 Current Activities this Week:

 Foundations:
 Area 4 Field Level – Backfill of foundations for “infill”
 area between Column Lines 39-1 is complete.

 Concrete Flatwork:
 Area 3 Field Level – Concrete for base slab at Cauldron
 Club is complete.                                               Field Level Area 3 – Cauldron Club base slab
                                                                 has been placed.
 Masonry:
 Area 3 – Masonry pilaster installation at Truck Dock is
 ongoing. Area 1, 2, 3 – Masonry installation is ongoing
 at Concession Buildings.

 Steel:
 Area 1, 2, 3 – Canopy decking installation is ongoing.
 Area 2 – Concession Building steel truss and decking
 installation is nearly complete. Area 1 – Elevator
 support steel installation is ongoing for F1.
                                                                 Area 1 – Masonry and Densglas installation
                                                                 at Northwest corner of West Building.
 Roofing and Sheetmetal:
 Area 1, 3 – Canopy gutter installation is complete.
 Area 1 – Subgirt installation for metal panels is ongoing
 at West Building.

 Metal Stud Framing:
 Area 1 – Metal stud framing for Field, Concourse, Suite
 and Press Levels are ongoing. Drywall installation is
 is ongoing at Field and Mezzanine Levels

                                                                 Field Level Area 3 – Masonry pilaster
                                                                 installation at East Elevation (Truck Dock).

Building the Future
Glass:
 Area 1 - Curtainwall framing and glass installation is
 ongoing at West Building on west, south and east
 elevations. South “wing” framing is complete.

 MEP Rough-in:
 Area 4 – Underground MEP rough-in is ongoing.
 West Building - Ductwork installation on
 Concourse, Suite and Press Levels are ongoing.               Field Level Area 4 – Structural steel at infill
 Plumbing rough-in is ongoing on Suite and                    area is set and foundations are backfilled.
 Press Levels. Fire Protection rough-in is ongoing on
 Concourse, Suite and Press Levels. Electrical rough-in is
 ongoing on Concourse, Suite and Press Levels.


 Projected Activities occurring next Week:

 Concrete Flatwork:
 Area 3 Field Level – Prep for Slab-on-Grade at Stair 1
 will continue. Area 4 Field Level – Installation of on-grade
 seating risers and intermediate stairs will continue.
 Area 1 Concourse Level – Placement of topping slabs inside
 Concession Buildings will begin.                             Concourse Level Area 1 – Soffit construction
                                                              on SW Concourse Concession Buildings.
 Masonry:
 Area 3 – Field level masonry installation will continue in
 Area C and D. Area 1, 2, 3 – Concourse building
 masonry installation will continue.

 Steel:
 Field Level Area 3 – Misc steel installation that supports
 Burnished CMU will begin. Field Level Area 2 - Subroof
 installation will continue.

 Roofing and Sheetmetal:
 Area 1 – Permanent roofing installation at West
 Building will continue. Area 1 – Subgirt installation at     Mezzanine Level Area 4 – Slab prep is
 West Building will continue.                                 ongoing for Mezzanine walkway.

 Metal Stud Framing:
 Area 1 – Metal stud framing on Field Level will continue.
 Area 1 - Drywall installation will continue at Field Level


Building the Future
and Mezzanine Level. Drywall installation will begin on
 Suite Level.

 Glass:
 Area 1 – Curtain Framing and Glass installation around West
 Building will continue. Curtainwall framing on Suite and
 Press Level balconies will continue. Solar Innovations
 recessed track will deliver.
                                                               Area 1 – Shot of the Field Side of the West
 MEP Rough-in:                                                 Building looking Northwest.
 MEP Rough-in at Concourse, Suite and Press Levels will
 continue. Ductwork installation on Concourse, Suite, and
 Press Level will continue. Fire Sprinkler installation will
 continue on Concourse, Suite and Press Levels. MEP
 rough-in will continue in Main Concourse Buildings.




                                                               Area 1 – Shot of the west building showing
                                                               the progress of the exterior envelope.




Building the Future
Additional Photos:




Field Level Area 2– Swithgear is set in        Concourse Level Area 2 – Plumbing carriers
Electrical Service Room 01.20.01.              set in Restrooms 03.19.01.




Field Level Area 3 – Emergency Generator is    Concourse Level Area 1 – Stair 4 installation
set.                                           is ongoing.




Concourse Level Area 4 – Installation of
metal decking is nearly complete at “infill”   Field Level Area 1 – Metal stud framing is
area.                                          ongoing in Wizards Locker room.




Building the Future

Mais conteúdo relacionado

Destaque

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

Destaque (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Construction Update 10-20-2010

  • 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 10.20.2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 10.18.2010 Current Activities this Week: Foundations: Area 4 Field Level – Backfill of foundations for “infill” area between Column Lines 39-1 is complete. Concrete Flatwork: Area 3 Field Level – Concrete for base slab at Cauldron Club is complete. Field Level Area 3 – Cauldron Club base slab has been placed. Masonry: Area 3 – Masonry pilaster installation at Truck Dock is ongoing. Area 1, 2, 3 – Masonry installation is ongoing at Concession Buildings. Steel: Area 1, 2, 3 – Canopy decking installation is ongoing. Area 2 – Concession Building steel truss and decking installation is nearly complete. Area 1 – Elevator support steel installation is ongoing for F1. Area 1 – Masonry and Densglas installation at Northwest corner of West Building. Roofing and Sheetmetal: Area 1, 3 – Canopy gutter installation is complete. Area 1 – Subgirt installation for metal panels is ongoing at West Building. Metal Stud Framing: Area 1 – Metal stud framing for Field, Concourse, Suite and Press Levels are ongoing. Drywall installation is is ongoing at Field and Mezzanine Levels Field Level Area 3 – Masonry pilaster installation at East Elevation (Truck Dock). Building the Future
  • 2. Glass: Area 1 - Curtainwall framing and glass installation is ongoing at West Building on west, south and east elevations. South “wing” framing is complete. MEP Rough-in: Area 4 – Underground MEP rough-in is ongoing. West Building - Ductwork installation on Concourse, Suite and Press Levels are ongoing. Field Level Area 4 – Structural steel at infill Plumbing rough-in is ongoing on Suite and area is set and foundations are backfilled. Press Levels. Fire Protection rough-in is ongoing on Concourse, Suite and Press Levels. Electrical rough-in is ongoing on Concourse, Suite and Press Levels. Projected Activities occurring next Week: Concrete Flatwork: Area 3 Field Level – Prep for Slab-on-Grade at Stair 1 will continue. Area 4 Field Level – Installation of on-grade seating risers and intermediate stairs will continue. Area 1 Concourse Level – Placement of topping slabs inside Concession Buildings will begin. Concourse Level Area 1 – Soffit construction on SW Concourse Concession Buildings. Masonry: Area 3 – Field level masonry installation will continue in Area C and D. Area 1, 2, 3 – Concourse building masonry installation will continue. Steel: Field Level Area 3 – Misc steel installation that supports Burnished CMU will begin. Field Level Area 2 - Subroof installation will continue. Roofing and Sheetmetal: Area 1 – Permanent roofing installation at West Building will continue. Area 1 – Subgirt installation at Mezzanine Level Area 4 – Slab prep is West Building will continue. ongoing for Mezzanine walkway. Metal Stud Framing: Area 1 – Metal stud framing on Field Level will continue. Area 1 - Drywall installation will continue at Field Level Building the Future
  • 3. and Mezzanine Level. Drywall installation will begin on Suite Level. Glass: Area 1 – Curtain Framing and Glass installation around West Building will continue. Curtainwall framing on Suite and Press Level balconies will continue. Solar Innovations recessed track will deliver. Area 1 – Shot of the Field Side of the West MEP Rough-in: Building looking Northwest. MEP Rough-in at Concourse, Suite and Press Levels will continue. Ductwork installation on Concourse, Suite, and Press Level will continue. Fire Sprinkler installation will continue on Concourse, Suite and Press Levels. MEP rough-in will continue in Main Concourse Buildings. Area 1 – Shot of the west building showing the progress of the exterior envelope. Building the Future
  • 4. Additional Photos: Field Level Area 2– Swithgear is set in Concourse Level Area 2 – Plumbing carriers Electrical Service Room 01.20.01. set in Restrooms 03.19.01. Field Level Area 3 – Emergency Generator is Concourse Level Area 1 – Stair 4 installation set. is ongoing. Concourse Level Area 4 – Installation of metal decking is nearly complete at “infill” Field Level Area 1 – Metal stud framing is area. ongoing in Wizards Locker room. Building the Future