Inadvertent Exchanger Tube
Bundle Extraction
a Safety Critical Mistake
James R. “Chezo” Cesarini, PE
Maintenance Manager
Valero Refining - Texas, LP
Texas City, Texas
james.cesarini@valero.com
Inadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical Mistake
Operational Situation
• September 30, 2005 @ 06:30 AM
• Shift Change @ Gas Oil
Hydrotreater (GOHT) Unit
• Cold Separator Trim Condenser
– E-13-1308
• Plant down from hurricane Rita – in
process of starting up
• Tube leak identified during start up
requiring bundle replacement
• Having difficulty extracting bundle
from shell - 50K LB with extractor
• In addition to bundle extractor,
have added 450 LB steam in the
shell – common practice
• Currently in process of adding
stress relieving coils to shell – also
common practice
• 8 ½ hours of steam addition
• Adding additional coils to
expand shell
• Rapid heat ramp to 800 Deg. F.
• Steam escaping from bottom
shell nozzle– Cooling Water Inlet
• Blind on CW Inlet was tightened
to lessen steam loss
• Pressure built in the shell (> 360
psig)
• Shell condensate quickly
became steam
• Steam exit orifice equal or
smaller than entrance orifice
Inadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical Mistake
Incident Description
• Closing the bottom blind (CW
Inlet – 450 LB Steam Inlet)
allowed the following to occur:
– Pressure to build In the shell
– Rapid vaporization of
condensate to steam
(reaching sonic velocity)
– expansion of shell (coupled
with the external heating coils)
• Result
– One Inadvertent Bundle
Launch
• Bundle contacted extractor gear
box and landed 58 feet away
• Extractor gear box traveled 108
feet through sour water pumps
Inadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical Mistake
Incident Description
Inadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical Mistake
Root Cause of Incident
• Impatience - extended length of
time to extract bundle
• Loss of focus – Deviation of
proven procedure without
thorough review
• Pressure build in shell due to
inadequate venting
• Volumetric expansion of
condensate to steam
• Excessive heat ramp with
external coils (rapid shell
expansion)
• Steam alignment incorrect from
the beginning entering from the
bottom and exiting from the top
• EIL source violation – adding an
energy source to LO/TO item
Steam added from the bottom
+ Blind Flange was later closed
Reduced area of escape for steam +
Condensate build in vessel–no escape
Additional Heat
Source - 800 Deg. F.
• More rigorous procedure to
extract bundle is necessary
• Increased communications
necessary when making a
change during a process
• Avoid using a compressible
fluid in all cases if possible
• Adding steam to LO/TO item is
breech of the Energy Isolation
List (EIL)
• Add a pressure indicator to the
system for safety observation
• Additional craft training and
observation regarding steam
line up is warranted
• Have an experienced technician
or engineer review/calculate the
configuration
Inadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical Mistake
Lessons Learned
• Providing additional LO/TO and
EIL training to all refinery
personnel
• Informing all within Valero
Refining system about incident
• Informing petrochemical
community about incident
• Preparing procedure to safely
extract difficult bundles
• Amending refinery Safety and
Health Guideline for LO/TO and
EIL
• Requiring a pressure indicator
with this configuration
Inadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical Mistake
Counter Measures
• Bundle change provided
opportunity to install new
proprietary patented pressure
seal
• Pressure seal allowed
exchanger reassembly without
welding on another diaphragm
• Successful pressure seal
installation paved the way for
future modification on 13 other
exchangers
• Successful pressure seal will
save substantial $$$ for all
future shutdowns
– Time savings
– Easy assembly
– Reliability issue resolved
Inadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical Mistake
Opportunity Provided (!) – Existing Arrangement
• Leak Free Service
• Interest has exploded
– VLO McKee
– VLO Delaware City
– VLO Wilmington
– Eastman TN
– VLO Texas City
• Everyone likes their
own idea!
Inadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical Mistake
Opportunity Provided (!) – Post Modification
• Incident
• EIL violation – adding energy
source to a LO/TO item
• Inadequate venting of steam
during use as a heat source
• Loss of concentration during
heat of battle
• Opportunity
• Opportunities exist even during bad
situations
• Thinking outside the box today will
save $MM for us going forward
• Thinking outside the box can still
be considered coloring within the
lines
Inadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical Mistake
Summary

Mais conteúdo relacionado

Semelhante a 2005 API NPRA Ops Sym E1308 Bundle Launch

Basics Of Pricess Plant Piping System Design .pdf
Basics Of Pricess Plant Piping System Design .pdfBasics Of Pricess Plant Piping System Design .pdf
Basics Of Pricess Plant Piping System Design .pdfVenkataSivaNagaSai
 
Central heating level 3
Central heating level 3Central heating level 3
Central heating level 3Barry Everard
 
Condensate Return Solutions.ppt
Condensate Return Solutions.pptCondensate Return Solutions.ppt
Condensate Return Solutions.pptssuser8006c7
 
Avoid syn gas catalyst mal operation
Avoid syn gas catalyst mal operationAvoid syn gas catalyst mal operation
Avoid syn gas catalyst mal operationGerard B. Hawkins
 
HeatBolier_and_IC_engine_.pptx
HeatBolier_and_IC_engine_.pptxHeatBolier_and_IC_engine_.pptx
HeatBolier_and_IC_engine_.pptxBLITZGAMING4
 
Catalyst Catastrophes in Syngas Production - II
Catalyst Catastrophes in Syngas Production - IICatalyst Catastrophes in Syngas Production - II
Catalyst Catastrophes in Syngas Production - IIGerard B. Hawkins
 
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsPipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsHammerHead Trenchless Equipment
 
TRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyTRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyMEL3360
 
"Solar Systems in Practise" - Alan Kiff, ARK Specialist Services
"Solar Systems in Practise" - Alan Kiff, ARK Specialist Services"Solar Systems in Practise" - Alan Kiff, ARK Specialist Services
"Solar Systems in Practise" - Alan Kiff, ARK Specialist ServicesSustainable Business Partnership
 
Tank Overflow Protection and Surge Mitigation
Tank Overflow Protection and Surge MitigationTank Overflow Protection and Surge Mitigation
Tank Overflow Protection and Surge MitigationAdvisian
 
Evaporator coil repair Edwards Unit
Evaporator coil repair Edwards UnitEvaporator coil repair Edwards Unit
Evaporator coil repair Edwards UnitFrank Rubino
 
194309386-LESSON-LEARNT-FROM-AICHE-PAPER-S.pptx
194309386-LESSON-LEARNT-FROM-AICHE-PAPER-S.pptx194309386-LESSON-LEARNT-FROM-AICHE-PAPER-S.pptx
194309386-LESSON-LEARNT-FROM-AICHE-PAPER-S.pptxrajneeshjauhari2
 
Boilers report
Boilers reportBoilers report
Boilers reportR.K. JAIN
 
novNikezicPresentationNikezicPresentation
novNikezicPresentationNikezicPresentationnovNikezicPresentationNikezicPresentation
novNikezicPresentationNikezicPresentationARUNPRAKASHS7
 
Power Generation-10n.ppt
Power Generation-10n.pptPower Generation-10n.ppt
Power Generation-10n.pptSubratSahu57
 
JDWW001v6evapcocondenser
JDWW001v6evapcocondenserJDWW001v6evapcocondenser
JDWW001v6evapcocondenserKelly Erwin
 
PRESENTATION ON SURGE ANTICIPATION VALVE.pptx
PRESENTATION ON SURGE ANTICIPATION VALVE.pptxPRESENTATION ON SURGE ANTICIPATION VALVE.pptx
PRESENTATION ON SURGE ANTICIPATION VALVE.pptxholegajendra
 
SunMaxx Installation Manual - StorMaxx Solar Hot Water Storage Tanks
SunMaxx Installation Manual - StorMaxx Solar Hot Water Storage TanksSunMaxx Installation Manual - StorMaxx Solar Hot Water Storage Tanks
SunMaxx Installation Manual - StorMaxx Solar Hot Water Storage TanksSunMaxx Solar
 

Semelhante a 2005 API NPRA Ops Sym E1308 Bundle Launch (20)

Lessons learned solving pilot valve instability issues on LNG storage tanks
Lessons learned solving pilot valve instability issues on LNG storage tanksLessons learned solving pilot valve instability issues on LNG storage tanks
Lessons learned solving pilot valve instability issues on LNG storage tanks
 
Basics Of Pricess Plant Piping System Design .pdf
Basics Of Pricess Plant Piping System Design .pdfBasics Of Pricess Plant Piping System Design .pdf
Basics Of Pricess Plant Piping System Design .pdf
 
Central heating level 3
Central heating level 3Central heating level 3
Central heating level 3
 
Condensate Return Solutions.ppt
Condensate Return Solutions.pptCondensate Return Solutions.ppt
Condensate Return Solutions.ppt
 
Avoid syn gas catalyst mal operation
Avoid syn gas catalyst mal operationAvoid syn gas catalyst mal operation
Avoid syn gas catalyst mal operation
 
HeatBolier_and_IC_engine_.pptx
HeatBolier_and_IC_engine_.pptxHeatBolier_and_IC_engine_.pptx
HeatBolier_and_IC_engine_.pptx
 
Catalyst Catastrophes in Syngas Production - II
Catalyst Catastrophes in Syngas Production - IICatalyst Catastrophes in Syngas Production - II
Catalyst Catastrophes in Syngas Production - II
 
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsPipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
 
TRIC Trenchless LA building & safety
TRIC Trenchless LA building & safetyTRIC Trenchless LA building & safety
TRIC Trenchless LA building & safety
 
"Solar Systems in Practise" - Alan Kiff, ARK Specialist Services
"Solar Systems in Practise" - Alan Kiff, ARK Specialist Services"Solar Systems in Practise" - Alan Kiff, ARK Specialist Services
"Solar Systems in Practise" - Alan Kiff, ARK Specialist Services
 
Hydel Generation and Types Of Turbines
Hydel Generation and Types Of TurbinesHydel Generation and Types Of Turbines
Hydel Generation and Types Of Turbines
 
Tank Overflow Protection and Surge Mitigation
Tank Overflow Protection and Surge MitigationTank Overflow Protection and Surge Mitigation
Tank Overflow Protection and Surge Mitigation
 
Evaporator coil repair Edwards Unit
Evaporator coil repair Edwards UnitEvaporator coil repair Edwards Unit
Evaporator coil repair Edwards Unit
 
194309386-LESSON-LEARNT-FROM-AICHE-PAPER-S.pptx
194309386-LESSON-LEARNT-FROM-AICHE-PAPER-S.pptx194309386-LESSON-LEARNT-FROM-AICHE-PAPER-S.pptx
194309386-LESSON-LEARNT-FROM-AICHE-PAPER-S.pptx
 
Boilers report
Boilers reportBoilers report
Boilers report
 
novNikezicPresentationNikezicPresentation
novNikezicPresentationNikezicPresentationnovNikezicPresentationNikezicPresentation
novNikezicPresentationNikezicPresentation
 
Power Generation-10n.ppt
Power Generation-10n.pptPower Generation-10n.ppt
Power Generation-10n.ppt
 
JDWW001v6evapcocondenser
JDWW001v6evapcocondenserJDWW001v6evapcocondenser
JDWW001v6evapcocondenser
 
PRESENTATION ON SURGE ANTICIPATION VALVE.pptx
PRESENTATION ON SURGE ANTICIPATION VALVE.pptxPRESENTATION ON SURGE ANTICIPATION VALVE.pptx
PRESENTATION ON SURGE ANTICIPATION VALVE.pptx
 
SunMaxx Installation Manual - StorMaxx Solar Hot Water Storage Tanks
SunMaxx Installation Manual - StorMaxx Solar Hot Water Storage TanksSunMaxx Installation Manual - StorMaxx Solar Hot Water Storage Tanks
SunMaxx Installation Manual - StorMaxx Solar Hot Water Storage Tanks
 

2005 API NPRA Ops Sym E1308 Bundle Launch

  • 1. Inadvertent Exchanger Tube Bundle Extraction a Safety Critical Mistake James R. “Chezo” Cesarini, PE Maintenance Manager Valero Refining - Texas, LP Texas City, Texas james.cesarini@valero.com
  • 2. Inadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical Mistake Operational Situation • September 30, 2005 @ 06:30 AM • Shift Change @ Gas Oil Hydrotreater (GOHT) Unit • Cold Separator Trim Condenser – E-13-1308 • Plant down from hurricane Rita – in process of starting up • Tube leak identified during start up requiring bundle replacement • Having difficulty extracting bundle from shell - 50K LB with extractor • In addition to bundle extractor, have added 450 LB steam in the shell – common practice • Currently in process of adding stress relieving coils to shell – also common practice
  • 3. • 8 ½ hours of steam addition • Adding additional coils to expand shell • Rapid heat ramp to 800 Deg. F. • Steam escaping from bottom shell nozzle– Cooling Water Inlet • Blind on CW Inlet was tightened to lessen steam loss • Pressure built in the shell (> 360 psig) • Shell condensate quickly became steam • Steam exit orifice equal or smaller than entrance orifice Inadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical Mistake Incident Description
  • 4. • Closing the bottom blind (CW Inlet – 450 LB Steam Inlet) allowed the following to occur: – Pressure to build In the shell – Rapid vaporization of condensate to steam (reaching sonic velocity) – expansion of shell (coupled with the external heating coils) • Result – One Inadvertent Bundle Launch • Bundle contacted extractor gear box and landed 58 feet away • Extractor gear box traveled 108 feet through sour water pumps Inadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical Mistake Incident Description
  • 5. Inadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical Mistake Root Cause of Incident • Impatience - extended length of time to extract bundle • Loss of focus – Deviation of proven procedure without thorough review • Pressure build in shell due to inadequate venting • Volumetric expansion of condensate to steam • Excessive heat ramp with external coils (rapid shell expansion) • Steam alignment incorrect from the beginning entering from the bottom and exiting from the top • EIL source violation – adding an energy source to LO/TO item Steam added from the bottom + Blind Flange was later closed Reduced area of escape for steam + Condensate build in vessel–no escape Additional Heat Source - 800 Deg. F.
  • 6. • More rigorous procedure to extract bundle is necessary • Increased communications necessary when making a change during a process • Avoid using a compressible fluid in all cases if possible • Adding steam to LO/TO item is breech of the Energy Isolation List (EIL) • Add a pressure indicator to the system for safety observation • Additional craft training and observation regarding steam line up is warranted • Have an experienced technician or engineer review/calculate the configuration Inadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical Mistake Lessons Learned
  • 7. • Providing additional LO/TO and EIL training to all refinery personnel • Informing all within Valero Refining system about incident • Informing petrochemical community about incident • Preparing procedure to safely extract difficult bundles • Amending refinery Safety and Health Guideline for LO/TO and EIL • Requiring a pressure indicator with this configuration Inadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical Mistake Counter Measures
  • 8. • Bundle change provided opportunity to install new proprietary patented pressure seal • Pressure seal allowed exchanger reassembly without welding on another diaphragm • Successful pressure seal installation paved the way for future modification on 13 other exchangers • Successful pressure seal will save substantial $$$ for all future shutdowns – Time savings – Easy assembly – Reliability issue resolved Inadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical Mistake Opportunity Provided (!) – Existing Arrangement
  • 9. • Leak Free Service • Interest has exploded – VLO McKee – VLO Delaware City – VLO Wilmington – Eastman TN – VLO Texas City • Everyone likes their own idea! Inadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical Mistake Opportunity Provided (!) – Post Modification
  • 10. • Incident • EIL violation – adding energy source to a LO/TO item • Inadequate venting of steam during use as a heat source • Loss of concentration during heat of battle • Opportunity • Opportunities exist even during bad situations • Thinking outside the box today will save $MM for us going forward • Thinking outside the box can still be considered coloring within the lines Inadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical MistakeInadvertent Exchanger Tube Bundle Extraction … a Safety Critical Mistake Summary