SlideShare uma empresa Scribd logo
1 de 22
Baixar para ler offline
LEAN GLOBAL
                                        NETWORK




Michael Kazoglou
Lean Management Instituut - Netherlands
Lean Global Network

Teamwork within Toyota and with its
Suppliers, and methods to satisfy multiple
customers during New Vehicle Development
Journée Lean en ingénierie
Paris, 9th Avril 2013
kazoglou@leaninstituut.nl
Who is your   Engineering is the Customer ?
Customer?
              Production is the Customer ?
              Supplier is the Customer ?
              Supplier Contribution
              65%
Why focus
   on
Suppliers?
                    Manufacturing
                     Contribution
                                                  P
              Total Product Cost              D       Q
Teamwork within Toyota and with its Suppliers,
and methods to satisfy multiple customers                  LEAN GLOBAL


during New Vehicle Development
                                                             NETWORK




 Why Europe, Why The Netherlands?
 Background – Toyota in Australia (18 years experience)
 Agenda:
        1. Toyota’s Supplier Management Process
        2. Toyota’s Supplier Development
        3. Toyota Engineering – Product to Process
        > Techniques: VAVE, PPC, Obeya/SPTT, Lean in Design
 Questions
My ‘Toyota Way’ challenge in 2013

The Toyota Way 2001:
Lean Values & Behavours



• Challenge : Move to The Netherlands – NEW EXPERIENCE

• Kaizen : Learn from LMI & Our Clients (& European Operations)

• Genchi Genbutsu : European Workplace, in Dutch, French,….

• Respect : Share (both ways) & Teach / Develop People & Process

• Teamwork : LMI, Lean Global Network, LMI Clients & Practitioners
About Toyota Australia….




AMI/Toyota Assembly Line
         ca.1963             2006-2013
                           Camry / Aurion
Organisational Structure

                              Manufacturing &
                                Purchasing

Manufacturing   Production          Purchasing             Product           Quality
                Engineering                               Engineering         Prod Control



                Direct Purchasing   Indirect Purchasing   Supplier Prep. &
                                                           Development
Teamwork within Toyota and with its Supplier,
and methods to satisfy multiple customers               LEAN GLOBAL


during New Vehicle Development
                                                          NETWORK




 Why Europe, Why The Netherlands?
 Background - Toyota in Australia
 Agenda:
        1. Toyota’s Supplier Management Process
        2. Toyota’s Supplier Development
        3. Toyota Engineering – Product to Process
        > Techniques: VAVE, PPC, Obeya, SPTT, Lean in Design
 Questions
About Toyota Purchasing….
1. Open Door Policy:
   Based on Quality, Technological Capabilities, Reliability & Delivery
2. Mutual Benefit Based on Mutual Trust:
  They Believe in Developing Mutually Beneficial,
   Long-Term Relationships Based on Mutual Trust
3. Localisation:
  Purchase Parts & Materials from Local Suppliers


   The ‘Tough Love’ approach:

   •   They understand how their suppliers work

   •   They supervise their vendors

   •   They develop their supplier’s technical capabilities

   •   They share information intensively but selectively

   •   They conduct joint improvement activities
Managing Supplier Relationships

                                  SUPPORT:

                                  •    TPS / Technical Consultation
                                  •    Staff Secondment
                                  •    Supplier Parts Tracking Team
                                  •    Project Conferences
                                       (Communications Strategy)
                                  •    Benchmarking Study Tours
                                  •    Technical Agreements
                                  •    Toyota Institute

                                      Performance Outcomes
Supplier Opportunities:
                     (Customer always pays whether it is Quality, Delivery, Cost)
                     •    Raw materials (2nd – 3rd tier suppliers)
                     •    Product unit cost :
                                       »    O/heads, energy, head-office, consumables, tooling,
                                            Capital/depreciation, Maintenance costs
Can we make it                         »    R/materials, internal & externals components
less expensive?                        »    Processing costs – efficiencies, rates, waste?
                                       »    Labour – efficiencies?
Can we use less                        »    Wastage – allowances, best practice?
expensive product?   •    Supplier Inventory costs
                     •    Logistics costs / efficiencies . Shipping/storage methods
Can is perform
better?              •    Inventory costs / waste / storage / Handling-Mngt
                     •    Production Plant Impacts:
                                       »    Delivery, Quality, Wastage, Downtime, efficiencies, overtime etc

                     •    Product variation – in-plant / field / customer etc
                     •    New Product Development – total process
                     •    Projects / support / responsiveness
                     •    Value adding opportunities?
Supplier Opportunities:
                         (Customer always pays whether it is Quality, Delivery, Cost)

                     Product design opportunities:
                     •     Recycle, substitute, thinner, lighter, smaller,
Can we make it       •     Shape, surface, materials, no. of sites, no. of parts/skus,
less expensive?
                     •     Excessive quality, difference b/n skus,
Can we use less      •     Next NPD opportunity, suitable for plant, function,
expensive product?   •     Technical complexity, use, legals etc?
Can is perform
better?              Toyota Process:
                     •     Cost Structure / Biggest Gap / Priority / Activity Action Plan
                     •     Benchmarking – Target, Gaps, Breakdown costs, pareto/priority
                     •     Understand Cost elements – Processing costs, material costs, overheads
                     •     Competitor Cost elements – identify breakdown costs/gaps (Pareto/Top 1-3)
                     •     VAVE analysis – design for purpose/manufacture/customer need (O/process)
                     •     Production process costs – compare operations vs lean organisation, CI/Lean
                           process improvement opportunity review (lean assessment/gap analysis)
Teamwork entre conception et méthodes
chez Toyota pour satisfaire plusieurs clients           LEAN GLOBAL
                                                          NETWORK




 Why Europe, Why The Netherlands?
 Background - Toyota in Australia
 Agenda:
        1. Toyota’s Supplier Management Process
        2. Toyota’s Supplier Development
        3. Toyota Engineering – Product to Process
        > Techniques: VAVE, PPC, Obeya, SPTT, Lean in Design
 Questions
Toyota Supplier Development
Objective:
The overall goal of the program is to strengthen the capability and cost competitiveness
of Toyota’s local supply base and ensure achievement goals beyond next New Model
Introduction.
           By Supplier              By Supplier
            Numbers                  $ VOB
  Image
             LOCAL                                              SUPPLIERS SELECTION CRITERIA:
                                      LOCAL
                                                  CORE FOCUS    1. VOB / COLOR / LOGISTICS
  50%       GLOBAL                                 SUPPLIERS:   2. COST GAP (Next Model)
                                     GLOBAL
Coverage                  > 80%                    SUPPORT      3. LEAN SUPPORT ATTITUDE
Supplier   JAPANESE       $ VOB                    REQUIRED
                                                                4. LEAN LEVEL(OPPORTUNITY)
                         Coverage                               5. ACCESS TO ADEQUATE SUPPORT
                                    JAPANESE
             OTHER                                              RISKS to Toyota:
                                                                1. TIMING (Next Model UP TO SVP)
                                     OTHER                      2. COST TARGET ACHIEVEMENT
Teamwork entre conception et méthodes
chez Toyota pour satisfaire plusieurs clients          LEAN GLOBAL
                                                         NETWORK




 Why Europe, Why The Netherlands?
 Background - Toyota in Australia
 Agenda:
        1. Toyota’s Supplier Management Process
        2. Toyota’s Supplier Development
        3. Toyota Engineering – Product to Process
        > New Vehicle, VAVE, PPC, Obeya/SPTT, Lean in Design
 Questions
New Product Development Process
          Concept to Vehicle Production Launch


Release
Drawing                                  Volume
            Drawing                      Production

                      Tooling

                                Tuning

                                          Prod Ready
Design Process
             “Value Analysis / Value Engineering Launch

                   1. Gather information
Continuous         2. Function/Performance analysis
                    3. Creation innovation
Consensus           4. Analyze ideas
 Building           5. Presentation




              Get agreement and proceed to development of parts!

                                 Create Design!
Previous Problem Check
Problem Area          Problem Lists            Make PPC          C/M Process

Vehicle                                          NPD Design
concerns                                                              Check
Plant                                            NPD Process
                                                                      Final
concerns                                                              Outcome
Supplier                                         NPD Parts
concerns

 Key Point: Make a product problem history list
    Include ALL GLOBAL HISTORY / Knowledge of Company
    Internal Quality / Workability Problems
    Previous Customer Impact Concerns Quality tracking systems etc
     (Not just within your organisation)
Obeya – Visual Project Management



 •   Visualisation – Everyone can share
     Progress
 •   Inform Bad News First – Reporting,
     Informing, Consulting
 •   Practice Worst Case Scenario Activity
LEAN IN DESIGN STAGE
Opportunities
 for Process
                (Pre-production, Process, Production)
Improvement     Pre- Production:
at the Design
                •   Product Design/Raw Materials
    Stage
                •   Tool Design/Manufacture (Jidoka + QDC)
                •   Equip. / Tool Trial (SOP/STD. Work/Training)
                •   Production Proto-type trial (Die / Equip./Assy.)
                Process
                •   Equip./Process integration
                •   Lay-out
                •   Mat. Handling/Conveyance
                •   Ergonomics/Safety
                •   Labour Req.& Training
                Production
                •   Total work contents (Process c/time)
                •   Efficiency (Change over/Down time/Op.Efficiency/Rejects)
                •   Takt time
                •   Confirmation of Mass production(HVPT)
LEAN IN DESIGN STAGE
    (Pre-production, Process, Production)
•      Production Preparation Parts / Process Summary.
•      Part Specific Value Stream Map.
•      Plant/Process layout to show material Flow.
•      Man / Machine loading and Capacity estimates
       (Std Work Charts).
Respect the Production Operator, while
              making improvement to Quality, Delivery & Cost
               1. Minimise No. of equipment    (More than one function)

               2. Avoid secondary process
Focus          3. Consider handling problems
points for     4. Consider / use gravity force   (Avoid complex motions)

New Process    5. Consider self locate jigs/fixtures
Design         6. Integrate “Pokayoke” functions
               7. Simplify or eliminate packaging      (container size / Wrapping / Access)

               8. Minimise variations if possible
               9. Enhance ergonomic conditions
               10. Eliminate Movements, adjustments and Reorientations
               11. Floor space reduction
               12. Overall focus on all relevant non value adding operations
Michael Kazoglou
                            Teamwork within Toyota and with its Supplier,
                            and methods to satisfy multiple customers                      LEAN GLOBAL


Paris,   9th   Avril 2013   during New Vehicle Development
                                                                                             NETWORK




kazoglou@leaninstituut.nl
                               Agenda themes:
                                     1. Toyota’s Supplier Management Process
                                     2. Toyota’s Supplier Development
                                     3. Toyota Engineering – Product to Process
                                     > Techniques: VAVE, PPC, Obeya/SPTT, Lean in Design

Mais conteúdo relacionado

Mais procurados

Seven wastes of lean operations management
Seven wastes of lean operations managementSeven wastes of lean operations management
Seven wastes of lean operations managementHriday Bora
 
Value chain ​​and competitive advantage of pt toyota ppt (task)
Value chain ​​and competitive advantage of pt toyota ppt (task)Value chain ​​and competitive advantage of pt toyota ppt (task)
Value chain ​​and competitive advantage of pt toyota ppt (task)stmt trisakti
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarMichael E. Parker
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and ControlSwatanu Satpathy
 
New Product Development and Stage Gates
New Product Development and Stage GatesNew Product Development and Stage Gates
New Product Development and Stage GatesRick Berzle
 
Toyota Production System 14 Management Principles
Toyota Production System 14 Management PrinciplesToyota Production System 14 Management Principles
Toyota Production System 14 Management PrinciplesDK Sharma
 
Toyota Production System
 Toyota Production System Toyota Production System
Toyota Production SystemAmol Shah
 
Final year project report on Value stream mapping and Smed
Final year project report on Value stream mapping and SmedFinal year project report on Value stream mapping and Smed
Final year project report on Value stream mapping and SmedUmar Yazdani
 
A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)Avijeet Suryavanshi
 
Tpm presentasion in marathi
Tpm presentasion in marathiTpm presentasion in marathi
Tpm presentasion in marathisagar thete
 
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturingravindra sharma
 
Lean Management
Lean ManagementLean Management
Lean ManagementPeter Klym
 
Lean manufacturing and its tool
Lean manufacturing and its toolLean manufacturing and its tool
Lean manufacturing and its toolAnkit Gupta
 

Mais procurados (20)

Seven wastes of lean operations management
Seven wastes of lean operations managementSeven wastes of lean operations management
Seven wastes of lean operations management
 
Toyota Part Approval (PA) Process
Toyota Part Approval (PA) ProcessToyota Part Approval (PA) Process
Toyota Part Approval (PA) Process
 
Value Stream Mapping (VSM)
Value Stream Mapping (VSM)Value Stream Mapping (VSM)
Value Stream Mapping (VSM)
 
Value chain ​​and competitive advantage of pt toyota ppt (task)
Value chain ​​and competitive advantage of pt toyota ppt (task)Value chain ​​and competitive advantage of pt toyota ppt (task)
Value chain ​​and competitive advantage of pt toyota ppt (task)
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview Webinar
 
Just In Time(JIT)
Just In Time(JIT)Just In Time(JIT)
Just In Time(JIT)
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
New Product Development and Stage Gates
New Product Development and Stage GatesNew Product Development and Stage Gates
New Product Development and Stage Gates
 
Shop Floor Planning & Control
Shop Floor Planning & ControlShop Floor Planning & Control
Shop Floor Planning & Control
 
Toyota Production System 14 Management Principles
Toyota Production System 14 Management PrinciplesToyota Production System 14 Management Principles
Toyota Production System 14 Management Principles
 
Toyota Production System
 Toyota Production System Toyota Production System
Toyota Production System
 
Final year project report on Value stream mapping and Smed
Final year project report on Value stream mapping and SmedFinal year project report on Value stream mapping and Smed
Final year project report on Value stream mapping and Smed
 
A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)
 
Tpm presentasion in marathi
Tpm presentasion in marathiTpm presentasion in marathi
Tpm presentasion in marathi
 
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturing
 
Lean Management
Lean ManagementLean Management
Lean Management
 
A3 concept guide
A3 concept guideA3 concept guide
A3 concept guide
 
Fiat India
Fiat IndiaFiat India
Fiat India
 
Lean manufacturing and its tool
Lean manufacturing and its toolLean manufacturing and its tool
Lean manufacturing and its tool
 
Tpm training
Tpm trainingTpm training
Tpm training
 

Destaque

Sogefi : Du produit au lean engineering
Sogefi : Du produit au lean engineeringSogefi : Du produit au lean engineering
Sogefi : Du produit au lean engineeringInstitut Lean France
 
Les obeyas chez Thales par Cécile Roche
Les obeyas chez Thales par Cécile RocheLes obeyas chez Thales par Cécile Roche
Les obeyas chez Thales par Cécile RocheInstitut Lean France
 
10 exercices de Lean engineering par Michael Ballé
10 exercices de Lean engineering par Michael Ballé10 exercices de Lean engineering par Michael Ballé
10 exercices de Lean engineering par Michael BalléInstitut Lean France
 
Expériences et apprentissages value analysis, value engineering par Eric Prev...
Expériences et apprentissages value analysis, value engineering par Eric Prev...Expériences et apprentissages value analysis, value engineering par Eric Prev...
Expériences et apprentissages value analysis, value engineering par Eric Prev...Institut Lean France
 
Ce que nous avons appris de Toyota par Olivier Soulié de PSA
Ce que nous avons appris de Toyota par Olivier Soulié de PSACe que nous avons appris de Toyota par Olivier Soulié de PSA
Ce que nous avons appris de Toyota par Olivier Soulié de PSAInstitut Lean France
 
Du lean en ingénierie à la stratégie produit par Jean-Claude Bihr, Alliance
Du lean en ingénierie à la stratégie produit par Jean-Claude Bihr, AllianceDu lean en ingénierie à la stratégie produit par Jean-Claude Bihr, Alliance
Du lean en ingénierie à la stratégie produit par Jean-Claude Bihr, AllianceInstitut Lean France
 
Elements de pratique du Set-Based Concurrent Engineering par Olivier Soulié
Elements de pratique du Set-Based Concurrent Engineering par Olivier SouliéElements de pratique du Set-Based Concurrent Engineering par Olivier Soulié
Elements de pratique du Set-Based Concurrent Engineering par Olivier SouliéInstitut Lean France
 
Lean engineering : repenser l'entreprise par Michael Ballé
Lean engineering : repenser l'entreprise par Michael BalléLean engineering : repenser l'entreprise par Michael Ballé
Lean engineering : repenser l'entreprise par Michael BalléInstitut Lean France
 
Développer le travail collaboratif et l'innovation grâce au Lean engineering ...
Développer le travail collaboratif et l'innovation grâce au Lean engineering ...Développer le travail collaboratif et l'innovation grâce au Lean engineering ...
Développer le travail collaboratif et l'innovation grâce au Lean engineering ...Institut Lean France
 
Pourquoi faire du Lean engineering par Fabien Leroy
Pourquoi faire du Lean engineering par Fabien LeroyPourquoi faire du Lean engineering par Fabien Leroy
Pourquoi faire du Lean engineering par Fabien LeroyInstitut Lean France
 
Lean en conception et développement par Michael Ballé
Lean en conception et développement par Michael BalléLean en conception et développement par Michael Ballé
Lean en conception et développement par Michael BalléInstitut Lean France
 
Web-formation | L'Obeya pour le pilotage de projets Lean Développement
Web-formation | L'Obeya pour le pilotage de projets Lean DéveloppementWeb-formation | L'Obeya pour le pilotage de projets Lean Développement
Web-formation | L'Obeya pour le pilotage de projets Lean DéveloppementXL Groupe
 

Destaque (12)

Sogefi : Du produit au lean engineering
Sogefi : Du produit au lean engineeringSogefi : Du produit au lean engineering
Sogefi : Du produit au lean engineering
 
Les obeyas chez Thales par Cécile Roche
Les obeyas chez Thales par Cécile RocheLes obeyas chez Thales par Cécile Roche
Les obeyas chez Thales par Cécile Roche
 
10 exercices de Lean engineering par Michael Ballé
10 exercices de Lean engineering par Michael Ballé10 exercices de Lean engineering par Michael Ballé
10 exercices de Lean engineering par Michael Ballé
 
Expériences et apprentissages value analysis, value engineering par Eric Prev...
Expériences et apprentissages value analysis, value engineering par Eric Prev...Expériences et apprentissages value analysis, value engineering par Eric Prev...
Expériences et apprentissages value analysis, value engineering par Eric Prev...
 
Ce que nous avons appris de Toyota par Olivier Soulié de PSA
Ce que nous avons appris de Toyota par Olivier Soulié de PSACe que nous avons appris de Toyota par Olivier Soulié de PSA
Ce que nous avons appris de Toyota par Olivier Soulié de PSA
 
Du lean en ingénierie à la stratégie produit par Jean-Claude Bihr, Alliance
Du lean en ingénierie à la stratégie produit par Jean-Claude Bihr, AllianceDu lean en ingénierie à la stratégie produit par Jean-Claude Bihr, Alliance
Du lean en ingénierie à la stratégie produit par Jean-Claude Bihr, Alliance
 
Elements de pratique du Set-Based Concurrent Engineering par Olivier Soulié
Elements de pratique du Set-Based Concurrent Engineering par Olivier SouliéElements de pratique du Set-Based Concurrent Engineering par Olivier Soulié
Elements de pratique du Set-Based Concurrent Engineering par Olivier Soulié
 
Lean engineering : repenser l'entreprise par Michael Ballé
Lean engineering : repenser l'entreprise par Michael BalléLean engineering : repenser l'entreprise par Michael Ballé
Lean engineering : repenser l'entreprise par Michael Ballé
 
Développer le travail collaboratif et l'innovation grâce au Lean engineering ...
Développer le travail collaboratif et l'innovation grâce au Lean engineering ...Développer le travail collaboratif et l'innovation grâce au Lean engineering ...
Développer le travail collaboratif et l'innovation grâce au Lean engineering ...
 
Pourquoi faire du Lean engineering par Fabien Leroy
Pourquoi faire du Lean engineering par Fabien LeroyPourquoi faire du Lean engineering par Fabien Leroy
Pourquoi faire du Lean engineering par Fabien Leroy
 
Lean en conception et développement par Michael Ballé
Lean en conception et développement par Michael BalléLean en conception et développement par Michael Ballé
Lean en conception et développement par Michael Ballé
 
Web-formation | L'Obeya pour le pilotage de projets Lean Développement
Web-formation | L'Obeya pour le pilotage de projets Lean DéveloppementWeb-formation | L'Obeya pour le pilotage de projets Lean Développement
Web-formation | L'Obeya pour le pilotage de projets Lean Développement
 

Semelhante a Teamwork within Toyota by Michael Kazoglou

Strategic Advantages of Implementing Enventive Software
Strategic Advantages of Implementing Enventive SoftwareStrategic Advantages of Implementing Enventive Software
Strategic Advantages of Implementing Enventive SoftwareAlan Smith
 
Ag09 Offshore Et Pratiques Agiles En
Ag09 Offshore Et Pratiques Agiles EnAg09 Offshore Et Pratiques Agiles En
Ag09 Offshore Et Pratiques Agiles EnValtech
 
Strategicadvantagesofimplementingenventive 130724023349-phpapp01
Strategicadvantagesofimplementingenventive 130724023349-phpapp01Strategicadvantagesofimplementingenventive 130724023349-phpapp01
Strategicadvantagesofimplementingenventive 130724023349-phpapp01Charles (Ronnie) Laing
 
Mohamed thalha senior mes consultant Resume
Mohamed thalha  senior mes consultant ResumeMohamed thalha  senior mes consultant Resume
Mohamed thalha senior mes consultant ResumeMohamed Thalha
 
Agile Hardware Product Development (NextGen NPD plus - MRO shop example) inc...
Agile Hardware Product Development  (NextGen NPD plus - MRO shop example) inc...Agile Hardware Product Development  (NextGen NPD plus - MRO shop example) inc...
Agile Hardware Product Development (NextGen NPD plus - MRO shop example) inc...Richard Platt
 
Winners Announced in 2011 Global Awards for Excellence in BPM & Workflow
Winners Announced in 2011 Global Awards for Excellence in BPM & WorkflowWinners Announced in 2011 Global Awards for Excellence in BPM & Workflow
Winners Announced in 2011 Global Awards for Excellence in BPM & WorkflowFuture Strategies Inc.
 
Operations strategy
Operations strategyOperations strategy
Operations strategyRajThakuri
 
In search of technical exellence
In search of technical exellenceIn search of technical exellence
In search of technical exellenceJinping Qu
 
Verhaert Innovation Day 2011 – Koen Verschraegen (VERHAERT) - Building supply...
Verhaert Innovation Day 2011 – Koen Verschraegen (VERHAERT) - Building supply...Verhaert Innovation Day 2011 – Koen Verschraegen (VERHAERT) - Building supply...
Verhaert Innovation Day 2011 – Koen Verschraegen (VERHAERT) - Building supply...Verhaert Masters in Innovation
 
Resume of Vaishnav Mithun_New
Resume of Vaishnav Mithun_NewResume of Vaishnav Mithun_New
Resume of Vaishnav Mithun_NewVaishnav Mithun
 
HVAC SENIOR PRODUCT ENGINEER
HVAC SENIOR PRODUCT ENGINEERHVAC SENIOR PRODUCT ENGINEER
HVAC SENIOR PRODUCT ENGINEERmalazab
 
20141111 tinker tuesday prototype to product
20141111 tinker tuesday prototype to product20141111 tinker tuesday prototype to product
20141111 tinker tuesday prototype to productTakeda Pharmaceuticals
 
Beating the product credit crunch
Beating the product credit crunchBeating the product credit crunch
Beating the product credit crunchStephen Williams
 
IVAR DDMRP journey v.06.1 | DDtech conference Bilbao 28 - 29 march 2019
IVAR DDMRP journey v.06.1 | DDtech conference Bilbao 28 - 29 march 2019IVAR DDMRP journey v.06.1 | DDtech conference Bilbao 28 - 29 march 2019
IVAR DDMRP journey v.06.1 | DDtech conference Bilbao 28 - 29 march 2019IVAR Group
 
Sdec10 lean package implementation
Sdec10 lean package implementationSdec10 lean package implementation
Sdec10 lean package implementationTerry Bunio
 

Semelhante a Teamwork within Toyota by Michael Kazoglou (20)

Strategic Advantages of Implementing Enventive Software
Strategic Advantages of Implementing Enventive SoftwareStrategic Advantages of Implementing Enventive Software
Strategic Advantages of Implementing Enventive Software
 
Ag09 Offshore Et Pratiques Agiles En
Ag09 Offshore Et Pratiques Agiles EnAg09 Offshore Et Pratiques Agiles En
Ag09 Offshore Et Pratiques Agiles En
 
Strategicadvantagesofimplementingenventive 130724023349-phpapp01
Strategicadvantagesofimplementingenventive 130724023349-phpapp01Strategicadvantagesofimplementingenventive 130724023349-phpapp01
Strategicadvantagesofimplementingenventive 130724023349-phpapp01
 
Mohamed thalha senior mes consultant Resume
Mohamed thalha  senior mes consultant ResumeMohamed thalha  senior mes consultant Resume
Mohamed thalha senior mes consultant Resume
 
Agile Hardware Product Development (NextGen NPD plus - MRO shop example) inc...
Agile Hardware Product Development  (NextGen NPD plus - MRO shop example) inc...Agile Hardware Product Development  (NextGen NPD plus - MRO shop example) inc...
Agile Hardware Product Development (NextGen NPD plus - MRO shop example) inc...
 
MANJU ME NPD
MANJU ME NPDMANJU ME NPD
MANJU ME NPD
 
Winners Announced in 2011 Global Awards for Excellence in BPM & Workflow
Winners Announced in 2011 Global Awards for Excellence in BPM & WorkflowWinners Announced in 2011 Global Awards for Excellence in BPM & Workflow
Winners Announced in 2011 Global Awards for Excellence in BPM & Workflow
 
Global Awards for BPM and Workflow
Global Awards for BPM and WorkflowGlobal Awards for BPM and Workflow
Global Awards for BPM and Workflow
 
Chap12
Chap12Chap12
Chap12
 
Operations strategy
Operations strategyOperations strategy
Operations strategy
 
Lean New Product & Process Development
Lean New Product & Process DevelopmentLean New Product & Process Development
Lean New Product & Process Development
 
In search of technical exellence
In search of technical exellenceIn search of technical exellence
In search of technical exellence
 
Verhaert Innovation Day 2011 – Koen Verschraegen (VERHAERT) - Building supply...
Verhaert Innovation Day 2011 – Koen Verschraegen (VERHAERT) - Building supply...Verhaert Innovation Day 2011 – Koen Verschraegen (VERHAERT) - Building supply...
Verhaert Innovation Day 2011 – Koen Verschraegen (VERHAERT) - Building supply...
 
Resume of Vaishnav Mithun_New
Resume of Vaishnav Mithun_NewResume of Vaishnav Mithun_New
Resume of Vaishnav Mithun_New
 
HVAC SENIOR PRODUCT ENGINEER
HVAC SENIOR PRODUCT ENGINEERHVAC SENIOR PRODUCT ENGINEER
HVAC SENIOR PRODUCT ENGINEER
 
20141111 tinker tuesday prototype to product
20141111 tinker tuesday prototype to product20141111 tinker tuesday prototype to product
20141111 tinker tuesday prototype to product
 
Prototype to production a startup perspective
Prototype to production   a startup perspectivePrototype to production   a startup perspective
Prototype to production a startup perspective
 
Beating the product credit crunch
Beating the product credit crunchBeating the product credit crunch
Beating the product credit crunch
 
IVAR DDMRP journey v.06.1 | DDtech conference Bilbao 28 - 29 march 2019
IVAR DDMRP journey v.06.1 | DDtech conference Bilbao 28 - 29 march 2019IVAR DDMRP journey v.06.1 | DDtech conference Bilbao 28 - 29 march 2019
IVAR DDMRP journey v.06.1 | DDtech conference Bilbao 28 - 29 march 2019
 
Sdec10 lean package implementation
Sdec10 lean package implementationSdec10 lean package implementation
Sdec10 lean package implementation
 

Mais de Institut Lean France

Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de criseLe "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de criseInstitut Lean France
 
Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise Institut Lean France
 
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-CuthillBuild Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-CuthillInstitut Lean France
 
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...Institut Lean France
 
The story of our Lean IT journey Melanie Noyel, Acta Mobilier
The story of our Lean IT journey Melanie Noyel, Acta MobilierThe story of our Lean IT journey Melanie Noyel, Acta Mobilier
The story of our Lean IT journey Melanie Noyel, Acta MobilierInstitut Lean France
 
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix QontoWhy kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix QontoInstitut Lean France
 
Management practices for the digital era by Cecil Dijoux
Management practices for the digital era by Cecil DijouxManagement practices for the digital era by Cecil Dijoux
Management practices for the digital era by Cecil DijouxInstitut Lean France
 
Build hyper efficient team with TPS by Pierre Jannez
Build hyper efficient team with TPS by Pierre JannezBuild hyper efficient team with TPS by Pierre Jannez
Build hyper efficient team with TPS by Pierre JannezInstitut Lean France
 
Lean organization framework by Pierre Masai
Lean organization framework by Pierre MasaiLean organization framework by Pierre Masai
Lean organization framework by Pierre MasaiInstitut Lean France
 
The high performance learning enterpris, by Steve Bell and Karen Whitley
The high performance learning enterpris, by Steve Bell and Karen WhitleyThe high performance learning enterpris, by Steve Bell and Karen Whitley
The high performance learning enterpris, by Steve Bell and Karen WhitleyInstitut Lean France
 
True Continuous Improvement with Toyota Kata, Jesper Boeg
True Continuous Improvement with Toyota Kata, Jesper BoegTrue Continuous Improvement with Toyota Kata, Jesper Boeg
True Continuous Improvement with Toyota Kata, Jesper BoegInstitut Lean France
 
Getting to the heart of agile by Alistair Cockburn
Getting to the heart of agile by Alistair CockburnGetting to the heart of agile by Alistair Cockburn
Getting to the heart of agile by Alistair CockburnInstitut Lean France
 
Lean and agile software because or despite rising complexity by Yves Caseau
Lean and agile software because or despite rising complexity by Yves CaseauLean and agile software because or despite rising complexity by Yves Caseau
Lean and agile software because or despite rising complexity by Yves CaseauInstitut Lean France
 
A transformation journey for a complex development organization
A transformation journey for a complex development organizationA transformation journey for a complex development organization
A transformation journey for a complex development organizationInstitut Lean France
 
Can Lean help improve the Architecture Maturity of an entire Organization?
Can Lean help improve the Architecture Maturity of an entire Organization?Can Lean help improve the Architecture Maturity of an entire Organization?
Can Lean help improve the Architecture Maturity of an entire Organization?Institut Lean France
 
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...Institut Lean France
 
Se transformer soi-même pour transformer sa boite, Priscilla Saunier
Se transformer soi-même pour transformer sa boite, Priscilla SaunierSe transformer soi-même pour transformer sa boite, Priscilla Saunier
Se transformer soi-même pour transformer sa boite, Priscilla SaunierInstitut Lean France
 
Présentation COGETIQ Lean Tour Blois 2018
Présentation COGETIQ Lean Tour Blois 2018 Présentation COGETIQ Lean Tour Blois 2018
Présentation COGETIQ Lean Tour Blois 2018 Institut Lean France
 
Présentation BMI Lean Tour Blois 2018
Présentation BMI   Lean Tour Blois 2018Présentation BMI   Lean Tour Blois 2018
Présentation BMI Lean Tour Blois 2018Institut Lean France
 

Mais de Institut Lean France (20)

Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de criseLe "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise
 
Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise Le "Scenario Planning" pour réagir en situation de crise
Le "Scenario Planning" pour réagir en situation de crise
 
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-CuthillBuild Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
Build Lasting Customer Obsession to Disrupt Yourself, Bianca Bowron-Cuthill
 
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
Build Lasting Customer Obsession to Disrupt yourself, Bianca Bowron-Cuthill, ...
 
The story of our Lean IT journey Melanie Noyel, Acta Mobilier
The story of our Lean IT journey Melanie Noyel, Acta MobilierThe story of our Lean IT journey Melanie Noyel, Acta Mobilier
The story of our Lean IT journey Melanie Noyel, Acta Mobilier
 
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix QontoWhy kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
Why kanban is the secret to scale your tech team by Marc-Antoine Lacroix Qonto
 
Management practices for the digital era by Cecil Dijoux
Management practices for the digital era by Cecil DijouxManagement practices for the digital era by Cecil Dijoux
Management practices for the digital era by Cecil Dijoux
 
Build hyper efficient team with TPS by Pierre Jannez
Build hyper efficient team with TPS by Pierre JannezBuild hyper efficient team with TPS by Pierre Jannez
Build hyper efficient team with TPS by Pierre Jannez
 
Lean organization framework by Pierre Masai
Lean organization framework by Pierre MasaiLean organization framework by Pierre Masai
Lean organization framework by Pierre Masai
 
The high performance learning enterpris, by Steve Bell and Karen Whitley
The high performance learning enterpris, by Steve Bell and Karen WhitleyThe high performance learning enterpris, by Steve Bell and Karen Whitley
The high performance learning enterpris, by Steve Bell and Karen Whitley
 
Story of LeSS by Bas Vodde
Story of LeSS by Bas VoddeStory of LeSS by Bas Vodde
Story of LeSS by Bas Vodde
 
True Continuous Improvement with Toyota Kata, Jesper Boeg
True Continuous Improvement with Toyota Kata, Jesper BoegTrue Continuous Improvement with Toyota Kata, Jesper Boeg
True Continuous Improvement with Toyota Kata, Jesper Boeg
 
Getting to the heart of agile by Alistair Cockburn
Getting to the heart of agile by Alistair CockburnGetting to the heart of agile by Alistair Cockburn
Getting to the heart of agile by Alistair Cockburn
 
Lean and agile software because or despite rising complexity by Yves Caseau
Lean and agile software because or despite rising complexity by Yves CaseauLean and agile software because or despite rising complexity by Yves Caseau
Lean and agile software because or despite rising complexity by Yves Caseau
 
A transformation journey for a complex development organization
A transformation journey for a complex development organizationA transformation journey for a complex development organization
A transformation journey for a complex development organization
 
Can Lean help improve the Architecture Maturity of an entire Organization?
Can Lean help improve the Architecture Maturity of an entire Organization?Can Lean help improve the Architecture Maturity of an entire Organization?
Can Lean help improve the Architecture Maturity of an entire Organization?
 
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
Résolution de problème et autonomie des équipes, l’exemple de la Plateforme S...
 
Se transformer soi-même pour transformer sa boite, Priscilla Saunier
Se transformer soi-même pour transformer sa boite, Priscilla SaunierSe transformer soi-même pour transformer sa boite, Priscilla Saunier
Se transformer soi-même pour transformer sa boite, Priscilla Saunier
 
Présentation COGETIQ Lean Tour Blois 2018
Présentation COGETIQ Lean Tour Blois 2018 Présentation COGETIQ Lean Tour Blois 2018
Présentation COGETIQ Lean Tour Blois 2018
 
Présentation BMI Lean Tour Blois 2018
Présentation BMI   Lean Tour Blois 2018Présentation BMI   Lean Tour Blois 2018
Présentation BMI Lean Tour Blois 2018
 

Último

Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 

Último (20)

Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 

Teamwork within Toyota by Michael Kazoglou

  • 1. LEAN GLOBAL NETWORK Michael Kazoglou Lean Management Instituut - Netherlands Lean Global Network Teamwork within Toyota and with its Suppliers, and methods to satisfy multiple customers during New Vehicle Development Journée Lean en ingénierie Paris, 9th Avril 2013 kazoglou@leaninstituut.nl
  • 2. Who is your Engineering is the Customer ? Customer? Production is the Customer ? Supplier is the Customer ? Supplier Contribution 65% Why focus on Suppliers? Manufacturing Contribution P Total Product Cost D Q
  • 3. Teamwork within Toyota and with its Suppliers, and methods to satisfy multiple customers LEAN GLOBAL during New Vehicle Development NETWORK  Why Europe, Why The Netherlands?  Background – Toyota in Australia (18 years experience)  Agenda: 1. Toyota’s Supplier Management Process 2. Toyota’s Supplier Development 3. Toyota Engineering – Product to Process > Techniques: VAVE, PPC, Obeya/SPTT, Lean in Design  Questions
  • 4. My ‘Toyota Way’ challenge in 2013 The Toyota Way 2001: Lean Values & Behavours • Challenge : Move to The Netherlands – NEW EXPERIENCE • Kaizen : Learn from LMI & Our Clients (& European Operations) • Genchi Genbutsu : European Workplace, in Dutch, French,…. • Respect : Share (both ways) & Teach / Develop People & Process • Teamwork : LMI, Lean Global Network, LMI Clients & Practitioners
  • 5. About Toyota Australia…. AMI/Toyota Assembly Line ca.1963 2006-2013 Camry / Aurion
  • 6. Organisational Structure Manufacturing & Purchasing Manufacturing Production Purchasing Product Quality Engineering Engineering Prod Control Direct Purchasing Indirect Purchasing Supplier Prep. & Development
  • 7. Teamwork within Toyota and with its Supplier, and methods to satisfy multiple customers LEAN GLOBAL during New Vehicle Development NETWORK  Why Europe, Why The Netherlands?  Background - Toyota in Australia  Agenda: 1. Toyota’s Supplier Management Process 2. Toyota’s Supplier Development 3. Toyota Engineering – Product to Process > Techniques: VAVE, PPC, Obeya, SPTT, Lean in Design  Questions
  • 8. About Toyota Purchasing…. 1. Open Door Policy: Based on Quality, Technological Capabilities, Reliability & Delivery 2. Mutual Benefit Based on Mutual Trust: They Believe in Developing Mutually Beneficial, Long-Term Relationships Based on Mutual Trust 3. Localisation: Purchase Parts & Materials from Local Suppliers The ‘Tough Love’ approach: • They understand how their suppliers work • They supervise their vendors • They develop their supplier’s technical capabilities • They share information intensively but selectively • They conduct joint improvement activities
  • 9. Managing Supplier Relationships SUPPORT: • TPS / Technical Consultation • Staff Secondment • Supplier Parts Tracking Team • Project Conferences (Communications Strategy) • Benchmarking Study Tours • Technical Agreements • Toyota Institute Performance Outcomes
  • 10. Supplier Opportunities: (Customer always pays whether it is Quality, Delivery, Cost) • Raw materials (2nd – 3rd tier suppliers) • Product unit cost : » O/heads, energy, head-office, consumables, tooling, Capital/depreciation, Maintenance costs Can we make it » R/materials, internal & externals components less expensive? » Processing costs – efficiencies, rates, waste? » Labour – efficiencies? Can we use less » Wastage – allowances, best practice? expensive product? • Supplier Inventory costs • Logistics costs / efficiencies . Shipping/storage methods Can is perform better? • Inventory costs / waste / storage / Handling-Mngt • Production Plant Impacts: » Delivery, Quality, Wastage, Downtime, efficiencies, overtime etc • Product variation – in-plant / field / customer etc • New Product Development – total process • Projects / support / responsiveness • Value adding opportunities?
  • 11. Supplier Opportunities: (Customer always pays whether it is Quality, Delivery, Cost) Product design opportunities: • Recycle, substitute, thinner, lighter, smaller, Can we make it • Shape, surface, materials, no. of sites, no. of parts/skus, less expensive? • Excessive quality, difference b/n skus, Can we use less • Next NPD opportunity, suitable for plant, function, expensive product? • Technical complexity, use, legals etc? Can is perform better? Toyota Process: • Cost Structure / Biggest Gap / Priority / Activity Action Plan • Benchmarking – Target, Gaps, Breakdown costs, pareto/priority • Understand Cost elements – Processing costs, material costs, overheads • Competitor Cost elements – identify breakdown costs/gaps (Pareto/Top 1-3) • VAVE analysis – design for purpose/manufacture/customer need (O/process) • Production process costs – compare operations vs lean organisation, CI/Lean process improvement opportunity review (lean assessment/gap analysis)
  • 12. Teamwork entre conception et méthodes chez Toyota pour satisfaire plusieurs clients LEAN GLOBAL NETWORK  Why Europe, Why The Netherlands?  Background - Toyota in Australia  Agenda: 1. Toyota’s Supplier Management Process 2. Toyota’s Supplier Development 3. Toyota Engineering – Product to Process > Techniques: VAVE, PPC, Obeya, SPTT, Lean in Design  Questions
  • 13. Toyota Supplier Development Objective: The overall goal of the program is to strengthen the capability and cost competitiveness of Toyota’s local supply base and ensure achievement goals beyond next New Model Introduction. By Supplier By Supplier Numbers $ VOB Image LOCAL SUPPLIERS SELECTION CRITERIA: LOCAL CORE FOCUS 1. VOB / COLOR / LOGISTICS 50% GLOBAL SUPPLIERS: 2. COST GAP (Next Model) GLOBAL Coverage > 80% SUPPORT 3. LEAN SUPPORT ATTITUDE Supplier JAPANESE $ VOB REQUIRED 4. LEAN LEVEL(OPPORTUNITY) Coverage 5. ACCESS TO ADEQUATE SUPPORT JAPANESE OTHER RISKS to Toyota: 1. TIMING (Next Model UP TO SVP) OTHER 2. COST TARGET ACHIEVEMENT
  • 14. Teamwork entre conception et méthodes chez Toyota pour satisfaire plusieurs clients LEAN GLOBAL NETWORK  Why Europe, Why The Netherlands?  Background - Toyota in Australia  Agenda: 1. Toyota’s Supplier Management Process 2. Toyota’s Supplier Development 3. Toyota Engineering – Product to Process > New Vehicle, VAVE, PPC, Obeya/SPTT, Lean in Design  Questions
  • 15. New Product Development Process Concept to Vehicle Production Launch Release Drawing Volume Drawing Production Tooling Tuning Prod Ready
  • 16. Design Process “Value Analysis / Value Engineering Launch 1. Gather information Continuous 2. Function/Performance analysis 3. Creation innovation Consensus 4. Analyze ideas Building 5. Presentation Get agreement and proceed to development of parts! Create Design!
  • 17. Previous Problem Check Problem Area Problem Lists Make PPC C/M Process Vehicle NPD Design concerns Check Plant NPD Process Final concerns Outcome Supplier NPD Parts concerns Key Point: Make a product problem history list  Include ALL GLOBAL HISTORY / Knowledge of Company  Internal Quality / Workability Problems  Previous Customer Impact Concerns Quality tracking systems etc (Not just within your organisation)
  • 18. Obeya – Visual Project Management • Visualisation – Everyone can share Progress • Inform Bad News First – Reporting, Informing, Consulting • Practice Worst Case Scenario Activity
  • 19. LEAN IN DESIGN STAGE Opportunities for Process (Pre-production, Process, Production) Improvement Pre- Production: at the Design • Product Design/Raw Materials Stage • Tool Design/Manufacture (Jidoka + QDC) • Equip. / Tool Trial (SOP/STD. Work/Training) • Production Proto-type trial (Die / Equip./Assy.) Process • Equip./Process integration • Lay-out • Mat. Handling/Conveyance • Ergonomics/Safety • Labour Req.& Training Production • Total work contents (Process c/time) • Efficiency (Change over/Down time/Op.Efficiency/Rejects) • Takt time • Confirmation of Mass production(HVPT)
  • 20. LEAN IN DESIGN STAGE (Pre-production, Process, Production) • Production Preparation Parts / Process Summary. • Part Specific Value Stream Map. • Plant/Process layout to show material Flow. • Man / Machine loading and Capacity estimates (Std Work Charts).
  • 21. Respect the Production Operator, while making improvement to Quality, Delivery & Cost 1. Minimise No. of equipment (More than one function) 2. Avoid secondary process Focus 3. Consider handling problems points for 4. Consider / use gravity force (Avoid complex motions) New Process 5. Consider self locate jigs/fixtures Design 6. Integrate “Pokayoke” functions 7. Simplify or eliminate packaging (container size / Wrapping / Access) 8. Minimise variations if possible 9. Enhance ergonomic conditions 10. Eliminate Movements, adjustments and Reorientations 11. Floor space reduction 12. Overall focus on all relevant non value adding operations
  • 22. Michael Kazoglou Teamwork within Toyota and with its Supplier, and methods to satisfy multiple customers LEAN GLOBAL Paris, 9th Avril 2013 during New Vehicle Development NETWORK kazoglou@leaninstituut.nl  Agenda themes: 1. Toyota’s Supplier Management Process 2. Toyota’s Supplier Development 3. Toyota Engineering – Product to Process > Techniques: VAVE, PPC, Obeya/SPTT, Lean in Design