Banjarmasin “Road safety at road works” workshop
              13-14 December 2011
 Numerous signs
 Generally clean and in good condition
 Delineators (painted bamboo) used


 Sincere efforts appear to have been made.
 The four zones not used
 Insufficient advanced warning
 Some warnings not clear or specific
 No speed restrictions
 Concrete blocks holding the painted bamboo
    delineators
   Inconsistent line marking
   Many rocks and stones on edge of road
   Workers not wearing reflective safety vests
   Machinery on road but no warning
 Long term road works.
 Traffic passes through the work site, except at the end where
    there is a side track.

 Is there a Traffic Management Plan for the road works?

   Good advance warning at each end is essential.
   Advance warning of each main work site is necessary.
   Consistent regulatory speed limit is necessary – 40km/h
   More consistent delineation – lines and cones.
   Clearer messages on signs about what is ahead
   All workers to wear safety vests.
No advance warning zone
Stop sign not correct
Not forgiving
Workers sign too late and should
be removed when no workers         More conspicuous
                                   and forgiving
Cones more conspicuous
Cones more forgiving
Bagus
Bagus
Bagus
Bagus
Stop sign not correct.
Worker sign should NOT be
displayed as there are no workers.
Should speed limit be
20 or 40km/h? Must
be a regulatory sign
Bagus
Cones aid delineation.
Edge line would help also
Bagus
Not a regulatory sign - do
we want 20 or 40km/h
Bagus
Ha ha ha – you
         Australians!




Bagus
Sign is too late – already well
within work zone
Concrete base unsafe
Bagus
No lines – night time?
Centre line only....
Centre line only.... but edge has deep
drop off and is not consistent width
Centre line only.... but edge has deep
drop off and is not consistent width
Edge line plus tired centre line.... but
edge has deep drop off .
Edge line plus tired centre line.... but
1       edge has deep drop off and is not
    1
        consistent width
Edge line ends, so does centre line.... but
2   there is a curve ahead and drop off continues
Edge line ends, so does centre line.... but
3   there is a curve ahead and drop off continues
Edge line ends, so does centre line.... but
4   there is a curve ahead and drop off continues
Edge line ends, so does centre line.... but
5   there is a curve ahead and drop off continues
Edge line ends, so does centre line.... but
6   there is a curve ahead and drop off continues
Edge line ends, so does centre line.... but
7   there is a curve ahead and drop off continues
Edge line ends, so does centre line.... but
8   there is a curve ahead and drop off continues
Centre line.... but no edge line and gravel on road.
There is a surprise ahead!
Surprise! No advance warning of
machinery on road. Traffic must stop.
Narrow, no speed reduction, dangerous
roadside hazards, mud on road
Narrow, no speed reduction, dangerous roadside
hazards, little delineation, workers without safety vests
Narrow, no speed reduction, dangerous roadside
hazards, little delineation, workers without safety vests
Narrow, no speed reduction, dangerous roadside
hazards, little delineation, workers without safety vests
Narrow, no speed reduction, dangerous roadside
hazards, little delineation, workers without safety vests
Flag men too close, no speed reduction, no advance
warning of machinery. This is one way flow and should
be managed that way!
Narrow, dangerous roadside hazards,
workers without safety vests
The side track commences ahead, but there is
nothing to inform road users of this. No delineation.
This sign says “Sorry for disturbing your journey”. To me,
this means the road works have finished! But no.....
This sign says “Sorry for disturbing your journey”. To me,
this means the road works have finished! But no.....
The side track commences ahead, but this
sign only mentions road work. No mention
of what the driver/rider will have to do.
The side track commences ahead, but this
sign only mentions road work. No mention
of what the driver/rider will have to do.
The side track commences here, but there is nothing to
clearly inform road users of this. Little delineation,
rough muddy surface
Are we happy with 15km/h for the side
track? This sign needs washing.
The side track commences here, but there is nothing to
clearly inform road users of this. Little delineation,
rough muddy surface
The side track - no delineation, rough muddy surface
This sign is OK but is too late – it needs
to be before the side track.
No information of going from sealed to
unsealed surface (a rough muddy surface).
Too close to the work site. Is 15 km/h reasonable?
No signs mention a side track. For a long term
work site, should this track be sealed?
The side track is muddy and slippery.
No delineation. Night time?
Poor sight distance to the access road.
Pedestrians need assistance to cross.
The side track has a rough muddy surface
The side track has a rough muddy surface
When I looked at this photo I saw a family travelling with their
little girl. She has her Mickey Mouse bag. She could be an
Indonesian girl or an Australian girl – and she deserves
protection. She is at risk here! We must do better in road works
When I looked at this photo I saw a family travelling with their little
girl. She has her Mickey Mouse bag. She could be an Indonesian girl or
an Australian girl – and she deserves protection. She is at risk here! We
must do better in road works




          South Gippsland Highway, Victoria
Large water pipe was to be placed under a rural highway

Approx 8,000vpd, 100km/h speed limit

A side track was decided

Farm land was purchased – to be sold back to the farmer later

Careful planning went into the entire task.

I audited the work – twice!

The side track was to last for less than one week (in fact it
lasted 4 days)

Cost $50,000AUD
Existing
highway




                        Side track
       Hazardous pole
Hazardous roadside
Four days
$500,000

Prevention is
better than cure
Matthew filmed the work
This example is not to show that all road works in Australia are
great and wonderful.

Nor is it to expect Indonesia to spend $500,000 at each large
road work site.

But it does stress:
        - work sites are important

       - careful planning.

       - attention to safety

       - prevention rather than cure

When the work was ended, the asphalt was recycled and
reused. The land was sold back to the farmer.
Roadside hazards. Fabricate away from
road, lift into place immediately.
Roadside hazards. Fabricate away from
road, lift into place immediately.
Driving into sun.
Night time?
Driving into sun.
Night time?
 Long term road works.
 Traffic passes through the work site, except at the end where
    there is a side track.

 Is there a Traffic Management Plan for the road works?

   Good advance warning at each end is essential.
   Advance warning of each main work site is necessary.
   Consistent regulatory speed limit is necessary – 40km/h
   More consistent delineation – lines and cones.
   Clearer messages on signs about what is ahead
   All workers to wear safety vests.
Bagus
Bagus
Bagus
Bagus

Mais conteúdo relacionado

Semelhante a 20120118103352.phillip j inspection of banjarmasin road works on

Stupidity of road widening - long article
Stupidity of road widening - long articleStupidity of road widening - long article
Stupidity of road widening - long article
Dasarathi GV
 
Roads? Where We’re Going, We Don’t Need Roads
Roads? Where We’re Going, We Don’t Need RoadsRoads? Where We’re Going, We Don’t Need Roads
Roads? Where We’re Going, We Don’t Need Roads
Safe Software
 
Share cyclisy motorist
Share cyclisy motoristShare cyclisy motorist
Share cyclisy motorist
Adam Guerguis
 

Semelhante a 20120118103352.phillip j inspection of banjarmasin road works on (6)

Stupidity of road widening - long article
Stupidity of road widening - long articleStupidity of road widening - long article
Stupidity of road widening - long article
 
Make It A Roundtrip: Student Notes
Make It A Roundtrip: Student NotesMake It A Roundtrip: Student Notes
Make It A Roundtrip: Student Notes
 
Live to Help Another Day: Student Notes
Live to Help Another Day: Student NotesLive to Help Another Day: Student Notes
Live to Help Another Day: Student Notes
 
Motor Coach & Transit Drivers: Student Notes
Motor Coach & Transit Drivers: Student NotesMotor Coach & Transit Drivers: Student Notes
Motor Coach & Transit Drivers: Student Notes
 
Roads? Where We’re Going, We Don’t Need Roads
Roads? Where We’re Going, We Don’t Need RoadsRoads? Where We’re Going, We Don’t Need Roads
Roads? Where We’re Going, We Don’t Need Roads
 
Share cyclisy motorist
Share cyclisy motoristShare cyclisy motorist
Share cyclisy motorist
 

Mais de Indonesia Infrastructure Initiative

Mais de Indonesia Infrastructure Initiative (20)

Presentasi Sanitasi INDII
Presentasi Sanitasi INDIIPresentasi Sanitasi INDII
Presentasi Sanitasi INDII
 
Balikpapan Public Diplomacy 25 May 2015
Balikpapan  Public Diplomacy 25 May 2015Balikpapan  Public Diplomacy 25 May 2015
Balikpapan Public Diplomacy 25 May 2015
 
World experience-in-railway-restructuring
World experience-in-railway-restructuringWorld experience-in-railway-restructuring
World experience-in-railway-restructuring
 
Indonesian railways revitalisation bambang susantono, vice minister for tra...
Indonesian railways revitalisation   bambang susantono, vice minister for tra...Indonesian railways revitalisation   bambang susantono, vice minister for tra...
Indonesian railways revitalisation bambang susantono, vice minister for tra...
 
WS2 Infrastructure Issues
WS2 Infrastructure IssuesWS2 Infrastructure Issues
WS2 Infrastructure Issues
 
Development of multimodal transport in north java corridor
Development of multimodal transport in north java corridorDevelopment of multimodal transport in north java corridor
Development of multimodal transport in north java corridor
 
Railway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in javaRailway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in java
 
The role of ipc in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in javaThe role of ipc in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in java
 
Government strategy in developing multimodal transportation
Government strategy in developing multimodal transportationGovernment strategy in developing multimodal transportation
Government strategy in developing multimodal transportation
 
The role of ferry in developing multimodal transportation
The role of ferry in developing multimodal transportationThe role of ferry in developing multimodal transportation
The role of ferry in developing multimodal transportation
 
Development of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiyDevelopment of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiy
 
Ws3 safe system approach (bahasa version)
Ws3 safe system approach (bahasa version)Ws3 safe system approach (bahasa version)
Ws3 safe system approach (bahasa version)
 
Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (english version)Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (english version)
 
Ws3 safe system supporting vru (bahasa version)
Ws3 safe system supporting vru (bahasa version)Ws3 safe system supporting vru (bahasa version)
Ws3 safe system supporting vru (bahasa version)
 
Ws3 presentation
Ws3 presentationWs3 presentation
Ws3 presentation
 
Ws3 me
Ws3 meWs3 me
Ws3 me
 
Ws3 infrastructure related to pedestrian safety
Ws3 infrastructure related to pedestrian safetyWs3 infrastructure related to pedestrian safety
Ws3 infrastructure related to pedestrian safety
 
Ws3 gender and disability presentation
Ws3 gender and disability presentationWs3 gender and disability presentation
Ws3 gender and disability presentation
 
Ws2 introduction
Ws2 introductionWs2 introduction
Ws2 introduction
 
Workshop #2 safe system approach
Workshop #2 safe system approachWorkshop #2 safe system approach
Workshop #2 safe system approach
 

Último

Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 

Último (20)

Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 

20120118103352.phillip j inspection of banjarmasin road works on

  • 1. Banjarmasin “Road safety at road works” workshop 13-14 December 2011
  • 2.  Numerous signs  Generally clean and in good condition  Delineators (painted bamboo) used  Sincere efforts appear to have been made.
  • 3.  The four zones not used  Insufficient advanced warning  Some warnings not clear or specific  No speed restrictions  Concrete blocks holding the painted bamboo delineators  Inconsistent line marking  Many rocks and stones on edge of road  Workers not wearing reflective safety vests  Machinery on road but no warning
  • 4.
  • 5.  Long term road works.  Traffic passes through the work site, except at the end where there is a side track.  Is there a Traffic Management Plan for the road works?  Good advance warning at each end is essential.  Advance warning of each main work site is necessary.  Consistent regulatory speed limit is necessary – 40km/h  More consistent delineation – lines and cones.  Clearer messages on signs about what is ahead  All workers to wear safety vests.
  • 7. Stop sign not correct
  • 9. Workers sign too late and should be removed when no workers More conspicuous and forgiving
  • 12. Bagus
  • 13. Bagus
  • 14. Bagus
  • 15. Bagus
  • 16. Stop sign not correct. Worker sign should NOT be displayed as there are no workers.
  • 17. Should speed limit be 20 or 40km/h? Must be a regulatory sign
  • 18. Bagus
  • 19. Cones aid delineation. Edge line would help also
  • 20. Bagus
  • 21. Not a regulatory sign - do we want 20 or 40km/h
  • 22. Bagus
  • 23. Ha ha ha – you Australians! Bagus
  • 24. Sign is too late – already well within work zone
  • 26. Bagus
  • 27. No lines – night time?
  • 29. Centre line only.... but edge has deep drop off and is not consistent width
  • 30. Centre line only.... but edge has deep drop off and is not consistent width
  • 31. Edge line plus tired centre line.... but edge has deep drop off .
  • 32. Edge line plus tired centre line.... but 1 edge has deep drop off and is not 1 consistent width
  • 33. Edge line ends, so does centre line.... but 2 there is a curve ahead and drop off continues
  • 34. Edge line ends, so does centre line.... but 3 there is a curve ahead and drop off continues
  • 35. Edge line ends, so does centre line.... but 4 there is a curve ahead and drop off continues
  • 36. Edge line ends, so does centre line.... but 5 there is a curve ahead and drop off continues
  • 37. Edge line ends, so does centre line.... but 6 there is a curve ahead and drop off continues
  • 38. Edge line ends, so does centre line.... but 7 there is a curve ahead and drop off continues
  • 39. Edge line ends, so does centre line.... but 8 there is a curve ahead and drop off continues
  • 40. Centre line.... but no edge line and gravel on road. There is a surprise ahead!
  • 41. Surprise! No advance warning of machinery on road. Traffic must stop.
  • 42. Narrow, no speed reduction, dangerous roadside hazards, mud on road
  • 43. Narrow, no speed reduction, dangerous roadside hazards, little delineation, workers without safety vests
  • 44. Narrow, no speed reduction, dangerous roadside hazards, little delineation, workers without safety vests
  • 45. Narrow, no speed reduction, dangerous roadside hazards, little delineation, workers without safety vests
  • 46. Narrow, no speed reduction, dangerous roadside hazards, little delineation, workers without safety vests
  • 47.
  • 48. Flag men too close, no speed reduction, no advance warning of machinery. This is one way flow and should be managed that way!
  • 49. Narrow, dangerous roadside hazards, workers without safety vests
  • 50. The side track commences ahead, but there is nothing to inform road users of this. No delineation.
  • 51. This sign says “Sorry for disturbing your journey”. To me, this means the road works have finished! But no.....
  • 52. This sign says “Sorry for disturbing your journey”. To me, this means the road works have finished! But no.....
  • 53. The side track commences ahead, but this sign only mentions road work. No mention of what the driver/rider will have to do.
  • 54. The side track commences ahead, but this sign only mentions road work. No mention of what the driver/rider will have to do.
  • 55. The side track commences here, but there is nothing to clearly inform road users of this. Little delineation, rough muddy surface
  • 56. Are we happy with 15km/h for the side track? This sign needs washing.
  • 57. The side track commences here, but there is nothing to clearly inform road users of this. Little delineation, rough muddy surface
  • 58. The side track - no delineation, rough muddy surface
  • 59. This sign is OK but is too late – it needs to be before the side track.
  • 60.
  • 61.
  • 62.
  • 63.
  • 64.
  • 65.
  • 66. No information of going from sealed to unsealed surface (a rough muddy surface).
  • 67. Too close to the work site. Is 15 km/h reasonable?
  • 68.
  • 69.
  • 70. No signs mention a side track. For a long term work site, should this track be sealed?
  • 71. The side track is muddy and slippery. No delineation. Night time?
  • 72. Poor sight distance to the access road. Pedestrians need assistance to cross.
  • 73. The side track has a rough muddy surface
  • 74. The side track has a rough muddy surface
  • 75.
  • 76. When I looked at this photo I saw a family travelling with their little girl. She has her Mickey Mouse bag. She could be an Indonesian girl or an Australian girl – and she deserves protection. She is at risk here! We must do better in road works
  • 77. When I looked at this photo I saw a family travelling with their little girl. She has her Mickey Mouse bag. She could be an Indonesian girl or an Australian girl – and she deserves protection. She is at risk here! We must do better in road works South Gippsland Highway, Victoria
  • 78.
  • 79. Large water pipe was to be placed under a rural highway Approx 8,000vpd, 100km/h speed limit A side track was decided Farm land was purchased – to be sold back to the farmer later Careful planning went into the entire task. I audited the work – twice! The side track was to last for less than one week (in fact it lasted 4 days) Cost $50,000AUD
  • 80.
  • 81.
  • 82. Existing highway Side track Hazardous pole
  • 83.
  • 84.
  • 85.
  • 86.
  • 87.
  • 89.
  • 90.
  • 92.
  • 94.
  • 95.
  • 96.
  • 97.
  • 98.
  • 99. This example is not to show that all road works in Australia are great and wonderful. Nor is it to expect Indonesia to spend $500,000 at each large road work site. But it does stress: - work sites are important - careful planning. - attention to safety - prevention rather than cure When the work was ended, the asphalt was recycled and reused. The land was sold back to the farmer.
  • 100.
  • 101.
  • 102. Roadside hazards. Fabricate away from road, lift into place immediately.
  • 103. Roadside hazards. Fabricate away from road, lift into place immediately.
  • 106.  Long term road works.  Traffic passes through the work site, except at the end where there is a side track.  Is there a Traffic Management Plan for the road works?  Good advance warning at each end is essential.  Advance warning of each main work site is necessary.  Consistent regulatory speed limit is necessary – 40km/h  More consistent delineation – lines and cones.  Clearer messages on signs about what is ahead  All workers to wear safety vests.
  • 107. Bagus
  • 108. Bagus
  • 109. Bagus
  • 110. Bagus