SlideShare uma empresa Scribd logo
1 de 1
Baixar para ler offline
TERMINOLOGY– JACKET (WORLD’S LARGEST OFFSHORE JACKET – SHELL
BULLWINKLE)
BULLWINKLE IS A 1,736 FEET (529 M) TALL, PILE-SUPPORTED FIXED STEEL OIL PLATFORM IN THE GULF OF MEXICO. OF
THE TOTAL HEIGHT, 412.1 METERS (1,352 FT) ARE BELOW THE WATERLINE. IT IS LOCATED IN MANATEE FIELD,
APPROXIMATELY 160 MILES (260 KM) SOUTHWEST OF NEW ORLEANS. THE TOTAL FIELD DEVELOPMENT CONSTRUCTION
COST WAS US$500,000,000 ACCORDING TO SOME SOURCES. THE JACKET, I.E. THE MAINLY SUBMERGED PART OF THE
PLATFORM, WAS BUILT BY GULF MARINE FABRICATORS IN 1985-1988 AT THE NORTH YARD LOCATION AT THE
INTERSECTION OF THE CORPUS CHRISTI SHIP CHANNEL AND THE INTRACOASTAL WATERWAY IN PORT ARANSAS, TX,
EAST OFCORPUS CHRISTI. THE PLATFORM WAS INSTALLED BY HEEREMA MARINE CONTRACTORS.
FIXED OFFSHORE PLATFORMS
REV. 0 BY: KHALED SHERIF
83 April 16
FIXED OFFSHORE PLATFORMS

Mais conteúdo relacionado

Destaque

TYPES OF OFFSHORE & MARINE FACILITIES - SESSION 1 (Rev 3) - LinkedIn
TYPES OF OFFSHORE & MARINE FACILITIES  - SESSION 1 (Rev 3) - LinkedInTYPES OF OFFSHORE & MARINE FACILITIES  - SESSION 1 (Rev 3) - LinkedIn
TYPES OF OFFSHORE & MARINE FACILITIES - SESSION 1 (Rev 3) - LinkedInKhaled Sherif
 
Weld joint geometry and welding symbols
Weld joint geometry and welding symbolsWeld joint geometry and welding symbols
Weld joint geometry and welding symbolsSudhir Reddy
 
GTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IXGTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IXAntonius Pompi Bramono
 
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedInOFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedInKhaled Sherif
 
Introduction to offshore structures
Introduction to offshore structuresIntroduction to offshore structures
Introduction to offshore structuresNitish Anand
 
Welding design
Welding designWelding design
Welding designhirosezana
 
Wis5 process 04 (new )
Wis5 process 04 (new )Wis5 process 04 (new )
Wis5 process 04 (new )Thang Do Minh
 
Wis5 welding consumables 18
Wis5 welding consumables 18Wis5 welding consumables 18
Wis5 welding consumables 18Thang Do Minh
 
Wis5 stress and distortion 15
Wis5 stress and distortion 15Wis5 stress and distortion 15
Wis5 stress and distortion 15Thang Do Minh
 
Distortion in welding
Distortion in weldingDistortion in welding
Distortion in weldingChirag Swamy
 
Measurement of residual stresses in weldments
Measurement of residual stresses in weldmentsMeasurement of residual stresses in weldments
Measurement of residual stresses in weldmentsN.Prakasan
 
Wis5 welding defects 02
Wis5 welding defects 02Wis5 welding defects 02
Wis5 welding defects 02Thang Do Minh
 
Wis5 welding symbols 05
Wis5 welding symbols 05Wis5 welding symbols 05
Wis5 welding symbols 05Thang Do Minh
 
Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Ramdani Diningrat
 
Welding qualification a
Welding qualification aWelding qualification a
Welding qualification aJithu John
 

Destaque (19)

TYPES OF OFFSHORE & MARINE FACILITIES - SESSION 1 (Rev 3) - LinkedIn
TYPES OF OFFSHORE & MARINE FACILITIES  - SESSION 1 (Rev 3) - LinkedInTYPES OF OFFSHORE & MARINE FACILITIES  - SESSION 1 (Rev 3) - LinkedIn
TYPES OF OFFSHORE & MARINE FACILITIES - SESSION 1 (Rev 3) - LinkedIn
 
wps qualification metho
wps qualification methowps qualification metho
wps qualification metho
 
Weld joint geometry and welding symbols
Weld joint geometry and welding symbolsWeld joint geometry and welding symbols
Weld joint geometry and welding symbols
 
GTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IXGTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IX
 
Heat Treatment
Heat TreatmentHeat Treatment
Heat Treatment
 
Heat treatment
Heat treatment Heat treatment
Heat treatment
 
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedInOFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
 
Introduction to offshore structures
Introduction to offshore structuresIntroduction to offshore structures
Introduction to offshore structures
 
Welding design
Welding designWelding design
Welding design
 
Wis5 process 04 (new )
Wis5 process 04 (new )Wis5 process 04 (new )
Wis5 process 04 (new )
 
Wis5 welding consumables 18
Wis5 welding consumables 18Wis5 welding consumables 18
Wis5 welding consumables 18
 
Wis5 stress and distortion 15
Wis5 stress and distortion 15Wis5 stress and distortion 15
Wis5 stress and distortion 15
 
Distortion in welding
Distortion in weldingDistortion in welding
Distortion in welding
 
Measurement of residual stresses in weldments
Measurement of residual stresses in weldmentsMeasurement of residual stresses in weldments
Measurement of residual stresses in weldments
 
Wis5 welding defects 02
Wis5 welding defects 02Wis5 welding defects 02
Wis5 welding defects 02
 
Wis5 welding symbols 05
Wis5 welding symbols 05Wis5 welding symbols 05
Wis5 welding symbols 05
 
Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1Offshore qc welding inspection versi 1
Offshore qc welding inspection versi 1
 
Welding qualification a
Welding qualification aWelding qualification a
Welding qualification a
 
Welders qualification
Welders qualificationWelders qualification
Welders qualification
 

83 Pages from FIXED OFFSHORE PLATFORMS - SESSION 3 - REV 0 - LinkedIn-2

  • 1. TERMINOLOGY– JACKET (WORLD’S LARGEST OFFSHORE JACKET – SHELL BULLWINKLE) BULLWINKLE IS A 1,736 FEET (529 M) TALL, PILE-SUPPORTED FIXED STEEL OIL PLATFORM IN THE GULF OF MEXICO. OF THE TOTAL HEIGHT, 412.1 METERS (1,352 FT) ARE BELOW THE WATERLINE. IT IS LOCATED IN MANATEE FIELD, APPROXIMATELY 160 MILES (260 KM) SOUTHWEST OF NEW ORLEANS. THE TOTAL FIELD DEVELOPMENT CONSTRUCTION COST WAS US$500,000,000 ACCORDING TO SOME SOURCES. THE JACKET, I.E. THE MAINLY SUBMERGED PART OF THE PLATFORM, WAS BUILT BY GULF MARINE FABRICATORS IN 1985-1988 AT THE NORTH YARD LOCATION AT THE INTERSECTION OF THE CORPUS CHRISTI SHIP CHANNEL AND THE INTRACOASTAL WATERWAY IN PORT ARANSAS, TX, EAST OFCORPUS CHRISTI. THE PLATFORM WAS INSTALLED BY HEEREMA MARINE CONTRACTORS. FIXED OFFSHORE PLATFORMS REV. 0 BY: KHALED SHERIF 83 April 16 FIXED OFFSHORE PLATFORMS