Multi-Site Management System Implementation
Managing from Afar
Develop a visit strategy
Set expectations for work completed
Define “work complete”
Detailed plans
Routine updates
Summary reports
Roll-up Summary tracker
• Complete system look
Have complete sets of tools for training
Hands On Approach
1. Engagement, Planning, & Initial Start
2. Requirements Review
3. Business Process Training
4. CA/PA & HACCP Process Training
5. Operational Controls / GMP Training
6. Process Audit Training
7. Data/Results Analysis Training
8. Pre-assessment / Corrections Plan
5 Phases
1. Leadership focus
2. High level & department processes
3. System processes
4. Verification and validation
5. Structural issues
 Summary Tracker
• Leadership summary
• Roll-ups all projects
Item Description
%Complete
Owner
Status
Start
Complete
Target
4/21/2015
4/28/2015
5/5/2015
5/12/2015
5/19/2015
5/26/2015
6/2/2015
6/9/2015
6/16/2015
6/23/2015
6/30/2015
7/7/2015
7/14/2015
7/21/2015
7/28/2015
8/4/2015
Total Projected Implementation Sat, 1/00/00 Sat, 1/00/00
1 Phase 1
Senior Leadership Training 0%
Management System Intro Training for Senior Leaders
Resource Allocation 0%
Identify Food Safey Team Leader / Management Rep
Identify Envirnomental Management System Rep
Identify OHSAS Management System Rep
Responsibility Matrix
Organization Chart
Skill Sets / Job Descriptions
Requirements Training 0%
ISO Requirements Training Management Rep
ISO Requirements Training Staff
PAS Requirements Training Management Rep
PAS Requirements Training Staff
General Workforce Communication
Gap Assessments 0%
Gap Assessment (Management System)
Gap Assessment (PAS/Operational Controls)
Process Flow 0%
Process Flow
Inventory Current Documents
Stage 1 Processes 0%
Establish Management Review (Project Review)
Management Policy Statement
Document & Record Control Processes (SOP)
Training Process (SOP)
Action Item Log Process
Verification Planning 0%
PRP Verification Plan (Work Aid) First Draft
PRP Verification Plan (Work Aid) FST Review
2 Phase 2
Risk Assessment Training 0%
HACCP Training
Risk Assessment & Business Plan Training
Perform Risk Assessments 0%
PRP Risk Assessment
HACCP Analysis
Business & Quality Assessment
Environmental Aspects & Impacts
Safety Risk Assessment
Certification Date Phase 1 Responsibility Date Due Status
Develop Plan
Senior Leadership Training
Resource Allocation
Requirements Training
Team Names Signatures Gap Assessments
Sponsor: Process Flow
Lead: Stage 1 Processes
Member: Verification Planning
Member: Summary 0%
Member:
Member: Phase 2 Responsibility Date Due Status
RTM: Risk Assessment Training
MSM: Perform Risk Assessments
Business Planning & Management Review
Food Safety Processes
Status Item Expected Cost Environmental Processes
OHSAS Processes
Production Work
QA/Lab Work
Warehouse Work
Maintenance Work
Summary 0%
Phase 3 Responsibility Date Due Status
Management System Process Training
Management System Processes
Business System Processes
Maintenance System Processes
Management System Verification
Summary 0%
Phase 4 Responsibility Date Due Status
Analysis of Verification Results
Actions From Analysis
#DIV/0! Summary -$ How to use a Management System Training
Preassessment
Corrections from Preassessment
Certification
Attendees Summary 0%
Roadblocks Next Steps Next Visit
Comments
Project Status #DIV/0!
Date Last
Reviewed
Facility Name
Current Plant Status
Plan Goal
Operational Controls & PAS Required Corrections
ISO 22000, ISO 9001, ISO 14001, & OHSAS 18001 Approach/Process Records/Evidence Notes
4 Management System
4.1 General requirements
ISO 22000 § 4.1 ISO 9001 § 4.1
ISO 14001 § 4.1 OHSAS 18001 § 4.1
The organization shall establish, document, implement and
maintain and continually improve an effective management
system, which includes quality, food safety, environmental and
safety management. The management system shall be updated
when necessary in accordance with the requirements of the
International Standards of ISO 22000, ISO/TS 22002-1, ISO
9001:2008, ISO 18001:2007, and OHSAS 14001:2004, and shall
determine how it will fulfill these requirements.
Management System
Manual
Manual
Master Document List
Records / Records List
Management Review
The organization shall define and document the scope of its
management system for quality, environmental, and safety.
Management System
Manual
Section 2 of Manual -
Scope
The organization shall define the scope of the food safety
management system. The food safety scope shall specify the
products or product categories, processes and production sites
that are addressed by the food safety portion of the management
system.
Management System
Manual
Section 2 of Manual -
Scope
ID Clause Requirement
Processes used to control
Requirement
Verification
Activity
Frequency
Evidence
Record
FST Verification
Method
1
4 Construction and layout
of buildings
4.1 General requirements
Buildings are designed, constructed
and maintained in a manner
appropriate to the nature of the
processing operations that are
carried out, the food safety hazards
associated with those operations,
and the potential sources of
contamination from the plant
environs. Buildings are of durable
construction which presents no
During normal management
routines items are identified
and corrected
GMP
Inspection
Monthly GMP Record Food Safety
Coordinator
Review
2
4.2 Environment Consideration is given to potential
sources of contamination from the
local environment.
During the annual risk
assessment process, FST will
perform a PRP Risk Assessment
to identify changes
PRP Risk
Assessment
Annually Assessment FST Approval
3
4.2 Environment Food production is not carried out in
areas where potentially harmful
substances could enter the product
During the annual risk
assessment process, FST will
perform a PRP Risk Assessment
to identify changes
PRP Risk
Assessment
Annually Assessment FST Approval
4
4.2 Environment The effectiveness of measures taken
to protect against potential
contaminants are periodically
reviewed.
During the PRP Risk Assessment
Process, the controls are rated
and rerated as needed
PRP Risk
Assessment
Annually Assessment FST Approval
5
4.3 Locations of
establishments
The site boundaries are clearly
identified.
Curb, RR Tracks, Outer Walls, Map GMP
Inspection
Monthly GMP Record Food Safety
Coordinator
Review
6
4.3 Locations of
establishments
Access to the site is controlled. Locked doors, gates, e-cards,
receptionist
GMP
Inspection
Monthly GMP Record Food Safety
Coordinator
Review
7
4.3 Locations of
establishments
The site is maintained in good order.
Vegetation is tended or removed.
Roads, yards and parking areas are
drained to prevent standing water and
are maintained.
Vegetation is maintained by
interal persons
Standing water issues are
identified during normal
management routines and action
items are discussed and
corrected
GMP
Inspection
Monthly GMP Record Food Safety
Coordinator
Review
#
ID'd
From
Date
Open
Area Item Name Category Sub-Category Item Description Owner Date Due Date Closed
12038 G Mar-12 Quality Bev QC lab Building Materials Ceiling Tiles replace soiled ceiling tiles Steve 4/20/2012 5/11/2012
12016 A Mar-12 Production Floor around can line Building Materials Floors worn down to aggregate Steve 4/15/2012 5/1/2012
12024 G Mar-12 Sugar Room Floor needs repaired Building Materials Floors Sugar Room Steve
12/31/201
2
5/9/2012
12039 G Mar-12 Quality Micro lab Building Materials Lights replace cracked light cover Steve 4/20/2012 5/11/2012
12023 G Mar-12 Warehouse Spot Light Out Building Materials Lights No Dock door #8 Steve 4/20/2012 5/11/2012
12017 A Mar-12 Maintenance Drain cleaning. Documentation Missing no documentation for how to clean and verification Randy 4/15/2012 5/11/2012
12018 A Mar-12 Maintenance Maintenance records Documentation No Records no doc rec for release equip from Maint to prod Joe 4/15/2012 5/11/12
12033 G Mar-12 Premix Premix NW corner stand Equipment Needs Replacing replace rusty stand with stainless/aluminum Steve 4/20/2012 4/12/2012
12011 A Mar-12 KOCON Syrup on ceiling Housekeeping Ceiling Tiles KOCON room Randy 4/7/2012 3/27/2012
12031 G Mar-12 Premix Premix fan Housekeeping Fans south fan needs cleaning Steve 4/20/2012 4/12/2012
12034 G Mar-12 Packaging btl line video jet Housekeeping Not Clean clean ink from around the reflector Steve 4/20/2012
12037 G Mar-12 Packaging can line traymore Housekeeping Not Clean ink stain on floor and railing around coder Steve 4/20/2012
12022 G Mar-12 Warehouse North Dock debris Housekeeping Not Clean Doors #1, 2, 3 Steve 4/20/2012 3/27/2012
12036 G Mar-12 Filler Room Can filler/seamer Housekeeping Panels tile SW corner by elec panel needs cleaning Randy 4/20/2012 4/12/2012
12030 G Mar-12 Production Sledge Blow off panel Housekeeping Panels needs cleaned Randy 4/20/2012 3/27/2012
12019 G Mar-12 KOCON KOCON room Housekeeping Piping pipe above coke tank needs cleaning Randy 4/20/2012 4/5/12
12035 G Mar-12 Packaging case washer Housekeeping Piping white exhaust pipes need to be wiped off Steve 4/20/2012 5/11/2012
12021 G Mar-12 Warehouse Area below roll down rack Housekeeping Racks Needs to be cleaned Steve 4/20/2012 3/27/2012
12025 G Mar-12 Water Treatment RO Softener Housekeeping Tanks/Covers salt tank top is dirty Steve 4/20/2012 3/27/2012
12026 G Mar-12 Water Treatment West Water tmt covers & top Housekeeping Tanks/Covers all need cleaning Randy 4/20/2012
12027 G Mar-12 Water Treatment Ferric Sulfate container Housekeeping Tanks/Covers container and area around it need cleaning Steve 4/20/2012 5/3/2012
12028 G Mar-12 Water Treatment East Water Tmt Housekeeping Tanks/Covers Sand filters tops need cleaning Randy 4/20/2012 4/12/2012
12029 G Mar-12 Water Treatment Lime tank, east water Housekeeping Tanks/Covers top needs scraped…lime build-up Randy 4/20/2012 4/12/2012
12032 G Mar-12 Premix Premix filling area Housekeeping Walls false wall needs cleaning; handprint Steve 4/20/2012 3/27/2012
12015 A Mar-12 Premix Eye wash bottles in premix Materials Containers Not Controlled sitting on top of cabinet…need a rack/holder Joe 4/7/2012 3/27/2012
12014 A Mar-12 Can Crushing Wrongly labeled spray bottles Materials Containers Not ID'd Can crushing room Steve 4/7/2012 3/27/2012
12012 A Mar-12 Production Oil drain jug not labeled Materials Containers Not ID'd Alvey Steve 4/7/2012 3/27/2012
12013 A Mar-12 Production PF&B extension cords Materials Damaged one pulled out and two without caps Steve 4/7/2012 3/27/2012
12010 A Mar-12 Sanitation CIP room outdated bottles Materials Incorrect bottles are refilled Randy 4/7/2012 3/27/2012
12020 G Mar-12 Warehouse DrP not put away at E.O.S Storage Not Stored Prod by no. end of 12-pk rack Steve 4/20/2012 3/27/2012
12040 FSL Mar-12 Admin Bioterrorism Training Missing add to new employee training Joe 4/29/2012 4/13/2012
Jules Fijux, MBA
ASQ Certified Manager of Quality / OE
jfijux@gmail.com

Mais conteúdo relacionado

Mais procurados

Msil quality system audit sheet
Msil quality system audit sheetMsil quality system audit sheet
Msil quality system audit sheetAmit Mishra
 
IATF 16949 2016 implementation phases
IATF 16949 2016 implementation phasesIATF 16949 2016 implementation phases
IATF 16949 2016 implementation phasesAmit Mishra
 
Qms auditing powerpoint
Qms auditing powerpointQms auditing powerpoint
Qms auditing powerpointPat Kilbane
 
ISO 9001-2015 IATF 16949-2016 Numeric Structure
ISO 9001-2015 IATF 16949-2016 Numeric Structure ISO 9001-2015 IATF 16949-2016 Numeric Structure
ISO 9001-2015 IATF 16949-2016 Numeric Structure Ramona Kellner
 
J. Perrin Experienced Manager
J. Perrin Experienced ManagerJ. Perrin Experienced Manager
J. Perrin Experienced ManagerJennifer Perrin
 
Api q1 6 a monogram-iso audit template- blank
Api q1 6 a monogram-iso audit template- blankApi q1 6 a monogram-iso audit template- blank
Api q1 6 a monogram-iso audit template- blankBart Mullins
 

Mais procurados (9)

Msil quality system audit sheet
Msil quality system audit sheetMsil quality system audit sheet
Msil quality system audit sheet
 
Iso 17025
Iso 17025Iso 17025
Iso 17025
 
Ppt presentation 17065
Ppt presentation 17065Ppt presentation 17065
Ppt presentation 17065
 
IATF 16949 2016 implementation phases
IATF 16949 2016 implementation phasesIATF 16949 2016 implementation phases
IATF 16949 2016 implementation phases
 
Qms auditing powerpoint
Qms auditing powerpointQms auditing powerpoint
Qms auditing powerpoint
 
ISO 9001-2015 IATF 16949-2016 Numeric Structure
ISO 9001-2015 IATF 16949-2016 Numeric Structure ISO 9001-2015 IATF 16949-2016 Numeric Structure
ISO 9001-2015 IATF 16949-2016 Numeric Structure
 
J. Perrin Experienced Manager
J. Perrin Experienced ManagerJ. Perrin Experienced Manager
J. Perrin Experienced Manager
 
Api q1 6 a monogram-iso audit template- blank
Api q1 6 a monogram-iso audit template- blankApi q1 6 a monogram-iso audit template- blank
Api q1 6 a monogram-iso audit template- blank
 
Iso final
Iso finalIso final
Iso final
 

Semelhante a Multisite Project Management

Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summaryguest524810
 
8D 210801728
8D 2108017288D 210801728
8D 210801728辉 康
 
Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing
Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing
Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing John William
 
Case study based on production, financial and social audits
Case study based on production, financial and social auditsCase study based on production, financial and social audits
Case study based on production, financial and social auditsJohn William
 
NQA - ISO 13485 Transition Checklist
NQA - ISO 13485 Transition ChecklistNQA - ISO 13485 Transition Checklist
NQA - ISO 13485 Transition ChecklistNA Putra
 
Lean Management
Lean ManagementLean Management
Lean ManagementAshish Dev
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.Hal Frohreich
 
Pride Procurement Lean
Pride Procurement LeanPride Procurement Lean
Pride Procurement LeanElm Valle
 
Training BRC Certification
Training BRC CertificationTraining BRC Certification
Training BRC Certificationhimu_kamrul
 
Health Care Project Testing Process
Health Care Project Testing ProcessHealth Care Project Testing Process
Health Care Project Testing ProcessH2Kinfosys
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptGeorgeKabongah2
 
WHO- Self Inspection & Quality Audit_2012.ppt
WHO- Self Inspection & Quality Audit_2012.pptWHO- Self Inspection & Quality Audit_2012.ppt
WHO- Self Inspection & Quality Audit_2012.pptHafizurRahman130404
 
Site Overview & 5 S
Site Overview & 5 SSite Overview & 5 S
Site Overview & 5 SJohn Henry
 
Hany Mohammed mahmoud Amer new1
Hany Mohammed mahmoud Amer new1Hany Mohammed mahmoud Amer new1
Hany Mohammed mahmoud Amer new1hany amer
 
# 3 PPT - Expose Your Hidden Problems Using Visual Management
# 3 PPT - Expose Your Hidden Problems Using Visual Management# 3 PPT - Expose Your Hidden Problems Using Visual Management
# 3 PPT - Expose Your Hidden Problems Using Visual ManagementRhonda Kovera
 

Semelhante a Multisite Project Management (20)

Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summary
 
8D 210801728
8D 2108017288D 210801728
8D 210801728
 
Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing
Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing
Double wall Glass Bottle Sourcing Project Case Study by Dragon Sourcing
 
Case study based on production, financial and social audits
Case study based on production, financial and social auditsCase study based on production, financial and social audits
Case study based on production, financial and social audits
 
Audit Technique
Audit TechniqueAudit Technique
Audit Technique
 
NQA - ISO 13485 Transition Checklist
NQA - ISO 13485 Transition ChecklistNQA - ISO 13485 Transition Checklist
NQA - ISO 13485 Transition Checklist
 
Project stages v2.0
Project stages v2.0Project stages v2.0
Project stages v2.0
 
Lean Management
Lean ManagementLean Management
Lean Management
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.
 
Pride Procurement Lean
Pride Procurement LeanPride Procurement Lean
Pride Procurement Lean
 
Quality assurance screening_tool
Quality assurance screening_toolQuality assurance screening_tool
Quality assurance screening_tool
 
Training BRC Certification
Training BRC CertificationTraining BRC Certification
Training BRC Certification
 
Health Care Project Testing Process
Health Care Project Testing ProcessHealth Care Project Testing Process
Health Care Project Testing Process
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.ppt
 
WHO- Self Inspection & Quality Audit_2012.ppt
WHO- Self Inspection & Quality Audit_2012.pptWHO- Self Inspection & Quality Audit_2012.ppt
WHO- Self Inspection & Quality Audit_2012.ppt
 
Site Overview & 5 S
Site Overview & 5 SSite Overview & 5 S
Site Overview & 5 S
 
Deviations Permissibility & Handling in GMP
Deviations Permissibility & Handling in GMPDeviations Permissibility & Handling in GMP
Deviations Permissibility & Handling in GMP
 
Hany Mohammed mahmoud Amer new1
Hany Mohammed mahmoud Amer new1Hany Mohammed mahmoud Amer new1
Hany Mohammed mahmoud Amer new1
 
# 3 PPT - Expose Your Hidden Problems Using Visual Management
# 3 PPT - Expose Your Hidden Problems Using Visual Management# 3 PPT - Expose Your Hidden Problems Using Visual Management
# 3 PPT - Expose Your Hidden Problems Using Visual Management
 
Peer Review
Peer ReviewPeer Review
Peer Review
 

Multisite Project Management

  • 1. Multi-Site Management System Implementation Managing from Afar
  • 2. Develop a visit strategy Set expectations for work completed Define “work complete” Detailed plans Routine updates Summary reports Roll-up Summary tracker • Complete system look Have complete sets of tools for training
  • 3. Hands On Approach 1. Engagement, Planning, & Initial Start 2. Requirements Review 3. Business Process Training 4. CA/PA & HACCP Process Training 5. Operational Controls / GMP Training 6. Process Audit Training 7. Data/Results Analysis Training 8. Pre-assessment / Corrections Plan
  • 4. 5 Phases 1. Leadership focus 2. High level & department processes 3. System processes 4. Verification and validation 5. Structural issues  Summary Tracker • Leadership summary • Roll-ups all projects
  • 5. Item Description %Complete Owner Status Start Complete Target 4/21/2015 4/28/2015 5/5/2015 5/12/2015 5/19/2015 5/26/2015 6/2/2015 6/9/2015 6/16/2015 6/23/2015 6/30/2015 7/7/2015 7/14/2015 7/21/2015 7/28/2015 8/4/2015 Total Projected Implementation Sat, 1/00/00 Sat, 1/00/00 1 Phase 1 Senior Leadership Training 0% Management System Intro Training for Senior Leaders Resource Allocation 0% Identify Food Safey Team Leader / Management Rep Identify Envirnomental Management System Rep Identify OHSAS Management System Rep Responsibility Matrix Organization Chart Skill Sets / Job Descriptions Requirements Training 0% ISO Requirements Training Management Rep ISO Requirements Training Staff PAS Requirements Training Management Rep PAS Requirements Training Staff General Workforce Communication Gap Assessments 0% Gap Assessment (Management System) Gap Assessment (PAS/Operational Controls) Process Flow 0% Process Flow Inventory Current Documents Stage 1 Processes 0% Establish Management Review (Project Review) Management Policy Statement Document & Record Control Processes (SOP) Training Process (SOP) Action Item Log Process Verification Planning 0% PRP Verification Plan (Work Aid) First Draft PRP Verification Plan (Work Aid) FST Review 2 Phase 2 Risk Assessment Training 0% HACCP Training Risk Assessment & Business Plan Training Perform Risk Assessments 0% PRP Risk Assessment HACCP Analysis Business & Quality Assessment Environmental Aspects & Impacts Safety Risk Assessment
  • 6. Certification Date Phase 1 Responsibility Date Due Status Develop Plan Senior Leadership Training Resource Allocation Requirements Training Team Names Signatures Gap Assessments Sponsor: Process Flow Lead: Stage 1 Processes Member: Verification Planning Member: Summary 0% Member: Member: Phase 2 Responsibility Date Due Status RTM: Risk Assessment Training MSM: Perform Risk Assessments Business Planning & Management Review Food Safety Processes Status Item Expected Cost Environmental Processes OHSAS Processes Production Work QA/Lab Work Warehouse Work Maintenance Work Summary 0% Phase 3 Responsibility Date Due Status Management System Process Training Management System Processes Business System Processes Maintenance System Processes Management System Verification Summary 0% Phase 4 Responsibility Date Due Status Analysis of Verification Results Actions From Analysis #DIV/0! Summary -$ How to use a Management System Training Preassessment Corrections from Preassessment Certification Attendees Summary 0% Roadblocks Next Steps Next Visit Comments Project Status #DIV/0! Date Last Reviewed Facility Name Current Plant Status Plan Goal Operational Controls & PAS Required Corrections
  • 7.
  • 8. ISO 22000, ISO 9001, ISO 14001, & OHSAS 18001 Approach/Process Records/Evidence Notes 4 Management System 4.1 General requirements ISO 22000 § 4.1 ISO 9001 § 4.1 ISO 14001 § 4.1 OHSAS 18001 § 4.1 The organization shall establish, document, implement and maintain and continually improve an effective management system, which includes quality, food safety, environmental and safety management. The management system shall be updated when necessary in accordance with the requirements of the International Standards of ISO 22000, ISO/TS 22002-1, ISO 9001:2008, ISO 18001:2007, and OHSAS 14001:2004, and shall determine how it will fulfill these requirements. Management System Manual Manual Master Document List Records / Records List Management Review The organization shall define and document the scope of its management system for quality, environmental, and safety. Management System Manual Section 2 of Manual - Scope The organization shall define the scope of the food safety management system. The food safety scope shall specify the products or product categories, processes and production sites that are addressed by the food safety portion of the management system. Management System Manual Section 2 of Manual - Scope
  • 9. ID Clause Requirement Processes used to control Requirement Verification Activity Frequency Evidence Record FST Verification Method 1 4 Construction and layout of buildings 4.1 General requirements Buildings are designed, constructed and maintained in a manner appropriate to the nature of the processing operations that are carried out, the food safety hazards associated with those operations, and the potential sources of contamination from the plant environs. Buildings are of durable construction which presents no During normal management routines items are identified and corrected GMP Inspection Monthly GMP Record Food Safety Coordinator Review 2 4.2 Environment Consideration is given to potential sources of contamination from the local environment. During the annual risk assessment process, FST will perform a PRP Risk Assessment to identify changes PRP Risk Assessment Annually Assessment FST Approval 3 4.2 Environment Food production is not carried out in areas where potentially harmful substances could enter the product During the annual risk assessment process, FST will perform a PRP Risk Assessment to identify changes PRP Risk Assessment Annually Assessment FST Approval 4 4.2 Environment The effectiveness of measures taken to protect against potential contaminants are periodically reviewed. During the PRP Risk Assessment Process, the controls are rated and rerated as needed PRP Risk Assessment Annually Assessment FST Approval 5 4.3 Locations of establishments The site boundaries are clearly identified. Curb, RR Tracks, Outer Walls, Map GMP Inspection Monthly GMP Record Food Safety Coordinator Review 6 4.3 Locations of establishments Access to the site is controlled. Locked doors, gates, e-cards, receptionist GMP Inspection Monthly GMP Record Food Safety Coordinator Review 7 4.3 Locations of establishments The site is maintained in good order. Vegetation is tended or removed. Roads, yards and parking areas are drained to prevent standing water and are maintained. Vegetation is maintained by interal persons Standing water issues are identified during normal management routines and action items are discussed and corrected GMP Inspection Monthly GMP Record Food Safety Coordinator Review
  • 10. # ID'd From Date Open Area Item Name Category Sub-Category Item Description Owner Date Due Date Closed 12038 G Mar-12 Quality Bev QC lab Building Materials Ceiling Tiles replace soiled ceiling tiles Steve 4/20/2012 5/11/2012 12016 A Mar-12 Production Floor around can line Building Materials Floors worn down to aggregate Steve 4/15/2012 5/1/2012 12024 G Mar-12 Sugar Room Floor needs repaired Building Materials Floors Sugar Room Steve 12/31/201 2 5/9/2012 12039 G Mar-12 Quality Micro lab Building Materials Lights replace cracked light cover Steve 4/20/2012 5/11/2012 12023 G Mar-12 Warehouse Spot Light Out Building Materials Lights No Dock door #8 Steve 4/20/2012 5/11/2012 12017 A Mar-12 Maintenance Drain cleaning. Documentation Missing no documentation for how to clean and verification Randy 4/15/2012 5/11/2012 12018 A Mar-12 Maintenance Maintenance records Documentation No Records no doc rec for release equip from Maint to prod Joe 4/15/2012 5/11/12 12033 G Mar-12 Premix Premix NW corner stand Equipment Needs Replacing replace rusty stand with stainless/aluminum Steve 4/20/2012 4/12/2012 12011 A Mar-12 KOCON Syrup on ceiling Housekeeping Ceiling Tiles KOCON room Randy 4/7/2012 3/27/2012 12031 G Mar-12 Premix Premix fan Housekeeping Fans south fan needs cleaning Steve 4/20/2012 4/12/2012 12034 G Mar-12 Packaging btl line video jet Housekeeping Not Clean clean ink from around the reflector Steve 4/20/2012 12037 G Mar-12 Packaging can line traymore Housekeeping Not Clean ink stain on floor and railing around coder Steve 4/20/2012 12022 G Mar-12 Warehouse North Dock debris Housekeeping Not Clean Doors #1, 2, 3 Steve 4/20/2012 3/27/2012 12036 G Mar-12 Filler Room Can filler/seamer Housekeeping Panels tile SW corner by elec panel needs cleaning Randy 4/20/2012 4/12/2012 12030 G Mar-12 Production Sledge Blow off panel Housekeeping Panels needs cleaned Randy 4/20/2012 3/27/2012 12019 G Mar-12 KOCON KOCON room Housekeeping Piping pipe above coke tank needs cleaning Randy 4/20/2012 4/5/12 12035 G Mar-12 Packaging case washer Housekeeping Piping white exhaust pipes need to be wiped off Steve 4/20/2012 5/11/2012 12021 G Mar-12 Warehouse Area below roll down rack Housekeeping Racks Needs to be cleaned Steve 4/20/2012 3/27/2012 12025 G Mar-12 Water Treatment RO Softener Housekeeping Tanks/Covers salt tank top is dirty Steve 4/20/2012 3/27/2012 12026 G Mar-12 Water Treatment West Water tmt covers & top Housekeeping Tanks/Covers all need cleaning Randy 4/20/2012 12027 G Mar-12 Water Treatment Ferric Sulfate container Housekeeping Tanks/Covers container and area around it need cleaning Steve 4/20/2012 5/3/2012 12028 G Mar-12 Water Treatment East Water Tmt Housekeeping Tanks/Covers Sand filters tops need cleaning Randy 4/20/2012 4/12/2012 12029 G Mar-12 Water Treatment Lime tank, east water Housekeeping Tanks/Covers top needs scraped…lime build-up Randy 4/20/2012 4/12/2012 12032 G Mar-12 Premix Premix filling area Housekeeping Walls false wall needs cleaning; handprint Steve 4/20/2012 3/27/2012 12015 A Mar-12 Premix Eye wash bottles in premix Materials Containers Not Controlled sitting on top of cabinet…need a rack/holder Joe 4/7/2012 3/27/2012 12014 A Mar-12 Can Crushing Wrongly labeled spray bottles Materials Containers Not ID'd Can crushing room Steve 4/7/2012 3/27/2012 12012 A Mar-12 Production Oil drain jug not labeled Materials Containers Not ID'd Alvey Steve 4/7/2012 3/27/2012 12013 A Mar-12 Production PF&B extension cords Materials Damaged one pulled out and two without caps Steve 4/7/2012 3/27/2012 12010 A Mar-12 Sanitation CIP room outdated bottles Materials Incorrect bottles are refilled Randy 4/7/2012 3/27/2012 12020 G Mar-12 Warehouse DrP not put away at E.O.S Storage Not Stored Prod by no. end of 12-pk rack Steve 4/20/2012 3/27/2012 12040 FSL Mar-12 Admin Bioterrorism Training Missing add to new employee training Joe 4/29/2012 4/13/2012
  • 11.
  • 12. Jules Fijux, MBA ASQ Certified Manager of Quality / OE jfijux@gmail.com