China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 1 28 Sept. 2016
www.cspservices.de
China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 2 28 Sept. 2016
www.cspservices.de
China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 3 28 Sept. 2016
www.cspservices.de
1 Delingha 50MW Molten Salt Tower
Location of project: Delingha, Qinghai
DNI: 1976 kWh/m²/yr
Project owner: Qinghai Supcon Solar Technology Delingha Co., Ltd.
Project filing: completed
Route of technology: molten salt tower, 6 hours of molten salt thermal storage
Source of technology: Zhejiang Supcon Solar technology Co., Ltd.
System conversion efficiency: 18% (the design point efficiency)
Floor space: about 2.4 km²
Height of tower: about 180 m
Lighting area: about 550,000 m²
Size of heliostat: 20 m²
Designed generating capacity: 136 million kWh
Current situation:
The preliminary design of the whole plant has been finished, and relevant process packages
have been all set.
Comment:
Supcon Delingha 10MW Tower plant joined the national grid officially in July 5th, 2013. In
August 20th, 2016, the molten salt reconstruction project based on this 10MW project
realized one-time whole-process functioning and joined the national grid successfully.
2 Dunhuang 100MW Molten Salt
Location of project: Dunhuang, Gansu
DNI: 2000kWh/m²/yr
Project owner: Shouhang IHW Resources Saving Technology Co., Ltd.
Route of technology: molten salt, 11 hours of molten salt thermal storage
Source of technology: Shouhang IHW Resources Saving Technology Co., Ltd.
Project filing: completed
Height of tower: 180 m
Size of heliostat: 120 m²
Total investment: ¥304 million, including ¥303.025 million of construction
investment and ¥9,750,000 of initial working capital
Financing channel: The owner has raised ¥4.6 billion by way of private
placement, including ¥3.04 billion used for the construction
of the project
Project purchasing: Steam turbine: GE/Siemens/MAN (planned)
Molten salt pump: Moret/Flowserve (planned)
Other major equipment, such as heliostat, thermal absorber
and air cooling system will all be chosen among home
products
China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 4 28 Sept. 2016
www.cspservices.de
Current situation:
The opening ceremony of this project was held on November 9th, 2015. And the preliminary
work has been finished completely. The former 10MW demonstration project with a 15-hour
molten salt thermal storage system started construction in August 2014, and is expected to go
into operation in October of this year.
Comment:
The Reply from Jiuquan Energy Bureau to the altered technical proposal on Dunhuang
2X50MW Molten Salt Tower CSP Project of Dunhuang Shouhang IHW Resources Saving
Technology Co., Ltd., released on October 30th, 2015, agreed this altered technical proposal,
changing to 100MW single-tower molten salt tower CSP project, which also changed the
capacity of this project to 100MW in the final list.
3 Qinghai Gonghe 50MW Molten Salt Tower
Location of project: Gonghe County, Hainan Autonomous Prefecture, Qinghai
DNI: about 1900 kWh/m²/yr
Project owner: Northwest Institute of Survey and Design of China
Hydropower Consulting Group
Feasibility study institute: Northwest Institute of Survey and Design
Route of technology: molten salt tower, 6 hours of molten salt thermal storage
Source of technology: Zhejiang Supcon Solar Technology Co., Ltd. (planned)
Project filing: completed
Height of tower: 171 m
Lighting area: 516,000 m²
Size of heliostat: 20 m²
Amount of heliostats: 25795
Comment:
In April 2014, the Proposal about Starting the Preliminary Work of Qinghai Gonghe CSP
Project was submitted to People’s Government of Qinghai Gonghe. In September 2014, the
Proposal was agreed. In October 28th, 2015, Qinghai Development and Reform Commission
approved the project put on record.
Development idea:
Placing independent design and home equipment first, and foreign consulting agencies second
4 Hami 50MW
Location of project: Hami, Xinjiang
DNI: about 1900 kWh/m²/yr
Project owner: Northwest Electric Power Design Institute of China
Power Engineering Consulting Group
Feasibility study institute: Northwest Electric Power Design Institute
Route of technology: molten salt tower, 8 hours of molten salt thermal storage
Source of technology: Zhejiang Supcon Solar Technology Co., Ltd. (planned)
Project filing: underway
China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 5 28 Sept. 2016
www.cspservices.de
Comment:
In July 20th, 2016, the opening meeting for preparation was held in Beijing. In August 12th,
the review on the feasibility study report was finished. In August 23th, the Construction Mode
Seminar was held in Xian. The reported capacity of this project when it applying for the
demonstration project is 2X50MW. In the end, one 50MW unit was selected into the final list
of the demonstration projects.
5 Delingha Qinghai 135MW DSG Tower
Location of project: Delingha, Qinghai
DNI: about 1900 kWh/m²/yr
Project owner: Huanghe Hydropower Development Co., Ltd.
Feasibility study institute: Northwest Electric Power Design Institute
EPC: Shanghai Electric Brightsource Solar Energy Co., Ltd.
Route of technology: DSG Tower, 3.7 hours of molten salt thermal storage
Source of technology: Brightsource
Project filing: completed
Comment:
This project has the biggest capacity among the first batch demonstration projects. The EPC
of the project is obtained by Shanghai Electric Brightsource Solar Energy Co., Ltd, which is a
joint venture composed of Brightsource and Shanghai Electric. It adopts the DSG technique,
which yields superheated steam directly and stores thermal energy through transferring heat
from steam to molten salt.
6 Golden Tower 100MW Molten Salt Tower
Location of project: Jinta, Jiuquan, Gansu
DNI: about 1900 kWh/m²/yr
Project owner: China Three Gorges New Energy Co., Ltd
Feasibility study institute: Northwest Institute of Survey and Design
Route of technology: molten salt tower, 8 hours of molten salt thermal storage
Source of technology: Shouhang IHW Resources Saving Technology Co., Ltd
Northwest Institute of Survey and Design of China
Hydropower Consulting Group (planned)
Project filing: completed
Introduction of China Three Gorges New Energy Co., Ltd:
China Three Gorges New Energy Co., Ltd (TGNE) is a wholly-owned subsidiary of China
Three Gorges Corporation (TGC), bearing the historical missions of developing new energy
and forging the second main business of TGC. In recent years, TGNE is vigorously
developing land wind power and PV, positively exploiting offshore wind power, steadily
enhancing small and medium hydropower business, carrying forward CSP and closely
following other renewable energy techniques such as tidal energy and biomass energy,
basically forming a business structure of mutual support and collaborative development in
four main domains, namely wind power, solar power, small hydropower and equipment
manufacturing.
China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 6 28 Sept. 2016
www.cspservices.de
7 Yumen 50MW Molten Salt Tower
Location of project: Yumen, Gansu
DNI: about 1800 kWh/m²/yr
Project owner: Yumen Xinneng Thermal Power Co., Ltd
Route of technology: molten salt tower, beam down system with molten salt
Source of technology: Shanghai Parasol Renewable Energy Company
Jiangsu Xinchen CSP Co., Ltd
Status of project: Construction of this project is planned to start in October of
this year. The base of tower and plant will be built first.
Comment:
The project adopts the unique beam down tower CSP technique. At present, there is only one
100KW demonstration system with this technique around the world. Xinchen Company
completed a 300KW beam down demonstration project in Yancheng, Jiangsu in 2015. Based
on the above demonstration project, the commercial 50MW project will start in Yumen. The
project will build some beam down towers, composing 50MW capacity together. Shanghai
Parasol and Jiangsu Xinchen have some connections. They both work on driving the
commercial application of the beam down system with molten salt.
8 Yumen 100MW Molten Salt Tower
Location of project: Yumen, Gansu
DNI: about 1800 kWh/m²/yr
Project owner: Beijing Guohua Electric Power Co., Ltd
Route of technology: molten salt tower, 10 hours of molten salt thermal storage
Source of technology: Shouhang IHW Resources Saving Technology Co., Ltd
(planned)
Project filing: underway
Total investment: RMB3.53661 million
Comment:
According to the CSP development plan for 2015-2030 drafted by Guohua Electric, it plans to
complete 1.5GW during 2015-2020, 3.5GW during 2020-2025 and 6GW during 2025-2030.
This project is the first commercial CSP plant developed by Guohua Electric.
9 Shangyi 50MW DSG Tower
Location of project: Shangyi, Zhangjiakou, Hebei
DNI: about 1600 kWh/m²/yr
Project owner: DaHua Engineering Management(Group) Co., Ltd.
Institute of Electrical Engineering of CAS
Route of technology: DSG tower, 4 hours of molten salt thermal storage
Source of technology: Institute of Electrical Engineering of CAS
Status of project: project filing is underway
China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 7 28 Sept. 2016
www.cspservices.de
Comment:
This project uses the DSG tower technique, storing thermal energy through exchanging heat
from steam to molten salt.
Introduction of project owner:
DaHua Engineering Management(Group) Co., Ltd. is founded under the approval of State
Development Planning Commission(SDPC), State Science and Technology Commission and
the State Council, which is a joint stock company restructured from DaHua Energy
Technology company directly under SDPC. Possessing qualifications issued by a couple of
state commissions, DaHua has strong strength in many businesses including project
preliminary planning, designing, engineering consulting, project management(supervising),
engineering construction, EPC general contract, investment and development. DaHua will
work with Institute of Electrical Engineering of CAS to develop this project jointly.
10 Yumen 50MW Thermal Oil Trough
Location of project: Yumen, Gansu
DNI: about 1800 kWh/m²/yr
Project owner: Royal Tech CSP Limited
Route of technology: thermal oil parabolic trough
7 hours of molten salt thermal storage
Source of technology: Royal Tech CSP Limited
Status of project: project filing is underway
Introduction of project owner:
Changzhou Royal Tech CSP Limited is devoted to CSP and development, innovation and
industry promotion in the area of distributed solar utilization. Main businesses cover high
temperature evacuated collector tube, system integration of thermal field and system of
distributed solar combined supply of cooling, heating and power. As one of the pioneers in
China CSP area, Changzhou Royal has made a major breakthrough in key component of CSP,
whose homemade high temperature evacuated collector tube is successfully applied in
overseas commercial plant for the first time. Its technique in system integration of thermal
field was ranked as international advanced level by CSP Services, an international
authoritative institution in CSP.
11 Gansu Akesai 50MW Molten Salt Trough
Location of project: Akesai, Jiuquan, Gansu
DNI: about 2056.5 kWh/m²/yr
Project owner: Shenzhen Jinfan Energy Technology Co., Ltd.
Route of technology: molten salt trough, 15 hours of molten salt thermal storage
Source of technology: Tianjin Binhai Concentrating Solar Power Investm. Co., Ltd.
Status of project: project filing has been completed.
China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 8 28 Sept. 2016
www.cspservices.de
Introduction of project owner:
Tianjin Binhai Concentrating Solar Power Investment Co., Ltd. is co-funded by Shenzhen
Nuclear Power Engineering Co., Ltd. and the government of Tianjin Binhai High-tech Zone.
Shenzhen Jinfan is the then project applying body, but the actual body has been changed to
Tianjin Binhai. Tianjin Binhai brought in the world’s leading CSP techniques, aiming to
realize localized production to reduce cost. Its ultimate goal is to build a 200MW base
equipped with a large-scale system including heat collection, thermal storage, heat exchange
and power generation and a world-class CSP R&D center. The Akesai project will rely on this
base to realize the localization of equipment.
12 Yumen East Town 50MW Thermal Oil Trough
Location of project: Yumen, Gansu
DNI: about 1800 kWh/m²/yr
Project owner: Rayspower Energy Group Co., Ltd.
Route of technology: thermal oil parabolic trough
7 hours of molten salt thermal storage
Source of technology: Rayspower Energy Group Co., Ltd.
Introduction of project owner:
Rayspower Energy Group Co., Ltd. focuses on the business of the system integration of CSP
plant. It opened a leading reflecting mirror plant in Chengdu in June 2013. Based on this
plant, it cuts in the sun island EPC area. Through the construction of Yanqing 863 Trough
Testing project, it has accumulated integration experience in trough mirror field. Meanwhile,
it’s a new three board listed company, which, to some extent, is favorable to its financing.
13 Urat Middle Banner 100MW Thermal Oil Parabolic
Trough
Location of project: Urat Middle Banner, Inner Mongolia
DNI: 2025 kWh/m²/yr
Project owner: Inner Mongolia Royal Tech New Energy Co., Ltd.
Route of technology: thermal oil parabolic trough
4 hours of molten salt thermal storage
Source of technology: Changzhou Royal Tech Solar Thermal Equipment Co., Ltd.
Project Filing: completed
Comment: The feasibility study of this project is finished in May, 2016.
Introduction of project owner:
Inner Mongolia Royal Tech New Energy Co., Ltd. is co-founded by Changzhou Royal Tech
Development Co., Ltd, a subsidiary of Royal Tech, and Nanjing Zhonghe Solar Energy
Technology Co., Ltd. in July 14th, 2015.
China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 9 28 Sept. 2016
www.cspservices.de
14 50MW Thermal Oil Parabolic Trough
Location of project: Delingha, Qinghai
DNI: 1976 kWh/m²/yr
Project owner: CGN Delingha Solar Energy Development Co., Ltd.
Route of technology: thermal oil parabolic trough
9 hours of molten salt thermal storage
Source of technology: CGN Solar Energy Development Co., Ltd.
EPC of Sun Island: Shouhang IHW Resources Saving Technology Co., Ltd. And
Shandong Second Power Construction Company
EPC of Thermal Storage Island: Shandong Sunway Petrochemical Engineering Co., Ltd.
EPC of Conventional Island: Northwest Electric Power Design Institute Co., Ltd. of China
Power Engineering Consulting Group
OE: Aries
Basic design: Ingeteam
Feasibility study institute: Northwest Electric Power Design Institute Co., Ltd. of China
Power Engineering Consulting Group
Heat transfer oil: Suzhou Solutia Therminol Co., Ltd.
Molten salt: sodium nitrate (Sinkiang Nitrate Minerals Co., Ltd.) &
potassium nitrate (Shanxi Wentong Sylvite Group)
Steam turbine: Dongfang Electric Corporation
Molten salt pump: Moret pump
Oil-water heat exchanger: Harbin Turbine Company Limited
Status of project:
The construction work was officially started in July 1st, 2014. Northwest Electric Power
Design Institute, EPC of Conventional Island, entered into construction phase successively in
August 2015. Shandong Sunway Petrochemical Engineering Co., Ltd., EPC of Thermal
Storage Island, signed the EPC contract with CGN side in March 1st this year and then it
started work immediately. EPC contract of Sun Island was signed officially in late August.
Now, the preparation for construction is underway.
Comment:
This plant is the first commercial 50MW parabolic trough built in China.
15 Gulang 100MW Thermal Oil Parabolic Trough
Location of project: Gulang, Weiwu, Gansu
DNI: 1913 kWh/m²/yr
Project owner: OECEP Gansu Weiwu Solar Technology Co., Ltd
Route of technology: thermal oil parabolic trough
7 hours of molten salt thermal storage
Source of technology: Changzhou Royal Tech Solar Thermal Equipment Co., Ltd.
(planned)
Status of technology: project filing is underway.
China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 10 28 Sept. 2016
www.cspservices.de
16 64MW Molten Salt Parabolic Trough
Location of project: Chabei, Zhangjiakou, Hebei
DNI: about 1700 kWh/m²/yr
Project owner: Zhongyang Zhangjiakou Chabei
Route of technology: molten salt parabolic trough
16 hours of molten salt thermal storage
Source of technology: Skyfuel
Status of project: Opening ceremony was held in July 2014.
Introduction of project owner:
OECEP Gansu Weiwu Solar Technology Co., Ltd. is a project company established by
Beijing Guo Tou Jun An Investment Management Co., Ltd. in Zhangjiakou. Public
information shows, Guo Tou Jun An is a professional company specializing in promoting
CSP technology and projects founded under the help of State-owned Assets Supervision and
Administration Commission (SASAC) and National Development and Reform Commission
(NDRC).
Comment:
Skyfuel, the technology partner and founded in 2007, innovated reflecting mirror and heat
collector in trough CSP. Its featured product is a new reflecting mirror based on the
reflectance coating technique, which uses ReflectTechPLUS as coating. Moreover, it
designed SkyTrough(R), which is a high-performance parabolic trough heat collector.
Equipped with SkyTrough(R), the performance of heat collector has been enhanced and the
cost reduced significantly.
17 Dacheng Dunhuang 50MW Molten Salt Fresnel
Location of project: Dunhuang, Gansu
DNI: 2000 kWh/m²/yr
Project owner: Lanzhou Dacheng Technology Co., Ltd
Status of project: Project filing has been completed.
The first 10MW is under-construction.
Comment:
The applied capacity was 110MW. The final capacity approved is 50MW.
Introduction of project owner:
Lanzhou Dacheng has carried on the development and research of key components and
system integration since 2008. In May 2012, it built China’s first 200KW Fresnel &Trough
CSP system. At present, it focuses on Fresnel technique, which is quite suitable to be applied
in Northwest of China. The Fresnel heat collector with full intellectual property, relying on
independent research and development, have many advantages, such as small land
occupation, strong wind resistance, short construction period, easy testing and simple
maintenance. This project is the world’s first commercial molten salt Fresnel CSP plant.
China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 11 28 Sept. 2016
www.cspservices.de
18 Zhangbei 50MW CSG Fresnel CSP project
Location of project: Zhangbei, Zhangjiakou, Hebei
DNI: 1750 kWh/m²/yr
Project owner: Zhangbei Huaqiang Zhaoyang Co., Ltd.
Feasibility study institute: Hebei Electric Power Design & Research Institute
Route of technology: DSG Fresnel
all solid state formulated concrete thermal storage
Source of technology: Beijing Terasolar Photothermal Technologies Co., Ltd.
Status of project: Feasibility study was finished in February 2015
Filing was finished in February 15th this year.
Comment:
Zhangbei Huaqiang Zhaoyang Co., Ltd., funded and established by Xinli Energy
Development Co., Ltd., adopts the improved Fresnel technique provided by Beijing Terasolar
Photothermal Technologies Co., Ltd. Main technological innovation lies in its unique heat
collector designing and all solid state formulated concrete thermal storage technique. The
applied capacity is 2*50MW, one of which is finally chosen.
Introduction of project owner:
Zhangbei Huaqiang Zhaoyang Co., Ltd. is funded and established by Xinli Energy
Development Co., Ltd. in December 26th, 2014 with registered capital of RMB42500.
19 Zhangjiakou 50MW
Location of project: Zhangbei, Zhangjiakou, Hebei
DNI: about 1750 kWh/m²/yr
Project owner: Zhangbei Huaqiang Zhaoyang Energy Co., Ltd.
Route of technology: DSG Fresnel
14 hours of all solid state formulated concrete thermal
storage
Source of technology: Beijing TeraSolar Photothemal Technologies Co., Ltd.
Status of project: The preliminary work, including feasibility study,
construction design and project filing has been finished.
Comment:
This project also adopts the improved Fresnel technique provided by Beijing Terasolar
Photothermal Technologies Co., Ltd. Main technological innovation lies in its unique heat
collector designing and all solid state formulated concrete thermal storage technique. The
applied price is RMB1.12/kWh, which is the lowest among the first batch of 20 demonstration
projects. Zhangjiakou No.1 15MW CSP plant, which is now under-construction by Huaqiang
Zhaoyang, is expected to join the national grid at the end of this year.
Introduction of project owner:
Zhangbei Huaqiang Zhaoyang Energy Co., Ltd., with a registered capital of RMB100 million,
was founded in January 29th, 2015.
China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 12 28 Sept. 2016
www.cspservices.de
20 Urat 50MW Fresnel
Location of project: Urat, Inner Mongolia
DNI: 2025 kWh/m²/yr
Project owner: Huaneng North United Power Co., Ltd.
Route of technology: thermal oil Fresnel, 6 hours of molten salt thermal storage
Source of technology: China Huaneng Group Clean Energy Technology Research
Institute
Status of project: Feasibility study review was finished in September 2016
Project filing is underway
Comment:
This project uses thermal oil as heat transfer medium, which has never happened in the
existing commercial Fresnel projects worldwide. These commercial projects usually adopt
DSG and don’t have thermal storage system.
Introduction of project owner:
Huaneng North United Power Co., Ltd. is a joint-equity enterprise funded by China Huaneng
Group, CITIC Limited, Inner Mongolia Power Co., Ltd. and China Shenhua Energy Company
Limited with a registered capital of RMB10 billion. Once in a monopoly position, now it’s a
pretty competitive market entity.
China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 13 28 Sept. 2016
www.cspservices.de
Information on CSP Services
CSP Services GmbH, Concentrating Solar Power Services, is a spin-off company of the German
Aerospace Center (DLR) in Cologne, Germany, with know-how licensed from DLR. CSPS
offers engineering and consulting services for developers, operators and owners of solar thermal
power plants applying innovative and specific measurement techniques to assure high
performance solar fields.
Besides the know-how in standard measurement technologies, special techniques such as close
range photogrammetry and deflectometry together with specially developed evaluation and
assessment tools serve the clients for prototype evaluation, quality assurance, inspection and
performance improvement of solar fields in concentrating solar power plants (i.e. parabolic
troughs, heliostats, Fresnel systems, dishes). CSPS supports its clients to decrease risks,
increase project performance, and gain competitiveness in the growing concentrating solar
power market sector.
Our range of products and services includes the geometric quality assurance systems QFoto
(3D point measurements of large structures in series production) and QDec (high-resolution
shape measurements of reflective surfaces in series production) for application in solar power
plants. For solar irradiation resource assessment, we supply the automatic weather stations MDI
(for DNI measurement at remote sites) and MHP (for high-precision DNI measurement and
solar power plant monitoring). With our mobile solar field measurement services, we assess the
quality of all kinds of solar concentrators, and our consulting services cover specific topics such
as technical reviews, due diligence and operation monitoring.
QFoto: Structure 3D Testing QRec: Receiver Performance Testing QDec: Mirror Shape Testing
China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 14 28 Sept. 2016
www.cspservices.de
UAV Picture: DLR
China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 15 28 Sept. 2016
www.cspservices.de

Mais conteúdo relacionado

Mais procurados

Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC SimhadriAshish Uppu
 
India presentation 2
India presentation 2India presentation 2
India presentation 2UKTI2014
 
День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...
День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...
День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...НАЕК «Енергоатом»
 
Industrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadIndustrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadPawan Agrawal
 
Benefits of csp with thermal storage
Benefits of csp with thermal storageBenefits of csp with thermal storage
Benefits of csp with thermal storageSolar Reference
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar Dilip kumar
 
KALISINDH THARMAL POWER PLANT report by Neeraj Patidar
 KALISINDH THARMAL POWER PLANT report by Neeraj Patidar KALISINDH THARMAL POWER PLANT report by Neeraj Patidar
KALISINDH THARMAL POWER PLANT report by Neeraj PatidarNeeraj Patidar
 
An industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAn industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAtul Kumar Singh
 
Power Alt application on establishment of a new 10_7 MW Power station- NERSA ...
Power Alt application on establishment of a new 10_7 MW Power station- NERSA ...Power Alt application on establishment of a new 10_7 MW Power station- NERSA ...
Power Alt application on establishment of a new 10_7 MW Power station- NERSA ...James Muchongwe
 
summer training report ntpc anta
summer training report ntpc antasummer training report ntpc anta
summer training report ntpc antanishant pareek
 
A summer training report on NTPC
A summer training report on NTPCA summer training report on NTPC
A summer training report on NTPCRanjeet1501
 
Project management in thermal power plants
Project management in thermal power plantsProject management in thermal power plants
Project management in thermal power plantsPrashant Alekar
 
A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.Saurabh Biswas
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 

Mais procurados (19)

Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
 
India presentation 2
India presentation 2India presentation 2
India presentation 2
 
День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...
День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...
День атомної енергетики 2014. Technology Diversification - Westinghouse Exper...
 
Jw workshop
Jw workshopJw workshop
Jw workshop
 
Industrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadIndustrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC Faridabad
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Benefits of csp with thermal storage
Benefits of csp with thermal storageBenefits of csp with thermal storage
Benefits of csp with thermal storage
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
KALISINDH THARMAL POWER PLANT report by Neeraj Patidar
 KALISINDH THARMAL POWER PLANT report by Neeraj Patidar KALISINDH THARMAL POWER PLANT report by Neeraj Patidar
KALISINDH THARMAL POWER PLANT report by Neeraj Patidar
 
Report ntpc auraiya
Report ntpc auraiyaReport ntpc auraiya
Report ntpc auraiya
 
An industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYAAn industrial summer training at NTPC AURAIYA
An industrial summer training at NTPC AURAIYA
 
Power Alt application on establishment of a new 10_7 MW Power station- NERSA ...
Power Alt application on establishment of a new 10_7 MW Power station- NERSA ...Power Alt application on establishment of a new 10_7 MW Power station- NERSA ...
Power Alt application on establishment of a new 10_7 MW Power station- NERSA ...
 
Report ON NTPC DADRI .BY ....EMAM
Report ON NTPC DADRI  .BY ....EMAMReport ON NTPC DADRI  .BY ....EMAM
Report ON NTPC DADRI .BY ....EMAM
 
summer training report ntpc anta
summer training report ntpc antasummer training report ntpc anta
summer training report ntpc anta
 
A summer training report on NTPC
A summer training report on NTPCA summer training report on NTPC
A summer training report on NTPC
 
Project management in thermal power plants
Project management in thermal power plantsProject management in thermal power plants
Project management in thermal power plants
 
A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.A Praposal For Installation of 10 mw solar thermal power plant.
A Praposal For Installation of 10 mw solar thermal power plant.
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Energy and Power Brochure
Energy and Power BrochureEnergy and Power Brochure
Energy and Power Brochure
 

Destaque

交點台北Vol.12 - 林千郁 - 青年影響力論壇
交點台北Vol.12 - 林千郁 - 青年影響力論壇交點台北Vol.12 - 林千郁 - 青年影響力論壇
交點台北Vol.12 - 林千郁 - 青年影響力論壇交點
 
Aprendizaje en el contexto del desarrollo de la capacidad de aprender a aprender
Aprendizaje en el contexto del desarrollo de la capacidad de aprender a aprenderAprendizaje en el contexto del desarrollo de la capacidad de aprender a aprender
Aprendizaje en el contexto del desarrollo de la capacidad de aprender a aprenderAndres Cortina
 
Organization Theory booklet
Organization Theory bookletOrganization Theory booklet
Organization Theory bookletWilliam Kasati
 
1975 5 masuk sekolah
1975 5 masuk sekolah1975 5 masuk sekolah
1975 5 masuk sekolahSJKTRANTAU
 
交點桃園Vol.5 - Hank - free hugs
交點桃園Vol.5 - Hank - free hugs交點桃園Vol.5 - Hank - free hugs
交點桃園Vol.5 - Hank - free hugs交點
 
Top Things to Check out in Italy
Top Things to Check out in ItalyTop Things to Check out in Italy
Top Things to Check out in ItalyLauren Yurick
 
創人物Vol.5 - 實習講者 - 王思蘋
創人物Vol.5 - 實習講者 - 王思蘋創人物Vol.5 - 實習講者 - 王思蘋
創人物Vol.5 - 實習講者 - 王思蘋交點
 
Are employers whining or do we really have a skills gap?
Are employers whining or do we really have a skills gap?Are employers whining or do we really have a skills gap?
Are employers whining or do we really have a skills gap?serrainne Nyamori
 
Bg careers Packages [BG] 2016
Bg careers Packages [BG] 2016Bg careers Packages [BG] 2016
Bg careers Packages [BG] 2016Angel Ignatov
 
DealerHQ Investor Overview
DealerHQ Investor OverviewDealerHQ Investor Overview
DealerHQ Investor OverviewBrady Ferron
 
1974 1 keselamatan dlm makmal
1974 1 keselamatan dlm makmal1974 1 keselamatan dlm makmal
1974 1 keselamatan dlm makmalSJKTRANTAU
 
Boost Your Productivity Through an Innovative E-Sourcing Process Using Ariba ...
Boost Your Productivity Through an Innovative E-Sourcing Process Using Ariba ...Boost Your Productivity Through an Innovative E-Sourcing Process Using Ariba ...
Boost Your Productivity Through an Innovative E-Sourcing Process Using Ariba ...SAP Ariba
 
Estructura Atómica de los Materiales
Estructura Atómica de los MaterialesEstructura Atómica de los Materiales
Estructura Atómica de los MaterialesIvana Navas Smith
 
Endurance or stamina
Endurance or staminaEndurance or stamina
Endurance or staminaPARADELA2016
 
Journey towards Procurement Excellence through an Integrated SAP and Ariba So...
Journey towards Procurement Excellence through an Integrated SAP and Ariba So...Journey towards Procurement Excellence through an Integrated SAP and Ariba So...
Journey towards Procurement Excellence through an Integrated SAP and Ariba So...SAP Ariba
 

Destaque (20)

payroll
payrollpayroll
payroll
 
交點台北Vol.12 - 林千郁 - 青年影響力論壇
交點台北Vol.12 - 林千郁 - 青年影響力論壇交點台北Vol.12 - 林千郁 - 青年影響力論壇
交點台北Vol.12 - 林千郁 - 青年影響力論壇
 
Aprendizaje en el contexto del desarrollo de la capacidad de aprender a aprender
Aprendizaje en el contexto del desarrollo de la capacidad de aprender a aprenderAprendizaje en el contexto del desarrollo de la capacidad de aprender a aprender
Aprendizaje en el contexto del desarrollo de la capacidad de aprender a aprender
 
Organization Theory booklet
Organization Theory bookletOrganization Theory booklet
Organization Theory booklet
 
1975 5 masuk sekolah
1975 5 masuk sekolah1975 5 masuk sekolah
1975 5 masuk sekolah
 
Cuarta sesión
Cuarta sesiónCuarta sesión
Cuarta sesión
 
交點桃園Vol.5 - Hank - free hugs
交點桃園Vol.5 - Hank - free hugs交點桃園Vol.5 - Hank - free hugs
交點桃園Vol.5 - Hank - free hugs
 
Top Things to Check out in Italy
Top Things to Check out in ItalyTop Things to Check out in Italy
Top Things to Check out in Italy
 
創人物Vol.5 - 實習講者 - 王思蘋
創人物Vol.5 - 實習講者 - 王思蘋創人物Vol.5 - 實習講者 - 王思蘋
創人物Vol.5 - 實習講者 - 王思蘋
 
Are employers whining or do we really have a skills gap?
Are employers whining or do we really have a skills gap?Are employers whining or do we really have a skills gap?
Are employers whining or do we really have a skills gap?
 
Bg careers Packages [BG] 2016
Bg careers Packages [BG] 2016Bg careers Packages [BG] 2016
Bg careers Packages [BG] 2016
 
Escuelas y teorías gerenciales
Escuelas y teorías gerencialesEscuelas y teorías gerenciales
Escuelas y teorías gerenciales
 
Plastic+Surgery+US
Plastic+Surgery+USPlastic+Surgery+US
Plastic+Surgery+US
 
DealerHQ Investor Overview
DealerHQ Investor OverviewDealerHQ Investor Overview
DealerHQ Investor Overview
 
1974 1 keselamatan dlm makmal
1974 1 keselamatan dlm makmal1974 1 keselamatan dlm makmal
1974 1 keselamatan dlm makmal
 
Boost Your Productivity Through an Innovative E-Sourcing Process Using Ariba ...
Boost Your Productivity Through an Innovative E-Sourcing Process Using Ariba ...Boost Your Productivity Through an Innovative E-Sourcing Process Using Ariba ...
Boost Your Productivity Through an Innovative E-Sourcing Process Using Ariba ...
 
Estructura Atómica de los Materiales
Estructura Atómica de los MaterialesEstructura Atómica de los Materiales
Estructura Atómica de los Materiales
 
Endurance or stamina
Endurance or staminaEndurance or stamina
Endurance or stamina
 
S2 circuitos de corriente alterna 2015
S2 circuitos de corriente alterna 2015S2 circuitos de corriente alterna 2015
S2 circuitos de corriente alterna 2015
 
Journey towards Procurement Excellence through an Integrated SAP and Ariba So...
Journey towards Procurement Excellence through an Integrated SAP and Ariba So...Journey towards Procurement Excellence through an Integrated SAP and Ariba So...
Journey towards Procurement Excellence through an Integrated SAP and Ariba So...
 

Semelhante a China CSP Demonstration Projects

Coventry university CASE STUDY
Coventry university CASE STUDYCoventry university CASE STUDY
Coventry university CASE STUDYPaul Harrison
 
Company profile 2016
Company profile 2016Company profile 2016
Company profile 2016andy purnama
 
Abengoa Innovation - Hydrogen service station Infrastructure
Abengoa Innovation - Hydrogen service station InfrastructureAbengoa Innovation - Hydrogen service station Infrastructure
Abengoa Innovation - Hydrogen service station InfrastructureAbengoa
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectRubnawaz Bhatti
 
Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report muhammad khurram
 
Ukti marketing brief make it happens -jan2014
Ukti marketing brief  make it happens  -jan2014Ukti marketing brief  make it happens  -jan2014
Ukti marketing brief make it happens -jan2014Sarod Paichayonrittha
 
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...Global CCS Institute
 
Penarroyo ADB Geothermal Presentation 2012
Penarroyo ADB Geothermal Presentation 2012Penarroyo ADB Geothermal Presentation 2012
Penarroyo ADB Geothermal Presentation 2012Fernando Penarroyo
 
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...Global CCS Institute
 
Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014
Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014
Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014Global CCS Institute
 
Baglihar hydro electric power plant
Baglihar hydro electric power plantBaglihar hydro electric power plant
Baglihar hydro electric power plantRaja Katoch
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipatpratikguptateddy
 
Final Technical Report
Final Technical ReportFinal Technical Report
Final Technical ReportJeremy Evans
 
Waste Heat Recovery Power Plant - WHRPP Kalina Based Cycle.
Waste Heat Recovery Power Plant - WHRPP Kalina Based Cycle.Waste Heat Recovery Power Plant - WHRPP Kalina Based Cycle.
Waste Heat Recovery Power Plant - WHRPP Kalina Based Cycle.Muhammad Awais
 
2017 9 中国燃气发电项目名录
2017 9 中国燃气发电项目名录2017 9 中国燃气发电项目名录
2017 9 中国燃气发电项目名录arapublication
 
MPC Capability Brochure_V6_2016_Digital
MPC Capability Brochure_V6_2016_DigitalMPC Capability Brochure_V6_2016_Digital
MPC Capability Brochure_V6_2016_DigitalDave Machin
 

Semelhante a China CSP Demonstration Projects (20)

Coventry university CASE STUDY
Coventry university CASE STUDYCoventry university CASE STUDY
Coventry university CASE STUDY
 
Company profile 2016
Company profile 2016Company profile 2016
Company profile 2016
 
Solar Power 2
Solar Power 2Solar Power 2
Solar Power 2
 
118910007-Solar-Collectors.ppt
118910007-Solar-Collectors.ppt118910007-Solar-Collectors.ppt
118910007-Solar-Collectors.ppt
 
Abengoa Innovation - Hydrogen service station Infrastructure
Abengoa Innovation - Hydrogen service station InfrastructureAbengoa Innovation - Hydrogen service station Infrastructure
Abengoa Innovation - Hydrogen service station Infrastructure
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
 
Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report
 
Ukti marketing brief make it happens -jan2014
Ukti marketing brief  make it happens  -jan2014Ukti marketing brief  make it happens  -jan2014
Ukti marketing brief make it happens -jan2014
 
The Peterhead Carbon Capture and Storage Project - plenary presentation given...
The Peterhead Carbon Capture and Storage Project - plenary presentation given...The Peterhead Carbon Capture and Storage Project - plenary presentation given...
The Peterhead Carbon Capture and Storage Project - plenary presentation given...
 
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
Webinar: 'Applying carbon capture and storage to a Chinese steel plant.' Feas...
 
Penarroyo ADB Geothermal Presentation 2012
Penarroyo ADB Geothermal Presentation 2012Penarroyo ADB Geothermal Presentation 2012
Penarroyo ADB Geothermal Presentation 2012
 
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
'Applying carbon capture and storage to a Chinese steel plant.' Feasibility s...
 
Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014
Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014
Clare Penrose - No CCS, No 2 degrees. Japan Clean Coal Day 2014
 
Baglihar hydro electric power plant
Baglihar hydro electric power plantBaglihar hydro electric power plant
Baglihar hydro electric power plant
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 
Final Technical Report
Final Technical ReportFinal Technical Report
Final Technical Report
 
Waste Heat Recovery Power Plant - WHRPP Kalina Based Cycle.
Waste Heat Recovery Power Plant - WHRPP Kalina Based Cycle.Waste Heat Recovery Power Plant - WHRPP Kalina Based Cycle.
Waste Heat Recovery Power Plant - WHRPP Kalina Based Cycle.
 
2017 9 中国燃气发电项目名录
2017 9 中国燃气发电项目名录2017 9 中国燃气发电项目名录
2017 9 中国燃气发电项目名录
 
Ntpc 131113070238-phpapp02
Ntpc 131113070238-phpapp02Ntpc 131113070238-phpapp02
Ntpc 131113070238-phpapp02
 
MPC Capability Brochure_V6_2016_Digital
MPC Capability Brochure_V6_2016_DigitalMPC Capability Brochure_V6_2016_Digital
MPC Capability Brochure_V6_2016_Digital
 

Mais de Klaus Pottler

CSP Services Automatic Weather Stations-1510 中国
CSP Services Automatic Weather Stations-1510 中国CSP Services Automatic Weather Stations-1510 中国
CSP Services Automatic Weather Stations-1510 中国Klaus Pottler
 
CSP Services QDec-1510-中国
CSP Services QDec-1510-中国CSP Services QDec-1510-中国
CSP Services QDec-1510-中国Klaus Pottler
 
CSP Services QFoto-1510_中国
CSP Services QFoto-1510_中国CSP Services QFoto-1510_中国
CSP Services QFoto-1510_中国Klaus Pottler
 
CSP Services Expert Services-1510-中国
CSP Services Expert Services-1510-中国CSP Services Expert Services-1510-中国
CSP Services Expert Services-1510-中国Klaus Pottler
 
CSP Services Optimizing Solar Power-1510
CSP Services Optimizing Solar Power-1510CSP Services Optimizing Solar Power-1510
CSP Services Optimizing Solar Power-1510Klaus Pottler
 
CSP Services: Optimizing Solar Power-1510-中国
CSP Services: Optimizing Solar Power-1510-中国CSP Services: Optimizing Solar Power-1510-中国
CSP Services: Optimizing Solar Power-1510-中国Klaus Pottler
 
CSP Solar Field Quality Assurance Methods
CSP Solar Field Quality Assurance MethodsCSP Solar Field Quality Assurance Methods
CSP Solar Field Quality Assurance MethodsKlaus Pottler
 

Mais de Klaus Pottler (8)

CATCHING MORE SUN
CATCHING MORE SUNCATCHING MORE SUN
CATCHING MORE SUN
 
CSP Services Automatic Weather Stations-1510 中国
CSP Services Automatic Weather Stations-1510 中国CSP Services Automatic Weather Stations-1510 中国
CSP Services Automatic Weather Stations-1510 中国
 
CSP Services QDec-1510-中国
CSP Services QDec-1510-中国CSP Services QDec-1510-中国
CSP Services QDec-1510-中国
 
CSP Services QFoto-1510_中国
CSP Services QFoto-1510_中国CSP Services QFoto-1510_中国
CSP Services QFoto-1510_中国
 
CSP Services Expert Services-1510-中国
CSP Services Expert Services-1510-中国CSP Services Expert Services-1510-中国
CSP Services Expert Services-1510-中国
 
CSP Services Optimizing Solar Power-1510
CSP Services Optimizing Solar Power-1510CSP Services Optimizing Solar Power-1510
CSP Services Optimizing Solar Power-1510
 
CSP Services: Optimizing Solar Power-1510-中国
CSP Services: Optimizing Solar Power-1510-中国CSP Services: Optimizing Solar Power-1510-中国
CSP Services: Optimizing Solar Power-1510-中国
 
CSP Solar Field Quality Assurance Methods
CSP Solar Field Quality Assurance MethodsCSP Solar Field Quality Assurance Methods
CSP Solar Field Quality Assurance Methods
 

Último

04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 

Último (20)

04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 

China CSP Demonstration Projects

  • 1. China CSP Demonstration Projects Data provided and use granted by Catherine Wu, CSPPLAZA Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy. Klaus Pottler 1 28 Sept. 2016 www.cspservices.de
  • 2. China CSP Demonstration Projects Data provided and use granted by Catherine Wu, CSPPLAZA Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy. Klaus Pottler 2 28 Sept. 2016 www.cspservices.de
  • 3. China CSP Demonstration Projects Data provided and use granted by Catherine Wu, CSPPLAZA Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy. Klaus Pottler 3 28 Sept. 2016 www.cspservices.de 1 Delingha 50MW Molten Salt Tower Location of project: Delingha, Qinghai DNI: 1976 kWh/m²/yr Project owner: Qinghai Supcon Solar Technology Delingha Co., Ltd. Project filing: completed Route of technology: molten salt tower, 6 hours of molten salt thermal storage Source of technology: Zhejiang Supcon Solar technology Co., Ltd. System conversion efficiency: 18% (the design point efficiency) Floor space: about 2.4 km² Height of tower: about 180 m Lighting area: about 550,000 m² Size of heliostat: 20 m² Designed generating capacity: 136 million kWh Current situation: The preliminary design of the whole plant has been finished, and relevant process packages have been all set. Comment: Supcon Delingha 10MW Tower plant joined the national grid officially in July 5th, 2013. In August 20th, 2016, the molten salt reconstruction project based on this 10MW project realized one-time whole-process functioning and joined the national grid successfully. 2 Dunhuang 100MW Molten Salt Location of project: Dunhuang, Gansu DNI: 2000kWh/m²/yr Project owner: Shouhang IHW Resources Saving Technology Co., Ltd. Route of technology: molten salt, 11 hours of molten salt thermal storage Source of technology: Shouhang IHW Resources Saving Technology Co., Ltd. Project filing: completed Height of tower: 180 m Size of heliostat: 120 m² Total investment: ¥304 million, including ¥303.025 million of construction investment and ¥9,750,000 of initial working capital Financing channel: The owner has raised ¥4.6 billion by way of private placement, including ¥3.04 billion used for the construction of the project Project purchasing: Steam turbine: GE/Siemens/MAN (planned) Molten salt pump: Moret/Flowserve (planned) Other major equipment, such as heliostat, thermal absorber and air cooling system will all be chosen among home products
  • 4. China CSP Demonstration Projects Data provided and use granted by Catherine Wu, CSPPLAZA Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy. Klaus Pottler 4 28 Sept. 2016 www.cspservices.de Current situation: The opening ceremony of this project was held on November 9th, 2015. And the preliminary work has been finished completely. The former 10MW demonstration project with a 15-hour molten salt thermal storage system started construction in August 2014, and is expected to go into operation in October of this year. Comment: The Reply from Jiuquan Energy Bureau to the altered technical proposal on Dunhuang 2X50MW Molten Salt Tower CSP Project of Dunhuang Shouhang IHW Resources Saving Technology Co., Ltd., released on October 30th, 2015, agreed this altered technical proposal, changing to 100MW single-tower molten salt tower CSP project, which also changed the capacity of this project to 100MW in the final list. 3 Qinghai Gonghe 50MW Molten Salt Tower Location of project: Gonghe County, Hainan Autonomous Prefecture, Qinghai DNI: about 1900 kWh/m²/yr Project owner: Northwest Institute of Survey and Design of China Hydropower Consulting Group Feasibility study institute: Northwest Institute of Survey and Design Route of technology: molten salt tower, 6 hours of molten salt thermal storage Source of technology: Zhejiang Supcon Solar Technology Co., Ltd. (planned) Project filing: completed Height of tower: 171 m Lighting area: 516,000 m² Size of heliostat: 20 m² Amount of heliostats: 25795 Comment: In April 2014, the Proposal about Starting the Preliminary Work of Qinghai Gonghe CSP Project was submitted to People’s Government of Qinghai Gonghe. In September 2014, the Proposal was agreed. In October 28th, 2015, Qinghai Development and Reform Commission approved the project put on record. Development idea: Placing independent design and home equipment first, and foreign consulting agencies second 4 Hami 50MW Location of project: Hami, Xinjiang DNI: about 1900 kWh/m²/yr Project owner: Northwest Electric Power Design Institute of China Power Engineering Consulting Group Feasibility study institute: Northwest Electric Power Design Institute Route of technology: molten salt tower, 8 hours of molten salt thermal storage Source of technology: Zhejiang Supcon Solar Technology Co., Ltd. (planned) Project filing: underway
  • 5. China CSP Demonstration Projects Data provided and use granted by Catherine Wu, CSPPLAZA Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy. Klaus Pottler 5 28 Sept. 2016 www.cspservices.de Comment: In July 20th, 2016, the opening meeting for preparation was held in Beijing. In August 12th, the review on the feasibility study report was finished. In August 23th, the Construction Mode Seminar was held in Xian. The reported capacity of this project when it applying for the demonstration project is 2X50MW. In the end, one 50MW unit was selected into the final list of the demonstration projects. 5 Delingha Qinghai 135MW DSG Tower Location of project: Delingha, Qinghai DNI: about 1900 kWh/m²/yr Project owner: Huanghe Hydropower Development Co., Ltd. Feasibility study institute: Northwest Electric Power Design Institute EPC: Shanghai Electric Brightsource Solar Energy Co., Ltd. Route of technology: DSG Tower, 3.7 hours of molten salt thermal storage Source of technology: Brightsource Project filing: completed Comment: This project has the biggest capacity among the first batch demonstration projects. The EPC of the project is obtained by Shanghai Electric Brightsource Solar Energy Co., Ltd, which is a joint venture composed of Brightsource and Shanghai Electric. It adopts the DSG technique, which yields superheated steam directly and stores thermal energy through transferring heat from steam to molten salt. 6 Golden Tower 100MW Molten Salt Tower Location of project: Jinta, Jiuquan, Gansu DNI: about 1900 kWh/m²/yr Project owner: China Three Gorges New Energy Co., Ltd Feasibility study institute: Northwest Institute of Survey and Design Route of technology: molten salt tower, 8 hours of molten salt thermal storage Source of technology: Shouhang IHW Resources Saving Technology Co., Ltd Northwest Institute of Survey and Design of China Hydropower Consulting Group (planned) Project filing: completed Introduction of China Three Gorges New Energy Co., Ltd: China Three Gorges New Energy Co., Ltd (TGNE) is a wholly-owned subsidiary of China Three Gorges Corporation (TGC), bearing the historical missions of developing new energy and forging the second main business of TGC. In recent years, TGNE is vigorously developing land wind power and PV, positively exploiting offshore wind power, steadily enhancing small and medium hydropower business, carrying forward CSP and closely following other renewable energy techniques such as tidal energy and biomass energy, basically forming a business structure of mutual support and collaborative development in four main domains, namely wind power, solar power, small hydropower and equipment manufacturing.
  • 6. China CSP Demonstration Projects Data provided and use granted by Catherine Wu, CSPPLAZA Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy. Klaus Pottler 6 28 Sept. 2016 www.cspservices.de 7 Yumen 50MW Molten Salt Tower Location of project: Yumen, Gansu DNI: about 1800 kWh/m²/yr Project owner: Yumen Xinneng Thermal Power Co., Ltd Route of technology: molten salt tower, beam down system with molten salt Source of technology: Shanghai Parasol Renewable Energy Company Jiangsu Xinchen CSP Co., Ltd Status of project: Construction of this project is planned to start in October of this year. The base of tower and plant will be built first. Comment: The project adopts the unique beam down tower CSP technique. At present, there is only one 100KW demonstration system with this technique around the world. Xinchen Company completed a 300KW beam down demonstration project in Yancheng, Jiangsu in 2015. Based on the above demonstration project, the commercial 50MW project will start in Yumen. The project will build some beam down towers, composing 50MW capacity together. Shanghai Parasol and Jiangsu Xinchen have some connections. They both work on driving the commercial application of the beam down system with molten salt. 8 Yumen 100MW Molten Salt Tower Location of project: Yumen, Gansu DNI: about 1800 kWh/m²/yr Project owner: Beijing Guohua Electric Power Co., Ltd Route of technology: molten salt tower, 10 hours of molten salt thermal storage Source of technology: Shouhang IHW Resources Saving Technology Co., Ltd (planned) Project filing: underway Total investment: RMB3.53661 million Comment: According to the CSP development plan for 2015-2030 drafted by Guohua Electric, it plans to complete 1.5GW during 2015-2020, 3.5GW during 2020-2025 and 6GW during 2025-2030. This project is the first commercial CSP plant developed by Guohua Electric. 9 Shangyi 50MW DSG Tower Location of project: Shangyi, Zhangjiakou, Hebei DNI: about 1600 kWh/m²/yr Project owner: DaHua Engineering Management(Group) Co., Ltd. Institute of Electrical Engineering of CAS Route of technology: DSG tower, 4 hours of molten salt thermal storage Source of technology: Institute of Electrical Engineering of CAS Status of project: project filing is underway
  • 7. China CSP Demonstration Projects Data provided and use granted by Catherine Wu, CSPPLAZA Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy. Klaus Pottler 7 28 Sept. 2016 www.cspservices.de Comment: This project uses the DSG tower technique, storing thermal energy through exchanging heat from steam to molten salt. Introduction of project owner: DaHua Engineering Management(Group) Co., Ltd. is founded under the approval of State Development Planning Commission(SDPC), State Science and Technology Commission and the State Council, which is a joint stock company restructured from DaHua Energy Technology company directly under SDPC. Possessing qualifications issued by a couple of state commissions, DaHua has strong strength in many businesses including project preliminary planning, designing, engineering consulting, project management(supervising), engineering construction, EPC general contract, investment and development. DaHua will work with Institute of Electrical Engineering of CAS to develop this project jointly. 10 Yumen 50MW Thermal Oil Trough Location of project: Yumen, Gansu DNI: about 1800 kWh/m²/yr Project owner: Royal Tech CSP Limited Route of technology: thermal oil parabolic trough 7 hours of molten salt thermal storage Source of technology: Royal Tech CSP Limited Status of project: project filing is underway Introduction of project owner: Changzhou Royal Tech CSP Limited is devoted to CSP and development, innovation and industry promotion in the area of distributed solar utilization. Main businesses cover high temperature evacuated collector tube, system integration of thermal field and system of distributed solar combined supply of cooling, heating and power. As one of the pioneers in China CSP area, Changzhou Royal has made a major breakthrough in key component of CSP, whose homemade high temperature evacuated collector tube is successfully applied in overseas commercial plant for the first time. Its technique in system integration of thermal field was ranked as international advanced level by CSP Services, an international authoritative institution in CSP. 11 Gansu Akesai 50MW Molten Salt Trough Location of project: Akesai, Jiuquan, Gansu DNI: about 2056.5 kWh/m²/yr Project owner: Shenzhen Jinfan Energy Technology Co., Ltd. Route of technology: molten salt trough, 15 hours of molten salt thermal storage Source of technology: Tianjin Binhai Concentrating Solar Power Investm. Co., Ltd. Status of project: project filing has been completed.
  • 8. China CSP Demonstration Projects Data provided and use granted by Catherine Wu, CSPPLAZA Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy. Klaus Pottler 8 28 Sept. 2016 www.cspservices.de Introduction of project owner: Tianjin Binhai Concentrating Solar Power Investment Co., Ltd. is co-funded by Shenzhen Nuclear Power Engineering Co., Ltd. and the government of Tianjin Binhai High-tech Zone. Shenzhen Jinfan is the then project applying body, but the actual body has been changed to Tianjin Binhai. Tianjin Binhai brought in the world’s leading CSP techniques, aiming to realize localized production to reduce cost. Its ultimate goal is to build a 200MW base equipped with a large-scale system including heat collection, thermal storage, heat exchange and power generation and a world-class CSP R&D center. The Akesai project will rely on this base to realize the localization of equipment. 12 Yumen East Town 50MW Thermal Oil Trough Location of project: Yumen, Gansu DNI: about 1800 kWh/m²/yr Project owner: Rayspower Energy Group Co., Ltd. Route of technology: thermal oil parabolic trough 7 hours of molten salt thermal storage Source of technology: Rayspower Energy Group Co., Ltd. Introduction of project owner: Rayspower Energy Group Co., Ltd. focuses on the business of the system integration of CSP plant. It opened a leading reflecting mirror plant in Chengdu in June 2013. Based on this plant, it cuts in the sun island EPC area. Through the construction of Yanqing 863 Trough Testing project, it has accumulated integration experience in trough mirror field. Meanwhile, it’s a new three board listed company, which, to some extent, is favorable to its financing. 13 Urat Middle Banner 100MW Thermal Oil Parabolic Trough Location of project: Urat Middle Banner, Inner Mongolia DNI: 2025 kWh/m²/yr Project owner: Inner Mongolia Royal Tech New Energy Co., Ltd. Route of technology: thermal oil parabolic trough 4 hours of molten salt thermal storage Source of technology: Changzhou Royal Tech Solar Thermal Equipment Co., Ltd. Project Filing: completed Comment: The feasibility study of this project is finished in May, 2016. Introduction of project owner: Inner Mongolia Royal Tech New Energy Co., Ltd. is co-founded by Changzhou Royal Tech Development Co., Ltd, a subsidiary of Royal Tech, and Nanjing Zhonghe Solar Energy Technology Co., Ltd. in July 14th, 2015.
  • 9. China CSP Demonstration Projects Data provided and use granted by Catherine Wu, CSPPLAZA Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy. Klaus Pottler 9 28 Sept. 2016 www.cspservices.de 14 50MW Thermal Oil Parabolic Trough Location of project: Delingha, Qinghai DNI: 1976 kWh/m²/yr Project owner: CGN Delingha Solar Energy Development Co., Ltd. Route of technology: thermal oil parabolic trough 9 hours of molten salt thermal storage Source of technology: CGN Solar Energy Development Co., Ltd. EPC of Sun Island: Shouhang IHW Resources Saving Technology Co., Ltd. And Shandong Second Power Construction Company EPC of Thermal Storage Island: Shandong Sunway Petrochemical Engineering Co., Ltd. EPC of Conventional Island: Northwest Electric Power Design Institute Co., Ltd. of China Power Engineering Consulting Group OE: Aries Basic design: Ingeteam Feasibility study institute: Northwest Electric Power Design Institute Co., Ltd. of China Power Engineering Consulting Group Heat transfer oil: Suzhou Solutia Therminol Co., Ltd. Molten salt: sodium nitrate (Sinkiang Nitrate Minerals Co., Ltd.) & potassium nitrate (Shanxi Wentong Sylvite Group) Steam turbine: Dongfang Electric Corporation Molten salt pump: Moret pump Oil-water heat exchanger: Harbin Turbine Company Limited Status of project: The construction work was officially started in July 1st, 2014. Northwest Electric Power Design Institute, EPC of Conventional Island, entered into construction phase successively in August 2015. Shandong Sunway Petrochemical Engineering Co., Ltd., EPC of Thermal Storage Island, signed the EPC contract with CGN side in March 1st this year and then it started work immediately. EPC contract of Sun Island was signed officially in late August. Now, the preparation for construction is underway. Comment: This plant is the first commercial 50MW parabolic trough built in China. 15 Gulang 100MW Thermal Oil Parabolic Trough Location of project: Gulang, Weiwu, Gansu DNI: 1913 kWh/m²/yr Project owner: OECEP Gansu Weiwu Solar Technology Co., Ltd Route of technology: thermal oil parabolic trough 7 hours of molten salt thermal storage Source of technology: Changzhou Royal Tech Solar Thermal Equipment Co., Ltd. (planned) Status of technology: project filing is underway.
  • 10. China CSP Demonstration Projects Data provided and use granted by Catherine Wu, CSPPLAZA Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy. Klaus Pottler 10 28 Sept. 2016 www.cspservices.de 16 64MW Molten Salt Parabolic Trough Location of project: Chabei, Zhangjiakou, Hebei DNI: about 1700 kWh/m²/yr Project owner: Zhongyang Zhangjiakou Chabei Route of technology: molten salt parabolic trough 16 hours of molten salt thermal storage Source of technology: Skyfuel Status of project: Opening ceremony was held in July 2014. Introduction of project owner: OECEP Gansu Weiwu Solar Technology Co., Ltd. is a project company established by Beijing Guo Tou Jun An Investment Management Co., Ltd. in Zhangjiakou. Public information shows, Guo Tou Jun An is a professional company specializing in promoting CSP technology and projects founded under the help of State-owned Assets Supervision and Administration Commission (SASAC) and National Development and Reform Commission (NDRC). Comment: Skyfuel, the technology partner and founded in 2007, innovated reflecting mirror and heat collector in trough CSP. Its featured product is a new reflecting mirror based on the reflectance coating technique, which uses ReflectTechPLUS as coating. Moreover, it designed SkyTrough(R), which is a high-performance parabolic trough heat collector. Equipped with SkyTrough(R), the performance of heat collector has been enhanced and the cost reduced significantly. 17 Dacheng Dunhuang 50MW Molten Salt Fresnel Location of project: Dunhuang, Gansu DNI: 2000 kWh/m²/yr Project owner: Lanzhou Dacheng Technology Co., Ltd Status of project: Project filing has been completed. The first 10MW is under-construction. Comment: The applied capacity was 110MW. The final capacity approved is 50MW. Introduction of project owner: Lanzhou Dacheng has carried on the development and research of key components and system integration since 2008. In May 2012, it built China’s first 200KW Fresnel &Trough CSP system. At present, it focuses on Fresnel technique, which is quite suitable to be applied in Northwest of China. The Fresnel heat collector with full intellectual property, relying on independent research and development, have many advantages, such as small land occupation, strong wind resistance, short construction period, easy testing and simple maintenance. This project is the world’s first commercial molten salt Fresnel CSP plant.
  • 11. China CSP Demonstration Projects Data provided and use granted by Catherine Wu, CSPPLAZA Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy. Klaus Pottler 11 28 Sept. 2016 www.cspservices.de 18 Zhangbei 50MW CSG Fresnel CSP project Location of project: Zhangbei, Zhangjiakou, Hebei DNI: 1750 kWh/m²/yr Project owner: Zhangbei Huaqiang Zhaoyang Co., Ltd. Feasibility study institute: Hebei Electric Power Design & Research Institute Route of technology: DSG Fresnel all solid state formulated concrete thermal storage Source of technology: Beijing Terasolar Photothermal Technologies Co., Ltd. Status of project: Feasibility study was finished in February 2015 Filing was finished in February 15th this year. Comment: Zhangbei Huaqiang Zhaoyang Co., Ltd., funded and established by Xinli Energy Development Co., Ltd., adopts the improved Fresnel technique provided by Beijing Terasolar Photothermal Technologies Co., Ltd. Main technological innovation lies in its unique heat collector designing and all solid state formulated concrete thermal storage technique. The applied capacity is 2*50MW, one of which is finally chosen. Introduction of project owner: Zhangbei Huaqiang Zhaoyang Co., Ltd. is funded and established by Xinli Energy Development Co., Ltd. in December 26th, 2014 with registered capital of RMB42500. 19 Zhangjiakou 50MW Location of project: Zhangbei, Zhangjiakou, Hebei DNI: about 1750 kWh/m²/yr Project owner: Zhangbei Huaqiang Zhaoyang Energy Co., Ltd. Route of technology: DSG Fresnel 14 hours of all solid state formulated concrete thermal storage Source of technology: Beijing TeraSolar Photothemal Technologies Co., Ltd. Status of project: The preliminary work, including feasibility study, construction design and project filing has been finished. Comment: This project also adopts the improved Fresnel technique provided by Beijing Terasolar Photothermal Technologies Co., Ltd. Main technological innovation lies in its unique heat collector designing and all solid state formulated concrete thermal storage technique. The applied price is RMB1.12/kWh, which is the lowest among the first batch of 20 demonstration projects. Zhangjiakou No.1 15MW CSP plant, which is now under-construction by Huaqiang Zhaoyang, is expected to join the national grid at the end of this year. Introduction of project owner: Zhangbei Huaqiang Zhaoyang Energy Co., Ltd., with a registered capital of RMB100 million, was founded in January 29th, 2015.
  • 12. China CSP Demonstration Projects Data provided and use granted by Catherine Wu, CSPPLAZA Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy. Klaus Pottler 12 28 Sept. 2016 www.cspservices.de 20 Urat 50MW Fresnel Location of project: Urat, Inner Mongolia DNI: 2025 kWh/m²/yr Project owner: Huaneng North United Power Co., Ltd. Route of technology: thermal oil Fresnel, 6 hours of molten salt thermal storage Source of technology: China Huaneng Group Clean Energy Technology Research Institute Status of project: Feasibility study review was finished in September 2016 Project filing is underway Comment: This project uses thermal oil as heat transfer medium, which has never happened in the existing commercial Fresnel projects worldwide. These commercial projects usually adopt DSG and don’t have thermal storage system. Introduction of project owner: Huaneng North United Power Co., Ltd. is a joint-equity enterprise funded by China Huaneng Group, CITIC Limited, Inner Mongolia Power Co., Ltd. and China Shenhua Energy Company Limited with a registered capital of RMB10 billion. Once in a monopoly position, now it’s a pretty competitive market entity.
  • 13. China CSP Demonstration Projects Data provided and use granted by Catherine Wu, CSPPLAZA Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy. Klaus Pottler 13 28 Sept. 2016 www.cspservices.de Information on CSP Services CSP Services GmbH, Concentrating Solar Power Services, is a spin-off company of the German Aerospace Center (DLR) in Cologne, Germany, with know-how licensed from DLR. CSPS offers engineering and consulting services for developers, operators and owners of solar thermal power plants applying innovative and specific measurement techniques to assure high performance solar fields. Besides the know-how in standard measurement technologies, special techniques such as close range photogrammetry and deflectometry together with specially developed evaluation and assessment tools serve the clients for prototype evaluation, quality assurance, inspection and performance improvement of solar fields in concentrating solar power plants (i.e. parabolic troughs, heliostats, Fresnel systems, dishes). CSPS supports its clients to decrease risks, increase project performance, and gain competitiveness in the growing concentrating solar power market sector. Our range of products and services includes the geometric quality assurance systems QFoto (3D point measurements of large structures in series production) and QDec (high-resolution shape measurements of reflective surfaces in series production) for application in solar power plants. For solar irradiation resource assessment, we supply the automatic weather stations MDI (for DNI measurement at remote sites) and MHP (for high-precision DNI measurement and solar power plant monitoring). With our mobile solar field measurement services, we assess the quality of all kinds of solar concentrators, and our consulting services cover specific topics such as technical reviews, due diligence and operation monitoring. QFoto: Structure 3D Testing QRec: Receiver Performance Testing QDec: Mirror Shape Testing
  • 14. China CSP Demonstration Projects Data provided and use granted by Catherine Wu, CSPPLAZA Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy. Klaus Pottler 14 28 Sept. 2016 www.cspservices.de UAV Picture: DLR
  • 15. China CSP Demonstration Projects Data provided and use granted by Catherine Wu, CSPPLAZA Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy. Klaus Pottler 15 28 Sept. 2016 www.cspservices.de