SlideShare uma empresa Scribd logo
1 de 10
1
RÉSUMÉ Okusolubo, John Oluwagbemiga
Address: 5, Adenekan Salako Close,
Off Ijaiye Road,
Caterpillar Bus stop,
Ogba,
Lagos, Nigeria
Tel: (+234) 816 310 7450, 802 331 1476
Email: okusolubojohn@yahoo.com
okusolubojohn@gmail.com
PROFESSIONAL PROFILE
An enterprising and detailed-minded team player combining engineering, project management,
leadership, writing and communications skills with 16 years’ experience particularly in Oil and
Gas industry and has a passion for organizational and personal effectiveness. Known for his
integrity and skills to manage project related matters.
QUALIFICATIONS
2014 Action Learning MBA (Credit)
Business School Netherlands
1996 B.Eng (Second Class Lower) Mechanical Engineering,
University of Ilorin, Kwara State, Nigeria
1989 OND (Upper Credit) Mechanical Engineering,
The Polytechnic Ibadan, Oyo State, Nigeria
1986 WASC O’Level,
Methodist High School, Arigbajo Ifo, Ogun State, Nigeria
MANAGEMENT COURSES
2015 FPM22 - Project Management for Engineering and Construction
PetroSkills Conference Center, 25403 Katy Mills Parkway, Houston,Texas 77494
United States
2014 Technical Contract Negotiation Skills
MacTay, Lekki Peninsula Phase I, Lagos
2013 PL-42 “Onshore Pipeline Facilities-Design, Construction & Operations”
PetroSkill Facilities Training by John M. Campbell & Co., Denver, Colorado USA
2012 Global Pipeline Construction, Integrity & Maintenance Conference
Knowledge Expansion, Dubai
2
2011 Project Management Training
Piston & Fusion, Lagos
2010 NIS ISO 9001:2008 Auditors’ Training
Freshfountain Consulting Limited, Lagos
2010 Advance Certificate Course in Leadership,
Daystar Leadership Academy, Lagos State, Nigeria
2008 Basic Certificate Course in Leadership,
Daystar Leadership Academy, Lagos State, Nigeria
2008 Project Management Courses
Jeman Consulting, Lagos
2007 Training on Heat Exchanger
Shell Petroleum Development Company, Port Harcourt
2002 Construction Safety Course
Chevron Nigeria Limited, Warri
2001 Basic Piping Course
National Engineering & Technical Company (Nig) Ltd, V.I., Lagos
PROFESSIONAL MEMBERSHIP
Member, Council for the Regulation of Engineering in Nigeria, (R.30370)
Member, Nigerian Society of Engineers (NSE No: 21772)
Member, Project Management Institute (PMI No: 1272803)
Member, Nigerian Institution of Mechanical Engineers (NIMechE No: O00369)
AREA OF EXPERTISE
 Project Management
 Contract Negotiation and Management
 Pipeline Engineering and Construction (Onshore & Offshore)
 Pipeline Maintenance and Integrity Management
 Field Development Plan
 Conceptual Studies (Brown and Green Fields)
 FEED (Brown and Green Fields)
 Detailed Engineering (Brown and Green Fields)
 Team Building
KEY COMPETENCIES
 Ability to manage effectively the intricacies of the operational aspects of the industry
through creative thinking and people management
 Good project management and control skill to manage project to achieve set objectives
3
 Have knowledge of industry codes and standards,regulation, and design criteria relevant
to Onshore and Offshore SystemDesign.
 Good team spirit to work in a cross discipline group and in cross cultural environment even
when it demands working under pressure.
 Effective leadership skill, good human and public relation, strong organisational ability
and good operational safety awareness
 Excellent writing and oral communication in English
WORK HISTORY
PAN OCEAN OIL CORPORATION, THE FF TOWERS, PLOT 13/14 LIGALI AYORINDE AVENUE, V.I. LAGOS
MAR 2013 – TILL DATE
PROJECT MANAGER,
Responsibilities include:
 Implement project execution plans for pipeline engineering, procurement and
construction (EPC) activities
 Project initiation, cost/budget estimation and project scheduling
 Create clear and attainable project objectives and manage constraints,
 Contract management and control
 Monitor and report progress during all project phases,carrying out site visits as required.
 Liaise and manage all project stakeholders expectation
 Meet all regulatory and financial obligations (NNPC-NAPIMS, DPR, NCD)
JUL 2012 – FEB 2013
PROJECT LEAD ENGINEER
Responsibilities include:
 Relate closely with Construction and Operations departments on all pipeline related
matters
 Provide engineering support to pipeline detailed design, supervise pipeline engineering
activities in the field when being executed by third parties and manage engineering
modifications to the pipeline system
JAN 2012 – JUN 2012
SENIOR PIPELINE ENGINEER
Responsibilities include:
 Provide complete engineering expertise as well as technical support for pipeline facilities
 Supervise the construction ofand manage the technical integrity of considerable length
of pipelines
 Prepare project scopes,AFEs and proposalfor all new pipeline projects
 Produce maintenance and inspection plans to assure the technical integrity of pipelines
within defined scope and budget.
 Develop and implement best practice inspection,monitoring and emergency response
systems
4
ONGOING PROJECT: Amukpe-Escravos Pipeline Project (AEPP). A 20”X67Km Crude Oil Pipeline
construction project using the continuous Horizontal Directional Drilling (HDD)
trenchless method.
JAN 2008 – DEC 2011
FLOWLINE ENERGY SERVICES (FES) LTD, 3RD
FLOOR LINDEV PLAZA, 16, AMODU OJIKUTU STREET, VI,
LAGOS
ENGINEERING/PROJECT MANAGER
Responsibilities include:
 Management and coordination of engineering department activities
 Coordination of multi-discipline project activities that ensure safe, efficient, cost
effective and timely execution
 Staff management and development
 Man power planning, recruitment, training and appraisal
 Managing project development from beginning to end
 Project resource estimation and participation
 Project schedule planning and tracking
 Cost estimation and budget proposal
 Interface and contract management
 Technical proposals and tender packages
 Conceptual study, FEED, Detail engineering on onshore offshore projects
 Pipeline Design
 Multi-discipline document review
FEB 2001 – DEC 2007
NATIONAL ENGINEERING AND TECHNICAL COMPANY LIMITED (NETCO), LAGOS, NIGERIA - AN NNPC
SUBSIDIARY. 146B, LIGALI AYORINDE STREET, V.I., LAGOS
SENIOR MECHANICAL PIPING ENGINEER
Responsibilities include:
 Supervision of discipline activities and provision of leadership to discipline engineers
 Provision of FEED service
 Oil and Gas Production Platform and Wellhead design for both brown (retrofit) field and
green field development.
 Engineering specifications and datasheets.
 Project scoping and definition
 Equipment listing.
 Quality assurance and checking.
 Constructability reviews.
 Studies of piping routings around equipment.
5
 Plot plan and Equipment layout development.
 Piping procedure.
 Platforms/Jackets’ upgrade and topside hook up detail engineering.
 Flowline/pipeline campaign
 Rig approach and riser detail
FEB 1999 – JAN 2001
COMPUTER DESIGNS, SYSTEMS, SERVICES (CDSS) NIG. LTD, PLOT 188, SHITTU ANIMASHAUN STREET,
GBAGADA PHASE II, LAGOS, NIGERIA
MECHANICAL APPLICATION PRODUCTS MANAGER
Responsibilities include:
 Coordination of department works and activities
 Design, modelling and drafting services with Rebis AutoPLANT
 Design, modelling and drafting services with AutoCAD and Mechanical desktop
 Personnel training in AutoCAD and Mechanical desktop
 Promotion and sales of Mechanical Application Products
JAN 1998 – JAN 1999
BHASE ENGINEERING COMPANY LIMITED, 12, AROMIRE STREET, IKEJA, LAGOS, NIGERIA
HEAD OF MECHANICAL DEPARTMENT
Responsibilities include:
 Team coordination and workshop maintenance.
 Fabrication of mechanical parts and machining of engineering components.
 Sales and services of diesel generators
JUL 1996 – JUN 1997
NATIONAL YOUTH SERVICE CORPS (NYSC)
UNITED FAITH TABERNACLE COLLEGE (U.F.T.C), JARAWAN-KOGI, PLATEAU STATE, NIGERIA
NYSC TEACHER
 Taught Mathematics to SS3 (with brilliant result in their SSCE) and JS3, and Integrated
Science to JS1
 Participated in all Call to Duty to instill quality life in students
 Leader of the NYSC Community Development Program that brought Personal Hygiene
Awareness to the Jarawan Koji Community.
TRAINING
2007 Heat Exchanger (SPDC, Port-Harcourt)
2006 Quality Awareness Training Programme (SPDC, Port-Harcourt)
6
2006 Basic Swimming Training and Certification (SPDC, Port-Harcourt)
2003 Water Safety and Survival Course (CNL, Warri)
2002 Construction Safety Course (CNL, Escravos)
2002 Safety Training Observation Course (CNL, Escravos)
2001 Basic Piping Course (NETCO, Lagos)
FAMILIAR SOFTWARE
Microsoft Project, Microsoft PowerPoint, Microsoft Word, Microsoft Excel, AutoCAD
[Refer to Appendix for details on Projects Worked on.]
7
Appendix
PROJECTS WORKED ON
A. PROJECT EXCECUTED IN FLOWLINE ENERGY SERVICES MAIN OFFICE
Carried out Project Planning and Control, Conceptual Study and FEED on:
 Amukpe – Escravos Pipeline Project (AEPP)
 NGL Export Pipeline and Metering System
 Design and Construction of Export Terminal
B. AS A NETCO STAFF SECONDED TO SCIN FEED OFFICE (SFO) LOCATED IN SPDC PORT-
HARCOURT, NIGERIA
Dept: EPG-PN-TEF
Position: Senior Mechanical/ Piping Engineer
Period: March 15th 2006 to January 4th 2008
Responsibility: - Carried out Mechanical/Piping Engineering work in FEED Project teams,
- Provided input to Front End Design for green field and brown field engineering
development projects,
- Developed and evaluated various Conceptual options for Oil, Gas and Water
evacuation for projects
Assa North-Ohaji South Development Project
 Responsible for producing the piping design philosophy
 Provided input to equipment layout
 Produced the major equipment list
 Produced specification for condensate return pumps
 Produced datasheets foroil/condensate boosterpumps,teg distribution pump, and diesel
loading pump
Belema/Ekulama Environment Upgrade
 Carried out site survey for data collection
 Ensured piping modification was done to SHELL DEPs and standards
Soku NAG Compression FEED Project (SFO Project)
 Carried out Site Survey for Data Collection
 Produced Piping Specification
 Ensured Piping Modification to SHELL DEPs and Standards
 Produced Tie-in Schedule
 Generated the To and Fro Diagram
 Participated in Constructability Workshop
 Participated in Project Design Review
 Quality check on all Piping Deliverables
 IDC on Process PFS, PEFS and UEFS
H-Block Development FEED Project – Phase one completed (SFO Project)
8
 Produced piping design philosophy
 Produced specification for pig traps, produced water, potable water, chemical injection
package, nitrogen generation package, hypochlorite package and methanol injection
package
 Produced datasheets forproduced water, potable water, chemical injection package,
nitrogen generation package, hypochlorite package and methanol injection package
 Input to equipment layout and piping
 Produced major equipment list
 Participated in layout workshops and review meetings
 Participated in constructability and material handling workshops
C. PROJECT EXCECUTED IN NETCO MAIN OFFICE AS A STAFF
Bonga SouthWest Aparo Water Injection Subsea Manifold (SPDC Project)
Position: Piping Lead
Period: November 9th, 2005 to January 31st, 2006
Responsibilities include:
 Coordination of discipline staff and activities to meet project objectives
 Engineering design and specification services
 Promoted strong team work
WORK OVERSEA
BRASS LNG FEED Phase Project,
Done in Houston, Texas with Bechtel Corporation
Period: March 28th, 2005 to November 3rd, 2005
Participated in:
 The design and development of BRASS LNG overall site plan
 Pipe-racks sizing
 COMET modelling and material take off
Developed:
 The OSBL work area index from overall site plan
 The OSBL plot plan index from overall site plan
 The OSBL equipments layouts from plot plan index
D. AS A NETCO STAFF SECONDED TO CHEVRON NIGERIA LIMITED (CNL)
Dept: Facilities Engineering & Design Office (FEDO)
Position: Deputy Lead Piping Engineer
Period: May 2nd, 2001-March 25th, 2005
Responsibilities include:
 Assisting the management and coordination of discipline projects and activities
 Provision of engineering design services
Diesel Fuel Tie-in for Topcon-Warri Generators
 Site Visit to determine and define Scope of Work
9
 Project review meetings
 Plot Plan development
 Piping Study Plan
2004/2005 Flowlines Campaign
 Field Map Flowline Routing for Sub-sea Pipelines
 Rigs and Jack-ups Approach Development
 Risers Detail Drawings
EGP-3A Tie-ins and Modification
 Data Sheet development for Pig Launcher & Receiver, Tube Turn End Closure, Double
Block and Bleed Valve
 Piping Weight Calculation (Dry & Hydro)
 Quality Assurance and Checking for G.As and Isometrics
Meji Jackets 43&B and Flowlines, Offshore, Nigeria
 Piping Man-hour (Cost) Estimate/Review
 Project Progress Meeting
 Field Map Flowline Routing for Sub-sea Pipelines
 Rig Approach Development
 Topside Hook-up Detail Engineering
 Quality Assurance and Checking for G.As, Isometrics and Pipe Support
Delta South #47 Monopod Project, Offshore, Nigeria
 Piping Man-hour (Cost) Estimate
 Piping Layout and Studies
 Project Review meetings
 Off Shore (Okan & Delta South PP/Jackets) Site Visit
 Field Map Flowline Routing for Sub-sea Pipelines
 Rig Approach Development
 Risers Detail Development
 Topside Hook-up Detail Engineering
 Quality Assurance and Checking for G.As, Isometrics and Pipe Supports
ONDEO NALCO Chemical Blending Plant, Escravos, Nigeria
 Site Visit to Escravos for Data gathering
 Plot Plan Development
 Piping Routing around Equipments and Offices
 Development of Mechanical Data Sheet
 Vendor Drawing/Data Review and Approval
 Project Review Meetings
 Quality Assurance and Checking
Escravos Flowline Campaign 2001, Escravos (ChevronTexaco Project)
10
 Flowline routing (Gaslift & Oil Production)
 Rigs and Jack-ups Approach Development
 Risers Detail Drawings
Engineering services for SPMG (now CPG) Drawing Office, Escravos (JV Project),
Nigeria
Piping Layout Design, 3D Modelling, Production of G.As and Isometrics, Pipe support and
Fabrication drawings for;
 Hook-ups Piping for Dibi RMP Project
 Water Pump Fuel Gas Line
 KTI Vessels Sand Jetty and Water Lines
 Replacement of Damaged/Ruptured Piping
 Production of G.As, Sections, Details, and Fabrication Drawings in conformity with SID
for;
 Access Walkways, Staircase, and Ladders
 Access Platforms
 Handrails detailing
 Design of BBQ Pot
 Site Surveys to Swamp Float Stations, Production Platforms, Jackets, Rigs, and Jack-ups
 Construction Supervision
PERSONAL BIO
Date of Birth: 29 May, 1967.
Place of Birth: Abeokuta, Ogun State
Citizenship: Nigerian
Marital status: Married
REFEREES
Available on request

Mais conteúdo relacionado

Mais procurados

khinmaraye resume (1)
khinmaraye resume (1)khinmaraye resume (1)
khinmaraye resume (1)khin maraye
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Amir Mohammed
 
CALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CVCALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CVCaleb Bercero
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
Owais Khan - NED cv
Owais Khan - NED cvOwais Khan - NED cv
Owais Khan - NED cvOwais Khan
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_VEERAKAMU C
 

Mais procurados (19)

Resume_Jan 2017
Resume_Jan 2017Resume_Jan 2017
Resume_Jan 2017
 
Aris_Barbero_CV
Aris_Barbero_CVAris_Barbero_CV
Aris_Barbero_CV
 
Leandro CV
Leandro CVLeandro CV
Leandro CV
 
Leslie Lopena_CV
Leslie Lopena_CVLeslie Lopena_CV
Leslie Lopena_CV
 
Resume (engineer)
Resume (engineer)Resume (engineer)
Resume (engineer)
 
khinmaraye resume (1)
khinmaraye resume (1)khinmaraye resume (1)
khinmaraye resume (1)
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
CV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukriCV of JERSON ODUCAYEN_naukri
CV of JERSON ODUCAYEN_naukri
 
Engr salman cv
Engr salman cvEngr salman cv
Engr salman cv
 
CALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CVCALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CV
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Owais Khan - NED cv
Owais Khan - NED cvOwais Khan - NED cv
Owais Khan - NED cv
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
 
Ramendu cv - for Bd
Ramendu cv - for BdRamendu cv - for Bd
Ramendu cv - for Bd
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
 
Anthony pangras latest
Anthony pangras latestAnthony pangras latest
Anthony pangras latest
 
FAHD_CV
FAHD_CVFAHD_CV
FAHD_CV
 

Destaque (14)

Rayz cv new pdf
Rayz cv new pdfRayz cv new pdf
Rayz cv new pdf
 
patrick ojapah (CV)
patrick ojapah (CV)patrick ojapah (CV)
patrick ojapah (CV)
 
Charles CV
Charles CVCharles CV
Charles CV
 
Résumé
RésuméRésumé
Résumé
 
RESUME7
RESUME7RESUME7
RESUME7
 
Otitoaleke gideon-akinola-resume
Otitoaleke gideon-akinola-resumeOtitoaleke gideon-akinola-resume
Otitoaleke gideon-akinola-resume
 
IGE IBRAHIM RESUME 2016
IGE IBRAHIM RESUME 2016IGE IBRAHIM RESUME 2016
IGE IBRAHIM RESUME 2016
 
AMMA OGAN CV
AMMA OGAN CVAMMA OGAN CV
AMMA OGAN CV
 
Dr. mamedu peter cv
Dr. mamedu peter cvDr. mamedu peter cv
Dr. mamedu peter cv
 
ALEX BOAFO CV
ALEX BOAFO CVALEX BOAFO CV
ALEX BOAFO CV
 
CV (2)
CV (2)CV (2)
CV (2)
 
Randall J. Franchuk's OceanCosmos Nigeria Limited Curriculum Vitae (CV)
Randall J. Franchuk's OceanCosmos Nigeria Limited Curriculum Vitae (CV)Randall J. Franchuk's OceanCosmos Nigeria Limited Curriculum Vitae (CV)
Randall J. Franchuk's OceanCosmos Nigeria Limited Curriculum Vitae (CV)
 
Majemite Kelvin Esisi-CV Nigeria
Majemite Kelvin Esisi-CV NigeriaMajemite Kelvin Esisi-CV Nigeria
Majemite Kelvin Esisi-CV Nigeria
 
New CV Amended
New CV Amended New CV Amended
New CV Amended
 

Semelhante a John Okusolubo Resume 2015

EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015Obinna Ezeifedi
 
Mechanical Engineer_JBYosores_RMEE_PMP_RMP_MBA.pdf
Mechanical Engineer_JBYosores_RMEE_PMP_RMP_MBA.pdfMechanical Engineer_JBYosores_RMEE_PMP_RMP_MBA.pdf
Mechanical Engineer_JBYosores_RMEE_PMP_RMP_MBA.pdfJOEL B. YOSORES
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M RicoRene Rico
 
Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1Solomon Nuhu MNSE
 
Anil Parmar - Resume - Document Controller
Anil Parmar - Resume - Document ControllerAnil Parmar - Resume - Document Controller
Anil Parmar - Resume - Document ControllerAnil Parmar
 
Vinod kumar senior structural lead engineer
Vinod kumar  senior structural lead  engineerVinod kumar  senior structural lead  engineer
Vinod kumar senior structural lead engineerVinodh Kumar
 
ALAA MOHAN ALI CV
ALAA MOHAN ALI CVALAA MOHAN ALI CV
ALAA MOHAN ALI CVAlaa Mohan
 
Moch Anis - CV rev 2 (1)
Moch  Anis - CV rev 2 (1)Moch  Anis - CV rev 2 (1)
Moch Anis - CV rev 2 (1)Mochammad Anis
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015Ricky Dasal
 
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi
 
MOHD TALHA - RESUME (1)
MOHD TALHA - RESUME (1)MOHD TALHA - RESUME (1)
MOHD TALHA - RESUME (1)Mohammad Talha
 

Semelhante a John Okusolubo Resume 2015 (20)

Resume_P Prakosa 201605
Resume_P Prakosa 201605Resume_P Prakosa 201605
Resume_P Prakosa 201605
 
CV
CVCV
CV
 
EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015EZEIFEDI OBINNA RESUME 2015
EZEIFEDI OBINNA RESUME 2015
 
Mechanical Engineer_JBYosores_RMEE_PMP_RMP_MBA.pdf
Mechanical Engineer_JBYosores_RMEE_PMP_RMP_MBA.pdfMechanical Engineer_JBYosores_RMEE_PMP_RMP_MBA.pdf
Mechanical Engineer_JBYosores_RMEE_PMP_RMP_MBA.pdf
 
Curriculum Vitae of R M Rico
Curriculum Vitae of R M RicoCurriculum Vitae of R M Rico
Curriculum Vitae of R M Rico
 
Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1
 
Anil Parmar - Resume - Document Controller
Anil Parmar - Resume - Document ControllerAnil Parmar - Resume - Document Controller
Anil Parmar - Resume - Document Controller
 
Vinod kumar senior structural lead engineer
Vinod kumar  senior structural lead  engineerVinod kumar  senior structural lead  engineer
Vinod kumar senior structural lead engineer
 
Goutam-update
Goutam-updateGoutam-update
Goutam-update
 
ALAA MOHAN ALI CV
ALAA MOHAN ALI CVALAA MOHAN ALI CV
ALAA MOHAN ALI CV
 
Faruk Ulas SULHAN CV
Faruk Ulas SULHAN CVFaruk Ulas SULHAN CV
Faruk Ulas SULHAN CV
 
Moch Anis - CV rev 2 (1)
Moch  Anis - CV rev 2 (1)Moch  Anis - CV rev 2 (1)
Moch Anis - CV rev 2 (1)
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
CeeVee-10th January 2017_update
CeeVee-10th January 2017_updateCeeVee-10th January 2017_update
CeeVee-10th January 2017_update
 
Resume_Mallanagouda Patil
Resume_Mallanagouda PatilResume_Mallanagouda Patil
Resume_Mallanagouda Patil
 
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CVJavad Taghavi - Senior Project Manager - Industrial Projects - CV
Javad Taghavi - Senior Project Manager - Industrial Projects - CV
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
MOHD TALHA - RESUME (1)
MOHD TALHA - RESUME (1)MOHD TALHA - RESUME (1)
MOHD TALHA - RESUME (1)
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
PMM_CV_Summary 20150521
PMM_CV_Summary 20150521PMM_CV_Summary 20150521
PMM_CV_Summary 20150521
 

John Okusolubo Resume 2015

  • 1. 1 RÉSUMÉ Okusolubo, John Oluwagbemiga Address: 5, Adenekan Salako Close, Off Ijaiye Road, Caterpillar Bus stop, Ogba, Lagos, Nigeria Tel: (+234) 816 310 7450, 802 331 1476 Email: okusolubojohn@yahoo.com okusolubojohn@gmail.com PROFESSIONAL PROFILE An enterprising and detailed-minded team player combining engineering, project management, leadership, writing and communications skills with 16 years’ experience particularly in Oil and Gas industry and has a passion for organizational and personal effectiveness. Known for his integrity and skills to manage project related matters. QUALIFICATIONS 2014 Action Learning MBA (Credit) Business School Netherlands 1996 B.Eng (Second Class Lower) Mechanical Engineering, University of Ilorin, Kwara State, Nigeria 1989 OND (Upper Credit) Mechanical Engineering, The Polytechnic Ibadan, Oyo State, Nigeria 1986 WASC O’Level, Methodist High School, Arigbajo Ifo, Ogun State, Nigeria MANAGEMENT COURSES 2015 FPM22 - Project Management for Engineering and Construction PetroSkills Conference Center, 25403 Katy Mills Parkway, Houston,Texas 77494 United States 2014 Technical Contract Negotiation Skills MacTay, Lekki Peninsula Phase I, Lagos 2013 PL-42 “Onshore Pipeline Facilities-Design, Construction & Operations” PetroSkill Facilities Training by John M. Campbell & Co., Denver, Colorado USA 2012 Global Pipeline Construction, Integrity & Maintenance Conference Knowledge Expansion, Dubai
  • 2. 2 2011 Project Management Training Piston & Fusion, Lagos 2010 NIS ISO 9001:2008 Auditors’ Training Freshfountain Consulting Limited, Lagos 2010 Advance Certificate Course in Leadership, Daystar Leadership Academy, Lagos State, Nigeria 2008 Basic Certificate Course in Leadership, Daystar Leadership Academy, Lagos State, Nigeria 2008 Project Management Courses Jeman Consulting, Lagos 2007 Training on Heat Exchanger Shell Petroleum Development Company, Port Harcourt 2002 Construction Safety Course Chevron Nigeria Limited, Warri 2001 Basic Piping Course National Engineering & Technical Company (Nig) Ltd, V.I., Lagos PROFESSIONAL MEMBERSHIP Member, Council for the Regulation of Engineering in Nigeria, (R.30370) Member, Nigerian Society of Engineers (NSE No: 21772) Member, Project Management Institute (PMI No: 1272803) Member, Nigerian Institution of Mechanical Engineers (NIMechE No: O00369) AREA OF EXPERTISE  Project Management  Contract Negotiation and Management  Pipeline Engineering and Construction (Onshore & Offshore)  Pipeline Maintenance and Integrity Management  Field Development Plan  Conceptual Studies (Brown and Green Fields)  FEED (Brown and Green Fields)  Detailed Engineering (Brown and Green Fields)  Team Building KEY COMPETENCIES  Ability to manage effectively the intricacies of the operational aspects of the industry through creative thinking and people management  Good project management and control skill to manage project to achieve set objectives
  • 3. 3  Have knowledge of industry codes and standards,regulation, and design criteria relevant to Onshore and Offshore SystemDesign.  Good team spirit to work in a cross discipline group and in cross cultural environment even when it demands working under pressure.  Effective leadership skill, good human and public relation, strong organisational ability and good operational safety awareness  Excellent writing and oral communication in English WORK HISTORY PAN OCEAN OIL CORPORATION, THE FF TOWERS, PLOT 13/14 LIGALI AYORINDE AVENUE, V.I. LAGOS MAR 2013 – TILL DATE PROJECT MANAGER, Responsibilities include:  Implement project execution plans for pipeline engineering, procurement and construction (EPC) activities  Project initiation, cost/budget estimation and project scheduling  Create clear and attainable project objectives and manage constraints,  Contract management and control  Monitor and report progress during all project phases,carrying out site visits as required.  Liaise and manage all project stakeholders expectation  Meet all regulatory and financial obligations (NNPC-NAPIMS, DPR, NCD) JUL 2012 – FEB 2013 PROJECT LEAD ENGINEER Responsibilities include:  Relate closely with Construction and Operations departments on all pipeline related matters  Provide engineering support to pipeline detailed design, supervise pipeline engineering activities in the field when being executed by third parties and manage engineering modifications to the pipeline system JAN 2012 – JUN 2012 SENIOR PIPELINE ENGINEER Responsibilities include:  Provide complete engineering expertise as well as technical support for pipeline facilities  Supervise the construction ofand manage the technical integrity of considerable length of pipelines  Prepare project scopes,AFEs and proposalfor all new pipeline projects  Produce maintenance and inspection plans to assure the technical integrity of pipelines within defined scope and budget.  Develop and implement best practice inspection,monitoring and emergency response systems
  • 4. 4 ONGOING PROJECT: Amukpe-Escravos Pipeline Project (AEPP). A 20”X67Km Crude Oil Pipeline construction project using the continuous Horizontal Directional Drilling (HDD) trenchless method. JAN 2008 – DEC 2011 FLOWLINE ENERGY SERVICES (FES) LTD, 3RD FLOOR LINDEV PLAZA, 16, AMODU OJIKUTU STREET, VI, LAGOS ENGINEERING/PROJECT MANAGER Responsibilities include:  Management and coordination of engineering department activities  Coordination of multi-discipline project activities that ensure safe, efficient, cost effective and timely execution  Staff management and development  Man power planning, recruitment, training and appraisal  Managing project development from beginning to end  Project resource estimation and participation  Project schedule planning and tracking  Cost estimation and budget proposal  Interface and contract management  Technical proposals and tender packages  Conceptual study, FEED, Detail engineering on onshore offshore projects  Pipeline Design  Multi-discipline document review FEB 2001 – DEC 2007 NATIONAL ENGINEERING AND TECHNICAL COMPANY LIMITED (NETCO), LAGOS, NIGERIA - AN NNPC SUBSIDIARY. 146B, LIGALI AYORINDE STREET, V.I., LAGOS SENIOR MECHANICAL PIPING ENGINEER Responsibilities include:  Supervision of discipline activities and provision of leadership to discipline engineers  Provision of FEED service  Oil and Gas Production Platform and Wellhead design for both brown (retrofit) field and green field development.  Engineering specifications and datasheets.  Project scoping and definition  Equipment listing.  Quality assurance and checking.  Constructability reviews.  Studies of piping routings around equipment.
  • 5. 5  Plot plan and Equipment layout development.  Piping procedure.  Platforms/Jackets’ upgrade and topside hook up detail engineering.  Flowline/pipeline campaign  Rig approach and riser detail FEB 1999 – JAN 2001 COMPUTER DESIGNS, SYSTEMS, SERVICES (CDSS) NIG. LTD, PLOT 188, SHITTU ANIMASHAUN STREET, GBAGADA PHASE II, LAGOS, NIGERIA MECHANICAL APPLICATION PRODUCTS MANAGER Responsibilities include:  Coordination of department works and activities  Design, modelling and drafting services with Rebis AutoPLANT  Design, modelling and drafting services with AutoCAD and Mechanical desktop  Personnel training in AutoCAD and Mechanical desktop  Promotion and sales of Mechanical Application Products JAN 1998 – JAN 1999 BHASE ENGINEERING COMPANY LIMITED, 12, AROMIRE STREET, IKEJA, LAGOS, NIGERIA HEAD OF MECHANICAL DEPARTMENT Responsibilities include:  Team coordination and workshop maintenance.  Fabrication of mechanical parts and machining of engineering components.  Sales and services of diesel generators JUL 1996 – JUN 1997 NATIONAL YOUTH SERVICE CORPS (NYSC) UNITED FAITH TABERNACLE COLLEGE (U.F.T.C), JARAWAN-KOGI, PLATEAU STATE, NIGERIA NYSC TEACHER  Taught Mathematics to SS3 (with brilliant result in their SSCE) and JS3, and Integrated Science to JS1  Participated in all Call to Duty to instill quality life in students  Leader of the NYSC Community Development Program that brought Personal Hygiene Awareness to the Jarawan Koji Community. TRAINING 2007 Heat Exchanger (SPDC, Port-Harcourt) 2006 Quality Awareness Training Programme (SPDC, Port-Harcourt)
  • 6. 6 2006 Basic Swimming Training and Certification (SPDC, Port-Harcourt) 2003 Water Safety and Survival Course (CNL, Warri) 2002 Construction Safety Course (CNL, Escravos) 2002 Safety Training Observation Course (CNL, Escravos) 2001 Basic Piping Course (NETCO, Lagos) FAMILIAR SOFTWARE Microsoft Project, Microsoft PowerPoint, Microsoft Word, Microsoft Excel, AutoCAD [Refer to Appendix for details on Projects Worked on.]
  • 7. 7 Appendix PROJECTS WORKED ON A. PROJECT EXCECUTED IN FLOWLINE ENERGY SERVICES MAIN OFFICE Carried out Project Planning and Control, Conceptual Study and FEED on:  Amukpe – Escravos Pipeline Project (AEPP)  NGL Export Pipeline and Metering System  Design and Construction of Export Terminal B. AS A NETCO STAFF SECONDED TO SCIN FEED OFFICE (SFO) LOCATED IN SPDC PORT- HARCOURT, NIGERIA Dept: EPG-PN-TEF Position: Senior Mechanical/ Piping Engineer Period: March 15th 2006 to January 4th 2008 Responsibility: - Carried out Mechanical/Piping Engineering work in FEED Project teams, - Provided input to Front End Design for green field and brown field engineering development projects, - Developed and evaluated various Conceptual options for Oil, Gas and Water evacuation for projects Assa North-Ohaji South Development Project  Responsible for producing the piping design philosophy  Provided input to equipment layout  Produced the major equipment list  Produced specification for condensate return pumps  Produced datasheets foroil/condensate boosterpumps,teg distribution pump, and diesel loading pump Belema/Ekulama Environment Upgrade  Carried out site survey for data collection  Ensured piping modification was done to SHELL DEPs and standards Soku NAG Compression FEED Project (SFO Project)  Carried out Site Survey for Data Collection  Produced Piping Specification  Ensured Piping Modification to SHELL DEPs and Standards  Produced Tie-in Schedule  Generated the To and Fro Diagram  Participated in Constructability Workshop  Participated in Project Design Review  Quality check on all Piping Deliverables  IDC on Process PFS, PEFS and UEFS H-Block Development FEED Project – Phase one completed (SFO Project)
  • 8. 8  Produced piping design philosophy  Produced specification for pig traps, produced water, potable water, chemical injection package, nitrogen generation package, hypochlorite package and methanol injection package  Produced datasheets forproduced water, potable water, chemical injection package, nitrogen generation package, hypochlorite package and methanol injection package  Input to equipment layout and piping  Produced major equipment list  Participated in layout workshops and review meetings  Participated in constructability and material handling workshops C. PROJECT EXCECUTED IN NETCO MAIN OFFICE AS A STAFF Bonga SouthWest Aparo Water Injection Subsea Manifold (SPDC Project) Position: Piping Lead Period: November 9th, 2005 to January 31st, 2006 Responsibilities include:  Coordination of discipline staff and activities to meet project objectives  Engineering design and specification services  Promoted strong team work WORK OVERSEA BRASS LNG FEED Phase Project, Done in Houston, Texas with Bechtel Corporation Period: March 28th, 2005 to November 3rd, 2005 Participated in:  The design and development of BRASS LNG overall site plan  Pipe-racks sizing  COMET modelling and material take off Developed:  The OSBL work area index from overall site plan  The OSBL plot plan index from overall site plan  The OSBL equipments layouts from plot plan index D. AS A NETCO STAFF SECONDED TO CHEVRON NIGERIA LIMITED (CNL) Dept: Facilities Engineering & Design Office (FEDO) Position: Deputy Lead Piping Engineer Period: May 2nd, 2001-March 25th, 2005 Responsibilities include:  Assisting the management and coordination of discipline projects and activities  Provision of engineering design services Diesel Fuel Tie-in for Topcon-Warri Generators  Site Visit to determine and define Scope of Work
  • 9. 9  Project review meetings  Plot Plan development  Piping Study Plan 2004/2005 Flowlines Campaign  Field Map Flowline Routing for Sub-sea Pipelines  Rigs and Jack-ups Approach Development  Risers Detail Drawings EGP-3A Tie-ins and Modification  Data Sheet development for Pig Launcher & Receiver, Tube Turn End Closure, Double Block and Bleed Valve  Piping Weight Calculation (Dry & Hydro)  Quality Assurance and Checking for G.As and Isometrics Meji Jackets 43&B and Flowlines, Offshore, Nigeria  Piping Man-hour (Cost) Estimate/Review  Project Progress Meeting  Field Map Flowline Routing for Sub-sea Pipelines  Rig Approach Development  Topside Hook-up Detail Engineering  Quality Assurance and Checking for G.As, Isometrics and Pipe Support Delta South #47 Monopod Project, Offshore, Nigeria  Piping Man-hour (Cost) Estimate  Piping Layout and Studies  Project Review meetings  Off Shore (Okan & Delta South PP/Jackets) Site Visit  Field Map Flowline Routing for Sub-sea Pipelines  Rig Approach Development  Risers Detail Development  Topside Hook-up Detail Engineering  Quality Assurance and Checking for G.As, Isometrics and Pipe Supports ONDEO NALCO Chemical Blending Plant, Escravos, Nigeria  Site Visit to Escravos for Data gathering  Plot Plan Development  Piping Routing around Equipments and Offices  Development of Mechanical Data Sheet  Vendor Drawing/Data Review and Approval  Project Review Meetings  Quality Assurance and Checking Escravos Flowline Campaign 2001, Escravos (ChevronTexaco Project)
  • 10. 10  Flowline routing (Gaslift & Oil Production)  Rigs and Jack-ups Approach Development  Risers Detail Drawings Engineering services for SPMG (now CPG) Drawing Office, Escravos (JV Project), Nigeria Piping Layout Design, 3D Modelling, Production of G.As and Isometrics, Pipe support and Fabrication drawings for;  Hook-ups Piping for Dibi RMP Project  Water Pump Fuel Gas Line  KTI Vessels Sand Jetty and Water Lines  Replacement of Damaged/Ruptured Piping  Production of G.As, Sections, Details, and Fabrication Drawings in conformity with SID for;  Access Walkways, Staircase, and Ladders  Access Platforms  Handrails detailing  Design of BBQ Pot  Site Surveys to Swamp Float Stations, Production Platforms, Jackets, Rigs, and Jack-ups  Construction Supervision PERSONAL BIO Date of Birth: 29 May, 1967. Place of Birth: Abeokuta, Ogun State Citizenship: Nigerian Marital status: Married REFEREES Available on request