2. Personal Details:
Full Name
Jaundré Viljoen
Date of Birth
17 February 1993
I.D No
9302175009084
Nationality
South Africa
Driver’s license
Code 08
Home Language
Afrikaans, speak, read and write
Other Language
English, speak, read and write
Marital Status
Single
Health Status
Excellent
Contact Details
+27 72 012 0690
+27 982 3581
Home Address
Mahler Straat 17 Vanderbijlpark Sw5
Gauteng
Johannesburg
Email Address
Jaundreviljoen3@gmail.com
3. QUALIFICATIONS:
Secondary
Institution : Transvalia High school
Qualification : Grade 12 (2011)
Subjects Level %
1 Afrikaans First Language 5 62
2 English Second Language 5 61
3 Mathematics 2 36
4 Physical sience 4 52
5 Engineering graphics and design 4 53
6 Mechanical Technology 4 54
7 Life Orientation 5 60
Tertiary
Institution : South African institute of welding (SAIW)
Qualification : Fabrication and welding inspection LEVEL1
Institution South African institute of Welding
Qualification : Senior Welding Inspection Level 2 (Distinction)
Currently waiting for my International Welding Inspector IIW Cert
Qualificationcertificatescan be sendon request.
4. Work Experience
Company : Karbochem 2012-2014
Position : Process Controller
Duties: Receiving save and dangerous chemicals via road tankers and railway tankers,
controlling the offloading process according to the standard operating procedures. Setup
batches to specific needs. Sample and adjust the batches to meet specifications. Transferring
batches and chemicals to specific locations.
Controlling the waste water that went out of the company by testing the water and set an
average flow of the water. I took the readings of the steam lines coming in and going out to
make sure it is the correct temperature and pressure.
Responsibilities: Adhering to the high standard set by the company to maintain a high quality
product and excellent service.
Company : Henred
Qualification : Working As a WeldingInspector
WQRQCPPQRWPSQMS and all procedures regarding scope of work
ISO drawings
Ensuring all approved procedures gets followed
Raising and closing of NCR’s
Compiling data packs
Inspecting of fit ups ready to be welded
Post Weld Visual Inspections
Hydro Verifying
Verifying material heat numbers, and heat transfers
Drawing of AS BUILD Drawings
Marking up of ISO drawings
Final releases of QC packs
Pressure testing
Visual and dimensional checks
General Mechanical fitting work
Marking for NDT to take place
Quality control of steel erection done
5. Employer : Henred Fruehauf
Department : Manufacturing of new trailers/Road tankers
Position : QA/QC Inspector
Period : 2014 – Present
Line Manager : André Viljoen
Telephone no : 076 852 8914