Geothermal development activities in
Japan after the big earthquake in 2011
Kasumi Yasukawa
National Institute of Advanced Industrial Science and Technology
(AIST)
Contents
• Geothermal Power Plants in Japan
• The reasons why there was no new
GPP in Japan
• Recent movement especially after 3.11…
– National Parks
– Hot Springs
– Costs
– New Developments
• Summary
2
Yamagawa PP
1995.3-
30MW
Ogiri PP
1996.3-
30MW
Otake PP
1967.8-
12.5MW
Kirishima Kokusai
Hotel PP
1996.3- 0.1MW
Takigami PP
1996.11-
25MW
Suginoi GPP
1981.3-
3MW
Kuju GPP
1998-
0.9MW
付録. 地熱写真集
Geothermal Power Plants in Japan
(Kyushu Area)
In whole Japan, we have 17 geothermal
power plants with 19 units.
Hatchobaru PP
Ⅰ.1977.6-
55MW
Ⅱ.2000. 6-
55MW
Binary 2MW
3
Geothermal Power Plants in Japan
(North-Eastern Area)
Mori GPP
1982.11-
25MW
Onuma GPP
1974.6-
9.5MW
Sumikawa GPP
1995.3-
50MW
Matsukawa GPP
1966.10-
23.5MW
Kakkonda GPP
Ⅰ.1978.5-
50MW
Ⅱ.1996. 3-
30MW
Onikobe GPP
1975.3-
12.5MW
Yanaizu-
Nishiyama GPP
1995.5- 65MW
Hachijojima GPP
1995.5-
3.3MW
Uenotai GPP
1994.3-
28.8MW
M9.0
Epicenter
Fukushima Daiichi
Nuclear PP
Sapporo
Sendai
Tokyo
Osaka
Fukuoka
All GPPs affected by the big
earthquake on the 11th March
2011, recorded M9.0, survived!
4
Geothermal potential
in Japan
: Temperature of natural springs
(red : high, blue : low)
: geothermal power plant
: Quaternary volcanoes
Geothermal potential map
of Japan (GSJ, 2009)
The number of active volcanoes and
geothermal energy potential has a
linear relation.
Muraoka et al. (2008) estimated that
Japan has geothermal potential of
23,470 MWe.
5
Japan is the world’s 3rd largest geothermal potential country,
Country
No. of active
volcanoes
Geothermal
potential (MWe)
Geothermal Power
generation on 2010
(GWeh)
USA 160 30,000 16,603
Indonesia 146 27,790 9,600
Japan 119 23,470 3,064
Philippines 47 6,000 10,311
Mexico 39 6,000 7,047
Iceland 33 5,800 4,597
New Zealand 20 3,650 4,055
Italy 13 3,270 5,520
Number of active volcanoes & geothermal energy potential
(Muraoka et al., 2008)
Geothermal potential in Japan
but its power generation is merely No. 8 in the world…… Why?
Geothermal potential in this table is an estimated value from heat energy
stored at a depth of geological basement or shallower.
6
0
2'000
4'000
6'000
8'000
10'000
12'000
14'000
1946
1948
1950
1952
1954
1956
1958
1960
1962
1964
1966
1968
1970
1972
1974
1976
1978
1980
1982
1984
1986
1988
1990
1992
1994
1996
1998
2000
2002
2004
2006
2008
InstalledCumulative
Capacity(MW)
Geothermal power capacity of the world (10MW)
Bertani (2010)
800
600
400
200
0
(10MW)
As an environmentally friendly energy, the world’s
geothermal power capacity is increasing
constantly.
But no new GPP in Japan this century.
WHY?
Geothermal power in Japan
7
All these strong points are common with nuclear power.
Therefore, under the federal policy pushing nuclear power, lows and regulations
which limits geothermal development have not been improved.
Low CO2 emission
Hydro (11), Geothermal (13), Nuclear (20), Wind (24), PV (38),
LNG (474, 599), Oil (738), Coal (943) g-CO2/kWh (CRIEPI, 2010)
Stable power & High capacity factor
Not depending on weather
High energy return (generated power/used energy)
Hydro (50), Geothermal(31), Nuclear (24), Oil(21) , Coal (17)
Strong points of geothermal power
The reasons why there was no new
GPP in Japan
8
3. Cost
Thermal and nuclear power have been considered more cost effective so
that GPP has not been attractive for electric power suppliers.
The reasons why there was no new
GPP in Japan
1. National Parks (no drillings, no researches)
80% of the geothermal energy in Japan exist inside national parks where no
exploitation has been allowed. Even scientific survey has been limited.
2. Hot springs
Some hot spring owners make strong campaign against geothermal
development in afraid of degradation of the springs (amount, quality).
How these things have been improved after the nuclear accident?
9
Recent movement especially
after 3.11….
1. National Parks
For geothermal power as a low CO2 emission energy source, the cabinet
decided to mitigate restrictions in national parks (June, 2010).
Ministry of Environment (MOE) finally made new rules in 2012.
Ordinance of the Ministry of the Environment
1) Special Protection zone and Class 1 Special zone (SP and S1)
The development is not admitted but the gravity or MT survey will be admitted,
which covers wide area. A deviated well drilling is not admitted.
2) Class 2 and 3 Special zones (S2 and S3)
The development is basically not admitted. Only deviated well drilling from
outside will be admitted if there is no effect on the surface. (November 2011)
The development is basically not admitted but it may be allowed if
environmental consideration is well treated. (March 2012)
10
0
500
1000
1500
2000
2500
3000
3500
>20 Yen/kWh
15 - 20 Yen/kWh
10 - 15 Yen/kWh
< 10 Yen/kWh
SP
S1 S2
OZ
S3 Ou
t
Geothermalresource(MW)
Higher protection
It has been…
Do not enter.
Never!
Surface
survey
may be
allowed
Special
Protection
zones
Class 1
Special
zones
Class 2
Special
zones
Class 3
Special
zones
Ordinary
Zones
Outside
parks
11
0
500
1000
1500
2000
2500
3000
3500
>20 Yen/kWh
15 - 20 Yen/kWh
10 - 15 Yen/kWh
< 10 Yen/kWh
SP
S1 S2
OZ
S3 Ou
t
Geothermalresource(MW)
Special
Protection
zones
Class 1
Special
zones
Class 2
Special
zones
Class 3
Special
zones
Ordinary
Zones
Outside
parks
Since March 2012
Surface
survey
may be
allowed
if enough environmental consideration is taken,
Small scale
development
may be allowed
Higher protection
12
2. Hot springs
The only social problem that cannot be solved by laws and regulation. But...
Recent movement especially
after 3.11….
The Ministry of
Environment (MoE)
made a new guideline
on permission of
geothermal drilling in
March 2012, to be
referred by local
(prefecture)
government in order
to avoid delay in
giving permission. Procedure for decision making of permission
yes no
May geothermal development affect on shallow hot spring aquifer?
No information on
their relation
Model exists on
their relation
Monitoring data on
their relation
Judgment by basic
geo-scientific info.
Judgment based
on the Model
Judgment based
on Monitoring data
Existing info on relation btwn Geothermal Reservoir and hot spring
13
“Harmonious utilization of geothermal
energy with hot spring resources”
- to avoid conflicts between hot spring owners
and geothermal developers -
AIST has been conducting a 3-year research project since FY2010 sponsored by
MoE, consists of modeling, monitoring, and data integration for a whole subsurface
system including hot spring aquifer.
A final product, a
software which
automatically judges
possible interference of
geothermal development
on hot springs based on
natural state hot spring
data and monitoring data
will be used by hot
spring owners as well as
geothermal developers.
14
A Kalina cycle enables power generation by ~85 C water. GERD and AIST have
been conducting a demonstration project in Niigata sponsored by MoE.
Hot spring owners may have small scale binary plants for their own use.
Another way for “Harmonious utilization with hot springs”;
“Hot spring power plant” project
Low temperature binary system
Hot spring
source
To spa (bath)
To power line
Heat
exchanger
turbine
Cooling
tower
condencer
15
Recent movement especially
after 3.11….
3. Cost
The Energy Agency of METI supports domestic geothermal businesses by :
●Financial support
1. Drilling
• Government’s budget for geothermal drilling (~USD 15 million a
year) was to be abolished in FY2011. But after the big earthquake,
government decided to increase this budget to ~USD 90 million
from FY2012. It covers up to 50 % of the cost of exploration well
drillings.
2. Public Acceptance
• New budget for PA covers 100 % of PA activities by private sectors.
3. RD&D (EGS, etc.)
The above financial support by METI, which used to done through NEDO, will be
done through JOGMEC (Japan Oil, Gas and Metals National Corporation )
16
Recent movement especially
after 3.11….
3. Cost
The Energy Agency of METI supports domestic geothermal businesses by :
●Feed in Tarif (FIT)
FIT law for renewable energy was enacted and price is fixed in 2012.
1. Bigger geothermal power generation (15 MW or bigger)
• 27.3 JPY/kWh for 15 years
2. Smaller geothermal power generation (<15 MW)
• 42 JPY/kWh for 15 years.
The average geothermal power cost in Japan in the past is 20 JPY/kWh
and FIT may give enough incentive for geothermal developers.
The remaining economical obstacle, power transmission fee requested by
electric power company, may be reduced in few years by introduction of
free competition in transmission.
17
4. New developments
Private sectors (Industries)
• “Japan Geothermal Association (JGA)” was established in 4 Dec.
2012 by 34 companies, including metal developers, oil and gas
developers, power supplier, trading companies, construction
companies, turbine makers, plant makers, geothermal consultants,
drillings companies, banks, and an environmental NPO. .
• Geothermal developers in JGA have development plans of around
10 domestic fields.
Recent movement especially
after 3.11….
18
4. New developments
• Yuzawa-Chinetsu Co. Ltd. (J-Power, MMC and Mitsubishi Gas) has
begun environmental assessment in Wasabizawa geothermal field,
aiming at 42 MW GPP in 2020.
• TOHGEC group will start drilling an exploration will in Hachimantai,
aiming at 10 MW GPP.
• Kawasaki Heavy Industry, KOBELCO, IHI, etc., began production of
50-100 kW generator for “hot spring power plants” (small scale binary).
Several local groups (municipal or hotel owners) show interests in
such small GPP.
Recent movement especially
after 3.11….
19
Summary
• Renewable preference after the nuclear power plant
accident in March 2011 pushed Japanese government to
support geothermal development.
• Financial incentives for geothermal developments, ex.,
drilling support and FIT system are given by METI.
• New RD&D, such as EGS may begin under METI.
• MOE released constrains for national parks. MOE made
a guideline for geothermal drilling permission.
*Constraints on geothermal development in various aspects are
still under investigation to be released.
• Industries has also moved forward to accelerate
domestic geothermal developments.
20

Mais conteúdo relacionado

Semelhante a Geothermal development activities in Japan after the big earthquake in 2011

Indonesia ina002 1366765311
Indonesia ina002 1366765311Indonesia ina002 1366765311
Indonesia ina002 1366765311
Nurul Yakin
 
Geothermal Development in Turkey
Geothermal Development in TurkeyGeothermal Development in Turkey
Geothermal Development in Turkey
Ali Osman Öncel
 
Solar power generation JICA Trainer Hussain Naik
Solar power generation JICA Trainer Hussain NaikSolar power generation JICA Trainer Hussain Naik
Solar power generation JICA Trainer Hussain Naik
hussainmaloth
 

Semelhante a Geothermal development activities in Japan after the big earthquake in 2011 (20)

B4 - Status of Geothermal Exploration and Development in Ethiopia
B4 - Status of  Geothermal Exploration and Development in EthiopiaB4 - Status of  Geothermal Exploration and Development in Ethiopia
B4 - Status of Geothermal Exploration and Development in Ethiopia
 
Energy resources
Energy resourcesEnergy resources
Energy resources
 
M.CneytKahramanNuclearPowerPlants.pdf
M.CneytKahramanNuclearPowerPlants.pdfM.CneytKahramanNuclearPowerPlants.pdf
M.CneytKahramanNuclearPowerPlants.pdf
 
IRJET- Geothermal Energy:-An Effective Means of Renewable Energy Source
IRJET- Geothermal Energy:-An Effective Means of Renewable Energy SourceIRJET- Geothermal Energy:-An Effective Means of Renewable Energy Source
IRJET- Geothermal Energy:-An Effective Means of Renewable Energy Source
 
Assessment of renewable energy in nation-wide power grid in Japan by optimal ...
Assessment of renewable energy in nation-wide power grid in Japan by optimal ...Assessment of renewable energy in nation-wide power grid in Japan by optimal ...
Assessment of renewable energy in nation-wide power grid in Japan by optimal ...
 
Session 3A - Samuel Sanchez
Session 3A - Samuel SanchezSession 3A - Samuel Sanchez
Session 3A - Samuel Sanchez
 
Indonesia ina002 1366765311
Indonesia ina002 1366765311Indonesia ina002 1366765311
Indonesia ina002 1366765311
 
Measures and equipment
Measures and equipmentMeasures and equipment
Measures and equipment
 
Geothermal Development in Turkey
Geothermal Development in TurkeyGeothermal Development in Turkey
Geothermal Development in Turkey
 
Solar power generation JICA Trainer Hussain Naik
Solar power generation JICA Trainer Hussain NaikSolar power generation JICA Trainer Hussain Naik
Solar power generation JICA Trainer Hussain Naik
 
Jw workshop
Jw workshopJw workshop
Jw workshop
 
presentation vsv.ppt
presentation vsv.pptpresentation vsv.ppt
presentation vsv.ppt
 
Vietnam _Investment Guide on Energy
Vietnam _Investment Guide on EnergyVietnam _Investment Guide on Energy
Vietnam _Investment Guide on Energy
 
Geothermal Industry
Geothermal IndustryGeothermal Industry
Geothermal Industry
 
Climate Change Mitigation &amp; Adaptation
Climate Change  Mitigation &amp; AdaptationClimate Change  Mitigation &amp; Adaptation
Climate Change Mitigation &amp; Adaptation
 
lecture_note_403105181219180.pdf
lecture_note_403105181219180.pdflecture_note_403105181219180.pdf
lecture_note_403105181219180.pdf
 
Zimtu Research: Lakeland Resources Inc. Update - Athabasca Basin Uranium Expl...
Zimtu Research: Lakeland Resources Inc. Update - Athabasca Basin Uranium Expl...Zimtu Research: Lakeland Resources Inc. Update - Athabasca Basin Uranium Expl...
Zimtu Research: Lakeland Resources Inc. Update - Athabasca Basin Uranium Expl...
 
Solar Power Sustainability - Professional Development Course for Engineers
Solar Power Sustainability - Professional Development Course for EngineersSolar Power Sustainability - Professional Development Course for Engineers
Solar Power Sustainability - Professional Development Course for Engineers
 
Fukushima daichi disaster
Fukushima daichi disasterFukushima daichi disaster
Fukushima daichi disaster
 
Energy systems & power systems modelling, Comparing Experiences in Ireland an...
Energy systems & power systems modelling, Comparing Experiences in Ireland an...Energy systems & power systems modelling, Comparing Experiences in Ireland an...
Energy systems & power systems modelling, Comparing Experiences in Ireland an...
 

Mais de Iceland Geothermal

Mais de Iceland Geothermal (20)

Geothermal Landscape study final
Geothermal Landscape study finalGeothermal Landscape study final
Geothermal Landscape study final
 
A1 Winning Public Acceptance: Preparation of Geothermal Sustainability Asses...
A1  Winning Public Acceptance: Preparation of Geothermal Sustainability Asses...A1  Winning Public Acceptance: Preparation of Geothermal Sustainability Asses...
A1 Winning Public Acceptance: Preparation of Geothermal Sustainability Asses...
 
C4 - Geothermal Fuels Prosperity: How Geothermal Direct Use Projects Enable ...
C4 - Geothermal Fuels Prosperity:  How Geothermal Direct Use Projects Enable ...C4 - Geothermal Fuels Prosperity:  How Geothermal Direct Use Projects Enable ...
C4 - Geothermal Fuels Prosperity: How Geothermal Direct Use Projects Enable ...
 
C4 - Climeworks: Capturing CO2 from air
C4 - Climeworks: Capturing CO2 from airC4 - Climeworks: Capturing CO2 from air
C4 - Climeworks: Capturing CO2 from air
 
C4 - Opportunities to develop low-enthalpy geothermal project in Mexico
C4 - Opportunities to develop low-enthalpy geothermal project in MexicoC4 - Opportunities to develop low-enthalpy geothermal project in Mexico
C4 - Opportunities to develop low-enthalpy geothermal project in Mexico
 
C4 - Lithium recovery from high temperature geothermal brines.
C4 - Lithium recovery from high temperature geothermal brines.C4 - Lithium recovery from high temperature geothermal brines.
C4 - Lithium recovery from high temperature geothermal brines.
 
C4 - Transforming CO2 into a commercial product
C4 - Transforming CO2 into a commercial productC4 - Transforming CO2 into a commercial product
C4 - Transforming CO2 into a commercial product
 
C3 - Production Modelling for Sustainability
C3 - Production Modelling for SustainabilityC3 - Production Modelling for Sustainability
C3 - Production Modelling for Sustainability
 
C3 - IDDP2 A better tomorrow
C3 - IDDP2 A better tomorrowC3 - IDDP2 A better tomorrow
C3 - IDDP2 A better tomorrow
 
C3 - Production and reinjection at Hellisheiði: Holistic approach
C3 - Production and reinjection at Hellisheiði: Holistic approachC3 - Production and reinjection at Hellisheiði: Holistic approach
C3 - Production and reinjection at Hellisheiði: Holistic approach
 
C3 - Geothermal reservoir management and sustainable use
C3 - Geothermal reservoir management and sustainable useC3 - Geothermal reservoir management and sustainable use
C3 - Geothermal reservoir management and sustainable use
 
C2 - Optimization of existing systems: Improvement of plants in operation and...
C2 - Optimization of existing systems: Improvement of plants in operation and...C2 - Optimization of existing systems: Improvement of plants in operation and...
C2 - Optimization of existing systems: Improvement of plants in operation and...
 
C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...
C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...
C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...
 
C2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
C2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATIONC2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
C2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
 
C2 - ENGINEERING THE ENERGY TRANSITION
C2 - ENGINEERING THE  ENERGY TRANSITIONC2 - ENGINEERING THE  ENERGY TRANSITION
C2 - ENGINEERING THE ENERGY TRANSITION
 
C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...
C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...
C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...
 
C1 - Operation: Ownership Structure and its Effects
C1 - Operation: Ownership Structure and its EffectsC1 - Operation: Ownership Structure and its Effects
C1 - Operation: Ownership Structure and its Effects
 
C1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTS
C1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTSC1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTS
C1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTS
 
C1 - Financing Geothermal Development: Overview, Challenges and opportunities...
C1 - Financing Geothermal Development: Overview, Challenges and opportunities...C1 - Financing Geothermal Development: Overview, Challenges and opportunities...
C1 - Financing Geothermal Development: Overview, Challenges and opportunities...
 
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyB4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
 

Último

1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 

Último (20)

ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 

Geothermal development activities in Japan after the big earthquake in 2011

  • 1. Geothermal development activities in Japan after the big earthquake in 2011 Kasumi Yasukawa National Institute of Advanced Industrial Science and Technology (AIST)
  • 2. Contents • Geothermal Power Plants in Japan • The reasons why there was no new GPP in Japan • Recent movement especially after 3.11… – National Parks – Hot Springs – Costs – New Developments • Summary 2
  • 3. Yamagawa PP 1995.3- 30MW Ogiri PP 1996.3- 30MW Otake PP 1967.8- 12.5MW Kirishima Kokusai Hotel PP 1996.3- 0.1MW Takigami PP 1996.11- 25MW Suginoi GPP 1981.3- 3MW Kuju GPP 1998- 0.9MW 付録. 地熱写真集 Geothermal Power Plants in Japan (Kyushu Area) In whole Japan, we have 17 geothermal power plants with 19 units. Hatchobaru PP Ⅰ.1977.6- 55MW Ⅱ.2000. 6- 55MW Binary 2MW 3
  • 4. Geothermal Power Plants in Japan (North-Eastern Area) Mori GPP 1982.11- 25MW Onuma GPP 1974.6- 9.5MW Sumikawa GPP 1995.3- 50MW Matsukawa GPP 1966.10- 23.5MW Kakkonda GPP Ⅰ.1978.5- 50MW Ⅱ.1996. 3- 30MW Onikobe GPP 1975.3- 12.5MW Yanaizu- Nishiyama GPP 1995.5- 65MW Hachijojima GPP 1995.5- 3.3MW Uenotai GPP 1994.3- 28.8MW M9.0 Epicenter Fukushima Daiichi Nuclear PP Sapporo Sendai Tokyo Osaka Fukuoka All GPPs affected by the big earthquake on the 11th March 2011, recorded M9.0, survived! 4
  • 5. Geothermal potential in Japan : Temperature of natural springs (red : high, blue : low) : geothermal power plant : Quaternary volcanoes Geothermal potential map of Japan (GSJ, 2009) The number of active volcanoes and geothermal energy potential has a linear relation. Muraoka et al. (2008) estimated that Japan has geothermal potential of 23,470 MWe. 5
  • 6. Japan is the world’s 3rd largest geothermal potential country, Country No. of active volcanoes Geothermal potential (MWe) Geothermal Power generation on 2010 (GWeh) USA 160 30,000 16,603 Indonesia 146 27,790 9,600 Japan 119 23,470 3,064 Philippines 47 6,000 10,311 Mexico 39 6,000 7,047 Iceland 33 5,800 4,597 New Zealand 20 3,650 4,055 Italy 13 3,270 5,520 Number of active volcanoes & geothermal energy potential (Muraoka et al., 2008) Geothermal potential in Japan but its power generation is merely No. 8 in the world…… Why? Geothermal potential in this table is an estimated value from heat energy stored at a depth of geological basement or shallower. 6
  • 7. 0 2'000 4'000 6'000 8'000 10'000 12'000 14'000 1946 1948 1950 1952 1954 1956 1958 1960 1962 1964 1966 1968 1970 1972 1974 1976 1978 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 InstalledCumulative Capacity(MW) Geothermal power capacity of the world (10MW) Bertani (2010) 800 600 400 200 0 (10MW) As an environmentally friendly energy, the world’s geothermal power capacity is increasing constantly. But no new GPP in Japan this century. WHY? Geothermal power in Japan 7
  • 8. All these strong points are common with nuclear power. Therefore, under the federal policy pushing nuclear power, lows and regulations which limits geothermal development have not been improved. Low CO2 emission Hydro (11), Geothermal (13), Nuclear (20), Wind (24), PV (38), LNG (474, 599), Oil (738), Coal (943) g-CO2/kWh (CRIEPI, 2010) Stable power & High capacity factor Not depending on weather High energy return (generated power/used energy) Hydro (50), Geothermal(31), Nuclear (24), Oil(21) , Coal (17) Strong points of geothermal power The reasons why there was no new GPP in Japan 8
  • 9. 3. Cost Thermal and nuclear power have been considered more cost effective so that GPP has not been attractive for electric power suppliers. The reasons why there was no new GPP in Japan 1. National Parks (no drillings, no researches) 80% of the geothermal energy in Japan exist inside national parks where no exploitation has been allowed. Even scientific survey has been limited. 2. Hot springs Some hot spring owners make strong campaign against geothermal development in afraid of degradation of the springs (amount, quality). How these things have been improved after the nuclear accident? 9
  • 10. Recent movement especially after 3.11…. 1. National Parks For geothermal power as a low CO2 emission energy source, the cabinet decided to mitigate restrictions in national parks (June, 2010). Ministry of Environment (MOE) finally made new rules in 2012. Ordinance of the Ministry of the Environment 1) Special Protection zone and Class 1 Special zone (SP and S1) The development is not admitted but the gravity or MT survey will be admitted, which covers wide area. A deviated well drilling is not admitted. 2) Class 2 and 3 Special zones (S2 and S3) The development is basically not admitted. Only deviated well drilling from outside will be admitted if there is no effect on the surface. (November 2011) The development is basically not admitted but it may be allowed if environmental consideration is well treated. (March 2012) 10
  • 11. 0 500 1000 1500 2000 2500 3000 3500 >20 Yen/kWh 15 - 20 Yen/kWh 10 - 15 Yen/kWh < 10 Yen/kWh SP S1 S2 OZ S3 Ou t Geothermalresource(MW) Higher protection It has been… Do not enter. Never! Surface survey may be allowed Special Protection zones Class 1 Special zones Class 2 Special zones Class 3 Special zones Ordinary Zones Outside parks 11
  • 12. 0 500 1000 1500 2000 2500 3000 3500 >20 Yen/kWh 15 - 20 Yen/kWh 10 - 15 Yen/kWh < 10 Yen/kWh SP S1 S2 OZ S3 Ou t Geothermalresource(MW) Special Protection zones Class 1 Special zones Class 2 Special zones Class 3 Special zones Ordinary Zones Outside parks Since March 2012 Surface survey may be allowed if enough environmental consideration is taken, Small scale development may be allowed Higher protection 12
  • 13. 2. Hot springs The only social problem that cannot be solved by laws and regulation. But... Recent movement especially after 3.11…. The Ministry of Environment (MoE) made a new guideline on permission of geothermal drilling in March 2012, to be referred by local (prefecture) government in order to avoid delay in giving permission. Procedure for decision making of permission yes no May geothermal development affect on shallow hot spring aquifer? No information on their relation Model exists on their relation Monitoring data on their relation Judgment by basic geo-scientific info. Judgment based on the Model Judgment based on Monitoring data Existing info on relation btwn Geothermal Reservoir and hot spring 13
  • 14. “Harmonious utilization of geothermal energy with hot spring resources” - to avoid conflicts between hot spring owners and geothermal developers - AIST has been conducting a 3-year research project since FY2010 sponsored by MoE, consists of modeling, monitoring, and data integration for a whole subsurface system including hot spring aquifer. A final product, a software which automatically judges possible interference of geothermal development on hot springs based on natural state hot spring data and monitoring data will be used by hot spring owners as well as geothermal developers. 14
  • 15. A Kalina cycle enables power generation by ~85 C water. GERD and AIST have been conducting a demonstration project in Niigata sponsored by MoE. Hot spring owners may have small scale binary plants for their own use. Another way for “Harmonious utilization with hot springs”; “Hot spring power plant” project Low temperature binary system Hot spring source To spa (bath) To power line Heat exchanger turbine Cooling tower condencer 15
  • 16. Recent movement especially after 3.11…. 3. Cost The Energy Agency of METI supports domestic geothermal businesses by : ●Financial support 1. Drilling • Government’s budget for geothermal drilling (~USD 15 million a year) was to be abolished in FY2011. But after the big earthquake, government decided to increase this budget to ~USD 90 million from FY2012. It covers up to 50 % of the cost of exploration well drillings. 2. Public Acceptance • New budget for PA covers 100 % of PA activities by private sectors. 3. RD&D (EGS, etc.) The above financial support by METI, which used to done through NEDO, will be done through JOGMEC (Japan Oil, Gas and Metals National Corporation ) 16
  • 17. Recent movement especially after 3.11…. 3. Cost The Energy Agency of METI supports domestic geothermal businesses by : ●Feed in Tarif (FIT) FIT law for renewable energy was enacted and price is fixed in 2012. 1. Bigger geothermal power generation (15 MW or bigger) • 27.3 JPY/kWh for 15 years 2. Smaller geothermal power generation (<15 MW) • 42 JPY/kWh for 15 years. The average geothermal power cost in Japan in the past is 20 JPY/kWh and FIT may give enough incentive for geothermal developers. The remaining economical obstacle, power transmission fee requested by electric power company, may be reduced in few years by introduction of free competition in transmission. 17
  • 18. 4. New developments Private sectors (Industries) • “Japan Geothermal Association (JGA)” was established in 4 Dec. 2012 by 34 companies, including metal developers, oil and gas developers, power supplier, trading companies, construction companies, turbine makers, plant makers, geothermal consultants, drillings companies, banks, and an environmental NPO. . • Geothermal developers in JGA have development plans of around 10 domestic fields. Recent movement especially after 3.11…. 18
  • 19. 4. New developments • Yuzawa-Chinetsu Co. Ltd. (J-Power, MMC and Mitsubishi Gas) has begun environmental assessment in Wasabizawa geothermal field, aiming at 42 MW GPP in 2020. • TOHGEC group will start drilling an exploration will in Hachimantai, aiming at 10 MW GPP. • Kawasaki Heavy Industry, KOBELCO, IHI, etc., began production of 50-100 kW generator for “hot spring power plants” (small scale binary). Several local groups (municipal or hotel owners) show interests in such small GPP. Recent movement especially after 3.11…. 19
  • 20. Summary • Renewable preference after the nuclear power plant accident in March 2011 pushed Japanese government to support geothermal development. • Financial incentives for geothermal developments, ex., drilling support and FIT system are given by METI. • New RD&D, such as EGS may begin under METI. • MOE released constrains for national parks. MOE made a guideline for geothermal drilling permission. *Constraints on geothermal development in various aspects are still under investigation to be released. • Industries has also moved forward to accelerate domestic geothermal developments. 20