD-INT 2019 Flood forecasting in an Alpine region - HaberlDSD-INT 2019 Flood forecasting in an Alpine region - Haberl
DSD-INT 2019 Flood forecasting in an Alpine region - Haberl
 
Future of manufacturing + engineering summit uvs5
Future of manufacturing + engineering summit   uvs5Future of manufacturing + engineering summit   uvs5
Future of manufacturing + engineering summit uvs5
 
Trends in Blade Technology and Changing R&D Needs Panel
Trends in Blade Technology and Changing R&D Needs PanelTrends in Blade Technology and Changing R&D Needs Panel
Trends in Blade Technology and Changing R&D Needs Panel
 
SAP_EHSM_at_Tata_Steel_Europe_SAP_International_Conference_2016
SAP_EHSM_at_Tata_Steel_Europe_SAP_International_Conference_2016SAP_EHSM_at_Tata_Steel_Europe_SAP_International_Conference_2016
SAP_EHSM_at_Tata_Steel_Europe_SAP_International_Conference_2016
 
IRENA - Marine Energy Technologies
IRENA - Marine Energy TechnologiesIRENA - Marine Energy Technologies
IRENA - Marine Energy Technologies
 
70045 wind farms in cold climates (print) (2)
70045 wind farms in cold climates (print) (2)70045 wind farms in cold climates (print) (2)
70045 wind farms in cold climates (print) (2)
 
Derek Berry - IACMI/Wind Technology Area
Derek Berry - IACMI/Wind Technology AreaDerek Berry - IACMI/Wind Technology Area
Derek Berry - IACMI/Wind Technology Area
 

Destaque

Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy
 

Destaque (18)

SERS case study - Tanker oil spill
SERS case study - Tanker oil spillSERS case study - Tanker oil spill
SERS case study - Tanker oil spill
 
SERS case study - Container ship collision/oil spill
SERS case study - Container ship collision/oil spillSERS case study - Container ship collision/oil spill
SERS case study - Container ship collision/oil spill
 
SERS case study - Passenger ship stability loss
SERS case study - Passenger ship stability lossSERS case study - Passenger ship stability loss
SERS case study - Passenger ship stability loss
 
SERS case study - LPG carrier grounding
SERS case study - LPG carrier groundingSERS case study - LPG carrier grounding
SERS case study - LPG carrier grounding
 
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
REGLAMENTO DE PRODUCTOS DE LA CONSTRUCCIÓN Nº305/2011
 
Nova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminarioNova directiva de equipamentos sob pressão 2014 68-ue-seminario
Nova directiva de equipamentos sob pressão 2014 68-ue-seminario
 
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
Lloyd's Register Energy: Cumplimiento del marcado ce para estructuras de acer...
 
LR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbraLR en 1090 energy-presentation_cmm_coimbra
LR en 1090 energy-presentation_cmm_coimbra
 
Embed RBI in your EAM
Embed RBI in your EAMEmbed RBI in your EAM
Embed RBI in your EAM
 
What's new in IP 4.4
What's new in IP 4.4What's new in IP 4.4
What's new in IP 4.4
 
SERS case study - Bulk carrier grounding
SERS case study - Bulk carrier groundingSERS case study - Bulk carrier grounding
SERS case study - Bulk carrier grounding
 
Lloyd's Register Ship emergency response service - USCG requirements for NTV
Lloyd's Register Ship emergency response service - USCG requirements for NTVLloyd's Register Ship emergency response service - USCG requirements for NTV
Lloyd's Register Ship emergency response service - USCG requirements for NTV
 
Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...Certification of Laser Powder Additive Manufactured Components for Industrial...
Certification of Laser Powder Additive Manufactured Components for Industrial...
 
Whats new in IC 2016?
Whats new in IC 2016?Whats new in IC 2016?
Whats new in IC 2016?
 
De-icing on Wind Mill Generators
De-icing on Wind Mill GeneratorsDe-icing on Wind Mill Generators
De-icing on Wind Mill Generators
 
Overview: Rig inspection training
Overview: Rig inspection training Overview: Rig inspection training
Overview: Rig inspection training
 
Rig Inspection Training overview
Rig Inspection Training overviewRig Inspection Training overview
Rig Inspection Training overview
 
"IADC Accredited Rig Inspection Workshop"
"IADC Accredited Rig Inspection Workshop""IADC Accredited Rig Inspection Workshop"
"IADC Accredited Rig Inspection Workshop"
 

Semelhante a Methods for evaluating risk caused by ice throw

Semelhante a Methods for evaluating risk caused by ice throw (20)

Local Highways and Climate Change Event 9th july 2013
Local Highways and Climate Change Event 9th july 2013Local Highways and Climate Change Event 9th july 2013
Local Highways and Climate Change Event 9th july 2013
 
CV Sigve Hamilton Aspelund 092014
CV Sigve Hamilton Aspelund 092014 CV Sigve Hamilton Aspelund 092014
CV Sigve Hamilton Aspelund 092014
 
Winterization Of Offshore Facilities - IBC Energy Seminar Agenda 4-5 Feb 2015...
Winterization Of Offshore Facilities - IBC Energy Seminar Agenda 4-5 Feb 2015...Winterization Of Offshore Facilities - IBC Energy Seminar Agenda 4-5 Feb 2015...
Winterization Of Offshore Facilities - IBC Energy Seminar Agenda 4-5 Feb 2015...
 
CV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short versionCV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short version
 
CV Sigve Hamilton Aspelund 032015
CV Sigve Hamilton Aspelund 032015CV Sigve Hamilton Aspelund 032015
CV Sigve Hamilton Aspelund 032015
 
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
 
CV Sigve Hamilton Aspelund 092014 Production Engineer
CV Sigve Hamilton Aspelund 092014  Production EngineerCV Sigve Hamilton Aspelund 092014  Production Engineer
CV Sigve Hamilton Aspelund 092014 Production Engineer
 
CV Sigve Hamilton Aspelund 012015
CV Sigve Hamilton Aspelund 012015CV Sigve Hamilton Aspelund 012015
CV Sigve Hamilton Aspelund 012015
 
CV Sigve Hamilton Aspelund 022015 SV
CV Sigve Hamilton Aspelund 022015 SVCV Sigve Hamilton Aspelund 022015 SV
CV Sigve Hamilton Aspelund 022015 SV
 
Cv Sigve Hamilton Aspelund 092013
Cv Sigve Hamilton Aspelund 092013Cv Sigve Hamilton Aspelund 092013
Cv Sigve Hamilton Aspelund 092013
 
Qualitative Risk Assessment of Coal Combustion Residue Impoundment Closure, R...
Qualitative Risk Assessment of Coal Combustion Residue Impoundment Closure, R...Qualitative Risk Assessment of Coal Combustion Residue Impoundment Closure, R...
Qualitative Risk Assessment of Coal Combustion Residue Impoundment Closure, R...
 
CV Sigve Hamilton Aspelund 022015
CV Sigve Hamilton Aspelund 022015CV Sigve Hamilton Aspelund 022015
CV Sigve Hamilton Aspelund 022015
 
CV Sigve Hamilton Aspelund 032015 SV
CV Sigve Hamilton Aspelund 032015 SVCV Sigve Hamilton Aspelund 032015 SV
CV Sigve Hamilton Aspelund 032015 SV
 
CV Sigve Hamilton Aspelund 012015 SV
CV Sigve Hamilton Aspelund 012015 SVCV Sigve Hamilton Aspelund 012015 SV
CV Sigve Hamilton Aspelund 012015 SV
 
CV Sigve Hamilton Aspelund 062013
CV Sigve Hamilton Aspelund 062013CV Sigve Hamilton Aspelund 062013
CV Sigve Hamilton Aspelund 062013
 
CV Sigve Hamilton Aspelund 042015 b
CV Sigve Hamilton Aspelund 042015 bCV Sigve Hamilton Aspelund 042015 b
CV Sigve Hamilton Aspelund 042015 b
 
CV Sigve Hamilton Aspelund 042015
CV Sigve Hamilton Aspelund 042015CV Sigve Hamilton Aspelund 042015
CV Sigve Hamilton Aspelund 042015
 
CV Sigve Hamilton Aspelund 052015
CV Sigve Hamilton Aspelund 052015CV Sigve Hamilton Aspelund 052015
CV Sigve Hamilton Aspelund 052015
 
CV Sigve Hamilton Aspelund 122014 SV
CV Sigve Hamilton Aspelund 122014 SVCV Sigve Hamilton Aspelund 122014 SV
CV Sigve Hamilton Aspelund 122014 SV
 
CV Sigve Hamilton Aspelund 062013 Short version
CV Sigve Hamilton Aspelund 062013 Short versionCV Sigve Hamilton Aspelund 062013 Short version
CV Sigve Hamilton Aspelund 062013 Short version
 

Mais de Lloyd's Register Energy

Mais de Lloyd's Register Energy (17)

RBI Embedded within Maximo
RBI Embedded within MaximoRBI Embedded within Maximo
RBI Embedded within Maximo
 
Better prediction and better production - from every angle
Better prediction and better production - from every angleBetter prediction and better production - from every angle
Better prediction and better production - from every angle
 
Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.Strategic approach to managing Environmentally Critical Elements within SECEs.
Strategic approach to managing Environmentally Critical Elements within SECEs.
 
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
Introduction to the Revised UK Offshore Safety Legislation as Impacted by the...
 
Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...Clearing up material traceability: Confusion and myths in oil and gas manufac...
Clearing up material traceability: Confusion and myths in oil and gas manufac...
 
Functional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling IndustryFunctional Safety (SIL) in the Subsea and Drilling Industry
Functional Safety (SIL) in the Subsea and Drilling Industry
 
Bop reliability
Bop reliabilityBop reliability
Bop reliability
 
Dynamic Positioning & Power Management Awareness Training
Dynamic Positioning & Power Management Awareness TrainingDynamic Positioning & Power Management Awareness Training
Dynamic Positioning & Power Management Awareness Training
 
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
“Big data” – hva betyr dette i forhold til gjennomføring av olje og gass
 
Reliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsReliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During Operations
 
Competence assessment
Competence assessmentCompetence assessment
Competence assessment
 
Asset maintenance and integrity solutions
Asset maintenance and integrity solutionsAsset maintenance and integrity solutions
Asset maintenance and integrity solutions
 
Asset maintenance and integrity solutions
Asset maintenance and integrity solutionsAsset maintenance and integrity solutions
Asset maintenance and integrity solutions
 
Why risk management services are vital to the oil and gas industry
Why risk management services are vital to the oil and gas industryWhy risk management services are vital to the oil and gas industry
Why risk management services are vital to the oil and gas industry
 
Meeting the obligations of the new offshore safety regulations with your people
Meeting the obligations of the new offshore safety regulations with your peopleMeeting the obligations of the new offshore safety regulations with your people
Meeting the obligations of the new offshore safety regulations with your people
 
Managing the human factor
Managing the human factorManaging the human factor
Managing the human factor
 
Insight: Gas turbine exhaust duct failures on offshore platforms
Insight: Gas turbine exhaust duct failures on offshore platformsInsight: Gas turbine exhaust duct failures on offshore platforms
Insight: Gas turbine exhaust duct failures on offshore platforms
 

Último

Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Último (20)

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 

Methods for evaluating risk caused by ice throw

  • 1. Working together for a safer world Methods for evaluating risk caused by ice throw from wind turbines Helge Ausland Refsum, Lloyd's Register Consulting Rolv Erlend Bredesen, Kjeller Vindteknikk Winterwind 2015, Piteå, Sweden
  • 2. ©Lloyd’s Register Consulting Ice – a significant safety risk • Falling ice fatality potential • 40-60 J: Serious injuries to forehead • >80 J: Serious injury to body • Impact energy depends on ice density, mass and velocity. Impact of 40 J corresponds to • 200 g of ice falling from 30-50 m • 500 g of ice falling from 5-6 m • Special competence is needed to understand ice build up and shedding • Damage potential depends on surroundings Source: TNO Greenbook, CPR 16E, TNO ,1992 Example of accumulated ice at Tryvann communication mast, Oslo, 2014.
  • 3. ©Lloyd’s Register Consulting Current standard for safety distances is too simple • Commonly used safety distance rule for icefall from an operational wind turbine Safety distance = 1,5 * (H+D) where H = hub height of wind turbine D = rotor diameter • Our simulations and observations have shown that the actual safety distance may be both longer and shorter Source: IEA Wind 2012, Kjeller Vindteknikk Ice chunk of around 1 kg, observed at Norwegian wind farm.
  • 4. ©Lloyd’s Register Consulting Precise mapping of ice risk – site specific approach Metrological study • Probability of ice in construction • Estimated size and weight distribution of falling ice Risk assessment • Site risk for personnel operating the facility and third parties • Individual risk for different exposures, e.g. pedestrians and vehicle passengers Acceptance criteria • Proposed criteria for different safety zones • Based on Norwegian Directorate for Civil Protection (DSB) guidelines • Final, site specific criteria determined by installation owner (or by law where applicable) Risk reducing measures • Recommendations for risk reducing measures • Meteorological forecasting of ice throw probability
  • 5. ©Lloyd’s Register Consulting Probability distribution of falling ice used to map risk of fatality Falling ice • Calculated distribution of falling ice per square meter • Estimated energy per ice cube Protection • Tunnels etc. may provide 100% protection • Car: 10% risk of ice hitting wind screen, 140 J required to penetrate windscreen Fatality criteria • 10% risk of person being hit (covers area of ~20cm x 50cm) per square meter • Potentially fatal if energy > 40 J Risk of fatality • Map of annual probability for loss of life (PLL) due to falling ice from facility
  • 6. ©Lloyd’s Register Consulting Suggested acceptance criteria for third person • Key principle: Facility should not increase risk to public significantly compared to daily risk in society • Acceptance criteria are given as annual probability for loss of life (PLL) caused by the facility • Exposure time is factored into the acceptance criteria • Based on Norwegian Directorate for Civil Protection (DSB) guidelines • Higher risk may be accepted for personnel operating the facility, given sufficient knowledge and routines to handle the risk Outside outer zone: Schools, kindergartens, shopping malls, hospitals, etc. Facility Inner zone: Ski tracks, hiking areas Middle zone: Public roads, industrial sites, scattered houses Outer zone: Houses, cafés, shops, etc 10-5 10-6 10-7 10-4
  • 7. ©Lloyd’s Register Consulting Risk reducing measures • Ice fall risk is typically concentrated to a few, short periods per year • Meteorological forecasting • Ice sensors • Risk reducing measures for third party  Clearly visible warning signs  Fencing around area, locked gates  Limit public activities  Re-routing of footpath, ski tracks etc. • Risk reducing measures for operating personnel  Protective grids, roofs or tunnels  Personal protective equipment (PPE) Warning system at Tryvann communication mast, Oslo, 2015.
  • 8. ©Lloyd’s Register Consulting Benefits from our approach Planning • Ensure safety by design • Optimize installation footprint Consent • Increased certainty and understanding of risk level • Solid documentation of the impact on the surroundings Operation • Ensure a safe working environment • Minimize negative effects on third parties Project developers Installation owners Operators
  • 9. ©Lloyd’s Register Consulting Explore our services • Risk assessments and consequence modelling • Recommended safety zones • Recommendations of risk reducing measures • Meteorological simulations • Ice forecasting and warning systems • Human factors and safe behaviour studies http://www.lr.org/consulting www.vindteknikk.no
  • 10. ©Lloyd’s Register Consulting References 1. Bredesen, R.E., Harstveit, K., Refsum, H.: IceRisk: "Assessment of risks associated with ice throw and ice fall.", Winterwind 2014. 2. Bredesen, R.E.: Antennemast Tryvann, Oslo kommune – IceRisk - Beregninger av isnedfall med validering. KVT Report, KVT/KH/2013/R079, Revisjon 15.5.2014, Kjeller Vindteknikk, 2014. 3. Refsum, H.A.: "Risikoanalyse – Antennemast Tryvann – Vurdering av risiko tilknyttet isnedfall", 104282/R1a, Lloyd's Register Consulting, 2014. 4. Bredesen, R.E. og Harstveit, K.: "Raskiftet, kommunene Åmot og Trysil, Hedmark – Konsekvenser av atmosfærisk ising på ferdsel", KVT/REB/2013/R047, Kjeller Vindteknikk AS, 2013. 5. Refsum, H.A.: "Risikoanalyse – Iskast fra Raskiftet vindkraftverk", 104046/R1, Scandpower AS, 2013. 6. DSB Temaveileder ”Sikkerheten rundt anlegg som håndterer brannfarlige, reaksjonsfarlige, trykksatte og eksplosjonsfarlige stoffer: Kriterier for akseptabel risiko”, Mai 2013. 7. Bredesen, R.E.: Antennemast Tryvann, Oslo kommune – IceRisk - Beregninger av isnedfall på bilvei. KVT Report, KVT/REB/2014/R071, Kjeller Vindteknikk, 2014 8. Kjørri, M.: "Vurdering av risiko for bilister på Tryvannsveien i forbindelse med isnedfall fra antennemast Tryvann", 105226/R1, Lloyd's Register Consulting, 2014.
  • 11. ©Lloyd’s Register Consulting Recent example of results from Norwegian wind farm
  • 12. Lloyd’s Register and variants of it are trading names of Lloyd’s Register Group Limited, its subsidiaries and affiliates. Copyright © Lloyd’s Register Consulting. 2014. A member of the Lloyd’s Register group. Working together for a safer world Helge Ausland Refsum Principal Consultant Norway / Kjeller T +47 95 04 90 85 E helge.refsum@lr.org Lloyd’s Register Consulting http://www.lr.org/consulting Rolv Erlend Bredesen Advisor Norway / Kjeller T + 47 90 12 97 89 E rolv.bredesen@vindteknikk.no Kjeller Vindteknikk AS www.vindteknikk.no