Proposed Methodology
Josh Folgado
Business Enterprise Architect
Project Management Office
Standards used:
 Prince2/PM2 for Project Management
 TOGAF for Process and
Documentation
 Zachman for Enterprise
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Agenda
 Purpose of Discussion
 Proposed Project Management Process
 Some Project Examples
 Zachman Framework
 What/how information is gathered during
Project Process using Framework
 The Project Template (TGL):
Transformation Governance Log
 Open discussion on project methodology
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Purpose of Discussion
• Learn about proposed Project Management Methodology,
get feedback for refinement and how to use it
• Need support for delivering uniform Project Management
Services - for both the Business and IT, i.e. business projects, new
products, application development, database development, etc.
• Active engagement to implement best-practice:
Business Process Reengineering (BPR)
• Discover and help fine-tune single document (TGL) that keeps all
information regarding project
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Agenda
 Purpose of Discussion
 Proposed Project Management Process
 Some Project Examples
 Zachman Framework
 What/how information is gathered during
Project Process using Framework
 The Project Template (TGL):
Transformation Governance Log
 Open discussion on project methodology
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Project Management Process
Closure
phase
Execution
phase
Initiation
phase
Start-up
phase
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Closure
phase
Execution
phase
Initiation
phase
Start-up
phase
Quality street
NO
Project Management Process
YES
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Closure
phase
Execution
phase
Initiation
phase
Start-up
phase
Quality street
Architecture Services
• Business Intake
• Architecture Guidance
• Project Start Architecture
• Architecture Guidance
• Business Approval
• Project Health Check
• Architecture Guidance
• Final Conformity Audit
Project Management Process
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
• Business Intake:
Closure
phase
Execution
phase
Initiation
phase
Start-up
phase
Quality street
Architecture Services
• Business Intake
• Architecture Guidance
• Project Start Architecture
• Architecture Guidance
• Business Approval
• Project Health Check
• Architecture Guidance
• Final Conformity Audit
Project Management Process
– Assess impact and strategic needs of organisation
– Why are you doing this work; what is the benefit to the organisation
– What business services will be delivered to the project and draft
subsequent dependencies
– Discuss with all involved parties; inform and involve everyone concerned
for best understanding and focus of deliverables
 Architecture is responsible for Business Intake
 Programme manager agrees schedule based on resources,
criteria, priorities and impact to the organisation
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
• Project Impact:
Closure
phase
Execution
phase
Initiation
phase
Start-up
phase
Quality street
Architecture Services
• Business Intake
• Architecture Guidance
• Project Start Architecture
• Architecture Guidance
• Business Approval
• Project Health Check
• Architecture Guidance
• Final Conformity Audit
Project Management Process
Risk Factor Rating
Solution complexity Low/Medium/High
Standards compliance Low/Medium/High
Project size and complexity Low/Medium/High
Business strategy Low/Medium/High
Business impact Low/Medium/High
Business compliance Low/Medium/High
Impact to methods and structure Low/Medium/High
Resource usage/dependencies Low/Medium/High
Training of resources Low/Medium/High
Data/application models Low/Medium/High
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Closure
phase
Execution
phase
Initiation
phase
Start-up
phase
Quality street
Architecture Services
• Business Intake
• Architecture Guidance
• Project Start Architecture
• Architecture Guidance
• Business Approval
• Project Health Check
• Architecture Guidance
• Final Conformity Audit
Service
Intake
PSA
Approval
Health Check
Final Audit
Project Management Process
Medium
Impact
Mandatory
Recommended
Mandatory
Recommended
Mandatory
High
Impact
Mandatory
Mandatory
Mandatory
Mandatory
Mandatory
Low
Impact
Mandatory
Optional
Recommended
Optional
Recommended
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
• Project Start Architecture
Closure
phase
Execution
phase
Initiation
phase
Start-up
phase
Quality street
Architecture Services
• Business Intake
• Architecture Guidance
• Project Start Architecture
• Architecture Guidance
• Business Approval
• Project Health Check
• Architecture Guidance
• Final Conformity Audit
Project Management Process
– Which borders will the project have to respect
– Identify steps and milestones for project, i.e. building blocks
– What business services are involved and subsequent dependencies
 Architecture is responsible for project start architecture
– Creation/updating of enterprise blueprints for solution
 Final agreement on project’s deliverables and schedule
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
• Project Start Architecture
– Which borders will the project have to respect
– Identify steps and milestones for project, i.e. building blocks
– What business services are involved and subsequent dependencies
– Creation/updating of enterprise blueprints for solution
– Final agreement on project’s deliverables and schedule
Closure
phase
Execution
phase
Initiation
phase
Start-up
phase
Quality street
Architecture Services
• Business Intake
• Architecture Guidance
• Project Start Architecture
• Architecture Guidance
• Business Approval
• Project Health Check
• Architecture Guidance
• Final Conformity Audit
Project Management Process
• Business Approval
 Architecture is responsible for Business Approval
 Sign-off by project owner and architecture on how the project
is to be done by the applicable business services
 Inform project office on execution status
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
• Project Health Check
Closure
phase
Execution
phase
Initiation
phase
Start-up
phase
Quality street
Architecture Services
• Business Intake
• Architecture Guidance
• Project Start Architecture
• Architecture Guidance
• Business Approval
• Project Health Check
• Architecture Guidance
• Final Conformity Audit
Project Management Process
– In depth examination of the project's deliverables and their alignment with
approval/recommendations and/or architecture standards, guidelines and
principles or additional change requests
 Programme manager may set multiple health checks for projects,
depending on risk and project complexity
– Manage unexpected/unapproved features with programme manager
i.e. change requests
 Health checks can be called at anytime by programme manager
 Architecture is responsible for health checks and reports
results to programme manager
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Closure
phase
Execution
phase
Initiation
phase
Start-up
phase
Quality street
Architecture Services
• Business Intake
• Architecture Guidance
• Project Start Architecture
• Architecture Guidance
• Business Approval
• Project Health Check
• Architecture Guidance
• Final Conformity Audit
Project Management Process
• Final Conformity Audit
– Check and confirm final project deliverables are in line with agreements
with business service that owns project
Project owner signs-off project
 Architecture is responsible for final audit, working along with programme
manager and business owner
 Project office finalises and closes TGL document
– Verify that enterprise models are updated, according to final solution
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Agenda
 Purpose of Discussion
 Proposed Project Management Process
 Some Project Examples
 Zachman Framework
 What/how information is gathered during
Project Process using Framework
 The Project Template (TGL):
Transformation Governance Log
 Open discussion on project methodology
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Project Services - Low Impact Examples
• Study to replace the company
logo
• Cleaning of content in
databases
• Rearrange the parking area
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Project Services - Medium Impact Examples
• Multiple BPR Projects for
process improvement
• New regulations to be adopted
in financial systems
• Upgrade PABX
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Project Services - High Impact Examples
• Moving of IT to external entity
• Data Warehouse
• Restructuring of Business
Services
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Agenda
 Purpose of Discussion
 Proposed Project Management Process
 Some Project Examples
 Zachman Framework
 What/how information is gathered during
Project Process using Framework
 The Project Template (TGL):
Transformation Governance Log
 Open discussion on project methodology
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Business
Domains
Business Data
Model
Logical Data
Model
Physical Data
Model
Data
Specification
Data
Organisation
Structure
Business Roles
User Centric
Design
User Interface
Presentation
Security
Specification
Organisation
Business
Locations
Environments
and Locations
Technology
Platforms
Physical
(network)
Design
Hardware and
Network
Specifications
Network
Business
Functions and
Services
Business
Processes
Model
Application
Landscape
Application
Design
Application
Service
Specification
Service
Business
Drivers
Roadmaps
Transformation
Governance
Control
Design
Timing
Specification
Change
Business
Strategy
Business Goals
and Objectives
Guiding
Principles
Policies
Standards
Strategy
Planner
Enterprise Architect
Solution Architect
Designer
Engineer
Functioning
Enterprise
Scope
Business Model
System Model
Technology Model
Detailed specifications
Enterprise Architecture What How Where Who When Why
Zachman Framework
A1
A2
A3
A4
A5
B1
B2
B3
B4
B5
C1
C2
C3
C4
C5
D1
D2
D3
D4
D5
E1
E2
E3
E4
E5
F1
F2
F3
F4
F5
A6 B6 C6 D6 E6 F6
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Closure
phase
Execution
phase
Initiation
phase
Start-up
phase
Quality street
Architecture Services
• Business Intake
• Architecture Guidance
• Project Start Architecture
• Architecture Guidance
• Business Approval
• Project Health Check
• Architecture Guidance
• Final Conformity Audit
Focus during start-up phase
Project Services and Framework
Business
Domains
Business
Data Model
Logical
Data Model
Physical
Data Model
Data
Specificatio
n
Data
Organisation
Structure
Business
Roles
User
Centric
Design
User
Interface
Presentatio
nSecurity
Specificatio
n
Organisatio
n
Business
Locations
Environment
s and
Locations
Technolog
y Platforms
Physical
(network)
Design
Hardware
and
Network
Specificatio
ns
Network
Business
Functions
and
Services
Business
Processes
Model
Application
Landscape
Application
Design
Application
Service
Specificatio
nService
Business
Drivers
Roadmaps
Transforma
tion
Governanc
eControl
Design
Timing
Specificatio
n
Change
Business
Strategy
Business
Goals and
Objectives
Guiding
Principles
Policies
Standards
Strategy
Planner
Enterprise Architect
Solution Architect
Designer
Engineer
Functioning
Enterprise
Scope
Business Model
System Model
Technology Model
Detailed specifications
EA What How Where Who When Why
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Closure
phase
Execution
phase
Initiation
phase
Start-up
phase
Quality street
Architecture Services
• Business Intake
• Architecture Guidance
• Project Start Architecture
• Architecture Guidance
• Business Approval
• Project Health Check
• Architecture Guidance
• Final Conformity Audit
Focus during initiation phase
Project Services and Framework
Business
Domains
Business
Data Model
Logical Data
Model
Physical
Data Model
Data
Specificatio
n
Data
Organisation
Structure
Business
Roles
User Centric
Design
User
Interface
Presentatio
nSecurity
Specificatio
n
Organisatio
n
Business
Locations
Environment
s and
Locations
Technology
Platforms
Physical
(network)
Design
Hardware
and
Network
Specificatio
ns
Network
Business
Functions
and
Services
Business
Processes
Model
Application
Landscape
Application
Design
Application
Service
Specificatio
nService
Business
Drivers
Roadmaps
Transformati
on
Governance
Control
Design
Timing
Specificatio
n
Change
Business
Strategy
Business
Goals and
Objectives
Guiding
Principles
Policies
Standards
Strategy
Planner
Enterprise Architect
Solution Architect
Designer
Engineer
Functioning
Enterprise
Scope
Business Model
System Model
Technology Model
Detailed specifications
EA What How Where Who When Why
Focus during start-up phase
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Closure
phase
Execution
phase
Initiation
phase
Start-up
phase
Quality street
Architecture Services
• Business Intake
• Architecture Guidance
• Project Start Architecture
• Architecture Guidance
• Business Approval
• Project Health Check
• Architecture Guidance
• Final Conformity Audit
Focus during initiation phase
Focus during execution phase
Focus during start-up phase
Project Services and Framework
Business
Domains
Business
Data Model
Logical Data
Model
Physical
Data Model
Data
Specificatio
n
Data
Organisation
Structure
Business
Roles
User Centric
Design
User
Interface
Presentation
Security
Specificatio
n
Organisatio
n
Business
Locations
Environment
s and
Locations
Technology
Platforms
Physical
(network)
Design
Hardware
and
Network
Specificatio
ns
Network
Business
Functions
and
Services
Business
Processes
Model
Application
Landscape
Application
Design
Application
Service
Specificatio
nService
Business
Drivers
Roadmaps
Transformati
on
Governance
Control
Design
Timing
Specificatio
n
Change
Business
Strategy
Business
Goals and
Objectives
Guiding
Principles
Policies
Standards
Strategy
Planner
Enterprise Architect
Solution Architect
Designer
Engineer
Functioning
Enterprise
Scope
Business Model
System Model
Technology Model
Detailed specifications
EA What How Where Who When Why
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Closure
phase
Execution
phase
Initiation
phase
Start-up
phase
Quality street
Architecture Services
• Business Intake
• Architecture Guidance
• Project Start Architecture
• Architecture Guidance
• Business Approval
• Project Health Check
• Architecture Guidance
• Final Conformity Audit
Focus during initiation phase
Focus during execution phase
Focus during start-up phase
Project Services and Framework
Business
Domains
Business
Data Model
Logical Data
Model
Physical
Data Model
Data
Specification
Data
Organisation
Structure
Business
Roles
User Centric
Design
User
Interface
Presentation
Security
Specification
Organisatio
n
Business
Locations
Environment
s and
Locations
Technology
Platforms
Physical
(network)
Design
Hardware
and Network
Specification
s
Network
Business
Functions
and
Services
Business
Processes
Model
Application
Landscape
Application
Design
Application
Service
Specification
Service
Business
Drivers
Roadmaps
Transformati
on
Governance
Control
Design
Timing
Specification
Change
Business
Strategy
Business
Goals and
Objectives
Guiding
Principles
Policies
Standards
Strategy
Planner
Enterprise Architect
Solution Architect
Designer
Engineer
Functioning
Enterprise
Scope
Business Model
System Model
Technology Model
Detailed specifications
EA What How Where Who When Why
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Closure
phase
Execution
phase
Initiation
phase
Start-up
phase
Quality street
Architecture Services
• Business Intake
• Architecture Guidance
• Project Start Architecture
• Architecture Guidance
• Business Approval
• Project Health Check
• Architecture Guidance
• Final Conformity Audit
Focus during initiation phase
Focus during execution phase
Focus during start-up phase
Project Services and Framework
Business
Domains
Business
Data Model
Logical Data
Model
Physical
Data Model
Data
Specification
Data
Organisation
Structure
Business
Roles
User Centric
Design
User
Interface
Presentation
Security
Specification
Organisation
Business
Locations
Environment
s and
Locations
Technology
Platforms
Physical
(network)
Design
Hardware
and Network
Specification
s
Network
Business
Functions
and
Services
Business
Processes
Model
Application
Landscape
Application
Design
Application
Service
Specification
Service
Business
Drivers
Roadmaps
Transformati
on
Governance
Control
Design
Timing
Specification
Change
Business
Strategy
Business
Goals and
Objectives
Guiding
Principles
Policies
Standards
Strategy
Planner
Enterprise Architect
Solution Architect
Designer
Engineer
Functioning
Enterprise
Scope
Business Model
System Model
Technology Model
Detailed specifications
EA What How Where Who When Why
Focus during closure phase
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Agenda
 Purpose of Discussion
 Proposed Project Management Process
 Some Project Examples
 Zachman Framework
 What/how information is gathered during
Project Process using Framework
 The Project Template (TGL):
Transformation Governance Log
 Open discussion on project methodology
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Business
Domains
Business Data
Model
Logical Data
Model
Physical Data
Model
Data
Specification
Data
Organisation
Structure
Business Roles
User Centric
Design
User Interface
Presentation
Security
Specification
Organisation
Business
Locations
Environments
and Locations
Technology
Platforms
Physical
(network)
Design
Hardware and
Network
Specifications
Network
Business
Functions and
Services
Business
Processes
Model
Application
Landscape
Application
Design
Application
Service
Specification
Service
Business
Drivers
Roadmaps
Transformation
Governance
Control
Design
Timing
Specification
Change
Business
Strategy
Business Goals
and Objectives
Guiding
Principles
Policies
Standards
Strategy
Planner
Enterprise Architect
Solution Architect
Designer
Engineer
Functioning
Enterprise
Scope
Business Model
System Model
Technology Model
Detailed specifications
Enterprise Architecture What How Where Who When Why
A1
A2
A3
A4
A5
B1
B2
B3
B4
B5
C1
C2
C3
C4
C5
D1
D2
D3
D4
D5
E1
E2
E3
E4
E5
F1
F2
F3
F4
F5
A6 B6 C6 D6 E6 F6
Framework
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Business
Domains
Business Data
Model
Logical Data
Model
Physical Data
Model
Data
Specification
Data
Organisation
Structure
Business Roles
User Centric
Design
User Interface
Presentation
Security
Specification
Organisation
Business
Locations
Environments
and Locations
Technology
Platforms
Physical
(network)
Design
Hardware and
Network
Specifications
Network
Business
Functions and
Services
Business
Processes
Model
Application
Landscape
Application
Design
Application
Service
Specification
Service
Business
Drivers
Roadmaps
Transformation
Governance
Control
Design
Timing
Specification
Change
Business
Strategy
Business Goals
and Objectives
Guiding
Principles
Policies
Standards
Strategy
Planner
Enterprise Architect
Solution Architect
Designer
Engineer
Functioning
Enterprise
Scope
Business Model
System Model
Technology Model
Detailed specifications
Enterprise Architecture What How Where Who When Why
A1
A2
A3
A4
A5
B1
B2
B3
B4
B5
C1
C2
C3
C4
C5
D1
D2
D3
D4
D5
E1
E2
E3
E4
E5
F1
F2
F3
F4
F5
A6 B6 C6 D6 E6 F6
Project
IntakeFramework
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Business
Domains
Business Data
Model
Logical Data
Model
Physical Data
Model
Data
Specification
Data
Organisation
Structure
Business Roles
User Centric
Design
User Interface
Presentation
Security
Specification
Organisation
Business
Locations
Environments
and Locations
Technology
Platforms
Physical
(network)
Design
Hardware and
Network
Specifications
Network
Business
Functions and
Services
Business
Processes
Model
Application
Landscape
Application
Design
Application
Service
Specification
Service
Business
Drivers
Roadmaps
Transformation
Governance
Control
Design
Timing
Specification
Change
Business
Strategy
Business Goals
and Objectives
Guiding
Principles
Policies
Standards
Strategy
Planner
Enterprise Architect
Solution Architect
Designer
Engineer
Functioning
Enterprise
Scope
Business Model
System Model
Technology Model
Detailed specifications
Enterprise Architecture What How Where Who When Why
A1
A2
A3
A4
A5
B1
B2
B3
B4
B5
C1
C2
C3
C4
C5
D1
D2
D3
D4
D5
E1
E2
E3
E4
E5
F1
F2
F3
F4
F5
A6 B6 C6 D6 E6 F6
Project
Intake
Conformity
ApprovalFramework
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Business
Domains
Business Data
Model
Logical Data
Model
Physical Data
Model
Data
Specification
Data
Organisation
Structure
Business Roles
User Centric
Design
User Interface
Presentation
Security
Specification
Organisation
Business
Locations
Environments
and Locations
Technology
Platforms
Physical
(network)
Design
Hardware and
Network
Specifications
Network
Business
Functions and
Services
Business
Processes
Model
Application
Landscape
Application
Design
Application
Service
Specification
Service
Business
Drivers
Roadmaps
Transformation
Governance
Control
Design
Timing
Specification
Change
Business
Strategy
Business Goals
and Objectives
Guiding
Principles
Policies
Standards
Strategy
Planner
Enterprise Architect
Solution Architect
Designer
Engineer
Functioning
Enterprise
Scope
Business Model
System Model
Technology Model
Detailed specifications
Enterprise Architecture What How Where Who When Why
A1
A2
A3
A4
A5
B1
B2
B3
B4
B5
C1
C2
C3
C4
C5
D1
D2
D3
D4
D5
E1
E2
E3
E4
E5
F1
F2
F3
F4
F5
A6 B6 C6 D6 E6 F6
Project
Intake
Conformity
Approval
Health
CheckFramework
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Business
Domains
Business Data
Model
Logical Data
Model
Physical Data
Model
Data
Specification
Data
Organisation
Structure
Business Roles
User Centric
Design
User Interface
Presentation
Security
Specification
Organisation
Business
Locations
Environments
and Locations
Technology
Platforms
Physical
(network)
Design
Hardware and
Network
Specifications
Network
Business
Functions and
Services
Business
Processes
Model
Application
Landscape
Application
Design
Application
Service
Specification
Service
Business
Drivers
Roadmaps
Transformation
Governance
Control
Design
Timing
Specification
Change
Business
Strategy
Business Goals
and Objectives
Guiding
Principles
Policies
Standards
Strategy
Planner
Enterprise Architect
Solution Architect
Designer
Engineer
Functioning
Enterprise
Scope
Business Model
System Model
Technology Model
Detailed specifications
Enterprise Architecture What How Where Who When Why
Project
Intake
Conformity
Approval
Health
Check
Health
Check
A1
A2
A3
A4
A5
B1
B2
B3
B4
B5
C1
C2
C3
C4
C5
D1
D2
D3
D4
D5
E1
E2
E3
E4
E5
F1
F2
F3
F4
F5
Framework
A6 B6 C6 D6 E6 F6
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Business
Domains
Business Data
Model
Logical Data
Model
Physical Data
Model
Data
Specification
Data
Organisation
Structure
Business Roles
User Centric
Design
User Interface
Presentation
Security
Specification
Organisation
Business
Locations
Environments
and Locations
Technology
Platforms
Physical
(network)
Design
Hardware and
Network
Specifications
Network
Business
Functions and
Services
Business
Processes
Model
Application
Landscape
Application
Design
Application
Service
Specification
Service
Business
Drivers
Roadmaps
Transformation
Governance
Control
Design
Timing
Specification
Change
Business
Strategy
Business Goals
and Objectives
Guiding
Principles
Policies
Standards
Strategy
Planner
Enterprise Architect
Solution Architect
Designer
Engineer
Functioning
Enterprise
Scope
Business Model
System Model
Technology Model
Detailed specifications
Enterprise Architecture What How Where Who When Why
Project
Intake
Conformity
Approval
Health
Check
Health
Check
A1
A2
A3
A4
A5
B1
B2
B3
B4
B5
C1
C2
C3
C4
C5
D1
D2
D3
D4
D5
E1
E2
E3
E4
E5
F1
F2
F3
F4
F5
Framework
A6 B6 C6 D6 E6 F6
Final
Audit
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Agenda
 Purpose of Discussion
 Proposed Project Management Process
 Some Project Examples
 Zachman Framework
 What/how information is gathered during
Project Process using Framework
 The Project Template (TGL):
Transformation Governance Log
 Open discussion on project methodology
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Transformation Governance Log (TGL)
Project Start-up
 What services/solutions will be
delivered to the project
 Sign off regarding the
approach by the applicable
business services
 In depth examination of the
project's deliverables and their
alignment with approval and/or
architecture standards,
guidelines and principles
Project Initiation
 Which borders will the
project have to respect
- Business Intake
- Project Start Architecture
Project Execution
- Final Conformity Audit
Before Project Closure
 Final project deliverables in
line with agreements
- Project Health Check
- Business Approval
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
Agenda
 Purpose of Discussion
 Proposed Project Management Process
 Some Project Examples
 Zachman Framework
 What/how information is gathered during
Project Process using Framework
 The Project Template (TGL):
Transformation Governance Log
 Open discussion on project methodology
Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.

Mais conteúdo relacionado

Mais procurados

Change your project management approach or risk project success
Change your project management approach or risk project successChange your project management approach or risk project success
Change your project management approach or risk project successparag719
 
Contract construction-management142
Contract construction-management142Contract construction-management142
Contract construction-management142rkress61
 
Scenario - Project Management Processes | 2 of 2
Scenario - Project Management Processes | 2 of 2Scenario - Project Management Processes | 2 of 2
Scenario - Project Management Processes | 2 of 2DavidMcLachlan1
 
Chap 4.0 Project integration management Overview
Chap 4.0 Project integration management OverviewChap 4.0 Project integration management Overview
Chap 4.0 Project integration management OverviewAnand Bobade
 
ATEC 2340/4370 Lecture 4
ATEC 2340/4370 Lecture 4ATEC 2340/4370 Lecture 4
ATEC 2340/4370 Lecture 4KarynNarramore
 
4370 Week Two: History and Overview
4370 Week Two: History and Overview4370 Week Two: History and Overview
4370 Week Two: History and OverviewKarynNarramore
 
المحاضرة السادسة: إعداد جدول المشروع
المحاضرة السادسة: إعداد جدول المشروعالمحاضرة السادسة: إعداد جدول المشروع
المحاضرة السادسة: إعداد جدول المشروعEgypt Scholars Inc.
 
Successful change - good culture and governance matter Conference - Joanne Br...
Successful change - good culture and governance matter Conference - Joanne Br...Successful change - good culture and governance matter Conference - Joanne Br...
Successful change - good culture and governance matter Conference - Joanne Br...Association for Project Management
 
المحاضرة الثامنة: الرقابة على المشروع
المحاضرة الثامنة: الرقابة على المشروعالمحاضرة الثامنة: الرقابة على المشروع
المحاضرة الثامنة: الرقابة على المشروعEgypt Scholars Inc.
 
المحاضرة السابعة: تنفيذ المشروع وإدارة فريق العمل والاتصالات خلال المشروع
المحاضرة السابعة: تنفيذ المشروع وإدارة فريق العمل والاتصالات خلال المشروعالمحاضرة السابعة: تنفيذ المشروع وإدارة فريق العمل والاتصالات خلال المشروع
المحاضرة السابعة: تنفيذ المشروع وإدارة فريق العمل والاتصالات خلال المشروعEgypt Scholars Inc.
 
Unit2 scheduling wbs_network Management
Unit2 scheduling wbs_network Management Unit2 scheduling wbs_network Management
Unit2 scheduling wbs_network Management Reetesh Gupta
 
Chap 5.2 Collect requirements
Chap 5.2 Collect requirementsChap 5.2 Collect requirements
Chap 5.2 Collect requirementsAnand Bobade
 
Episode 23 : PROJECT TIME MANAGEMENT
Episode 23 : PROJECT TIME MANAGEMENTEpisode 23 : PROJECT TIME MANAGEMENT
Episode 23 : PROJECT TIME MANAGEMENTSAJJAD KHUDHUR ABBAS
 

Mais procurados (20)

Practical project management 12 feb 2014
Practical project management 12 feb 2014Practical project management 12 feb 2014
Practical project management 12 feb 2014
 
Change your project management approach or risk project success
Change your project management approach or risk project successChange your project management approach or risk project success
Change your project management approach or risk project success
 
1 project management framework
1  project management framework1  project management framework
1 project management framework
 
Contract construction-management142
Contract construction-management142Contract construction-management142
Contract construction-management142
 
Scenario - Project Management Processes | 2 of 2
Scenario - Project Management Processes | 2 of 2Scenario - Project Management Processes | 2 of 2
Scenario - Project Management Processes | 2 of 2
 
Basic Software Engineering v1.0
Basic Software Engineering v1.0Basic Software Engineering v1.0
Basic Software Engineering v1.0
 
Chap 4.0 Project integration management Overview
Chap 4.0 Project integration management OverviewChap 4.0 Project integration management Overview
Chap 4.0 Project integration management Overview
 
Atec 4370 lecture3
Atec 4370 lecture3Atec 4370 lecture3
Atec 4370 lecture3
 
ATEC 2340/4370 Lecture 4
ATEC 2340/4370 Lecture 4ATEC 2340/4370 Lecture 4
ATEC 2340/4370 Lecture 4
 
4370 Week Two: History and Overview
4370 Week Two: History and Overview4370 Week Two: History and Overview
4370 Week Two: History and Overview
 
المحاضرة السادسة: إعداد جدول المشروع
المحاضرة السادسة: إعداد جدول المشروعالمحاضرة السادسة: إعداد جدول المشروع
المحاضرة السادسة: إعداد جدول المشروع
 
Atec 2340 lecture6
Atec 2340 lecture6Atec 2340 lecture6
Atec 2340 lecture6
 
Successful change - good culture and governance matter Conference - Joanne Br...
Successful change - good culture and governance matter Conference - Joanne Br...Successful change - good culture and governance matter Conference - Joanne Br...
Successful change - good culture and governance matter Conference - Joanne Br...
 
المحاضرة الثامنة: الرقابة على المشروع
المحاضرة الثامنة: الرقابة على المشروعالمحاضرة الثامنة: الرقابة على المشروع
المحاضرة الثامنة: الرقابة على المشروع
 
Atec 2340 lecture7
Atec 2340 lecture7Atec 2340 lecture7
Atec 2340 lecture7
 
المحاضرة السابعة: تنفيذ المشروع وإدارة فريق العمل والاتصالات خلال المشروع
المحاضرة السابعة: تنفيذ المشروع وإدارة فريق العمل والاتصالات خلال المشروعالمحاضرة السابعة: تنفيذ المشروع وإدارة فريق العمل والاتصالات خلال المشروع
المحاضرة السابعة: تنفيذ المشروع وإدارة فريق العمل والاتصالات خلال المشروع
 
Unit2 scheduling wbs_network Management
Unit2 scheduling wbs_network Management Unit2 scheduling wbs_network Management
Unit2 scheduling wbs_network Management
 
Chap 5.2 Collect requirements
Chap 5.2 Collect requirementsChap 5.2 Collect requirements
Chap 5.2 Collect requirements
 
2019 Agile ^ Scrum
2019 Agile ^ Scrum2019 Agile ^ Scrum
2019 Agile ^ Scrum
 
Episode 23 : PROJECT TIME MANAGEMENT
Episode 23 : PROJECT TIME MANAGEMENTEpisode 23 : PROJECT TIME MANAGEMENT
Episode 23 : PROJECT TIME MANAGEMENT
 

Destaque

Architecture Projects Ppt Show
Architecture Projects Ppt ShowArchitecture Projects Ppt Show
Architecture Projects Ppt Showmarycauthen
 
Architect presentation
Architect  presentationArchitect  presentation
Architect presentationimpianharta
 
Student Architecture Projects
Student Architecture ProjectsStudent Architecture Projects
Student Architecture ProjectsGemma Ginty
 
Sandeep kulkarni architect presentation
Sandeep kulkarni architect presentationSandeep kulkarni architect presentation
Sandeep kulkarni architect presentationmumbaiarchitect2016
 
Portfolio September 2009
Portfolio September 2009Portfolio September 2009
Portfolio September 2009deirdregaffney
 
My design Work in Interior and Architectural Project as Estimator, Architect,...
My design Work in Interior and Architectural Project as Estimator, Architect,...My design Work in Interior and Architectural Project as Estimator, Architect,...
My design Work in Interior and Architectural Project as Estimator, Architect,...C Da
 
Architecture Portfolio Ashley Davis
Architecture Portfolio Ashley DavisArchitecture Portfolio Ashley Davis
Architecture Portfolio Ashley DavisAshley Davis
 

Destaque (8)

Architecture Projects Ppt Show
Architecture Projects Ppt ShowArchitecture Projects Ppt Show
Architecture Projects Ppt Show
 
Architect presentation
Architect  presentationArchitect  presentation
Architect presentation
 
Student Architecture Projects
Student Architecture ProjectsStudent Architecture Projects
Student Architecture Projects
 
Sandeep kulkarni architect presentation
Sandeep kulkarni architect presentationSandeep kulkarni architect presentation
Sandeep kulkarni architect presentation
 
Portfolio September 2009
Portfolio September 2009Portfolio September 2009
Portfolio September 2009
 
My design Work in Interior and Architectural Project as Estimator, Architect,...
My design Work in Interior and Architectural Project as Estimator, Architect,...My design Work in Interior and Architectural Project as Estimator, Architect,...
My design Work in Interior and Architectural Project as Estimator, Architect,...
 
Mies van der rohe
Mies van der roheMies van der rohe
Mies van der rohe
 
Architecture Portfolio Ashley Davis
Architecture Portfolio Ashley DavisArchitecture Portfolio Ashley Davis
Architecture Portfolio Ashley Davis
 

Semelhante a Proposed Project Office Strategy

Proposed Project Management Office
Proposed Project Management OfficeProposed Project Management Office
Proposed Project Management OfficeJosh Folgado
 
A guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectA guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectProject Management Solutions
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMPSubodh Kumar
 
Undestand PMBok 5th, Section 4
Undestand PMBok 5th, Section 4Undestand PMBok 5th, Section 4
Undestand PMBok 5th, Section 4Amr Miqdadi
 
About Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
About Agile & PMI Agile Certified Practitioner (PMI-ACP) OverviewAbout Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
About Agile & PMI Agile Certified Practitioner (PMI-ACP) OverviewAleem Khan
 
PmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit PayalPmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit PayalAMIT PAYAL
 
Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012REDceo.net
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration ManagementBhuWan Khadka
 
Project management paradigm
Project management paradigmProject management paradigm
Project management paradigmGlen Alleman
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principlestltiede
 
Gtm development framework aug 2017
Gtm development framework   aug 2017Gtm development framework   aug 2017
Gtm development framework aug 2017Daniel Thuraiappah
 
1. Introduction to Project Management and the Project Management Framework
1. Introduction to Project Management and the Project Management Framework1. Introduction to Project Management and the Project Management Framework
1. Introduction to Project Management and the Project Management FrameworkMeshack Shack
 
PMP Training - Project Integration Management - Part 1
PMP Training - Project Integration Management - Part 1PMP Training - Project Integration Management - Part 1
PMP Training - Project Integration Management - Part 1Skillogic Solutions
 

Semelhante a Proposed Project Office Strategy (20)

Proposed Project Management Office
Proposed Project Management OfficeProposed Project Management Office
Proposed Project Management Office
 
PMP Prep Handout_Integration
PMP Prep Handout_IntegrationPMP Prep Handout_Integration
PMP Prep Handout_Integration
 
A guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery projectA guide for the rolling out of a software delivery project
A guide for the rolling out of a software delivery project
 
Pm training day 2
Pm training   day 2Pm training   day 2
Pm training day 2
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
 
Undestand PMBok 5th, Section 4
Undestand PMBok 5th, Section 4Undestand PMBok 5th, Section 4
Undestand PMBok 5th, Section 4
 
1. introduction
1. introduction1. introduction
1. introduction
 
About Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
About Agile & PMI Agile Certified Practitioner (PMI-ACP) OverviewAbout Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
About Agile & PMI Agile Certified Practitioner (PMI-ACP) Overview
 
PmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit PayalPmiprojectmanagementprinciplesAmit Payal
PmiprojectmanagementprinciplesAmit Payal
 
Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012Comfori red-sop seminar-ppt brochure-091012
Comfori red-sop seminar-ppt brochure-091012
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration Management
 
PROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENT
PROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENTPROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENT
PROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENT
 
PMP PMBOK5 Ch4 integration management
PMP PMBOK5 Ch4 integration managementPMP PMBOK5 Ch4 integration management
PMP PMBOK5 Ch4 integration management
 
Project management paradigm
Project management paradigmProject management paradigm
Project management paradigm
 
The role of the project manager
The role of the project managerThe role of the project manager
The role of the project manager
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principles
 
Gtm development framework aug 2017
Gtm development framework   aug 2017Gtm development framework   aug 2017
Gtm development framework aug 2017
 
1. Introduction to Project Management and the Project Management Framework
1. Introduction to Project Management and the Project Management Framework1. Introduction to Project Management and the Project Management Framework
1. Introduction to Project Management and the Project Management Framework
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Management
 
PMP Training - Project Integration Management - Part 1
PMP Training - Project Integration Management - Part 1PMP Training - Project Integration Management - Part 1
PMP Training - Project Integration Management - Part 1
 

Último

SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardsticksaastr
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMoumonDas2
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Vipesco
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxraffaeleoman
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024eCommerce Institute
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Delhi Call girls
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxmohammadalnahdi22
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Kayode Fayemi
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Hasting Chen
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfSenaatti-kiinteistöt
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxNikitaBankoti2
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar TrainingKylaCullinane
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Chameera Dedduwage
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AITatiana Gurgel
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsaqsarehman5055
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesPooja Nehwal
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...Sheetaleventcompany
 
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyCall Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyPooja Nehwal
 

Último (20)

SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, YardstickSaaStr Workshop Wednesday w/ Lucas Price, Yardstick
SaaStr Workshop Wednesday w/ Lucas Price, Yardstick
 
Mathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptxMathematics of Finance Presentation.pptx
Mathematics of Finance Presentation.pptx
 
Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510Thirunelveli call girls Tamil escorts 7877702510
Thirunelveli call girls Tamil escorts 7877702510
 
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptxChiulli_Aurora_Oman_Raffaele_Beowulf.pptx
Chiulli_Aurora_Oman_Raffaele_Beowulf.pptx
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
 
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdfThe workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
The workplace ecosystem of the future 24.4.2024 Fabritius_share ii.pdf
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
 
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 93 Noida Escorts >༒8448380779 Escort Service
 
Report Writing Webinar Training
Report Writing Webinar TrainingReport Writing Webinar Training
Report Writing Webinar Training
 
Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)Introduction to Prompt Engineering (Focusing on ChatGPT)
Introduction to Prompt Engineering (Focusing on ChatGPT)
 
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 97 Noida Escorts >༒8448380779 Escort Service
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AI
 
Air breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animalsAir breathing and respiratory adaptations in diver animals
Air breathing and respiratory adaptations in diver animals
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
 
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyCall Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
 

Proposed Project Office Strategy

  • 1. Proposed Methodology Josh Folgado Business Enterprise Architect Project Management Office Standards used:  Prince2/PM2 for Project Management  TOGAF for Process and Documentation  Zachman for Enterprise Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 2. Agenda  Purpose of Discussion  Proposed Project Management Process  Some Project Examples  Zachman Framework  What/how information is gathered during Project Process using Framework  The Project Template (TGL): Transformation Governance Log  Open discussion on project methodology Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 3. Purpose of Discussion • Learn about proposed Project Management Methodology, get feedback for refinement and how to use it • Need support for delivering uniform Project Management Services - for both the Business and IT, i.e. business projects, new products, application development, database development, etc. • Active engagement to implement best-practice: Business Process Reengineering (BPR) • Discover and help fine-tune single document (TGL) that keeps all information regarding project Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 4. Agenda  Purpose of Discussion  Proposed Project Management Process  Some Project Examples  Zachman Framework  What/how information is gathered during Project Process using Framework  The Project Template (TGL): Transformation Governance Log  Open discussion on project methodology Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 5. Project Management Process Closure phase Execution phase Initiation phase Start-up phase Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 6. Closure phase Execution phase Initiation phase Start-up phase Quality street NO Project Management Process YES Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 7. Closure phase Execution phase Initiation phase Start-up phase Quality street Architecture Services • Business Intake • Architecture Guidance • Project Start Architecture • Architecture Guidance • Business Approval • Project Health Check • Architecture Guidance • Final Conformity Audit Project Management Process Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 8. • Business Intake: Closure phase Execution phase Initiation phase Start-up phase Quality street Architecture Services • Business Intake • Architecture Guidance • Project Start Architecture • Architecture Guidance • Business Approval • Project Health Check • Architecture Guidance • Final Conformity Audit Project Management Process – Assess impact and strategic needs of organisation – Why are you doing this work; what is the benefit to the organisation – What business services will be delivered to the project and draft subsequent dependencies – Discuss with all involved parties; inform and involve everyone concerned for best understanding and focus of deliverables  Architecture is responsible for Business Intake  Programme manager agrees schedule based on resources, criteria, priorities and impact to the organisation Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 9. • Project Impact: Closure phase Execution phase Initiation phase Start-up phase Quality street Architecture Services • Business Intake • Architecture Guidance • Project Start Architecture • Architecture Guidance • Business Approval • Project Health Check • Architecture Guidance • Final Conformity Audit Project Management Process Risk Factor Rating Solution complexity Low/Medium/High Standards compliance Low/Medium/High Project size and complexity Low/Medium/High Business strategy Low/Medium/High Business impact Low/Medium/High Business compliance Low/Medium/High Impact to methods and structure Low/Medium/High Resource usage/dependencies Low/Medium/High Training of resources Low/Medium/High Data/application models Low/Medium/High Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 10. Closure phase Execution phase Initiation phase Start-up phase Quality street Architecture Services • Business Intake • Architecture Guidance • Project Start Architecture • Architecture Guidance • Business Approval • Project Health Check • Architecture Guidance • Final Conformity Audit Service Intake PSA Approval Health Check Final Audit Project Management Process Medium Impact Mandatory Recommended Mandatory Recommended Mandatory High Impact Mandatory Mandatory Mandatory Mandatory Mandatory Low Impact Mandatory Optional Recommended Optional Recommended Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 11. • Project Start Architecture Closure phase Execution phase Initiation phase Start-up phase Quality street Architecture Services • Business Intake • Architecture Guidance • Project Start Architecture • Architecture Guidance • Business Approval • Project Health Check • Architecture Guidance • Final Conformity Audit Project Management Process – Which borders will the project have to respect – Identify steps and milestones for project, i.e. building blocks – What business services are involved and subsequent dependencies  Architecture is responsible for project start architecture – Creation/updating of enterprise blueprints for solution  Final agreement on project’s deliverables and schedule Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 12. • Project Start Architecture – Which borders will the project have to respect – Identify steps and milestones for project, i.e. building blocks – What business services are involved and subsequent dependencies – Creation/updating of enterprise blueprints for solution – Final agreement on project’s deliverables and schedule Closure phase Execution phase Initiation phase Start-up phase Quality street Architecture Services • Business Intake • Architecture Guidance • Project Start Architecture • Architecture Guidance • Business Approval • Project Health Check • Architecture Guidance • Final Conformity Audit Project Management Process • Business Approval  Architecture is responsible for Business Approval  Sign-off by project owner and architecture on how the project is to be done by the applicable business services  Inform project office on execution status Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 13. • Project Health Check Closure phase Execution phase Initiation phase Start-up phase Quality street Architecture Services • Business Intake • Architecture Guidance • Project Start Architecture • Architecture Guidance • Business Approval • Project Health Check • Architecture Guidance • Final Conformity Audit Project Management Process – In depth examination of the project's deliverables and their alignment with approval/recommendations and/or architecture standards, guidelines and principles or additional change requests  Programme manager may set multiple health checks for projects, depending on risk and project complexity – Manage unexpected/unapproved features with programme manager i.e. change requests  Health checks can be called at anytime by programme manager  Architecture is responsible for health checks and reports results to programme manager Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 14. Closure phase Execution phase Initiation phase Start-up phase Quality street Architecture Services • Business Intake • Architecture Guidance • Project Start Architecture • Architecture Guidance • Business Approval • Project Health Check • Architecture Guidance • Final Conformity Audit Project Management Process • Final Conformity Audit – Check and confirm final project deliverables are in line with agreements with business service that owns project Project owner signs-off project  Architecture is responsible for final audit, working along with programme manager and business owner  Project office finalises and closes TGL document – Verify that enterprise models are updated, according to final solution Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 15. Agenda  Purpose of Discussion  Proposed Project Management Process  Some Project Examples  Zachman Framework  What/how information is gathered during Project Process using Framework  The Project Template (TGL): Transformation Governance Log  Open discussion on project methodology Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 16. Project Services - Low Impact Examples • Study to replace the company logo • Cleaning of content in databases • Rearrange the parking area Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 17. Project Services - Medium Impact Examples • Multiple BPR Projects for process improvement • New regulations to be adopted in financial systems • Upgrade PABX Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 18. Project Services - High Impact Examples • Moving of IT to external entity • Data Warehouse • Restructuring of Business Services Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 19. Agenda  Purpose of Discussion  Proposed Project Management Process  Some Project Examples  Zachman Framework  What/how information is gathered during Project Process using Framework  The Project Template (TGL): Transformation Governance Log  Open discussion on project methodology Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 20. Business Domains Business Data Model Logical Data Model Physical Data Model Data Specification Data Organisation Structure Business Roles User Centric Design User Interface Presentation Security Specification Organisation Business Locations Environments and Locations Technology Platforms Physical (network) Design Hardware and Network Specifications Network Business Functions and Services Business Processes Model Application Landscape Application Design Application Service Specification Service Business Drivers Roadmaps Transformation Governance Control Design Timing Specification Change Business Strategy Business Goals and Objectives Guiding Principles Policies Standards Strategy Planner Enterprise Architect Solution Architect Designer Engineer Functioning Enterprise Scope Business Model System Model Technology Model Detailed specifications Enterprise Architecture What How Where Who When Why Zachman Framework A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 C1 C2 C3 C4 C5 D1 D2 D3 D4 D5 E1 E2 E3 E4 E5 F1 F2 F3 F4 F5 A6 B6 C6 D6 E6 F6 Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 21. Closure phase Execution phase Initiation phase Start-up phase Quality street Architecture Services • Business Intake • Architecture Guidance • Project Start Architecture • Architecture Guidance • Business Approval • Project Health Check • Architecture Guidance • Final Conformity Audit Focus during start-up phase Project Services and Framework Business Domains Business Data Model Logical Data Model Physical Data Model Data Specificatio n Data Organisation Structure Business Roles User Centric Design User Interface Presentatio nSecurity Specificatio n Organisatio n Business Locations Environment s and Locations Technolog y Platforms Physical (network) Design Hardware and Network Specificatio ns Network Business Functions and Services Business Processes Model Application Landscape Application Design Application Service Specificatio nService Business Drivers Roadmaps Transforma tion Governanc eControl Design Timing Specificatio n Change Business Strategy Business Goals and Objectives Guiding Principles Policies Standards Strategy Planner Enterprise Architect Solution Architect Designer Engineer Functioning Enterprise Scope Business Model System Model Technology Model Detailed specifications EA What How Where Who When Why Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 22. Closure phase Execution phase Initiation phase Start-up phase Quality street Architecture Services • Business Intake • Architecture Guidance • Project Start Architecture • Architecture Guidance • Business Approval • Project Health Check • Architecture Guidance • Final Conformity Audit Focus during initiation phase Project Services and Framework Business Domains Business Data Model Logical Data Model Physical Data Model Data Specificatio n Data Organisation Structure Business Roles User Centric Design User Interface Presentatio nSecurity Specificatio n Organisatio n Business Locations Environment s and Locations Technology Platforms Physical (network) Design Hardware and Network Specificatio ns Network Business Functions and Services Business Processes Model Application Landscape Application Design Application Service Specificatio nService Business Drivers Roadmaps Transformati on Governance Control Design Timing Specificatio n Change Business Strategy Business Goals and Objectives Guiding Principles Policies Standards Strategy Planner Enterprise Architect Solution Architect Designer Engineer Functioning Enterprise Scope Business Model System Model Technology Model Detailed specifications EA What How Where Who When Why Focus during start-up phase Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 23. Closure phase Execution phase Initiation phase Start-up phase Quality street Architecture Services • Business Intake • Architecture Guidance • Project Start Architecture • Architecture Guidance • Business Approval • Project Health Check • Architecture Guidance • Final Conformity Audit Focus during initiation phase Focus during execution phase Focus during start-up phase Project Services and Framework Business Domains Business Data Model Logical Data Model Physical Data Model Data Specificatio n Data Organisation Structure Business Roles User Centric Design User Interface Presentation Security Specificatio n Organisatio n Business Locations Environment s and Locations Technology Platforms Physical (network) Design Hardware and Network Specificatio ns Network Business Functions and Services Business Processes Model Application Landscape Application Design Application Service Specificatio nService Business Drivers Roadmaps Transformati on Governance Control Design Timing Specificatio n Change Business Strategy Business Goals and Objectives Guiding Principles Policies Standards Strategy Planner Enterprise Architect Solution Architect Designer Engineer Functioning Enterprise Scope Business Model System Model Technology Model Detailed specifications EA What How Where Who When Why Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 24. Closure phase Execution phase Initiation phase Start-up phase Quality street Architecture Services • Business Intake • Architecture Guidance • Project Start Architecture • Architecture Guidance • Business Approval • Project Health Check • Architecture Guidance • Final Conformity Audit Focus during initiation phase Focus during execution phase Focus during start-up phase Project Services and Framework Business Domains Business Data Model Logical Data Model Physical Data Model Data Specification Data Organisation Structure Business Roles User Centric Design User Interface Presentation Security Specification Organisatio n Business Locations Environment s and Locations Technology Platforms Physical (network) Design Hardware and Network Specification s Network Business Functions and Services Business Processes Model Application Landscape Application Design Application Service Specification Service Business Drivers Roadmaps Transformati on Governance Control Design Timing Specification Change Business Strategy Business Goals and Objectives Guiding Principles Policies Standards Strategy Planner Enterprise Architect Solution Architect Designer Engineer Functioning Enterprise Scope Business Model System Model Technology Model Detailed specifications EA What How Where Who When Why Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 25. Closure phase Execution phase Initiation phase Start-up phase Quality street Architecture Services • Business Intake • Architecture Guidance • Project Start Architecture • Architecture Guidance • Business Approval • Project Health Check • Architecture Guidance • Final Conformity Audit Focus during initiation phase Focus during execution phase Focus during start-up phase Project Services and Framework Business Domains Business Data Model Logical Data Model Physical Data Model Data Specification Data Organisation Structure Business Roles User Centric Design User Interface Presentation Security Specification Organisation Business Locations Environment s and Locations Technology Platforms Physical (network) Design Hardware and Network Specification s Network Business Functions and Services Business Processes Model Application Landscape Application Design Application Service Specification Service Business Drivers Roadmaps Transformati on Governance Control Design Timing Specification Change Business Strategy Business Goals and Objectives Guiding Principles Policies Standards Strategy Planner Enterprise Architect Solution Architect Designer Engineer Functioning Enterprise Scope Business Model System Model Technology Model Detailed specifications EA What How Where Who When Why Focus during closure phase Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 26. Agenda  Purpose of Discussion  Proposed Project Management Process  Some Project Examples  Zachman Framework  What/how information is gathered during Project Process using Framework  The Project Template (TGL): Transformation Governance Log  Open discussion on project methodology Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 27. Business Domains Business Data Model Logical Data Model Physical Data Model Data Specification Data Organisation Structure Business Roles User Centric Design User Interface Presentation Security Specification Organisation Business Locations Environments and Locations Technology Platforms Physical (network) Design Hardware and Network Specifications Network Business Functions and Services Business Processes Model Application Landscape Application Design Application Service Specification Service Business Drivers Roadmaps Transformation Governance Control Design Timing Specification Change Business Strategy Business Goals and Objectives Guiding Principles Policies Standards Strategy Planner Enterprise Architect Solution Architect Designer Engineer Functioning Enterprise Scope Business Model System Model Technology Model Detailed specifications Enterprise Architecture What How Where Who When Why A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 C1 C2 C3 C4 C5 D1 D2 D3 D4 D5 E1 E2 E3 E4 E5 F1 F2 F3 F4 F5 A6 B6 C6 D6 E6 F6 Framework Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 28. Business Domains Business Data Model Logical Data Model Physical Data Model Data Specification Data Organisation Structure Business Roles User Centric Design User Interface Presentation Security Specification Organisation Business Locations Environments and Locations Technology Platforms Physical (network) Design Hardware and Network Specifications Network Business Functions and Services Business Processes Model Application Landscape Application Design Application Service Specification Service Business Drivers Roadmaps Transformation Governance Control Design Timing Specification Change Business Strategy Business Goals and Objectives Guiding Principles Policies Standards Strategy Planner Enterprise Architect Solution Architect Designer Engineer Functioning Enterprise Scope Business Model System Model Technology Model Detailed specifications Enterprise Architecture What How Where Who When Why A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 C1 C2 C3 C4 C5 D1 D2 D3 D4 D5 E1 E2 E3 E4 E5 F1 F2 F3 F4 F5 A6 B6 C6 D6 E6 F6 Project IntakeFramework Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 29. Business Domains Business Data Model Logical Data Model Physical Data Model Data Specification Data Organisation Structure Business Roles User Centric Design User Interface Presentation Security Specification Organisation Business Locations Environments and Locations Technology Platforms Physical (network) Design Hardware and Network Specifications Network Business Functions and Services Business Processes Model Application Landscape Application Design Application Service Specification Service Business Drivers Roadmaps Transformation Governance Control Design Timing Specification Change Business Strategy Business Goals and Objectives Guiding Principles Policies Standards Strategy Planner Enterprise Architect Solution Architect Designer Engineer Functioning Enterprise Scope Business Model System Model Technology Model Detailed specifications Enterprise Architecture What How Where Who When Why A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 C1 C2 C3 C4 C5 D1 D2 D3 D4 D5 E1 E2 E3 E4 E5 F1 F2 F3 F4 F5 A6 B6 C6 D6 E6 F6 Project Intake Conformity ApprovalFramework Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 30. Business Domains Business Data Model Logical Data Model Physical Data Model Data Specification Data Organisation Structure Business Roles User Centric Design User Interface Presentation Security Specification Organisation Business Locations Environments and Locations Technology Platforms Physical (network) Design Hardware and Network Specifications Network Business Functions and Services Business Processes Model Application Landscape Application Design Application Service Specification Service Business Drivers Roadmaps Transformation Governance Control Design Timing Specification Change Business Strategy Business Goals and Objectives Guiding Principles Policies Standards Strategy Planner Enterprise Architect Solution Architect Designer Engineer Functioning Enterprise Scope Business Model System Model Technology Model Detailed specifications Enterprise Architecture What How Where Who When Why A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 C1 C2 C3 C4 C5 D1 D2 D3 D4 D5 E1 E2 E3 E4 E5 F1 F2 F3 F4 F5 A6 B6 C6 D6 E6 F6 Project Intake Conformity Approval Health CheckFramework Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 31. Business Domains Business Data Model Logical Data Model Physical Data Model Data Specification Data Organisation Structure Business Roles User Centric Design User Interface Presentation Security Specification Organisation Business Locations Environments and Locations Technology Platforms Physical (network) Design Hardware and Network Specifications Network Business Functions and Services Business Processes Model Application Landscape Application Design Application Service Specification Service Business Drivers Roadmaps Transformation Governance Control Design Timing Specification Change Business Strategy Business Goals and Objectives Guiding Principles Policies Standards Strategy Planner Enterprise Architect Solution Architect Designer Engineer Functioning Enterprise Scope Business Model System Model Technology Model Detailed specifications Enterprise Architecture What How Where Who When Why Project Intake Conformity Approval Health Check Health Check A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 C1 C2 C3 C4 C5 D1 D2 D3 D4 D5 E1 E2 E3 E4 E5 F1 F2 F3 F4 F5 Framework A6 B6 C6 D6 E6 F6 Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 32. Business Domains Business Data Model Logical Data Model Physical Data Model Data Specification Data Organisation Structure Business Roles User Centric Design User Interface Presentation Security Specification Organisation Business Locations Environments and Locations Technology Platforms Physical (network) Design Hardware and Network Specifications Network Business Functions and Services Business Processes Model Application Landscape Application Design Application Service Specification Service Business Drivers Roadmaps Transformation Governance Control Design Timing Specification Change Business Strategy Business Goals and Objectives Guiding Principles Policies Standards Strategy Planner Enterprise Architect Solution Architect Designer Engineer Functioning Enterprise Scope Business Model System Model Technology Model Detailed specifications Enterprise Architecture What How Where Who When Why Project Intake Conformity Approval Health Check Health Check A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 C1 C2 C3 C4 C5 D1 D2 D3 D4 D5 E1 E2 E3 E4 E5 F1 F2 F3 F4 F5 Framework A6 B6 C6 D6 E6 F6 Final Audit Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 33. Agenda  Purpose of Discussion  Proposed Project Management Process  Some Project Examples  Zachman Framework  What/how information is gathered during Project Process using Framework  The Project Template (TGL): Transformation Governance Log  Open discussion on project methodology Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 34. Transformation Governance Log (TGL) Project Start-up  What services/solutions will be delivered to the project  Sign off regarding the approach by the applicable business services  In depth examination of the project's deliverables and their alignment with approval and/or architecture standards, guidelines and principles Project Initiation  Which borders will the project have to respect - Business Intake - Project Start Architecture Project Execution - Final Conformity Audit Before Project Closure  Final project deliverables in line with agreements - Project Health Check - Business Approval Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.
  • 35. Agenda  Purpose of Discussion  Proposed Project Management Process  Some Project Examples  Zachman Framework  What/how information is gathered during Project Process using Framework  The Project Template (TGL): Transformation Governance Log  Open discussion on project methodology Done by Josh Folgado. Copyright © 2014 joshfolgado.com . All rights reserved.