SlideShare uma empresa Scribd logo
1 de 27
Baixar para ler offline
LTE CSFB Call Flows
Edited By Justin MA Created: June 2014 Updated: 2014_0714
Date and Version Author Change Note
2014_0630; v1.0 Justin MA Basic call flows
2014_0714; v1.1 Justin MA Call Release with IR
LTE and SAE netwroks
1/27
Ref:
Ref: Ericsson
2/27
Ref: Ericsson
3/27
General Voice over LTE solutions:
4/27
Ref:
5/27
Ref:
6/27
Ref:
Ref: Ericsson
7/27
Attach Procedure for LTE/WCDMA modes
8/27
Ref:
3GPP 23.272 V12.3.0
Basic CSFB MO Call Flow
9/27
Ref:
10/27
Ref:
Ref:
...etc
11/27
Mobile Originating call in Active Mode - PS HO
supported
12/27
UE/MS MMEBSS/RNS MSCeNodeB SGSN Serving
GW
2. Optional Measurement Report Solicitation
4b. A/Iu-cs message (with CM Service Request)
4b. CM Service Request
Location Area Update or Combined RA/LA Update
5. CM Service Reject 5. CM Service Reject
If the MSC
is changed
3a. PS HO as specified in 23.401 [2] (preparation phase and start of execution phase)
6. CS call establishment procedure
1a. Extended Service Request
1b. S1-AP Request message with CS Fallback indicator
7. PS HO as specified in 23.401 [2] (continuation of execution phase)
1c. S1-AP Response message
4a. Location Area Update
3c. Update Bearer(s)
3b. Suspend
P-GW/
GGSN
1d. MO CSFB Indication
Ref:
3GPP 23.272 V12.3.0
Mobile Originating call in Active Mode – No PS HO
support
13/27
UE/MS MMEBSS/RNS MSCeNodeB
2. Optional Measurement Report Solicitation
10b. Location Area Update
10a. Service Reject
10c. CS MO call
6. UE changes RAT then LA Update or RA Update or LAU and RAU
3a. NACC,
5. S1 UE Context Release
1a. NAS Extended Service Request
SGW/PGW
4. S1-AP: S1 UE Context Release Request
1b. S1-AP UE Context Modification Request with CS Fallback indicator
7a. Suspend (see 23.060)
8. Update bearer(s)
SGSN
7b. Suspend Request / Response
11. Routing Area Update or Combined RA/LA Update
3b, 3c. RRC connection release
If the MSC
is changed
1c. S1-AP UE Context Modification Response message
9. CM Service Request 9. A/Iu-cs message (with CM Service Request)
1d. MO CSFB Indication
Ref:
3GPP 23.272 V12.3.0
Basic CSFB MT Call Flow
14/27
Ref:
Ref: Huawei
15/27
Ref: Huawei
16/27
Mobile Terminating call in idle mode
17/27
1. IAM
3. IAM
4. Paging Request
5. Paging
6. Paging
2. SRI procedure in TS 23.018
G-MSCeNodeB RNC/BSCUE MME HSS
MSC
VLR
8. After the UE context setup the procedure continues as described the active
mode mobile terminated call procedures described in Clause 7.3 and 7.4.
If the eNodeB knows that PS HO is supported the procedure in clause 7.3 “Mobile
Terminating call in Active Mode - PS HO supported” may be applied from step 2, in
Clause 7.3, and onwards
If the eNodeB knows that PS HO is not supported the procedure in clause 7.4
“Mobile Terminating call in Active Mode – No PS HO support” shall be applied from
step 2 in Clause 7.4, and onwards
7a. Extended Service Request
7b. Initial UE Context Setup
7a. Service Request
Ref:
3GPP 23.272 V12.3.0
Mobile Terminating call in Active Mode - PS HO
supported
18/27
4a. Location Area Update
4b. Paging Response 4b. A/Iu-cs message (with Paging Response)
5b. Signalling Connection Release 5b. Connection Reject
If the MSC
is changed
5b. Location Area Update or Combined RA/LA Update
5c. CS call establishment procedure
6. PS HO as specified in 23.401 [2] (continuation of execution phase)
5a. Establish CS
connection
Option 1:
MSC is not
changed
3c. Update Bearer(s)
3b. Suspend
P-GW/
GGSN
2. Optional Measurement Report Solicitation
3a. PS HO as specified in 23.401 [2] (preparation phase and start of execution phase)
1e. S1-AP UE Context Modification Response message
1d. S1-AP UE Context Modification Request with CS Fallback indicator
UE/MS MMEBSS/RNS MSCeNodeB SGSN Serving
GW
1b. NAS Extended Service Request
1a. Paging Request
1a. CS SERVICE NOTIFICATION
1c. CS Paging Reject
1a. Service Request
Ref:
3GPP 23.272 V12.3.0
Mobile Terminating call in Active Mode - No PS HO
support
19/27
IF THE
MSC IS
CHANGED
UE/MS MME MSC
3a. CCO/NACC, 3b, 3c. Signalling connection release
eNodeB
2. Optional Measurement Report
9. Paging Response
9c. Location Area Update or Combined RA/LA Update
9b. Signalling Connection Release
S-GW/PGW
1b. NAS Extended Service Request
1d. S1-AP UE Context Modification Request with CS Fallback indicator
1c. CS Paging Reject
7a. Suspend (see TS 23.060)
8. Update bearer(s)
7b. Suspend Request / Response
9b. CONNECTION REJECT
1A. CS SERVICE NOTIFICATION 1A. PAGING REQUEST
SGSN
6.UE changes RAT then, LAU OR RA UPDATE OR LAU AND RAU
5. S1 UE CONTEXT RELEASE
BSS/RNS
4. S1-AP: S1 UE CONTEXT RELEASE REQUEST
1A. SERVICE REQUEST
1e. S1-AP UE Context Modification Response message
9a. Establish CS connection
Ref:
3GPP 23.272 V12.3.0
20/27
Ref:
Ref:
...etc
21/27
22/27
Ref:
Roaming Retry for CS fallback
23/27
GMSC HLR Old
VMSC/VLR
New
VMSC/VLR
MS
PRN (call ref.,GMSC@, Roaming retry)
2
PRN ACK (MSRN)
SRI ACK
IAM (MSRN) Paging
LocUpdate
Authentication Procedure
Update Location
Cancel Location
3
Cancel Location Ack
RCH (call reference, roaming retry)
Insert Subscriber Data (multiple)
Insert Subscriber Data (continued)
Update Location Ack
Further procedures
related to location
update. e.g.
ciphering, TMSI
reallocation.PRN
New VMSC/VLR may delay setup until
location update procedure finishes
8
PRN ACK (MSRN)
7
LocUpdate Accept
TMSI Reallocation Complete
Normal MT call procedure follows
Old MSC stops paging timer
and inform GMSC
2nd SRI ACK (MSRN)
7
2nd SRI (B, basic call interrogation)
5
REL RLCs
4
ACK
HLR delays the sending of
PRN until location update
procedure finishes
6
SAE/LTE
CSFallback
Setup
SRI (B, GMSC@,call Ref.,Roamingretry)
1
IAM (MSRN)
Call Confirmed
Ref:
3GPP 23.272 V12.3.0
Roaming Forwarding for CS fallback
24/27
GMSC HLR Old MSC/VLR New MSC/VLR MS
SRI (B) PRN
PRN ACK (MSRN)SRI ACK
IAM (MSRN) Paging
Location Update
2. Update Location (MTRF supported)1
3. Cancel Location
(MTRF Supported And Authorized, New MSC/VLR numbers)
Cancel Location Ack
6. PRN (MTRF indication, Old MSC number, last used LTE PLMN)
Insert Subscriber Data (multiple)
Insert Subscriber Data (continued)
Update Location Ack
Further procedures
related to location
update. E.g.
ciphering, IMEI
checking, TMSI
reallocation.
10. New VMSC/VLR delays setup until
location update procedure finishes.
8. PRN Resp (MSRN’)
9. IAM (MSRN’)
Location Update Accept
TMSI Realloc Complete
Setup
Call Confirmed
Normal MT call procedure follows
4. Old MSC stops paging timer
7. After Update Location Ack is received, the new
VLR returns MSRN’ to the old VLR.
5. If HLR authorises MTRF then use new MSC/VLR
numbers to trigger sending of PRN Req
1. Send Identification
(MTRF supported, New MSC/VLR numbers)
CSFB
Ref:
3GPP 23.272 V12.3.0
1x RTT CS Pre-Registration over EPS Procedure
25/27
1xCS
CSFB
UE
E-
UTRAN
MME 1xCS
IWS
1xRTT
MSC
4. 1xRTT CS registration request
4a. UL/DL Information
Transfer
4b. UL/DL S1 cdma2000
Tunnelling
4c. S102 Direct Transfer
6. 1xRTT CS registration response
6c. UL/DL Information
Transfer
6b UL/DL S1 cdma2000
Tunnelling
6a. S102 Direct Transfer
1. UE attaches to E-UTRAN as specified in TS 23.401
5. Location update to 1xRTT CS domain
2. Decision to
register with
1xRTT CS
3. Service Request procedure if the UE is in idle state .
Ref:
3GPP 23.272 V12.3.0
CS MO call using fallback to CDMA 1x RTT network
26/27
1xCS
CSFB
UE
E-
UTRAN
MME
1xCS
IWS
1xRTT
MSC
1. UE is E -UTRAN attached and registered with 1xRTT CS
11. 1x MO call establishment per 3GPP2 specifications
4. UE Context Modification Request
3. Extended Service Request
S-GW/
P-GW
5. Optional measurement report
solicitation
7. S1 UE Context Release
Request
8. Suspend Notification
10. UE Context Release
2. UE decision
to perform MO
call in 1xCS
6. E-UTRAN triggers RRC connection
release with redirection
4. UE Context Modification Response
9. Suspend Acknowledge
Ref:
3GPP 23.272 V12.3.0
CS MT call using fallback to CDMA 1x RTT network
27/27
Ref:
3GPP 23.272 V12.3.0

Mais conteúdo relacionado

Mais procurados

Mobile Networks Overview (2G / 3G / 4G-LTE)
Mobile Networks Overview (2G / 3G / 4G-LTE)Mobile Networks Overview (2G / 3G / 4G-LTE)
Mobile Networks Overview (2G / 3G / 4G-LTE)Hamidreza Bolhasani
 
Volte troubleshooting
Volte troubleshootingVolte troubleshooting
Volte troubleshootingJamil Awan
 
Best practices-lte-call-flow-guide
Best practices-lte-call-flow-guideBest practices-lte-call-flow-guide
Best practices-lte-call-flow-guideMorg
 
Csfb (circuit switch fall back)
Csfb (circuit switch fall back)Csfb (circuit switch fall back)
Csfb (circuit switch fall back)Rishi Mahajan
 
Lte principle
Lte principleLte principle
Lte principleHatim100
 
Lte ue initial attach & detach from networkx
Lte ue initial attach & detach from networkxLte ue initial attach & detach from networkx
Lte ue initial attach & detach from networkxtharinduwije
 
VoLTE optimization.pdf
VoLTE optimization.pdfVoLTE optimization.pdf
VoLTE optimization.pdfRakhiJadav1
 
Kpi 2g troubleshootin
Kpi 2g troubleshootinKpi 2g troubleshootin
Kpi 2g troubleshootinAbd Yehia
 
Ericsson optimization opti
Ericsson optimization optiEricsson optimization opti
Ericsson optimization optiTerra Sacrifice
 
Lte ho parameters trial_01262011
Lte ho parameters trial_01262011Lte ho parameters trial_01262011
Lte ho parameters trial_01262011Hatim100
 

Mais procurados (20)

LTE Air Interface
LTE Air InterfaceLTE Air Interface
LTE Air Interface
 
2G Handover Details (Huawei)
2G Handover Details (Huawei)2G Handover Details (Huawei)
2G Handover Details (Huawei)
 
Mobile Networks Overview (2G / 3G / 4G-LTE)
Mobile Networks Overview (2G / 3G / 4G-LTE)Mobile Networks Overview (2G / 3G / 4G-LTE)
Mobile Networks Overview (2G / 3G / 4G-LTE)
 
VoLTE flows - basics
VoLTE flows - basicsVoLTE flows - basics
VoLTE flows - basics
 
3 g call flow
3 g call flow3 g call flow
3 g call flow
 
Volte troubleshooting
Volte troubleshootingVolte troubleshooting
Volte troubleshooting
 
GSM Location area update
GSM Location area updateGSM Location area update
GSM Location area update
 
Call flows
Call flowsCall flows
Call flows
 
Best practices-lte-call-flow-guide
Best practices-lte-call-flow-guideBest practices-lte-call-flow-guide
Best practices-lte-call-flow-guide
 
Csfb (circuit switch fall back)
Csfb (circuit switch fall back)Csfb (circuit switch fall back)
Csfb (circuit switch fall back)
 
Lte principle
Lte principleLte principle
Lte principle
 
Attach flow & srb
Attach flow & srbAttach flow & srb
Attach flow & srb
 
Lte ue initial attach & detach from networkx
Lte ue initial attach & detach from networkxLte ue initial attach & detach from networkx
Lte ue initial attach & detach from networkx
 
VoLTE optimization.pdf
VoLTE optimization.pdfVoLTE optimization.pdf
VoLTE optimization.pdf
 
CS Services in LTE
CS Services in LTECS Services in LTE
CS Services in LTE
 
3 g call flow
3 g call flow3 g call flow
3 g call flow
 
Summary 2G y 3G
Summary 2G y 3GSummary 2G y 3G
Summary 2G y 3G
 
Kpi 2g troubleshootin
Kpi 2g troubleshootinKpi 2g troubleshootin
Kpi 2g troubleshootin
 
Ericsson optimization opti
Ericsson optimization optiEricsson optimization opti
Ericsson optimization opti
 
Lte ho parameters trial_01262011
Lte ho parameters trial_01262011Lte ho parameters trial_01262011
Lte ho parameters trial_01262011
 

Destaque

Huawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shopHuawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shopnavaidkhan
 
Umts call-flow-scenarios overview
Umts call-flow-scenarios overviewUmts call-flow-scenarios overview
Umts call-flow-scenarios overviewaritra321
 
Elementary procedures for Circuit-Switched (CS) Call Control (CC) in 3GPP
Elementary procedures for Circuit-Switched (CS) Call Control (CC) in 3GPPElementary procedures for Circuit-Switched (CS) Call Control (CC) in 3GPP
Elementary procedures for Circuit-Switched (CS) Call Control (CC) in 3GPPLouis K. H. Kuo
 
Socioeconomic impacts of 5G in Europe
Socioeconomic impacts of 5G in EuropeSocioeconomic impacts of 5G in Europe
Socioeconomic impacts of 5G in EuropetechUK
 
An overview of D2D in 3GPP LTE standard
An overview of D2D in 3GPP LTE standardAn overview of D2D in 3GPP LTE standard
An overview of D2D in 3GPP LTE standardssk
 
VoWLAN: Call Quality
VoWLAN: Call QualityVoWLAN: Call Quality
VoWLAN: Call Quality3G4G
 
5G Crosshaul vs 5G-XHaul
5G Crosshaul vs 5G-XHaul5G Crosshaul vs 5G-XHaul
5G Crosshaul vs 5G-XHaul3G4G
 
Overview 5G Architecture Options from Deutsche Telekom
Overview 5G Architecture Options from Deutsche TelekomOverview 5G Architecture Options from Deutsche Telekom
Overview 5G Architecture Options from Deutsche TelekomEiko Seidel
 
AT&T View on LTE to 5G Network Migration
AT&T View on LTE to 5G Network Migration AT&T View on LTE to 5G Network Migration
AT&T View on LTE to 5G Network Migration Eiko Seidel
 
Call flow and MS attach in LTE
Call flow and MS attach in LTECall flow and MS attach in LTE
Call flow and MS attach in LTEShashank Asthana
 
Lte system signaling procedures
Lte system signaling proceduresLte system signaling procedures
Lte system signaling procedurestharinduwije
 
Radio Frequency, Band and Spectrum
Radio Frequency, Band and SpectrumRadio Frequency, Band and Spectrum
Radio Frequency, Band and Spectrum3G4G
 
2G/3G Switch off Dates
2G/3G Switch off Dates2G/3G Switch off Dates
2G/3G Switch off Dates3G4G
 

Destaque (13)

Huawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shopHuawei - Access failures troubleshooting work shop
Huawei - Access failures troubleshooting work shop
 
Umts call-flow-scenarios overview
Umts call-flow-scenarios overviewUmts call-flow-scenarios overview
Umts call-flow-scenarios overview
 
Elementary procedures for Circuit-Switched (CS) Call Control (CC) in 3GPP
Elementary procedures for Circuit-Switched (CS) Call Control (CC) in 3GPPElementary procedures for Circuit-Switched (CS) Call Control (CC) in 3GPP
Elementary procedures for Circuit-Switched (CS) Call Control (CC) in 3GPP
 
Socioeconomic impacts of 5G in Europe
Socioeconomic impacts of 5G in EuropeSocioeconomic impacts of 5G in Europe
Socioeconomic impacts of 5G in Europe
 
An overview of D2D in 3GPP LTE standard
An overview of D2D in 3GPP LTE standardAn overview of D2D in 3GPP LTE standard
An overview of D2D in 3GPP LTE standard
 
VoWLAN: Call Quality
VoWLAN: Call QualityVoWLAN: Call Quality
VoWLAN: Call Quality
 
5G Crosshaul vs 5G-XHaul
5G Crosshaul vs 5G-XHaul5G Crosshaul vs 5G-XHaul
5G Crosshaul vs 5G-XHaul
 
Overview 5G Architecture Options from Deutsche Telekom
Overview 5G Architecture Options from Deutsche TelekomOverview 5G Architecture Options from Deutsche Telekom
Overview 5G Architecture Options from Deutsche Telekom
 
AT&T View on LTE to 5G Network Migration
AT&T View on LTE to 5G Network Migration AT&T View on LTE to 5G Network Migration
AT&T View on LTE to 5G Network Migration
 
Call flow and MS attach in LTE
Call flow and MS attach in LTECall flow and MS attach in LTE
Call flow and MS attach in LTE
 
Lte system signaling procedures
Lte system signaling proceduresLte system signaling procedures
Lte system signaling procedures
 
Radio Frequency, Band and Spectrum
Radio Frequency, Band and SpectrumRadio Frequency, Band and Spectrum
Radio Frequency, Band and Spectrum
 
2G/3G Switch off Dates
2G/3G Switch off Dates2G/3G Switch off Dates
2G/3G Switch off Dates
 

Semelhante a UMTS/LTE/EPC Call Flows for CSFB

SRVCC (Single Radio Voice Call Continuity) in VoLTE & Comparison with CSFB
SRVCC (Single Radio Voice Call Continuity) in VoLTE & Comparison with CSFBSRVCC (Single Radio Voice Call Continuity) in VoLTE & Comparison with CSFB
SRVCC (Single Radio Voice Call Continuity) in VoLTE & Comparison with CSFBVikas Shokeen
 
20_15517-ant29201_25uen_a.pdf
20_15517-ant29201_25uen_a.pdf20_15517-ant29201_25uen_a.pdf
20_15517-ant29201_25uen_a.pdfsnoc3team
 
Circuit switched fallback
Circuit switched fallbackCircuit switched fallback
Circuit switched fallbackSubhash Kumar
 
SS7: Locate. Track. Manipulate.
SS7: Locate. Track. Manipulate.SS7: Locate. Track. Manipulate.
SS7: Locate. Track. Manipulate.3G4G
 
lte-to-3g-circuit-switched-fall-back.pdf
lte-to-3g-circuit-switched-fall-back.pdflte-to-3g-circuit-switched-fall-back.pdf
lte-to-3g-circuit-switched-fall-back.pdfArbab Husain
 
SRVCC (Single Radio Voice Call Continuity) in VoLTE & Comparison with CSFB
SRVCC (Single Radio Voice Call Continuity) in VoLTE & Comparison with CSFBSRVCC (Single Radio Voice Call Continuity) in VoLTE & Comparison with CSFB
SRVCC (Single Radio Voice Call Continuity) in VoLTE & Comparison with CSFBVikas Shokeen
 
P1 cl11 bm_dt kpi_acceptance report
P1 cl11 bm_dt kpi_acceptance reportP1 cl11 bm_dt kpi_acceptance report
P1 cl11 bm_dt kpi_acceptance reportaqazad
 
Gsm originating call_flow
Gsm originating call_flow Gsm originating call_flow
Gsm originating call_flow Deepthi Reddy B
 
Gsm originating call_flow
Gsm originating call_flowGsm originating call_flow
Gsm originating call_flowvineet bhadwal
 
Cau hoi-trac-nghiem-thong-tin-di-dong-co-dap-an 2
Cau hoi-trac-nghiem-thong-tin-di-dong-co-dap-an 2Cau hoi-trac-nghiem-thong-tin-di-dong-co-dap-an 2
Cau hoi-trac-nghiem-thong-tin-di-dong-co-dap-an 2Huynh MVT
 

Semelhante a UMTS/LTE/EPC Call Flows for CSFB (20)

SRVCC (Single Radio Voice Call Continuity) in VoLTE & Comparison with CSFB
SRVCC (Single Radio Voice Call Continuity) in VoLTE & Comparison with CSFBSRVCC (Single Radio Voice Call Continuity) in VoLTE & Comparison with CSFB
SRVCC (Single Radio Voice Call Continuity) in VoLTE & Comparison with CSFB
 
Lte irat callflow pa1
Lte irat callflow pa1Lte irat callflow pa1
Lte irat callflow pa1
 
20_15517-ant29201_25uen_a.pdf
20_15517-ant29201_25uen_a.pdf20_15517-ant29201_25uen_a.pdf
20_15517-ant29201_25uen_a.pdf
 
Circuit switched fallback
Circuit switched fallbackCircuit switched fallback
Circuit switched fallback
 
SS7: Locate. Track. Manipulate.
SS7: Locate. Track. Manipulate.SS7: Locate. Track. Manipulate.
SS7: Locate. Track. Manipulate.
 
Wcdma callflow
Wcdma callflowWcdma callflow
Wcdma callflow
 
GSM Traffic Cases
GSM Traffic CasesGSM Traffic Cases
GSM Traffic Cases
 
lte-to-3g-circuit-switched-fall-back.pdf
lte-to-3g-circuit-switched-fall-back.pdflte-to-3g-circuit-switched-fall-back.pdf
lte-to-3g-circuit-switched-fall-back.pdf
 
SRVCC (Single Radio Voice Call Continuity) in VoLTE & Comparison with CSFB
SRVCC (Single Radio Voice Call Continuity) in VoLTE & Comparison with CSFBSRVCC (Single Radio Voice Call Continuity) in VoLTE & Comparison with CSFB
SRVCC (Single Radio Voice Call Continuity) in VoLTE & Comparison with CSFB
 
The Saudi Arabian Grid Code
The Saudi Arabian Grid CodeThe Saudi Arabian Grid Code
The Saudi Arabian Grid Code
 
3 g ssv ugm0089
3 g ssv ugm00893 g ssv ugm0089
3 g ssv ugm0089
 
P1 cl11 bm_dt kpi_acceptance report
P1 cl11 bm_dt kpi_acceptance reportP1 cl11 bm_dt kpi_acceptance report
P1 cl11 bm_dt kpi_acceptance report
 
Cap interface
Cap interfaceCap interface
Cap interface
 
Gprs
GprsGprs
Gprs
 
Tata
TataTata
Tata
 
Csfb
CsfbCsfb
Csfb
 
Gsm originating call_flow
Gsm originating call_flow Gsm originating call_flow
Gsm originating call_flow
 
Gsm originating call_flow
Gsm originating call_flowGsm originating call_flow
Gsm originating call_flow
 
PROJECT 2016-2017
PROJECT 2016-2017PROJECT 2016-2017
PROJECT 2016-2017
 
Cau hoi-trac-nghiem-thong-tin-di-dong-co-dap-an 2
Cau hoi-trac-nghiem-thong-tin-di-dong-co-dap-an 2Cau hoi-trac-nghiem-thong-tin-di-dong-co-dap-an 2
Cau hoi-trac-nghiem-thong-tin-di-dong-co-dap-an 2
 

Mais de Justin MA (馬嘉昌)

Mais de Justin MA (馬嘉昌) (12)

電信顧問的特質與基本技能
電信顧問的特質與基本技能電信顧問的特質與基本技能
電信顧問的特質與基本技能
 
To Calculate the Maximum LOS Coverage
To Calculate the Maximum LOS CoverageTo Calculate the Maximum LOS Coverage
To Calculate the Maximum LOS Coverage
 
UMTS/WCDMA Mobile/UE Geolocation
UMTS/WCDMA Mobile/UE GeolocationUMTS/WCDMA Mobile/UE Geolocation
UMTS/WCDMA Mobile/UE Geolocation
 
UMTS/HSPA Mobile Measurements in Air/Uu
UMTS/HSPA Mobile Measurements in Air/UuUMTS/HSPA Mobile Measurements in Air/Uu
UMTS/HSPA Mobile Measurements in Air/Uu
 
UMTS/WCDMA Mobile Measurements in Air/Uu
UMTS/WCDMA Mobile Measurements in Air/UuUMTS/WCDMA Mobile Measurements in Air/Uu
UMTS/WCDMA Mobile Measurements in Air/Uu
 
LTE Mobile Measurements in Air/eUu interface
LTE Mobile Measurements in Air/eUu interfaceLTE Mobile Measurements in Air/eUu interface
LTE Mobile Measurements in Air/eUu interface
 
UMTS/LTE/EPC Call Flows for Handovers
UMTS/LTE/EPC Call Flows for HandoversUMTS/LTE/EPC Call Flows for Handovers
UMTS/LTE/EPC Call Flows for Handovers
 
UMTS/LTE/EPC Basic Call Flows
UMTS/LTE/EPC Basic Call FlowsUMTS/LTE/EPC Basic Call Flows
UMTS/LTE/EPC Basic Call Flows
 
UMTS/WCDMA Call Flows for Handovers
UMTS/WCDMA Call Flows for HandoversUMTS/WCDMA Call Flows for Handovers
UMTS/WCDMA Call Flows for Handovers
 
UMTS/WCDMA Call Flows for PS services
UMTS/WCDMA Call Flows for PS servicesUMTS/WCDMA Call Flows for PS services
UMTS/WCDMA Call Flows for PS services
 
UMTS/WCDMA Call Flows for CS services
UMTS/WCDMA Call Flows for CS servicesUMTS/WCDMA Call Flows for CS services
UMTS/WCDMA Call Flows for CS services
 
LTE RF Planning Tool - Atoll
LTE RF Planning Tool - AtollLTE RF Planning Tool - Atoll
LTE RF Planning Tool - Atoll
 

Último

Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 

Último (20)

Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 

UMTS/LTE/EPC Call Flows for CSFB

  • 1. LTE CSFB Call Flows Edited By Justin MA Created: June 2014 Updated: 2014_0714 Date and Version Author Change Note 2014_0630; v1.0 Justin MA Basic call flows 2014_0714; v1.1 Justin MA Call Release with IR LTE and SAE netwroks 1/27 Ref:
  • 4. General Voice over LTE solutions: 4/27 Ref:
  • 8. Attach Procedure for LTE/WCDMA modes 8/27 Ref: 3GPP 23.272 V12.3.0
  • 9. Basic CSFB MO Call Flow 9/27 Ref:
  • 12. Mobile Originating call in Active Mode - PS HO supported 12/27 UE/MS MMEBSS/RNS MSCeNodeB SGSN Serving GW 2. Optional Measurement Report Solicitation 4b. A/Iu-cs message (with CM Service Request) 4b. CM Service Request Location Area Update or Combined RA/LA Update 5. CM Service Reject 5. CM Service Reject If the MSC is changed 3a. PS HO as specified in 23.401 [2] (preparation phase and start of execution phase) 6. CS call establishment procedure 1a. Extended Service Request 1b. S1-AP Request message with CS Fallback indicator 7. PS HO as specified in 23.401 [2] (continuation of execution phase) 1c. S1-AP Response message 4a. Location Area Update 3c. Update Bearer(s) 3b. Suspend P-GW/ GGSN 1d. MO CSFB Indication Ref: 3GPP 23.272 V12.3.0
  • 13. Mobile Originating call in Active Mode – No PS HO support 13/27 UE/MS MMEBSS/RNS MSCeNodeB 2. Optional Measurement Report Solicitation 10b. Location Area Update 10a. Service Reject 10c. CS MO call 6. UE changes RAT then LA Update or RA Update or LAU and RAU 3a. NACC, 5. S1 UE Context Release 1a. NAS Extended Service Request SGW/PGW 4. S1-AP: S1 UE Context Release Request 1b. S1-AP UE Context Modification Request with CS Fallback indicator 7a. Suspend (see 23.060) 8. Update bearer(s) SGSN 7b. Suspend Request / Response 11. Routing Area Update or Combined RA/LA Update 3b, 3c. RRC connection release If the MSC is changed 1c. S1-AP UE Context Modification Response message 9. CM Service Request 9. A/Iu-cs message (with CM Service Request) 1d. MO CSFB Indication Ref: 3GPP 23.272 V12.3.0
  • 14. Basic CSFB MT Call Flow 14/27 Ref:
  • 17. Mobile Terminating call in idle mode 17/27 1. IAM 3. IAM 4. Paging Request 5. Paging 6. Paging 2. SRI procedure in TS 23.018 G-MSCeNodeB RNC/BSCUE MME HSS MSC VLR 8. After the UE context setup the procedure continues as described the active mode mobile terminated call procedures described in Clause 7.3 and 7.4. If the eNodeB knows that PS HO is supported the procedure in clause 7.3 “Mobile Terminating call in Active Mode - PS HO supported” may be applied from step 2, in Clause 7.3, and onwards If the eNodeB knows that PS HO is not supported the procedure in clause 7.4 “Mobile Terminating call in Active Mode – No PS HO support” shall be applied from step 2 in Clause 7.4, and onwards 7a. Extended Service Request 7b. Initial UE Context Setup 7a. Service Request Ref: 3GPP 23.272 V12.3.0
  • 18. Mobile Terminating call in Active Mode - PS HO supported 18/27 4a. Location Area Update 4b. Paging Response 4b. A/Iu-cs message (with Paging Response) 5b. Signalling Connection Release 5b. Connection Reject If the MSC is changed 5b. Location Area Update or Combined RA/LA Update 5c. CS call establishment procedure 6. PS HO as specified in 23.401 [2] (continuation of execution phase) 5a. Establish CS connection Option 1: MSC is not changed 3c. Update Bearer(s) 3b. Suspend P-GW/ GGSN 2. Optional Measurement Report Solicitation 3a. PS HO as specified in 23.401 [2] (preparation phase and start of execution phase) 1e. S1-AP UE Context Modification Response message 1d. S1-AP UE Context Modification Request with CS Fallback indicator UE/MS MMEBSS/RNS MSCeNodeB SGSN Serving GW 1b. NAS Extended Service Request 1a. Paging Request 1a. CS SERVICE NOTIFICATION 1c. CS Paging Reject 1a. Service Request Ref: 3GPP 23.272 V12.3.0
  • 19. Mobile Terminating call in Active Mode - No PS HO support 19/27 IF THE MSC IS CHANGED UE/MS MME MSC 3a. CCO/NACC, 3b, 3c. Signalling connection release eNodeB 2. Optional Measurement Report 9. Paging Response 9c. Location Area Update or Combined RA/LA Update 9b. Signalling Connection Release S-GW/PGW 1b. NAS Extended Service Request 1d. S1-AP UE Context Modification Request with CS Fallback indicator 1c. CS Paging Reject 7a. Suspend (see TS 23.060) 8. Update bearer(s) 7b. Suspend Request / Response 9b. CONNECTION REJECT 1A. CS SERVICE NOTIFICATION 1A. PAGING REQUEST SGSN 6.UE changes RAT then, LAU OR RA UPDATE OR LAU AND RAU 5. S1 UE CONTEXT RELEASE BSS/RNS 4. S1-AP: S1 UE CONTEXT RELEASE REQUEST 1A. SERVICE REQUEST 1e. S1-AP UE Context Modification Response message 9a. Establish CS connection Ref: 3GPP 23.272 V12.3.0
  • 23. Roaming Retry for CS fallback 23/27 GMSC HLR Old VMSC/VLR New VMSC/VLR MS PRN (call ref.,GMSC@, Roaming retry) 2 PRN ACK (MSRN) SRI ACK IAM (MSRN) Paging LocUpdate Authentication Procedure Update Location Cancel Location 3 Cancel Location Ack RCH (call reference, roaming retry) Insert Subscriber Data (multiple) Insert Subscriber Data (continued) Update Location Ack Further procedures related to location update. e.g. ciphering, TMSI reallocation.PRN New VMSC/VLR may delay setup until location update procedure finishes 8 PRN ACK (MSRN) 7 LocUpdate Accept TMSI Reallocation Complete Normal MT call procedure follows Old MSC stops paging timer and inform GMSC 2nd SRI ACK (MSRN) 7 2nd SRI (B, basic call interrogation) 5 REL RLCs 4 ACK HLR delays the sending of PRN until location update procedure finishes 6 SAE/LTE CSFallback Setup SRI (B, GMSC@,call Ref.,Roamingretry) 1 IAM (MSRN) Call Confirmed Ref: 3GPP 23.272 V12.3.0
  • 24. Roaming Forwarding for CS fallback 24/27 GMSC HLR Old MSC/VLR New MSC/VLR MS SRI (B) PRN PRN ACK (MSRN)SRI ACK IAM (MSRN) Paging Location Update 2. Update Location (MTRF supported)1 3. Cancel Location (MTRF Supported And Authorized, New MSC/VLR numbers) Cancel Location Ack 6. PRN (MTRF indication, Old MSC number, last used LTE PLMN) Insert Subscriber Data (multiple) Insert Subscriber Data (continued) Update Location Ack Further procedures related to location update. E.g. ciphering, IMEI checking, TMSI reallocation. 10. New VMSC/VLR delays setup until location update procedure finishes. 8. PRN Resp (MSRN’) 9. IAM (MSRN’) Location Update Accept TMSI Realloc Complete Setup Call Confirmed Normal MT call procedure follows 4. Old MSC stops paging timer 7. After Update Location Ack is received, the new VLR returns MSRN’ to the old VLR. 5. If HLR authorises MTRF then use new MSC/VLR numbers to trigger sending of PRN Req 1. Send Identification (MTRF supported, New MSC/VLR numbers) CSFB Ref: 3GPP 23.272 V12.3.0
  • 25. 1x RTT CS Pre-Registration over EPS Procedure 25/27 1xCS CSFB UE E- UTRAN MME 1xCS IWS 1xRTT MSC 4. 1xRTT CS registration request 4a. UL/DL Information Transfer 4b. UL/DL S1 cdma2000 Tunnelling 4c. S102 Direct Transfer 6. 1xRTT CS registration response 6c. UL/DL Information Transfer 6b UL/DL S1 cdma2000 Tunnelling 6a. S102 Direct Transfer 1. UE attaches to E-UTRAN as specified in TS 23.401 5. Location update to 1xRTT CS domain 2. Decision to register with 1xRTT CS 3. Service Request procedure if the UE is in idle state . Ref: 3GPP 23.272 V12.3.0
  • 26. CS MO call using fallback to CDMA 1x RTT network 26/27 1xCS CSFB UE E- UTRAN MME 1xCS IWS 1xRTT MSC 1. UE is E -UTRAN attached and registered with 1xRTT CS 11. 1x MO call establishment per 3GPP2 specifications 4. UE Context Modification Request 3. Extended Service Request S-GW/ P-GW 5. Optional measurement report solicitation 7. S1 UE Context Release Request 8. Suspend Notification 10. UE Context Release 2. UE decision to perform MO call in 1xCS 6. E-UTRAN triggers RRC connection release with redirection 4. UE Context Modification Response 9. Suspend Acknowledge Ref: 3GPP 23.272 V12.3.0
  • 27. CS MT call using fallback to CDMA 1x RTT network 27/27 Ref: 3GPP 23.272 V12.3.0