Soil ExplorationSoil Exploration
http://usefulsearch.org
(useful search)
22
IndexIndex
 Purpose of Soil ExplorationPurpose of Soil Exploration
 Different methodsDifferent methods
1.1. Test trenches and PitsTest trenches and Pits
2.2. Auger and Wash BoringAuger and Wash Boring
3.3. Rotary DrillingRotary Drilling
4.4. Geophysical MethodsGeophysical Methods
How do weHow do we
Explorate Soil...?Explorate Soil...?
33
44
COMMON STAGES IN SITE INVESTIGATIONCOMMON STAGES IN SITE INVESTIGATION
 Desk StudyDesk Study
 Site ReconnaissanceSite Reconnaissance
 Field InvestigationsField Investigations
 a) Preliminary Ground Investigationa) Preliminary Ground Investigation
 b) Detailed Ground Investigationb) Detailed Ground Investigation
 Laboratory TestingLaboratory Testing
 Report WritingReport Writing
 Follow up Investigations during design &Follow up Investigations during design &
constructionconstruction
 Appraisal of performanceAppraisal of performance
55
SOIL INVESTIGATIONSOIL INVESTIGATION
 Determination of surface and subsurface soilDetermination of surface and subsurface soil
conditions and features in an area of proposedconditions and features in an area of proposed
construction that may influence the design andconstruction that may influence the design and
construction and address expected postconstruction and address expected post
construction problems.construction problems.
SCOPE OF INVESTIGATION
Simple visual examination of soil at the surface or
from shallow test pits.
Detailed study of soil and groundwater to a
reasonable depth (influence zone) by sampling from
bore holes, shafts and audits and in-situ and laboratory
tests.
66
PURPOSE OF SOIL INVESTIGATION:PURPOSE OF SOIL INVESTIGATION:
The site investigation provides first hand
information for;
Selection & Design of foundations type.
Planning construction techniques.
Selection of appropriate construction
equipment (especially for excavation and
foundations).
Estimating development cost for the site.
Study of environmental impacts of the
proposed construction.
77
7

Need for any suitable soil improvements.Need for any suitable soil improvements.
 Requirement of any surface or subsurfaceRequirement of any surface or subsurface
drainage.drainage.
 Selection of the most suitable and economicalSelection of the most suitable and economical
route for highways with respect to soilroute for highways with respect to soil
conditions.conditions.
 The design of extension works to existingThe design of extension works to existing
structures.structures.
 the investigation of the cases where failure hasthe investigation of the cases where failure has
occurred, to know the causes and design ofoccurred, to know the causes and design of
PURPOSE OF SOIL INVESTIGATION(B):PURPOSE OF SOIL INVESTIGATION(B):
DEPTH OF EXPLORATIONDEPTH OF EXPLORATION
Depth of exploration at particular site dependsDepth of exploration at particular site depends
upon degree of variation of subsurface data inupon degree of variation of subsurface data in
horizontal and vertical direction.horizontal and vertical direction.
For square footing 1.5B=D.For square footing 1.5B=D.
For strip footing 3B=D.For strip footing 3B=D.
For pile foundation D=1.5 times the width of theFor pile foundation D=1.5 times the width of the
pile group.pile group.
In case of friction pile D=1.5 times the width ofIn case of friction pile D=1.5 times the width of
the pile group measured from lower 3the pile group measured from lower 3rdrd point.point.
88
 In case of multistory buildings D= C(S)In case of multistory buildings D= C(S).7.7
 Here D= depth of exploration, C=constantHere D= depth of exploration, C=constant
equal to 3 for light steel buildings & naarrowequal to 3 for light steel buildings & naarrow
concrete buildings. It is equalto 6 for heavyconcrete buildings. It is equalto 6 for heavy
steel buildings & wide concrete building,S=steel buildings & wide concrete building,S=
number of stories.number of stories.
 In case of road fill mini Depth of boring=2mIn case of road fill mini Depth of boring=2m
below ground surface or = to the height of thebelow ground surface or = to the height of the
fill,whichever is more.fill,whichever is more.
 In case of gravity dam mini Depth of boring isIn case of gravity dam mini Depth of boring is
twice the height of the dam.twice the height of the dam.
99
 LATERAL EXTENT OF EXPLORATIONLATERAL EXTENT OF EXPLORATION
Lateral extent of exploration and spacing of boreLateral extent of exploration and spacing of bore
holes depends on horizontal variation of theholes depends on horizontal variation of the
strata.strata.
 For small and less imp building one bore hole orFor small and less imp building one bore hole or
a trial pit may sufficient. but for compacta trial pit may sufficient. but for compact
buildungs covering an area about 0.4 hect,therebuildungs covering an area about 0.4 hect,there
should be 5 bore holes one at centre & 4 nearshould be 5 bore holes one at centre & 4 near
the corner,(Spacing of bore hole=10m-30m).the corner,(Spacing of bore hole=10m-30m).
 For highways exploration carried out along theFor highways exploration carried out along the
centre line,(Spacing of bore hole=150m-centre line,(Spacing of bore hole=150m-
300m).if the substrata is erractic spacing may be300m).if the substrata is erractic spacing may be
reduced upto =30m.reduced upto =30m.
1010
1111
Boring Logs
1212
1313
METHODS OF INVESTIGATIONMETHODS OF INVESTIGATION
1414
METHODS OF INVESTIGATIONMETHODS OF INVESTIGATION
The methods to determine the sequence, thickness andThe methods to determine the sequence, thickness and
lateral extent of the soil strata and, where appropriatelateral extent of the soil strata and, where appropriate
the level of bedrock.the level of bedrock.
The common methods includeThe common methods include
 Test pitsTest pits
 Shafts and auditsShafts and audits
 Boring or drillingBoring or drilling
1515
Test PitsTest Pits
 The excavation of test pits is a simple and reliableThe excavation of test pits is a simple and reliable
method.method.
 The depth is limited to 4-5m only.The depth is limited to 4-5m only.
 The in-situ conditions are examined visuallyThe in-situ conditions are examined visually
 It is easy to obtain disturbed and undisturbed samplesIt is easy to obtain disturbed and undisturbed samples
 Block samples can be cut by hand tools and tubeBlock samples can be cut by hand tools and tube
samples can be taken from the bottom of the pit.samples can be taken from the bottom of the pit.
1616
16
1
2
3
4
Walls of the test pit indicate four layers (1) Clayey silt (2)
Sandy silt (3) Clean sand (4) Sandy gravel
1717
Boring or DrillingBoring or Drilling
Boring refers to advancing a hole in the ground.Boring refers to advancing a hole in the ground.
• Boring is required for the following:Boring is required for the following:
• To obtain representative soil and rock samples for laboratory tests.To obtain representative soil and rock samples for laboratory tests.
• To identify the groundwater conditions.To identify the groundwater conditions.
• Performance of in-situ tests to assess appropriate soil characteristics.Performance of in-situ tests to assess appropriate soil characteristics.
• Some of the common types of boring are as followsSome of the common types of boring are as follows
•Auger boringAuger boring
1818
18
Auger BoringAuger Boring
Hand AugerHand Auger
 It is the simplest method of boring used for small projects in soft cohesive soils.It is the simplest method of boring used for small projects in soft cohesive soils.
 For hard soil and soil containing gravels boring with hand auger becomesFor hard soil and soil containing gravels boring with hand auger becomes
difficult.difficult.
 Hand-augered holes can be made upto about 20m depth, although depthHand-augered holes can be made upto about 20m depth, although depth
greater than about 8-10m is usually not practical.greater than about 8-10m is usually not practical.
 The length of the auger blade varies from 0.3-0.5m.The length of the auger blade varies from 0.3-0.5m.
 The auger is rotated until it is full of soil, then it is withdrawn to remove theThe auger is rotated until it is full of soil, then it is withdrawn to remove the
soil and the soil type present at various depths is noted.soil and the soil type present at various depths is noted.
 Repeated with drawl of auger for soil removal makes boring difficult below 8-Repeated with drawl of auger for soil removal makes boring difficult below 8-
10m depth.10m depth.
 The soil samples collected in this manner are disturbed samples and can beThe soil samples collected in this manner are disturbed samples and can be
used for classification test. Auger boring may not be possible in very soft clayused for classification test. Auger boring may not be possible in very soft clay
or coarse sand because the hole tends to collapse when auger is removedor coarse sand because the hole tends to collapse when auger is removed
Hand Auger Mechanical Auger
1919
a.-Helical (worm types) Augera.-Helical (worm types) Auger
b. Short flight Augerb. Short flight Auger
c. Iwan (posthole) Augerc. Iwan (posthole) Auger
a
b c
2020
Mechanical AugerMechanical Auger
o Mechanical Auger means power operated augers. The power required toMechanical Auger means power operated augers. The power required to
rotate the auger depends on the type and size of auger and the type of soil.rotate the auger depends on the type and size of auger and the type of soil.
o Downwards pressure can be applied hydraulically, mechanically or by deadDownwards pressure can be applied hydraulically, mechanically or by dead
weightweight
a
a
b
c d
a. Continuous Flight Auger b. Hallow-stem auger plugged during advancing
bore
c. Plug removed and sampler inserted d. Truck mounted auger boring machine
2121
21
 The diameter of the flight auger usually is between 75 toThe diameter of the flight auger usually is between 75 to
300mm, although diameters up to 1m and bucket augers up300mm, although diameters up to 1m and bucket augers up
to2m are available.to2m are available.
 Borehole depths up to 50m are possible with continuous-flightBorehole depths up to 50m are possible with continuous-flight
augers.augers.
 Continuous flight augers can be solid stem or hollow stemContinuous flight augers can be solid stem or hollow stem
with internal diameter of 75-150mm.with internal diameter of 75-150mm.
 Hollow stem augers are used when undisturbed samples areHollow stem augers are used when undisturbed samples are
required.required.
 As the auger acts as a casing it can be used in sand belowAs the auger acts as a casing it can be used in sand below
water table. The possibility of rising sand in to the stem bywater table. The possibility of rising sand in to the stem by
hydrostatic pressure can be avoided by filling the stem withhydrostatic pressure can be avoided by filling the stem with
water up to the water table.water up to the water table.
2222
 The soil rises to the surface along the helical blades, obviatingThe soil rises to the surface along the helical blades, obviating
the necessity of withdrawal.the necessity of withdrawal.
 They are not suitable for soil bore that require casing, whichThey are not suitable for soil bore that require casing, which
demand removal of auger for driving the casing.demand removal of auger for driving the casing.
 The presence of cobbles and boulders create problems withThe presence of cobbles and boulders create problems with
small-sized augers.small-sized augers.
 There is a possibility that different soil types may becomeThere is a possibility that different soil types may become
mixed as they rise to the surface and it may be difficult tomixed as they rise to the surface and it may be difficult to
determine the depths of changes of strata. Experienced drillerdetermine the depths of changes of strata. Experienced driller
can however detect the change of strata by the change of speedcan however detect the change of strata by the change of speed
and the sound of drilling.and the sound of drilling.
2323
23
Wash boringWash boring
 Water with high pressure pumped through hallow boring rods isWater with high pressure pumped through hallow boring rods is
released from narrow holes in a chisel attach to the lower end ofreleased from narrow holes in a chisel attach to the lower end of
the rods.the rods.
 The soil is loosened and broken by the water jet and the up-The soil is loosened and broken by the water jet and the up-
down moment of the chisel.down moment of the chisel.
 The soil particles are carried in suspension to the surfaceThe soil particles are carried in suspension to the surface
between the rock and the borehole sites.between the rock and the borehole sites.
 The rods are raised and drop for chopping action of the chiselThe rods are raised and drop for chopping action of the chisel
by means of winch.by means of winch.
 Wash boring can be used in most type of soil but the progress isWash boring can be used in most type of soil but the progress is
slow in coarse gravel strata.slow in coarse gravel strata.
2424
 The accurate identification of soil strata is difficult due toThe accurate identification of soil strata is difficult due to
mixing of the material has they are carried to the surface.mixing of the material has they are carried to the surface.
 The method is unacceptable for obtaining soil samples.The method is unacceptable for obtaining soil samples.
 It is only used for advancing the borehole to enable tubeIt is only used for advancing the borehole to enable tube
sample to be taken or field test to be carried at the holesample to be taken or field test to be carried at the hole
bottom.bottom.
 The advantage is that the soil immediately below the holeThe advantage is that the soil immediately below the hole
remains relatively un-disturbedremains relatively un-disturbed
2525
Wash boring rig
2626
ROTARY DRILLINGROTARY DRILLING
 The rig consists of a derrick, power unit, winch, pump and a drillThe rig consists of a derrick, power unit, winch, pump and a drill
head to apply high-speed rotary drive and downward thrust to thehead to apply high-speed rotary drive and downward thrust to the
drilling rods.drilling rods.
 Primarily intended for investigation in rock, but also used in soils.Primarily intended for investigation in rock, but also used in soils.
 The drilling tool, (cutting bit or a coring bit) is attached to the lowerThe drilling tool, (cutting bit or a coring bit) is attached to the lower
end of hollow drilling rodsend of hollow drilling rods
 The coring bit is fixed to the lower end of a coreThe coring bit is fixed to the lower end of a core
 Water or drilling fluid is pumped down the hollow rods and passesWater or drilling fluid is pumped down the hollow rods and passes
under pressure through narrow holes in the bit or barrelunder pressure through narrow holes in the bit or barrel
 The drilling fluid cools and lubricates the drilling tool and carries theThe drilling fluid cools and lubricates the drilling tool and carries the
loose debris to the surface between the rods and the side of the hole.loose debris to the surface between the rods and the side of the hole.
2727
 The fluid (bentonite slurry) also provides some support to theThe fluid (bentonite slurry) also provides some support to the
sides of the hole if no casing is usedsides of the hole if no casing is used
 ..
 There are two forms of rotary drilling, open-hole drilling andThere are two forms of rotary drilling, open-hole drilling and
core drilling.core drilling.
 Open- hole drilling, which is generally used in soils and weakOpen- hole drilling, which is generally used in soils and weak
rock, just for advancing the holerock, just for advancing the hole
 The drilling rods can then be removed to allow tube samples toThe drilling rods can then be removed to allow tube samples to
be taken orbe taken or in-situin-situ tests to be carried out.tests to be carried out.

 In core drilling, which is used in rocks and hard clays, theIn core drilling, which is used in rocks and hard clays, the
diamond or tungsten carbide bit cuts an annular hole in thediamond or tungsten carbide bit cuts an annular hole in the
material and an intact core enters the barrel, to be removed as amaterial and an intact core enters the barrel, to be removed as a
sample. Typical core diameters are 41, 54 and 76mm, but cansample. Typical core diameters are 41, 54 and 76mm, but can
range up to 165 mm.range up to 165 mm.
2828
AdvantagesAdvantages
The advantage of rotary drilling in soils is that progress isThe advantage of rotary drilling in soils is that progress is
much faster than with other investigation methods andmuch faster than with other investigation methods and
disturbance of the soil below the borehole is slightdisturbance of the soil below the borehole is slight..
LimitationsLimitations
 The method is not suitable if the soil contains a highThe method is not suitable if the soil contains a high
percentage of gravel/cobbles, as they tend to rotate beneath thepercentage of gravel/cobbles, as they tend to rotate beneath the
bit and are not broken up.bit and are not broken up.
 The natural water content of the material is liable to beThe natural water content of the material is liable to be
increased due to contact with the drilling fluidincreased due to contact with the drilling fluid
2929
Rotary Drilling rig
3030
GEOPHYSICAL METHODGEOPHYSICAL METHOD
 Although boring and test pits provide definite results but they are timeAlthough boring and test pits provide definite results but they are time
consuming and expensive.consuming and expensive.
 Subsurface conditions are known only at the bore or test pit location.Subsurface conditions are known only at the bore or test pit location.
 Geophysical methods are more quick and cheaper.Geophysical methods are more quick and cheaper.
 They provide thorough coverage of the entire area.They provide thorough coverage of the entire area.
 The results of Geophysical testing require subjective interpretation.The results of Geophysical testing require subjective interpretation.
 Therefore both methods are important. In case geophysical testing in majorTherefore both methods are important. In case geophysical testing in major
in scope, few borings and sampling will be required for accuratein scope, few borings and sampling will be required for accurate
determination of soil properties.determination of soil properties.
 If boring is major in scope then few geophysical lines will be required to knowIf boring is major in scope then few geophysical lines will be required to know
the conditions in-between the borings.the conditions in-between the borings.
3131
31
Site Evaluation Direct MethodsSite Evaluation Direct Methods
Boreholes/ProbesBoreholes/Probes
 TestTest
Pits/TrenchesPits/Trenches
 CoresCores
3232
Geophysical Techniques IndirectGeophysical Techniques Indirect
MethodsMethods
o Ground Penetrating Radar (GPR)Ground Penetrating Radar (GPR)
o Electromagnetic (EM)Electromagnetic (EM)
o MagneticMagnetic
o Utility LocatingUtility Locating
o SeismicSeismic
o Electrical ResistivityElectrical Resistivity
o GravityGravity
o Very Low Frequency (VLF)Very Low Frequency (VLF)
3333
33
Geophysical Techniques Indirect MethodsGeophysical Techniques Indirect Methods
AdvantagesAdvantages
 Non-DestructiveNon-Destructive
 Cost EffectiveCost Effective
 ProvidesProvides
Preliminary orPreliminary or
SupplementalSupplemental
InformationInformation

Mais conteúdo relacionado

Mais procurados

1)methods of exploration
1)methods of exploration1)methods of exploration
1)methods of exploration
jagadish108
 

Mais procurados (20)

Standard penetration test
Standard penetration testStandard penetration test
Standard penetration test
 
Site investigation
Site investigationSite investigation
Site investigation
 
Soil slope stability
Soil slope stabilitySoil slope stability
Soil slope stability
 
Sinking of well foundation
Sinking of well foundationSinking of well foundation
Sinking of well foundation
 
1)methods of exploration
1)methods of exploration1)methods of exploration
1)methods of exploration
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
 
Soil investigation
Soil investigationSoil investigation
Soil investigation
 
CBR TEST
CBR TESTCBR TEST
CBR TEST
 
Design and construction of well foundations
Design and construction of well foundationsDesign and construction of well foundations
Design and construction of well foundations
 
Standard penetration test (spt)
Standard penetration test (spt)Standard penetration test (spt)
Standard penetration test (spt)
 
Plate load test
Plate load testPlate load test
Plate load test
 
07 101+ ground improvement techniques
07 101+ ground improvement techniques07 101+ ground improvement techniques
07 101+ ground improvement techniques
 
Shear strength of soil
Shear strength of soilShear strength of soil
Shear strength of soil
 
Geotechnical Engineering-II [Lec #3: Direct Shear Test)
Geotechnical Engineering-II [Lec #3: Direct Shear Test)Geotechnical Engineering-II [Lec #3: Direct Shear Test)
Geotechnical Engineering-II [Lec #3: Direct Shear Test)
 
Quick sand condation
Quick sand condationQuick sand condation
Quick sand condation
 
Lecture 2 bearing capacity
Lecture 2 bearing capacityLecture 2 bearing capacity
Lecture 2 bearing capacity
 
Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma
 
Stress distribution of the soil
Stress distribution of the soilStress distribution of the soil
Stress distribution of the soil
 
Shear strength of soil
Shear strength of soilShear strength of soil
Shear strength of soil
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of piles
 

Destaque

Detection of Low-Speed Layer (Lvl) In Seismic Refraction Survey Using Combine...
Detection of Low-Speed Layer (Lvl) In Seismic Refraction Survey Using Combine...Detection of Low-Speed Layer (Lvl) In Seismic Refraction Survey Using Combine...
Detection of Low-Speed Layer (Lvl) In Seismic Refraction Survey Using Combine...
iosrjce
 
Chapter 2 soil investigation
Chapter 2 soil investigationChapter 2 soil investigation
Chapter 2 soil investigation
AmiRul AFiq
 
site investigation
site investigationsite investigation
site investigation
olvive1208
 

Destaque (9)

Rock Drilling, Sampling & Testing
Rock Drilling, Sampling & TestingRock Drilling, Sampling & Testing
Rock Drilling, Sampling & Testing
 
Soil investigation
Soil investigationSoil investigation
Soil investigation
 
Soil Exploration
Soil ExplorationSoil Exploration
Soil Exploration
 
Detection of Low-Speed Layer (Lvl) In Seismic Refraction Survey Using Combine...
Detection of Low-Speed Layer (Lvl) In Seismic Refraction Survey Using Combine...Detection of Low-Speed Layer (Lvl) In Seismic Refraction Survey Using Combine...
Detection of Low-Speed Layer (Lvl) In Seismic Refraction Survey Using Combine...
 
Chapter 2 soil investigation
Chapter 2 soil investigationChapter 2 soil investigation
Chapter 2 soil investigation
 
Geo-Physical Investigations
Geo-Physical InvestigationsGeo-Physical Investigations
Geo-Physical Investigations
 
Geophysical methods of soil/Foundation testing
Geophysical methods of soil/Foundation testing Geophysical methods of soil/Foundation testing
Geophysical methods of soil/Foundation testing
 
Dams, Types of dams
Dams, Types of damsDams, Types of dams
Dams, Types of dams
 
site investigation
site investigationsite investigation
site investigation
 

Semelhante a Soil exploration/Investigation method, purpose depth of exploration (Usefulsearch.org) (useful search)

Semelhante a Soil exploration/Investigation method, purpose depth of exploration (Usefulsearch.org) (useful search) (20)

Soil comp.ppt
Soil comp.pptSoil comp.ppt
Soil comp.ppt
 
soil_comp.ppt.ppt
soil_comp.ppt.pptsoil_comp.ppt.ppt
soil_comp.ppt.ppt
 
soil mechanics and foundation engineering for btech civil engineering fourth ...
soil mechanics and foundation engineering for btech civil engineering fourth ...soil mechanics and foundation engineering for btech civil engineering fourth ...
soil mechanics and foundation engineering for btech civil engineering fourth ...
 
Soil investigation
Soil investigationSoil investigation
Soil investigation
 
Soil Exploration.pdf
Soil Exploration.pdfSoil Exploration.pdf
Soil Exploration.pdf
 
Chapter-1-Soil Exploration.ppt
Chapter-1-Soil Exploration.pptChapter-1-Soil Exploration.ppt
Chapter-1-Soil Exploration.ppt
 
Site inveswtigation vandana miss
Site inveswtigation vandana missSite inveswtigation vandana miss
Site inveswtigation vandana miss
 
Sub soil exploration & spt
Sub soil exploration & sptSub soil exploration & spt
Sub soil exploration & spt
 
Chapter 2 sub-surface investigation
Chapter 2 sub-surface investigationChapter 2 sub-surface investigation
Chapter 2 sub-surface investigation
 
methods of sub-surface exploration, methods of boring, number, location and d...
methods of sub-surface exploration, methods of boring, number, location and d...methods of sub-surface exploration, methods of boring, number, location and d...
methods of sub-surface exploration, methods of boring, number, location and d...
 
Chapter 09
Chapter 09Chapter 09
Chapter 09
 
Site investigation 5.pdf
Site investigation 5.pdfSite investigation 5.pdf
Site investigation 5.pdf
 
Geological site investigation for Civil Engineering Foundations
Geological site investigation for Civil Engineering FoundationsGeological site investigation for Civil Engineering Foundations
Geological site investigation for Civil Engineering Foundations
 
M soil exploration
M soil explorationM soil exploration
M soil exploration
 
Presentation on surface investigation techniques for foundation
Presentation on surface investigation techniques  for foundationPresentation on surface investigation techniques  for foundation
Presentation on surface investigation techniques for foundation
 
1. Site Investgation.pptxDebre Markos University Technology College Departmen...
1. Site Investgation.pptxDebre Markos University Technology College Departmen...1. Site Investgation.pptxDebre Markos University Technology College Departmen...
1. Site Investgation.pptxDebre Markos University Technology College Departmen...
 
sm-1_chap._6_geotechnical_investigation.pptx
sm-1_chap._6_geotechnical_investigation.pptxsm-1_chap._6_geotechnical_investigation.pptx
sm-1_chap._6_geotechnical_investigation.pptx
 
Civil engineering materials & Construction - Soil explorations
Civil engineering materials & Construction - Soil explorationsCivil engineering materials & Construction - Soil explorations
Civil engineering materials & Construction - Soil explorations
 
Lecture about foundation engineering.pptx
Lecture about foundation engineering.pptxLecture about foundation engineering.pptx
Lecture about foundation engineering.pptx
 
Mid 1 soil exploration.pdf
Mid 1 soil exploration.pdfMid 1 soil exploration.pdf
Mid 1 soil exploration.pdf
 

Mais de Make Mannan

Mais de Make Mannan (20)

Matlab solved problems
Matlab solved problemsMatlab solved problems
Matlab solved problems
 
Earth quake failures best
Earth quake failures bestEarth quake failures best
Earth quake failures best
 
Engineering Graphics Drawing PPT : Download above File and Click on each topi...
Engineering Graphics Drawing PPT : Download above File and Click on each topi...Engineering Graphics Drawing PPT : Download above File and Click on each topi...
Engineering Graphics Drawing PPT : Download above File and Click on each topi...
 
Geo technical Geotech. Soil Mechanics : Download above File and Click on eac...
Geo technical Geotech. Soil Mechanics : Download above File and Click  on eac...Geo technical Geotech. Soil Mechanics : Download above File and Click  on eac...
Geo technical Geotech. Soil Mechanics : Download above File and Click on eac...
 
Slabs Beam Reinforcement Detailing
Slabs Beam Reinforcement DetailingSlabs Beam Reinforcement Detailing
Slabs Beam Reinforcement Detailing
 
Thanks vote english
Thanks vote englishThanks vote english
Thanks vote english
 
Bricks (usefulsearchorg) (useful search)
Bricks (usefulsearchorg) (useful search)Bricks (usefulsearchorg) (useful search)
Bricks (usefulsearchorg) (useful search)
 
Basic paper
Basic paperBasic paper
Basic paper
 
Be 205 basic civil engineering jun 09 (useful search)
Be 205 basic civil engineering jun 09 (useful search)Be 205 basic civil engineering jun 09 (useful search)
Be 205 basic civil engineering jun 09 (useful search)
 
Be 204 basic civil engineering and engineering mechanics jun 14 (useful search)
Be 204 basic civil engineering and engineering mechanics jun 14 (useful search)Be 204 basic civil engineering and engineering mechanics jun 14 (useful search)
Be 204 basic civil engineering and engineering mechanics jun 14 (useful search)
 
Be 204 basic civil engineering and engineering mechanics jun 13 (useful search)
Be 204 basic civil engineering and engineering mechanics jun 13 (useful search)Be 204 basic civil engineering and engineering mechanics jun 13 (useful search)
Be 204 basic civil engineering and engineering mechanics jun 13 (useful search)
 
Be 204 basic civil engineering and engineering mechanics dec 14 (useful search)
Be 204 basic civil engineering and engineering mechanics dec 14  (useful search)Be 204 basic civil engineering and engineering mechanics dec 14  (useful search)
Be 204 basic civil engineering and engineering mechanics dec 14 (useful search)
 
Be 204 basic civil engineering and engineering mechanics dec 13 (useful search)
Be 204 basic civil engineering and engineering mechanics dec 13  (useful search)Be 204 basic civil engineering and engineering mechanics dec 13  (useful search)
Be 204 basic civil engineering and engineering mechanics dec 13 (useful search)
 
Sheet pile (usefulsearch.org) (useful search)
Sheet pile (usefulsearch.org) (useful search)Sheet pile (usefulsearch.org) (useful search)
Sheet pile (usefulsearch.org) (useful search)
 
Sheet pile and bulkhead (usefulsearch.org) (useful search)
Sheet pile and bulkhead (usefulsearch.org)  (useful search)Sheet pile and bulkhead (usefulsearch.org)  (useful search)
Sheet pile and bulkhead (usefulsearch.org) (useful search)
 
Under reamed pile construction (usefulsearch.org) (useful search)
Under reamed pile construction (usefulsearch.org)  (useful search)Under reamed pile construction (usefulsearch.org)  (useful search)
Under reamed pile construction (usefulsearch.org) (useful search)
 
Pile dynamic capacity formula (usefulsearch.org) (useful search)
Pile dynamic capacity formula (usefulsearch.org)  (useful search)Pile dynamic capacity formula (usefulsearch.org)  (useful search)
Pile dynamic capacity formula (usefulsearch.org) (useful search)
 
Static pile capacity formula (usefulsearch.org) (useful search)
Static pile capacity formula (usefulsearch.org)  (useful search)Static pile capacity formula (usefulsearch.org)  (useful search)
Static pile capacity formula (usefulsearch.org) (useful search)
 
Lab manual operating system [cs 502 rgpv] (usefulsearch.org) (useful search)
Lab manual operating system [cs 502 rgpv] (usefulsearch.org)  (useful search)Lab manual operating system [cs 502 rgpv] (usefulsearch.org)  (useful search)
Lab manual operating system [cs 502 rgpv] (usefulsearch.org) (useful search)
 
Lab manual object oriented technology (it 303 rgpv) (usefulsearch.org) (usef...
Lab manual object oriented technology (it 303 rgpv) (usefulsearch.org)  (usef...Lab manual object oriented technology (it 303 rgpv) (usefulsearch.org)  (usef...
Lab manual object oriented technology (it 303 rgpv) (usefulsearch.org) (usef...
 

Último

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 

Último (20)

GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 

Soil exploration/Investigation method, purpose depth of exploration (Usefulsearch.org) (useful search)

  • 2. 22 IndexIndex  Purpose of Soil ExplorationPurpose of Soil Exploration  Different methodsDifferent methods 1.1. Test trenches and PitsTest trenches and Pits 2.2. Auger and Wash BoringAuger and Wash Boring 3.3. Rotary DrillingRotary Drilling 4.4. Geophysical MethodsGeophysical Methods
  • 3. How do weHow do we Explorate Soil...?Explorate Soil...? 33
  • 4. 44 COMMON STAGES IN SITE INVESTIGATIONCOMMON STAGES IN SITE INVESTIGATION  Desk StudyDesk Study  Site ReconnaissanceSite Reconnaissance  Field InvestigationsField Investigations  a) Preliminary Ground Investigationa) Preliminary Ground Investigation  b) Detailed Ground Investigationb) Detailed Ground Investigation  Laboratory TestingLaboratory Testing  Report WritingReport Writing  Follow up Investigations during design &Follow up Investigations during design & constructionconstruction  Appraisal of performanceAppraisal of performance
  • 5. 55 SOIL INVESTIGATIONSOIL INVESTIGATION  Determination of surface and subsurface soilDetermination of surface and subsurface soil conditions and features in an area of proposedconditions and features in an area of proposed construction that may influence the design andconstruction that may influence the design and construction and address expected postconstruction and address expected post construction problems.construction problems. SCOPE OF INVESTIGATION Simple visual examination of soil at the surface or from shallow test pits. Detailed study of soil and groundwater to a reasonable depth (influence zone) by sampling from bore holes, shafts and audits and in-situ and laboratory tests.
  • 6. 66 PURPOSE OF SOIL INVESTIGATION:PURPOSE OF SOIL INVESTIGATION: The site investigation provides first hand information for; Selection & Design of foundations type. Planning construction techniques. Selection of appropriate construction equipment (especially for excavation and foundations). Estimating development cost for the site. Study of environmental impacts of the proposed construction.
  • 7. 77 7  Need for any suitable soil improvements.Need for any suitable soil improvements.  Requirement of any surface or subsurfaceRequirement of any surface or subsurface drainage.drainage.  Selection of the most suitable and economicalSelection of the most suitable and economical route for highways with respect to soilroute for highways with respect to soil conditions.conditions.  The design of extension works to existingThe design of extension works to existing structures.structures.  the investigation of the cases where failure hasthe investigation of the cases where failure has occurred, to know the causes and design ofoccurred, to know the causes and design of PURPOSE OF SOIL INVESTIGATION(B):PURPOSE OF SOIL INVESTIGATION(B):
  • 8. DEPTH OF EXPLORATIONDEPTH OF EXPLORATION Depth of exploration at particular site dependsDepth of exploration at particular site depends upon degree of variation of subsurface data inupon degree of variation of subsurface data in horizontal and vertical direction.horizontal and vertical direction. For square footing 1.5B=D.For square footing 1.5B=D. For strip footing 3B=D.For strip footing 3B=D. For pile foundation D=1.5 times the width of theFor pile foundation D=1.5 times the width of the pile group.pile group. In case of friction pile D=1.5 times the width ofIn case of friction pile D=1.5 times the width of the pile group measured from lower 3the pile group measured from lower 3rdrd point.point. 88
  • 9.  In case of multistory buildings D= C(S)In case of multistory buildings D= C(S).7.7  Here D= depth of exploration, C=constantHere D= depth of exploration, C=constant equal to 3 for light steel buildings & naarrowequal to 3 for light steel buildings & naarrow concrete buildings. It is equalto 6 for heavyconcrete buildings. It is equalto 6 for heavy steel buildings & wide concrete building,S=steel buildings & wide concrete building,S= number of stories.number of stories.  In case of road fill mini Depth of boring=2mIn case of road fill mini Depth of boring=2m below ground surface or = to the height of thebelow ground surface or = to the height of the fill,whichever is more.fill,whichever is more.  In case of gravity dam mini Depth of boring isIn case of gravity dam mini Depth of boring is twice the height of the dam.twice the height of the dam. 99
  • 10.  LATERAL EXTENT OF EXPLORATIONLATERAL EXTENT OF EXPLORATION Lateral extent of exploration and spacing of boreLateral extent of exploration and spacing of bore holes depends on horizontal variation of theholes depends on horizontal variation of the strata.strata.  For small and less imp building one bore hole orFor small and less imp building one bore hole or a trial pit may sufficient. but for compacta trial pit may sufficient. but for compact buildungs covering an area about 0.4 hect,therebuildungs covering an area about 0.4 hect,there should be 5 bore holes one at centre & 4 nearshould be 5 bore holes one at centre & 4 near the corner,(Spacing of bore hole=10m-30m).the corner,(Spacing of bore hole=10m-30m).  For highways exploration carried out along theFor highways exploration carried out along the centre line,(Spacing of bore hole=150m-centre line,(Spacing of bore hole=150m- 300m).if the substrata is erractic spacing may be300m).if the substrata is erractic spacing may be reduced upto =30m.reduced upto =30m. 1010
  • 12. 1212
  • 14. 1414 METHODS OF INVESTIGATIONMETHODS OF INVESTIGATION The methods to determine the sequence, thickness andThe methods to determine the sequence, thickness and lateral extent of the soil strata and, where appropriatelateral extent of the soil strata and, where appropriate the level of bedrock.the level of bedrock. The common methods includeThe common methods include  Test pitsTest pits  Shafts and auditsShafts and audits  Boring or drillingBoring or drilling
  • 15. 1515 Test PitsTest Pits  The excavation of test pits is a simple and reliableThe excavation of test pits is a simple and reliable method.method.  The depth is limited to 4-5m only.The depth is limited to 4-5m only.  The in-situ conditions are examined visuallyThe in-situ conditions are examined visually  It is easy to obtain disturbed and undisturbed samplesIt is easy to obtain disturbed and undisturbed samples  Block samples can be cut by hand tools and tubeBlock samples can be cut by hand tools and tube samples can be taken from the bottom of the pit.samples can be taken from the bottom of the pit.
  • 16. 1616 16 1 2 3 4 Walls of the test pit indicate four layers (1) Clayey silt (2) Sandy silt (3) Clean sand (4) Sandy gravel
  • 17. 1717 Boring or DrillingBoring or Drilling Boring refers to advancing a hole in the ground.Boring refers to advancing a hole in the ground. • Boring is required for the following:Boring is required for the following: • To obtain representative soil and rock samples for laboratory tests.To obtain representative soil and rock samples for laboratory tests. • To identify the groundwater conditions.To identify the groundwater conditions. • Performance of in-situ tests to assess appropriate soil characteristics.Performance of in-situ tests to assess appropriate soil characteristics. • Some of the common types of boring are as followsSome of the common types of boring are as follows •Auger boringAuger boring
  • 18. 1818 18 Auger BoringAuger Boring Hand AugerHand Auger  It is the simplest method of boring used for small projects in soft cohesive soils.It is the simplest method of boring used for small projects in soft cohesive soils.  For hard soil and soil containing gravels boring with hand auger becomesFor hard soil and soil containing gravels boring with hand auger becomes difficult.difficult.  Hand-augered holes can be made upto about 20m depth, although depthHand-augered holes can be made upto about 20m depth, although depth greater than about 8-10m is usually not practical.greater than about 8-10m is usually not practical.  The length of the auger blade varies from 0.3-0.5m.The length of the auger blade varies from 0.3-0.5m.  The auger is rotated until it is full of soil, then it is withdrawn to remove theThe auger is rotated until it is full of soil, then it is withdrawn to remove the soil and the soil type present at various depths is noted.soil and the soil type present at various depths is noted.  Repeated with drawl of auger for soil removal makes boring difficult below 8-Repeated with drawl of auger for soil removal makes boring difficult below 8- 10m depth.10m depth.  The soil samples collected in this manner are disturbed samples and can beThe soil samples collected in this manner are disturbed samples and can be used for classification test. Auger boring may not be possible in very soft clayused for classification test. Auger boring may not be possible in very soft clay or coarse sand because the hole tends to collapse when auger is removedor coarse sand because the hole tends to collapse when auger is removed Hand Auger Mechanical Auger
  • 19. 1919 a.-Helical (worm types) Augera.-Helical (worm types) Auger b. Short flight Augerb. Short flight Auger c. Iwan (posthole) Augerc. Iwan (posthole) Auger a b c
  • 20. 2020 Mechanical AugerMechanical Auger o Mechanical Auger means power operated augers. The power required toMechanical Auger means power operated augers. The power required to rotate the auger depends on the type and size of auger and the type of soil.rotate the auger depends on the type and size of auger and the type of soil. o Downwards pressure can be applied hydraulically, mechanically or by deadDownwards pressure can be applied hydraulically, mechanically or by dead weightweight a a b c d a. Continuous Flight Auger b. Hallow-stem auger plugged during advancing bore c. Plug removed and sampler inserted d. Truck mounted auger boring machine
  • 21. 2121 21  The diameter of the flight auger usually is between 75 toThe diameter of the flight auger usually is between 75 to 300mm, although diameters up to 1m and bucket augers up300mm, although diameters up to 1m and bucket augers up to2m are available.to2m are available.  Borehole depths up to 50m are possible with continuous-flightBorehole depths up to 50m are possible with continuous-flight augers.augers.  Continuous flight augers can be solid stem or hollow stemContinuous flight augers can be solid stem or hollow stem with internal diameter of 75-150mm.with internal diameter of 75-150mm.  Hollow stem augers are used when undisturbed samples areHollow stem augers are used when undisturbed samples are required.required.  As the auger acts as a casing it can be used in sand belowAs the auger acts as a casing it can be used in sand below water table. The possibility of rising sand in to the stem bywater table. The possibility of rising sand in to the stem by hydrostatic pressure can be avoided by filling the stem withhydrostatic pressure can be avoided by filling the stem with water up to the water table.water up to the water table.
  • 22. 2222  The soil rises to the surface along the helical blades, obviatingThe soil rises to the surface along the helical blades, obviating the necessity of withdrawal.the necessity of withdrawal.  They are not suitable for soil bore that require casing, whichThey are not suitable for soil bore that require casing, which demand removal of auger for driving the casing.demand removal of auger for driving the casing.  The presence of cobbles and boulders create problems withThe presence of cobbles and boulders create problems with small-sized augers.small-sized augers.  There is a possibility that different soil types may becomeThere is a possibility that different soil types may become mixed as they rise to the surface and it may be difficult tomixed as they rise to the surface and it may be difficult to determine the depths of changes of strata. Experienced drillerdetermine the depths of changes of strata. Experienced driller can however detect the change of strata by the change of speedcan however detect the change of strata by the change of speed and the sound of drilling.and the sound of drilling.
  • 23. 2323 23 Wash boringWash boring  Water with high pressure pumped through hallow boring rods isWater with high pressure pumped through hallow boring rods is released from narrow holes in a chisel attach to the lower end ofreleased from narrow holes in a chisel attach to the lower end of the rods.the rods.  The soil is loosened and broken by the water jet and the up-The soil is loosened and broken by the water jet and the up- down moment of the chisel.down moment of the chisel.  The soil particles are carried in suspension to the surfaceThe soil particles are carried in suspension to the surface between the rock and the borehole sites.between the rock and the borehole sites.  The rods are raised and drop for chopping action of the chiselThe rods are raised and drop for chopping action of the chisel by means of winch.by means of winch.  Wash boring can be used in most type of soil but the progress isWash boring can be used in most type of soil but the progress is slow in coarse gravel strata.slow in coarse gravel strata.
  • 24. 2424  The accurate identification of soil strata is difficult due toThe accurate identification of soil strata is difficult due to mixing of the material has they are carried to the surface.mixing of the material has they are carried to the surface.  The method is unacceptable for obtaining soil samples.The method is unacceptable for obtaining soil samples.  It is only used for advancing the borehole to enable tubeIt is only used for advancing the borehole to enable tube sample to be taken or field test to be carried at the holesample to be taken or field test to be carried at the hole bottom.bottom.  The advantage is that the soil immediately below the holeThe advantage is that the soil immediately below the hole remains relatively un-disturbedremains relatively un-disturbed
  • 26. 2626 ROTARY DRILLINGROTARY DRILLING  The rig consists of a derrick, power unit, winch, pump and a drillThe rig consists of a derrick, power unit, winch, pump and a drill head to apply high-speed rotary drive and downward thrust to thehead to apply high-speed rotary drive and downward thrust to the drilling rods.drilling rods.  Primarily intended for investigation in rock, but also used in soils.Primarily intended for investigation in rock, but also used in soils.  The drilling tool, (cutting bit or a coring bit) is attached to the lowerThe drilling tool, (cutting bit or a coring bit) is attached to the lower end of hollow drilling rodsend of hollow drilling rods  The coring bit is fixed to the lower end of a coreThe coring bit is fixed to the lower end of a core  Water or drilling fluid is pumped down the hollow rods and passesWater or drilling fluid is pumped down the hollow rods and passes under pressure through narrow holes in the bit or barrelunder pressure through narrow holes in the bit or barrel  The drilling fluid cools and lubricates the drilling tool and carries theThe drilling fluid cools and lubricates the drilling tool and carries the loose debris to the surface between the rods and the side of the hole.loose debris to the surface between the rods and the side of the hole.
  • 27. 2727  The fluid (bentonite slurry) also provides some support to theThe fluid (bentonite slurry) also provides some support to the sides of the hole if no casing is usedsides of the hole if no casing is used  ..  There are two forms of rotary drilling, open-hole drilling andThere are two forms of rotary drilling, open-hole drilling and core drilling.core drilling.  Open- hole drilling, which is generally used in soils and weakOpen- hole drilling, which is generally used in soils and weak rock, just for advancing the holerock, just for advancing the hole  The drilling rods can then be removed to allow tube samples toThe drilling rods can then be removed to allow tube samples to be taken orbe taken or in-situin-situ tests to be carried out.tests to be carried out.   In core drilling, which is used in rocks and hard clays, theIn core drilling, which is used in rocks and hard clays, the diamond or tungsten carbide bit cuts an annular hole in thediamond or tungsten carbide bit cuts an annular hole in the material and an intact core enters the barrel, to be removed as amaterial and an intact core enters the barrel, to be removed as a sample. Typical core diameters are 41, 54 and 76mm, but cansample. Typical core diameters are 41, 54 and 76mm, but can range up to 165 mm.range up to 165 mm.
  • 28. 2828 AdvantagesAdvantages The advantage of rotary drilling in soils is that progress isThe advantage of rotary drilling in soils is that progress is much faster than with other investigation methods andmuch faster than with other investigation methods and disturbance of the soil below the borehole is slightdisturbance of the soil below the borehole is slight.. LimitationsLimitations  The method is not suitable if the soil contains a highThe method is not suitable if the soil contains a high percentage of gravel/cobbles, as they tend to rotate beneath thepercentage of gravel/cobbles, as they tend to rotate beneath the bit and are not broken up.bit and are not broken up.  The natural water content of the material is liable to beThe natural water content of the material is liable to be increased due to contact with the drilling fluidincreased due to contact with the drilling fluid
  • 30. 3030 GEOPHYSICAL METHODGEOPHYSICAL METHOD  Although boring and test pits provide definite results but they are timeAlthough boring and test pits provide definite results but they are time consuming and expensive.consuming and expensive.  Subsurface conditions are known only at the bore or test pit location.Subsurface conditions are known only at the bore or test pit location.  Geophysical methods are more quick and cheaper.Geophysical methods are more quick and cheaper.  They provide thorough coverage of the entire area.They provide thorough coverage of the entire area.  The results of Geophysical testing require subjective interpretation.The results of Geophysical testing require subjective interpretation.  Therefore both methods are important. In case geophysical testing in majorTherefore both methods are important. In case geophysical testing in major in scope, few borings and sampling will be required for accuratein scope, few borings and sampling will be required for accurate determination of soil properties.determination of soil properties.  If boring is major in scope then few geophysical lines will be required to knowIf boring is major in scope then few geophysical lines will be required to know the conditions in-between the borings.the conditions in-between the borings.
  • 31. 3131 31 Site Evaluation Direct MethodsSite Evaluation Direct Methods Boreholes/ProbesBoreholes/Probes  TestTest Pits/TrenchesPits/Trenches  CoresCores
  • 32. 3232 Geophysical Techniques IndirectGeophysical Techniques Indirect MethodsMethods o Ground Penetrating Radar (GPR)Ground Penetrating Radar (GPR) o Electromagnetic (EM)Electromagnetic (EM) o MagneticMagnetic o Utility LocatingUtility Locating o SeismicSeismic o Electrical ResistivityElectrical Resistivity o GravityGravity o Very Low Frequency (VLF)Very Low Frequency (VLF)
  • 33. 3333 33 Geophysical Techniques Indirect MethodsGeophysical Techniques Indirect Methods AdvantagesAdvantages  Non-DestructiveNon-Destructive  Cost EffectiveCost Effective  ProvidesProvides Preliminary orPreliminary or SupplementalSupplemental InformationInformation