SlideShare uma empresa Scribd logo
1 de 20
www.ivpower.com
Automated Disturbance Analysis for Utilities
Presentation of NetCeler
2
 French company, since 1997
 Based in France (Two main offices)
 50-people staff
 20 years of experience
Creator of Innovative Monitoring Solutions
 IVPower : Real-time Monitoring Solution Software for Power Utilities
IVPower : A Modular System
3
Any combinations of modules for the best application requirement fit
4
Some of our References: TSO
Some of our References: DSO
5
Localisation of our References
6
Our Global Reach: Wherever our Clients are located
• France
• Italy
• Switzerland
• Germany
• Portugal
• Romania
• Turkey
• Saudi Arabia
• Canada
• Singapore
• China
• South Africa
• Mexico
• Chile
• Belgium
• Netherlands
• Spain
• Denmark
ROI : Customer Voice
7
 RTE example
 Brochure prepared
by RTE for CIGRE
2016
IVPower : Decision Support Tool for Utilities
9
 Support network control
 Accurate and reliable fault
location
 Automated Conclusions
presented to the Operator (with
suggestions)
AFA+
PQ WAM
Flicker&Harmonics Grid Instability
 Streamline the event analysis
 Event sequence timeline
automated
 Characterization on the
Disturbance
 Perform verifications
systematically
 Support conditional maintenance
 Monitor breakers and relay performance
 Pinpoint abnormal events : e.g late tripping
 Record correct operation to postpone
maintenance, if unnecessary
DST = Real-time & Automated Fault Location,
Asset Operational Monitoring, PQ, WAM
Legacy from Existing Environment
10
Meters DPR/DFR PMU SAS
Dispatching
(fault location)
Asset
management
Maintenance
Power
Quality
Substation
Information
Data
An Integrated Decision Support Tool, IVPower
takes into account existing systems and leverages their data
How IVPower fits
Customer’s Network
Architecture
11
Power Grid Monitoring
12
 1. Real Time Supervision
• Goal: quickly & reliably identify faulty scenario
 Deploy Emergency crew in a targeted small area
 Reduce outage time
 2. Post-mortem Analysis
• Goal: improve efficiency and system quality
 Fault analysis & characterization – type, duration, fault impedance, distance
 Voltage Quality and Stability – power quality
 Asset mulfunctioning with root cause analysis
 Data archival for statistical analysis
 Frequency Stability - Wide Area Monitoring
1 Platform : 2 Types of Monitoring, 2 Systems…
Automated Fault Analysis
13
 Use of oscillographic records (COMTRADE format)
 Time saving: automatic collection and classification
of various event-related following any disturbance.
 Fast indication (within a few minutes) of healthy /
faulty lines
 Fast indication of accurate and reliable fault location
to optimize crew interventions:
 Presentation of the sequence of events,
measurements and key performance indicators to
facilitate and speed up the post mortem analysis
 Providing of fault statistics regarding lines,
transformers, breakers and protection devices.
Main Benefits
Boasts productivity of both dispatching crews and post-mortem analysts
Automated Fault Analysis
14
 Fault position in km from substation
 Fault accuracy: 5% of line length, (98%
prob.)
 Geographical view with the fault position
 Graphical representation of the fault
 Red rectangle : tolerance zone
Geo-located indication of the fault position
Automated Fault Analysis
15
 L1-G short circuit on line Klm-WOL 536
 The short circuit is located at 4.77 km [Mast356;Mast355] +/- 1.27 km from station Wolmirstedt
 Line Klm-Wol 536 is surely faulty
 L1-G short circuit on line Eu-Wd 208
 The short circuit is located at 62.35 km [Mast181;Mast182] +/- 3.36 km from station Eula
 Line EU-WD is surely faulty
Manual reclosing suggestion
According to the analyzed
elements, IVPower suggests
to reclose the line manually
According to the analyzed
elements, IVPower suggests NOT
to reclose the line manually
Automated Fault Analysis
16
 Presented in a relative time scale
 The time origin : start of fault
 Located faults and relay trips shown
by default
 Additionally, feeder, station binary
signals or additional (secondary) fault
locations may be added to the event
timeline
Sequence of fault event
Protection Performance Monitoring
17
 Detection of latent defects in the protection system
 Every disturbance event will trigger an automated performance analysis of the
concerned IED
 Maintenance inspections planned according to IED performances, not time
Main Benefits
Protection Performance Monitoring
18
 Selection of the device type:
relays, CB’s
 Upon every disturbance event is
an automated performance test
for concerned IED’s and CB’s
 Statistical data can be linked to
external data historian systems
 Custom protection monitoring
rules can be added through a
development environment
Asset Management : Protection statistics
Demonstration
Thank-you
Les Peyrons – 05400 VEYNES
Phone. +33 4 92 57 12 12
www.ivpower.com
Contact

Mais conteúdo relacionado

Mais procurados

ComGen CPnet presentation
ComGen CPnet presentationComGen CPnet presentation
ComGen CPnet presentation
pdewit
 
PRESENTATION THESIS
PRESENTATION THESISPRESENTATION THESIS
PRESENTATION THESIS
Umair Abbasi
 

Mais procurados (18)

ComGen CPnet presentation
ComGen CPnet presentationComGen CPnet presentation
ComGen CPnet presentation
 
Tizimlar va signallarni qayta ishlash_26-ma'ruza (Systems and Digital Signal ...
Tizimlar va signallarni qayta ishlash_26-ma'ruza (Systems and Digital Signal ...Tizimlar va signallarni qayta ishlash_26-ma'ruza (Systems and Digital Signal ...
Tizimlar va signallarni qayta ishlash_26-ma'ruza (Systems and Digital Signal ...
 
Satrack ppt
Satrack pptSatrack ppt
Satrack ppt
 
Forklift onboard OSHA safety checklist automatic recorders for single vehicle...
Forklift onboard OSHA safety checklist automatic recorders for single vehicle...Forklift onboard OSHA safety checklist automatic recorders for single vehicle...
Forklift onboard OSHA safety checklist automatic recorders for single vehicle...
 
Final Presentation
Final PresentationFinal Presentation
Final Presentation
 
SICAM FSI – Fault Sensor Indicator
SICAM FSI – Fault Sensor IndicatorSICAM FSI – Fault Sensor Indicator
SICAM FSI – Fault Sensor Indicator
 
Master Metering using your SCADA System
Master Metering using your SCADA SystemMaster Metering using your SCADA System
Master Metering using your SCADA System
 
Tizimlar va signallarni qayta ishlash_29-ma'ruza (Systems and Digital Signal ...
Tizimlar va signallarni qayta ishlash_29-ma'ruza (Systems and Digital Signal ...Tizimlar va signallarni qayta ishlash_29-ma'ruza (Systems and Digital Signal ...
Tizimlar va signallarni qayta ishlash_29-ma'ruza (Systems and Digital Signal ...
 
Telemetry system of Residual liquid
 Telemetry system of Residual liquid Telemetry system of Residual liquid
Telemetry system of Residual liquid
 
An introduction to scada fundamentals and implementation
An introduction to scada fundamentals and implementationAn introduction to scada fundamentals and implementation
An introduction to scada fundamentals and implementation
 
Tizimlar va signallarni qayta ishlash_12-ma'ruza (Systems and Digital Signal ...
Tizimlar va signallarni qayta ishlash_12-ma'ruza (Systems and Digital Signal ...Tizimlar va signallarni qayta ishlash_12-ma'ruza (Systems and Digital Signal ...
Tizimlar va signallarni qayta ishlash_12-ma'ruza (Systems and Digital Signal ...
 
SICAM FCM – Feeder Condition Monitor
SICAM FCM – Feeder Condition MonitorSICAM FCM – Feeder Condition Monitor
SICAM FCM – Feeder Condition Monitor
 
Implementation of METRO rail using PLC and SCADA
Implementation of METRO rail using PLC and SCADAImplementation of METRO rail using PLC and SCADA
Implementation of METRO rail using PLC and SCADA
 
PPT_16-9_Template
PPT_16-9_TemplatePPT_16-9_Template
PPT_16-9_Template
 
Automatic Dialing Alert System / Remote Indication System
Automatic Dialing Alert System / Remote Indication SystemAutomatic Dialing Alert System / Remote Indication System
Automatic Dialing Alert System / Remote Indication System
 
PRESENTATION THESIS
PRESENTATION THESISPRESENTATION THESIS
PRESENTATION THESIS
 
Practical DNP3 and Modern SCADA Systems
Practical DNP3 and Modern SCADA SystemsPractical DNP3 and Modern SCADA Systems
Practical DNP3 and Modern SCADA Systems
 
Introduction to SCADA
Introduction to SCADAIntroduction to SCADA
Introduction to SCADA
 

Semelhante a Automated Fault Analysis - IVPower for Transmission System Operators and Distribution System Operators

Octavis Vibration Monitor Brochure
Octavis Vibration Monitor BrochureOctavis Vibration Monitor Brochure
Octavis Vibration Monitor Brochure
ifm electronic gmbh
 
NXP Functional Safety High Voltage Low voltage
NXP Functional Safety High Voltage Low voltageNXP Functional Safety High Voltage Low voltage
NXP Functional Safety High Voltage Low voltage
ssuser57b3e5
 
Electrical-Safety-Productoverview_PROSP_en
Electrical-Safety-Productoverview_PROSP_enElectrical-Safety-Productoverview_PROSP_en
Electrical-Safety-Productoverview_PROSP_en
Wakkas Mirza
 

Semelhante a Automated Fault Analysis - IVPower for Transmission System Operators and Distribution System Operators (20)

Octavis Vibration Monitor Brochure
Octavis Vibration Monitor BrochureOctavis Vibration Monitor Brochure
Octavis Vibration Monitor Brochure
 
Transformer monitoring and controlling with GSM based system
Transformer monitoring and controlling with GSM based systemTransformer monitoring and controlling with GSM based system
Transformer monitoring and controlling with GSM based system
 
Psoc
PsocPsoc
Psoc
 
OPAL-RT ePHASORsim Webinar
OPAL-RT ePHASORsim WebinarOPAL-RT ePHASORsim Webinar
OPAL-RT ePHASORsim Webinar
 
21 industrial vibration analysis
21 industrial vibration analysis21 industrial vibration analysis
21 industrial vibration analysis
 
NXP Functional Safety High Voltage Low voltage
NXP Functional Safety High Voltage Low voltageNXP Functional Safety High Voltage Low voltage
NXP Functional Safety High Voltage Low voltage
 
TCMS Presentation (Train Control & Monitoring Systems)
TCMS Presentation (Train Control & Monitoring Systems)TCMS Presentation (Train Control & Monitoring Systems)
TCMS Presentation (Train Control & Monitoring Systems)
 
Ifm efector octavis brochure England 2013
Ifm efector octavis brochure England 2013Ifm efector octavis brochure England 2013
Ifm efector octavis brochure England 2013
 
International Journal of Computational Engineering Research(IJCER)
International Journal of Computational Engineering Research(IJCER)International Journal of Computational Engineering Research(IJCER)
International Journal of Computational Engineering Research(IJCER)
 
Unit 6 power quality
Unit 6 power qualityUnit 6 power quality
Unit 6 power quality
 
IRJET- FPGA Implementation of an Improved Watchdog Timer for Safety Critical ...
IRJET- FPGA Implementation of an Improved Watchdog Timer for Safety Critical ...IRJET- FPGA Implementation of an Improved Watchdog Timer for Safety Critical ...
IRJET- FPGA Implementation of an Improved Watchdog Timer for Safety Critical ...
 
Ieeepro techno solutions ieee 2014 embedded project design and constructio...
Ieeepro techno solutions    ieee 2014 embedded project design and constructio...Ieeepro techno solutions    ieee 2014 embedded project design and constructio...
Ieeepro techno solutions ieee 2014 embedded project design and constructio...
 
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
How to Implement Functional Safety in Mobile Machinery IQAN MC4xFS Parker Han...
 
Setting up iMC784 for a proper PQ monitoring
Setting up iMC784 for a proper PQ monitoringSetting up iMC784 for a proper PQ monitoring
Setting up iMC784 for a proper PQ monitoring
 
Electrical-Safety-Productoverview_PROSP_en
Electrical-Safety-Productoverview_PROSP_enElectrical-Safety-Productoverview_PROSP_en
Electrical-Safety-Productoverview_PROSP_en
 
Vibration monitoring
Vibration monitoringVibration monitoring
Vibration monitoring
 
Customized Monitoring and Assessment of Circuit Breaker Operations in Differe...
Customized Monitoring and Assessment of Circuit Breaker Operations in Differe...Customized Monitoring and Assessment of Circuit Breaker Operations in Differe...
Customized Monitoring and Assessment of Circuit Breaker Operations in Differe...
 
Power grid monitoring solution
Power grid monitoring solutionPower grid monitoring solution
Power grid monitoring solution
 
IOT Based Machine Health Monitoring System
IOT Based Machine Health Monitoring SystemIOT Based Machine Health Monitoring System
IOT Based Machine Health Monitoring System
 
Techimp Products and Services Portfolio
Techimp Products and Services PortfolioTechimp Products and Services Portfolio
Techimp Products and Services Portfolio
 

Último

introduction-to-automotive Andoid os-csimmonds-ndctechtown-2021.pdf
introduction-to-automotive Andoid os-csimmonds-ndctechtown-2021.pdfintroduction-to-automotive Andoid os-csimmonds-ndctechtown-2021.pdf
introduction-to-automotive Andoid os-csimmonds-ndctechtown-2021.pdf
VishalKumarJha10
 
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
Health
 

Último (20)

How To Troubleshoot Collaboration Apps for the Modern Connected Worker
How To Troubleshoot Collaboration Apps for the Modern Connected WorkerHow To Troubleshoot Collaboration Apps for the Modern Connected Worker
How To Troubleshoot Collaboration Apps for the Modern Connected Worker
 
Right Money Management App For Your Financial Goals
Right Money Management App For Your Financial GoalsRight Money Management App For Your Financial Goals
Right Money Management App For Your Financial Goals
 
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
 
Direct Style Effect Systems - The Print[A] Example - A Comprehension Aid
Direct Style Effect Systems -The Print[A] Example- A Comprehension AidDirect Style Effect Systems -The Print[A] Example- A Comprehension Aid
Direct Style Effect Systems - The Print[A] Example - A Comprehension Aid
 
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
 
introduction-to-automotive Andoid os-csimmonds-ndctechtown-2021.pdf
introduction-to-automotive Andoid os-csimmonds-ndctechtown-2021.pdfintroduction-to-automotive Andoid os-csimmonds-ndctechtown-2021.pdf
introduction-to-automotive Andoid os-csimmonds-ndctechtown-2021.pdf
 
8257 interfacing 2 in microprocessor for btech students
8257 interfacing 2 in microprocessor for btech students8257 interfacing 2 in microprocessor for btech students
8257 interfacing 2 in microprocessor for btech students
 
Microsoft AI Transformation Partner Playbook.pdf
Microsoft AI Transformation Partner Playbook.pdfMicrosoft AI Transformation Partner Playbook.pdf
Microsoft AI Transformation Partner Playbook.pdf
 
HR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.comHR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.com
 
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
 
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
 
Optimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTVOptimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTV
 
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
 
Vip Call Girls Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
Unveiling the Tech Salsa of LAMs with Janus in Real-Time Applications
Unveiling the Tech Salsa of LAMs with Janus in Real-Time ApplicationsUnveiling the Tech Salsa of LAMs with Janus in Real-Time Applications
Unveiling the Tech Salsa of LAMs with Janus in Real-Time Applications
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
 
The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...
The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...
The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...
 
A Secure and Reliable Document Management System is Essential.docx
A Secure and Reliable Document Management System is Essential.docxA Secure and Reliable Document Management System is Essential.docx
A Secure and Reliable Document Management System is Essential.docx
 
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdfLearn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
 
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfThe Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
 

Automated Fault Analysis - IVPower for Transmission System Operators and Distribution System Operators

  • 2. Presentation of NetCeler 2  French company, since 1997  Based in France (Two main offices)  50-people staff  20 years of experience Creator of Innovative Monitoring Solutions  IVPower : Real-time Monitoring Solution Software for Power Utilities
  • 3. IVPower : A Modular System 3 Any combinations of modules for the best application requirement fit
  • 4. 4 Some of our References: TSO
  • 5. Some of our References: DSO 5
  • 6. Localisation of our References 6 Our Global Reach: Wherever our Clients are located • France • Italy • Switzerland • Germany • Portugal • Romania • Turkey • Saudi Arabia • Canada • Singapore • China • South Africa • Mexico • Chile • Belgium • Netherlands • Spain • Denmark
  • 7. ROI : Customer Voice 7  RTE example  Brochure prepared by RTE for CIGRE 2016
  • 8.
  • 9. IVPower : Decision Support Tool for Utilities 9  Support network control  Accurate and reliable fault location  Automated Conclusions presented to the Operator (with suggestions) AFA+ PQ WAM Flicker&Harmonics Grid Instability  Streamline the event analysis  Event sequence timeline automated  Characterization on the Disturbance  Perform verifications systematically  Support conditional maintenance  Monitor breakers and relay performance  Pinpoint abnormal events : e.g late tripping  Record correct operation to postpone maintenance, if unnecessary DST = Real-time & Automated Fault Location, Asset Operational Monitoring, PQ, WAM
  • 10. Legacy from Existing Environment 10 Meters DPR/DFR PMU SAS Dispatching (fault location) Asset management Maintenance Power Quality Substation Information Data An Integrated Decision Support Tool, IVPower takes into account existing systems and leverages their data
  • 11. How IVPower fits Customer’s Network Architecture 11
  • 12. Power Grid Monitoring 12  1. Real Time Supervision • Goal: quickly & reliably identify faulty scenario  Deploy Emergency crew in a targeted small area  Reduce outage time  2. Post-mortem Analysis • Goal: improve efficiency and system quality  Fault analysis & characterization – type, duration, fault impedance, distance  Voltage Quality and Stability – power quality  Asset mulfunctioning with root cause analysis  Data archival for statistical analysis  Frequency Stability - Wide Area Monitoring 1 Platform : 2 Types of Monitoring, 2 Systems…
  • 13. Automated Fault Analysis 13  Use of oscillographic records (COMTRADE format)  Time saving: automatic collection and classification of various event-related following any disturbance.  Fast indication (within a few minutes) of healthy / faulty lines  Fast indication of accurate and reliable fault location to optimize crew interventions:  Presentation of the sequence of events, measurements and key performance indicators to facilitate and speed up the post mortem analysis  Providing of fault statistics regarding lines, transformers, breakers and protection devices. Main Benefits Boasts productivity of both dispatching crews and post-mortem analysts
  • 14. Automated Fault Analysis 14  Fault position in km from substation  Fault accuracy: 5% of line length, (98% prob.)  Geographical view with the fault position  Graphical representation of the fault  Red rectangle : tolerance zone Geo-located indication of the fault position
  • 15. Automated Fault Analysis 15  L1-G short circuit on line Klm-WOL 536  The short circuit is located at 4.77 km [Mast356;Mast355] +/- 1.27 km from station Wolmirstedt  Line Klm-Wol 536 is surely faulty  L1-G short circuit on line Eu-Wd 208  The short circuit is located at 62.35 km [Mast181;Mast182] +/- 3.36 km from station Eula  Line EU-WD is surely faulty Manual reclosing suggestion According to the analyzed elements, IVPower suggests to reclose the line manually According to the analyzed elements, IVPower suggests NOT to reclose the line manually
  • 16. Automated Fault Analysis 16  Presented in a relative time scale  The time origin : start of fault  Located faults and relay trips shown by default  Additionally, feeder, station binary signals or additional (secondary) fault locations may be added to the event timeline Sequence of fault event
  • 17. Protection Performance Monitoring 17  Detection of latent defects in the protection system  Every disturbance event will trigger an automated performance analysis of the concerned IED  Maintenance inspections planned according to IED performances, not time Main Benefits
  • 18. Protection Performance Monitoring 18  Selection of the device type: relays, CB’s  Upon every disturbance event is an automated performance test for concerned IED’s and CB’s  Statistical data can be linked to external data historian systems  Custom protection monitoring rules can be added through a development environment Asset Management : Protection statistics
  • 20. Thank-you Les Peyrons – 05400 VEYNES Phone. +33 4 92 57 12 12 www.ivpower.com Contact

Notas do Editor

  1. Columns show: -Latest observed behavior during an event, corresponding to a binary signal transition from the device -Device ID -Bay on which the device is installed -Number of observations -Percentage of correct behaviors -Number of correct behaviors