1. RESUME
JitendraKumar Dubey
B-402, RavindraHeights, Titwala(East),
Mumbai, INDIA
Pincode- 421605
Mobile : +91 9699824490
Email:jitendra4491@gmail.com, d_jitendrakumar@yahoo.com
Professional Summary
I have 6 years of experience in health and safety profession and currently working as the Safety
Officer (SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE) with multiple roles on a
constructionbarge (1 Mas 300, SwiberConquest,SwiberVictorious,Ulswater, SwiberTriumphant) &
prosess platform (Zawtika Myanmar, TCPP & C24-P1 in India). Conducting safety meetings,
coordinate andconduct mock drills,safety inspections/monitoringand internal training. I facilitate
pre-tour meetings, toolbox talks, HazCom, risk assessment & behavioral safety programs.
Conducting periodic test of H2S/CH4 Gas monitors system including inspection of LSA & FFE.
Goal
To create an accident free environment where people can work freely and safely, by identifying
Hazards and by taking immediate action to eliminate or reduce its potential as reasonably as
practicable.
Education Qualifications
SecondarySchool Examinationfrom UtterPradeshEducationBoard, Indiainthe yearJun2002.
HigherSecondarySchool inScience & math from Uttar PradeshEducationBoard,India,(yearJun
2004).
BachelorDegree inArtfrom V.B.S.Purvanchal University(Jun2004 to May 2007 )
Technical Qualifications
Diploma in Fire and Safety from ANNAMALAI University in2010.
Professional Training Undertaken
NEBOSH IGC & OSHA (General Industry) 30 Hours
OPITO approved BOSIET (Basic Offshore Safety Induction and Emergency Training) which
includes;
Sea survival Training
Offshore Fire Fighting Training
First Aid Training
HUET (Helicopter Underwater Egress Training)
IT Skills
Proficient in MS Office, Excel & PowerPoint
2. Duties & Responsibilities:
Implementing and complying Project HSE Plan and Procedures.
Preparing daily, monthly and annual HSE documents.
Permit-to-Work System Compliance.
Implementing internal training safety programs and promoting safety behavior practices for
personnel on the vessel during project activities as per STCW/95, IRS, IMO and SOLAS.
Conduct and coordinate HSE Committee meeting on daily and monthly basis.
Conduct daily random site inspections, to identify unsafe acts, conditions and hazards, make
reports based on observations, report to HSE Manager.
Conducting Mock Drills and creating Safety awareness in staff and workers.
Conduct HSE training for the Swiber team to create safety awareness.
Focal point between Swiber Team and Other Subcontractors onsite (SIMOPS).
Conduct SSHE observation and complete the unsafe act/condition report form as required.
Conducting the HSE Induction Course for all newly arriving personnel.
Conduct regular safety talks covering pertinent topics / Toolbox Meetings for Swiber Team
Play an active role in incident investigation and reporting of all accidents to the project
manager and the HSE manager.
Record HSE statistics and report SSHE activities on weekly basis to the SSHE Manager.
Participate SSHE meetings and make safety suggestions.
Coordinate Weekly SAFETY Awards.
Work History:
Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE
Project: Cluster26, Daman DevelopmentProject(Tapti Field),India
Client: ONGCIndia
Designation: Safetyofficer
Duration: 2nd
April 2016 to 12th
June 2016.
Project Description:
PlatformmodificationandhookupworksonTCPPandC24 P1 processplatformwithriserguard
installationatC24P1.
Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE
Project: Cluster26, Daman DevelopmentProject,PRP4, India
Place: Jindal Saw Ltd & Adani Port, Gujrat,India
Client: ONGCIndia
Designation: Safetyofficer
Duration: 5th
September2015 to 13th
March 2016.
3. Project Description:
Swiberhasawardedworkscope to the JIndal Saw Ltd involvedPipe manufacturing,bend
fabrication,3LPPcoating& CWC coatingof pipesandbends,Anode installationandMonel
sheathing.Transportationandloadoutof the pipesof the pipesbendpipe andanode pipes.
Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE
Project: WO-15 Pipeline Project,ONGCfield(India)
Client: ONGC India
Designation: Barge Safetyofficer
Duration: 15 April 2015 to 28 May 2015.
Project Description:
Installation of approximately 28 km section of 14” dia pipeline from BPB to WO 16, including
replacement of abandoned head pull cable, recovering of 14’’ dia pipeline ,SSIV cage installation
withfabricationand installation of 14’’ spool. Installation of approximately 21 km section of 8’’ dia
pipeline from WO 5 to WO-15 including fabrication and installation of spool. Recovery of 12’’ dia
pipeline and complete the remaining 30 joints at WO-5 to WO-15.
Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE
Project: Su Tu Nau DevelopmentProject,Vietnam.
Client: CLJOC Vietnam.
Designation: Barge Safetyofficer
Duration: 21 July2014 to 01 October 2014.
Project Description:
Work scope underthe Su Tu Naucontract covereddetailed engineering procurement construction,
transportationandinstallation,hookupcommissioningof twowellheadplatformsnamelySuTuNau
north and Su Tu Nau south, in addition PTSC M&C will provide modification work for existi ng
platform (WHP-A, WHP-B Su Tu Varg central processing platform) and 37-mile (60Km) of pipeline
including riser guard and spool installation at WHP-B & WHP -A.
Company: HALLIN CORPORATE SERVICE PTE LTD, SINGAPORE
Project: REPAIR THE MAIN UMBILICAL,INSTALL INFIELD UMBILICAL AND FLOWLINE. AT G-1
FIELD GODAVARIBASIN, KAKINADA,INDIA. (Oil & Natural Gas Corporation, India)
Designation : Safetyofficer
Duration : 14 June 2014 to 18 July.
Project Description:
Subsea 7 has completed the two phases of offshore campaign in March –May 2012 & 2013 and
returnsin2014 to repairthe mainumbilical,installinfieldumbilical &flowline; associated hardware
and pre-commissioning work. The project has employed construction vessel Hallin Ullswater for
offshore support.
4. Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE
Project: PIPELINE POST TRENCHING AND JET SLED RECOVERY AT TALI FIELD, BRUNEI (Brunei
Shell Petroleum)
Designation : Safetyofficer
Duration : 14 May 2014 to 24 May 2014.
Project Description:
The project involves 8’’ dia pipeline post trenching from Tali booster station (E36) to SEPP01-
PID2063 and 8’’ dia pipeline jet sled salvage from Tali booster station (E36) to SEPP01-PID2063.
Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE
Project: Drying and N2 Packing of 28” exportPipe Line (ZPQplatform) Zawtika Field,
Myanmar)
Client: PTTEP Myanmar.
Designation: Safety officer
Duration: 07th December2013 to 10th March 2014.
Project Description:
The scope of work includes dryinganN2 packingof existing28” pipe line fromZPQ processplatform
to ZOC at Yangon,Myanmar.
Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE
Project: Pipe Laying Work(TOTAL Field,Indonesia)
Client: Total Indonesia.
Designation: Barge Safetyofficer
Duration: August2013 to November2013.
Department: HSE.
Project Description:
The scope of work for the contract having Engineering, Procurement, Supply, Construction,
Installation, Pre-commissioning and Commissioning assistance for: 16" Pipeline 5.483 km with
ExpansionSpool fromWPS2to MWPS at Sisi Field, 16" Pipeline 7.366km with Expansion Spool from
WPN3 to MWPN at Nubi Fieldand20" Pipeline3.326 km withExpansion Spool from SWPJ to MWPA
at Peciko Field.
Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE
Project: Cluster7 Project (Pipe Layingwork), ONGCFieldMumbai.India
Designation: Barge Safety officer
Duration: Feb.2013 to May 2013.
Department: HSE.
Project Description:
The subseaprojectinvolves116.5kilometers of infield subsea pipelines comprising: 16-kilometre,
12-inch oil pipeline betweenthe B-178-A and B-193-A wellheadplatforms.7.5-kilometre,eight-inch
oil pipeline from B-179-A to B-178-A. 5.5 km,12-inch oil pipeline from B-172-A to B-178-A. 16.5-
kilometre,10-inchoil pipeline fromB-28A-A toB-193-A. 23-kilometrs,12-inch pipeline from B-23A-A
to B-193A, witha lateral nearthe B-28A platformforgas.28-kilometre,16-inchgaspipeline between
the B-193-A and BCP-B platforms. 20 kilometre,12-inch gas pipeline from B-193-A to tie into the
Heera pipeline.
5. Company: JMC Projects India Ltd.
Project: Bhiwandi Fly-overBridge,Mumbai
Client: Mumbai MetropolitanRegionDevelopmentAuthority.
Place: Bhiwandi,Mumbai
Duration: From Jun 2012 to Feb 2013.
Project Description:
Mumbai MetropolitanRegionDevelopmentAuthority(MMRDA) proposed to construction of 1.2 km
long two lane Flyover Bridge at Bhiwandi - Wada road, Mumbai.
Company: Pratibha Industries Ltd.
Project : Modak Sagar Tunnel Project, Mumbai.
Client : Brihanmumbai Municipal Corporation. (BMC)
Positionheld: Asst. HSE Officer
Duration: From July 2010 to Jun 2012
Project Description
The projectinvolvesthe constructionof 7.5km longtunnel of 4100 mm diameterwithall allied
workssuch as intake andpipe line fortransportationof water.The tunnel islaidaround 100 meter
belowthe ground level,whichwillhave theirintakeclose toModaksagardam, and theiroutlets
withinthe same existingservice andbifurcationchamberatBell Nallah.
Passport Details
Passport No : G4450333
Date of Expiry : 16.08.2017
Place of Issue : Lucknow, India.
Personal Profile
Father’s Name : Mr. S.C. Dubey
Date of Birth : 10 March 1986
Gender : Male
Marital Status : Married
Nationality : Indian
Languages Known : English and Hindi
Strength and Vision:
Excellent interpersonal skills and the ability to work as a contributing team leader
Good verbal and written communication skills to exchange information and give/receive
instructions.
Proactive, Confident, Independent & problem solving attitude.
Willingness to take responsibilities and challenges.
Declaration
I hereby declare that all information stated herein is true to the best of my knowledge and belief.
Date: 12/09/2016. (JITENDRA )