MEASUREMENT IV
TENDER DOCUMENT
Group Member:
Lecturer: Sr Loo Seong King
INTRODUCTION
Proposed 3 Storey Semi Detached House on Lot 1512, Pekeliling
Sempadan, Seksyen 2, Bandar Ayer Itam, Daerah Timur Laut,
Pulau Pinang.
Key plan Location Plan
Site Plan
PEKELILING SEMPADAN, ,
SEKSYEN 2, BANDAR AYER
ITAM, DAERAH TIMUR LAUT,
PULAU PINANG.
LOCATION
PLAN
Level 1 Level 2 Level 3
FRONT ELEVATION
BACK ELEVATION
RIGHT ELEVATION
SECTION 1
SECTION 2
TENDER DOCUMENT
● This is a form for the tenderer to fill in and sign to declare that they are not
under any agreement with any other tenderers or parties to submit any
pre-determined tender amount.
DECLARATION OF NON-COLLUSION
● Tender validity period:
60 days from the date of submission of tender.
● Tender Deposit /Tender Documentation Fees:
RM500.00 non-refundable in the form of cash or Banker’s Cheque
made payable to the Quantity Surveyor
● Tender Bond / Earnest Money:
RM 10,000.00 in the form of a Bank Guarantee or Banker's Cheque
made payable to the Employer.
● Fixed completion period:
10 months
● Tendering period:
2 weeks from the date of the letter of invitation to tender.
INSTRUCTION & CONDITIONS OF TENDERING
PAM 2006 (with quantities)
FORM OF CONTRACT
Defects Liability Period: 24 months
Insurance cover of third parties and damages to property: RM 1 million
Insurance deductible amount: RM 50,000.00
Percentage to Cover Professional fees for reinstatement: 10% of Contract Sum
Amount for removal of Debris: 1% of Contract Sum
Liquidated damages: At the rate of RM 1,000.00 per day
Period of Delay: 3 months
Interim Claim Interval: 1 month
FORM OF CONTRACT
Period of Honouring of Certificates: 30 days
Percentage of the value of materials and goods included in the Certificate: 75%
Percentage of Certified Value Retained: 10%
Limit of Retention: 5% of the Contract Sum
Period to complete the Final Account: 6 months
Amount of Performance Bond: 5% of Contract Sum
FORM OF CONTRACT
BILLS OF QUANTITIES
Scope of work:
● Construction of one unit of 3 storey residential house including external
works within lot boundary.
● Cold water and Sanitary Plumbing and Electrical Installation are nominated
sub-contract works
● Supply of sanitary fittings is nominated supply sub-contract works
● Fixing of sanitary fittings, in-coming cold water supply and soil pipes and
manholes within lot boundary are included under Cold Water and Sanitary
Plumbing
PRELIMINARIES
Site:
● The site is generally flat.
● All earthwork, site clearance, external infrastructure works such as roads,
surface water drains and sumps, soil drainage pipes and manholes and
water supply mains leading to and around the site have already been
completed by others.
PRELIMINARIES
Prime Cost Sum:
Cold Water and Sanitary Plumbing Works: RM 20,000.00
Electrical Installation Works: RM 15,000.00
Supply and Delivery to Site of Sanitary Fittings: RM 10,000.00
Provisional Sum:
Contingencies: RM 100,000.00
PC AND PROVISIONAL SUM
APPENDICES
LIST OF DRAWINGS
SCHEDULE OF FINISHES
First Floor
SCHEDULE OF FINISHES
Second Floor
SCHEDULE OF FINISHES
Third Floor
SCHEDULE OF FINISHES
Floor Finishes
600mm X 600mm Niro polish
homogeneous tiles
600mm X 600mm Niro
homogeneous non-slip tiles
300mm X 600mm Niro
non-polish homogeneous tiles
SCHEDULE OF FINISHES
Wall Finishes
300mmx600mm “Niro” homogeneous estilo
ceramic tile
Location: Kitchen
300 x 600mm 'Niro' horizon stone (PONE)
LAPPATO ceramic tile
Location: Bath
SCHEDULE OF FINISHES
Ceiling Finishes
Plaster glass ceiling Moisture resistant plaster ceiling
Skim coating ceiling
SCHEDULE OF DAYWORK RATES
● For tenderer to fill in daywork rates for labour & machineries.
● Form the basis of payment for daywork ordered by the Architect.
● Avoid protracted argument on the reasonable rates to be used
PRICES OF BASIC MATERIALS
● For tenderer to fill in daywork rates for the prices of basic materials
● To be used for deriving new rates for variation ordered by the Architect.
● Avoid protracted argument on the reasonable rates to be used
● A standard form with pre-determined wordings for the tenderer’s sourcing of
a bank Guarantee for Earnest Money in the event of a successful tender.
BANK GUARANTEE FORM FOR EARNEST MONEY
● A standard form with pre-determined wordings for the tenderer’s sourcing of
a bank Guarantee for Performance Bond in the event of a successful tender.
BANK GUARANTEE FORM FOR PERFORMANCE BOND
THANK YOU !

Mais conteúdo relacionado

Mais procurados

A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
Pang Khai Shuen
 
Assignmenr for pp2 final account
Assignmenr for pp2 final accountAssignmenr for pp2 final account
Assignmenr for pp2 final account
ahmong4
 
Provisional sum prime cost sum
Provisional sum  prime cost sumProvisional sum  prime cost sum
Provisional sum prime cost sum
Est
 
PP2 Assignment: Group
PP2 Assignment: GroupPP2 Assignment: Group
PP2 Assignment: Group
Farah Sham
 
Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017
DarrenTofu
 
The architect as contract administrator a legal perspective - presentation ...
The architect as contract administrator   a legal perspective - presentation ...The architect as contract administrator   a legal perspective - presentation ...
The architect as contract administrator a legal perspective - presentation ...
Zainab Zainordin
 

Mais procurados (20)

Measurement 4 Tender Document
Measurement 4 Tender Document Measurement 4 Tender Document
Measurement 4 Tender Document
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1
 
ECA form
ECA formECA form
ECA form
 
Project management (1)
Project management (1)Project management (1)
Project management (1)
 
Assignmenr for pp2 final account
Assignmenr for pp2 final accountAssignmenr for pp2 final account
Assignmenr for pp2 final account
 
Professional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentProfessional Practice 1 Group Assignment
Professional Practice 1 Group Assignment
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
Provisional sum prime cost sum
Provisional sum  prime cost sumProvisional sum  prime cost sum
Provisional sum prime cost sum
 
Professional practice 1 report
Professional practice 1 reportProfessional practice 1 report
Professional practice 1 report
 
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
PP2 Assignment: Group
PP2 Assignment: GroupPP2 Assignment: Group
PP2 Assignment: Group
 
Elemental Cost Analysis
Elemental Cost AnalysisElemental Cost Analysis
Elemental Cost Analysis
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedure
 
Tender
TenderTender
Tender
 
Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017
 
The architect as contract administrator a legal perspective - presentation ...
The architect as contract administrator   a legal perspective - presentation ...The architect as contract administrator   a legal perspective - presentation ...
The architect as contract administrator a legal perspective - presentation ...
 
contract procedure
contract procedurecontract procedure
contract procedure
 

Destaque

PM Final Assignment Report
PM Final Assignment ReportPM Final Assignment Report
PM Final Assignment Report
Melvin Lim
 
Estimating Presentation Slides - To Client
Estimating Presentation Slides - To ClientEstimating Presentation Slides - To Client
Estimating Presentation Slides - To Client
Pang Khai Shuen
 

Destaque (20)

Assignment - Tender Submission Part 1
Assignment - Tender Submission Part 1Assignment - Tender Submission Part 1
Assignment - Tender Submission Part 1
 
Assignment - Tender Submission Part 2
Assignment - Tender Submission Part 2Assignment - Tender Submission Part 2
Assignment - Tender Submission Part 2
 
Assignment - Single Storey Show House (Presentation)
Assignment - Single Storey Show House (Presentation)Assignment - Single Storey Show House (Presentation)
Assignment - Single Storey Show House (Presentation)
 
Assignment - Tender Documentation
Assignment - Tender DocumentationAssignment - Tender Documentation
Assignment - Tender Documentation
 
Assignment - Single Storey Show House (Cover Letter)
Assignment - Single Storey Show House (Cover Letter)Assignment - Single Storey Show House (Cover Letter)
Assignment - Single Storey Show House (Cover Letter)
 
Measurement 4 ooompa loompa
Measurement 4   ooompa loompaMeasurement 4   ooompa loompa
Measurement 4 ooompa loompa
 
Software Application Group Assignment
Software Application Group AssignmentSoftware Application Group Assignment
Software Application Group Assignment
 
Estimating letters
Estimating lettersEstimating letters
Estimating letters
 
Professional practice 1 (QS)
Professional practice 1 (QS)Professional practice 1 (QS)
Professional practice 1 (QS)
 
Management science assignment report.
Management science assignment report.Management science assignment report.
Management science assignment report.
 
Measurement 4 Assignment Presentation
Measurement 4 Assignment PresentationMeasurement 4 Assignment Presentation
Measurement 4 Assignment Presentation
 
PM Final Assignment Report
PM Final Assignment ReportPM Final Assignment Report
PM Final Assignment Report
 
Estimating
EstimatingEstimating
Estimating
 
Group Component
Group ComponentGroup Component
Group Component
 
Pp group assignment
Pp group assignmentPp group assignment
Pp group assignment
 
Estimating tender presentation
Estimating tender presentation Estimating tender presentation
Estimating tender presentation
 
M4 presentation slides
M4 presentation slidesM4 presentation slides
M4 presentation slides
 
PP1 presentation slide.
PP1 presentation slide.PP1 presentation slide.
PP1 presentation slide.
 
Assignment 2 - Buildsoft Software
Assignment 2 - Buildsoft SoftwareAssignment 2 - Buildsoft Software
Assignment 2 - Buildsoft Software
 
Estimating Presentation Slides - To Client
Estimating Presentation Slides - To ClientEstimating Presentation Slides - To Client
Estimating Presentation Slides - To Client
 

Semelhante a Assignment - Tender Documentation (Presentation Slide)

Measurement iv
Measurement ivMeasurement iv
Measurement iv
tfkc1212
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
Kailyn Lee
 
Sanjeewa_CV updated on 16.05.2014
Sanjeewa_CV  updated on 16.05.2014Sanjeewa_CV  updated on 16.05.2014
Sanjeewa_CV updated on 16.05.2014
Sanjeewa Mahawedage
 

Semelhante a Assignment - Tender Documentation (Presentation Slide) (20)

Measurement iv
Measurement ivMeasurement iv
Measurement iv
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
M4ppt
M4pptM4ppt
M4ppt
 
MEASUREMENT 4 SLIDES
MEASUREMENT 4 SLIDESMEASUREMENT 4 SLIDES
MEASUREMENT 4 SLIDES
 
Measurement 4 presentation
Measurement 4 presentationMeasurement 4 presentation
Measurement 4 presentation
 
Measurement Presentation
Measurement PresentationMeasurement Presentation
Measurement Presentation
 
Tendering Document for the Procurement of Works
Tendering Document for the Procurement of WorksTendering Document for the Procurement of Works
Tendering Document for the Procurement of Works
 
F inal presentation slides
F inal presentation slidesF inal presentation slides
F inal presentation slides
 
Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignment
 
M4 presentation
M4 presentationM4 presentation
M4 presentation
 
Contract_Design_for_Dam_Construction.pdf
Contract_Design_for_Dam_Construction.pdfContract_Design_for_Dam_Construction.pdf
Contract_Design_for_Dam_Construction.pdf
 
Measurement 4 Presentation (QS)
Measurement 4 Presentation (QS)Measurement 4 Presentation (QS)
Measurement 4 Presentation (QS)
 
MEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATIONMEASUREMENT TENDER DOCUMENTATION
MEASUREMENT TENDER DOCUMENTATION
 
Measurement 4
Measurement 4 Measurement 4
Measurement 4
 
MEASUREMENT 4 PRESENTATION
MEASUREMENT 4 PRESENTATIONMEASUREMENT 4 PRESENTATION
MEASUREMENT 4 PRESENTATION
 
Contract presentation
Contract presentation  Contract presentation
Contract presentation
 
Report
ReportReport
Report
 
Sanjeewa_CV updated on 16.05.2014
Sanjeewa_CV  updated on 16.05.2014Sanjeewa_CV  updated on 16.05.2014
Sanjeewa_CV updated on 16.05.2014
 
Fififinalnal
FififinalnalFififinalnal
Fififinalnal
 

Mais de Kai Yun Pang

Mais de Kai Yun Pang (20)

Assignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiAssignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau Langkawi
 
Assignment 2 - Report
Assignment 2 - ReportAssignment 2 - Report
Assignment 2 - Report
 
Assignment 1 - Water Pump Station
Assignment 1 - Water Pump StationAssignment 1 - Water Pump Station
Assignment 1 - Water Pump Station
 
Assignment 1 - Microsoft Project
Assignment 1 - Microsoft ProjectAssignment 1 - Microsoft Project
Assignment 1 - Microsoft Project
 
Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial Appraisal
 
Assignment - Financial Appraisal
Assignment - Financial Appraisal Assignment - Financial Appraisal
Assignment - Financial Appraisal
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC Contract
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Seminar - CIPAA 2012
Seminar - CIPAA 2012Seminar - CIPAA 2012
Seminar - CIPAA 2012
 
Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)
 
Assignment - S Hotel
Assignment - S HotelAssignment - S Hotel
Assignment - S Hotel
 
Assignment - Case Study Report
Assignment - Case Study ReportAssignment - Case Study Report
Assignment - Case Study Report
 
Assignment - Journal
Assignment - JournalAssignment - Journal
Assignment - Journal
 
Assignment - Community Service
Assignment - Community Service Assignment - Community Service
Assignment - Community Service
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by Employer
 
Seminar - Question
Seminar - QuestionSeminar - Question
Seminar - Question
 
Assignment - MK Land
Assignment - MK LandAssignment - MK Land
Assignment - MK Land
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial Analysis
 
Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)Assignment - Preliminary Cost Appraisal (Presentation Slide)
Assignment - Preliminary Cost Appraisal (Presentation Slide)
 

Último

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
MateoGardella
 

Último (20)

This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 

Assignment - Tender Documentation (Presentation Slide)

  • 1. 1. Pang Kai Yun 2. Sam Wei Yin 3. Sandrabrooke 4. Tan Hwee Min 5. Tan Ming Howe 6. Tan You Liang 7. Sim Chia Ting MEASUREMENT IV TENDER DOCUMENT Group Member: Lecturer: Sr Loo Seong King
  • 2. INTRODUCTION Proposed 3 Storey Semi Detached House on Lot 1512, Pekeliling Sempadan, Seksyen 2, Bandar Ayer Itam, Daerah Timur Laut, Pulau Pinang.
  • 3. Key plan Location Plan Site Plan PEKELILING SEMPADAN, , SEKSYEN 2, BANDAR AYER ITAM, DAERAH TIMUR LAUT, PULAU PINANG. LOCATION
  • 4. PLAN Level 1 Level 2 Level 3
  • 11. ● This is a form for the tenderer to fill in and sign to declare that they are not under any agreement with any other tenderers or parties to submit any pre-determined tender amount. DECLARATION OF NON-COLLUSION
  • 12. ● Tender validity period: 60 days from the date of submission of tender. ● Tender Deposit /Tender Documentation Fees: RM500.00 non-refundable in the form of cash or Banker’s Cheque made payable to the Quantity Surveyor ● Tender Bond / Earnest Money: RM 10,000.00 in the form of a Bank Guarantee or Banker's Cheque made payable to the Employer. ● Fixed completion period: 10 months ● Tendering period: 2 weeks from the date of the letter of invitation to tender. INSTRUCTION & CONDITIONS OF TENDERING
  • 13. PAM 2006 (with quantities) FORM OF CONTRACT
  • 14. Defects Liability Period: 24 months Insurance cover of third parties and damages to property: RM 1 million Insurance deductible amount: RM 50,000.00 Percentage to Cover Professional fees for reinstatement: 10% of Contract Sum Amount for removal of Debris: 1% of Contract Sum Liquidated damages: At the rate of RM 1,000.00 per day Period of Delay: 3 months Interim Claim Interval: 1 month FORM OF CONTRACT
  • 15. Period of Honouring of Certificates: 30 days Percentage of the value of materials and goods included in the Certificate: 75% Percentage of Certified Value Retained: 10% Limit of Retention: 5% of the Contract Sum Period to complete the Final Account: 6 months Amount of Performance Bond: 5% of Contract Sum FORM OF CONTRACT
  • 17. Scope of work: ● Construction of one unit of 3 storey residential house including external works within lot boundary. ● Cold water and Sanitary Plumbing and Electrical Installation are nominated sub-contract works ● Supply of sanitary fittings is nominated supply sub-contract works ● Fixing of sanitary fittings, in-coming cold water supply and soil pipes and manholes within lot boundary are included under Cold Water and Sanitary Plumbing PRELIMINARIES
  • 18. Site: ● The site is generally flat. ● All earthwork, site clearance, external infrastructure works such as roads, surface water drains and sumps, soil drainage pipes and manholes and water supply mains leading to and around the site have already been completed by others. PRELIMINARIES
  • 19. Prime Cost Sum: Cold Water and Sanitary Plumbing Works: RM 20,000.00 Electrical Installation Works: RM 15,000.00 Supply and Delivery to Site of Sanitary Fittings: RM 10,000.00 Provisional Sum: Contingencies: RM 100,000.00 PC AND PROVISIONAL SUM
  • 25. SCHEDULE OF FINISHES Floor Finishes 600mm X 600mm Niro polish homogeneous tiles 600mm X 600mm Niro homogeneous non-slip tiles 300mm X 600mm Niro non-polish homogeneous tiles
  • 26. SCHEDULE OF FINISHES Wall Finishes 300mmx600mm “Niro” homogeneous estilo ceramic tile Location: Kitchen 300 x 600mm 'Niro' horizon stone (PONE) LAPPATO ceramic tile Location: Bath
  • 27. SCHEDULE OF FINISHES Ceiling Finishes Plaster glass ceiling Moisture resistant plaster ceiling Skim coating ceiling
  • 28. SCHEDULE OF DAYWORK RATES ● For tenderer to fill in daywork rates for labour & machineries. ● Form the basis of payment for daywork ordered by the Architect. ● Avoid protracted argument on the reasonable rates to be used
  • 29. PRICES OF BASIC MATERIALS ● For tenderer to fill in daywork rates for the prices of basic materials ● To be used for deriving new rates for variation ordered by the Architect. ● Avoid protracted argument on the reasonable rates to be used
  • 30. ● A standard form with pre-determined wordings for the tenderer’s sourcing of a bank Guarantee for Earnest Money in the event of a successful tender. BANK GUARANTEE FORM FOR EARNEST MONEY
  • 31. ● A standard form with pre-determined wordings for the tenderer’s sourcing of a bank Guarantee for Performance Bond in the event of a successful tender. BANK GUARANTEE FORM FOR PERFORMANCE BOND