SlideShare uma empresa Scribd logo
1 de 16
Baixar para ler offline
gasworld – Middle East Conference 11th
December 2007
The uses & applications for industrial gases in the offshore oil & gas Industry
gasworld – Middle East Conference
USES & APPLICATIONS OF INDUSTRIAL GASES IN THE
OFFSHORE OIL & GAS INDUSTRY
John Grover
11th December 2006
gasworld – Middle East Conference 11th
December 2007
The uses & applications for industrial gases in the offshore oil & gas Industry
Objective
Industrial gases, and in particular liquid
nitrogen, are used for a variety of
applications in the offshore oil & gas
industry. This presentation will provide
an overview of this market, discuss the
potential growth areas, and review the
support services necessary to support
offshore work.
We shall focus on the equipment packaging, certification codes and
standards, and transportation issues.
A particular focus will be on the use of nitrogen / helium to leak
testing offshore facilities prior to commissioning - this service has
become the industry standard for oil & gas facilities and can
consume large quantities of liquid nitrogen and helium gas.
gasworld – Middle East Conference 11th
December 2007
The uses & applications for industrial gases in the offshore oil & gas Industry
Contents
• What is offshore?
• Downhole applications for industrial gases
• Topside applications for industrial gases
• Nitrogen / helium leak testing
• Offshore equipment overview
› Transport of cryogenic liquids & gases
› Vaporisation & pumping of cryogenic LN2
• Typical gas consumption
• Membrane vs. LN2
• Growth opportunities
gasworld – Middle East Conference 11th
December 2007
The uses & applications for industrial gases in the offshore oil & gas Industry
What is Offshore?
Initially N2 used
on drilling & well
completion on
jack-up or semi-
sub drilling rigs
Vessel based
operations to
support either
pipeline
commissioning or
well stimulation
Main use of industrial gases is
on permanent offshore
platforms.
As fields being developed in
ever deeper waters the
complexity and cost increases
High oil prices make such
projects economic
gasworld – Middle East Conference 11th
December 2007
The uses & applications for industrial gases in the offshore oil & gas Industry
Offshore Middle East
UAE
• Adma Opco, Zadco, Total
• DP, Crescent, Atlantis
• New Umm Shaif & sour gas
KSA
• Saudi Aramco
• New “Maintain Potential”
QATAR
• Oxy, Maersk, QP – oil & gas
• RasGas / Qatargas feeding LNG
• Dolphin feeding UAE / Oman
• New “RG II, QG 3&4, Pearl GTL
IRAN
• South Pars
OMAN
• Some deepwater potential
CASPIAN & INDIA
• Many projects supported from UAE
gasworld – Middle East Conference 11th
December 2007
The uses & applications for industrial gases in the offshore oil & gas Industry
Downhole Applications
Nitrogen gas can be injected in the well via
coiled tubing. Normally the nitrogen
equipment is supplied as part of the coil
tubing package for:
• Gas lifting (reduce hydrostatic head)
• Sand-fill cleanout (after fracturing)
Nitrogen can also be pumped directly in to
the well via the wellhead to displace the fluid
column left in the well after completion via the
downhole sliding sleeve. Other uses include:
• Foaming cement
• Nitrifying acid
• Packer equalisation
Customers for the sector will be major service co’s (BJ, Halliburton,
Schlumberger and local / regional service co’s (NOWMCO, MB, Sapesco)
gasworld – Middle East Conference 11th
December 2007
The uses & applications for industrial gases in the offshore oil & gas Industry
Topside Applications
There are many uses for nitrogen in oil & gas platforms:
• Purging systems out of and in to service
• Drying moisture sensitive systems
• Pressure testing valves for seat leakage
• Deploying pipeline smart plugs
• Propelling pipeline pigs
• Blanketing systems for preservation
• Leak testing flanged connections
• Starting compressors
Whilst these services are used daily in the North Sea, there is a
growing acceptance of such techniques in the Middle East
Customers for the sector will be major service co’s (BJ, Halliburton,
Weatherford and some local service companies.
gasworld – Middle East Conference 11th
December 2007
The uses & applications for industrial gases in the offshore oil & gas Industry
Nitrogen / Helium Leak Testing
Using both LN2 & gaseous
helium this is the largest
market for offshore industrial
gases
Service is also provided at
onshore construction yards in
Abu Dhabi and Dubai
It allows all hydrocarbon systems to be leak tested at their
working pressures and all leaks quantified in standard cubic feet
per year (scf/yr) using a mass spectrometer tuned to helium
gasworld – Middle East Conference 11th
December 2007
The uses & applications for industrial gases in the offshore oil & gas Industry
Nitrogen / Helium Leak Testing
gasworld – Middle East Conference 11th
December 2007
The uses & applications for industrial gases in the offshore oil & gas Industry
Offshore Cryogenic Tanks
LENGTH 16ft
WIDTH 8ft
HEIGHT 8ft
WEIGHT 12,000 KG full, 6,000 KG empty
MAWP Up to 17 barg
CAPACITY 8,000 litres LN2 = 5,250 Nm3
GN2
Note – at 12,000 KG
full some platforms
may be unable to lift
full tanks
LENGTH 10ft
WIDTH 8ft
HEIGHT 8ft
WEIGHT 12,000 KG full
MAWP Up to 17 barg
CAPACITY 7,220 litres LN2 = 5,000 Nm3
GN2
Note – these 10’ tanks
can be linked to ship as
20’ container
Offshore LN2 tanks are lifted using 5 leg slings. They are governed by
lifting regulations as well as ADR and IMO codes
gasworld – Middle East Conference 11th
December 2007
The uses & applications for industrial gases in the offshore oil & gas Industry
Offshore Cryogenic Tanks
AMBIENT HEAT
CHECK VALVE
7
RETURN VALVE
9
OVERFILL VALVE
SAFETY VALVES @ 10 BAR
SAFETY VALVES
4
BACK FILL LINE
PRESSURE COIL
TANK
PRESSURE
2
TANK
LEVEL
1
VENT VALVE
BURST
DISC
VACUUM
POINT
11
6
12
15
13
3 +14
16
17
8
10
5
gasworld – Middle East Conference 11th
December 2007
The uses & applications for industrial gases in the offshore oil & gas Industry
Offshore Nitrogen Pumps / Vaporisers
NITROGEN PUMP NP 90
LENGTH 12ft
WIDTH 8ft
HEIGHT 8ft
WEIGHT 7,500 KG
CAPACITY 90,000 scfh / up to 10,000 psig
Note – at 7,500 KG
unit suitable for older
platforms with reduced
crane capacity
NITROGEN PUMP NP 180
LENGTH 16ft
WIDTH 8ft
HEIGHT 8ft
WEIGHT 12,000 KG
CAPACITY 180,000 scfh / up to 15,000 psig
Lift frames governed by DNV 2.71 code. Engines for zone 2 operation
gasworld – Middle East Conference 11th
December 2007
The uses & applications for industrial gases in the offshore oil & gas Industry
Offshore Nitrogen Pumps / Vaporisers
.
HIGH PRESSURE
CRYOGENIC PUMP
HIGH PRESSURE
VAPORISER
TANK
VAPORISER
( AMBIENT HEAT
)GN2 DISCHARGE
BOOST PUMP
ENGINE
RADIATOR
HEAT NITROGEN COOLANT
VAPORIZER
POT
PUMP
HYDRAULIC
FLOW
PUMP
HYDRAULIC
FLOW
SYSTEM
HYDRAULIC
FLOW
COOLANT
CENTRIFUGAL
DIESEL
ENGINE
ENGINE OIL
LEVEL
COOLANT
LEVEL
HYDRAULIC OIL LEVEL
DANGER
7
1
5
0
0
7
1
5
0
0
NO STEP
LIQUID
NITROGEN
OPERNATIONAL OVERVIEW
• LN2 circulated back to tank via boost pump
• Once circuit cooled LN2 pumped via triplex
• All waste heat sources used from diesel engine
• Heat transfer medium is engine coolant
• Counter coil heat exchanger used to vaporise LN2
• LN2 to GN2 expansion = 696 times
• Total control on pressure and gas temp
gasworld – Middle East Conference 11th
December 2007
The uses & applications for industrial gases in the offshore oil & gas Industry
Typical Gas Usage
OPERATION
LN2 USAGE
(USG)
HELUM
USAGE (M3)
Nitrogen well displacement 4,000 0
Nitrgoen foamed acid treatment 6,000 0
Nitrogen / CT gas lift 8,000 0
Wellhead platform purge 4,000 0
Compression platform purge 10,000 0
Central process platform purge 16,000 0
Wellhead platform N2/He leak test 6,000 200
Compression platform N2/He leak test 20,000 600
Central process platform N2/He leak test 30000 900
Position pipeline isolation plug 8000 0
Provide N2/He for compressor start up / tests 2000 4000
Purge & pack of new infield pipeline 12000 0
Purge & pack of new export tunkline 50000 0
Points to consider
• Nearest LN2 supply location, tanker fleet and storage capacity
• Boat availability & jetty LN2 storage
• Platform space, deck loading, crane capacity / availability
gasworld – Middle East Conference 11th
December 2007
The uses & applications for industrial gases in the offshore oil & gas Industry
Membrane vs. LN2
Positive
• No LN2 supplies = reduced logistics
• Typically lower N2 supply cost
• Great for remote areas with limited LN2 supply
Negative
• Large equipment footprint, particularly for high flow
• 95% purity not suitable for all applications
• High capital cost (approx. 2 x LN2 for 90,000 scfh spread)
• Feed air not available in zone 2 rating
MEMBRANE
Positive
• Wide availability of equipment – smaller overall footprint
• Equipment built for DNV 2.71, zone 2, and ATEX
• Very flexible in terms of flow, pressure and gas temp
• High purity nitrogen suitable for all applications
Negative
• LN2 cost and supply issues
• Greater number of lifts c/w cryogenic spill risks
• Challenge in areas with poor LN2 supply
• May require storage tank farm to support
LN2
gasworld – Middle East Conference 11th
December 2007
The uses & applications for industrial gases in the offshore oil & gas Industry
Growth Opportunities
1. Gas developments require far more offshore nitrogen services than
oil developments – this means growth in Qatar, UAE, India, Iran, Egypt
and the Caspian
2. LNG developments offer best growth opportunity as all feature
significant infrastructure plus export pipelines – for Middle East the
focus is Qatar and Egypt (plus Yemen onshore)
3. Dewatering deepwater pipelines after hydrotest can use up to 50,000
USG on LN2 per line – developments underway in India with future
opportunities in Azerbaijan
4. Increased acceptance of “North Sea” techniques by National Oil
Companies – there has been a strong increase in N2/He leak testing and
N2 purging in Qatar, UAE and Azerbaijan, with some interest now in Saudi
Arabia and Kuwait
5. Increased LN2 production capacity in developing areas – in Yemen,
the Caspian, and particularly Kazakhstan there is a shortage of LN2 which
hampers the growth of the associated service applications
END

Mais conteúdo relacionado

Mais procurados

Technical Prospects of Floating LNG
Technical Prospects of Floating LNGTechnical Prospects of Floating LNG
Technical Prospects of Floating LNGRonak Sani
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2syed abdul wahab
 
Hisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsHisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsSarah El Akkad
 
2013版中国lng接收站项目名单(英文)
2013版中国lng接收站项目名单(英文)2013版中国lng接收站项目名单(英文)
2013版中国lng接收站项目名单(英文)arapublication
 
Lng regasification asit
Lng regasification asitLng regasification asit
Lng regasification asitAsit Meher
 
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...John Downs
 
Economic Model In Exploiting Stranded Natural Gas In Niger Delta Offshore Fields
Economic Model In Exploiting Stranded Natural Gas In Niger Delta Offshore FieldsEconomic Model In Exploiting Stranded Natural Gas In Niger Delta Offshore Fields
Economic Model In Exploiting Stranded Natural Gas In Niger Delta Offshore FieldsIJERD Editor
 
2015版中国lng卫星站项目名录
2015版中国lng卫星站项目名录2015版中国lng卫星站项目名录
2015版中国lng卫星站项目名录arapublication
 
Assignment 1 Technical and economic review of four possible methods of develo...
Assignment 1 Technical and economic review of four possible methods of develo...Assignment 1 Technical and economic review of four possible methods of develo...
Assignment 1 Technical and economic review of four possible methods of develo...Nikolaos Felessakis
 
R-22 Phase Out in Indonesia
R-22 Phase Out in IndonesiaR-22 Phase Out in Indonesia
R-22 Phase Out in IndonesiaMuhamad Rizky
 
Mpc implementation for cdu (2002 nprc gcc)
Mpc implementation for cdu (2002 nprc gcc)Mpc implementation for cdu (2002 nprc gcc)
Mpc implementation for cdu (2002 nprc gcc)Yang Lee
 
Offshore production technology summit 2014
Offshore production technology summit 2014Offshore production technology summit 2014
Offshore production technology summit 2014BRONSWERK
 
Horizon 2020
Horizon 2020Horizon 2020
Horizon 2020Pomcert
 
Velocys PTQ_modular_design_of_GTL_130101
Velocys PTQ_modular_design_of_GTL_130101Velocys PTQ_modular_design_of_GTL_130101
Velocys PTQ_modular_design_of_GTL_130101John Glenning
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24Jean-Francois Saint-Marcoux
 
2017.9 directory of china's lng satellite stations
2017.9 directory of china's lng satellite stations2017.9 directory of china's lng satellite stations
2017.9 directory of china's lng satellite stationsarapublication
 
Global Gravity - TubeLock brochure
Global Gravity - TubeLock brochureGlobal Gravity - TubeLock brochure
Global Gravity - TubeLock brochureGlobal Gravity
 
2013版中国lng卫星站项目名单(英文)
2013版中国lng卫星站项目名单(英文)2013版中国lng卫星站项目名单(英文)
2013版中国lng卫星站项目名单(英文)arapublication
 

Mais procurados (20)

Technical Prospects of Floating LNG
Technical Prospects of Floating LNGTechnical Prospects of Floating LNG
Technical Prospects of Floating LNG
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
 
Hisham hajaj, stanley consultants
Hisham hajaj, stanley consultantsHisham hajaj, stanley consultants
Hisham hajaj, stanley consultants
 
2013版中国lng接收站项目名单(英文)
2013版中国lng接收站项目名单(英文)2013版中国lng接收站项目名单(英文)
2013版中国lng接收站项目名单(英文)
 
Lng regasification asit
Lng regasification asitLng regasification asit
Lng regasification asit
 
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
 
Economic Model In Exploiting Stranded Natural Gas In Niger Delta Offshore Fields
Economic Model In Exploiting Stranded Natural Gas In Niger Delta Offshore FieldsEconomic Model In Exploiting Stranded Natural Gas In Niger Delta Offshore Fields
Economic Model In Exploiting Stranded Natural Gas In Niger Delta Offshore Fields
 
2015版中国lng卫星站项目名录
2015版中国lng卫星站项目名录2015版中国lng卫星站项目名录
2015版中国lng卫星站项目名录
 
Assignment 1 Technical and economic review of four possible methods of develo...
Assignment 1 Technical and economic review of four possible methods of develo...Assignment 1 Technical and economic review of four possible methods of develo...
Assignment 1 Technical and economic review of four possible methods of develo...
 
R-22 Phase Out in Indonesia
R-22 Phase Out in IndonesiaR-22 Phase Out in Indonesia
R-22 Phase Out in Indonesia
 
QATAR GAS
QATAR GASQATAR GAS
QATAR GAS
 
Mpc implementation for cdu (2002 nprc gcc)
Mpc implementation for cdu (2002 nprc gcc)Mpc implementation for cdu (2002 nprc gcc)
Mpc implementation for cdu (2002 nprc gcc)
 
Offshore production technology summit 2014
Offshore production technology summit 2014Offshore production technology summit 2014
Offshore production technology summit 2014
 
Horizon 2020
Horizon 2020Horizon 2020
Horizon 2020
 
Velocys PTQ_modular_design_of_GTL_130101
Velocys PTQ_modular_design_of_GTL_130101Velocys PTQ_modular_design_of_GTL_130101
Velocys PTQ_modular_design_of_GTL_130101
 
PETROBRAS LNG PROJECT
PETROBRAS LNG PROJECTPETROBRAS LNG PROJECT
PETROBRAS LNG PROJECT
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
 
2017.9 directory of china's lng satellite stations
2017.9 directory of china's lng satellite stations2017.9 directory of china's lng satellite stations
2017.9 directory of china's lng satellite stations
 
Global Gravity - TubeLock brochure
Global Gravity - TubeLock brochureGlobal Gravity - TubeLock brochure
Global Gravity - TubeLock brochure
 
2013版中国lng卫星站项目名单(英文)
2013版中国lng卫星站项目名单(英文)2013版中国lng卫星站项目名单(英文)
2013版中国lng卫星站项目名单(英文)
 

Destaque

PII Paper for PetroMin Gas Pipeline Conference
PII Paper for PetroMin Gas Pipeline ConferencePII Paper for PetroMin Gas Pipeline Conference
PII Paper for PetroMin Gas Pipeline ConferenceJohn Grover
 
Appendix i part a sea_final_dec2010
Appendix i part a sea_final_dec2010Appendix i part a sea_final_dec2010
Appendix i part a sea_final_dec2010Severn Estuary
 
OSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact finalOSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact finalJohn Grover
 
Appendix g preferred management approach testing final_dec2010
Appendix g preferred management approach testing final_dec2010Appendix g preferred management approach testing final_dec2010
Appendix g preferred management approach testing final_dec2010Severn Estuary
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-finalJohn Grover
 
Smp2 part b policy statements tidenham only_final
Smp2 part b policy statements tidenham only_finalSmp2 part b policy statements tidenham only_final
Smp2 part b policy statements tidenham only_finalSevern Estuary
 
Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010Severn Estuary
 
Smp2 part b policy statements kingston seymour only_final
Smp2 part b policy statements kingston seymour only_finalSmp2 part b policy statements kingston seymour only_final
Smp2 part b policy statements kingston seymour only_finalSevern Estuary
 
Smp2 part c action plan final
Smp2 part c action plan finalSmp2 part c action plan final
Smp2 part c action plan finalSevern Estuary
 
Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010Severn Estuary
 
Appendix i part b _hra_final_dec2010
Appendix i part b _hra_final_dec2010Appendix i part b _hra_final_dec2010
Appendix i part b _hra_final_dec2010Severn Estuary
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15John Grover
 
Appendix d theme review final_dec2010a
Appendix d theme review final_dec2010aAppendix d theme review final_dec2010a
Appendix d theme review final_dec2010aSevern Estuary
 
Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010Severn Estuary
 
Appendix b stakeholder engagement and consultation final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010Appendix b stakeholder engagement and consultation final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010Severn Estuary
 
Smp2 part b policy statements bristol only_final
Smp2 part b policy statements bristol only_finalSmp2 part b policy statements bristol only_final
Smp2 part b policy statements bristol only_finalSevern Estuary
 
Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010Severn Estuary
 
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...John Grover
 

Destaque (20)

PII Paper for PetroMin Gas Pipeline Conference
PII Paper for PetroMin Gas Pipeline ConferencePII Paper for PetroMin Gas Pipeline Conference
PII Paper for PetroMin Gas Pipeline Conference
 
Appendix i part a sea_final_dec2010
Appendix i part a sea_final_dec2010Appendix i part a sea_final_dec2010
Appendix i part a sea_final_dec2010
 
OSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact finalOSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact final
 
Appendix g preferred management approach testing final_dec2010
Appendix g preferred management approach testing final_dec2010Appendix g preferred management approach testing final_dec2010
Appendix g preferred management approach testing final_dec2010
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-final
 
Tasnia
TasniaTasnia
Tasnia
 
Smp2 part b policy statements tidenham only_final
Smp2 part b policy statements tidenham only_finalSmp2 part b policy statements tidenham only_final
Smp2 part b policy statements tidenham only_final
 
Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010
 
Smp2 part b policy statements kingston seymour only_final
Smp2 part b policy statements kingston seymour only_finalSmp2 part b policy statements kingston seymour only_final
Smp2 part b policy statements kingston seymour only_final
 
Smp2 part c action plan final
Smp2 part c action plan finalSmp2 part c action plan final
Smp2 part c action plan final
 
Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010
 
Appendix i part b _hra_final_dec2010
Appendix i part b _hra_final_dec2010Appendix i part b _hra_final_dec2010
Appendix i part b _hra_final_dec2010
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15
 
Appendix d theme review final_dec2010a
Appendix d theme review final_dec2010aAppendix d theme review final_dec2010a
Appendix d theme review final_dec2010a
 
Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010
 
Appendix b stakeholder engagement and consultation final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010Appendix b stakeholder engagement and consultation final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010
 
PII_IQPC_May_04
PII_IQPC_May_04PII_IQPC_May_04
PII_IQPC_May_04
 
Smp2 part b policy statements bristol only_final
Smp2 part b policy statements bristol only_finalSmp2 part b policy statements bristol only_final
Smp2 part b policy statements bristol only_final
 
Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010
 
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
 

Semelhante a Offshore Ind Gases J Grover 11 Dec 07

Wärtsilä offshore oil and gas business
Wärtsilä offshore oil and gas businessWärtsilä offshore oil and gas business
Wärtsilä offshore oil and gas businessBusiness Finland
 
SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...
SPE 165151  The Long-Term Production Performance of Deep HPHT Gas Condensate ...SPE 165151  The Long-Term Production Performance of Deep HPHT Gas Condensate ...
SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...jdowns
 
H2deep conference v3
H2deep conference v3H2deep conference v3
H2deep conference v3Londonren
 
Global Trend & Perspective on LNG - Lng World Summit Doha 2011
Global Trend & Perspective on LNG - Lng World Summit Doha 2011Global Trend & Perspective on LNG - Lng World Summit Doha 2011
Global Trend & Perspective on LNG - Lng World Summit Doha 2011Mukesh Kumar Gupta
 
Desulphur - A new Desulphurisation Technique
Desulphur - A new Desulphurisation TechniqueDesulphur - A new Desulphurisation Technique
Desulphur - A new Desulphurisation TechniqueTecnoVeritas
 
Bob Alford - Perspectives on CO2-EOR
Bob Alford - Perspectives on CO2-EORBob Alford - Perspectives on CO2-EOR
Bob Alford - Perspectives on CO2-EORGlobal CCS Institute
 
VERDIS Presentation - APR 2015 - CUSTOMER
VERDIS Presentation - APR 2015 - CUSTOMERVERDIS Presentation - APR 2015 - CUSTOMER
VERDIS Presentation - APR 2015 - CUSTOMERJorge Gomez
 
SPE 145562 - Life Without Barite: Ten Years of Drilling Deep HPHT Gas Wells ...
SPE 145562 -  Life Without Barite: Ten Years of Drilling Deep HPHT Gas Wells ...SPE 145562 -  Life Without Barite: Ten Years of Drilling Deep HPHT Gas Wells ...
SPE 145562 - Life Without Barite: Ten Years of Drilling Deep HPHT Gas Wells ...John Downs
 
Inoxtech Presentation Marbella 11 Nov 08
Inoxtech Presentation Marbella 11 Nov 08Inoxtech Presentation Marbella 11 Nov 08
Inoxtech Presentation Marbella 11 Nov 08Mattia Agnoletto
 
cryogenic-nitrogen injection
cryogenic-nitrogen injectioncryogenic-nitrogen injection
cryogenic-nitrogen injectionabdullahusman81
 
Amal modular yard rev03 20150921 -pdf
Amal modular yard rev03 20150921 -pdfAmal modular yard rev03 20150921 -pdf
Amal modular yard rev03 20150921 -pdfTiago Alvarez
 
Group Presentation Linkedin
Group Presentation LinkedinGroup Presentation Linkedin
Group Presentation Linkedinjpjedi
 
Unlock Your Reservoir Presentation
Unlock Your Reservoir PresentationUnlock Your Reservoir Presentation
Unlock Your Reservoir Presentationtimothyrsmart
 

Semelhante a Offshore Ind Gases J Grover 11 Dec 07 (20)

ACARP wall -flow DFP project - Coplin
ACARP wall -flow DFP project - Coplin ACARP wall -flow DFP project - Coplin
ACARP wall -flow DFP project - Coplin
 
Wärtsilä offshore oil and gas business
Wärtsilä offshore oil and gas businessWärtsilä offshore oil and gas business
Wärtsilä offshore oil and gas business
 
SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...
SPE 165151  The Long-Term Production Performance of Deep HPHT Gas Condensate ...SPE 165151  The Long-Term Production Performance of Deep HPHT Gas Condensate ...
SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...
 
H2deep conference v3
H2deep conference v3H2deep conference v3
H2deep conference v3
 
saudi_arabia_baixa
saudi_arabia_baixasaudi_arabia_baixa
saudi_arabia_baixa
 
Global Trend & Perspective on LNG - Lng World Summit Doha 2011
Global Trend & Perspective on LNG - Lng World Summit Doha 2011Global Trend & Perspective on LNG - Lng World Summit Doha 2011
Global Trend & Perspective on LNG - Lng World Summit Doha 2011
 
Desulphur - A new Desulphurisation Technique
Desulphur - A new Desulphurisation TechniqueDesulphur - A new Desulphurisation Technique
Desulphur - A new Desulphurisation Technique
 
Egypt Gas Map.pdf
Egypt Gas Map.pdfEgypt Gas Map.pdf
Egypt Gas Map.pdf
 
RINA_Paper
RINA_PaperRINA_Paper
RINA_Paper
 
Bob Alford - Perspectives on CO2-EOR
Bob Alford - Perspectives on CO2-EORBob Alford - Perspectives on CO2-EOR
Bob Alford - Perspectives on CO2-EOR
 
LNG as fuel innovation 220618
LNG as fuel innovation 220618LNG as fuel innovation 220618
LNG as fuel innovation 220618
 
VERDIS Presentation - APR 2015 - CUSTOMER
VERDIS Presentation - APR 2015 - CUSTOMERVERDIS Presentation - APR 2015 - CUSTOMER
VERDIS Presentation - APR 2015 - CUSTOMER
 
SPE 145562 - Life Without Barite: Ten Years of Drilling Deep HPHT Gas Wells ...
SPE 145562 -  Life Without Barite: Ten Years of Drilling Deep HPHT Gas Wells ...SPE 145562 -  Life Without Barite: Ten Years of Drilling Deep HPHT Gas Wells ...
SPE 145562 - Life Without Barite: Ten Years of Drilling Deep HPHT Gas Wells ...
 
Oman sndc eng
Oman sndc engOman sndc eng
Oman sndc eng
 
Inoxtech Presentation Marbella 11 Nov 08
Inoxtech Presentation Marbella 11 Nov 08Inoxtech Presentation Marbella 11 Nov 08
Inoxtech Presentation Marbella 11 Nov 08
 
cryogenic-nitrogen injection
cryogenic-nitrogen injectioncryogenic-nitrogen injection
cryogenic-nitrogen injection
 
Amal modular yard rev03 20150921 -pdf
Amal modular yard rev03 20150921 -pdfAmal modular yard rev03 20150921 -pdf
Amal modular yard rev03 20150921 -pdf
 
Group Presentation Linkedin
Group Presentation LinkedinGroup Presentation Linkedin
Group Presentation Linkedin
 
3S technology
3S technology3S technology
3S technology
 
Unlock Your Reservoir Presentation
Unlock Your Reservoir PresentationUnlock Your Reservoir Presentation
Unlock Your Reservoir Presentation
 

Mais de John Grover

OSEA J Grover 7 Dec 06
OSEA J Grover 7 Dec 06OSEA J Grover 7 Dec 06
OSEA J Grover 7 Dec 06John Grover
 
26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draftJohn Grover
 
50-Marco Casirati-Nord Stream Pre-Commissioning
50-Marco Casirati-Nord Stream Pre-Commissioning50-Marco Casirati-Nord Stream Pre-Commissioning
50-Marco Casirati-Nord Stream Pre-CommissioningJohn Grover
 
Paper 43 - OPT 2015_BHI 9_2_15
Paper 43 - OPT 2015_BHI 9_2_15Paper 43 - OPT 2015_BHI 9_2_15
Paper 43 - OPT 2015_BHI 9_2_15John Grover
 
BHI NSP Final 14_6_12
BHI NSP Final 14_6_12BHI NSP Final 14_6_12
BHI NSP Final 14_6_12John Grover
 
20130411110129735 (2)
20130411110129735 (2)20130411110129735 (2)
20130411110129735 (2)John Grover
 

Mais de John Grover (7)

OSEA J Grover 7 Dec 06
OSEA J Grover 7 Dec 06OSEA J Grover 7 Dec 06
OSEA J Grover 7 Dec 06
 
26-grover-john-draft
26-grover-john-draft26-grover-john-draft
26-grover-john-draft
 
50-Marco Casirati-Nord Stream Pre-Commissioning
50-Marco Casirati-Nord Stream Pre-Commissioning50-Marco Casirati-Nord Stream Pre-Commissioning
50-Marco Casirati-Nord Stream Pre-Commissioning
 
Paper 43 - OPT 2015_BHI 9_2_15
Paper 43 - OPT 2015_BHI 9_2_15Paper 43 - OPT 2015_BHI 9_2_15
Paper 43 - OPT 2015_BHI 9_2_15
 
BHI NSP Final 14_6_12
BHI NSP Final 14_6_12BHI NSP Final 14_6_12
BHI NSP Final 14_6_12
 
OGJ Nordstream
OGJ NordstreamOGJ Nordstream
OGJ Nordstream
 
20130411110129735 (2)
20130411110129735 (2)20130411110129735 (2)
20130411110129735 (2)
 

Offshore Ind Gases J Grover 11 Dec 07

  • 1. gasworld – Middle East Conference 11th December 2007 The uses & applications for industrial gases in the offshore oil & gas Industry gasworld – Middle East Conference USES & APPLICATIONS OF INDUSTRIAL GASES IN THE OFFSHORE OIL & GAS INDUSTRY John Grover 11th December 2006
  • 2. gasworld – Middle East Conference 11th December 2007 The uses & applications for industrial gases in the offshore oil & gas Industry Objective Industrial gases, and in particular liquid nitrogen, are used for a variety of applications in the offshore oil & gas industry. This presentation will provide an overview of this market, discuss the potential growth areas, and review the support services necessary to support offshore work. We shall focus on the equipment packaging, certification codes and standards, and transportation issues. A particular focus will be on the use of nitrogen / helium to leak testing offshore facilities prior to commissioning - this service has become the industry standard for oil & gas facilities and can consume large quantities of liquid nitrogen and helium gas.
  • 3. gasworld – Middle East Conference 11th December 2007 The uses & applications for industrial gases in the offshore oil & gas Industry Contents • What is offshore? • Downhole applications for industrial gases • Topside applications for industrial gases • Nitrogen / helium leak testing • Offshore equipment overview › Transport of cryogenic liquids & gases › Vaporisation & pumping of cryogenic LN2 • Typical gas consumption • Membrane vs. LN2 • Growth opportunities
  • 4. gasworld – Middle East Conference 11th December 2007 The uses & applications for industrial gases in the offshore oil & gas Industry What is Offshore? Initially N2 used on drilling & well completion on jack-up or semi- sub drilling rigs Vessel based operations to support either pipeline commissioning or well stimulation Main use of industrial gases is on permanent offshore platforms. As fields being developed in ever deeper waters the complexity and cost increases High oil prices make such projects economic
  • 5. gasworld – Middle East Conference 11th December 2007 The uses & applications for industrial gases in the offshore oil & gas Industry Offshore Middle East UAE • Adma Opco, Zadco, Total • DP, Crescent, Atlantis • New Umm Shaif & sour gas KSA • Saudi Aramco • New “Maintain Potential” QATAR • Oxy, Maersk, QP – oil & gas • RasGas / Qatargas feeding LNG • Dolphin feeding UAE / Oman • New “RG II, QG 3&4, Pearl GTL IRAN • South Pars OMAN • Some deepwater potential CASPIAN & INDIA • Many projects supported from UAE
  • 6. gasworld – Middle East Conference 11th December 2007 The uses & applications for industrial gases in the offshore oil & gas Industry Downhole Applications Nitrogen gas can be injected in the well via coiled tubing. Normally the nitrogen equipment is supplied as part of the coil tubing package for: • Gas lifting (reduce hydrostatic head) • Sand-fill cleanout (after fracturing) Nitrogen can also be pumped directly in to the well via the wellhead to displace the fluid column left in the well after completion via the downhole sliding sleeve. Other uses include: • Foaming cement • Nitrifying acid • Packer equalisation Customers for the sector will be major service co’s (BJ, Halliburton, Schlumberger and local / regional service co’s (NOWMCO, MB, Sapesco)
  • 7. gasworld – Middle East Conference 11th December 2007 The uses & applications for industrial gases in the offshore oil & gas Industry Topside Applications There are many uses for nitrogen in oil & gas platforms: • Purging systems out of and in to service • Drying moisture sensitive systems • Pressure testing valves for seat leakage • Deploying pipeline smart plugs • Propelling pipeline pigs • Blanketing systems for preservation • Leak testing flanged connections • Starting compressors Whilst these services are used daily in the North Sea, there is a growing acceptance of such techniques in the Middle East Customers for the sector will be major service co’s (BJ, Halliburton, Weatherford and some local service companies.
  • 8. gasworld – Middle East Conference 11th December 2007 The uses & applications for industrial gases in the offshore oil & gas Industry Nitrogen / Helium Leak Testing Using both LN2 & gaseous helium this is the largest market for offshore industrial gases Service is also provided at onshore construction yards in Abu Dhabi and Dubai It allows all hydrocarbon systems to be leak tested at their working pressures and all leaks quantified in standard cubic feet per year (scf/yr) using a mass spectrometer tuned to helium
  • 9. gasworld – Middle East Conference 11th December 2007 The uses & applications for industrial gases in the offshore oil & gas Industry Nitrogen / Helium Leak Testing
  • 10. gasworld – Middle East Conference 11th December 2007 The uses & applications for industrial gases in the offshore oil & gas Industry Offshore Cryogenic Tanks LENGTH 16ft WIDTH 8ft HEIGHT 8ft WEIGHT 12,000 KG full, 6,000 KG empty MAWP Up to 17 barg CAPACITY 8,000 litres LN2 = 5,250 Nm3 GN2 Note – at 12,000 KG full some platforms may be unable to lift full tanks LENGTH 10ft WIDTH 8ft HEIGHT 8ft WEIGHT 12,000 KG full MAWP Up to 17 barg CAPACITY 7,220 litres LN2 = 5,000 Nm3 GN2 Note – these 10’ tanks can be linked to ship as 20’ container Offshore LN2 tanks are lifted using 5 leg slings. They are governed by lifting regulations as well as ADR and IMO codes
  • 11. gasworld – Middle East Conference 11th December 2007 The uses & applications for industrial gases in the offshore oil & gas Industry Offshore Cryogenic Tanks AMBIENT HEAT CHECK VALVE 7 RETURN VALVE 9 OVERFILL VALVE SAFETY VALVES @ 10 BAR SAFETY VALVES 4 BACK FILL LINE PRESSURE COIL TANK PRESSURE 2 TANK LEVEL 1 VENT VALVE BURST DISC VACUUM POINT 11 6 12 15 13 3 +14 16 17 8 10 5
  • 12. gasworld – Middle East Conference 11th December 2007 The uses & applications for industrial gases in the offshore oil & gas Industry Offshore Nitrogen Pumps / Vaporisers NITROGEN PUMP NP 90 LENGTH 12ft WIDTH 8ft HEIGHT 8ft WEIGHT 7,500 KG CAPACITY 90,000 scfh / up to 10,000 psig Note – at 7,500 KG unit suitable for older platforms with reduced crane capacity NITROGEN PUMP NP 180 LENGTH 16ft WIDTH 8ft HEIGHT 8ft WEIGHT 12,000 KG CAPACITY 180,000 scfh / up to 15,000 psig Lift frames governed by DNV 2.71 code. Engines for zone 2 operation
  • 13. gasworld – Middle East Conference 11th December 2007 The uses & applications for industrial gases in the offshore oil & gas Industry Offshore Nitrogen Pumps / Vaporisers . HIGH PRESSURE CRYOGENIC PUMP HIGH PRESSURE VAPORISER TANK VAPORISER ( AMBIENT HEAT )GN2 DISCHARGE BOOST PUMP ENGINE RADIATOR HEAT NITROGEN COOLANT VAPORIZER POT PUMP HYDRAULIC FLOW PUMP HYDRAULIC FLOW SYSTEM HYDRAULIC FLOW COOLANT CENTRIFUGAL DIESEL ENGINE ENGINE OIL LEVEL COOLANT LEVEL HYDRAULIC OIL LEVEL DANGER 7 1 5 0 0 7 1 5 0 0 NO STEP LIQUID NITROGEN OPERNATIONAL OVERVIEW • LN2 circulated back to tank via boost pump • Once circuit cooled LN2 pumped via triplex • All waste heat sources used from diesel engine • Heat transfer medium is engine coolant • Counter coil heat exchanger used to vaporise LN2 • LN2 to GN2 expansion = 696 times • Total control on pressure and gas temp
  • 14. gasworld – Middle East Conference 11th December 2007 The uses & applications for industrial gases in the offshore oil & gas Industry Typical Gas Usage OPERATION LN2 USAGE (USG) HELUM USAGE (M3) Nitrogen well displacement 4,000 0 Nitrgoen foamed acid treatment 6,000 0 Nitrogen / CT gas lift 8,000 0 Wellhead platform purge 4,000 0 Compression platform purge 10,000 0 Central process platform purge 16,000 0 Wellhead platform N2/He leak test 6,000 200 Compression platform N2/He leak test 20,000 600 Central process platform N2/He leak test 30000 900 Position pipeline isolation plug 8000 0 Provide N2/He for compressor start up / tests 2000 4000 Purge & pack of new infield pipeline 12000 0 Purge & pack of new export tunkline 50000 0 Points to consider • Nearest LN2 supply location, tanker fleet and storage capacity • Boat availability & jetty LN2 storage • Platform space, deck loading, crane capacity / availability
  • 15. gasworld – Middle East Conference 11th December 2007 The uses & applications for industrial gases in the offshore oil & gas Industry Membrane vs. LN2 Positive • No LN2 supplies = reduced logistics • Typically lower N2 supply cost • Great for remote areas with limited LN2 supply Negative • Large equipment footprint, particularly for high flow • 95% purity not suitable for all applications • High capital cost (approx. 2 x LN2 for 90,000 scfh spread) • Feed air not available in zone 2 rating MEMBRANE Positive • Wide availability of equipment – smaller overall footprint • Equipment built for DNV 2.71, zone 2, and ATEX • Very flexible in terms of flow, pressure and gas temp • High purity nitrogen suitable for all applications Negative • LN2 cost and supply issues • Greater number of lifts c/w cryogenic spill risks • Challenge in areas with poor LN2 supply • May require storage tank farm to support LN2
  • 16. gasworld – Middle East Conference 11th December 2007 The uses & applications for industrial gases in the offshore oil & gas Industry Growth Opportunities 1. Gas developments require far more offshore nitrogen services than oil developments – this means growth in Qatar, UAE, India, Iran, Egypt and the Caspian 2. LNG developments offer best growth opportunity as all feature significant infrastructure plus export pipelines – for Middle East the focus is Qatar and Egypt (plus Yemen onshore) 3. Dewatering deepwater pipelines after hydrotest can use up to 50,000 USG on LN2 per line – developments underway in India with future opportunities in Azerbaijan 4. Increased acceptance of “North Sea” techniques by National Oil Companies – there has been a strong increase in N2/He leak testing and N2 purging in Qatar, UAE and Azerbaijan, with some interest now in Saudi Arabia and Kuwait 5. Increased LN2 production capacity in developing areas – in Yemen, the Caspian, and particularly Kazakhstan there is a shortage of LN2 which hampers the growth of the associated service applications END