2. China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 2 28 Sept. 2016
www.cspservices.de
3. China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 3 28 Sept. 2016
www.cspservices.de
1 Delingha 50MW Molten Salt Tower
Location of project: Delingha, Qinghai
DNI: 1976 kWh/m²/yr
Project owner: Qinghai Supcon Solar Technology Delingha Co., Ltd.
Project filing: completed
Route of technology: molten salt tower, 6 hours of molten salt thermal storage
Source of technology: Zhejiang Supcon Solar technology Co., Ltd.
System conversion efficiency: 18% (the design point efficiency)
Floor space: about 2.4 km²
Height of tower: about 180 m
Lighting area: about 550,000 m²
Size of heliostat: 20 m²
Designed generating capacity: 136 million kWh
Current situation:
The preliminary design of the whole plant has been finished, and relevant process packages
have been all set.
Comment:
Supcon Delingha 10MW Tower plant joined the national grid officially in July 5th, 2013. In
August 20th, 2016, the molten salt reconstruction project based on this 10MW project
realized one-time whole-process functioning and joined the national grid successfully.
2 Dunhuang 100MW Molten Salt
Location of project: Dunhuang, Gansu
DNI: 2000kWh/m²/yr
Project owner: Shouhang IHW Resources Saving Technology Co., Ltd.
Route of technology: molten salt, 11 hours of molten salt thermal storage
Source of technology: Shouhang IHW Resources Saving Technology Co., Ltd.
Project filing: completed
Height of tower: 180 m
Size of heliostat: 120 m²
Total investment: ¥304 million, including ¥303.025 million of construction
investment and ¥9,750,000 of initial working capital
Financing channel: The owner has raised ¥4.6 billion by way of private
placement, including ¥3.04 billion used for the construction
of the project
Project purchasing: Steam turbine: GE/Siemens/MAN (planned)
Molten salt pump: Moret/Flowserve (planned)
Other major equipment, such as heliostat, thermal absorber
and air cooling system will all be chosen among home
products
4. China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 4 28 Sept. 2016
www.cspservices.de
Current situation:
The opening ceremony of this project was held on November 9th, 2015. And the preliminary
work has been finished completely. The former 10MW demonstration project with a 15-hour
molten salt thermal storage system started construction in August 2014, and is expected to go
into operation in October of this year.
Comment:
The Reply from Jiuquan Energy Bureau to the altered technical proposal on Dunhuang
2X50MW Molten Salt Tower CSP Project of Dunhuang Shouhang IHW Resources Saving
Technology Co., Ltd., released on October 30th, 2015, agreed this altered technical proposal,
changing to 100MW single-tower molten salt tower CSP project, which also changed the
capacity of this project to 100MW in the final list.
3 Qinghai Gonghe 50MW Molten Salt Tower
Location of project: Gonghe County, Hainan Autonomous Prefecture, Qinghai
DNI: about 1900 kWh/m²/yr
Project owner: Northwest Institute of Survey and Design of China
Hydropower Consulting Group
Feasibility study institute: Northwest Institute of Survey and Design
Route of technology: molten salt tower, 6 hours of molten salt thermal storage
Source of technology: Zhejiang Supcon Solar Technology Co., Ltd. (planned)
Project filing: completed
Height of tower: 171 m
Lighting area: 516,000 m²
Size of heliostat: 20 m²
Amount of heliostats: 25795
Comment:
In April 2014, the Proposal about Starting the Preliminary Work of Qinghai Gonghe CSP
Project was submitted to People’s Government of Qinghai Gonghe. In September 2014, the
Proposal was agreed. In October 28th, 2015, Qinghai Development and Reform Commission
approved the project put on record.
Development idea:
Placing independent design and home equipment first, and foreign consulting agencies second
4 Hami 50MW
Location of project: Hami, Xinjiang
DNI: about 1900 kWh/m²/yr
Project owner: Northwest Electric Power Design Institute of China
Power Engineering Consulting Group
Feasibility study institute: Northwest Electric Power Design Institute
Route of technology: molten salt tower, 8 hours of molten salt thermal storage
Source of technology: Zhejiang Supcon Solar Technology Co., Ltd. (planned)
Project filing: underway
5. China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 5 28 Sept. 2016
www.cspservices.de
Comment:
In July 20th, 2016, the opening meeting for preparation was held in Beijing. In August 12th,
the review on the feasibility study report was finished. In August 23th, the Construction Mode
Seminar was held in Xian. The reported capacity of this project when it applying for the
demonstration project is 2X50MW. In the end, one 50MW unit was selected into the final list
of the demonstration projects.
5 Delingha Qinghai 135MW DSG Tower
Location of project: Delingha, Qinghai
DNI: about 1900 kWh/m²/yr
Project owner: Huanghe Hydropower Development Co., Ltd.
Feasibility study institute: Northwest Electric Power Design Institute
EPC: Shanghai Electric Brightsource Solar Energy Co., Ltd.
Route of technology: DSG Tower, 3.7 hours of molten salt thermal storage
Source of technology: Brightsource
Project filing: completed
Comment:
This project has the biggest capacity among the first batch demonstration projects. The EPC
of the project is obtained by Shanghai Electric Brightsource Solar Energy Co., Ltd, which is a
joint venture composed of Brightsource and Shanghai Electric. It adopts the DSG technique,
which yields superheated steam directly and stores thermal energy through transferring heat
from steam to molten salt.
6 Golden Tower 100MW Molten Salt Tower
Location of project: Jinta, Jiuquan, Gansu
DNI: about 1900 kWh/m²/yr
Project owner: China Three Gorges New Energy Co., Ltd
Feasibility study institute: Northwest Institute of Survey and Design
Route of technology: molten salt tower, 8 hours of molten salt thermal storage
Source of technology: Shouhang IHW Resources Saving Technology Co., Ltd
Northwest Institute of Survey and Design of China
Hydropower Consulting Group (planned)
Project filing: completed
Introduction of China Three Gorges New Energy Co., Ltd:
China Three Gorges New Energy Co., Ltd (TGNE) is a wholly-owned subsidiary of China
Three Gorges Corporation (TGC), bearing the historical missions of developing new energy
and forging the second main business of TGC. In recent years, TGNE is vigorously
developing land wind power and PV, positively exploiting offshore wind power, steadily
enhancing small and medium hydropower business, carrying forward CSP and closely
following other renewable energy techniques such as tidal energy and biomass energy,
basically forming a business structure of mutual support and collaborative development in
four main domains, namely wind power, solar power, small hydropower and equipment
manufacturing.
6. China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 6 28 Sept. 2016
www.cspservices.de
7 Yumen 50MW Molten Salt Tower
Location of project: Yumen, Gansu
DNI: about 1800 kWh/m²/yr
Project owner: Yumen Xinneng Thermal Power Co., Ltd
Route of technology: molten salt tower, beam down system with molten salt
Source of technology: Shanghai Parasol Renewable Energy Company
Jiangsu Xinchen CSP Co., Ltd
Status of project: Construction of this project is planned to start in October of
this year. The base of tower and plant will be built first.
Comment:
The project adopts the unique beam down tower CSP technique. At present, there is only one
100KW demonstration system with this technique around the world. Xinchen Company
completed a 300KW beam down demonstration project in Yancheng, Jiangsu in 2015. Based
on the above demonstration project, the commercial 50MW project will start in Yumen. The
project will build some beam down towers, composing 50MW capacity together. Shanghai
Parasol and Jiangsu Xinchen have some connections. They both work on driving the
commercial application of the beam down system with molten salt.
8 Yumen 100MW Molten Salt Tower
Location of project: Yumen, Gansu
DNI: about 1800 kWh/m²/yr
Project owner: Beijing Guohua Electric Power Co., Ltd
Route of technology: molten salt tower, 10 hours of molten salt thermal storage
Source of technology: Shouhang IHW Resources Saving Technology Co., Ltd
(planned)
Project filing: underway
Total investment: RMB3.53661 million
Comment:
According to the CSP development plan for 2015-2030 drafted by Guohua Electric, it plans to
complete 1.5GW during 2015-2020, 3.5GW during 2020-2025 and 6GW during 2025-2030.
This project is the first commercial CSP plant developed by Guohua Electric.
9 Shangyi 50MW DSG Tower
Location of project: Shangyi, Zhangjiakou, Hebei
DNI: about 1600 kWh/m²/yr
Project owner: DaHua Engineering Management(Group) Co., Ltd.
Institute of Electrical Engineering of CAS
Route of technology: DSG tower, 4 hours of molten salt thermal storage
Source of technology: Institute of Electrical Engineering of CAS
Status of project: project filing is underway
7. China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 7 28 Sept. 2016
www.cspservices.de
Comment:
This project uses the DSG tower technique, storing thermal energy through exchanging heat
from steam to molten salt.
Introduction of project owner:
DaHua Engineering Management(Group) Co., Ltd. is founded under the approval of State
Development Planning Commission(SDPC), State Science and Technology Commission and
the State Council, which is a joint stock company restructured from DaHua Energy
Technology company directly under SDPC. Possessing qualifications issued by a couple of
state commissions, DaHua has strong strength in many businesses including project
preliminary planning, designing, engineering consulting, project management(supervising),
engineering construction, EPC general contract, investment and development. DaHua will
work with Institute of Electrical Engineering of CAS to develop this project jointly.
10 Yumen 50MW Thermal Oil Trough
Location of project: Yumen, Gansu
DNI: about 1800 kWh/m²/yr
Project owner: Royal Tech CSP Limited
Route of technology: thermal oil parabolic trough
7 hours of molten salt thermal storage
Source of technology: Royal Tech CSP Limited
Status of project: project filing is underway
Introduction of project owner:
Changzhou Royal Tech CSP Limited is devoted to CSP and development, innovation and
industry promotion in the area of distributed solar utilization. Main businesses cover high
temperature evacuated collector tube, system integration of thermal field and system of
distributed solar combined supply of cooling, heating and power. As one of the pioneers in
China CSP area, Changzhou Royal has made a major breakthrough in key component of CSP,
whose homemade high temperature evacuated collector tube is successfully applied in
overseas commercial plant for the first time. Its technique in system integration of thermal
field was ranked as international advanced level by CSP Services, an international
authoritative institution in CSP.
11 Gansu Akesai 50MW Molten Salt Trough
Location of project: Akesai, Jiuquan, Gansu
DNI: about 2056.5 kWh/m²/yr
Project owner: Shenzhen Jinfan Energy Technology Co., Ltd.
Route of technology: molten salt trough, 15 hours of molten salt thermal storage
Source of technology: Tianjin Binhai Concentrating Solar Power Investm. Co., Ltd.
Status of project: project filing has been completed.
8. China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 8 28 Sept. 2016
www.cspservices.de
Introduction of project owner:
Tianjin Binhai Concentrating Solar Power Investment Co., Ltd. is co-funded by Shenzhen
Nuclear Power Engineering Co., Ltd. and the government of Tianjin Binhai High-tech Zone.
Shenzhen Jinfan is the then project applying body, but the actual body has been changed to
Tianjin Binhai. Tianjin Binhai brought in the world’s leading CSP techniques, aiming to
realize localized production to reduce cost. Its ultimate goal is to build a 200MW base
equipped with a large-scale system including heat collection, thermal storage, heat exchange
and power generation and a world-class CSP R&D center. The Akesai project will rely on this
base to realize the localization of equipment.
12 Yumen East Town 50MW Thermal Oil Trough
Location of project: Yumen, Gansu
DNI: about 1800 kWh/m²/yr
Project owner: Rayspower Energy Group Co., Ltd.
Route of technology: thermal oil parabolic trough
7 hours of molten salt thermal storage
Source of technology: Rayspower Energy Group Co., Ltd.
Introduction of project owner:
Rayspower Energy Group Co., Ltd. focuses on the business of the system integration of CSP
plant. It opened a leading reflecting mirror plant in Chengdu in June 2013. Based on this
plant, it cuts in the sun island EPC area. Through the construction of Yanqing 863 Trough
Testing project, it has accumulated integration experience in trough mirror field. Meanwhile,
it’s a new three board listed company, which, to some extent, is favorable to its financing.
13 Urat Middle Banner 100MW Thermal Oil Parabolic
Trough
Location of project: Urat Middle Banner, Inner Mongolia
DNI: 2025 kWh/m²/yr
Project owner: Inner Mongolia Royal Tech New Energy Co., Ltd.
Route of technology: thermal oil parabolic trough
4 hours of molten salt thermal storage
Source of technology: Changzhou Royal Tech Solar Thermal Equipment Co., Ltd.
Project Filing: completed
Comment: The feasibility study of this project is finished in May, 2016.
Introduction of project owner:
Inner Mongolia Royal Tech New Energy Co., Ltd. is co-founded by Changzhou Royal Tech
Development Co., Ltd, a subsidiary of Royal Tech, and Nanjing Zhonghe Solar Energy
Technology Co., Ltd. in July 14th, 2015.
9. China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 9 28 Sept. 2016
www.cspservices.de
14 50MW Thermal Oil Parabolic Trough
Location of project: Delingha, Qinghai
DNI: 1976 kWh/m²/yr
Project owner: CGN Delingha Solar Energy Development Co., Ltd.
Route of technology: thermal oil parabolic trough
9 hours of molten salt thermal storage
Source of technology: CGN Solar Energy Development Co., Ltd.
EPC of Sun Island: Shouhang IHW Resources Saving Technology Co., Ltd. And
Shandong Second Power Construction Company
EPC of Thermal Storage Island: Shandong Sunway Petrochemical Engineering Co., Ltd.
EPC of Conventional Island: Northwest Electric Power Design Institute Co., Ltd. of China
Power Engineering Consulting Group
OE: Aries
Basic design: Ingeteam
Feasibility study institute: Northwest Electric Power Design Institute Co., Ltd. of China
Power Engineering Consulting Group
Heat transfer oil: Suzhou Solutia Therminol Co., Ltd.
Molten salt: sodium nitrate (Sinkiang Nitrate Minerals Co., Ltd.) &
potassium nitrate (Shanxi Wentong Sylvite Group)
Steam turbine: Dongfang Electric Corporation
Molten salt pump: Moret pump
Oil-water heat exchanger: Harbin Turbine Company Limited
Status of project:
The construction work was officially started in July 1st, 2014. Northwest Electric Power
Design Institute, EPC of Conventional Island, entered into construction phase successively in
August 2015. Shandong Sunway Petrochemical Engineering Co., Ltd., EPC of Thermal
Storage Island, signed the EPC contract with CGN side in March 1st this year and then it
started work immediately. EPC contract of Sun Island was signed officially in late August.
Now, the preparation for construction is underway.
Comment:
This plant is the first commercial 50MW parabolic trough built in China.
15 Gulang 100MW Thermal Oil Parabolic Trough
Location of project: Gulang, Weiwu, Gansu
DNI: 1913 kWh/m²/yr
Project owner: OECEP Gansu Weiwu Solar Technology Co., Ltd
Route of technology: thermal oil parabolic trough
7 hours of molten salt thermal storage
Source of technology: Changzhou Royal Tech Solar Thermal Equipment Co., Ltd.
(planned)
Status of technology: project filing is underway.
10. China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 10 28 Sept. 2016
www.cspservices.de
16 64MW Molten Salt Parabolic Trough
Location of project: Chabei, Zhangjiakou, Hebei
DNI: about 1700 kWh/m²/yr
Project owner: Zhongyang Zhangjiakou Chabei
Route of technology: molten salt parabolic trough
16 hours of molten salt thermal storage
Source of technology: Skyfuel
Status of project: Opening ceremony was held in July 2014.
Introduction of project owner:
OECEP Gansu Weiwu Solar Technology Co., Ltd. is a project company established by
Beijing Guo Tou Jun An Investment Management Co., Ltd. in Zhangjiakou. Public
information shows, Guo Tou Jun An is a professional company specializing in promoting
CSP technology and projects founded under the help of State-owned Assets Supervision and
Administration Commission (SASAC) and National Development and Reform Commission
(NDRC).
Comment:
Skyfuel, the technology partner and founded in 2007, innovated reflecting mirror and heat
collector in trough CSP. Its featured product is a new reflecting mirror based on the
reflectance coating technique, which uses ReflectTechPLUS as coating. Moreover, it
designed SkyTrough(R), which is a high-performance parabolic trough heat collector.
Equipped with SkyTrough(R), the performance of heat collector has been enhanced and the
cost reduced significantly.
17 Dacheng Dunhuang 50MW Molten Salt Fresnel
Location of project: Dunhuang, Gansu
DNI: 2000 kWh/m²/yr
Project owner: Lanzhou Dacheng Technology Co., Ltd
Status of project: Project filing has been completed.
The first 10MW is under-construction.
Comment:
The applied capacity was 110MW. The final capacity approved is 50MW.
Introduction of project owner:
Lanzhou Dacheng has carried on the development and research of key components and
system integration since 2008. In May 2012, it built China’s first 200KW Fresnel &Trough
CSP system. At present, it focuses on Fresnel technique, which is quite suitable to be applied
in Northwest of China. The Fresnel heat collector with full intellectual property, relying on
independent research and development, have many advantages, such as small land
occupation, strong wind resistance, short construction period, easy testing and simple
maintenance. This project is the world’s first commercial molten salt Fresnel CSP plant.
11. China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 11 28 Sept. 2016
www.cspservices.de
18 Zhangbei 50MW CSG Fresnel CSP project
Location of project: Zhangbei, Zhangjiakou, Hebei
DNI: 1750 kWh/m²/yr
Project owner: Zhangbei Huaqiang Zhaoyang Co., Ltd.
Feasibility study institute: Hebei Electric Power Design & Research Institute
Route of technology: DSG Fresnel
all solid state formulated concrete thermal storage
Source of technology: Beijing Terasolar Photothermal Technologies Co., Ltd.
Status of project: Feasibility study was finished in February 2015
Filing was finished in February 15th this year.
Comment:
Zhangbei Huaqiang Zhaoyang Co., Ltd., funded and established by Xinli Energy
Development Co., Ltd., adopts the improved Fresnel technique provided by Beijing Terasolar
Photothermal Technologies Co., Ltd. Main technological innovation lies in its unique heat
collector designing and all solid state formulated concrete thermal storage technique. The
applied capacity is 2*50MW, one of which is finally chosen.
Introduction of project owner:
Zhangbei Huaqiang Zhaoyang Co., Ltd. is funded and established by Xinli Energy
Development Co., Ltd. in December 26th, 2014 with registered capital of RMB42500.
19 Zhangjiakou 50MW
Location of project: Zhangbei, Zhangjiakou, Hebei
DNI: about 1750 kWh/m²/yr
Project owner: Zhangbei Huaqiang Zhaoyang Energy Co., Ltd.
Route of technology: DSG Fresnel
14 hours of all solid state formulated concrete thermal
storage
Source of technology: Beijing TeraSolar Photothemal Technologies Co., Ltd.
Status of project: The preliminary work, including feasibility study,
construction design and project filing has been finished.
Comment:
This project also adopts the improved Fresnel technique provided by Beijing Terasolar
Photothermal Technologies Co., Ltd. Main technological innovation lies in its unique heat
collector designing and all solid state formulated concrete thermal storage technique. The
applied price is RMB1.12/kWh, which is the lowest among the first batch of 20 demonstration
projects. Zhangjiakou No.1 15MW CSP plant, which is now under-construction by Huaqiang
Zhaoyang, is expected to join the national grid at the end of this year.
Introduction of project owner:
Zhangbei Huaqiang Zhaoyang Energy Co., Ltd., with a registered capital of RMB100 million,
was founded in January 29th, 2015.
12. China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 12 28 Sept. 2016
www.cspservices.de
20 Urat 50MW Fresnel
Location of project: Urat, Inner Mongolia
DNI: 2025 kWh/m²/yr
Project owner: Huaneng North United Power Co., Ltd.
Route of technology: thermal oil Fresnel, 6 hours of molten salt thermal storage
Source of technology: China Huaneng Group Clean Energy Technology Research
Institute
Status of project: Feasibility study review was finished in September 2016
Project filing is underway
Comment:
This project uses thermal oil as heat transfer medium, which has never happened in the
existing commercial Fresnel projects worldwide. These commercial projects usually adopt
DSG and don’t have thermal storage system.
Introduction of project owner:
Huaneng North United Power Co., Ltd. is a joint-equity enterprise funded by China Huaneng
Group, CITIC Limited, Inner Mongolia Power Co., Ltd. and China Shenhua Energy Company
Limited with a registered capital of RMB10 billion. Once in a monopoly position, now it’s a
pretty competitive market entity.
13. China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 13 28 Sept. 2016
www.cspservices.de
Information on CSP Services
CSP Services GmbH, Concentrating Solar Power Services, is a spin-off company of the German
Aerospace Center (DLR) in Cologne, Germany, with know-how licensed from DLR. CSPS
offers engineering and consulting services for developers, operators and owners of solar thermal
power plants applying innovative and specific measurement techniques to assure high
performance solar fields.
Besides the know-how in standard measurement technologies, special techniques such as close
range photogrammetry and deflectometry together with specially developed evaluation and
assessment tools serve the clients for prototype evaluation, quality assurance, inspection and
performance improvement of solar fields in concentrating solar power plants (i.e. parabolic
troughs, heliostats, Fresnel systems, dishes). CSPS supports its clients to decrease risks,
increase project performance, and gain competitiveness in the growing concentrating solar
power market sector.
Our range of products and services includes the geometric quality assurance systems QFoto
(3D point measurements of large structures in series production) and QDec (high-resolution
shape measurements of reflective surfaces in series production) for application in solar power
plants. For solar irradiation resource assessment, we supply the automatic weather stations MDI
(for DNI measurement at remote sites) and MHP (for high-precision DNI measurement and
solar power plant monitoring). With our mobile solar field measurement services, we assess the
quality of all kinds of solar concentrators, and our consulting services cover specific topics such
as technical reviews, due diligence and operation monitoring.
QFoto: Structure 3D Testing QRec: Receiver Performance Testing QDec: Mirror Shape Testing
14. China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 14 28 Sept. 2016
www.cspservices.de
UAV Picture: DLR
15. China CSP Demonstration Projects
Data provided and use granted by Catherine Wu, CSPPLAZA
Note: The information given is based on sources we believe reliable, but we do not guarantee its accuracy.
Klaus Pottler 15 28 Sept. 2016
www.cspservices.de