Reported by : Komal Zahra
Earthen roads, Culverts & Small bridges
Focal Group Discussion
Project: CIIP
UC: Daira Deen panah
Tehsil: Kot Addu
District: Muzafargarh
Conducted by: Komal Zahra
Reported by : Komal Zahra
Focal Group Discussion (Female)
Objective:-
How this reconstructed earthen roads benefits women economically and socially. And how
this reconstructed earthen roads makes difference in their livelihood activities.
Discussion:-
 How this reconstructed earthen roads differs socially from previous construction and
how it is benefiting the women economically and socially….
Following this questions they said before the roads were not able to walk and drive and not
even good for heavy vehicles and there was no proper way to go to some place and also a lot of
different occasions and functions as we had to attend and because of the roads there was so
much blockages on the way. And Our Home-based Business was stopped by this hurdle and
daily routeen activities stopped because of the rough and blocked road. And this reconstruction
creates big change in our routeen and our walk and drive is now possible. This reconstruction
makes access to go any place and it makes our business restart.
 How it facilitate in the betterment of livelihood, health facilities and how it has
increased their accessibility to…local Markets, Schools, Hospitals…
For women these roads become a chance to have their own home based business successfully,
mostly these women do embroidery and make Quilts and make bread plates as they needed for
it the raw material also, for this they walk and drive to market now any time of the day and
night and sometimes they travel alone easily on this road. For their children these roads are
clean and smooth, their children uniforms remain clean because of no dirt and no holes on the
roads now and no thorns. Now they can easily walk to school and this way make them regular
as well, according to the school teachers and head master this road create change but not
enough change to mention, their school attendance before this 70% to 80% and now it just
increase 10%.They like to go to school now and they want this road remain and undamaged and
they also take interest to protect and clean and maintain this road and help each other and
RMTs to save it from damage.
 Are these earthen roads helping you in your neighborhood and community activities
and for mobility during emergency and linkages to the market…
Before flood and after flood these roads were not even in this condition to walk even and after
this reconstruction these roads able to walk and we can drive vehicles on it also. Before this our
mobility just by foot or carts and we can drive motor cycle, car, tractor, and van also. In
Reported by : Komal Zahra
emergency situations we have to wait for days to move to hospitals and dispensaries and now
we can call ambulance and hire a car on the door step. Before they charge much rent foe
emergency vehicle but now because of the roads they charge less. Sometimes we have to take
patient on shoulders and sometimes tie them in a clothe to reach hospital as soon as possible
and this reconstruction make big difference in our emergency situations. It linked to main road
and we can go to market easily now and even we hire auto and on the way back it dropped at
our home before they not even allow us to travel on that because they had to drive on that
rough roads and they easily drive on this road.
 Were women involved during selection and what was the level of participation of them
and what will be the role of sustainability reconstruction of earthen roads…
Meetings held by Awaz cds in different villages and where they selected women for RMTs and
also invited all women from the area to inform and had discussion with them, all women was
part of selection process and they participate with their full concern , some selected and some
not but they promise to play a role to envisage this effort and if again these roads damaged
fully or partially they do not wait for help and do not cal any one they maintain it by themselves
and also motivate community and their husbands and the farmers of that related land to
rebuild and maintain the damages of the roads.
 Does this project help in mitigating any disaster like flood, heavy rain…
For this question they are not positive because of the last flood , its level in this area was 8 to
10 feet high and again this level of water hit this area than these roads cannot remain
undamaged these will completely damage.
Conclusion:-
These reconstructions of earthen roads create change and possibility for easy transportation
but it is temporary and cannot helpful in disaster like 2010 flood.
Reported by : Komal Zahra
Annex I:
Visual Images
Reported by : Komal Zahra
Reported by : Komal Zahra
FGD (Female) Participants List UC/ Daira Deen Panah
S# Name Father/Husband Name CNIC# Village
1 HameedaBibi Rasheedahmad 32303-2301322-6 Chah WazeerWala
2 Jeeval Bibi AllahWasaaya 32303-2178758-4 Chah WazeerWala
3 Hajraa Bibi Ilaahi Bux 32303-0735737-2 Chah WazeerWala
4 SafeenaMai SaeedAhmed 32303-2795545-0 Chah ShahWala
5 SammanBibi MohdammadRiaz 32303-7645946-8 Chah Beli Wala
6 Zahra Mai BashirAhmed 32303-0671092-8 Chah Muzammil Wala
7 RasheedMai RaheemBux 32303-0762569-6 Chah HameedWala
8 NaseemMai Dost Muhammad 32303-5285009-0 TibbaShirqi
9 HaseenaBibi KhadimHusain 32303-5964380-4 Pattal
10 AmeerMai Muhammad Shafi 32303-6949467-2 Chah Yousaf Wala
11 ZeenatBibi Liaaqat Ali 32303-4884030-9 Chah ShahWala
12 Karmo Mai AllahWasaya 32303-7619864-8 Pattal
13 ZakkiaBibi IrshadAhmed 32303-2084191-0 Chah NawaanWala
14 RuqayyaIrshad MuhammadIrshad 32303-0954540-8 KaalayBagray Wala
15 NasreenBibi IjaazAhmed 32303-2092017-4 Chah NawaanTibba

Mais conteúdo relacionado

Semelhante a FGD Report (Female)_Province of Punjab

Linking rivers best way 1
Linking rivers best way 1Linking rivers best way 1
Linking rivers best way 1AZAGAR KUMAR
 
Road Widening In Bangalore
Road Widening In BangaloreRoad Widening In Bangalore
Road Widening In Bangaloreguest9ab0ac5
 
The story of a footpath
The story of a footpathThe story of a footpath
The story of a footpathCitizensA123
 
Bangalore - the Bus as a solution.
Bangalore - the Bus as a solution.Bangalore - the Bus as a solution.
Bangalore - the Bus as a solution.Dasarathi GV
 
Accessible Public Transportation Handbook
Accessible Public Transportation HandbookAccessible Public Transportation Handbook
Accessible Public Transportation HandbookScott Rains
 
Indian traffic systems
Indian traffic systemsIndian traffic systems
Indian traffic systemsAchu Zachariah
 
Public transport will save Bangalore
Public transport will save BangalorePublic transport will save Bangalore
Public transport will save Bangaloreguest0591bc
 
Project on Insights Gained from Industrial Visits
Project on Insights Gained from Industrial VisitsProject on Insights Gained from Industrial Visits
Project on Insights Gained from Industrial VisitsShivam Shukla
 
presenting report bahasa inggris
presenting report bahasa inggrispresenting report bahasa inggris
presenting report bahasa inggrisAris Khinuzuka
 
Sanitation/ street pavement in village naway killi
Sanitation/ street pavement in village naway killiSanitation/ street pavement in village naway killi
Sanitation/ street pavement in village naway killiSRSP
 
Transport and communication
Transport and communicationTransport and communication
Transport and communicationindianeducation
 
Case studies on Community Physical Infrastructure projects under PEACE
Case studies on Community Physical Infrastructure projects under PEACECase studies on Community Physical Infrastructure projects under PEACE
Case studies on Community Physical Infrastructure projects under PEACESRSP
 
Project proposal
Project proposalProject proposal
Project proposalMoeed Awais
 
Dfc save water compaign sbs budhakhera
Dfc save water compaign  sbs budhakheraDfc save water compaign  sbs budhakhera
Dfc save water compaign sbs budhakheraDFC2011
 
Transportation
TransportationTransportation
TransportationLohginDayn
 
Transportation
TransportationTransportation
TransportationLohginDayn
 

Semelhante a FGD Report (Female)_Province of Punjab (20)

Linking rivers best way 1
Linking rivers best way 1Linking rivers best way 1
Linking rivers best way 1
 
Road Widening In Bangalore
Road Widening In BangaloreRoad Widening In Bangalore
Road Widening In Bangalore
 
THE NATURE HIGHWAY
THE NATURE HIGHWAYTHE NATURE HIGHWAY
THE NATURE HIGHWAY
 
SWF Profile _SL_
SWF Profile _SL_SWF Profile _SL_
SWF Profile _SL_
 
The story of a footpath
The story of a footpathThe story of a footpath
The story of a footpath
 
Bangalore - the Bus as a solution.
Bangalore - the Bus as a solution.Bangalore - the Bus as a solution.
Bangalore - the Bus as a solution.
 
Article3
Article3Article3
Article3
 
Accessible Public Transportation Handbook
Accessible Public Transportation HandbookAccessible Public Transportation Handbook
Accessible Public Transportation Handbook
 
Indian traffic systems
Indian traffic systemsIndian traffic systems
Indian traffic systems
 
Public transport will save Bangalore
Public transport will save BangalorePublic transport will save Bangalore
Public transport will save Bangalore
 
Writing sample
Writing sampleWriting sample
Writing sample
 
Project on Insights Gained from Industrial Visits
Project on Insights Gained from Industrial VisitsProject on Insights Gained from Industrial Visits
Project on Insights Gained from Industrial Visits
 
presenting report bahasa inggris
presenting report bahasa inggrispresenting report bahasa inggris
presenting report bahasa inggris
 
Sanitation/ street pavement in village naway killi
Sanitation/ street pavement in village naway killiSanitation/ street pavement in village naway killi
Sanitation/ street pavement in village naway killi
 
Transport and communication
Transport and communicationTransport and communication
Transport and communication
 
Case studies on Community Physical Infrastructure projects under PEACE
Case studies on Community Physical Infrastructure projects under PEACECase studies on Community Physical Infrastructure projects under PEACE
Case studies on Community Physical Infrastructure projects under PEACE
 
Project proposal
Project proposalProject proposal
Project proposal
 
Dfc save water compaign sbs budhakhera
Dfc save water compaign  sbs budhakheraDfc save water compaign  sbs budhakhera
Dfc save water compaign sbs budhakhera
 
Transportation
TransportationTransportation
Transportation
 
Transportation
TransportationTransportation
Transportation
 

Mais de Komal Zahra

URRAN District Election Commission Observers
URRAN District Election Commission ObserversURRAN District Election Commission Observers
URRAN District Election Commission ObserversKomal Zahra
 
URRAN District Political Advisors Pakistan
URRAN District Political Advisors PakistanURRAN District Political Advisors Pakistan
URRAN District Political Advisors PakistanKomal Zahra
 
South Asia Partnership Forum Discussion_Visual Record
South Asia Partnership Forum Discussion_Visual RecordSouth Asia Partnership Forum Discussion_Visual Record
South Asia Partnership Forum Discussion_Visual RecordKomal Zahra
 
Trainees Group Work
Trainees Group WorkTrainees Group Work
Trainees Group WorkKomal Zahra
 
Trainees Presentation
Trainees PresentationTrainees Presentation
Trainees PresentationKomal Zahra
 
Survey-Trainees Livestock
Survey-Trainees LivestockSurvey-Trainees Livestock
Survey-Trainees LivestockKomal Zahra
 
Monitoring Report Data Review
Monitoring Report Data ReviewMonitoring Report Data Review
Monitoring Report Data ReviewKomal Zahra
 
Training Sessions
Training SessionsTraining Sessions
Training SessionsKomal Zahra
 
Field Monitoring Report
Field Monitoring ReportField Monitoring Report
Field Monitoring ReportKomal Zahra
 
Case Study_Shamo Mai_Component Mat Making
Case Study_Shamo Mai_Component Mat MakingCase Study_Shamo Mai_Component Mat Making
Case Study_Shamo Mai_Component Mat MakingKomal Zahra
 
Case Study_Muraad Mai_Component Bread-Plate Making
Case Study_Muraad Mai_Component Bread-Plate MakingCase Study_Muraad Mai_Component Bread-Plate Making
Case Study_Muraad Mai_Component Bread-Plate MakingKomal Zahra
 
Multan Field Assessment
Multan Field AssessmentMultan Field Assessment
Multan Field AssessmentKomal Zahra
 
DIK Field Assessment
DIK Field AssessmentDIK Field Assessment
DIK Field AssessmentKomal Zahra
 
Training Report_March 3 to 8, 2012
Training Report_March 3 to 8, 2012Training Report_March 3 to 8, 2012
Training Report_March 3 to 8, 2012Komal Zahra
 
Undertake the Risk Analysis Policy
Undertake the Risk Analysis PolicyUndertake the Risk Analysis Policy
Undertake the Risk Analysis PolicyKomal Zahra
 
Risk Management Policy (NRDM)
Risk Management Policy (NRDM)Risk Management Policy (NRDM)
Risk Management Policy (NRDM)Komal Zahra
 
Monitoring and Evaluation Policy
Monitoring and Evaluation PolicyMonitoring and Evaluation Policy
Monitoring and Evaluation PolicyKomal Zahra
 
Impact Assessment Policy
Impact Assessment PolicyImpact Assessment Policy
Impact Assessment PolicyKomal Zahra
 

Mais de Komal Zahra (19)

URRAN District Election Commission Observers
URRAN District Election Commission ObserversURRAN District Election Commission Observers
URRAN District Election Commission Observers
 
URRAN District Political Advisors Pakistan
URRAN District Political Advisors PakistanURRAN District Political Advisors Pakistan
URRAN District Political Advisors Pakistan
 
South Asia Partnership Forum Discussion_Visual Record
South Asia Partnership Forum Discussion_Visual RecordSouth Asia Partnership Forum Discussion_Visual Record
South Asia Partnership Forum Discussion_Visual Record
 
DIK EMBROIDERY
DIK EMBROIDERYDIK EMBROIDERY
DIK EMBROIDERY
 
Trainees Group Work
Trainees Group WorkTrainees Group Work
Trainees Group Work
 
Trainees Presentation
Trainees PresentationTrainees Presentation
Trainees Presentation
 
Survey-Trainees Livestock
Survey-Trainees LivestockSurvey-Trainees Livestock
Survey-Trainees Livestock
 
Monitoring Report Data Review
Monitoring Report Data ReviewMonitoring Report Data Review
Monitoring Report Data Review
 
Training Sessions
Training SessionsTraining Sessions
Training Sessions
 
Field Monitoring Report
Field Monitoring ReportField Monitoring Report
Field Monitoring Report
 
Case Study_Shamo Mai_Component Mat Making
Case Study_Shamo Mai_Component Mat MakingCase Study_Shamo Mai_Component Mat Making
Case Study_Shamo Mai_Component Mat Making
 
Case Study_Muraad Mai_Component Bread-Plate Making
Case Study_Muraad Mai_Component Bread-Plate MakingCase Study_Muraad Mai_Component Bread-Plate Making
Case Study_Muraad Mai_Component Bread-Plate Making
 
Multan Field Assessment
Multan Field AssessmentMultan Field Assessment
Multan Field Assessment
 
DIK Field Assessment
DIK Field AssessmentDIK Field Assessment
DIK Field Assessment
 
Training Report_March 3 to 8, 2012
Training Report_March 3 to 8, 2012Training Report_March 3 to 8, 2012
Training Report_March 3 to 8, 2012
 
Undertake the Risk Analysis Policy
Undertake the Risk Analysis PolicyUndertake the Risk Analysis Policy
Undertake the Risk Analysis Policy
 
Risk Management Policy (NRDM)
Risk Management Policy (NRDM)Risk Management Policy (NRDM)
Risk Management Policy (NRDM)
 
Monitoring and Evaluation Policy
Monitoring and Evaluation PolicyMonitoring and Evaluation Policy
Monitoring and Evaluation Policy
 
Impact Assessment Policy
Impact Assessment PolicyImpact Assessment Policy
Impact Assessment Policy
 

FGD Report (Female)_Province of Punjab

  • 1. Reported by : Komal Zahra Earthen roads, Culverts & Small bridges Focal Group Discussion Project: CIIP UC: Daira Deen panah Tehsil: Kot Addu District: Muzafargarh Conducted by: Komal Zahra
  • 2. Reported by : Komal Zahra Focal Group Discussion (Female) Objective:- How this reconstructed earthen roads benefits women economically and socially. And how this reconstructed earthen roads makes difference in their livelihood activities. Discussion:-  How this reconstructed earthen roads differs socially from previous construction and how it is benefiting the women economically and socially…. Following this questions they said before the roads were not able to walk and drive and not even good for heavy vehicles and there was no proper way to go to some place and also a lot of different occasions and functions as we had to attend and because of the roads there was so much blockages on the way. And Our Home-based Business was stopped by this hurdle and daily routeen activities stopped because of the rough and blocked road. And this reconstruction creates big change in our routeen and our walk and drive is now possible. This reconstruction makes access to go any place and it makes our business restart.  How it facilitate in the betterment of livelihood, health facilities and how it has increased their accessibility to…local Markets, Schools, Hospitals… For women these roads become a chance to have their own home based business successfully, mostly these women do embroidery and make Quilts and make bread plates as they needed for it the raw material also, for this they walk and drive to market now any time of the day and night and sometimes they travel alone easily on this road. For their children these roads are clean and smooth, their children uniforms remain clean because of no dirt and no holes on the roads now and no thorns. Now they can easily walk to school and this way make them regular as well, according to the school teachers and head master this road create change but not enough change to mention, their school attendance before this 70% to 80% and now it just increase 10%.They like to go to school now and they want this road remain and undamaged and they also take interest to protect and clean and maintain this road and help each other and RMTs to save it from damage.  Are these earthen roads helping you in your neighborhood and community activities and for mobility during emergency and linkages to the market… Before flood and after flood these roads were not even in this condition to walk even and after this reconstruction these roads able to walk and we can drive vehicles on it also. Before this our mobility just by foot or carts and we can drive motor cycle, car, tractor, and van also. In
  • 3. Reported by : Komal Zahra emergency situations we have to wait for days to move to hospitals and dispensaries and now we can call ambulance and hire a car on the door step. Before they charge much rent foe emergency vehicle but now because of the roads they charge less. Sometimes we have to take patient on shoulders and sometimes tie them in a clothe to reach hospital as soon as possible and this reconstruction make big difference in our emergency situations. It linked to main road and we can go to market easily now and even we hire auto and on the way back it dropped at our home before they not even allow us to travel on that because they had to drive on that rough roads and they easily drive on this road.  Were women involved during selection and what was the level of participation of them and what will be the role of sustainability reconstruction of earthen roads… Meetings held by Awaz cds in different villages and where they selected women for RMTs and also invited all women from the area to inform and had discussion with them, all women was part of selection process and they participate with their full concern , some selected and some not but they promise to play a role to envisage this effort and if again these roads damaged fully or partially they do not wait for help and do not cal any one they maintain it by themselves and also motivate community and their husbands and the farmers of that related land to rebuild and maintain the damages of the roads.  Does this project help in mitigating any disaster like flood, heavy rain… For this question they are not positive because of the last flood , its level in this area was 8 to 10 feet high and again this level of water hit this area than these roads cannot remain undamaged these will completely damage. Conclusion:- These reconstructions of earthen roads create change and possibility for easy transportation but it is temporary and cannot helpful in disaster like 2010 flood.
  • 4. Reported by : Komal Zahra Annex I: Visual Images
  • 5. Reported by : Komal Zahra
  • 6. Reported by : Komal Zahra FGD (Female) Participants List UC/ Daira Deen Panah S# Name Father/Husband Name CNIC# Village 1 HameedaBibi Rasheedahmad 32303-2301322-6 Chah WazeerWala 2 Jeeval Bibi AllahWasaaya 32303-2178758-4 Chah WazeerWala 3 Hajraa Bibi Ilaahi Bux 32303-0735737-2 Chah WazeerWala 4 SafeenaMai SaeedAhmed 32303-2795545-0 Chah ShahWala 5 SammanBibi MohdammadRiaz 32303-7645946-8 Chah Beli Wala 6 Zahra Mai BashirAhmed 32303-0671092-8 Chah Muzammil Wala 7 RasheedMai RaheemBux 32303-0762569-6 Chah HameedWala 8 NaseemMai Dost Muhammad 32303-5285009-0 TibbaShirqi 9 HaseenaBibi KhadimHusain 32303-5964380-4 Pattal 10 AmeerMai Muhammad Shafi 32303-6949467-2 Chah Yousaf Wala 11 ZeenatBibi Liaaqat Ali 32303-4884030-9 Chah ShahWala 12 Karmo Mai AllahWasaya 32303-7619864-8 Pattal 13 ZakkiaBibi IrshadAhmed 32303-2084191-0 Chah NawaanWala 14 RuqayyaIrshad MuhammadIrshad 32303-0954540-8 KaalayBagray Wala 15 NasreenBibi IjaazAhmed 32303-2092017-4 Chah NawaanTibba