IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE)
e-ISSN: 2278-1684,p-ISSN: 2320-334X, Volume 12, Issue 1 Ver. IV (Jan- Feb. 2015), PP 45-51
www.iosrjournals.org
DOI: 10.9790/1684-12144551 www.iosrjournals.org 45 | Page
“Productivity Improvement by Using Quality Control Tools – A
Case Study of Chartered Rubber Products”
Mayank Dev Singh1
, Swati Singh2
, Laiju Philipose3
, Patel Akshit4
,
Patel Juned5
, Chauhan Ajazahemad6
1, 2
(Assistant Professor, Department of Mechanical Engineering, SIE College, Vadodara, Gujarat, India)
3, 4, 5, 6
(UG Students, Department of Mechanical Engineering, SIE College, Vadodara, Gujarat, India)
Abstract: Small – scale industries are the foundational pillars of Indian economy. Here we are doing a case
study on Chartered rubber product to improve its productivity. They are following various orthodox customs,
improper utilization of available space & inaccurate arrangement of machineries with respect to one another.
Hence they are taking a lot of time for undertaking various tasks, and also more human effort is required. Thus
with the help of SLP technique & with the help of various quality control tools, the non-value adding activities
are eliminated. Thus the Productivity has been increased with reduced human efforts & employees work
satisfaction.
Keywords: Systematic Layout Planning, Plant Layout, Productivity Improvement
I. Introduction
During the ancient times Wooden Wheels were used for animal carts for transportation, but due to its
limitation, it undergone through various changes. The outer ring of the wheel provides attire (dressing) to the
wheel of vehicle, to provide wear – resistance surface on the periphery of the wheels, thus from the word attire
the word tire was developed & it was used to represent the metal band used to dress wheels. In 1835 Charles
good year & Dietz were the first to patent a rubber cushioned tire or a rubber cushion applied to an iron tire or
rim. An Irishman named as John Dunlop also made an automobile pneumatic tire in 1839 for his son, as he used
to have severe headaches while riding bicycles in irregular road surface, but was not of practical use due its
limitations, so his patent was declared as invalid. R.W Thomson, a Scottish civil engineer had made the
pneumatic tires in the year 1845 for his horse driven carriage. Tread is the outer most portions or the top most
portion of a tire, which makes direct contact with the road surface. While manufacturing a rubber tire about ¾ of
the cost is incurred in manufacturing its casing, while about ¼ manufacturing its cost depends on thread of
rubber tire. When a vehicle use the same tire for a long distance & for a long duration of time, its tread gets wear
out, hence it will not be safe to use it, hence it should be replaced. It is not economical to replace old worn out
tire with new tire but by re-treading a new life can be given to the old tire at about 20 % of the cost of the
entirely new tire& also save about 90% of material required for manufacturing a new tire. The current
generation tires can last up to 600000 miles, if they are re-treaded 2 to 3 times.
Small – scale industries are the foundational pillars of Indian economy. Here we are doing a case study
on Chartered rubber product to improve its productivity. They are following various orthodox customs,
improper utilization of available space & inaccurate arrangement of machineries with respect to one another.
Hence they are taking a lot of time for undertaking various tasks, and also more human effort is required. Thus
with the help of SLP technique & with the help of various quality control tools, the non-value adding activities
are eliminated. Thus the Productivity has been increased with reduced human efforts & employees work
satisfaction.
II. Literature Review
Wiyaratn et al (2010), in their paper “Improvement Plant Layout Using Systematic Layout Planning for
Increased Productivity”, have studied about the amount of equipment’s and tools in an iron production. Authors
have stated that, this is a method which shows step- by-step process of plant design from input data and
activities to evaluation of plant layout. The authors also have stated that with the help of SLP new layout can be
designed, which improves the flow of processes with new plant layout and helps to increase productivity in
industries [1]. Shewale et al (2012), in their paper “Improvement in plant layout using Systematic layout
planning for increased productivity”, have studied on the amount of equipment’s and tools in compressor
production & stated that with the help of SLP, the distances travelled between various stations can be reduced
and the new layout will decrease the flow of material and hence resulting in reduction in waste and increased
production [2]. Mahendra Singh (2012), in his paper “Innovative practices in Facility layout planning”, have
studied on various types of basic Facility layout and advanced facility layouts. Their study was also aimed on
“Productivity Improvement By Using Quality Control Tools – A Case Study On Chartered ….
DOI: 10.9790/1684-12144551 www.iosrjournals.org 46 | Page
the application of innovative practices in Facility layout planning. He stated that SLP can be an effective stage
for playing out the services to customers [3]. Subodh et al (2014), in their paper “Productivity Improvement in
plant by using Systematic layout planning (SLP) – a case study of medium scale industry, have discussed about
the problems faced by a medium scale auto ancillary company & also stated that the material handling time,
labor cost, transportation cost etc. can be successfully minimized by SLP technique [4].
III. Problem Identification
3.1 Flow of Material
In chartered rubber products, long distances (162.4ft) are required to be covered for handling of semi-finished
product from cooling tank to hydraulic press. Hence lot of time is being wasted.
3.2 Poor Storage Facility
Chartered rubber products are not utilizing their plant to its full potential in an optimum way. The raw- material
is stored in the plant in an unplanned manner. The raw-materials are also stored in the area allocated for
packaging.
Fig 1 Poor Raw Material Storage
IV. Data Collection
4.1 Manufacturing Sequence:
Chartered rubber products are basically manufacturing two types of tread rubber. They are producing 1) Cold or
Conventional Tread Rubber 2) Pre-cured Hot Tread Rubber in the same layout.
4.1.1 Conventional Process:
The following are the material flow pattern at Chartered Rubber Products for producing hot cured or
conventional tread rubber.
Fig 2.Material Flow of Hot or Conventional Tread Process
The following are the sequence followed by the Chartered Rubber Products for producing hot tread
rubber. The Raw materials such as natural rubber, synthetic rubber, wax etc. & chemicals such as carbon black,
sulphur etc. is weighed in weighing machine. After weighing the above mentioned materials are brought to the
mixing mill. About 40 minutes, the compounds are processed in mixing mill & a sheet is prepared. This
prepared sheet is now brought to the extruder, & is fed to the mouth of extruder by one operator, while one
operator would check the size & thickness of the extruded rubber. Now extruded rubber is cooled in the cooling
tank for sometimes & then brought to the roller press. At the same time the rubber sheet is also fed to the
calendars assembly, where it is stretched to require shape & size to form rubber cushion. This Rubber cushion is
fed to the roller press & thus both the extruder rubber & cushioned rubber are sandwiched together to form hot
rubber. This hot rubber after passing through the conveyor is rolled manually by one employee. This rolled
rubber is packed by one operator for transportation.
“Productivity Improvement By Using Quality Control Tools – A Case Study On Chartered ….
DOI: 10.9790/1684-12144551 www.iosrjournals.org 47 | Page
Fig 3 Manufacturing Sequence for Hot or Conventional Tread Rubber
4.1.2 Pre-cured Process
The following are the material flow pattern at Chartered Rubber Products for producing pre-cured tread rubber.
Fig 4.Material Flow of Cold or Pre-cured Tread Process
About 40 minutes, the compounds are processed in mixing mill & a sheet is prepared .This prepared
sheet is now brought to the extruder, & is fed to the mouth of extruder by one operator, while one operator
would check the size & thickness of the extruded rubber. Now extruded rubber is cooled in the cooling tank for
sometimes & now this extruded rubber is brought to the hydraulic press. In hydraulic press, with the help of
dyes of different patterns, size, & shapes tread pattern is prepared over the extruded rubber. This final product is
brought to the plant for final packing & is packed by one operator for transportation.
Fig 5 Manufacturing Sequence for Cold or Pre-cured Tread Rubber
“Productivity Improvement By Using Quality Control Tools – A Case Study On Chartered ….
DOI: 10.9790/1684-12144551 www.iosrjournals.org 48 | Page
Thus based on the manufacturing sequence & material flow, the operations & current locations of
machineries with respect to each other & their inter-dependency can be well understood.
4.2 Existing Plant Layout
Fig 6 Existing Plant Layout of C.R.P at G.I.D.C
4.3 Relationship Between Equipment Size And Area
Table: 1 Relationship between Equipment’s Sizes and Area
V. Data Analysis & Proposed Solution
5.1 Relationship Chart:
A relationship chart is a chart which shows the relationship between each department. Thus with the
help of relationship chart, one could easily find out the inter-departmental importance & it’s relationship. Hence
relationship chart helps to design a new optimum layout by considering the inter–dependency & inter-
relationship between various departments. Here we have made two relationship charts, one each for cold process
& hot process.
5.1.1 Relationship Chart For Cold Process
EQUIPMENT NO OF EQUIPMENT EQUIPMENT
AREA IN SQ.FT
Mixing mill 1 14.10*3.5
Extruder 1 10.6*6.6
Cooling tank 1 30.2*3.6
Roller Press 1 1*1.5
Calendar machine 1 3.6*5
Rollers 1 5*6
Belt conveyors 2 9.6*2
Hydraulic press 1 3*13
Boiler 1 8*21.1
“Productivity Improvement By Using Quality Control Tools – A Case Study On Chartered ….
DOI: 10.9790/1684-12144551 www.iosrjournals.org 49 | Page
Fig 7 Relationship Chart For Cold Process
5.1.2 Relationship Chart For Cold Process
Fig 8 Relationship Chart For Hot Process
5.2.1 Flow Process Chart for Cold Tread Process
Fig 9 Outline Process Chart for Cold Tread Rubber
5.2.2 Flow Process Chart for Hot Tread Process
Fig 10 Outline Process Chart for Hot Tread Rubber
“Productivity Improvement By Using Quality Control Tools – A Case Study On Chartered ….
DOI: 10.9790/1684-12144551 www.iosrjournals.org 50 | Page
5.3 Distance Travelled Between Operations
Table: 2 Distance Travelled By Components in Present Layout
5.4 Solution Based On SLP
Based on SLP, the relationship chart has been constructed and on the basis of the chart, the relationship
between equipment has been identified & on that basis a new plant layout has been constructed. The new –
layout is as shown in the figure11 given below.
Fig 11 New Layout
5.5 Total Distance Travelled In New Plant Layout
The table shown below indicates the total distance travelled in the work station.
Table: 3 Distances Travelled By Components in New Layout
FROM TO DISTANCE
Raw-material Mixing mill 40.4ft.
Mixing mill Extruder 16.3ft.
Extruder Water tank 0
Water tank Hydraulic press 33ft.
Mixing mill Calendar assembly 18ft.
Calendar assembly Roller Press 16ft.
FROM TO DISTANCE
Raw-material Mixing mill 60ft.
Mixing mill Extruder 37.4ft.
Extruder Water tank 0
Water tank Hydraulic press 162.4ft.
Mixing mill Calendar assembly 26.3ft.
Calendar assembly Roller Press 22.9ft.
“Productivity Improvement By Using Quality Control Tools – A Case Study On Chartered ….
DOI: 10.9790/1684-12144551 www.iosrjournals.org 51 | Page
5.6 Comparison of Distance Travelled
Table: 4 Comparison of Distance Travelled
From To Distance
Travelled In New
Layout
Distance Travelled
In Old Layout
Difference
Raw-material Mixing mill 40.4ft. 60ft. 19.6ft.
Mixing mill Extruder 16.3ft. 37.4ft. 21.1ft
Extruder Water tank 0 0 0
Water tank Hydraulic press 33ft. 162.4ft 129.4ft.
Mixing mill Calendar
assembly
18ft. 26.3ft. 8.3ft.
Calendar
assembly
Roller Press 16ft. 22.9ft. 6.9ft.
TOTAL 123.7ft. 309ft. 185.3ft
VI. Conclusion
Here on the basis of SLP we have studied & analysed the layout & working process of Chartered
Rubber Products. We have identified the degree of necessity of placing the equipment close to each other with
the help of SLP. We tried to eliminate the wasteful elements from the plant & on the basis of SLP we have
designed a new plant layout. The new layout on the basis of SLP reduces about 185.3ft of the distance travelled
during the entire manufacturing process. Hence the entire manufacturing time gets reduced. Thus the over-all
productivity of the Chartered rubber gets increased.
References:
[1]. W. Wiyaratn, and A. Watanapa, Improvement Plant Layout Using Systematic Layout Planning (SLP) for Increased Productivity,
International Scholarly and Scientific Research & Innovation, Volume 4, Dec 2010, pg.309-313.
[2]. Pramod P. Shewale, Manmath S. Shete, Prof. Dr. S. M. Sane, Improvement in Plant layout using Systematic Layout Planning(SLP)
for Increased Productivity, International Journal of Advanced Engineering Research and Studies, Volume1, Issue 3, April-June,
2012,pg.259-261.
[3]. Mahendra Singh, Innovative Practices in Facility Layout Planning, International Journal of Marketing, Financial Services &
Management Research, Volume1, Issue 12, December 2012 pg.127-139.
[4]. Subodh B Patil, S.S.Kuber, Productivity Improvement in plant by using Systematic Layout Planning(SLP) – a case study of
Medium scale Industry, International Journal of Research in Engineering and Technology, Volume 3 Issue 4, Apr-2014, pg.770-
775.
[5]. http://www.atmaindia.org/Redreading.htm, accessed on 06/02/15.
[6]. http://en.wikipedia.org/wiki/Retread, accessed on 06/02/15.
[7]. http://en.wikipedia.org/wiki/Tire, accessed on 06/02/2015.

Mais conteúdo relacionado

Mais procurados

IRJET- Effect of Partial Replacement of Coarse Aggregate and Fine Aggregate b...
IRJET- Effect of Partial Replacement of Coarse Aggregate and Fine Aggregate b...IRJET- Effect of Partial Replacement of Coarse Aggregate and Fine Aggregate b...
IRJET- Effect of Partial Replacement of Coarse Aggregate and Fine Aggregate b...IRJET Journal
 
Superfine Vertical Mill, superfine powder large-scale producing
Superfine Vertical Mill, superfine powder large-scale producingSuperfine Vertical Mill, superfine powder large-scale producing
Superfine Vertical Mill, superfine powder large-scale producingGrinding Mill
 
Industrial Process Analysis and Recommendation for Goodwill Los Angeles - Ind...
Industrial Process Analysis and Recommendation for Goodwill Los Angeles - Ind...Industrial Process Analysis and Recommendation for Goodwill Los Angeles - Ind...
Industrial Process Analysis and Recommendation for Goodwill Los Angeles - Ind...Cole S. Grundstedt MBA, PMP®
 
Project report on just in time production
Project report on just in time productionProject report on just in time production
Project report on just in time productionProjects Kart
 
Through Lean Manufacturing Techniques Improvement InProduction of Cement Plant
Through Lean Manufacturing Techniques Improvement InProduction of Cement PlantThrough Lean Manufacturing Techniques Improvement InProduction of Cement Plant
Through Lean Manufacturing Techniques Improvement InProduction of Cement PlantIJERA Editor
 
Organisation study at BILVA MOULDS PVT LTD
Organisation study at BILVA MOULDS PVT LTDOrganisation study at BILVA MOULDS PVT LTD
Organisation study at BILVA MOULDS PVT LTDRahul G
 
Ways to Optimize Ribbon Blender Efficiency, PBE Jan 2008
Ways to Optimize Ribbon Blender Efficiency, PBE Jan 2008Ways to Optimize Ribbon Blender Efficiency, PBE Jan 2008
Ways to Optimize Ribbon Blender Efficiency, PBE Jan 2008Warren Ang
 
Rohit kumar high resume
Rohit kumar high resumeRohit kumar high resume
Rohit kumar high resumerohit kumar
 

Mais procurados (14)

IRJET- Effect of Partial Replacement of Coarse Aggregate and Fine Aggregate b...
IRJET- Effect of Partial Replacement of Coarse Aggregate and Fine Aggregate b...IRJET- Effect of Partial Replacement of Coarse Aggregate and Fine Aggregate b...
IRJET- Effect of Partial Replacement of Coarse Aggregate and Fine Aggregate b...
 
Superfine Vertical Mill, superfine powder large-scale producing
Superfine Vertical Mill, superfine powder large-scale producingSuperfine Vertical Mill, superfine powder large-scale producing
Superfine Vertical Mill, superfine powder large-scale producing
 
Industrial Process Analysis and Recommendation for Goodwill Los Angeles - Ind...
Industrial Process Analysis and Recommendation for Goodwill Los Angeles - Ind...Industrial Process Analysis and Recommendation for Goodwill Los Angeles - Ind...
Industrial Process Analysis and Recommendation for Goodwill Los Angeles - Ind...
 
Project report on just in time production
Project report on just in time productionProject report on just in time production
Project report on just in time production
 
Fab india
Fab indiaFab india
Fab india
 
Through Lean Manufacturing Techniques Improvement InProduction of Cement Plant
Through Lean Manufacturing Techniques Improvement InProduction of Cement PlantThrough Lean Manufacturing Techniques Improvement InProduction of Cement Plant
Through Lean Manufacturing Techniques Improvement InProduction of Cement Plant
 
Organisation study at BILVA MOULDS PVT LTD
Organisation study at BILVA MOULDS PVT LTDOrganisation study at BILVA MOULDS PVT LTD
Organisation study at BILVA MOULDS PVT LTD
 
Cipet Profile
Cipet ProfileCipet Profile
Cipet Profile
 
3M
3M3M
3M
 
3 m
3 m3 m
3 m
 
Knowledge Management
Knowledge Management Knowledge Management
Knowledge Management
 
Ways to Optimize Ribbon Blender Efficiency, PBE Jan 2008
Ways to Optimize Ribbon Blender Efficiency, PBE Jan 2008Ways to Optimize Ribbon Blender Efficiency, PBE Jan 2008
Ways to Optimize Ribbon Blender Efficiency, PBE Jan 2008
 
Dvidson hienergy-90
Dvidson hienergy-90Dvidson hienergy-90
Dvidson hienergy-90
 
Rohit kumar high resume
Rohit kumar high resumeRohit kumar high resume
Rohit kumar high resume
 

Semelhante a “Productivity Improvement by Using Quality Control Tools – A Case Study of Chartered Rubber Products”

A literature review on life cycle analysis of tyre retreading
A literature review on life cycle analysis of tyre retreadingA literature review on life cycle analysis of tyre retreading
A literature review on life cycle analysis of tyre retreadingijsrd.com
 
IRJET- Reduction of Man Power, Cost and Power Consumption in Grits Plant
IRJET- Reduction of Man Power, Cost and Power Consumption in Grits PlantIRJET- Reduction of Man Power, Cost and Power Consumption in Grits Plant
IRJET- Reduction of Man Power, Cost and Power Consumption in Grits PlantIRJET Journal
 
Multidisciplinary Engineering Innovations: From Conveyors to Propulsion to Su...
Multidisciplinary Engineering Innovations: From Conveyors to Propulsion to Su...Multidisciplinary Engineering Innovations: From Conveyors to Propulsion to Su...
Multidisciplinary Engineering Innovations: From Conveyors to Propulsion to Su...IRJET Journal
 
applicationof vsm
applicationof vsmapplicationof vsm
applicationof vsmAro Ephrem
 
Recycling of Asphalt Pavements
Recycling of Asphalt PavementsRecycling of Asphalt Pavements
Recycling of Asphalt PavementsIRJET Journal
 
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...IRJET Journal
 
Conceptual design of transfer mould tool for rubber bumper spring
Conceptual design of transfer mould tool for rubber bumper springConceptual design of transfer mould tool for rubber bumper spring
Conceptual design of transfer mould tool for rubber bumper springeSAT Publishing House
 
IMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDY
IMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDYIMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDY
IMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDYIAEME Publication
 
IRJET- Review on Design and Fabrication of Coating Powder Filtration Machine
IRJET- Review on Design and Fabrication of Coating Powder Filtration MachineIRJET- Review on Design and Fabrication of Coating Powder Filtration Machine
IRJET- Review on Design and Fabrication of Coating Powder Filtration MachineIRJET Journal
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET Journal
 
Reducing Manufacturing Cost through Value Stream Mapping
Reducing Manufacturing Cost through Value Stream MappingReducing Manufacturing Cost through Value Stream Mapping
Reducing Manufacturing Cost through Value Stream MappingEditor IJCATR
 
IRJET - Durability of Potholes Filled with Waste Materials
IRJET - Durability of Potholes Filled with Waste MaterialsIRJET - Durability of Potholes Filled with Waste Materials
IRJET - Durability of Potholes Filled with Waste MaterialsIRJET Journal
 
Design and Development of Valve Lapping Machine
Design and Development of Valve Lapping MachineDesign and Development of Valve Lapping Machine
Design and Development of Valve Lapping MachineIRJET Journal
 
Multiple Applications Rubber Tiles & Their Composite Materials Formulations U...
Multiple Applications Rubber Tiles & Their Composite Materials Formulations U...Multiple Applications Rubber Tiles & Their Composite Materials Formulations U...
Multiple Applications Rubber Tiles & Their Composite Materials Formulations U...IRJET Journal
 
Multiple Applications Rubber Tiles & Their Composite Materials Formulations U...
Multiple Applications Rubber Tiles & Their Composite Materials Formulations U...Multiple Applications Rubber Tiles & Their Composite Materials Formulations U...
Multiple Applications Rubber Tiles & Their Composite Materials Formulations U...IRJET Journal
 
Design and Fabrication of Pneumatic Bar Bending Machine
Design and Fabrication of Pneumatic Bar Bending MachineDesign and Fabrication of Pneumatic Bar Bending Machine
Design and Fabrication of Pneumatic Bar Bending MachineIRJET Journal
 
IRJET- Design and Analysis of Brake Lining of Commercial Car
IRJET- Design and Analysis of Brake Lining of Commercial CarIRJET- Design and Analysis of Brake Lining of Commercial Car
IRJET- Design and Analysis of Brake Lining of Commercial CarIRJET Journal
 

Semelhante a “Productivity Improvement by Using Quality Control Tools – A Case Study of Chartered Rubber Products” (20)

A literature review on life cycle analysis of tyre retreading
A literature review on life cycle analysis of tyre retreadingA literature review on life cycle analysis of tyre retreading
A literature review on life cycle analysis of tyre retreading
 
IRJET- Reduction of Man Power, Cost and Power Consumption in Grits Plant
IRJET- Reduction of Man Power, Cost and Power Consumption in Grits PlantIRJET- Reduction of Man Power, Cost and Power Consumption in Grits Plant
IRJET- Reduction of Man Power, Cost and Power Consumption in Grits Plant
 
Ijmet 06 09_011
Ijmet 06 09_011Ijmet 06 09_011
Ijmet 06 09_011
 
Multidisciplinary Engineering Innovations: From Conveyors to Propulsion to Su...
Multidisciplinary Engineering Innovations: From Conveyors to Propulsion to Su...Multidisciplinary Engineering Innovations: From Conveyors to Propulsion to Su...
Multidisciplinary Engineering Innovations: From Conveyors to Propulsion to Su...
 
applicationof vsm
applicationof vsmapplicationof vsm
applicationof vsm
 
Recycling of Asphalt Pavements
Recycling of Asphalt PavementsRecycling of Asphalt Pavements
Recycling of Asphalt Pavements
 
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...IRJET- 	  Planning and Selection of Heavy Construction Equipments in Civil En...
IRJET- Planning and Selection of Heavy Construction Equipments in Civil En...
 
Conceptual design of transfer mould tool for rubber bumper spring
Conceptual design of transfer mould tool for rubber bumper springConceptual design of transfer mould tool for rubber bumper spring
Conceptual design of transfer mould tool for rubber bumper spring
 
IMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDY
IMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDYIMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDY
IMPROVEMENT IN PROCESS INDUSTRIES BY USING WORK STUDY METHODS: A CASE STUDY
 
IRJET- Review on Design and Fabrication of Coating Powder Filtration Machine
IRJET- Review on Design and Fabrication of Coating Powder Filtration MachineIRJET- Review on Design and Fabrication of Coating Powder Filtration Machine
IRJET- Review on Design and Fabrication of Coating Powder Filtration Machine
 
Plant Layout
Plant LayoutPlant Layout
Plant Layout
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
 
Puro water plant
Puro water plantPuro water plant
Puro water plant
 
Reducing Manufacturing Cost through Value Stream Mapping
Reducing Manufacturing Cost through Value Stream MappingReducing Manufacturing Cost through Value Stream Mapping
Reducing Manufacturing Cost through Value Stream Mapping
 
IRJET - Durability of Potholes Filled with Waste Materials
IRJET - Durability of Potholes Filled with Waste MaterialsIRJET - Durability of Potholes Filled with Waste Materials
IRJET - Durability of Potholes Filled with Waste Materials
 
Design and Development of Valve Lapping Machine
Design and Development of Valve Lapping MachineDesign and Development of Valve Lapping Machine
Design and Development of Valve Lapping Machine
 
Multiple Applications Rubber Tiles & Their Composite Materials Formulations U...
Multiple Applications Rubber Tiles & Their Composite Materials Formulations U...Multiple Applications Rubber Tiles & Their Composite Materials Formulations U...
Multiple Applications Rubber Tiles & Their Composite Materials Formulations U...
 
Multiple Applications Rubber Tiles & Their Composite Materials Formulations U...
Multiple Applications Rubber Tiles & Their Composite Materials Formulations U...Multiple Applications Rubber Tiles & Their Composite Materials Formulations U...
Multiple Applications Rubber Tiles & Their Composite Materials Formulations U...
 
Design and Fabrication of Pneumatic Bar Bending Machine
Design and Fabrication of Pneumatic Bar Bending MachineDesign and Fabrication of Pneumatic Bar Bending Machine
Design and Fabrication of Pneumatic Bar Bending Machine
 
IRJET- Design and Analysis of Brake Lining of Commercial Car
IRJET- Design and Analysis of Brake Lining of Commercial CarIRJET- Design and Analysis of Brake Lining of Commercial Car
IRJET- Design and Analysis of Brake Lining of Commercial Car
 

Mais de IOSR Journals (20)

A011140104
A011140104A011140104
A011140104
 
M0111397100
M0111397100M0111397100
M0111397100
 
L011138596
L011138596L011138596
L011138596
 
K011138084
K011138084K011138084
K011138084
 
J011137479
J011137479J011137479
J011137479
 
I011136673
I011136673I011136673
I011136673
 
G011134454
G011134454G011134454
G011134454
 
H011135565
H011135565H011135565
H011135565
 
F011134043
F011134043F011134043
F011134043
 
E011133639
E011133639E011133639
E011133639
 
D011132635
D011132635D011132635
D011132635
 
C011131925
C011131925C011131925
C011131925
 
B011130918
B011130918B011130918
B011130918
 
A011130108
A011130108A011130108
A011130108
 
I011125160
I011125160I011125160
I011125160
 
H011124050
H011124050H011124050
H011124050
 
G011123539
G011123539G011123539
G011123539
 
F011123134
F011123134F011123134
F011123134
 
E011122530
E011122530E011122530
E011122530
 
D011121524
D011121524D011121524
D011121524
 

Último

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 

Último (20)

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 

“Productivity Improvement by Using Quality Control Tools – A Case Study of Chartered Rubber Products”

  • 1. IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-ISSN: 2278-1684,p-ISSN: 2320-334X, Volume 12, Issue 1 Ver. IV (Jan- Feb. 2015), PP 45-51 www.iosrjournals.org DOI: 10.9790/1684-12144551 www.iosrjournals.org 45 | Page “Productivity Improvement by Using Quality Control Tools – A Case Study of Chartered Rubber Products” Mayank Dev Singh1 , Swati Singh2 , Laiju Philipose3 , Patel Akshit4 , Patel Juned5 , Chauhan Ajazahemad6 1, 2 (Assistant Professor, Department of Mechanical Engineering, SIE College, Vadodara, Gujarat, India) 3, 4, 5, 6 (UG Students, Department of Mechanical Engineering, SIE College, Vadodara, Gujarat, India) Abstract: Small – scale industries are the foundational pillars of Indian economy. Here we are doing a case study on Chartered rubber product to improve its productivity. They are following various orthodox customs, improper utilization of available space & inaccurate arrangement of machineries with respect to one another. Hence they are taking a lot of time for undertaking various tasks, and also more human effort is required. Thus with the help of SLP technique & with the help of various quality control tools, the non-value adding activities are eliminated. Thus the Productivity has been increased with reduced human efforts & employees work satisfaction. Keywords: Systematic Layout Planning, Plant Layout, Productivity Improvement I. Introduction During the ancient times Wooden Wheels were used for animal carts for transportation, but due to its limitation, it undergone through various changes. The outer ring of the wheel provides attire (dressing) to the wheel of vehicle, to provide wear – resistance surface on the periphery of the wheels, thus from the word attire the word tire was developed & it was used to represent the metal band used to dress wheels. In 1835 Charles good year & Dietz were the first to patent a rubber cushioned tire or a rubber cushion applied to an iron tire or rim. An Irishman named as John Dunlop also made an automobile pneumatic tire in 1839 for his son, as he used to have severe headaches while riding bicycles in irregular road surface, but was not of practical use due its limitations, so his patent was declared as invalid. R.W Thomson, a Scottish civil engineer had made the pneumatic tires in the year 1845 for his horse driven carriage. Tread is the outer most portions or the top most portion of a tire, which makes direct contact with the road surface. While manufacturing a rubber tire about ¾ of the cost is incurred in manufacturing its casing, while about ¼ manufacturing its cost depends on thread of rubber tire. When a vehicle use the same tire for a long distance & for a long duration of time, its tread gets wear out, hence it will not be safe to use it, hence it should be replaced. It is not economical to replace old worn out tire with new tire but by re-treading a new life can be given to the old tire at about 20 % of the cost of the entirely new tire& also save about 90% of material required for manufacturing a new tire. The current generation tires can last up to 600000 miles, if they are re-treaded 2 to 3 times. Small – scale industries are the foundational pillars of Indian economy. Here we are doing a case study on Chartered rubber product to improve its productivity. They are following various orthodox customs, improper utilization of available space & inaccurate arrangement of machineries with respect to one another. Hence they are taking a lot of time for undertaking various tasks, and also more human effort is required. Thus with the help of SLP technique & with the help of various quality control tools, the non-value adding activities are eliminated. Thus the Productivity has been increased with reduced human efforts & employees work satisfaction. II. Literature Review Wiyaratn et al (2010), in their paper “Improvement Plant Layout Using Systematic Layout Planning for Increased Productivity”, have studied about the amount of equipment’s and tools in an iron production. Authors have stated that, this is a method which shows step- by-step process of plant design from input data and activities to evaluation of plant layout. The authors also have stated that with the help of SLP new layout can be designed, which improves the flow of processes with new plant layout and helps to increase productivity in industries [1]. Shewale et al (2012), in their paper “Improvement in plant layout using Systematic layout planning for increased productivity”, have studied on the amount of equipment’s and tools in compressor production & stated that with the help of SLP, the distances travelled between various stations can be reduced and the new layout will decrease the flow of material and hence resulting in reduction in waste and increased production [2]. Mahendra Singh (2012), in his paper “Innovative practices in Facility layout planning”, have studied on various types of basic Facility layout and advanced facility layouts. Their study was also aimed on
  • 2. “Productivity Improvement By Using Quality Control Tools – A Case Study On Chartered …. DOI: 10.9790/1684-12144551 www.iosrjournals.org 46 | Page the application of innovative practices in Facility layout planning. He stated that SLP can be an effective stage for playing out the services to customers [3]. Subodh et al (2014), in their paper “Productivity Improvement in plant by using Systematic layout planning (SLP) – a case study of medium scale industry, have discussed about the problems faced by a medium scale auto ancillary company & also stated that the material handling time, labor cost, transportation cost etc. can be successfully minimized by SLP technique [4]. III. Problem Identification 3.1 Flow of Material In chartered rubber products, long distances (162.4ft) are required to be covered for handling of semi-finished product from cooling tank to hydraulic press. Hence lot of time is being wasted. 3.2 Poor Storage Facility Chartered rubber products are not utilizing their plant to its full potential in an optimum way. The raw- material is stored in the plant in an unplanned manner. The raw-materials are also stored in the area allocated for packaging. Fig 1 Poor Raw Material Storage IV. Data Collection 4.1 Manufacturing Sequence: Chartered rubber products are basically manufacturing two types of tread rubber. They are producing 1) Cold or Conventional Tread Rubber 2) Pre-cured Hot Tread Rubber in the same layout. 4.1.1 Conventional Process: The following are the material flow pattern at Chartered Rubber Products for producing hot cured or conventional tread rubber. Fig 2.Material Flow of Hot or Conventional Tread Process The following are the sequence followed by the Chartered Rubber Products for producing hot tread rubber. The Raw materials such as natural rubber, synthetic rubber, wax etc. & chemicals such as carbon black, sulphur etc. is weighed in weighing machine. After weighing the above mentioned materials are brought to the mixing mill. About 40 minutes, the compounds are processed in mixing mill & a sheet is prepared. This prepared sheet is now brought to the extruder, & is fed to the mouth of extruder by one operator, while one operator would check the size & thickness of the extruded rubber. Now extruded rubber is cooled in the cooling tank for sometimes & then brought to the roller press. At the same time the rubber sheet is also fed to the calendars assembly, where it is stretched to require shape & size to form rubber cushion. This Rubber cushion is fed to the roller press & thus both the extruder rubber & cushioned rubber are sandwiched together to form hot rubber. This hot rubber after passing through the conveyor is rolled manually by one employee. This rolled rubber is packed by one operator for transportation.
  • 3. “Productivity Improvement By Using Quality Control Tools – A Case Study On Chartered …. DOI: 10.9790/1684-12144551 www.iosrjournals.org 47 | Page Fig 3 Manufacturing Sequence for Hot or Conventional Tread Rubber 4.1.2 Pre-cured Process The following are the material flow pattern at Chartered Rubber Products for producing pre-cured tread rubber. Fig 4.Material Flow of Cold or Pre-cured Tread Process About 40 minutes, the compounds are processed in mixing mill & a sheet is prepared .This prepared sheet is now brought to the extruder, & is fed to the mouth of extruder by one operator, while one operator would check the size & thickness of the extruded rubber. Now extruded rubber is cooled in the cooling tank for sometimes & now this extruded rubber is brought to the hydraulic press. In hydraulic press, with the help of dyes of different patterns, size, & shapes tread pattern is prepared over the extruded rubber. This final product is brought to the plant for final packing & is packed by one operator for transportation. Fig 5 Manufacturing Sequence for Cold or Pre-cured Tread Rubber
  • 4. “Productivity Improvement By Using Quality Control Tools – A Case Study On Chartered …. DOI: 10.9790/1684-12144551 www.iosrjournals.org 48 | Page Thus based on the manufacturing sequence & material flow, the operations & current locations of machineries with respect to each other & their inter-dependency can be well understood. 4.2 Existing Plant Layout Fig 6 Existing Plant Layout of C.R.P at G.I.D.C 4.3 Relationship Between Equipment Size And Area Table: 1 Relationship between Equipment’s Sizes and Area V. Data Analysis & Proposed Solution 5.1 Relationship Chart: A relationship chart is a chart which shows the relationship between each department. Thus with the help of relationship chart, one could easily find out the inter-departmental importance & it’s relationship. Hence relationship chart helps to design a new optimum layout by considering the inter–dependency & inter- relationship between various departments. Here we have made two relationship charts, one each for cold process & hot process. 5.1.1 Relationship Chart For Cold Process EQUIPMENT NO OF EQUIPMENT EQUIPMENT AREA IN SQ.FT Mixing mill 1 14.10*3.5 Extruder 1 10.6*6.6 Cooling tank 1 30.2*3.6 Roller Press 1 1*1.5 Calendar machine 1 3.6*5 Rollers 1 5*6 Belt conveyors 2 9.6*2 Hydraulic press 1 3*13 Boiler 1 8*21.1
  • 5. “Productivity Improvement By Using Quality Control Tools – A Case Study On Chartered …. DOI: 10.9790/1684-12144551 www.iosrjournals.org 49 | Page Fig 7 Relationship Chart For Cold Process 5.1.2 Relationship Chart For Cold Process Fig 8 Relationship Chart For Hot Process 5.2.1 Flow Process Chart for Cold Tread Process Fig 9 Outline Process Chart for Cold Tread Rubber 5.2.2 Flow Process Chart for Hot Tread Process Fig 10 Outline Process Chart for Hot Tread Rubber
  • 6. “Productivity Improvement By Using Quality Control Tools – A Case Study On Chartered …. DOI: 10.9790/1684-12144551 www.iosrjournals.org 50 | Page 5.3 Distance Travelled Between Operations Table: 2 Distance Travelled By Components in Present Layout 5.4 Solution Based On SLP Based on SLP, the relationship chart has been constructed and on the basis of the chart, the relationship between equipment has been identified & on that basis a new plant layout has been constructed. The new – layout is as shown in the figure11 given below. Fig 11 New Layout 5.5 Total Distance Travelled In New Plant Layout The table shown below indicates the total distance travelled in the work station. Table: 3 Distances Travelled By Components in New Layout FROM TO DISTANCE Raw-material Mixing mill 40.4ft. Mixing mill Extruder 16.3ft. Extruder Water tank 0 Water tank Hydraulic press 33ft. Mixing mill Calendar assembly 18ft. Calendar assembly Roller Press 16ft. FROM TO DISTANCE Raw-material Mixing mill 60ft. Mixing mill Extruder 37.4ft. Extruder Water tank 0 Water tank Hydraulic press 162.4ft. Mixing mill Calendar assembly 26.3ft. Calendar assembly Roller Press 22.9ft.
  • 7. “Productivity Improvement By Using Quality Control Tools – A Case Study On Chartered …. DOI: 10.9790/1684-12144551 www.iosrjournals.org 51 | Page 5.6 Comparison of Distance Travelled Table: 4 Comparison of Distance Travelled From To Distance Travelled In New Layout Distance Travelled In Old Layout Difference Raw-material Mixing mill 40.4ft. 60ft. 19.6ft. Mixing mill Extruder 16.3ft. 37.4ft. 21.1ft Extruder Water tank 0 0 0 Water tank Hydraulic press 33ft. 162.4ft 129.4ft. Mixing mill Calendar assembly 18ft. 26.3ft. 8.3ft. Calendar assembly Roller Press 16ft. 22.9ft. 6.9ft. TOTAL 123.7ft. 309ft. 185.3ft VI. Conclusion Here on the basis of SLP we have studied & analysed the layout & working process of Chartered Rubber Products. We have identified the degree of necessity of placing the equipment close to each other with the help of SLP. We tried to eliminate the wasteful elements from the plant & on the basis of SLP we have designed a new plant layout. The new layout on the basis of SLP reduces about 185.3ft of the distance travelled during the entire manufacturing process. Hence the entire manufacturing time gets reduced. Thus the over-all productivity of the Chartered rubber gets increased. References: [1]. W. Wiyaratn, and A. Watanapa, Improvement Plant Layout Using Systematic Layout Planning (SLP) for Increased Productivity, International Scholarly and Scientific Research & Innovation, Volume 4, Dec 2010, pg.309-313. [2]. Pramod P. Shewale, Manmath S. Shete, Prof. Dr. S. M. Sane, Improvement in Plant layout using Systematic Layout Planning(SLP) for Increased Productivity, International Journal of Advanced Engineering Research and Studies, Volume1, Issue 3, April-June, 2012,pg.259-261. [3]. Mahendra Singh, Innovative Practices in Facility Layout Planning, International Journal of Marketing, Financial Services & Management Research, Volume1, Issue 12, December 2012 pg.127-139. [4]. Subodh B Patil, S.S.Kuber, Productivity Improvement in plant by using Systematic Layout Planning(SLP) – a case study of Medium scale Industry, International Journal of Research in Engineering and Technology, Volume 3 Issue 4, Apr-2014, pg.770- 775. [5]. http://www.atmaindia.org/Redreading.htm, accessed on 06/02/15. [6]. http://en.wikipedia.org/wiki/Retread, accessed on 06/02/15. [7]. http://en.wikipedia.org/wiki/Tire, accessed on 06/02/2015.