Program Managment Framework
Version 1.0
Technical Project Monitoring
National ICT R&D Fund
Contents
1 Technical Project Monitoring Framework 3
1.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.2 Project Monitoring and Reporting . . . . . . . . . . . . . . . . . . . . 3
1.2.1 Project Review Committee (PRC) . . . . . . . . . . . . . . . . 4
1.3 Project Management . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
1.4 Task Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
1.4.1 Task Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1.4.2 Task Tracking . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
1.5 Change Management . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1.6 Risk Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
1.7 Configuration Management . . . . . . . . . . . . . . . . . . . . . . . . 8
1.8 Project Closure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1.9 Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
i
List of Tables
1.1 Sample Risk Register . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
1.2 Key Steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1.3 Responsibility Matrix . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1.4 Mid Review Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
1
1 Technical Project Monitoring
Framework
1.1 Introduction
This document sets out the monitoring framework within which newly funded projects
are monitored and managed by Fund and must be followed through contractual obli-
gations. It is intended as a reference for anyone involved in the development and
execution of funded project, including participants from organizations (e.g. univer-
sities).
The purpose is to provide a comprehensive guide to project management and to set
out core project management and monitoring policies and principles with techniques
which have been found either to be particularly useful, or where an implementation
within a project portfolio is required.
Participating organizations are free to develop and implement their own internal
project management systems and procedures, however Project framework must con-
form to the best practices laid out in this Framework. It is the responsibility of
relevant Monitoring officer to ensure that documented procedures within the fund,
meeting the minimum requirements set out must be followed for complete/whole
project’s life cycle.
This Framework shall be reviewed on closure of project and updated to reflect best
practices and lessons learned. More detailed guidelines and advice on key aspects
of project management (e.g. project planning, risk management) shall be provided
where considered helpful.
1.2 Project Monitoring and Reporting
As project must be regularly reviewed with monitoring of progress against scope,
time and budget reported. The scope and frequency of information and reporting
requirements may vary depending on the scale and complexity of the project and
the project reporting format to be used which enable tracking of performance and
budget upon completion.
As a minimum, reports should include:
3
Chapter 1 Technical Project Monitoring Framework
• Progress summary (including the overall status of the project, demonstrating
whether it is on track, key successes/problems) .
• Financial summary, including latest forecast of future requirements
• Key Milestone /Deliverable Summary (showing baseline, revised and comple-
tion dates)
• Issues/Risk Log
1.2.1 Project Review Committee (PRC)
The Project Review Committee (PRC) shall conduct mid-review project progress or
shall review project key milestone as decided in project planning. The PRC shall be
comprised of four members which includes one General Manager , Project Manager
and a Manager(depending upon the nature of review i.e. Technical or Financial)
along with subject specialist/expert (which can be hired on service contracts for
monitoring the project performance) as per clause 7.1-Major Actors and sub clause
7.1.3 of company’s operational manual. The purpose would be to monitor and ad-
dress the key issues or risk identified within project (the proposed mitigation/action
to be taken in “Traffic Light” report format ).
The PRC shall also provide the project “Go/No-Go” decision etc, after the comple-
tion of major milestones.
The Project Review Committee should be using Key Performance Indicators (KPIs)
to measure the project progress.
1.3 Project Management
Principal Investigator (PI) is free to choose Project Management Framework as
convenient, however, PI is bound to provide the documentation required for the
selected Framework to the Company at the start of the project. All the required
documentation generated during the project execution should be available.
1.4 Task Management
Project tasks should be scheduled, showing planned start and finish dates for each
task. The project schedule should include an overall schedule along with milestones
for the entire project. These are points in time, depicting the completion of a
specified part of the project, such as a phase/stage transition, which need to be
clearly identified.
4
1.4 Task Management
Project PI and PRC will collectively identify and prioritize the core research and
development tasks . The team (PRC+PI) will also identify the time-frame for the
mid-review of project progress.
There are number of methods of communicating progress to the Company as the
payments by the Company are linked with the completion of milestones. In these
circumstances, criteria for achieving the milestone must be specified and agreed by
the company and PI.
1.4.1 Task Scheduling
When producing a schedule, the following techniques should be considered:
1.4.1.1 Precedence Diagrams
A precedence diagram is a method used to show the sequence of tasks, in the form
of a network, which identifies the inter dependencies between tasks.
1.4.1.2 Critical Path Method
Critical Path Method (CPM) is a scheduling method, also based on a network that
identifies the single chain of tasks through the schedule that will take the longest to
complete or achieve. CPM incorporates the word ‘critical‘ because, if this sequence of
tasks and milestones is not complete on time, the project will not finish on schedule.
Planned start and finish dates should be added and the logic diagram should be
configured to minimize the impact of the critical path.
1.4.1.3 Bar/Gantt Chart
A Bar Gantt chart can be used to show the network of tasks against a project calen-
dar, taking into account the length of the working day, holidays, and other factors.
It will also facilitate the mapping of resource availability against the activities and
skills required and for resource leveling to take place.
1.4.1.4 Resource Levelling
Resource levelling techniques distribute the use of resources over time to minimize
the variation in manpower, equipment, or money to be spent. The central idea of
resource levelling is to reschedule tasks and milestones within the limits of available
slack to achieve a better distribution of resources. The resource levelling procedure
should not allow the duration of a project to increase.
5
Chapter 1 Technical Project Monitoring Framework
1.4.1.5 Slack/Stretch
Slack, can be used to calculate the amount of time over and above that is required
to complete the task or milestone. Stretch factor is used to calculate the amount
of calendar time required and to complete a specified amount of effort. The stretch
factor can take account of non-project overheads, such as holidays.
1.4.1.6 Project Evaluation and Review Techniques (PERT)
PERT is a time-focused, network-based planning system, which is used for projects
where meeting the schedule is more sensitive than costs.
1.4.2 Task Tracking
For task Tracking following Open Source system could be considered however PI
could also select his own task tracking system.
1.4.2.1 LibrePlan
LibrePlan is a web based application, making project management available to not
just the project manager, but the entire project team, and if necessary across orga-
nizations. LibrePlan is licensed under the AGPL.
1.4.2.2 OpenProject
OpenProject is released under the GNU General Public License Version 3 and runs
on Ruby on Rails.
1.4.2.3 Redmine
Redmine is a web-based project management tool. It’s powerful, runs on Ruby and
Rails, and is licensed under GNU General Public License v2 (GPL).
1.4.2.4 Agilefant
Agilefant, as its name implies, is based on Agile methods. However, this open
source project management tool also supports product portfolios, projects, sprints,
and multi-team development.
6
1.5 Change Management
1.5 Change Management
Change Control or Change Management is concerned with controlling the results
of unforeseen events, factors or mistakes which might modify or remove the need
for the deliverable being developed. Such changes can occur at any time, before,
during or after their creation. It is inevitable that there will be changes during the
lifetime of a project and the Project Manager is concerned with the management
and control of changes so that impact to the project may be minimized.
Change management involves a set of procedures including, change requests, eval-
uation of requested changes, change approval and implementing approved changes.
Changes should be classified as minor changes, those which may be accommodated
without impacting the project plan and major changes which necessitate a revised
plan and its re-approval.
A change request which is minor(that does not have any financial impact, change
of scope or time extension) shall be processed by Monitoring Department right
away . However in other case change request shall be presented to Change Request
Review Committee (CRRC) which has already comprised of CFO, GM-Monitoring
and GM-SEED. Decision on change request must be taken within 10 days or less.
1.6 Risk Management
In addition to changes, other issues may arise which may have an impact on the
progress of the project. Examples of such issues include non-completion or late
completion of actions by either the PI, the supplier or other involved party.
All problems, no matter how large or small, should be documented and communi-
cated. The Project Manager together with the appropriate personnel meet to discuss
these problems, identify solutions, the impact of these solutions and together with
the PI agree on the action to be taken. There is also an associated escalation pro-
cedure whereby more senior management may become involved in order to resolve
complex or time critical issues.
7
Chapter 1 Technical Project Monitoring Framework
Table 1.1: Sample Risk Register
Risk Identification Risk Analysis Risk
Planning
Monitoring and Control
Date
Risk
Categories
Probability(0-1)
Impact(0-100)
RiskScore(P×I)
RiskOwner
Mitigation
Comments
1.7 Configuration Management
Configuration Management is a discipline for controlling the identification of the
software developed to:
• Establishing baselines,
• Recording and tracking
• Auditing the product.
All software modules, specifications, test procedures, etc. are configuration items
and subject to change control. A base level (or baseline) is the set of all documents
and files that comprises of specific version of a product (or application) created at
a specific time. Configuration management is therefore concerned with the identifi-
cation and control of all components in any given base level.
At this point in time code tracking and baselining should be maintain through one
of the following configuration management tools.
• VSS – Visual source safe
• CVS- Concurrent version system
• Rational Clear Case
• SVN- Subversion
• Perforce
• TortoiseSVN
1.8 Project Closure
In Project Closure, the Project Team assesses the outcome of the project, as well
as the performance of the Project Team and the Performing Organization. This
8
1.9 Summary
is accomplished primarily through soliciting and evaluating feedback and Project
Team members.
A comprehensive project closure report by involving Project Review Committee
should be submitted mentioning the key project metrics, performance, best practices
, lessons learned and commercialization potential for use on current future projects.
(Report format shall be provided )
1.9 Summary
The basic purpose of this document is to provide the guidelines to manage, track
and monitor the project effectively. The Motivations behind this are given in Tab
1.2
Summary of responsibility of PI, Project Manager and PRC is given in responsibility
assignment matrix in Tab 1.3.
PRC committee shall be responsible to conduct mid review of projects and provide
reports in traffic light format as given in Tab 1.4.
9
Chapter 1 Technical Project Monitoring Framework
Table 1.2: Key Steps
# Motivation Requirement
1 Successful projects
utilize a proven project
life cycle model.
PI will choose the proven project life cycle
model and stick to it and ensure that best
practice is implemented at the appropriate
stages and proper documentation is
provided.
2 Planning is everything Detailed Project Plan will be prepared with
PI that reflect each and every task in detail
3 Project Risk must be
assessed, reviewed and
actively managed
throughout the project
life cycle
PI will mentioned Risk at every stage of
project and as part of deliverables PI will
submitt the potensial risks and Manager
will react depending upon the level.
4 Use trend and
forecasting techniques.
A successful project is not just on-time &
budget but must also deliver the desired
outcomes. Using Key Performance
Indicators (KPIs) is one technique to
monitor wider success criteria through
Project Review Committe.
5 Monitoring and Control Project will be monitor and Control through
Task and Code base Managment Systems.
6 Integrated Change
Control
Formal change control procedures to be
adopted. Evaluate all potential changes but
implement only those that are beneficial.
7 Scope , Cost , Quality
and Time Control
With help of Project Review Committe and
Monitoring Tools Scope, Cost and Schedule
will be controled. and correct balance
between them will be maintianed through
checklists and report templates.
8 Fight for the time to do
things right.
We always have the time to do the project
over; but not the time to do it right in the
first place!” Project Managers must
demonstrate to sponsors and senior
managers why it’s necessary to make this
time available in the pursuit of quality
deliverables.
9 Learn from the past. Make sure to include the post
implementation review for the future
projects
10 Acquire the best people
available.
To run the project effectivity training must
be given to appropriate time and people.
10
1.9 Summary
Table 1.3: Responsibility Matrix
Task Project Manager Principal Investigator PRC
Prepare Project Plan × × ×
Selection of Project
Management Framework
×
Risk Reporting ×
Risk Mitigation and
Respond within 14 days
×
Mangement Framework
Documentation
×
Project Progress Summary ×
Financial Summary ×
Key Milestone /Deliverable
Summary
×
Issues/Risk Log ×
Change Management -
Without Effect on Time ,
Budget and Schedule
×
Change Management -
Effect on Time , Budget
and Schedule
×
Task Managemt System ×
Configuration Managment
System
×
Project Monitoring and
Control
×
Project Mid Review and
Traffic Light Report
×
Communication
Managment
×
Project Closure Report × × ×
11
Chapter 1 Technical Project Monitoring Framework
Table 1.4: Mid Review Report
12

Mais conteúdo relacionado

Mais procurados

PMP Exam Prep - Time Management
PMP Exam Prep - Time ManagementPMP Exam Prep - Time Management
PMP Exam Prep - Time Managementtkrikau
 
Project time management
Project time managementProject time management
Project time managementJivan Nepali
 
13 project control & closing management
13 project control & closing management13 project control & closing management
13 project control & closing managementDhamo daran
 
Schedule levels-as-presented 02-may11
Schedule levels-as-presented  02-may11Schedule levels-as-presented  02-may11
Schedule levels-as-presented 02-may11PMA Consultants
 
Project planning
Project planningProject planning
Project planningShaikh Zain
 
Good scheduling practice
Good scheduling practiceGood scheduling practice
Good scheduling practicekrunalchem
 
Project management-plan template
Project management-plan templateProject management-plan template
Project management-plan templateVivek Srivastava
 
Project Management Body of Knowledge (Integration)
Project Management Body of Knowledge (Integration)Project Management Body of Knowledge (Integration)
Project Management Body of Knowledge (Integration)Jeffrey Cheah
 
Team Final_Scope Management
Team Final_Scope ManagementTeam Final_Scope Management
Team Final_Scope ManagementRKDickey
 
Software Project Management Plan
Software Project Management PlanSoftware Project Management Plan
Software Project Management PlanSeval Çapraz
 
05 project scope management
05  project scope management05  project scope management
05 project scope managementAla Ibrahim
 
Improving Project Performance in the DOE
Improving Project Performance in the DOEImproving Project Performance in the DOE
Improving Project Performance in the DOEGlen Alleman
 
Pmbok 5th planning process group part two
Pmbok 5th planning process group part twoPmbok 5th planning process group part two
Pmbok 5th planning process group part twoHossam Maghrabi
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project ManagementReetesh Gupta
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life CycleReema
 

Mais procurados (20)

PMP Exam Prep - Time Management
PMP Exam Prep - Time ManagementPMP Exam Prep - Time Management
PMP Exam Prep - Time Management
 
Project control
Project controlProject control
Project control
 
Project time management
Project time managementProject time management
Project time management
 
13 project control & closing management
13 project control & closing management13 project control & closing management
13 project control & closing management
 
Schedule levels-as-presented 02-may11
Schedule levels-as-presented  02-may11Schedule levels-as-presented  02-may11
Schedule levels-as-presented 02-may11
 
Project planning
Project planningProject planning
Project planning
 
Good scheduling practice
Good scheduling practiceGood scheduling practice
Good scheduling practice
 
Project management-plan template
Project management-plan templateProject management-plan template
Project management-plan template
 
Planning And Managing The Project
Planning And Managing The ProjectPlanning And Managing The Project
Planning And Managing The Project
 
Project Management Body of Knowledge (Integration)
Project Management Body of Knowledge (Integration)Project Management Body of Knowledge (Integration)
Project Management Body of Knowledge (Integration)
 
Team Final_Scope Management
Team Final_Scope ManagementTeam Final_Scope Management
Team Final_Scope Management
 
Communication 1
Communication 1Communication 1
Communication 1
 
Software Project Management Plan
Software Project Management PlanSoftware Project Management Plan
Software Project Management Plan
 
PMP PMBOK5 Ch4 integration management
PMP PMBOK5 Ch4 integration managementPMP PMBOK5 Ch4 integration management
PMP PMBOK5 Ch4 integration management
 
05 project scope management
05  project scope management05  project scope management
05 project scope management
 
Improving Project Performance in the DOE
Improving Project Performance in the DOEImproving Project Performance in the DOE
Improving Project Performance in the DOE
 
Project Scheduling, Planning and Risk Management
Project Scheduling, Planning and Risk ManagementProject Scheduling, Planning and Risk Management
Project Scheduling, Planning and Risk Management
 
Pmbok 5th planning process group part two
Pmbok 5th planning process group part twoPmbok 5th planning process group part two
Pmbok 5th planning process group part two
 
Introduction to Software Project Management
Introduction to Software Project ManagementIntroduction to Software Project Management
Introduction to Software Project Management
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life Cycle
 

Semelhante a National ICT R&D Project Management Framework

The simplified project management process it-toolkits
The simplified project management process   it-toolkitsThe simplified project management process   it-toolkits
The simplified project management process it-toolkitsIT-Toolkits.org
 
Project management
Project managementProject management
Project managementArnab Ghosh
 
170537122 study-notes
170537122 study-notes170537122 study-notes
170537122 study-noteshomeworkping8
 
Project Management Skills unit-4 Notes
Project Management Skills unit-4 NotesProject Management Skills unit-4 Notes
Project Management Skills unit-4 NotesSamarthVarpe
 
223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.pptDeepgaichor1
 
Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)Logitrain: New Zealand
 
Time Management within IT Project Management
Time Management within IT Project ManagementTime Management within IT Project Management
Time Management within IT Project Managementrielaantonio
 
2 Project Management Life CycleKemaltaneriStockThinkstoc.docx
2 Project Management Life CycleKemaltaneriStockThinkstoc.docx2 Project Management Life CycleKemaltaneriStockThinkstoc.docx
2 Project Management Life CycleKemaltaneriStockThinkstoc.docxeugeniadean34240
 
06- PROJECT SCHEDULE MANAGEMENT (PMBOK Ch - 06).pptx
06-  PROJECT SCHEDULE MANAGEMENT (PMBOK Ch - 06).pptx06-  PROJECT SCHEDULE MANAGEMENT (PMBOK Ch - 06).pptx
06- PROJECT SCHEDULE MANAGEMENT (PMBOK Ch - 06).pptxWajihAnsari7
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementAnil Singh
 
Project Plan For A Project Management Project
Project Plan For A Project Management ProjectProject Plan For A Project Management Project
Project Plan For A Project Management ProjectMary Stevenson
 
EPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group
 
PMP - Session 01 Updated.pptx
PMP - Session 01 Updated.pptxPMP - Session 01 Updated.pptx
PMP - Session 01 Updated.pptxKareemBullard1
 

Semelhante a National ICT R&D Project Management Framework (20)

Project controls outlined
Project controls outlinedProject controls outlined
Project controls outlined
 
The simplified project management process it-toolkits
The simplified project management process   it-toolkitsThe simplified project management process   it-toolkits
The simplified project management process it-toolkits
 
Project management
Project managementProject management
Project management
 
170537122 study-notes
170537122 study-notes170537122 study-notes
170537122 study-notes
 
Project Management Skills unit-4 Notes
Project Management Skills unit-4 NotesProject Management Skills unit-4 Notes
Project Management Skills unit-4 Notes
 
PMO Daily Operations using Scrum Methodology
PMO Daily Operations using Scrum MethodologyPMO Daily Operations using Scrum Methodology
PMO Daily Operations using Scrum Methodology
 
Pm chapter 5...
Pm chapter 5...Pm chapter 5...
Pm chapter 5...
 
223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt
 
Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)
 
Time Management within IT Project Management
Time Management within IT Project ManagementTime Management within IT Project Management
Time Management within IT Project Management
 
2 Project Management Life CycleKemaltaneriStockThinkstoc.docx
2 Project Management Life CycleKemaltaneriStockThinkstoc.docx2 Project Management Life CycleKemaltaneriStockThinkstoc.docx
2 Project Management Life CycleKemaltaneriStockThinkstoc.docx
 
06- PROJECT SCHEDULE MANAGEMENT (PMBOK Ch - 06).pptx
06-  PROJECT SCHEDULE MANAGEMENT (PMBOK Ch - 06).pptx06-  PROJECT SCHEDULE MANAGEMENT (PMBOK Ch - 06).pptx
06- PROJECT SCHEDULE MANAGEMENT (PMBOK Ch - 06).pptx
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
Charter template 17.01.15
Charter template 17.01.15Charter template 17.01.15
Charter template 17.01.15
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Project Plan For A Project Management Project
Project Plan For A Project Management ProjectProject Plan For A Project Management Project
Project Plan For A Project Management Project
 
Rtp mod 2.4
Rtp mod 2.4Rtp mod 2.4
Rtp mod 2.4
 
EPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s Methodology
 
PMP - Session 01 Updated.pptx
PMP - Session 01 Updated.pptxPMP - Session 01 Updated.pptx
PMP - Session 01 Updated.pptx
 

National ICT R&D Project Management Framework

  • 1. Program Managment Framework Version 1.0 Technical Project Monitoring National ICT R&D Fund
  • 2.
  • 3. Contents 1 Technical Project Monitoring Framework 3 1.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 1.2 Project Monitoring and Reporting . . . . . . . . . . . . . . . . . . . . 3 1.2.1 Project Review Committee (PRC) . . . . . . . . . . . . . . . . 4 1.3 Project Management . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 1.4 Task Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 1.4.1 Task Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . 5 1.4.2 Task Tracking . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 1.5 Change Management . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 1.6 Risk Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 1.7 Configuration Management . . . . . . . . . . . . . . . . . . . . . . . . 8 1.8 Project Closure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 1.9 Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 i
  • 4.
  • 5. List of Tables 1.1 Sample Risk Register . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 1.2 Key Steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 1.3 Responsibility Matrix . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 1.4 Mid Review Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 1
  • 6.
  • 7. 1 Technical Project Monitoring Framework 1.1 Introduction This document sets out the monitoring framework within which newly funded projects are monitored and managed by Fund and must be followed through contractual obli- gations. It is intended as a reference for anyone involved in the development and execution of funded project, including participants from organizations (e.g. univer- sities). The purpose is to provide a comprehensive guide to project management and to set out core project management and monitoring policies and principles with techniques which have been found either to be particularly useful, or where an implementation within a project portfolio is required. Participating organizations are free to develop and implement their own internal project management systems and procedures, however Project framework must con- form to the best practices laid out in this Framework. It is the responsibility of relevant Monitoring officer to ensure that documented procedures within the fund, meeting the minimum requirements set out must be followed for complete/whole project’s life cycle. This Framework shall be reviewed on closure of project and updated to reflect best practices and lessons learned. More detailed guidelines and advice on key aspects of project management (e.g. project planning, risk management) shall be provided where considered helpful. 1.2 Project Monitoring and Reporting As project must be regularly reviewed with monitoring of progress against scope, time and budget reported. The scope and frequency of information and reporting requirements may vary depending on the scale and complexity of the project and the project reporting format to be used which enable tracking of performance and budget upon completion. As a minimum, reports should include: 3
  • 8. Chapter 1 Technical Project Monitoring Framework • Progress summary (including the overall status of the project, demonstrating whether it is on track, key successes/problems) . • Financial summary, including latest forecast of future requirements • Key Milestone /Deliverable Summary (showing baseline, revised and comple- tion dates) • Issues/Risk Log 1.2.1 Project Review Committee (PRC) The Project Review Committee (PRC) shall conduct mid-review project progress or shall review project key milestone as decided in project planning. The PRC shall be comprised of four members which includes one General Manager , Project Manager and a Manager(depending upon the nature of review i.e. Technical or Financial) along with subject specialist/expert (which can be hired on service contracts for monitoring the project performance) as per clause 7.1-Major Actors and sub clause 7.1.3 of company’s operational manual. The purpose would be to monitor and ad- dress the key issues or risk identified within project (the proposed mitigation/action to be taken in “Traffic Light” report format ). The PRC shall also provide the project “Go/No-Go” decision etc, after the comple- tion of major milestones. The Project Review Committee should be using Key Performance Indicators (KPIs) to measure the project progress. 1.3 Project Management Principal Investigator (PI) is free to choose Project Management Framework as convenient, however, PI is bound to provide the documentation required for the selected Framework to the Company at the start of the project. All the required documentation generated during the project execution should be available. 1.4 Task Management Project tasks should be scheduled, showing planned start and finish dates for each task. The project schedule should include an overall schedule along with milestones for the entire project. These are points in time, depicting the completion of a specified part of the project, such as a phase/stage transition, which need to be clearly identified. 4
  • 9. 1.4 Task Management Project PI and PRC will collectively identify and prioritize the core research and development tasks . The team (PRC+PI) will also identify the time-frame for the mid-review of project progress. There are number of methods of communicating progress to the Company as the payments by the Company are linked with the completion of milestones. In these circumstances, criteria for achieving the milestone must be specified and agreed by the company and PI. 1.4.1 Task Scheduling When producing a schedule, the following techniques should be considered: 1.4.1.1 Precedence Diagrams A precedence diagram is a method used to show the sequence of tasks, in the form of a network, which identifies the inter dependencies between tasks. 1.4.1.2 Critical Path Method Critical Path Method (CPM) is a scheduling method, also based on a network that identifies the single chain of tasks through the schedule that will take the longest to complete or achieve. CPM incorporates the word ‘critical‘ because, if this sequence of tasks and milestones is not complete on time, the project will not finish on schedule. Planned start and finish dates should be added and the logic diagram should be configured to minimize the impact of the critical path. 1.4.1.3 Bar/Gantt Chart A Bar Gantt chart can be used to show the network of tasks against a project calen- dar, taking into account the length of the working day, holidays, and other factors. It will also facilitate the mapping of resource availability against the activities and skills required and for resource leveling to take place. 1.4.1.4 Resource Levelling Resource levelling techniques distribute the use of resources over time to minimize the variation in manpower, equipment, or money to be spent. The central idea of resource levelling is to reschedule tasks and milestones within the limits of available slack to achieve a better distribution of resources. The resource levelling procedure should not allow the duration of a project to increase. 5
  • 10. Chapter 1 Technical Project Monitoring Framework 1.4.1.5 Slack/Stretch Slack, can be used to calculate the amount of time over and above that is required to complete the task or milestone. Stretch factor is used to calculate the amount of calendar time required and to complete a specified amount of effort. The stretch factor can take account of non-project overheads, such as holidays. 1.4.1.6 Project Evaluation and Review Techniques (PERT) PERT is a time-focused, network-based planning system, which is used for projects where meeting the schedule is more sensitive than costs. 1.4.2 Task Tracking For task Tracking following Open Source system could be considered however PI could also select his own task tracking system. 1.4.2.1 LibrePlan LibrePlan is a web based application, making project management available to not just the project manager, but the entire project team, and if necessary across orga- nizations. LibrePlan is licensed under the AGPL. 1.4.2.2 OpenProject OpenProject is released under the GNU General Public License Version 3 and runs on Ruby on Rails. 1.4.2.3 Redmine Redmine is a web-based project management tool. It’s powerful, runs on Ruby and Rails, and is licensed under GNU General Public License v2 (GPL). 1.4.2.4 Agilefant Agilefant, as its name implies, is based on Agile methods. However, this open source project management tool also supports product portfolios, projects, sprints, and multi-team development. 6
  • 11. 1.5 Change Management 1.5 Change Management Change Control or Change Management is concerned with controlling the results of unforeseen events, factors or mistakes which might modify or remove the need for the deliverable being developed. Such changes can occur at any time, before, during or after their creation. It is inevitable that there will be changes during the lifetime of a project and the Project Manager is concerned with the management and control of changes so that impact to the project may be minimized. Change management involves a set of procedures including, change requests, eval- uation of requested changes, change approval and implementing approved changes. Changes should be classified as minor changes, those which may be accommodated without impacting the project plan and major changes which necessitate a revised plan and its re-approval. A change request which is minor(that does not have any financial impact, change of scope or time extension) shall be processed by Monitoring Department right away . However in other case change request shall be presented to Change Request Review Committee (CRRC) which has already comprised of CFO, GM-Monitoring and GM-SEED. Decision on change request must be taken within 10 days or less. 1.6 Risk Management In addition to changes, other issues may arise which may have an impact on the progress of the project. Examples of such issues include non-completion or late completion of actions by either the PI, the supplier or other involved party. All problems, no matter how large or small, should be documented and communi- cated. The Project Manager together with the appropriate personnel meet to discuss these problems, identify solutions, the impact of these solutions and together with the PI agree on the action to be taken. There is also an associated escalation pro- cedure whereby more senior management may become involved in order to resolve complex or time critical issues. 7
  • 12. Chapter 1 Technical Project Monitoring Framework Table 1.1: Sample Risk Register Risk Identification Risk Analysis Risk Planning Monitoring and Control Date Risk Categories Probability(0-1) Impact(0-100) RiskScore(P×I) RiskOwner Mitigation Comments 1.7 Configuration Management Configuration Management is a discipline for controlling the identification of the software developed to: • Establishing baselines, • Recording and tracking • Auditing the product. All software modules, specifications, test procedures, etc. are configuration items and subject to change control. A base level (or baseline) is the set of all documents and files that comprises of specific version of a product (or application) created at a specific time. Configuration management is therefore concerned with the identifi- cation and control of all components in any given base level. At this point in time code tracking and baselining should be maintain through one of the following configuration management tools. • VSS – Visual source safe • CVS- Concurrent version system • Rational Clear Case • SVN- Subversion • Perforce • TortoiseSVN 1.8 Project Closure In Project Closure, the Project Team assesses the outcome of the project, as well as the performance of the Project Team and the Performing Organization. This 8
  • 13. 1.9 Summary is accomplished primarily through soliciting and evaluating feedback and Project Team members. A comprehensive project closure report by involving Project Review Committee should be submitted mentioning the key project metrics, performance, best practices , lessons learned and commercialization potential for use on current future projects. (Report format shall be provided ) 1.9 Summary The basic purpose of this document is to provide the guidelines to manage, track and monitor the project effectively. The Motivations behind this are given in Tab 1.2 Summary of responsibility of PI, Project Manager and PRC is given in responsibility assignment matrix in Tab 1.3. PRC committee shall be responsible to conduct mid review of projects and provide reports in traffic light format as given in Tab 1.4. 9
  • 14. Chapter 1 Technical Project Monitoring Framework Table 1.2: Key Steps # Motivation Requirement 1 Successful projects utilize a proven project life cycle model. PI will choose the proven project life cycle model and stick to it and ensure that best practice is implemented at the appropriate stages and proper documentation is provided. 2 Planning is everything Detailed Project Plan will be prepared with PI that reflect each and every task in detail 3 Project Risk must be assessed, reviewed and actively managed throughout the project life cycle PI will mentioned Risk at every stage of project and as part of deliverables PI will submitt the potensial risks and Manager will react depending upon the level. 4 Use trend and forecasting techniques. A successful project is not just on-time & budget but must also deliver the desired outcomes. Using Key Performance Indicators (KPIs) is one technique to monitor wider success criteria through Project Review Committe. 5 Monitoring and Control Project will be monitor and Control through Task and Code base Managment Systems. 6 Integrated Change Control Formal change control procedures to be adopted. Evaluate all potential changes but implement only those that are beneficial. 7 Scope , Cost , Quality and Time Control With help of Project Review Committe and Monitoring Tools Scope, Cost and Schedule will be controled. and correct balance between them will be maintianed through checklists and report templates. 8 Fight for the time to do things right. We always have the time to do the project over; but not the time to do it right in the first place!” Project Managers must demonstrate to sponsors and senior managers why it’s necessary to make this time available in the pursuit of quality deliverables. 9 Learn from the past. Make sure to include the post implementation review for the future projects 10 Acquire the best people available. To run the project effectivity training must be given to appropriate time and people. 10
  • 15. 1.9 Summary Table 1.3: Responsibility Matrix Task Project Manager Principal Investigator PRC Prepare Project Plan × × × Selection of Project Management Framework × Risk Reporting × Risk Mitigation and Respond within 14 days × Mangement Framework Documentation × Project Progress Summary × Financial Summary × Key Milestone /Deliverable Summary × Issues/Risk Log × Change Management - Without Effect on Time , Budget and Schedule × Change Management - Effect on Time , Budget and Schedule × Task Managemt System × Configuration Managment System × Project Monitoring and Control × Project Mid Review and Traffic Light Report × Communication Managment × Project Closure Report × × × 11
  • 16. Chapter 1 Technical Project Monitoring Framework Table 1.4: Mid Review Report 12