Objectives
 Assess the functioning of WUAs at collective
pump stations in IIP and IIIMP projects
 Carry out a comparative survey on the working
of BCWUAs
1
2
3
WUAs - Methodology
• Rapid Appraisal of 50 pump stations, IIP
and IIIMP in Meet Yazid command area
• Additional surveys and literature review
• 4 Masters students
WUAs at pumping stations
Functioning of WUAs
1. Normative plans: no WUA functions as planned, # WUAs not formally active
2. Board not farmers considered as WUA members, few re-elections,
assemblies, or other (formal) meetings
3. Decision-making is often informal, fundamental role of the pumping station
(PS) operator
4. Very little participation in design of PS and network; limited recollection of
training; reception of PS often problematic
5. Large diversity of water distribution arrangements, with rotations only
during peak summer time
6. Running costs and fee collection relatively un-problematic; investment
decisions by consensus when needed
7. Conflicts happen when supply/demand ratio too low (tail-ends, or), which
social relations can amplify/reduce
BCWUA survey
Activity
• Methodology:
– Use earlier literature study on
successful cases and surveys
– Focus group with BCWUAs on
management options
– Interviews with key-
informants
– Survey of 15 selected
BCWUAs
Output
Focus group with BCWUAs
BCWUA survey
Activities
• Comparative survey of 15
BCWUAs in Mit Yazid
• Discussion topics:
– Trajectory of the BCWUA
– Election & composition Board
– The role of IIP improvement
– BCWUA resources &
responsibilities
– Relations with Project and
Irrigation Management Staff
– Effectiveness of BCWUAs
– Law for BCWUAs, etc.
BCWUA presidents
Main Findings I
• Laudable efforts of BCWUAs and irrigation staff to
deal with O&M problems at BC-level
• BCWUAs have no legal recognition, resource base
(fee collection), office and records
• BCWUAs have no large O&M role, even in success
cases
• Weak link between WUAs and the BCWUAs,
which affects enforcement rotation
• BCWUA leaders need the authority of district
engineers to implement rotations
Main Findings II
• BCWUA leaders selected to promote
improvement, cannot effectively represent users
with design & construction problems
• How representative are BCWUAs when many
water users along BCs are not aware of them?
• Women in BCWUA appears a token measure,
driven by donor pressures
• Efforts focused on (re-)elections of BCWUAs and
less on sustaining them
• Egyptian Revolution discontinued regular
interactions BCWUAs - engineers
BCWUA representation
Main Findings III
• In sum, BCWUAs are financially,
representationally and institutionally weak
organizations, which potentially might, but
presently do not play a significant role in the
O&M of BCs
• Even when a law and additional maintenance
responsibilities would strengthen the legitimacy
of BCWUAs, it is questionable whether they
would be sustainable
Key-messages
• The need to adopt a law to recognize BCWUAs
with fee collection capacity and concrete
O&M responsibilities
or:
• Give up the idea of BCWUA participation
Future investment

Mais conteúdo relacionado

Semelhante a Water Users’ Associations (WUAs/BCWUAs) - Meet Yazid Area

2. Integrated Catchment Management - Vision
2. Integrated Catchment Management - Vision2. Integrated Catchment Management - Vision
2. Integrated Catchment Management - Vision
Environmental Protection Agency, Ireland
 
1 introduction iwrm_gwp_advocacy
1 introduction iwrm_gwp_advocacy1 introduction iwrm_gwp_advocacy
1 introduction iwrm_gwp_advocacy
Saurabh Raghuvansi
 
Water Resources Management Financing in Philippine
Water Resources Management Financing in PhilippineWater Resources Management Financing in Philippine
Water Resources Management Financing in Philippine
GWP SOUTHEAST ASIA
 
Small bore sewers - afd-pseau - World Water Week 2013 - Stockholm
Small bore sewers - afd-pseau - World Water Week 2013 - StockholmSmall bore sewers - afd-pseau - World Water Week 2013 - Stockholm
Small bore sewers - afd-pseau - World Water Week 2013 - Stockholm
Désille Denis
 
Business: John Matthews, Aliance for Water, 16th January UN Water Zaragoza Co...
Business: John Matthews, Aliance for Water, 16th January UN Water Zaragoza Co...Business: John Matthews, Aliance for Water, 16th January UN Water Zaragoza Co...
Business: John Matthews, Aliance for Water, 16th January UN Water Zaragoza Co...
water-decade
 
10212014 KEWASNET SNV WPM RESULTS PRESENTATION - ISIOLO
10212014 KEWASNET SNV WPM RESULTS PRESENTATION - ISIOLO10212014 KEWASNET SNV WPM RESULTS PRESENTATION - ISIOLO
10212014 KEWASNET SNV WPM RESULTS PRESENTATION - ISIOLO
Binagwaho Gakunju
 

Semelhante a Water Users’ Associations (WUAs/BCWUAs) - Meet Yazid Area (20)

Water.org approach and activities to promote microfinance for sanitation (Dar...
Water.org approach and activities to promote microfinance for sanitation (Dar...Water.org approach and activities to promote microfinance for sanitation (Dar...
Water.org approach and activities to promote microfinance for sanitation (Dar...
 
Institutional structures for productive use of agricultural water
Institutional structures for productive use of agricultural waterInstitutional structures for productive use of agricultural water
Institutional structures for productive use of agricultural water
 
2. Integrated Catchment Management - Vision
2. Integrated Catchment Management - Vision2. Integrated Catchment Management - Vision
2. Integrated Catchment Management - Vision
 
How to Conduct a Community Assessment for Water Projects
How to Conduct a Community Assessment for Water ProjectsHow to Conduct a Community Assessment for Water Projects
How to Conduct a Community Assessment for Water Projects
 
Pathways to improved irrigation performance in Africa
Pathways to improved irrigation performance in AfricaPathways to improved irrigation performance in Africa
Pathways to improved irrigation performance in Africa
 
1 introduction iwrm_gwp_advocacy
1 introduction iwrm_gwp_advocacy1 introduction iwrm_gwp_advocacy
1 introduction iwrm_gwp_advocacy
 
A Framework for Action
A Framework for ActionA Framework for Action
A Framework for Action
 
Water Resources Management Financing in Philippine
Water Resources Management Financing in PhilippineWater Resources Management Financing in Philippine
Water Resources Management Financing in Philippine
 
Rhetoric versus realities: An assessment of rainwater management planning and...
Rhetoric versus realities: An assessment of rainwater management planning and...Rhetoric versus realities: An assessment of rainwater management planning and...
Rhetoric versus realities: An assessment of rainwater management planning and...
 
Small bore sewers - afd-pseau - World Water Week 2013 - Stockholm
Small bore sewers - afd-pseau - World Water Week 2013 - StockholmSmall bore sewers - afd-pseau - World Water Week 2013 - Stockholm
Small bore sewers - afd-pseau - World Water Week 2013 - Stockholm
 
Business: John Matthews, Aliance for Water, 16th January UN Water Zaragoza Co...
Business: John Matthews, Aliance for Water, 16th January UN Water Zaragoza Co...Business: John Matthews, Aliance for Water, 16th January UN Water Zaragoza Co...
Business: John Matthews, Aliance for Water, 16th January UN Water Zaragoza Co...
 
Sustainability of community managed irrigation projects in nigeria
Sustainability of community managed irrigation projects in nigeriaSustainability of community managed irrigation projects in nigeria
Sustainability of community managed irrigation projects in nigeria
 
Dr adnan abu mahfouz wrmn network introduction scene setting
Dr adnan abu mahfouz wrmn network introduction scene settingDr adnan abu mahfouz wrmn network introduction scene setting
Dr adnan abu mahfouz wrmn network introduction scene setting
 
Enablers and Challenges for Water Institutions in Tajikistan
Enablers and Challenges for Water Institutions in Tajikistan Enablers and Challenges for Water Institutions in Tajikistan
Enablers and Challenges for Water Institutions in Tajikistan
 
10212014 KEWASNET SNV WPM RESULTS PRESENTATION - ISIOLO
10212014 KEWASNET SNV WPM RESULTS PRESENTATION - ISIOLO10212014 KEWASNET SNV WPM RESULTS PRESENTATION - ISIOLO
10212014 KEWASNET SNV WPM RESULTS PRESENTATION - ISIOLO
 
Watercredit case study (wcs) kenya
Watercredit case study (wcs) kenyaWatercredit case study (wcs) kenya
Watercredit case study (wcs) kenya
 
Meeker The New Frontier
Meeker The New Frontier Meeker The New Frontier
Meeker The New Frontier
 
Revitalising Catchment Management Forums
Revitalising Catchment Management ForumsRevitalising Catchment Management Forums
Revitalising Catchment Management Forums
 
Companion Modeling in Ghana: Objectives, Processes, First Results
Companion Modeling in Ghana: Objectives, Processes, First ResultsCompanion Modeling in Ghana: Objectives, Processes, First Results
Companion Modeling in Ghana: Objectives, Processes, First Results
 
Mr. Matthew Griffith IEWP @ Workshop on River Basin Management Planning and G...
Mr. Matthew Griffith IEWP @ Workshop on River Basin Management Planning and G...Mr. Matthew Griffith IEWP @ Workshop on River Basin Management Planning and G...
Mr. Matthew Griffith IEWP @ Workshop on River Basin Management Planning and G...
 

Mais de International Water Management Institute (IWMI)

Mais de International Water Management Institute (IWMI) (20)

ACDI VOCA: Experience with bundling innovations and services in ADVANCE I & I...
ACDI VOCA: Experience with bundling innovations and services in ADVANCE I & I...ACDI VOCA: Experience with bundling innovations and services in ADVANCE I & I...
ACDI VOCA: Experience with bundling innovations and services in ADVANCE I & I...
 
A compilation of presentations made at the 7th Small Scale Irrigation Multi-S...
A compilation of presentations made at the 7th Small Scale Irrigation Multi-S...A compilation of presentations made at the 7th Small Scale Irrigation Multi-S...
A compilation of presentations made at the 7th Small Scale Irrigation Multi-S...
 
ClimBeR – Governance for Resilience (G4R) - French version
ClimBeR – Governance for Resilience (G4R) - French versionClimBeR – Governance for Resilience (G4R) - French version
ClimBeR – Governance for Resilience (G4R) - French version
 
ClimBeR – Governance for Resilience (G4R)
ClimBeR – Governance for Resilience (G4R)ClimBeR – Governance for Resilience (G4R)
ClimBeR – Governance for Resilience (G4R)
 
Groundwater irrigation for building climate resilience in West Africa_ IWMI-E...
Groundwater irrigation for building climate resilience in West Africa_ IWMI-E...Groundwater irrigation for building climate resilience in West Africa_ IWMI-E...
Groundwater irrigation for building climate resilience in West Africa_ IWMI-E...
 
Systemic, adaptive approach for scaling groundwater irrigation in West Africa
Systemic, adaptive approach  for scaling groundwater  irrigation in West AfricaSystemic, adaptive approach  for scaling groundwater  irrigation in West Africa
Systemic, adaptive approach for scaling groundwater irrigation in West Africa
 
Groundwater and the Untapped Potential for Building Climate Resilience in W...
Groundwater and the Untapped  Potential for Building Climate  Resilience in W...Groundwater and the Untapped  Potential for Building Climate  Resilience in W...
Groundwater and the Untapped Potential for Building Climate Resilience in W...
 
Operationalizing farmer led irrigation development at scale
Operationalizing farmer led irrigation development at scaleOperationalizing farmer led irrigation development at scale
Operationalizing farmer led irrigation development at scale
 
Application of the water-energy-food (WEF) nexus concept to transboundary riv...
Application of the water-energy-food (WEF) nexus concept to transboundary riv...Application of the water-energy-food (WEF) nexus concept to transboundary riv...
Application of the water-energy-food (WEF) nexus concept to transboundary riv...
 
Develop and implement an incremental improvement plan: Module Five
Develop and implement an incremental improvement plan: Module Five Develop and implement an incremental improvement plan: Module Five
Develop and implement an incremental improvement plan: Module Five
 
Identify hazards, assess existing control measures, and assess exposure risks...
Identify hazards, assess existing control measures, and assess exposure risks...Identify hazards, assess existing control measures, and assess exposure risks...
Identify hazards, assess existing control measures, and assess exposure risks...
 
Identify hazards, assess existing control measures, and assess exposure risk...
Identify hazards, assess existing control measures, and assess  exposure risk...Identify hazards, assess existing control measures, and assess  exposure risk...
Identify hazards, assess existing control measures, and assess exposure risk...
 
Describe the existing sanitation system - Module Three of Governance and Reus...
Describe the existing sanitation system - Module Three of Governance and Reus...Describe the existing sanitation system - Module Three of Governance and Reus...
Describe the existing sanitation system - Module Three of Governance and Reus...
 
Prepare for Reuse/Sanitation Safety Plan - Module Two of Governance and Reuse...
Prepare for Reuse/Sanitation Safety Plan - Module Two of Governance and Reuse...Prepare for Reuse/Sanitation Safety Plan - Module Two of Governance and Reuse...
Prepare for Reuse/Sanitation Safety Plan - Module Two of Governance and Reuse...
 
Introduction to Reuse/Sanitation Safety Planning and Governance System - Modu...
Introduction to Reuse/Sanitation Safety Planning and Governance System - Modu...Introduction to Reuse/Sanitation Safety Planning and Governance System - Modu...
Introduction to Reuse/Sanitation Safety Planning and Governance System - Modu...
 
Water reuse in MENA: Status, prospects and challenges
Water reuse in MENA: Status, prospects and challenges Water reuse in MENA: Status, prospects and challenges
Water reuse in MENA: Status, prospects and challenges
 
Integration of circular economy approach into sanitation service delivery for...
Integration of circular economy approach into sanitation service delivery for...Integration of circular economy approach into sanitation service delivery for...
Integration of circular economy approach into sanitation service delivery for...
 
Irrigation development and agricultural water management in Africa: transitio...
Irrigation development and agricultural water management in Africa: transitio...Irrigation development and agricultural water management in Africa: transitio...
Irrigation development and agricultural water management in Africa: transitio...
 
Drought Challenges: Policy Options for Developing Countries
Drought Challenges: Policy Options for Developing CountriesDrought Challenges: Policy Options for Developing Countries
Drought Challenges: Policy Options for Developing Countries
 
Institutionalizing Water Accounting - Overview
Institutionalizing Water Accounting - Overview Institutionalizing Water Accounting - Overview
Institutionalizing Water Accounting - Overview
 

Último

CYTOGENETIC MAP................ ppt.pptx
CYTOGENETIC MAP................ ppt.pptxCYTOGENETIC MAP................ ppt.pptx
CYTOGENETIC MAP................ ppt.pptx
Silpa
 
biology HL practice questions IB BIOLOGY
biology HL practice questions IB BIOLOGYbiology HL practice questions IB BIOLOGY
biology HL practice questions IB BIOLOGY
1301aanya
 
Phenolics: types, biosynthesis and functions.
Phenolics: types, biosynthesis and functions.Phenolics: types, biosynthesis and functions.
Phenolics: types, biosynthesis and functions.
Silpa
 
LUNULARIA -features, morphology, anatomy ,reproduction etc.
LUNULARIA -features, morphology, anatomy ,reproduction etc.LUNULARIA -features, morphology, anatomy ,reproduction etc.
LUNULARIA -features, morphology, anatomy ,reproduction etc.
Silpa
 
Porella : features, morphology, anatomy, reproduction etc.
Porella : features, morphology, anatomy, reproduction etc.Porella : features, morphology, anatomy, reproduction etc.
Porella : features, morphology, anatomy, reproduction etc.
Silpa
 

Último (20)

CYTOGENETIC MAP................ ppt.pptx
CYTOGENETIC MAP................ ppt.pptxCYTOGENETIC MAP................ ppt.pptx
CYTOGENETIC MAP................ ppt.pptx
 
biology HL practice questions IB BIOLOGY
biology HL practice questions IB BIOLOGYbiology HL practice questions IB BIOLOGY
biology HL practice questions IB BIOLOGY
 
Phenolics: types, biosynthesis and functions.
Phenolics: types, biosynthesis and functions.Phenolics: types, biosynthesis and functions.
Phenolics: types, biosynthesis and functions.
 
300003-World Science Day For Peace And Development.pptx
300003-World Science Day For Peace And Development.pptx300003-World Science Day For Peace And Development.pptx
300003-World Science Day For Peace And Development.pptx
 
Gwalior ❤CALL GIRL 84099*07087 ❤CALL GIRLS IN Gwalior ESCORT SERVICE❤CALL GIRL
Gwalior ❤CALL GIRL 84099*07087 ❤CALL GIRLS IN Gwalior ESCORT SERVICE❤CALL GIRLGwalior ❤CALL GIRL 84099*07087 ❤CALL GIRLS IN Gwalior ESCORT SERVICE❤CALL GIRL
Gwalior ❤CALL GIRL 84099*07087 ❤CALL GIRLS IN Gwalior ESCORT SERVICE❤CALL GIRL
 
Zoology 5th semester notes( Sumit_yadav).pdf
Zoology 5th semester notes( Sumit_yadav).pdfZoology 5th semester notes( Sumit_yadav).pdf
Zoology 5th semester notes( Sumit_yadav).pdf
 
Human & Veterinary Respiratory Physilogy_DR.E.Muralinath_Associate Professor....
Human & Veterinary Respiratory Physilogy_DR.E.Muralinath_Associate Professor....Human & Veterinary Respiratory Physilogy_DR.E.Muralinath_Associate Professor....
Human & Veterinary Respiratory Physilogy_DR.E.Muralinath_Associate Professor....
 
Factory Acceptance Test( FAT).pptx .
Factory Acceptance Test( FAT).pptx       .Factory Acceptance Test( FAT).pptx       .
Factory Acceptance Test( FAT).pptx .
 
FAIRSpectra - Enabling the FAIRification of Analytical Science
FAIRSpectra - Enabling the FAIRification of Analytical ScienceFAIRSpectra - Enabling the FAIRification of Analytical Science
FAIRSpectra - Enabling the FAIRification of Analytical Science
 
LUNULARIA -features, morphology, anatomy ,reproduction etc.
LUNULARIA -features, morphology, anatomy ,reproduction etc.LUNULARIA -features, morphology, anatomy ,reproduction etc.
LUNULARIA -features, morphology, anatomy ,reproduction etc.
 
Genome sequencing,shotgun sequencing.pptx
Genome sequencing,shotgun sequencing.pptxGenome sequencing,shotgun sequencing.pptx
Genome sequencing,shotgun sequencing.pptx
 
Porella : features, morphology, anatomy, reproduction etc.
Porella : features, morphology, anatomy, reproduction etc.Porella : features, morphology, anatomy, reproduction etc.
Porella : features, morphology, anatomy, reproduction etc.
 
Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS ESCORT SERVICE In Bhiwan...
Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS  ESCORT SERVICE In Bhiwan...Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS  ESCORT SERVICE In Bhiwan...
Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS ESCORT SERVICE In Bhiwan...
 
Cyanide resistant respiration pathway.pptx
Cyanide resistant respiration pathway.pptxCyanide resistant respiration pathway.pptx
Cyanide resistant respiration pathway.pptx
 
Dr. E. Muralinath_ Blood indices_clinical aspects
Dr. E. Muralinath_ Blood indices_clinical  aspectsDr. E. Muralinath_ Blood indices_clinical  aspects
Dr. E. Muralinath_ Blood indices_clinical aspects
 
Chemistry 5th semester paper 1st Notes.pdf
Chemistry 5th semester paper 1st Notes.pdfChemistry 5th semester paper 1st Notes.pdf
Chemistry 5th semester paper 1st Notes.pdf
 
TransientOffsetin14CAftertheCarringtonEventRecordedbyPolarTreeRings
TransientOffsetin14CAftertheCarringtonEventRecordedbyPolarTreeRingsTransientOffsetin14CAftertheCarringtonEventRecordedbyPolarTreeRings
TransientOffsetin14CAftertheCarringtonEventRecordedbyPolarTreeRings
 
GBSN - Biochemistry (Unit 2) Basic concept of organic chemistry
GBSN - Biochemistry (Unit 2) Basic concept of organic chemistry GBSN - Biochemistry (Unit 2) Basic concept of organic chemistry
GBSN - Biochemistry (Unit 2) Basic concept of organic chemistry
 
Use of mutants in understanding seedling development.pptx
Use of mutants in understanding seedling development.pptxUse of mutants in understanding seedling development.pptx
Use of mutants in understanding seedling development.pptx
 
GBSN - Microbiology (Unit 3)Defense Mechanism of the body
GBSN - Microbiology (Unit 3)Defense Mechanism of the body GBSN - Microbiology (Unit 3)Defense Mechanism of the body
GBSN - Microbiology (Unit 3)Defense Mechanism of the body
 

Water Users’ Associations (WUAs/BCWUAs) - Meet Yazid Area

  • 1. Water Users’ Associations (WUAs/BCWUAs) Meet Yazid Area Research team: Dr. Edwin Rap Dr. François Molle Dr. Doaa Ezzat Eng. Ahmed Ismail Dr. Waleed Abu Hassan
  • 2. Objectives  Assess the functioning of WUAs at collective pump stations in IIP and IIIMP projects  Carry out a comparative survey on the working of BCWUAs
  • 3. 1 2 3 WUAs - Methodology • Rapid Appraisal of 50 pump stations, IIP and IIIMP in Meet Yazid command area • Additional surveys and literature review • 4 Masters students
  • 4. WUAs at pumping stations
  • 5.
  • 6. Functioning of WUAs 1. Normative plans: no WUA functions as planned, # WUAs not formally active 2. Board not farmers considered as WUA members, few re-elections, assemblies, or other (formal) meetings 3. Decision-making is often informal, fundamental role of the pumping station (PS) operator 4. Very little participation in design of PS and network; limited recollection of training; reception of PS often problematic 5. Large diversity of water distribution arrangements, with rotations only during peak summer time 6. Running costs and fee collection relatively un-problematic; investment decisions by consensus when needed 7. Conflicts happen when supply/demand ratio too low (tail-ends, or), which social relations can amplify/reduce
  • 7. BCWUA survey Activity • Methodology: – Use earlier literature study on successful cases and surveys – Focus group with BCWUAs on management options – Interviews with key- informants – Survey of 15 selected BCWUAs Output
  • 9. BCWUA survey Activities • Comparative survey of 15 BCWUAs in Mit Yazid • Discussion topics: – Trajectory of the BCWUA – Election & composition Board – The role of IIP improvement – BCWUA resources & responsibilities – Relations with Project and Irrigation Management Staff – Effectiveness of BCWUAs – Law for BCWUAs, etc. BCWUA presidents
  • 10. Main Findings I • Laudable efforts of BCWUAs and irrigation staff to deal with O&M problems at BC-level • BCWUAs have no legal recognition, resource base (fee collection), office and records • BCWUAs have no large O&M role, even in success cases • Weak link between WUAs and the BCWUAs, which affects enforcement rotation • BCWUA leaders need the authority of district engineers to implement rotations
  • 11. Main Findings II • BCWUA leaders selected to promote improvement, cannot effectively represent users with design & construction problems • How representative are BCWUAs when many water users along BCs are not aware of them? • Women in BCWUA appears a token measure, driven by donor pressures • Efforts focused on (re-)elections of BCWUAs and less on sustaining them • Egyptian Revolution discontinued regular interactions BCWUAs - engineers
  • 13. Main Findings III • In sum, BCWUAs are financially, representationally and institutionally weak organizations, which potentially might, but presently do not play a significant role in the O&M of BCs • Even when a law and additional maintenance responsibilities would strengthen the legitimacy of BCWUAs, it is questionable whether they would be sustainable
  • 14. Key-messages • The need to adopt a law to recognize BCWUAs with fee collection capacity and concrete O&M responsibilities or: • Give up the idea of BCWUA participation