Purpose of ‘Introductory Metocean
Session’
• A brief overview of the full 3 day course
• An introduction to Metocean:
– learn about some of the key activities, products and services
– decide on the merits of different length courses
What is Metocean?
• Most offshore/nearshore activities affected by weather and sea conditions (meteorology and
oceanography = ‘Metocean’)
• Effective use of Metocean expertise, information and support throughout life cycle of a
development can improve planning, reduce costs and contribute to enhanced safety.
• The need for Metocean expertise was recognised in the oil and gas sector in the 1970’s;
setting up of dedicated Metocean departments in the major oil companies
• Physical parameters, e.g. winds, waves, currents, water levels, temps etc.
• does not cover biological and chemical oceanography
• BUT Metocean expertise is spread thinly and most companies involved in offshore activities
do not have dedicated staff
– heavy reliance on contractors
– NEED FOR INDIVIDUALS TO UNDERSTAND THE PRINCIPLES
•
Key Metocean
Activities
• Operations & Data Acquisition
– in-situ measurements
– spatial data (modelling/satellites)
– weather & ocean forecasting
• Data Management
– data QC/Archive
• Analyses & Reports
– standards, policies, processes
– operational stats
– design criteria
– expert advice
Metocean Services and Products – ‘Exploration’ Phase
• Initial Metocean briefing note (prior to award of licence block or sea area)
• Preliminary Metocean report (after licence has been awarded) includes:
– known conditions, available data, data collection requirements
– initial conservative operational statistics and design criteria
• Data is acquired through:
– measurements: sensor type, duration etc.
– consideration of modelling/hindcasts
• Weather forecasts
• Data QC/archive consideration
Metocean Services and Products – ‘Production’ Phase
• Continued data collection and modelling
• Metocean design criteria reports - ‘feasibility’ of initial design followed by ‘Final’
• Metocean equipment/sensors for new structure
• Tow-out and installation
– operational statistics and design criteria
– real-time data and weather forecasts
• Daily operations
– real-time data and weather forecasts
– final operational statistics
• weather downtime for maintenance, vessel ops, planning etc
• Regular 3-5 yearly updates of operational statistics and design criteria
Ethos of IMarEST 3-day Metocean
Awareness
Target Audience
The course is aimed at those who need a greater understanding of Metocean so that they can make
informed decisions
– Project Managers, Engineers, Drillers, new Metocean staff
Format
Course format is a mixture of short presentations by a range of expert speakers together with
exercises, interactive sessions and team-based case studies. Speakers are internationally
renowned Metocean experts from oil and gas companies, Metocean contractors and consultancies.
• Delegates receive a comprehensive course manual
• Prior Metocean knowledge is not essential
IMarEST 3 Day Metocean Course –
Key Sessions
• Offshore requirements for Metocean
• Metocean parameters and processes
• Data trends/Climate variability
• Data acquisition
• Metocean conditions around the world
• Weather forecasting
• Operational statistics
• Metocean design criteria
Importance of Getting Metocean ‘Right’
• Hurricane Katrina in the Gulf of Mexico
– equivalent to 50-100 year design criteria
– BUT criteria ‘too low’
– extensive damage: 47 platforms destroyed, 20 badly damaged
– insurance costs in the $billions
Importance of Getting ‘Metocean’ Right
• Pressure from end-users for a ’number’
• Lack of dialogue between information providers and end-users
– how many clients just accept whatever numbers are given
• Metocean expertise is not widespread so people don’t always use the best providers of
Metocean support
– know your contractors
• May lead to incorrect values with potential adverse consequences for safety and/or cost
– overly conservative design criteria = additional cost
– under-estimation of potential downtime = additional cost
Key Metocean Issues
• Terminology and expertise
• Data sources – what data is available?
– measured vs. model vs. satellite
– differences between sensors, differences between models
• Data amount/appropriateness – how much is needed? Impact of climate variability/trends
• Data QC/archive/management – looking after the data
• How to derive design criteria and understand their meaning (extreme value analysis and
probabilities)
• Operational statistics – what types?
• How to present data (and interpret it)
• Standards/key documents
• Offshore vs. nearshore
Metocean Expertise
• Oil and Gas companies
– majors only
• Renewables companies
– not enough, particularly in offshore wind
• Metocean contractors
– Integrated, weather forecasters, studies, modellers
• Metocean consultants
– generally ‘one-man bands’ (analysts/studies/modellers)
• Institutes/Academia
• Government
• Knowledge of capabilities, expertise, who to contact/use is important
UK H&E OIS Note – Role of a Metocean Advisor
Actions
21 HSE wishes to encourage duty holders to
pay appropriate attention to metocean
issues, bearing in mind the relevant
legislation and guidelines referred to in this
document. By so doing they can reduce the
risk to personnel and infrastructure while
offsetting the relatively minor costs against
potentially significant financial benefits that
will accrue in the short to medium term.
22 This note has provided an example of
good practice as to how these requirements
may be met through the role of a Metocean
Advisor. It will form the basis for part of the
inspection interventions carried out by HSE
inspectors.
Topics
Metocean process
Competency
Duties
Metocean Design Criteria & Operational Statistics
• 2 key sets of information required
– operational statistics ('typical', 'average' or 'normal' conditions)
– design criteria (extreme or 'survival' conditions)
• Deriving operational statistics is relatively straightforward; deriving design criteria is one of the most
challenging activities for Metocean engineers
• Important to appreciate we are analysing historical data
– operational statistics are summaries of past data ('facts')
– design criteria are derived from extrapolation of past data ('fiction')
• Significant difference between values for operational statistics (typical conditions) and design criteria
(extreme conditions)
Metocean Design Criteria 1
• A need to ensure that installations are optimally designed (balancing safety and cost issues)
– avoid under-design (impact on people, equipment & asset)
– avoid over-design (increased cost)
• Not designing for the worst foreseeable condition, rather a statistical or probability-based approach
– a 100 year return period value tends to be the default requirement
– the value that will be exceeded once on average during 100 years
– a 1% probability of being exceeded in any one year (10-2
)
• In order to derive meaningful design criteria, we need
– knowledge of the area or location, legislation and standards
– quality long term database(s) and appropriate analytical tools
– consideration of climate variability
– dialogue between the Metocean engineer and end-user
Metocean Design Criteria 2
• ‘End-users generally want a number’, e.g. the 100 year Hs
• BUT as part of the process of deriving the criteria, a wide range of extreme values can be generated.
Due to:
– data amount / availability / representativeness / quality
– different data types (measured vs. hindcast vs. satellite)
– different sensor types (buoys vs. radar)
– how data is extrapolated (EVA)
– people: ‘give the same dataset to 5 people and you can get 5 different answers’
• The challenge is to distil the diversity of extreme values into final design criteria and presentations
– a ‘journey’ from extreme values to design criteria
– needs expertise and experience as well as statistical knowledge
– engineering judgement plays a key role
Operational Statistics
• Weather-related downtime can significantly affect cost and schedule
• Appropriate statistics from long datasets can assist with
– safety, planning and execution of activities e.g. maintenance
– selection of suitable vessels
– estimating budgets
• Examples of what is needed
– how often is the Hs >2m in April?
– how many weather windows of Hs<2m for 3 days in September?
– how long will an activity take to complete if I start 1 May?
– what are dominant wind directions?
• Types of presentations and analyses
– min/mean/max tables
– percentage exceedance/percentiles
– persistence/duration stats and weather windows analysis
– wind roses
Climate Variability
Natural Variability
• Solar, earth's orbit, volcanoes
• Ocean heat cycles, eg
– El Nino/La Nina
– AMO (Atlantic Multi-decadal Oscillation)
– NAO (North Atlantic Oscillation)
High NAO index
More westerlies
More storms
Milder, wetter
Low NAO index
Less westerlies
Less storms
Colder
Metocean Standards
• ISO 19901-1 – Metocean Design and Operating Considerations
• Norsok N-002 – Collection of Metocean Data
• HSE RR392 – Wave Mapping in UK Waters
• OGP 447 – HSE Guidelines for Metocean and Arctic Surveys
• DNV OS J101 – Design of Offshore Wind Turbines
• Need to be careful using OTR 2001/010 Environmental Considerations
Example of an Integrated Approach for Metocean
Data
collection
Post-
storm
reports
Monthly
data QC
Daily checks
Of data
Forecast
verification
reports
Maintenance
reports
Gov't &
Institutes
Third party
transmission
access
Offshore
maintenance
visits
Metocean
database
Annual
data
reports
Pre-Storm
warningMet
Office
Data server
Metocean
library
Users
Survey
Contractor
Weather
Forecast
Contractor
Independent
Data QC
Contractor
Weather
Forecasts
website
Data
website
Users
Survey
& Data QC
contractors
Metocean
statistics
websites
Initial
pre QC
data
Studies
Contractor
Design
Criteria &
Ops Stats
Users
Booking a Course
Courses are available internationally. For more details on the course, please get in touch:
We can also offer bespoke Metocean training for organisations who would like a tailored Metocean
course programme.
Contact
E: stephen.bodie@imarest.org
T: +44 (0)20 7382 2652

Mais conteúdo relacionado

Mais procurados

Well logging and interpretation techniques asin b000bhl7ou
Well logging and interpretation techniques asin  b000bhl7ouWell logging and interpretation techniques asin  b000bhl7ou
Well logging and interpretation techniques asin b000bhl7ouAhmed Raafat
 
Seismic Surveying Presentation
Seismic Surveying PresentationSeismic Surveying Presentation
Seismic Surveying PresentationRakesh Kumar
 
Nick - Benefits of Using Combined Bathymetry and Side Scan Sonar in Shallow W...
Nick - Benefits of Using Combined Bathymetry and Side Scan Sonar in Shallow W...Nick - Benefits of Using Combined Bathymetry and Side Scan Sonar in Shallow W...
Nick - Benefits of Using Combined Bathymetry and Side Scan Sonar in Shallow W...Codevintec Italiana srl
 
Reservoir Modeling with Petrel
Reservoir Modeling with PetrelReservoir Modeling with Petrel
Reservoir Modeling with Petreladeeba setu
 
Tides and its significance
Tides and its significanceTides and its significance
Tides and its significancePramoda Raj
 
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedInOFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedInKhaled Sherif
 
Coastal Morphology
Coastal MorphologyCoastal Morphology
Coastal MorphologyJames Foster
 
Introduction to seismic interpretation
Introduction to seismic interpretationIntroduction to seismic interpretation
Introduction to seismic interpretationAmir I. Abdelaziz
 
What is the river discharge and what factors
What is the river discharge and what factorsWhat is the river discharge and what factors
What is the river discharge and what factorsMischa Knight
 
Reflection Seismology Overview
Reflection Seismology OverviewReflection Seismology Overview
Reflection Seismology OverviewAli Osman Öncel
 
Estmation of oil & gas proven probable posiible
Estmation of oil & gas proven probable posiibleEstmation of oil & gas proven probable posiible
Estmation of oil & gas proven probable posiibleNarendra Kumar Dewangan
 
4- Geophysics and exploration
4- Geophysics and exploration4- Geophysics and exploration
4- Geophysics and explorationElsayed Amer
 
Role of Geophysics in the Oil and Gas Industry
Role of Geophysics in the Oil and Gas IndustryRole of Geophysics in the Oil and Gas Industry
Role of Geophysics in the Oil and Gas IndustryMusisi Norbert
 
Seismic interpretation work flow final ppt
Seismic interpretation work flow final pptSeismic interpretation work flow final ppt
Seismic interpretation work flow final pptMuhammadJawwad28
 
Slope Monitoring Systems – Enhancing Geotechnology
Slope Monitoring Systems – Enhancing GeotechnologySlope Monitoring Systems – Enhancing Geotechnology
Slope Monitoring Systems – Enhancing GeotechnologyRussellCrue
 

Mais procurados (20)

Well logging and interpretation techniques asin b000bhl7ou
Well logging and interpretation techniques asin  b000bhl7ouWell logging and interpretation techniques asin  b000bhl7ou
Well logging and interpretation techniques asin b000bhl7ou
 
Seismic Surveying Presentation
Seismic Surveying PresentationSeismic Surveying Presentation
Seismic Surveying Presentation
 
Well logging
Well loggingWell logging
Well logging
 
Nick - Benefits of Using Combined Bathymetry and Side Scan Sonar in Shallow W...
Nick - Benefits of Using Combined Bathymetry and Side Scan Sonar in Shallow W...Nick - Benefits of Using Combined Bathymetry and Side Scan Sonar in Shallow W...
Nick - Benefits of Using Combined Bathymetry and Side Scan Sonar in Shallow W...
 
Reservoir Modeling with Petrel
Reservoir Modeling with PetrelReservoir Modeling with Petrel
Reservoir Modeling with Petrel
 
Tides and its significance
Tides and its significanceTides and its significance
Tides and its significance
 
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedInOFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
OFFSHORE OIL & GAS - SESSION 2 - REV 2 - LinkedIn
 
Principles of seismic data interpretation m.m.badawy
Principles of seismic data interpretation   m.m.badawyPrinciples of seismic data interpretation   m.m.badawy
Principles of seismic data interpretation m.m.badawy
 
Coastal Morphology
Coastal MorphologyCoastal Morphology
Coastal Morphology
 
Introduction to seismic interpretation
Introduction to seismic interpretationIntroduction to seismic interpretation
Introduction to seismic interpretation
 
Mineral exploration
Mineral explorationMineral exploration
Mineral exploration
 
What is the river discharge and what factors
What is the river discharge and what factorsWhat is the river discharge and what factors
What is the river discharge and what factors
 
Reflection Seismology Overview
Reflection Seismology OverviewReflection Seismology Overview
Reflection Seismology Overview
 
Estmation of oil & gas proven probable posiible
Estmation of oil & gas proven probable posiibleEstmation of oil & gas proven probable posiible
Estmation of oil & gas proven probable posiible
 
Ocean Waves.ppt
Ocean Waves.pptOcean Waves.ppt
Ocean Waves.ppt
 
4- Geophysics and exploration
4- Geophysics and exploration4- Geophysics and exploration
4- Geophysics and exploration
 
Role of Geophysics in the Oil and Gas Industry
Role of Geophysics in the Oil and Gas IndustryRole of Geophysics in the Oil and Gas Industry
Role of Geophysics in the Oil and Gas Industry
 
Physical Oceanography
Physical  OceanographyPhysical  Oceanography
Physical Oceanography
 
Seismic interpretation work flow final ppt
Seismic interpretation work flow final pptSeismic interpretation work flow final ppt
Seismic interpretation work flow final ppt
 
Slope Monitoring Systems – Enhancing Geotechnology
Slope Monitoring Systems – Enhancing GeotechnologySlope Monitoring Systems – Enhancing Geotechnology
Slope Monitoring Systems – Enhancing Geotechnology
 

Destaque

Fugro GEOS Introduction to McDermott 2009
Fugro GEOS Introduction to McDermott 2009Fugro GEOS Introduction to McDermott 2009
Fugro GEOS Introduction to McDermott 2009guestafa7cb26
 
Presentation_icetracking
Presentation_icetrackingPresentation_icetracking
Presentation_icetrackingKaren Kielblock
 
Response-based Metocean Criteria for OptimisingDesign and Operation of FPSOs
Response-based Metocean Criteria for OptimisingDesign and Operation of FPSOsResponse-based Metocean Criteria for OptimisingDesign and Operation of FPSOs
Response-based Metocean Criteria for OptimisingDesign and Operation of FPSOsFPSO Network
 
Api standards for safe offshore operations brochure
Api standards for safe offshore operations brochureApi standards for safe offshore operations brochure
Api standards for safe offshore operations brochuremarco garofanello
 
Career talk and presentation on marine engineering
Career talk and presentation on marine engineeringCareer talk and presentation on marine engineering
Career talk and presentation on marine engineeringfatima roshan
 
Marine electrical distribution system and control engineering
Marine electrical distribution system and control engineeringMarine electrical distribution system and control engineering
Marine electrical distribution system and control engineeringZeeshan Ahmed
 
1 introduction to shipping and marine engineering
1 introduction to shipping and marine engineering1 introduction to shipping and marine engineering
1 introduction to shipping and marine engineeringOlanrewaju O Sulaiman
 
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu sajiSHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu sajiJishnu Saji
 
Marine engineering i
Marine engineering iMarine engineering i
Marine engineering ialitaufiqh
 
Shipping ppt
Shipping pptShipping ppt
Shipping pptHamza Ali
 
Careers in Marine Engineering
Careers  in Marine EngineeringCareers  in Marine Engineering
Careers in Marine EngineeringShravan Shetty
 

Destaque (14)

Fugro GEOS Introduction to McDermott 2009
Fugro GEOS Introduction to McDermott 2009Fugro GEOS Introduction to McDermott 2009
Fugro GEOS Introduction to McDermott 2009
 
SubseaServices
SubseaServicesSubseaServices
SubseaServices
 
Presentation_icetracking
Presentation_icetrackingPresentation_icetracking
Presentation_icetracking
 
Response-based Metocean Criteria for OptimisingDesign and Operation of FPSOs
Response-based Metocean Criteria for OptimisingDesign and Operation of FPSOsResponse-based Metocean Criteria for OptimisingDesign and Operation of FPSOs
Response-based Metocean Criteria for OptimisingDesign and Operation of FPSOs
 
Api standards for safe offshore operations brochure
Api standards for safe offshore operations brochureApi standards for safe offshore operations brochure
Api standards for safe offshore operations brochure
 
Engineering design and construction of marine structures in Arctic
Engineering design and construction of marine structures in ArcticEngineering design and construction of marine structures in Arctic
Engineering design and construction of marine structures in Arctic
 
Career talk and presentation on marine engineering
Career talk and presentation on marine engineeringCareer talk and presentation on marine engineering
Career talk and presentation on marine engineering
 
Environmental Sustainability in the Marine Industry
Environmental Sustainability in the Marine IndustryEnvironmental Sustainability in the Marine Industry
Environmental Sustainability in the Marine Industry
 
Marine electrical distribution system and control engineering
Marine electrical distribution system and control engineeringMarine electrical distribution system and control engineering
Marine electrical distribution system and control engineering
 
1 introduction to shipping and marine engineering
1 introduction to shipping and marine engineering1 introduction to shipping and marine engineering
1 introduction to shipping and marine engineering
 
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu sajiSHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
 
Marine engineering i
Marine engineering iMarine engineering i
Marine engineering i
 
Shipping ppt
Shipping pptShipping ppt
Shipping ppt
 
Careers in Marine Engineering
Careers  in Marine EngineeringCareers  in Marine Engineering
Careers in Marine Engineering
 

Semelhante a Introduction to Metocean: Quantifying the impact and effect of weather and sea conditions on offshore activities

Todd Dickey_ resume June 2016 gov
Todd Dickey_ resume June 2016 govTodd Dickey_ resume June 2016 gov
Todd Dickey_ resume June 2016 govTodd Dickey
 
Berdian van wyk resume HSE manager v1
Berdian van wyk  resume HSE manager v1Berdian van wyk  resume HSE manager v1
Berdian van wyk resume HSE manager v1Berdian van wyk
 
Vladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CVVladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CVVladimir Nikitin
 
Mining Operation and Estimation planning.pptx
Mining Operation and Estimation planning.pptxMining Operation and Estimation planning.pptx
Mining Operation and Estimation planning.pptxPramitPattanayak
 
capacity planning and Forecasting.pptx
capacity planning and Forecasting.pptxcapacity planning and Forecasting.pptx
capacity planning and Forecasting.pptxHiteshKumar874262
 
Overview of Experience Presentation
Overview of Experience PresentationOverview of Experience Presentation
Overview of Experience PresentationJerry Rodgers
 
Overview of Experience Presentation
Overview of Experience PresentationOverview of Experience Presentation
Overview of Experience PresentationJerry Rodgers
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assetsAdvisian
 
Project management
Project managementProject management
Project managementtwilight89
 
projectmanagement-123765482.pdf
projectmanagement-123765482.pdfprojectmanagement-123765482.pdf
projectmanagement-123765482.pdfAmarDeo7
 
CV_Henrik-2016V3_1_English
CV_Henrik-2016V3_1_EnglishCV_Henrik-2016V3_1_English
CV_Henrik-2016V3_1_Englishhenrik storgaard
 
Building a comissioning guideline
Building a comissioning guidelineBuilding a comissioning guideline
Building a comissioning guidelineZuzi Evangelista
 
Maintenance & inspection adapted to equipment criticality gunnars & jonsson...
Maintenance & inspection adapted to equipment criticality   gunnars & jonsson...Maintenance & inspection adapted to equipment criticality   gunnars & jonsson...
Maintenance & inspection adapted to equipment criticality gunnars & jonsson...Jens Gunnars
 
Oil & Gas Disciplines
Oil & Gas DisciplinesOil & Gas Disciplines
Oil & Gas DisciplinesFidan Aliyeva
 
1.m. clark environmental obligations
1.m. clark environmental obligations1.m. clark environmental obligations
1.m. clark environmental obligationsBill Bly
 
Optimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farmsOptimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farmsLloyd's Register Energy
 

Semelhante a Introduction to Metocean: Quantifying the impact and effect of weather and sea conditions on offshore activities (20)

Todd Dickey_ resume June 2016 gov
Todd Dickey_ resume June 2016 govTodd Dickey_ resume June 2016 gov
Todd Dickey_ resume June 2016 gov
 
Berdian van wyk resume HSE manager v1
Berdian van wyk  resume HSE manager v1Berdian van wyk  resume HSE manager v1
Berdian van wyk resume HSE manager v1
 
Clark.pdf
Clark.pdfClark.pdf
Clark.pdf
 
Vladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CVVladimir Nikitin - Completed CV
Vladimir Nikitin - Completed CV
 
Mining Operation and Estimation planning.pptx
Mining Operation and Estimation planning.pptxMining Operation and Estimation planning.pptx
Mining Operation and Estimation planning.pptx
 
capacity planning and Forecasting.pptx
capacity planning and Forecasting.pptxcapacity planning and Forecasting.pptx
capacity planning and Forecasting.pptx
 
Overview of Experience Presentation
Overview of Experience PresentationOverview of Experience Presentation
Overview of Experience Presentation
 
Overview of Experience Presentation
Overview of Experience PresentationOverview of Experience Presentation
Overview of Experience Presentation
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assets
 
Project management
Project managementProject management
Project management
 
projectmanagement-123765482.pdf
projectmanagement-123765482.pdfprojectmanagement-123765482.pdf
projectmanagement-123765482.pdf
 
CV_Henrik-2016V3_1_English
CV_Henrik-2016V3_1_EnglishCV_Henrik-2016V3_1_English
CV_Henrik-2016V3_1_English
 
Building a comissioning guideline
Building a comissioning guidelineBuilding a comissioning guideline
Building a comissioning guideline
 
Maintenance & inspection adapted to equipment criticality gunnars & jonsson...
Maintenance & inspection adapted to equipment criticality   gunnars & jonsson...Maintenance & inspection adapted to equipment criticality   gunnars & jonsson...
Maintenance & inspection adapted to equipment criticality gunnars & jonsson...
 
Ahmed Elrassas CV_11_2015-rev2
Ahmed Elrassas CV_11_2015-rev2Ahmed Elrassas CV_11_2015-rev2
Ahmed Elrassas CV_11_2015-rev2
 
Oil & Gas Disciplines
Oil & Gas DisciplinesOil & Gas Disciplines
Oil & Gas Disciplines
 
Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, ResumeAntonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
 
1.m. clark environmental obligations
1.m. clark environmental obligations1.m. clark environmental obligations
1.m. clark environmental obligations
 
Optimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farmsOptimisation of maintenance strategies for offshore wind farms
Optimisation of maintenance strategies for offshore wind farms
 
Resume Jun-2015
Resume Jun-2015Resume Jun-2015
Resume Jun-2015
 

Último

8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxPurva Nikam
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 

Último (20)

8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptx
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 

Introduction to Metocean: Quantifying the impact and effect of weather and sea conditions on offshore activities

  • 2. Metocean Awareness Course An Introduction Dr Bev Mackenzie CSci, CMarSci, MIMarEST Senior Technical Manager April 2014
  • 3. Purpose of ‘Introductory Metocean Session’ • A brief overview of the full 3 day course • An introduction to Metocean: – learn about some of the key activities, products and services – decide on the merits of different length courses
  • 4. What is Metocean? • Most offshore/nearshore activities affected by weather and sea conditions (meteorology and oceanography = ‘Metocean’) • Effective use of Metocean expertise, information and support throughout life cycle of a development can improve planning, reduce costs and contribute to enhanced safety. • The need for Metocean expertise was recognised in the oil and gas sector in the 1970’s; setting up of dedicated Metocean departments in the major oil companies • Physical parameters, e.g. winds, waves, currents, water levels, temps etc. • does not cover biological and chemical oceanography • BUT Metocean expertise is spread thinly and most companies involved in offshore activities do not have dedicated staff – heavy reliance on contractors – NEED FOR INDIVIDUALS TO UNDERSTAND THE PRINCIPLES •
  • 5. Key Metocean Activities • Operations & Data Acquisition – in-situ measurements – spatial data (modelling/satellites) – weather & ocean forecasting • Data Management – data QC/Archive • Analyses & Reports – standards, policies, processes – operational stats – design criteria – expert advice
  • 6. Metocean Services and Products – ‘Exploration’ Phase • Initial Metocean briefing note (prior to award of licence block or sea area) • Preliminary Metocean report (after licence has been awarded) includes: – known conditions, available data, data collection requirements – initial conservative operational statistics and design criteria • Data is acquired through: – measurements: sensor type, duration etc. – consideration of modelling/hindcasts • Weather forecasts • Data QC/archive consideration
  • 7. Metocean Services and Products – ‘Production’ Phase • Continued data collection and modelling • Metocean design criteria reports - ‘feasibility’ of initial design followed by ‘Final’ • Metocean equipment/sensors for new structure • Tow-out and installation – operational statistics and design criteria – real-time data and weather forecasts • Daily operations – real-time data and weather forecasts – final operational statistics • weather downtime for maintenance, vessel ops, planning etc • Regular 3-5 yearly updates of operational statistics and design criteria
  • 8. Ethos of IMarEST 3-day Metocean Awareness Target Audience The course is aimed at those who need a greater understanding of Metocean so that they can make informed decisions – Project Managers, Engineers, Drillers, new Metocean staff Format Course format is a mixture of short presentations by a range of expert speakers together with exercises, interactive sessions and team-based case studies. Speakers are internationally renowned Metocean experts from oil and gas companies, Metocean contractors and consultancies. • Delegates receive a comprehensive course manual • Prior Metocean knowledge is not essential
  • 9. IMarEST 3 Day Metocean Course – Key Sessions • Offshore requirements for Metocean • Metocean parameters and processes • Data trends/Climate variability • Data acquisition • Metocean conditions around the world • Weather forecasting • Operational statistics • Metocean design criteria
  • 10. Importance of Getting Metocean ‘Right’ • Hurricane Katrina in the Gulf of Mexico – equivalent to 50-100 year design criteria – BUT criteria ‘too low’ – extensive damage: 47 platforms destroyed, 20 badly damaged – insurance costs in the $billions
  • 11. Importance of Getting ‘Metocean’ Right • Pressure from end-users for a ’number’ • Lack of dialogue between information providers and end-users – how many clients just accept whatever numbers are given • Metocean expertise is not widespread so people don’t always use the best providers of Metocean support – know your contractors • May lead to incorrect values with potential adverse consequences for safety and/or cost – overly conservative design criteria = additional cost – under-estimation of potential downtime = additional cost
  • 12. Key Metocean Issues • Terminology and expertise • Data sources – what data is available? – measured vs. model vs. satellite – differences between sensors, differences between models • Data amount/appropriateness – how much is needed? Impact of climate variability/trends • Data QC/archive/management – looking after the data • How to derive design criteria and understand their meaning (extreme value analysis and probabilities) • Operational statistics – what types? • How to present data (and interpret it) • Standards/key documents • Offshore vs. nearshore
  • 13. Metocean Expertise • Oil and Gas companies – majors only • Renewables companies – not enough, particularly in offshore wind • Metocean contractors – Integrated, weather forecasters, studies, modellers • Metocean consultants – generally ‘one-man bands’ (analysts/studies/modellers) • Institutes/Academia • Government • Knowledge of capabilities, expertise, who to contact/use is important
  • 14. UK H&E OIS Note – Role of a Metocean Advisor Actions 21 HSE wishes to encourage duty holders to pay appropriate attention to metocean issues, bearing in mind the relevant legislation and guidelines referred to in this document. By so doing they can reduce the risk to personnel and infrastructure while offsetting the relatively minor costs against potentially significant financial benefits that will accrue in the short to medium term. 22 This note has provided an example of good practice as to how these requirements may be met through the role of a Metocean Advisor. It will form the basis for part of the inspection interventions carried out by HSE inspectors. Topics Metocean process Competency Duties
  • 15. Metocean Design Criteria & Operational Statistics • 2 key sets of information required – operational statistics ('typical', 'average' or 'normal' conditions) – design criteria (extreme or 'survival' conditions) • Deriving operational statistics is relatively straightforward; deriving design criteria is one of the most challenging activities for Metocean engineers • Important to appreciate we are analysing historical data – operational statistics are summaries of past data ('facts') – design criteria are derived from extrapolation of past data ('fiction') • Significant difference between values for operational statistics (typical conditions) and design criteria (extreme conditions)
  • 16. Metocean Design Criteria 1 • A need to ensure that installations are optimally designed (balancing safety and cost issues) – avoid under-design (impact on people, equipment & asset) – avoid over-design (increased cost) • Not designing for the worst foreseeable condition, rather a statistical or probability-based approach – a 100 year return period value tends to be the default requirement – the value that will be exceeded once on average during 100 years – a 1% probability of being exceeded in any one year (10-2 ) • In order to derive meaningful design criteria, we need – knowledge of the area or location, legislation and standards – quality long term database(s) and appropriate analytical tools – consideration of climate variability – dialogue between the Metocean engineer and end-user
  • 17. Metocean Design Criteria 2 • ‘End-users generally want a number’, e.g. the 100 year Hs • BUT as part of the process of deriving the criteria, a wide range of extreme values can be generated. Due to: – data amount / availability / representativeness / quality – different data types (measured vs. hindcast vs. satellite) – different sensor types (buoys vs. radar) – how data is extrapolated (EVA) – people: ‘give the same dataset to 5 people and you can get 5 different answers’ • The challenge is to distil the diversity of extreme values into final design criteria and presentations – a ‘journey’ from extreme values to design criteria – needs expertise and experience as well as statistical knowledge – engineering judgement plays a key role
  • 18. Operational Statistics • Weather-related downtime can significantly affect cost and schedule • Appropriate statistics from long datasets can assist with – safety, planning and execution of activities e.g. maintenance – selection of suitable vessels – estimating budgets • Examples of what is needed – how often is the Hs >2m in April? – how many weather windows of Hs<2m for 3 days in September? – how long will an activity take to complete if I start 1 May? – what are dominant wind directions? • Types of presentations and analyses – min/mean/max tables – percentage exceedance/percentiles – persistence/duration stats and weather windows analysis – wind roses
  • 20. Natural Variability • Solar, earth's orbit, volcanoes • Ocean heat cycles, eg – El Nino/La Nina – AMO (Atlantic Multi-decadal Oscillation) – NAO (North Atlantic Oscillation) High NAO index More westerlies More storms Milder, wetter Low NAO index Less westerlies Less storms Colder
  • 21. Metocean Standards • ISO 19901-1 – Metocean Design and Operating Considerations • Norsok N-002 – Collection of Metocean Data • HSE RR392 – Wave Mapping in UK Waters • OGP 447 – HSE Guidelines for Metocean and Arctic Surveys • DNV OS J101 – Design of Offshore Wind Turbines • Need to be careful using OTR 2001/010 Environmental Considerations
  • 22. Example of an Integrated Approach for Metocean Data collection Post- storm reports Monthly data QC Daily checks Of data Forecast verification reports Maintenance reports Gov't & Institutes Third party transmission access Offshore maintenance visits Metocean database Annual data reports Pre-Storm warningMet Office Data server Metocean library Users Survey Contractor Weather Forecast Contractor Independent Data QC Contractor Weather Forecasts website Data website Users Survey & Data QC contractors Metocean statistics websites Initial pre QC data Studies Contractor Design Criteria & Ops Stats Users
  • 23. Booking a Course Courses are available internationally. For more details on the course, please get in touch: We can also offer bespoke Metocean training for organisations who would like a tailored Metocean course programme. Contact E: stephen.bodie@imarest.org T: +44 (0)20 7382 2652