Claudio Modola Design - Architectural Design Process Examples
project overview
1. Copyright by AHR Architects
www.ahr-global.com
Izabela Szymańska
Project Architect at AHR Architects
(rebranded Aedas CE)
Portfolio includes selected projects from different categories of commercial buildings like hotels, retails, offices and others.
Thanks to the many brain-storms we formed unique and modern building designs some of which ended up on the construction sites.
Fruitful collaboration with my colleagues and specialists of other branches expanded my knowledge and gave the opportunity to learn and
develop. I present some of the projects which show my previous experience.
Office Tower
Warsaw, Poland
Client Roundabout
Area 40,000 sqm
Stage Concept
Luzycka Business Park
Gdynia, Poland
Client Allcon
Area 41,200 sqm
Stage Completed
Artema Street
Kiev, Ukraine
Client F&C Development
Area 60,000 sqm
Stage Concept
Sterlinga Office Building
Lodz, Poland
Client Hines
Area 15,400 sqm
Stage Completed
OFFICE MIXED-USE RESIDENTIAL HOSPOTALITY
key responsibilities:
• responsible for the concept design starting from functional layouts,
architectural appearance and all relevant calculations according Boma
standards,
• developed concept designs and prepared presentation drawings,
• prepared 3d massing and models for render team members and
coordination of their work
key responsibilities:
• in charge of developing volume and feasibility assumptions (GBA, GLA,
parking No.,etc)
• developed concept designs from client brief and prepared presentation
drawings for client acceptance or city authorities approval,
• in charge of building architectural appearance,
• prepared 3d massing and presentation drawings
• cooperated with structural engineers and different consultants
key responsibilities:
• prepared cad drawings and all relevant information with cooperation
with colleagues and manager for building permit stage and tender
documentation,
• liaised with structural engineers,
key responsibilities:
• responsible for changes in technical documentation for construction
site,
• regular site visits to check on progress, ensuring that the project is
realized within architectural documentation,
• responsible for internal info distribution
2. Copyright by AHR Architects
www.ahr-global.com
Izabela Szymańska
ProjectArchitectatAHRArchitects
(rebranded Aedas CE)
Portfolio includes selected projects from different categories of commercial buildings like hotels, retails, offices and others.
Thanks to the many brain-storms we formed unique and modern building designs some of which ended up on the construction sites.
Fruitful collaboration with my colleagues and specialists of other branches expanded my knowledge and gave the opportunity to learn and
develop. I present some of the projects which show my previous experience.
key responsibilities:
• responsible for test-fit and preliminary calculation to evaluate the site
opportunities,
• in charge of developing volume and feasibility assumptions (GBA, GLA,
parking No.,etc)
• in charge of architectural appearance of the building, landscape and
the building functions,
• developed concept designs and prepared presentation drawings,
• responsible for final presentation of the project,
• performed duty of team leader and control over team work
key responsibilities:
• in charge of developing volume and feasibility assumptions (GBA, GLA,
parking No.,etc )
• responsible for the concept design starting from functional layouts,
architecture and all relevant calculations according ISO and Boma
standards,
• developed concept designs and prepared presentation drawings,
• responsible for final presentation of the project,
• performed duty of team leader and control over team work
key responsibilities:
• assisted in project managing and interfacing with the client bodies,
• coordinated the design team in terms of delivery material
• developed concept designs from client brief and prepared presentation
drawings
• prepared 3d massing and models for render team members and
coordination of their work
• prepared the graphic layout for presentation boards,
• responsible for final presentation of the project,
key responsibilities:
• conducted internal meeting of concept design team,
• developed concept designs and prepared presentation drawings for
international investors,
• prepared 3d massing and models for render team members and
coordination of their work
• prepared conceptual drawings for interpretation by others into CAD,
Ciech office building
Warsaw
Client Ciech Service
Area -- sq m
Stage Concept
Office Tower
Gdansk, Poland
Client Hines
Area 45000 sqm
Stage Concept
Fabryka Biznesu Mixed-use
Lodz, Poland
Client Fabryka Biznesu
Area 75,000 sqm
Stage Concept
Sennoi Mixed Use Development
Kiev, Ukraine
Client Metrica
Area 120,000 sq m
Stage Concept
OFFICE MIXED-USE RESIDENTIAL HOSPOTALITY
3. Copyright by AHR Architects
www.ahr-global.com
Izabela Szymańska
ProjectArchitectatAHRArchitects
(rebranded Aedas CE)
Portfolio includes selected projects from different categories of commercial buildings like hotels, retails, offices and others.
Thanks to the many brain-storms we formed unique and modern building designs some of which ended up on the construction sites.
Fruitful collaboration with my colleagues and specialists of other branches expanded my knowledge and gave the opportunity to learn and
develop. I present some of the projects which show my previous experience.
Novin
Tyumen, Russia
Client Partner Invest
Area 210 000 sqm
Phase Under construction
Zaspa Residential
Gdansk, Poland
Client Allcon
Area 67 000 sq m
Stage Concept
Residential Development
Surgut, Russia
Client Brusnika
Area 290 000 sqm
Stage Under construction
Dunayevskovo Residential
Novosibirsk, Russia
Client Brusnika
Area 72 000 sqm
Stage Under construction
OFFICE MIXED-USE RESIDENTIAL HOSPOTALITY
key responsibilities:
• involved in the design on concept and tender documentation stage,
• performed duty of team leader and control over team work,
• coordinated the design team in terms of delivery material
• prepared conceptual drawings for interpretation by others into CAD,
• prepared 3d massing and models for render team members and
coordination of their work
• prepared conceptual drawings for interpretation by others into CAD,
key responsibilities:
• involved in the design on concept and tender documentation stage,
• coordinated the design team in terms of delivery material,
• in charge of architectural appearance of the building and landscape,
• in charge of preparing drawings for review by Project Director,
• disseminated information to other team members,
• responsible for final presentation delivery
key responsibilities:
• involved in the design on concept stage
• coordinated the design team in terms of delivery material,
• in charge of architectural appearance of the building and landscape,
• in charge of preparing drawings for review by Project Director,
• disseminated information to other team members,
• responsible for final presentation delivery
• prepared 3d model for render team members and coordination of their
work
key responsibilities:
• developed concept designs from client brief and prepared presentation
drawings for client acceptance,
• prepared the graphic layout for presentation boards,
4. Copyright by AHR Architects
www.ahr-global.com
Izabela Szymańska
ProjectArchitectatAHRArchitects
(rebranded Aedas CE)
Portfolio includes selected projects from different categories of commercial buildings like hotels, retails, offices and others.
Thanks to the many brain-storms we formed unique and modern building designs some of which ended up on the construction sites.
Fruitful collaboration with my colleagues and specialists of other branches expanded my knowledge and gave the opportunity to learn and
develop. I present some of the projects which show my previous experience.
Stavropol Residential
Novosibirsk, Russia
Client Brusnika
Area 23 000 sqm
Stage Under construction
Client Medeu Resorts
Area 43,000 sqm
Stage Terder documentation
Medeu Resort Apart - hotel
Almaty, Kazakhstan
Hotel Park inn
Almaty, Kazakhstan
Client -----
Area ---- sqm
Stage Tender documentation
Okecie Marriott Hotel Competition
Warsaw, Poland
Client -----
Area ---- sqm
Stage Concept
OFFICE MIXED-USE RESIDENTIAL HOSPOTALITY
key responsibilities:
• involved in the design on concept stage
• responsibel for facade solutions and finishes proposal,
• prepared 3d model for render team members and coordination of their
work
key responsibilities:
• involved in the design on concept stage and tender documentation,
• produced technical documentation for building permit stage with
cooperation with other colleagues,
key responsibilities:
• coordinated the design team in terms of delivery material,
• responsible for internal info distribution
• performed duty of team leader and control over team work
• produced technical documentation for tender stage with cooperation
with other colleagues,
key responsibilities:
• involved in work on architectural appearance of the building
• prepared design working drawings in accordance to the architectural
norms and building code,