SlideShare uma empresa Scribd logo
1 de 35
Global Quality Management Solutions, LLC
2016 Kaizen Spiral PDCA
Project Report Template
GQMS Phone: 1-888-216-8324
GQMS Email: info@globalqualitymanagementsolutions.com
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
PDCA - KAIZEN Spiral – Improvement ActivityEnsures:
Use of PDCA
Recognition
Skills & training
Communication
Use of CI Tools
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Team Name:
Date
Note that this will be the 1st page of your presentation, so delete the
previous slides. Also, need to remove the helpful ideas/information in
all of the following slides and replace with your specific data and
explanation.
Remember that this presentation is a story of your team improvement
activities – needs to be clear and logical, not only showing your
successes, but showing your failures along the way.
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
What is the problem? 1. a
Identify Gap
Budget
Customer Complaint
Desire
Document the “gap” that needs addressed with this project
A PROBLEM IS DEFINED AS A DEVIATION BETWEEN WHAT SHOULD BE HAPPENING,
AND WHAT IS ACTUALLY HAPPENING.
Identify what the problem is before beginning analysis
Ideal state / target
Gap = Problem (abnormality)
Current condition
Outputs:
Theme, Problem and gap defined and approved
Customers acknowledged and input documented
Type of problem (lean or variation/quality)
Note: Be careful about listing
symptoms instead of the problem
and be careful to not assume a
cause of the problem
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Why this problem? 1. b
Identify Gap
Budget
Customer Complaint
Desire
Gap: Document how it ties to the company
goals
Identify: ASK, How this project ties to the company goals?
The gap that is initiating the project could come from:
Quality - Customer complaints
Cost - Budget targets not met
Productivity - Some desired improved level
Other – Safety, Environmental, etc
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Why this problem?
1. c
Identify Gap
Budget
Customer Complaint
Desire
Gap: Document how it impacts CS
(Customer Satisfaction).
Identify: ASK, who is the Customer?
(internal or external or both)
Clarify: Ask, how the customer satisfaction is being damaged
(PPM, customer targets not being met, customer surveys, etc.).
Go talk to the customer.
Maybe use a survey to document impact on customer
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Use a slide or two to show historical data analysis
that narrows issue to specific problem(s)
2.
Data
Analysis
Use graphs, diagrams, etc to show why specific parts and defects are chosen
Outputs:
Big problem or gap broke
down
NSL by Model - Windshields
0
200
400
600
800
1000
1200
1400
1600
1800
L32-F
044-F
GMT191-F
UL-F
GM315-F
500N-F
W164LS-FD
W164-F
CM-F
770-F
U388/387-F
Defects
NSL - Sidelites Repeat Issues
0
5
10
15
20
25
Logo
Grind
Pits
Chips
Contamination
BrokenLine
Scratch
MissingCorner
MixedModels
Warp
MissingPriint
Rubs
InkSpot
CeramicVoid
Printissue
Mis-Labeled
Curvature
Distortion
Packaging
Size
Kink
Beltmarks
MoldMarks
Occurrances
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Set the priorities and targets for the team by
establishing the project and/or problem
statement and goals or targets for improvement.
3.
Set Priorities
& Targets
Use the historical data to categorize the project into smaller, more concrete problems.
If working on a big project , then tackle the most impacting problem 1st, then the 2nd most important, until
the big project target is met.
One Specific Problem Statement:
Document the problem statement or statements (if
addressing more than one defect or object)
One object
One defect
Target: Document the target for
improvement such as 50% reduction
and note the ultimate goal.
2. Break Down The Problem
5
3. Set A Target
- Make the commitment.
- Measurable, concrete and challenging.
> Do what by how much by when?
> Clarify rationale and impact.
> Output oriented (things to be achieved, not things to do).
- Use data to categorize the problem
into smaller, more concrete
problems. Use division points
such as Who, What, When
or Where?
- Narrow the focus to one aspect
of the problem to solve.
- Genchi Genbutsu: Go & see the
smaller problem and visualize
the process.
(Contain the problem if needed)
- Specify the point of cause and
state the problem to engage.
- Keep in mind scope.
Tally Sheet
Survey
P D C A
P D C A
July
Start
Finish!
April
Current
Situation
Problem
Problem Problem
ProblemProblem Problem Problem
Point of Cause
Include a picture or diagram of the
part and the defect
Outputs:
Specific Problem statement and target Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Assign the resources required to meet the target. Establish the team members and leader
(generally 4-7 members) and any other team guidelines including timing and leadership
approval.
4.
Assign
Team
Team Members:
Name Title/Area
1
2
3
4
5
Other support members:
1.
Include a team picture if
possible
Timing: Project to be completed in 3 months by
end of July, 2011.
Champion/Approval: Jim Jones, Dept Manager
Outputs:
Team members assigned
Timeline completed
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Do not rely on historical data 5.
Study Actual
Facts 3e
• 5a Fill out IS/IS NOT with known information
• 5b Process Flow Chart – Walk the Process
• Process Map – 3e
• 5c Fill out 2E column
• Reviewing current SOP and Standards and compare to what is
actually happening
• What are the process settings suppose to be
• How are changeovers supposed to be completed
• What PM schedules are supposed to be followed
• 5d Data Collection Plan
• Used to complete questions that you don’t have answers to
• Part Analysis
• Collect a sampling of the defects
• What is the location
• What kind of pattern
• Special Condition of Defect – Microscope
• 5e Benchmarking
• Are there other plants that have the same/similar equipment
A B
A1
D1
A2
D2
Checksheets
3e Go to the exact place
See the exact object
Confirm the exact facts
Outputs:
Process Flow chart or Process Map
Is/Is-not answers on Problem specification
2E completed on Problem specification
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Describe the Problem• Complete a problem description
• Break down the problem into an IS category
and IS Not category
• The IS gives an accurate description of the
problem – FACTS ONLY
• The IS NOT provides additional information
about closely related items which do not have
the same problem thus helping to eliminate
possible causes = saves time
• Answering the questions focused around What,
Where, When and Extent
2E Differences
Produced on different Lines -
Wash tanks
Final Assemblies
Overhead conveyors
Different Employees
Different Production Rates
6% More or less than 6%
1mm - 2mm Larger or smaller
Increasing Stable or decreasing
Stable up to 11 Increasing or decreasing
up to 11 more than 11
Periodically (more data would be helpful) Continuously or Sporadically
Drying booth we actually could see the
defect but it was first seen during visual
final inspection
Paint Booth
Two weeks ago Before two weeks ago
Final Inspection
Final Assembly, Drying and Paint
Booth
Randomly on the painted surface In one specific spot
Paint Gaps Peeling, running, globs, discoloring
IS IS-NOT Changes
Extend your Knowledge!
Look at the Fundemental
Rules!
What is different, odd,
unusual or distinctive
about each IS compared
to each IS-NOT?
What has changed
in, on, or about
each Difference?
Accord Door Panels Civic & Acura Door Panels
Clean more units weekly
for the last 3 weeks
more units last 3 weeks
panels loaded closer
New employees 5 wks ago
Increasing wkly - last 3wks
How many
objects
W
H
A
T
What
Object
W
H
E
N
E
X
T
E
N
T
What is
the size
of the
defect
No. of
defects on
one unit
Trend of
object
Trend of
defect
Where
Geographically
Where on
the object
When first
When Since Is
there a pattern
for Varience
What was
going on in
the process or at
what process step
did it occur
What is having the Problem
What could be having the problem
but IS-NOT
W
H
E
R
E
3e - Reality of the Present Situation, Go to the exact place, See the exact object, Confirm the exact facts
What should be happening? How
should it opperate?
What
Defect
Problem Statement: Honda Door Panels with Paint Gaps
Where do I get the information
• Breakdown the problem factually
– It will be necessary to spend time getting
the facts about the current state from the
exact place and exact object (3e) – Walk
the Floor
5.a
Study Actual
Facts 3e
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Study the actual facts – Walk the process and
document it using a flow chart or a process map
5.b
Study Actual
Facts 3e
Walk the Process
1) Establish the process start and stop points
2) Entire team takes time to walk the process and observe
each step of the process including repair loops
3) Note documents and talk to operators and take notes and
pictures for reference later
3e
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Describe the Problem - 2E - Determine if
the process standards are being followed.
5.c
Study Actual
Facts
Does Actual = Standard
2E – Using our current knowledge,
experience and fundamental rules to
collect as much information about the
problem as possible. Example Work
Instructions, standards, etc.
2E
Extend your knowledge
Establish your own fundamental rules
Go to process:
What should be happening? (Work instructions, procedures, specifications, process
standards, staffing, etc.)
What is actually happening? (Setup sheets, process verification logs, PM logs, actual
staffing, training status, etc.)
Processes set up to existing standards?
Following PM schedule?
Measurement system satisfactory?
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Study the Facts – Use the Is/Is-not missing data to help develop and implement a
data collection plan. Go deep into the issue.
5.d
Study Actual
Facts
Specify the Problem: Delivery trucks with broken glass
IS IS NOT
WHAT
What object? Delivery Trucks Harp Racks, Dollies
What defect? Broken Glass Scratched, Rubs,
WHERE
Where geographically? ???? ????
Where on the object? ????? ????
WHEN
When first? Been an issue for a while Before
When since? Daily Every Truck
When in the life cycle? ????? ?????
EXTENT
How many objects? ???? ????
What is the size? Full Sheets Partial Sheets
How many defects? ???? ????
What is the trend? ???? ????
PART ANALYSIS
-Visual observation – Use magnification, lighting, etc to improve ability
to see
-Dimensional comparison
-Test results and Technical reportsGlobal Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Complete a Benchmarking Study looking for best
practices.
5.e
Study Actual
Facts
Compare your process to others to understand your current situation and learn from it.
By comparing your process to other processes, you can learn a lot about how to develop
and improve yours.
Benchmarking can show you:
Where your weaknesses are
Which areas you can improve
New or different ways to do things
Strategies for improvement
What is possible
Where your strengths are and how to
maintain them
Where you can increase efficiency
Hints:
Look at other AGC sites even in other
parts of the world
Is there another company that is known
for this process
Note that Benchmarking can be used in
step 1 also to help establish the “gap”
3e Go to the exact place
See the exact object
Confirm the exact facts
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Analyze the actual facts 6.
Analyze
Facts
6a - Developing Possible Causes by
Differences & Changes
Brainstorming/Fishbone from Knowledge & Experience
6b - Create Possible Cause Statements
6c - Test Possible Causes
6d - Prioritize the Possible Causes
6e - Verify the most likely Cause(s)
Outputs:
Completed problem specification
Tested Possible Causes
-2000 -1000 0
-2200
-1200
-200
Sales Var
ProfVar
Prof Var = -566.037 + 0.608943 Sales Var
S = 216.684 R-Sq = 93.1 % R-Sq(adj) = 91.4 %
Regression Plot
+/- 3 Sigma
(99.7 % of Data)
Customer Specification
Process Width
Mean
Sample
SampleMean
10987654321
11.5
11.0
10.5
10.0
9.5
9.0
8.5
__
X=9.935
UCL=11.245
LCL=8.626
Xbar Chart of C4
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Analyze the Facts – Develop possible causes by using Differences
and Changes and developing a Fishbone Diagram.
6. a
Analyze
Facts
The ways of developing possible causes.
METHODS
Difference & Changes
Brain Storming
Fishbone Diagram
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Create Possible Cause Statements from the causes
developed in step 6a.
6.b
Analyze
FactsDevelop statements that explain how the problem
occurred
To create possible cause statements for
testing against the facts
List Possible cause statements from Differences and
Changes along with the Fishbone Analysis.
Purpose:
How could…
a change
a change and a difference
a change and another change
a difference alone
…cause the problem?
What causes can be generated from Fishbone
Analysis
Write a short statement in object/defeat format
Explain how the cause creates the problem
Examples
Possible Cause Statement:
I ran over a piece of metal in the road 2 weeks
ago which may have punctured my
radiator.
The drain valve is partially open causing it to
leak.
The automatic transmission connection line
has worked loose causing a leak.
A hose has developed a hole allowing a leak.
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Test Possible Causes against the Is/Is not specification.
Eliminate some of the causes and list assumptions.
6.c
Analyze
Facts
Evaluating possible causes against the
IS/IS NOT specification
• To save time by eliminating possible
causes that do not make sense
Ask:
If Possible Cause is the cause of Problem
Statement, how does it explain both the IS
and the IS NOT?
• Ask about each pair of IS/IS NOT data
• Eliminate any cause that fails
• List all assumptions
Examples
* I ran over a piece of metal in the road 2
weeks ago which may have punctured my
radiator.
Explains only if started leaking 2 wks ago
* The drain valve is partially open causing it
to leak.
Explains only if started leaking 2 wks ago
* The automatic transmission connection
line has worked loose causing a leak.
X Does not explain – You would see
transmission fluid not coolant
* A hose has developed a hole allowing a
leak.
Explains only if started leaking 2 wks ago
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Prioritize the Possible Causes by reviewing the
assumptions and picking the most likely.
6.d
Analyze
Facts
Explanation
• Identifying the cause that is most
reasonable
• To pick the possible cause to verify first
Ask:
• Which of the possible causes is the most
believable?
• Most Probable Cause has:
Reasonable assumptions
Fewest assumptions
Overall simplest assumptions
Example
All of the causes have potential in this
case but the ones that are most likely are?
1. Puncture to the radiator
2. Puncture to the hose
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Verify the most likely Possible Cause(s) by 3e observation,
research/testing and turning the defect/issue on/off.
Proving the cause of the defect
To identify steps to take, use:
• Observation - How can we look at the cause?
(3e)
• Research - How can we experiment to test this
cause? You want to be able to turn the defect
on and off
• Results - How can we try our Fix to see if it
works?
Example
Observation in this case, go and look
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Identify the root cause(s) by using the why-why analysis on
the most probable cause(s) from step 6.
7.a
5 why
Root Cause
Example (not complete)
Deduction: Why-Why or 5-Why Analysis
A way to find the actual Root Causes.
To make sure we countermeasure the correct
items.
The purpose of Root Cause analysis is to go
beyond direct and somewhat apparent causes
and figure out the underlying reasons for the
event.
It is not enough to just find what broke or
changed and fix it. We must go to the next
level and determine the root cause if we want
to minimize repeat problems and eliminate this
issue in the future. Outputs:
Root cause(s) identified and testedGlobal Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Verify the root cause(s) by testing and documenting
the results preferably recreating the issue/defect.
7.b
5 why
Root Cause
The purpose of Root Cause verification is to test the hypothesis. Once the
issue or defect has been recreated, then at least one root cause has been
confirmed.
Verify the root cause(s) by trial and error or
Design of Experiment
Recreate the issue/defect
Use a summary table to show the result of the
testing.
Hints:
For more than one variable, use
a table like the one below
Verify the recreated defect is
exactly the same, not
similar.
Use Scientific method (Develop
a thesis (idea for
improvement), Conduct
experiment, Review results)Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Lean Projects
If the project is a Lean
Waste Reduction Project
then different methods and
tools will be used in Steps 5-
7 to develop the Action plan.
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
The 5S Visual Workplace
Utilize 5S to stabilize, improve and standardize the process.
Definition (Vision)
• A clean and organized work
area that visually
communicates all the vital
statistics.
• Status of the operation is
understood at a glance
• An area where an
unintended event or activity
is immediately visible
5S refers to improvement activities aimed at increasing the cleanliness,
orderliness, and organization of a work area for greater efficiency and reduction
of waste.
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Develop the plan of corrective actions that will
address the root causes
8.
Develop
Improvement
Plan
Outputs:
Approved Improvement Plan
• Establish criteria for selecting a
solution/countermeasure
• Generate potential solutions that will
address the root causes of the problem
• Select a solution
• Gain approval and support for the chosen
solution
• Plan the solution
Hints:
• Consider poka yoke (mistake
proof) countermeasures
• Assure countermeasures address
root causes (confirm before
implementation if possible)
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Execute the corrective actions. 9.
Execute
Plan
• Implement the chosen solutions
• Follow through with countermeasures
• Show before and after countermeasure
pictures, if possible
Hints:
• Implement the chosen solution
on a trial or pilot basis, if possible
and if expensive.
Outputs:
Improvements completed
Before:
200
Mesh
Count
After:
230
Mesh
CountGlobal Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Confirm and validate the impact of the corrective actions using
tests and analysis of data.
10.
Confirm
Results
Outputs:
Data analysis showing impact of changes
• Validate using data
• Statistical Proof (N-Chart, P-Chart, X&R)
• C/M verify (turn on – off)
• Supplier Self Audit (Schedule)
• Durability Tests
• Re-inspection Results
• Training Records
• Sign-off Sheets
• Product Specification Changes
Beautiful!
151413121110987654321
11
10
9
8
7
__
X=7.660
UCL=8.073
LCL=7.248
Before After
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Analyze the results and determine if the improvement targets were
met. If not, then go back to step 5.
11.a
Analyze
Results
Outputs:
Proof that goal(s) were met
Any secondary metric impact
Financial cost impact (actual and annualized)
Customer feedback analysis
• Check the final results verses the target from Step 3.
• If possible, show results in visual form using a run/SPC
chart or some other chart
• Show the actual impact short term and long term.
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Calculate the cost impact of the project using the
SGA guidelines
11.b
Analyze
Results
• Include cost savings for productivity, yield,
uptime, material use, reduction of head
count or inventory or other improvements
• Use the calculation guidelines for SGA in
the SGA Guidelines
• Report actual savings and an annualized
amount
• Include savings from other lines and plants
if the improvements were successfully
implemented
Hints:
• Include formulas for calculations
Cost Impact ( May’XX ~ Oct ‘XX )
Line 1: $ 90,895
Line 2: $ 224,087
TOTAL : $ 314,982 ( Scrap reduction )
=Σ Input * (Month Yield – Ave Yield (JAN~APR)) * Parts Cost
Monthly Yield=May
Oct
Cost Impact Annual Est. ( May ’XX to Apr ’XX )
Line 1: $ 271,645
Line 2: $ 487,057
TOTAL : $ 758,702 ( Scrap reduction )
=Σ Input * (Month Yield – Ave Yield (JAN~APR)) * Parts Cost
Monthly Yield=May
Oct
+ XX’ Oct effect * 6 month
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Determine final impact on CS (Customer
Satisfaction)
11.c
Analyze
Results
• Include a way to measure CS
• Customer surveys are one way to measure
both internal and external CS
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Standardize the solutions by changing the system and the
rules. Establish controls to assure the solutions stay in place.
12.a
Standardize
2E
• Adopt the solution
• Standardize countermeasures by changing
system documentation and training people
on the new way
• Implement controls assuring the
countermeasures are in place and stay in
place
Hints:
• Plan ongoing monitoring of the solution
• May use the Kamishibai Board and cards for visual
audits usually on a weekly, monthly, quarterly
schedule by supervisors or managers.
Outputs:
All improvements standardized assuring no
reversal
Communication of new best practices
completed
Team rewarded and acknowledged
Function FM FE Cause RPNControls
FMEA
Improvement Purpose Perf Mech Implementation ResponseAlarm
Control Plan
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Communicate and implement best practices to other similar
lines, plants, etc.
12.b
Standardize
2E
FEED BACK / FEED FORWARD
• Make sure pertinent information
was given to those who needed it.
• Indicate to whom information was
given and the date the information
was relayed.
• Make sure new associates are
trained using the correct
countermeasures.
• Share the information with other
lines and sites and customers, as
needed.
Hints:
• Include next steps for
improvement
• Recognize the team
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
Summarize what the team learned and next
steps.
12.c
Standardize
2E
Summarize the learning points
Summarize the next steps or the next project
Global Quality Management Solutions Phone: 1-888-216-8324
Global Quality Management Solutions, LLC
What to do with the completed Kaizen Spiral
• If SGA team, then copy with summary sheet to CI Rep at your site
• Share with others who need the information.
• Make sure management is aware of situation.
• Give copy to your QA department if it is quality related.
• Keep a copy on file. This could be useful in the
event of a similar problem.
Documentation of SGA progress and results using kaizen spiral
template and the summary sheet - Why is it important?
Standardize; share knowledge (feed forward); Training; show
failures and learn from history; present to managers and others.
Global Quality Management Solutions Phone: 1-888-216-8324

Mais conteúdo relacionado

Mais procurados

เกณฑ์สมศ.รอบ3
เกณฑ์สมศ.รอบ3เกณฑ์สมศ.รอบ3
เกณฑ์สมศ.รอบ3arsad20
 
ข้อกำหนด กติกา และเกณฑ์การพิจารณาให้คะแนน การประกวดโครงงานวิทยาศาสตร์ สมาคม...
ข้อกำหนด  กติกา  และเกณฑ์การพิจารณาให้คะแนน การประกวดโครงงานวิทยาศาสตร์ สมาคม...ข้อกำหนด  กติกา  และเกณฑ์การพิจารณาให้คะแนน การประกวดโครงงานวิทยาศาสตร์ สมาคม...
ข้อกำหนด กติกา และเกณฑ์การพิจารณาให้คะแนน การประกวดโครงงานวิทยาศาสตร์ สมาคม...Totsaporn Inthanin
 
O net ลำดับเลขคณิต
O net ลำดับเลขคณิตO net ลำดับเลขคณิต
O net ลำดับเลขคณิตToongneung SP
 
คุณค่าของภูมิปัญญาไทยสมัยสุโขทัย+569+55t2his p04 f15-4page
คุณค่าของภูมิปัญญาไทยสมัยสุโขทัย+569+55t2his p04 f15-4pageคุณค่าของภูมิปัญญาไทยสมัยสุโขทัย+569+55t2his p04 f15-4page
คุณค่าของภูมิปัญญาไทยสมัยสุโขทัย+569+55t2his p04 f15-4pagePrachoom Rangkasikorn
 
แผนการสอนเลขยกกำลัง
แผนการสอนเลขยกกำลังแผนการสอนเลขยกกำลัง
แผนการสอนเลขยกกำลังkatokung
 
ระบบศาลในประเทศไทย
ระบบศาลในประเทศไทยระบบศาลในประเทศไทย
ระบบศาลในประเทศไทยDookzaa Sanno
 
ประวัติศาสตร์กรุงรัตนโกสินทร์ ม.3
ประวัติศาสตร์กรุงรัตนโกสินทร์ ม.3ประวัติศาสตร์กรุงรัตนโกสินทร์ ม.3
ประวัติศาสตร์กรุงรัตนโกสินทร์ ม.3Oae Butrawong Skr
 
หลักธรรมทางพระพุทธศาสนา
หลักธรรมทางพระพุทธศาสนาหลักธรรมทางพระพุทธศาสนา
หลักธรรมทางพระพุทธศาสนาprimpatcha
 
สุขฯ ม.2 หน่วย 3
สุขฯ ม.2 หน่วย 3สุขฯ ม.2 หน่วย 3
สุขฯ ม.2 หน่วย 3supap6259
 
แผนการสอน เว็บไซต์ ม.5
แผนการสอน เว็บไซต์ ม.5แผนการสอน เว็บไซต์ ม.5
แผนการสอน เว็บไซต์ ม.5พงศธร ภักดี
 
เอกลักษณ์ตรีโกณฯ
เอกลักษณ์ตรีโกณฯเอกลักษณ์ตรีโกณฯ
เอกลักษณ์ตรีโกณฯkrupatcharin
 
ĐÁNH GIÁ TÁC DỤNG ĐIỆN CHÂM HUYỆT NỘI QUAN, THẦN MÔN, TAM ÂM GIAO TRONG ĐIỀU ...
ĐÁNH GIÁ TÁC DỤNG ĐIỆN CHÂM HUYỆT NỘI QUAN, THẦN MÔN, TAM ÂM GIAO TRONG ĐIỀU ...ĐÁNH GIÁ TÁC DỤNG ĐIỆN CHÂM HUYỆT NỘI QUAN, THẦN MÔN, TAM ÂM GIAO TRONG ĐIỀU ...
ĐÁNH GIÁ TÁC DỤNG ĐIỆN CHÂM HUYỆT NỘI QUAN, THẦN MÔN, TAM ÂM GIAO TRONG ĐIỀU ...Luanvanyhoc.com-Zalo 0927.007.596
 
ระบบสมการเชิงเส้น
ระบบสมการเชิงเส้นระบบสมการเชิงเส้น
ระบบสมการเชิงเส้นRitthinarongron School
 
ใบความรู้คู่อันดับและกราฟ
ใบความรู้คู่อันดับและกราฟใบความรู้คู่อันดับและกราฟ
ใบความรู้คู่อันดับและกราฟJiraprapa Suwannajak
 
กราฟ ม.3
กราฟ ม.3กราฟ ม.3
กราฟ ม.3krookay2012
 
VÕ NÃO VÀ THÂN NÃO TRONG CHỨC NĂNG KIỂM SOÁT VẬN ĐỘNG
VÕ NÃO VÀ THÂN NÃO TRONG CHỨC NĂNG KIỂM SOÁT VẬN ĐỘNGVÕ NÃO VÀ THÂN NÃO TRONG CHỨC NĂNG KIỂM SOÁT VẬN ĐỘNG
VÕ NÃO VÀ THÂN NÃO TRONG CHỨC NĂNG KIỂM SOÁT VẬN ĐỘNGSoM
 

Mais procurados (20)

เกณฑ์สมศ.รอบ3
เกณฑ์สมศ.รอบ3เกณฑ์สมศ.รอบ3
เกณฑ์สมศ.รอบ3
 
พรหมวิหาร 4 สมถกัมมัฏฐาน ppt
พรหมวิหาร 4 สมถกัมมัฏฐาน pptพรหมวิหาร 4 สมถกัมมัฏฐาน ppt
พรหมวิหาร 4 สมถกัมมัฏฐาน ppt
 
ข้อกำหนด กติกา และเกณฑ์การพิจารณาให้คะแนน การประกวดโครงงานวิทยาศาสตร์ สมาคม...
ข้อกำหนด  กติกา  และเกณฑ์การพิจารณาให้คะแนน การประกวดโครงงานวิทยาศาสตร์ สมาคม...ข้อกำหนด  กติกา  และเกณฑ์การพิจารณาให้คะแนน การประกวดโครงงานวิทยาศาสตร์ สมาคม...
ข้อกำหนด กติกา และเกณฑ์การพิจารณาให้คะแนน การประกวดโครงงานวิทยาศาสตร์ สมาคม...
 
O net ลำดับเลขคณิต
O net ลำดับเลขคณิตO net ลำดับเลขคณิต
O net ลำดับเลขคณิต
 
คุณค่าของภูมิปัญญาไทยสมัยสุโขทัย+569+55t2his p04 f15-4page
คุณค่าของภูมิปัญญาไทยสมัยสุโขทัย+569+55t2his p04 f15-4pageคุณค่าของภูมิปัญญาไทยสมัยสุโขทัย+569+55t2his p04 f15-4page
คุณค่าของภูมิปัญญาไทยสมัยสุโขทัย+569+55t2his p04 f15-4page
 
แผนการสอนเลขยกกำลัง
แผนการสอนเลขยกกำลังแผนการสอนเลขยกกำลัง
แผนการสอนเลขยกกำลัง
 
ระบบศาลในประเทศไทย
ระบบศาลในประเทศไทยระบบศาลในประเทศไทย
ระบบศาลในประเทศไทย
 
ประวัติศาสตร์กรุงรัตนโกสินทร์ ม.3
ประวัติศาสตร์กรุงรัตนโกสินทร์ ม.3ประวัติศาสตร์กรุงรัตนโกสินทร์ ม.3
ประวัติศาสตร์กรุงรัตนโกสินทร์ ม.3
 
หลักธรรมทางพระพุทธศาสนา
หลักธรรมทางพระพุทธศาสนาหลักธรรมทางพระพุทธศาสนา
หลักธรรมทางพระพุทธศาสนา
 
สุขฯ ม.2 หน่วย 3
สุขฯ ม.2 หน่วย 3สุขฯ ม.2 หน่วย 3
สุขฯ ม.2 หน่วย 3
 
แผนการสอน เว็บไซต์ ม.5
แผนการสอน เว็บไซต์ ม.5แผนการสอน เว็บไซต์ ม.5
แผนการสอน เว็บไซต์ ม.5
 
เอกลักษณ์ตรีโกณฯ
เอกลักษณ์ตรีโกณฯเอกลักษณ์ตรีโกณฯ
เอกลักษณ์ตรีโกณฯ
 
นำเสนองานโรงเรียนดี
นำเสนองานโรงเรียนดี นำเสนองานโรงเรียนดี
นำเสนองานโรงเรียนดี
 
ĐÁNH GIÁ TÁC DỤNG ĐIỆN CHÂM HUYỆT NỘI QUAN, THẦN MÔN, TAM ÂM GIAO TRONG ĐIỀU ...
ĐÁNH GIÁ TÁC DỤNG ĐIỆN CHÂM HUYỆT NỘI QUAN, THẦN MÔN, TAM ÂM GIAO TRONG ĐIỀU ...ĐÁNH GIÁ TÁC DỤNG ĐIỆN CHÂM HUYỆT NỘI QUAN, THẦN MÔN, TAM ÂM GIAO TRONG ĐIỀU ...
ĐÁNH GIÁ TÁC DỤNG ĐIỆN CHÂM HUYỆT NỘI QUAN, THẦN MÔN, TAM ÂM GIAO TRONG ĐIỀU ...
 
ระบบสมการเชิงเส้น
ระบบสมการเชิงเส้นระบบสมการเชิงเส้น
ระบบสมการเชิงเส้น
 
ใบความรู้คู่อันดับและกราฟ
ใบความรู้คู่อันดับและกราฟใบความรู้คู่อันดับและกราฟ
ใบความรู้คู่อันดับและกราฟ
 
กราฟ ม.3
กราฟ ม.3กราฟ ม.3
กราฟ ม.3
 
VÕ NÃO VÀ THÂN NÃO TRONG CHỨC NĂNG KIỂM SOÁT VẬN ĐỘNG
VÕ NÃO VÀ THÂN NÃO TRONG CHỨC NĂNG KIỂM SOÁT VẬN ĐỘNGVÕ NÃO VÀ THÂN NÃO TRONG CHỨC NĂNG KIỂM SOÁT VẬN ĐỘNG
VÕ NÃO VÀ THÂN NÃO TRONG CHỨC NĂNG KIỂM SOÁT VẬN ĐỘNG
 
เหตุผลกับภาษา
เหตุผลกับภาษาเหตุผลกับภาษา
เหตุผลกับภาษา
 
แผนที่อารยธรรมโบราณ1
แผนที่อารยธรรมโบราณ1แผนที่อารยธรรมโบราณ1
แผนที่อารยธรรมโบราณ1
 

Semelhante a Kaizen Spiral PDCA Report Template

Problem Solving Frameworks
Problem Solving FrameworksProblem Solving Frameworks
Problem Solving FrameworksAlan McCloy
 
Process Redesign or Improvement Approach Options
Process Redesign or Improvement Approach OptionsProcess Redesign or Improvement Approach Options
Process Redesign or Improvement Approach OptionsChief Innovation
 
Effective prob. solving technique
Effective prob. solving techniqueEffective prob. solving technique
Effective prob. solving techniqueMohd Shahjahan
 
How to be a consultant and run a successful assignment
How to be a consultant and run a successful assignmentHow to be a consultant and run a successful assignment
How to be a consultant and run a successful assignment1STOUTSOURCE LTD
 
1Grand Canyon UniversityInstructor Name MIS-652 Busines
1Grand Canyon UniversityInstructor Name MIS-652 Busines1Grand Canyon UniversityInstructor Name MIS-652 Busines
1Grand Canyon UniversityInstructor Name MIS-652 BusinesEttaBenton28
 
Problem Solving: The P in PDSA
Problem Solving: The P in PDSAProblem Solving: The P in PDSA
Problem Solving: The P in PDSATKMG, Inc.
 
8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...
8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...
8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...VDiversify
 
Technical Escalations Best Practices
Technical Escalations Best PracticesTechnical Escalations Best Practices
Technical Escalations Best Practicesmagalong
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Problem solving techniques
Problem solving techniquesProblem solving techniques
Problem solving techniquesAhsan Saleem
 
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docx
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docxChaplin School of Hospitality and Tourism ManagementInternship Lea.docx
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docxcravennichole326
 
Corrective action training april 2013
Corrective action training april 2013Corrective action training april 2013
Corrective action training april 2013Doug Bryson
 
Root Cause Analysis
Root Cause Analysis Root Cause Analysis
Root Cause Analysis Grafic.guru
 

Semelhante a Kaizen Spiral PDCA Report Template (20)

Qc story
Qc storyQc story
Qc story
 
Rkfl Problem Solving
Rkfl Problem SolvingRkfl Problem Solving
Rkfl Problem Solving
 
Problem Solving Frameworks
Problem Solving FrameworksProblem Solving Frameworks
Problem Solving Frameworks
 
A3 problem solving
A3 problem solvingA3 problem solving
A3 problem solving
 
Process Redesign or Improvement Approach Options
Process Redesign or Improvement Approach OptionsProcess Redesign or Improvement Approach Options
Process Redesign or Improvement Approach Options
 
Effective prob. solving technique
Effective prob. solving techniqueEffective prob. solving technique
Effective prob. solving technique
 
How to be a consultant and run a successful assignment
How to be a consultant and run a successful assignmentHow to be a consultant and run a successful assignment
How to be a consultant and run a successful assignment
 
1Grand Canyon UniversityInstructor Name MIS-652 Busines
1Grand Canyon UniversityInstructor Name MIS-652 Busines1Grand Canyon UniversityInstructor Name MIS-652 Busines
1Grand Canyon UniversityInstructor Name MIS-652 Busines
 
Problem Solving: The P in PDSA
Problem Solving: The P in PDSAProblem Solving: The P in PDSA
Problem Solving: The P in PDSA
 
8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...
8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...
8D Training Material From VDiversify.com | 8D Training Material PDF Free Down...
 
D06 Project Selection
D06 Project SelectionD06 Project Selection
D06 Project Selection
 
D06 Project Selection
D06 Project SelectionD06 Project Selection
D06 Project Selection
 
Technical Escalations Best Practices
Technical Escalations Best PracticesTechnical Escalations Best Practices
Technical Escalations Best Practices
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Problem solving techniques
Problem solving techniquesProblem solving techniques
Problem solving techniques
 
A3 analisis
A3 analisisA3 analisis
A3 analisis
 
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docx
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docxChaplin School of Hospitality and Tourism ManagementInternship Lea.docx
Chaplin School of Hospitality and Tourism ManagementInternship Lea.docx
 
Corrective action training april 2013
Corrective action training april 2013Corrective action training april 2013
Corrective action training april 2013
 
Root Cause Analysis
Root Cause Analysis Root Cause Analysis
Root Cause Analysis
 

Kaizen Spiral PDCA Report Template

  • 1. Global Quality Management Solutions, LLC 2016 Kaizen Spiral PDCA Project Report Template GQMS Phone: 1-888-216-8324 GQMS Email: info@globalqualitymanagementsolutions.com Global Quality Management Solutions Phone: 1-888-216-8324
  • 2. Global Quality Management Solutions, LLC PDCA - KAIZEN Spiral – Improvement ActivityEnsures: Use of PDCA Recognition Skills & training Communication Use of CI Tools Global Quality Management Solutions Phone: 1-888-216-8324
  • 3. Global Quality Management Solutions, LLC Team Name: Date Note that this will be the 1st page of your presentation, so delete the previous slides. Also, need to remove the helpful ideas/information in all of the following slides and replace with your specific data and explanation. Remember that this presentation is a story of your team improvement activities – needs to be clear and logical, not only showing your successes, but showing your failures along the way. Global Quality Management Solutions Phone: 1-888-216-8324
  • 4. Global Quality Management Solutions, LLC What is the problem? 1. a Identify Gap Budget Customer Complaint Desire Document the “gap” that needs addressed with this project A PROBLEM IS DEFINED AS A DEVIATION BETWEEN WHAT SHOULD BE HAPPENING, AND WHAT IS ACTUALLY HAPPENING. Identify what the problem is before beginning analysis Ideal state / target Gap = Problem (abnormality) Current condition Outputs: Theme, Problem and gap defined and approved Customers acknowledged and input documented Type of problem (lean or variation/quality) Note: Be careful about listing symptoms instead of the problem and be careful to not assume a cause of the problem Global Quality Management Solutions Phone: 1-888-216-8324
  • 5. Global Quality Management Solutions, LLC Why this problem? 1. b Identify Gap Budget Customer Complaint Desire Gap: Document how it ties to the company goals Identify: ASK, How this project ties to the company goals? The gap that is initiating the project could come from: Quality - Customer complaints Cost - Budget targets not met Productivity - Some desired improved level Other – Safety, Environmental, etc Global Quality Management Solutions Phone: 1-888-216-8324
  • 6. Global Quality Management Solutions, LLC Why this problem? 1. c Identify Gap Budget Customer Complaint Desire Gap: Document how it impacts CS (Customer Satisfaction). Identify: ASK, who is the Customer? (internal or external or both) Clarify: Ask, how the customer satisfaction is being damaged (PPM, customer targets not being met, customer surveys, etc.). Go talk to the customer. Maybe use a survey to document impact on customer Global Quality Management Solutions Phone: 1-888-216-8324
  • 7. Global Quality Management Solutions, LLC Use a slide or two to show historical data analysis that narrows issue to specific problem(s) 2. Data Analysis Use graphs, diagrams, etc to show why specific parts and defects are chosen Outputs: Big problem or gap broke down NSL by Model - Windshields 0 200 400 600 800 1000 1200 1400 1600 1800 L32-F 044-F GMT191-F UL-F GM315-F 500N-F W164LS-FD W164-F CM-F 770-F U388/387-F Defects NSL - Sidelites Repeat Issues 0 5 10 15 20 25 Logo Grind Pits Chips Contamination BrokenLine Scratch MissingCorner MixedModels Warp MissingPriint Rubs InkSpot CeramicVoid Printissue Mis-Labeled Curvature Distortion Packaging Size Kink Beltmarks MoldMarks Occurrances Global Quality Management Solutions Phone: 1-888-216-8324
  • 8. Global Quality Management Solutions, LLC Set the priorities and targets for the team by establishing the project and/or problem statement and goals or targets for improvement. 3. Set Priorities & Targets Use the historical data to categorize the project into smaller, more concrete problems. If working on a big project , then tackle the most impacting problem 1st, then the 2nd most important, until the big project target is met. One Specific Problem Statement: Document the problem statement or statements (if addressing more than one defect or object) One object One defect Target: Document the target for improvement such as 50% reduction and note the ultimate goal. 2. Break Down The Problem 5 3. Set A Target - Make the commitment. - Measurable, concrete and challenging. > Do what by how much by when? > Clarify rationale and impact. > Output oriented (things to be achieved, not things to do). - Use data to categorize the problem into smaller, more concrete problems. Use division points such as Who, What, When or Where? - Narrow the focus to one aspect of the problem to solve. - Genchi Genbutsu: Go & see the smaller problem and visualize the process. (Contain the problem if needed) - Specify the point of cause and state the problem to engage. - Keep in mind scope. Tally Sheet Survey P D C A P D C A July Start Finish! April Current Situation Problem Problem Problem ProblemProblem Problem Problem Point of Cause Include a picture or diagram of the part and the defect Outputs: Specific Problem statement and target Global Quality Management Solutions Phone: 1-888-216-8324
  • 9. Global Quality Management Solutions, LLC Assign the resources required to meet the target. Establish the team members and leader (generally 4-7 members) and any other team guidelines including timing and leadership approval. 4. Assign Team Team Members: Name Title/Area 1 2 3 4 5 Other support members: 1. Include a team picture if possible Timing: Project to be completed in 3 months by end of July, 2011. Champion/Approval: Jim Jones, Dept Manager Outputs: Team members assigned Timeline completed Global Quality Management Solutions Phone: 1-888-216-8324
  • 10. Global Quality Management Solutions, LLC Do not rely on historical data 5. Study Actual Facts 3e • 5a Fill out IS/IS NOT with known information • 5b Process Flow Chart – Walk the Process • Process Map – 3e • 5c Fill out 2E column • Reviewing current SOP and Standards and compare to what is actually happening • What are the process settings suppose to be • How are changeovers supposed to be completed • What PM schedules are supposed to be followed • 5d Data Collection Plan • Used to complete questions that you don’t have answers to • Part Analysis • Collect a sampling of the defects • What is the location • What kind of pattern • Special Condition of Defect – Microscope • 5e Benchmarking • Are there other plants that have the same/similar equipment A B A1 D1 A2 D2 Checksheets 3e Go to the exact place See the exact object Confirm the exact facts Outputs: Process Flow chart or Process Map Is/Is-not answers on Problem specification 2E completed on Problem specification Global Quality Management Solutions Phone: 1-888-216-8324
  • 11. Global Quality Management Solutions, LLC Describe the Problem• Complete a problem description • Break down the problem into an IS category and IS Not category • The IS gives an accurate description of the problem – FACTS ONLY • The IS NOT provides additional information about closely related items which do not have the same problem thus helping to eliminate possible causes = saves time • Answering the questions focused around What, Where, When and Extent 2E Differences Produced on different Lines - Wash tanks Final Assemblies Overhead conveyors Different Employees Different Production Rates 6% More or less than 6% 1mm - 2mm Larger or smaller Increasing Stable or decreasing Stable up to 11 Increasing or decreasing up to 11 more than 11 Periodically (more data would be helpful) Continuously or Sporadically Drying booth we actually could see the defect but it was first seen during visual final inspection Paint Booth Two weeks ago Before two weeks ago Final Inspection Final Assembly, Drying and Paint Booth Randomly on the painted surface In one specific spot Paint Gaps Peeling, running, globs, discoloring IS IS-NOT Changes Extend your Knowledge! Look at the Fundemental Rules! What is different, odd, unusual or distinctive about each IS compared to each IS-NOT? What has changed in, on, or about each Difference? Accord Door Panels Civic & Acura Door Panels Clean more units weekly for the last 3 weeks more units last 3 weeks panels loaded closer New employees 5 wks ago Increasing wkly - last 3wks How many objects W H A T What Object W H E N E X T E N T What is the size of the defect No. of defects on one unit Trend of object Trend of defect Where Geographically Where on the object When first When Since Is there a pattern for Varience What was going on in the process or at what process step did it occur What is having the Problem What could be having the problem but IS-NOT W H E R E 3e - Reality of the Present Situation, Go to the exact place, See the exact object, Confirm the exact facts What should be happening? How should it opperate? What Defect Problem Statement: Honda Door Panels with Paint Gaps Where do I get the information • Breakdown the problem factually – It will be necessary to spend time getting the facts about the current state from the exact place and exact object (3e) – Walk the Floor 5.a Study Actual Facts 3e Global Quality Management Solutions Phone: 1-888-216-8324
  • 12. Global Quality Management Solutions, LLC Study the actual facts – Walk the process and document it using a flow chart or a process map 5.b Study Actual Facts 3e Walk the Process 1) Establish the process start and stop points 2) Entire team takes time to walk the process and observe each step of the process including repair loops 3) Note documents and talk to operators and take notes and pictures for reference later 3e Global Quality Management Solutions Phone: 1-888-216-8324
  • 13. Global Quality Management Solutions, LLC Describe the Problem - 2E - Determine if the process standards are being followed. 5.c Study Actual Facts Does Actual = Standard 2E – Using our current knowledge, experience and fundamental rules to collect as much information about the problem as possible. Example Work Instructions, standards, etc. 2E Extend your knowledge Establish your own fundamental rules Go to process: What should be happening? (Work instructions, procedures, specifications, process standards, staffing, etc.) What is actually happening? (Setup sheets, process verification logs, PM logs, actual staffing, training status, etc.) Processes set up to existing standards? Following PM schedule? Measurement system satisfactory? Global Quality Management Solutions Phone: 1-888-216-8324
  • 14. Global Quality Management Solutions, LLC Study the Facts – Use the Is/Is-not missing data to help develop and implement a data collection plan. Go deep into the issue. 5.d Study Actual Facts Specify the Problem: Delivery trucks with broken glass IS IS NOT WHAT What object? Delivery Trucks Harp Racks, Dollies What defect? Broken Glass Scratched, Rubs, WHERE Where geographically? ???? ???? Where on the object? ????? ???? WHEN When first? Been an issue for a while Before When since? Daily Every Truck When in the life cycle? ????? ????? EXTENT How many objects? ???? ???? What is the size? Full Sheets Partial Sheets How many defects? ???? ???? What is the trend? ???? ???? PART ANALYSIS -Visual observation – Use magnification, lighting, etc to improve ability to see -Dimensional comparison -Test results and Technical reportsGlobal Quality Management Solutions Phone: 1-888-216-8324
  • 15. Global Quality Management Solutions, LLC Complete a Benchmarking Study looking for best practices. 5.e Study Actual Facts Compare your process to others to understand your current situation and learn from it. By comparing your process to other processes, you can learn a lot about how to develop and improve yours. Benchmarking can show you: Where your weaknesses are Which areas you can improve New or different ways to do things Strategies for improvement What is possible Where your strengths are and how to maintain them Where you can increase efficiency Hints: Look at other AGC sites even in other parts of the world Is there another company that is known for this process Note that Benchmarking can be used in step 1 also to help establish the “gap” 3e Go to the exact place See the exact object Confirm the exact facts Global Quality Management Solutions Phone: 1-888-216-8324
  • 16. Global Quality Management Solutions, LLC Analyze the actual facts 6. Analyze Facts 6a - Developing Possible Causes by Differences & Changes Brainstorming/Fishbone from Knowledge & Experience 6b - Create Possible Cause Statements 6c - Test Possible Causes 6d - Prioritize the Possible Causes 6e - Verify the most likely Cause(s) Outputs: Completed problem specification Tested Possible Causes -2000 -1000 0 -2200 -1200 -200 Sales Var ProfVar Prof Var = -566.037 + 0.608943 Sales Var S = 216.684 R-Sq = 93.1 % R-Sq(adj) = 91.4 % Regression Plot +/- 3 Sigma (99.7 % of Data) Customer Specification Process Width Mean Sample SampleMean 10987654321 11.5 11.0 10.5 10.0 9.5 9.0 8.5 __ X=9.935 UCL=11.245 LCL=8.626 Xbar Chart of C4 Global Quality Management Solutions Phone: 1-888-216-8324
  • 17. Global Quality Management Solutions, LLC Analyze the Facts – Develop possible causes by using Differences and Changes and developing a Fishbone Diagram. 6. a Analyze Facts The ways of developing possible causes. METHODS Difference & Changes Brain Storming Fishbone Diagram Global Quality Management Solutions Phone: 1-888-216-8324
  • 18. Global Quality Management Solutions, LLC Create Possible Cause Statements from the causes developed in step 6a. 6.b Analyze FactsDevelop statements that explain how the problem occurred To create possible cause statements for testing against the facts List Possible cause statements from Differences and Changes along with the Fishbone Analysis. Purpose: How could… a change a change and a difference a change and another change a difference alone …cause the problem? What causes can be generated from Fishbone Analysis Write a short statement in object/defeat format Explain how the cause creates the problem Examples Possible Cause Statement: I ran over a piece of metal in the road 2 weeks ago which may have punctured my radiator. The drain valve is partially open causing it to leak. The automatic transmission connection line has worked loose causing a leak. A hose has developed a hole allowing a leak. Global Quality Management Solutions Phone: 1-888-216-8324
  • 19. Global Quality Management Solutions, LLC Test Possible Causes against the Is/Is not specification. Eliminate some of the causes and list assumptions. 6.c Analyze Facts Evaluating possible causes against the IS/IS NOT specification • To save time by eliminating possible causes that do not make sense Ask: If Possible Cause is the cause of Problem Statement, how does it explain both the IS and the IS NOT? • Ask about each pair of IS/IS NOT data • Eliminate any cause that fails • List all assumptions Examples * I ran over a piece of metal in the road 2 weeks ago which may have punctured my radiator. Explains only if started leaking 2 wks ago * The drain valve is partially open causing it to leak. Explains only if started leaking 2 wks ago * The automatic transmission connection line has worked loose causing a leak. X Does not explain – You would see transmission fluid not coolant * A hose has developed a hole allowing a leak. Explains only if started leaking 2 wks ago Global Quality Management Solutions Phone: 1-888-216-8324
  • 20. Global Quality Management Solutions, LLC Prioritize the Possible Causes by reviewing the assumptions and picking the most likely. 6.d Analyze Facts Explanation • Identifying the cause that is most reasonable • To pick the possible cause to verify first Ask: • Which of the possible causes is the most believable? • Most Probable Cause has: Reasonable assumptions Fewest assumptions Overall simplest assumptions Example All of the causes have potential in this case but the ones that are most likely are? 1. Puncture to the radiator 2. Puncture to the hose Global Quality Management Solutions Phone: 1-888-216-8324
  • 21. Global Quality Management Solutions, LLC Verify the most likely Possible Cause(s) by 3e observation, research/testing and turning the defect/issue on/off. Proving the cause of the defect To identify steps to take, use: • Observation - How can we look at the cause? (3e) • Research - How can we experiment to test this cause? You want to be able to turn the defect on and off • Results - How can we try our Fix to see if it works? Example Observation in this case, go and look Global Quality Management Solutions Phone: 1-888-216-8324
  • 22. Global Quality Management Solutions, LLC Identify the root cause(s) by using the why-why analysis on the most probable cause(s) from step 6. 7.a 5 why Root Cause Example (not complete) Deduction: Why-Why or 5-Why Analysis A way to find the actual Root Causes. To make sure we countermeasure the correct items. The purpose of Root Cause analysis is to go beyond direct and somewhat apparent causes and figure out the underlying reasons for the event. It is not enough to just find what broke or changed and fix it. We must go to the next level and determine the root cause if we want to minimize repeat problems and eliminate this issue in the future. Outputs: Root cause(s) identified and testedGlobal Quality Management Solutions Phone: 1-888-216-8324
  • 23. Global Quality Management Solutions, LLC Verify the root cause(s) by testing and documenting the results preferably recreating the issue/defect. 7.b 5 why Root Cause The purpose of Root Cause verification is to test the hypothesis. Once the issue or defect has been recreated, then at least one root cause has been confirmed. Verify the root cause(s) by trial and error or Design of Experiment Recreate the issue/defect Use a summary table to show the result of the testing. Hints: For more than one variable, use a table like the one below Verify the recreated defect is exactly the same, not similar. Use Scientific method (Develop a thesis (idea for improvement), Conduct experiment, Review results)Global Quality Management Solutions Phone: 1-888-216-8324
  • 24. Global Quality Management Solutions, LLC Lean Projects If the project is a Lean Waste Reduction Project then different methods and tools will be used in Steps 5- 7 to develop the Action plan. Global Quality Management Solutions Phone: 1-888-216-8324
  • 25. Global Quality Management Solutions, LLC The 5S Visual Workplace Utilize 5S to stabilize, improve and standardize the process. Definition (Vision) • A clean and organized work area that visually communicates all the vital statistics. • Status of the operation is understood at a glance • An area where an unintended event or activity is immediately visible 5S refers to improvement activities aimed at increasing the cleanliness, orderliness, and organization of a work area for greater efficiency and reduction of waste. Global Quality Management Solutions Phone: 1-888-216-8324
  • 26. Global Quality Management Solutions, LLC Develop the plan of corrective actions that will address the root causes 8. Develop Improvement Plan Outputs: Approved Improvement Plan • Establish criteria for selecting a solution/countermeasure • Generate potential solutions that will address the root causes of the problem • Select a solution • Gain approval and support for the chosen solution • Plan the solution Hints: • Consider poka yoke (mistake proof) countermeasures • Assure countermeasures address root causes (confirm before implementation if possible) Global Quality Management Solutions Phone: 1-888-216-8324
  • 27. Global Quality Management Solutions, LLC Execute the corrective actions. 9. Execute Plan • Implement the chosen solutions • Follow through with countermeasures • Show before and after countermeasure pictures, if possible Hints: • Implement the chosen solution on a trial or pilot basis, if possible and if expensive. Outputs: Improvements completed Before: 200 Mesh Count After: 230 Mesh CountGlobal Quality Management Solutions Phone: 1-888-216-8324
  • 28. Global Quality Management Solutions, LLC Confirm and validate the impact of the corrective actions using tests and analysis of data. 10. Confirm Results Outputs: Data analysis showing impact of changes • Validate using data • Statistical Proof (N-Chart, P-Chart, X&R) • C/M verify (turn on – off) • Supplier Self Audit (Schedule) • Durability Tests • Re-inspection Results • Training Records • Sign-off Sheets • Product Specification Changes Beautiful! 151413121110987654321 11 10 9 8 7 __ X=7.660 UCL=8.073 LCL=7.248 Before After Global Quality Management Solutions Phone: 1-888-216-8324
  • 29. Global Quality Management Solutions, LLC Analyze the results and determine if the improvement targets were met. If not, then go back to step 5. 11.a Analyze Results Outputs: Proof that goal(s) were met Any secondary metric impact Financial cost impact (actual and annualized) Customer feedback analysis • Check the final results verses the target from Step 3. • If possible, show results in visual form using a run/SPC chart or some other chart • Show the actual impact short term and long term. Global Quality Management Solutions Phone: 1-888-216-8324
  • 30. Global Quality Management Solutions, LLC Calculate the cost impact of the project using the SGA guidelines 11.b Analyze Results • Include cost savings for productivity, yield, uptime, material use, reduction of head count or inventory or other improvements • Use the calculation guidelines for SGA in the SGA Guidelines • Report actual savings and an annualized amount • Include savings from other lines and plants if the improvements were successfully implemented Hints: • Include formulas for calculations Cost Impact ( May’XX ~ Oct ‘XX ) Line 1: $ 90,895 Line 2: $ 224,087 TOTAL : $ 314,982 ( Scrap reduction ) =Σ Input * (Month Yield – Ave Yield (JAN~APR)) * Parts Cost Monthly Yield=May Oct Cost Impact Annual Est. ( May ’XX to Apr ’XX ) Line 1: $ 271,645 Line 2: $ 487,057 TOTAL : $ 758,702 ( Scrap reduction ) =Σ Input * (Month Yield – Ave Yield (JAN~APR)) * Parts Cost Monthly Yield=May Oct + XX’ Oct effect * 6 month Global Quality Management Solutions Phone: 1-888-216-8324
  • 31. Global Quality Management Solutions, LLC Determine final impact on CS (Customer Satisfaction) 11.c Analyze Results • Include a way to measure CS • Customer surveys are one way to measure both internal and external CS Global Quality Management Solutions Phone: 1-888-216-8324
  • 32. Global Quality Management Solutions, LLC Standardize the solutions by changing the system and the rules. Establish controls to assure the solutions stay in place. 12.a Standardize 2E • Adopt the solution • Standardize countermeasures by changing system documentation and training people on the new way • Implement controls assuring the countermeasures are in place and stay in place Hints: • Plan ongoing monitoring of the solution • May use the Kamishibai Board and cards for visual audits usually on a weekly, monthly, quarterly schedule by supervisors or managers. Outputs: All improvements standardized assuring no reversal Communication of new best practices completed Team rewarded and acknowledged Function FM FE Cause RPNControls FMEA Improvement Purpose Perf Mech Implementation ResponseAlarm Control Plan Global Quality Management Solutions Phone: 1-888-216-8324
  • 33. Global Quality Management Solutions, LLC Communicate and implement best practices to other similar lines, plants, etc. 12.b Standardize 2E FEED BACK / FEED FORWARD • Make sure pertinent information was given to those who needed it. • Indicate to whom information was given and the date the information was relayed. • Make sure new associates are trained using the correct countermeasures. • Share the information with other lines and sites and customers, as needed. Hints: • Include next steps for improvement • Recognize the team Global Quality Management Solutions Phone: 1-888-216-8324
  • 34. Global Quality Management Solutions, LLC Summarize what the team learned and next steps. 12.c Standardize 2E Summarize the learning points Summarize the next steps or the next project Global Quality Management Solutions Phone: 1-888-216-8324
  • 35. Global Quality Management Solutions, LLC What to do with the completed Kaizen Spiral • If SGA team, then copy with summary sheet to CI Rep at your site • Share with others who need the information. • Make sure management is aware of situation. • Give copy to your QA department if it is quality related. • Keep a copy on file. This could be useful in the event of a similar problem. Documentation of SGA progress and results using kaizen spiral template and the summary sheet - Why is it important? Standardize; share knowledge (feed forward); Training; show failures and learn from history; present to managers and others. Global Quality Management Solutions Phone: 1-888-216-8324