-Preparing, maintenance and inventory all SWT equipment in workshop and field
-Rig up and rig down SWT equipment on field, such as Flow Head, Choke manifold, heat Exchanger, Separator, Surge Tank, Compressor, Electric Centrifugal Pump, Flare/Burner Boom, etc
-Running/execute the equipment during the job
-Help the Supervisor to solving if there any problems/troubles during the job.
-Perform some paperwork during the job such as PTW (Permit To Work), JSA (Job Safety Analysis), Tool Box Talk, and sometimes doing reporting of data acquisition.
-Assist the Well test Eng at Sarulla Geothermal Project in North Sumatera to ensure, monitoring and controlling the project runs smoothly and safe in accordance with applicable procedure.
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
Service Operator Surface Well Testing
1. Jason Bonar FerdinanSitumorang
Clean Up and Surface Well Test Operator
NAME : Jason Bonar FerdinanSitumorang
NATIONALITY : Indonesian
DATE OF BIRTH : 25 February 1991
POSITION : Clean Up and Surface Well Test Operator
EDUCATION : Diploma Degree of Mechanical Enginering of GadjahMadaUniv
LANGUAGE SPOKEN : English, Bahasa Indonesia
OIL FIELD EXPERIENCE : 3 Years 5 Months
EMPLOYMENTHISTORY:
Year Job Description
15 Oct 2012 – 07 Mar
2016
Halliburton Indonesia – Service Operator Well Testing
JOB CAPSULE:
Under general supervision, performs all phases of the rigging up and down of Surface Well Testing (SWT) service
line equipment on work locations for the purpose maintaining control and processing of wellbore fluids during well
testing operations and providing the customer with essential reservoir information by the use of (but not limted to):
Surface Well Testing and Surface Pressure Control equipment packages. In addition to responsibilities, systems
knowledge, competence and skills sets acquired from lower level roles, this individual will be required to mentor
and train lower level personnel in areas of expertise and will be required to become a dedicated Assessor for junior
SWT personnel. Routinely works in more than one type of well site (onshore and offshore) and base camp as
assigned by Service Coordinator. Capable of working in other product lines within the Testing & Subsea (PSL) on
location and in the workshop.Participates in high profile projects.Provides the planning necessary for the job
including rig site surveys, equipment set up, well site direction, and customer-related support activities. Performs
quality control of well test data and provides basic customer reports. Monitors instruments and performs necessary
calculations to assure quality of data/job. Job tasks, correctly performed, impact indirectly on cost containment,
efficiency, profitability of operations. Should have good working knowledge of all service lines within the Testing
& Subsea PSL.
JOB EXPERIENCES:
Year Job Description Tools Rig
April2013 – May 2013
Surface WellTesting at MEDCO
Energi, Well Matang#1, (Loc. Aceh)
HPHT (50 MMSCF/D Gas well)
Flow head, Choke Manifol,
Separator, Surge Tank,
Burner
Onshore
Rig Century 28
May 2013 – June 2013
Surface WellTesting at Genting Oil
Kasuri, Well Rajaw ali1X , (Papua)
Flow head, Choke Manifol,
Separator, Surge Tank,
Burner
Onshore
Rig Cerui
June 2013 – July 2013
Surface WellTesting at Pertamina
Talisman, Well PGD#6 (Loc. Jambi)
Flow head, Choke Manifol,
Separator, Surge Tank,
Burner
Onshore
Rigless
July 2013 – August 2013
Surface WellTesting at PHE WMO,
and Rigging dow n Burner Boom,
Well N#1, (Loc. Madura Sea)
Flow head, Choke Manifol,
Separator, Surge Tank,
Burner
Offshore
Rig Bohai 8
August 2013 Rigging up Burner Boom at JOB- Burner Boom Offshore
2. Year Job Description Tools Rig
Petrochina, Well Zircon#1, (Loc.
Papua)
Rig Bohai 8
Sept 2013 – Okt 2013 Surface Well Testing at JOB-
Petrochina, Well Zircon#1, (Loc.
Papua)
Flowhead, Choke Manifol,
Separator, Surge Tank,
Burner
Offshore
Rig Bohai 8
Nov 2013 – Des 2013 Surface Well Testing at Husky
CNOOC (HCML), Well MBF#1, (Loc.
Banyuwangi)
Flowhead, Choke Manifol,
Separator, Surge Tank,
Burner
Offshore
Rig HYSY 937
Jan 2014 – Feb 2014 Surface Well Testing at JOB-
Petrochina, Well KOI#2, (Loc.
Papua)
Flowhead, Choke Manifol,
Separator, Surge Tank,
Burner
Offshore
Rig Bohai 8
Apr 2014 – Jun 2014 Surface Well Testing (MRT) at
PetronasCarigali, WellKEDP A1, A2,
A3, A4, (Loc. Kepodang – Java Sea)
Flowhead, Sand Filter, Choke
Manifold, Separator, Surge
Tank, Burner Boom
Offshore
Rig Rowan EXL#1
July 2014 – Aug 2014 Surface Well Testing (MRT) at
PetronasCarigali, WellKEJT-C1, C2,
(Loc. Kepodang – Java Sea)
Flowhead, Sand Filter, Choke
Manifold, Separator, Surge
Tank, Burner Boom
Offshore
Rig TOPAZ DRILLER
August 2014 Surface Well Testing (MIT) at PHE
Nunukan, Well West Badik #1
DST#1,#2, #3, #4, (Loc. Nunukan-
Kalimantan)
Flowhead, Choke Manifold,
SSV, Steam Heat Exhanger,
Separator, Surge Tank,
Burner Boom
Offshore
Rig Rowan Gorilla II
Sept 2014 – Oct 2014 Preparing (Make Up/Instaled and
redress some Part, Fuction Testing,
Pressure Testing, Inventory,
Mobilizing) SWT equipments for Shell
Project inPerth-Halliburton Australia
Flowhead, Sand Filter, Choke
Manifold, SSV, SteamHeat
Exhanger, Separator, Surge
Tank, Burner Boom
Onshore
(Workshop)
Dec 2014 – Jan 2015 Surface Well Testing (MIT) at PTTEP
InternationalMyanmar, WellSNM-
1ST1, (Loc. Bagan-Myanmar)
Flowhead, Choke Manifold,
SteamHeat Exhanger,
Separator, Surge Tank,
Burner
Onshore
Rig Great Wall-193
March 2015 – April2015 Surface Well Testing (MIT) at
Conoco Philips Suban, Well Suban
14, (Loc. Suban-Palembang)
HPHT (70 MMSCF/D Gas well)
UpstreamGlayloc D27 line,
2ea Choke Manifold (3 1/16”
& 4 1/16”), 6” 206 high rate
line, 4” 206 Outlet separator
line, 3” 206 oil line, 2ea SSV
(3 1/16” & 4 1/16”), 1440
Separator, Surge Tank, 1 ea
Vulcan Burner, 4 ea Silencer.
Onshore
Rigless
April 2015 – May 2015 Surface Well Testing (Clean Up –
Heavy Oil (Wax)) at Petronas, Well
BJTJ Z-5, (Loc. Ketapang-Java Sea-
Surabaya)
Oil Well 5000 BOPD
Choke Manifold, SSV, Steam
Heat Exhanger, Separator,
Surge Tank, Burner Boom
Offshore
Rig TOPAZ DRILLER
June 2015 – July 2015 Surface Well Testing (MIT) at
Conoco Philips Suban, Well Suban
14, (Loc. Suban-Palembang)
HPHT (70 MMSCF/D Gas well)
UpstreamGlayloc D27 line,
2ea Choke Manifold (3 1/16”
& 4 1/16”), 6” 206 high rate
line, 4” 206 Outlet separator
line, 3” 206 oil line, 2ea SSV
(3 1/16” & 4 1/16”), 1440
Separator, Surge Tank, 1 ea
Vulcan Burner, 4 ea Silencer.
Onshore
Rigless
July 2015 – August 2015 Surface Well Testing (MIT) at
Conoco Philips Suban, Well Suban
13, (Loc. Suban-Palembang)
HPHT (120 MMSCF/D Gas well)
UpstreamGlayloc D27 line,
2ea Choke Manifold (3 1/16”
& 4 1/16”), 6” 206 high rate
line, 4” 206 Outlet separator
line, 3” 206 oil line, 2ea SSV
(3 1/16” & 4 1/16”), 1440
Separator, Surge Tank, 1 ea
Vulcan Burner, 4 ea Silencer.
Onshore
Rigless
August 2015 – September 2015 Surface Well Testing (Clean Up –
Heavy Oil (Wax oil)) at Petronas,
Choke Manifold, SSV, Steam
Heat Exhanger, Separator,
Offshore
Rig TOPAZ DRILLER
3. Year Job Description Tools Rig
Well BJTJ Z-2, (Loc. Ketapang-Java
Sea-Surabaya)
Oil Well 5000 BOPD
Surge Tank, Burner Boom
26 Oct 2015 – 24 Nov 2015 Geothermal Jobat Sarulla
Operation Limited (SOL)As Well
Test Technician to assist Well Test
Supervisor to Monitor/Control,
making the planning for Shorterm
Test/Injectivity Test, Heating Up
Test and Flow Test/Longterm
Test, Instalation and Maintenance X-
Mas Tree).
Well Test Geothermal
Equipments (Flow Control
Valve, Pipe line Flanges
connection, LECM, Brine
Manifold), Wireline
equipment (running PTS/PT)).
PRA#09, PRA#15,
EPI#09
(Floatingon allthe
Rig site)
21 Dec 2015 – 30 Jan 2016 Geothermal Job at Sarulla
Operation Limited (SOL) As Well
Test Technician to assist Well Test
Supervisor to Monitor/Control,
making the planning for Shorterm
Test/Injectivity Test, Heating Up
Test and Flow Test/Longterm
Test, Instalation and Maintenance X-
Mas Tree).
Well Test Geothermal
Equipments (Flow Control
Valve, Pipe line Flanges
connection, LECM, Brine
Manifold), Wireline
equipment (running PTS/PT)).
PRA#09, PRA#15,
EPI#09
(Floating on all the
Rig site)
TRAININGS:
NO SAFETY TRAINING Year
1. BASIC FIRST AID 2012
2. TROPICAL-BASIC OFFSHORE SAFETY INDUCTION AND EMERGENCY TRAINING 2012
3. Confined Space & Authorize Gas Tester 2012
4. BASIC FIRE FIGHTING 2012
5. Common Safety Training Program Recognition of Prior Learning (at ERGT Australia) 2014
6. Work Safety at Heights (at ERGT Australia) 2014
7. Operate Breathing Apparatus Open Circuit (at ERGT Australia) 2014
8. Further Offshore Emergency Training (FUET 5858) Include EBS (at ERGT Australia) 2014
9. Shell Palta Prelude Drilling Campaign Onboard Training (at IFAP Australia) 2014
10 H2S Training Level 1 at Pandu Service Company 2014
NO SKILL TRAINING Year
1. Hydrolic Fittings and Thread Identification Aw arenessCourse (at TRIDENT Australia) 2014
2. Simple Training for BHS (Bottom Hole Sampling SPS 15 @ Halliburton CilandakWorkshop 2013
3. Basic Well Testig Training(At Labuan – Malaysia) 2015
4. Intermediate Well Testing Training (At Labuan – Malaysia) 2015
NO I-LEARN TRAINING Date Completed
1 PERFORMANCE EXPECTATIONS FOR OPERATOR ASSISTANTS Jan- 2013
2 RISK MANAGEMENT - EVALUATING RISK Nov-2012
3 RISK MANAGEMENT - CONTROLLING RISKS Nov-2012
4 CONFINED ENTRY Nov-2012
5 RISK MANAGEMENT - HAZARD IDENTIFICATION Nov-2012
6 CPI OVERVIEW Nov-2012
7 INTERNAL CONTROLS Nov-2012
8 EXPLOSIVES GENERAL AWARENESS - NON USERS Nov-2012
9 RADIATION - GENERAL AWARENESS Nov-2012
10 PII ENVIRONMENT Nov-2012
11 DROPPED OBJECTS AWARENESS Nov-2012
12 CODE OF BUSINESS CONDUCT INTRO - CATEGORY 2 Nov-2012
13 ERGONOMICS - GENERAL Nov-2012
14 HAZARD COMMUNICATIONS Nov-2012
15 SHELL LIFE SAVING RULES Nov-2012
4. NO I-LEARN TRAINING Date Completed
16 SUBSTANCE ABUSE AWARENESS & POLICY Nov-2012
17 ENVIRONMENTAL AWARENESS & INCIDENT RPT. Nov-2012
18 HAND AND FINGER SAFETY Nov-2012
19 BLOODBORNE PATHOGENS AWARENESS LEVEL Nov-2012
20 ANTI-CORRUPTION: FCPA & INTL ANTI-BRIBERY Nov-2012