Personal Information
Organização/Local de trabalho
Agra Area, India India
Cargo
Sr. Manager - Track Construction
Setor
Logistics / Supply Chain
Sobre
- Planning & Construction of Track at New Daud Khan Jn. Yard.
- Bottom Ballasting/Initial Layer - 200 mm & Compaction.
- Handling of Inspection & RFI on site with PMC.
- Manual Track Installation - 13 m Rails inside Yard Limit.
- Leading a Team of 2 Track Supervisors with 15 Gangmen and 5 Keymen for Track Installation
and Ballasting.
- FAT's, QAP's, Joint Inspection with Phooltas Harsco Rail Ltd, Haridwar for Superstructures, Power & Transition Wagon of New Track Construction Equipment (NTC).
- Erection & Commissioning of Reva Crane Gantry (For handling of 260 m LWR Panels) to be Loaded into Work Train/NTCE.
- Lead of Phooltas Harsco Rail NTC Equipment for Long Welded Rails & Cont...
Apresentações
(3)Personal Information
Organização/Local de trabalho
Agra Area, India India
Cargo
Sr. Manager - Track Construction
Setor
Logistics / Supply Chain
Sobre
- Planning & Construction of Track at New Daud Khan Jn. Yard.
- Bottom Ballasting/Initial Layer - 200 mm & Compaction.
- Handling of Inspection & RFI on site with PMC.
- Manual Track Installation - 13 m Rails inside Yard Limit.
- Leading a Team of 2 Track Supervisors with 15 Gangmen and 5 Keymen for Track Installation
and Ballasting.
- FAT's, QAP's, Joint Inspection with Phooltas Harsco Rail Ltd, Haridwar for Superstructures, Power & Transition Wagon of New Track Construction Equipment (NTC).
- Erection & Commissioning of Reva Crane Gantry (For handling of 260 m LWR Panels) to be Loaded into Work Train/NTCE.
- Lead of Phooltas Harsco Rail NTC Equipment for Long Welded Rails & Cont...