SlideShare uma empresa Scribd logo
1 de 5
RESUME
JitendraKumar Dubey
B-402, RavindraHeights, Titwala(East),
Mumbai, INDIA
Pincode- 421605
Mobile : +91 9699824490
Email:jitendra4491@gmail.com, d_jitendrakumar@yahoo.com
Professional Summary
I have 6 years of experience in health and safety profession and currently working as the Safety
Officer (SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE) with multiple roles on a
constructionbarge (1 Mas 300, SwiberConquest,SwiberVictorious,Ulswater, SwiberTriumphant) &
prosess platform (Zawtika Myanmar, TCPP & C24-P1 in India). Conducting safety meetings,
coordinate andconduct mock drills,safety inspections/monitoringand internal training. I facilitate
pre-tour meetings, toolbox talks, HazCom, risk assessment & behavioral safety programs.
Conducting periodic test of H2S/CH4 Gas monitors system including inspection of LSA & FFE.
Goal
To create an accident free environment where people can work freely and safely, by identifying
Hazards and by taking immediate action to eliminate or reduce its potential as reasonably as
practicable.
Education Qualifications
 SecondarySchool Examinationfrom UtterPradeshEducationBoard, Indiainthe yearJun2002.
 HigherSecondarySchool inScience & math from Uttar PradeshEducationBoard,India,(yearJun
2004).
 BachelorDegree inArtfrom V.B.S.Purvanchal University(Jun2004 to May 2007 )
Technical Qualifications
 Diploma in Fire and Safety from ANNAMALAI University in2010.
Professional Training Undertaken
 NEBOSH IGC & OSHA (General Industry) 30 Hours
 OPITO approved BOSIET (Basic Offshore Safety Induction and Emergency Training) which
includes;
 Sea survival Training
 Offshore Fire Fighting Training
 First Aid Training
 HUET (Helicopter Underwater Egress Training)
IT Skills
 Proficient in MS Office, Excel & PowerPoint
Duties & Responsibilities:
 Implementing and complying Project HSE Plan and Procedures.
 Preparing daily, monthly and annual HSE documents.
 Permit-to-Work System Compliance.
 Implementing internal training safety programs and promoting safety behavior practices for
personnel on the vessel during project activities as per STCW/95, IRS, IMO and SOLAS.
 Conduct and coordinate HSE Committee meeting on daily and monthly basis.
 Conduct daily random site inspections, to identify unsafe acts, conditions and hazards, make
reports based on observations, report to HSE Manager.
 Conducting Mock Drills and creating Safety awareness in staff and workers.
 Conduct HSE training for the Swiber team to create safety awareness.
 Focal point between Swiber Team and Other Subcontractors onsite (SIMOPS).
 Conduct SSHE observation and complete the unsafe act/condition report form as required.
 Conducting the HSE Induction Course for all newly arriving personnel.
 Conduct regular safety talks covering pertinent topics / Toolbox Meetings for Swiber Team
 Play an active role in incident investigation and reporting of all accidents to the project
manager and the HSE manager.
 Record HSE statistics and report SSHE activities on weekly basis to the SSHE Manager.
 Participate SSHE meetings and make safety suggestions.
 Coordinate Weekly SAFETY Awards.
Work History:
Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE
Project: Cluster26, Daman DevelopmentProject(Tapti Field),India
Client: ONGCIndia
Designation: Safetyofficer
Duration: 2nd
April 2016 to 12th
June 2016.
Project Description:
PlatformmodificationandhookupworksonTCPPandC24 P1 processplatformwithriserguard
installationatC24P1.
Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE
Project: Cluster26, Daman DevelopmentProject,PRP4, India
Place: Jindal Saw Ltd & Adani Port, Gujrat,India
Client: ONGCIndia
Designation: Safetyofficer
Duration: 5th
September2015 to 13th
March 2016.
Project Description:
Swiberhasawardedworkscope to the JIndal Saw Ltd involvedPipe manufacturing,bend
fabrication,3LPPcoating& CWC coatingof pipesandbends,Anode installationandMonel
sheathing.Transportationandloadoutof the pipesof the pipesbendpipe andanode pipes.
Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE
Project: WO-15 Pipeline Project,ONGCfield(India)
Client: ONGC India
Designation: Barge Safetyofficer
Duration: 15 April 2015 to 28 May 2015.
Project Description:
Installation of approximately 28 km section of 14” dia pipeline from BPB to WO 16, including
replacement of abandoned head pull cable, recovering of 14’’ dia pipeline ,SSIV cage installation
withfabricationand installation of 14’’ spool. Installation of approximately 21 km section of 8’’ dia
pipeline from WO 5 to WO-15 including fabrication and installation of spool. Recovery of 12’’ dia
pipeline and complete the remaining 30 joints at WO-5 to WO-15.
Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE
Project: Su Tu Nau DevelopmentProject,Vietnam.
Client: CLJOC Vietnam.
Designation: Barge Safetyofficer
Duration: 21 July2014 to 01 October 2014.
Project Description:
Work scope underthe Su Tu Naucontract covereddetailed engineering procurement construction,
transportationandinstallation,hookupcommissioningof twowellheadplatformsnamelySuTuNau
north and Su Tu Nau south, in addition PTSC M&C will provide modification work for existi ng
platform (WHP-A, WHP-B Su Tu Varg central processing platform) and 37-mile (60Km) of pipeline
including riser guard and spool installation at WHP-B & WHP -A.
Company: HALLIN CORPORATE SERVICE PTE LTD, SINGAPORE
Project: REPAIR THE MAIN UMBILICAL,INSTALL INFIELD UMBILICAL AND FLOWLINE. AT G-1
FIELD GODAVARIBASIN, KAKINADA,INDIA. (Oil & Natural Gas Corporation, India)
Designation : Safetyofficer
Duration : 14 June 2014 to 18 July.
Project Description:
Subsea 7 has completed the two phases of offshore campaign in March –May 2012 & 2013 and
returnsin2014 to repairthe mainumbilical,installinfieldumbilical &flowline; associated hardware
and pre-commissioning work. The project has employed construction vessel Hallin Ullswater for
offshore support.
Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE
Project: PIPELINE POST TRENCHING AND JET SLED RECOVERY AT TALI FIELD, BRUNEI (Brunei
Shell Petroleum)
Designation : Safetyofficer
Duration : 14 May 2014 to 24 May 2014.
Project Description:
The project involves 8’’ dia pipeline post trenching from Tali booster station (E36) to SEPP01-
PID2063 and 8’’ dia pipeline jet sled salvage from Tali booster station (E36) to SEPP01-PID2063.
Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE
Project: Drying and N2 Packing of 28” exportPipe Line (ZPQplatform) Zawtika Field,
Myanmar)
Client: PTTEP Myanmar.
Designation: Safety officer
Duration: 07th December2013 to 10th March 2014.
Project Description:
The scope of work includes dryinganN2 packingof existing28” pipe line fromZPQ processplatform
to ZOC at Yangon,Myanmar.
Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE
Project: Pipe Laying Work(TOTAL Field,Indonesia)
Client: Total Indonesia.
Designation: Barge Safetyofficer
Duration: August2013 to November2013.
Department: HSE.
Project Description:
The scope of work for the contract having Engineering, Procurement, Supply, Construction,
Installation, Pre-commissioning and Commissioning assistance for: 16" Pipeline 5.483 km with
ExpansionSpool fromWPS2to MWPS at Sisi Field, 16" Pipeline 7.366km with Expansion Spool from
WPN3 to MWPN at Nubi Fieldand20" Pipeline3.326 km withExpansion Spool from SWPJ to MWPA
at Peciko Field.
Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE
Project: Cluster7 Project (Pipe Layingwork), ONGCFieldMumbai.India
Designation: Barge Safety officer
Duration: Feb.2013 to May 2013.
Department: HSE.
Project Description:
The subseaprojectinvolves116.5kilometers of infield subsea pipelines comprising: 16-kilometre,
12-inch oil pipeline betweenthe B-178-A and
B-193-A wellheadplatforms.7.5-kilometre,eight-inch
oil pipeline from B-179-A to B-178-A. 5.5 km,12-inch oil pipeline from B-172-A to B-178-A. 16.5-
kilometre,10-inchoil pipeline fromB-28A-A toB-193-A. 23-kilometrs,12-inch pipeline from B-23A-A
to B-193A, witha lateral nearthe B-28A platformforgas.28-kilometre,16-inchgaspipeline between
the B-193-A and BCP-B platforms. 20 kilometre,12-inch gas pipeline from B-193-A to tie into the
Heera pipeline.
Company: JMC Projects India Ltd.
Project: Bhiwandi Fly-overBridge,Mumbai
Client: Mumbai MetropolitanRegionDevelopmentAuthority.
Place: Bhiwandi,Mumbai
Duration: From Jun 2012 to Feb 2013.
Project Description:
Mumbai MetropolitanRegionDevelopmentAuthority(MMRDA) proposed to construction of 1.2 km
long two lane Flyover Bridge at Bhiwandi - Wada road, Mumbai.
Company: Pratibha Industries Ltd.
Project : Modak Sagar Tunnel Project, Mumbai.
Client : Brihanmumbai Municipal Corporation. (BMC)
Positionheld: Asst. HSE Officer
Duration: From July 2010 to Jun 2012
Project Description
The projectinvolvesthe constructionof 7.5km longtunnel of 4100 mm diameterwithall allied
workssuch as intake andpipe line fortransportationof water.The tunnel islaidaround 100 meter
belowthe ground level,whichwillhave theirintakeclose toModaksagardam, and theiroutlets
withinthe same existingservice andbifurcationchamberatBell Nallah.
Passport Details
 Passport No : G4450333
 Date of Expiry : 16.08.2017
 Place of Issue : Lucknow, India.
Personal Profile
 Father’s Name : Mr. S.C. Dubey
 Date of Birth : 10 March 1986
 Gender : Male
 Marital Status : Married
 Nationality : Indian
 Languages Known : English and Hindi
Strength and Vision:
 Excellent interpersonal skills and the ability to work as a contributing team leader
 Good verbal and written communication skills to exchange information and give/receive
instructions.
 Proactive, Confident, Independent & problem solving attitude.
 Willingness to take responsibilities and challenges.
Declaration
I hereby declare that all information stated herein is true to the best of my knowledge and belief.
Date: 12/09/2016. (JITENDRA )

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

HSE Engineer Resume
HSE Engineer ResumeHSE Engineer Resume
HSE Engineer Resume
 
Safi-Ullah HSE Resume
Safi-Ullah HSE ResumeSafi-Ullah HSE Resume
Safi-Ullah HSE Resume
 
Abdulla Safety Officer CV
Abdulla Safety Officer CVAbdulla Safety Officer CV
Abdulla Safety Officer CV
 
Amir Khurshid HSE Officer
Amir Khurshid HSE OfficerAmir Khurshid HSE Officer
Amir Khurshid HSE Officer
 
Mansur HSE Manager - cv
Mansur HSE Manager - cvMansur HSE Manager - cv
Mansur HSE Manager - cv
 
Prajin CV HSE Officer
Prajin CV HSE OfficerPrajin CV HSE Officer
Prajin CV HSE Officer
 
Resume of Sohail Butt as safety officer
Resume of Sohail Butt as safety officer Resume of Sohail Butt as safety officer
Resume of Sohail Butt as safety officer
 
Updated CV - Aquib Pagarkar - June 2015
Updated CV - Aquib Pagarkar - June 2015Updated CV - Aquib Pagarkar - June 2015
Updated CV - Aquib Pagarkar - June 2015
 
CV-Safety Engineer - Ahmed Kaleem Shaik
CV-Safety Engineer - Ahmed Kaleem ShaikCV-Safety Engineer - Ahmed Kaleem Shaik
CV-Safety Engineer - Ahmed Kaleem Shaik
 
shamim ahmad HSE manager CV
shamim ahmad HSE manager CVshamim ahmad HSE manager CV
shamim ahmad HSE manager CV
 
HSE Manager CV
HSE Manager CVHSE Manager CV
HSE Manager CV
 
HSE/FACILITATION OFFICER (NEBOSH CERTIFIED)
HSE/FACILITATION OFFICER (NEBOSH CERTIFIED)HSE/FACILITATION OFFICER (NEBOSH CERTIFIED)
HSE/FACILITATION OFFICER (NEBOSH CERTIFIED)
 
kabeer's CV
kabeer's CVkabeer's CV
kabeer's CV
 
HSE Officer CV
HSE Officer CVHSE Officer CV
HSE Officer CV
 
M. Ajmal CV (Field Safety Engineer - 11 Years)
M. Ajmal CV (Field Safety Engineer - 11 Years)M. Ajmal CV (Field Safety Engineer - 11 Years)
M. Ajmal CV (Field Safety Engineer - 11 Years)
 
Arnel Z. Gupit CV HSE Manager
Arnel Z. Gupit CV HSE ManagerArnel Z. Gupit CV HSE Manager
Arnel Z. Gupit CV HSE Manager
 
Walid Soliman, Safety Officer, CV
Walid Soliman, Safety Officer, CVWalid Soliman, Safety Officer, CV
Walid Soliman, Safety Officer, CV
 
UPDATED CV HSE
UPDATED CV HSEUPDATED CV HSE
UPDATED CV HSE
 
Nawaz Safety Officer CV
Nawaz Safety Officer CVNawaz Safety Officer CV
Nawaz Safety Officer CV
 
RESUME
RESUMERESUME
RESUME
 

Destaque

Daniel Louw-CV (2)
Daniel Louw-CV (2)Daniel Louw-CV (2)
Daniel Louw-CV (2)Danie Louw
 
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)Herman Moral
 
54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedure54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedureMohammed Alam
 
My view imprint 2007 11 - 2
My view imprint 2007   11 - 2My view imprint 2007   11 - 2
My view imprint 2007 11 - 2Clive Burgess
 
HSE Annual Performance
HSE Annual PerformanceHSE Annual Performance
HSE Annual PerformanceArun Kumar
 
Hse frm 09 hse flyer
Hse frm 09 hse flyerHse frm 09 hse flyer
Hse frm 09 hse flyerperwez21
 
Monthly safety report may 2012
Monthly safety report may 2012Monthly safety report may 2012
Monthly safety report may 2012ChinaHarbour
 
Currículum vitae Rubén Díaz
Currículum vitae Rubén DíazCurrículum vitae Rubén Díaz
Currículum vitae Rubén Díazneburd
 
Hse cv english
Hse cv englishHse cv english
Hse cv englishgokhan1985
 
JAN2016 - IMPROVEMENT REPORT
JAN2016 - IMPROVEMENT REPORTJAN2016 - IMPROVEMENT REPORT
JAN2016 - IMPROVEMENT REPORTStephen Austria
 
Safety PPE Poster (ONE SAFETY)
Safety PPE Poster (ONE SAFETY)Safety PPE Poster (ONE SAFETY)
Safety PPE Poster (ONE SAFETY)Stephen Austria
 
Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012ChinaHarbour
 
Performance Improvement Roadmap V4
Performance Improvement Roadmap V4Performance Improvement Roadmap V4
Performance Improvement Roadmap V4mulcahymike
 

Destaque (20)

Daniel Louw-CV (2)
Daniel Louw-CV (2)Daniel Louw-CV (2)
Daniel Louw-CV (2)
 
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
 
54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedure54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedure
 
My view imprint 2007 11 - 2
My view imprint 2007   11 - 2My view imprint 2007   11 - 2
My view imprint 2007 11 - 2
 
HSE Annual Performance
HSE Annual PerformanceHSE Annual Performance
HSE Annual Performance
 
Hse frm 09 hse flyer
Hse frm 09 hse flyerHse frm 09 hse flyer
Hse frm 09 hse flyer
 
Monthly safety report may 2012
Monthly safety report may 2012Monthly safety report may 2012
Monthly safety report may 2012
 
Currículum vitae Rubén Díaz
Currículum vitae Rubén DíazCurrículum vitae Rubén Díaz
Currículum vitae Rubén Díaz
 
6th smester
6th smester6th smester
6th smester
 
Hse cv english
Hse cv englishHse cv english
Hse cv english
 
JAN2016 - IMPROVEMENT REPORT
JAN2016 - IMPROVEMENT REPORTJAN2016 - IMPROVEMENT REPORT
JAN2016 - IMPROVEMENT REPORT
 
Contoh Monthly Reports
Contoh  Monthly  ReportsContoh  Monthly  Reports
Contoh Monthly Reports
 
5S Urdu Training
5S Urdu Training5S Urdu Training
5S Urdu Training
 
Safety PPE Poster (ONE SAFETY)
Safety PPE Poster (ONE SAFETY)Safety PPE Poster (ONE SAFETY)
Safety PPE Poster (ONE SAFETY)
 
Safety officer (k3 officer)
Safety officer (k3 officer)Safety officer (k3 officer)
Safety officer (k3 officer)
 
Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012
 
FIRE DRILL
FIRE DRILLFIRE DRILL
FIRE DRILL
 
Induction QHSE
Induction QHSEInduction QHSE
Induction QHSE
 
Work place safety
Work place safetyWork place safety
Work place safety
 
Performance Improvement Roadmap V4
Performance Improvement Roadmap V4Performance Improvement Roadmap V4
Performance Improvement Roadmap V4
 

Semelhante a Resume HSE Officer (Jitendra dubey)

Semelhante a Resume HSE Officer (Jitendra dubey) (20)

BIO DATA
BIO DATABIO DATA
BIO DATA
 
SUNDAR CV.
SUNDAR CV.SUNDAR CV.
SUNDAR CV.
 
Final Project
Final ProjectFinal Project
Final Project
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
 
Resume Surendran IND (2) (1)
Resume Surendran IND (2) (1)Resume Surendran IND (2) (1)
Resume Surendran IND (2) (1)
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
updated CVlarrybisa
updated CVlarrybisaupdated CVlarrybisa
updated CVlarrybisa
 
Jijin updated cv 25 oct-15-12-55-27 (2)
Jijin updated cv 25 oct-15-12-55-27 (2)Jijin updated cv 25 oct-15-12-55-27 (2)
Jijin updated cv 25 oct-15-12-55-27 (2)
 
_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)
 
1.Resume.pdf
1.Resume.pdf1.Resume.pdf
1.Resume.pdf
 
Rezume ongky
Rezume ongkyRezume ongky
Rezume ongky
 
Ang kwang Wee_CV-Hertel
Ang kwang Wee_CV-HertelAng kwang Wee_CV-Hertel
Ang kwang Wee_CV-Hertel
 
subhash__cv
subhash__cvsubhash__cv
subhash__cv
 
cv of suresh latest (4) (1)
cv of suresh latest (4) (1)cv of suresh latest (4) (1)
cv of suresh latest (4) (1)
 
Sanjay CV
Sanjay CVSanjay CV
Sanjay CV
 
Naushad MM CV - 2016
Naushad MM CV - 2016Naushad MM CV - 2016
Naushad MM CV - 2016
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
Sanjeev Barwal
Sanjeev BarwalSanjeev Barwal
Sanjeev Barwal
 

Resume HSE Officer (Jitendra dubey)

  • 1. RESUME JitendraKumar Dubey B-402, RavindraHeights, Titwala(East), Mumbai, INDIA Pincode- 421605 Mobile : +91 9699824490 Email:jitendra4491@gmail.com, d_jitendrakumar@yahoo.com Professional Summary I have 6 years of experience in health and safety profession and currently working as the Safety Officer (SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE) with multiple roles on a constructionbarge (1 Mas 300, SwiberConquest,SwiberVictorious,Ulswater, SwiberTriumphant) & prosess platform (Zawtika Myanmar, TCPP & C24-P1 in India). Conducting safety meetings, coordinate andconduct mock drills,safety inspections/monitoringand internal training. I facilitate pre-tour meetings, toolbox talks, HazCom, risk assessment & behavioral safety programs. Conducting periodic test of H2S/CH4 Gas monitors system including inspection of LSA & FFE. Goal To create an accident free environment where people can work freely and safely, by identifying Hazards and by taking immediate action to eliminate or reduce its potential as reasonably as practicable. Education Qualifications  SecondarySchool Examinationfrom UtterPradeshEducationBoard, Indiainthe yearJun2002.  HigherSecondarySchool inScience & math from Uttar PradeshEducationBoard,India,(yearJun 2004).  BachelorDegree inArtfrom V.B.S.Purvanchal University(Jun2004 to May 2007 ) Technical Qualifications  Diploma in Fire and Safety from ANNAMALAI University in2010. Professional Training Undertaken  NEBOSH IGC & OSHA (General Industry) 30 Hours  OPITO approved BOSIET (Basic Offshore Safety Induction and Emergency Training) which includes;  Sea survival Training  Offshore Fire Fighting Training  First Aid Training  HUET (Helicopter Underwater Egress Training) IT Skills  Proficient in MS Office, Excel & PowerPoint
  • 2. Duties & Responsibilities:  Implementing and complying Project HSE Plan and Procedures.  Preparing daily, monthly and annual HSE documents.  Permit-to-Work System Compliance.  Implementing internal training safety programs and promoting safety behavior practices for personnel on the vessel during project activities as per STCW/95, IRS, IMO and SOLAS.  Conduct and coordinate HSE Committee meeting on daily and monthly basis.  Conduct daily random site inspections, to identify unsafe acts, conditions and hazards, make reports based on observations, report to HSE Manager.  Conducting Mock Drills and creating Safety awareness in staff and workers.  Conduct HSE training for the Swiber team to create safety awareness.  Focal point between Swiber Team and Other Subcontractors onsite (SIMOPS).  Conduct SSHE observation and complete the unsafe act/condition report form as required.  Conducting the HSE Induction Course for all newly arriving personnel.  Conduct regular safety talks covering pertinent topics / Toolbox Meetings for Swiber Team  Play an active role in incident investigation and reporting of all accidents to the project manager and the HSE manager.  Record HSE statistics and report SSHE activities on weekly basis to the SSHE Manager.  Participate SSHE meetings and make safety suggestions.  Coordinate Weekly SAFETY Awards. Work History: Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE Project: Cluster26, Daman DevelopmentProject(Tapti Field),India Client: ONGCIndia Designation: Safetyofficer Duration: 2nd April 2016 to 12th June 2016. Project Description: PlatformmodificationandhookupworksonTCPPandC24 P1 processplatformwithriserguard installationatC24P1. Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE Project: Cluster26, Daman DevelopmentProject,PRP4, India Place: Jindal Saw Ltd & Adani Port, Gujrat,India Client: ONGCIndia Designation: Safetyofficer Duration: 5th September2015 to 13th March 2016.
  • 3. Project Description: Swiberhasawardedworkscope to the JIndal Saw Ltd involvedPipe manufacturing,bend fabrication,3LPPcoating& CWC coatingof pipesandbends,Anode installationandMonel sheathing.Transportationandloadoutof the pipesof the pipesbendpipe andanode pipes. Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE Project: WO-15 Pipeline Project,ONGCfield(India) Client: ONGC India Designation: Barge Safetyofficer Duration: 15 April 2015 to 28 May 2015. Project Description: Installation of approximately 28 km section of 14” dia pipeline from BPB to WO 16, including replacement of abandoned head pull cable, recovering of 14’’ dia pipeline ,SSIV cage installation withfabricationand installation of 14’’ spool. Installation of approximately 21 km section of 8’’ dia pipeline from WO 5 to WO-15 including fabrication and installation of spool. Recovery of 12’’ dia pipeline and complete the remaining 30 joints at WO-5 to WO-15. Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE Project: Su Tu Nau DevelopmentProject,Vietnam. Client: CLJOC Vietnam. Designation: Barge Safetyofficer Duration: 21 July2014 to 01 October 2014. Project Description: Work scope underthe Su Tu Naucontract covereddetailed engineering procurement construction, transportationandinstallation,hookupcommissioningof twowellheadplatformsnamelySuTuNau north and Su Tu Nau south, in addition PTSC M&C will provide modification work for existi ng platform (WHP-A, WHP-B Su Tu Varg central processing platform) and 37-mile (60Km) of pipeline including riser guard and spool installation at WHP-B & WHP -A. Company: HALLIN CORPORATE SERVICE PTE LTD, SINGAPORE Project: REPAIR THE MAIN UMBILICAL,INSTALL INFIELD UMBILICAL AND FLOWLINE. AT G-1 FIELD GODAVARIBASIN, KAKINADA,INDIA. (Oil & Natural Gas Corporation, India) Designation : Safetyofficer Duration : 14 June 2014 to 18 July. Project Description: Subsea 7 has completed the two phases of offshore campaign in March –May 2012 & 2013 and returnsin2014 to repairthe mainumbilical,installinfieldumbilical &flowline; associated hardware and pre-commissioning work. The project has employed construction vessel Hallin Ullswater for offshore support.
  • 4. Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE Project: PIPELINE POST TRENCHING AND JET SLED RECOVERY AT TALI FIELD, BRUNEI (Brunei Shell Petroleum) Designation : Safetyofficer Duration : 14 May 2014 to 24 May 2014. Project Description: The project involves 8’’ dia pipeline post trenching from Tali booster station (E36) to SEPP01- PID2063 and 8’’ dia pipeline jet sled salvage from Tali booster station (E36) to SEPP01-PID2063. Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE Project: Drying and N2 Packing of 28” exportPipe Line (ZPQplatform) Zawtika Field, Myanmar) Client: PTTEP Myanmar. Designation: Safety officer Duration: 07th December2013 to 10th March 2014. Project Description: The scope of work includes dryinganN2 packingof existing28” pipe line fromZPQ processplatform to ZOC at Yangon,Myanmar. Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE Project: Pipe Laying Work(TOTAL Field,Indonesia) Client: Total Indonesia. Designation: Barge Safetyofficer Duration: August2013 to November2013. Department: HSE. Project Description: The scope of work for the contract having Engineering, Procurement, Supply, Construction, Installation, Pre-commissioning and Commissioning assistance for: 16" Pipeline 5.483 km with ExpansionSpool fromWPS2to MWPS at Sisi Field, 16" Pipeline 7.366km with Expansion Spool from WPN3 to MWPN at Nubi Fieldand20" Pipeline3.326 km withExpansion Spool from SWPJ to MWPA at Peciko Field. Company: SWIBER OFFSHORE CONSTRUCTIONS P. LTD, SINGAPORE Project: Cluster7 Project (Pipe Layingwork), ONGCFieldMumbai.India Designation: Barge Safety officer Duration: Feb.2013 to May 2013. Department: HSE. Project Description: The subseaprojectinvolves116.5kilometers of infield subsea pipelines comprising: 16-kilometre, 12-inch oil pipeline betweenthe B-178-A and
B-193-A wellheadplatforms.7.5-kilometre,eight-inch oil pipeline from B-179-A to B-178-A. 5.5 km,12-inch oil pipeline from B-172-A to B-178-A. 16.5- kilometre,10-inchoil pipeline fromB-28A-A toB-193-A. 23-kilometrs,12-inch pipeline from B-23A-A to B-193A, witha lateral nearthe B-28A platformforgas.28-kilometre,16-inchgaspipeline between the B-193-A and BCP-B platforms. 20 kilometre,12-inch gas pipeline from B-193-A to tie into the Heera pipeline.
  • 5. Company: JMC Projects India Ltd. Project: Bhiwandi Fly-overBridge,Mumbai Client: Mumbai MetropolitanRegionDevelopmentAuthority. Place: Bhiwandi,Mumbai Duration: From Jun 2012 to Feb 2013. Project Description: Mumbai MetropolitanRegionDevelopmentAuthority(MMRDA) proposed to construction of 1.2 km long two lane Flyover Bridge at Bhiwandi - Wada road, Mumbai. Company: Pratibha Industries Ltd. Project : Modak Sagar Tunnel Project, Mumbai. Client : Brihanmumbai Municipal Corporation. (BMC) Positionheld: Asst. HSE Officer Duration: From July 2010 to Jun 2012 Project Description The projectinvolvesthe constructionof 7.5km longtunnel of 4100 mm diameterwithall allied workssuch as intake andpipe line fortransportationof water.The tunnel islaidaround 100 meter belowthe ground level,whichwillhave theirintakeclose toModaksagardam, and theiroutlets withinthe same existingservice andbifurcationchamberatBell Nallah. Passport Details  Passport No : G4450333  Date of Expiry : 16.08.2017  Place of Issue : Lucknow, India. Personal Profile  Father’s Name : Mr. S.C. Dubey  Date of Birth : 10 March 1986  Gender : Male  Marital Status : Married  Nationality : Indian  Languages Known : English and Hindi Strength and Vision:  Excellent interpersonal skills and the ability to work as a contributing team leader  Good verbal and written communication skills to exchange information and give/receive instructions.  Proactive, Confident, Independent & problem solving attitude.  Willingness to take responsibilities and challenges. Declaration I hereby declare that all information stated herein is true to the best of my knowledge and belief. Date: 12/09/2016. (JITENDRA )