| IJMER | ISSN: 2249–6645 www.ijmer.com | Vol. 7 | Iss. 7 | July. 2017 | 32 |
Place of Power Sector in Public-Private Partnership: A Veritable
Tool to Promote Sustainable Delivery of Infrastructural and
Economic Development in Nigeria
1*
Lawal M., 2
Adeleke D.A.,3
Chukwunyeaka C., 4
Ejura G.J, 5
Nafisa M.A
Energy Commission of Nigeria
I. INTRODUCTION
Public Private Partnership is a prescribe arrangement which is formed between public and private
sector partners which involve the private sector in the development, financing, ownership, or operation of a
public facility or service to make available adequate infrastructure through public private partnership
development. In such a partnership, public and private resources are position and divided so that the partners
’efforts are complementary. The private sector partner usually makes a substantial cash or equity investment in
the project and the public sector gains access to new revenue or service delivery capacity, and this arrangement
between the public and private sector differ from service contracting. Egbewole Qasim A, (2011)
In general, PPP refers to form of cooperation between public authorities and the private sector to finance,
construct, renovate, manage, operate or maintain an infrastructure or service. It also involves some form of risk
sharing between the public and private sector to provide the infrastructure or services. The allocation of sizable
and, at times significant, elements of risk to the private partner is essential in distinguishing a PPP from the
more traditional public sector model of public service delivery. There are two basic forms of PPP: contractual
and institutional. Although institutional PPP have been quite successful in some circumstances, particularly in
countries with well-developed institutional and regulatory capacities, contractual PPP are significantly more
common, especially in developing economies.
Risks are distributed between the public partner and private partner and are allocated to the party best
positioned to manage each individual risk. PPP are complex structures, involving multiple parties and relatively
high transaction costs. PPP is a procurement tool where the focus is payment for the successful delivery of the
service. In PPP arrangements, the private partner is typically compensated through either: User-based payments
(i.e., toll roads, airport or port charges) Availability payments from the public authority [i.e., PFI, power
purchase agreements (PPAs), water purchase agreements (WPAs)] A combination of the above in user-based
payment structures, the government or public authority often needs to provide some financial support to the
project to reduce specific risks, such as demand risk, or to ensure that full cost recovery is compatible with
affordability . Government support mechanisms can take many forms, such as contributions, investments,
guarantees and subsidies, but they should be carefully designed and implemented to allow for optimal risk
allocation between the public and private sectors. When government supports are present, the objective is to
increase private capital mobilization per unit of public sector. Egbewole Qasim A, (2011).
ABSTRACT: Public Private Partnership involves private sector engagement in infrastructural
development. Though in the past, the country infrastructure had been experiencing a decline in the
system, this is because, government had been the sole contributor to infrastructural finance and had
often taken responsibility for implementation, operations and maintenance as well. This decline in the
system is caused by escalating population growth depending on available infrastructure, decaying of
existing power infrastructure, political instability and corruption in the system. The ongoing reform is
about bringing the system to a lime light. Hence, Public Private Partnership participation in the
infrastructural development in Nigeria, will create favorable environment for an investors, provide job
opportunities, long time policy, decision making and efficient use of the available resources. This paper
therefore dwells on overview of the public private partnership with regards to energy and other
infrastructural development of Nigeria. Challenges of the partnership and possible solutions towards
subduing the problems are proffered.
Keyword: Infrastructure, Energy, Economy, Public-Private, Partnership, Power.
Place of Power Sector in Public-Private Partnership: A Veritable Tool To…..
| IJMER | ISSN: 2249–6645 www.ijmer.com | Vol. 7 | Iss. 7 | July. 2017 | 33 |
Table 1: Nigeria Infrastructural Project Undergoing PPP Development
S/N Project PPP Model
1 Rehabilitation and upgrade of Muritala Airport
Road
Build Operate and transfer(BOT)
2 2nd Niger Bridge Build Operate and transfer(BOT)
3 River Niger Bridge at Nupeko Build Operate and transfer(BOT)
4 Small and Medium Hydro Power
Projects
Rehabilitate/Build Operate
Transfer (RBOT) mode
5 PHCN 3 Large Hydro Power Plants Build Operate and transfer(BOT)
6 25 Silos complexes Rehabilitate/Build Operate
Transfer (RBOT) mode
7 National Centre for Women
Development
Rehabilitation Lease and Transfer (RLT)
8
Rehabilitation and Upgrade of Kiri
Kiri Lighter Terminals I & II
Landlord Port Model” for the Nigerian
ports in line with the ports reform
programme
9 Development of Katampe District Build Operate and transfer(BOT)
10 Development of Four Districts Design, Build, Finance, Operate
and Transfer (DBFOT)
Source: (Infrastructure Regulatory Commission, 2012)
II. Why Public Private Partnership in Infrastructural Development in Nigeria
In the past the government has been the sole financial of infrastructure finance and has often taken
responsibility for implementation, operations and maintenance as well. There is a gradual recognition which is
the best way to execute/finance these projects. This recognition is based on considerations such as cost
efficiency, equity considerations, allocation efficiency, and fiscal prudence, most countries have adopted the
PPP policy about two or three decades ago as a way of fixing their infrastructural gap and at the same time,
delivering good welfare for their citizens. From the World Bank report, since 1984, 86 industrialized and
developing countries have privatized 547 infrastructures in developing countries. This is far beyond the public
sector’s capacity and clearly highlights the opportunities for private sector involvement. In the light of this
many developing countries including Nigeria have therefore begun a review of previously natural monopolies in
order to create opportunities for the private sector to add value in the provision of infrastructure and to provide
relief to their already overstretched budgets. The restructuring of public enterprises is an efficient strategy and
an important first step towards private provision of infrastructure. Through reform and privatization of public
enterprises, new private infrastructure companies will emerge, with incentives to seek additional opportunities
for further development. (Ikpefan, Ochei. Ailemen, 2015).
III. Models of Public-Private Partnerships
 The following terms are developed from commonly used terms to describe PPP agreements globally as in
Nigeria.
• Design-Build (DB) or “Turnkey” contract: The private sector designs and builds infrastructure to meet
public sector performance specifications, often for a fixed price, so the risk of cost overruns is transferred to
the private sector. (Many do not consider DB’s to be within the spectrum of PPP’s).
• Service Provision (e.g., Specific customer services or operation & maintenance) contract: A private operator,
under contract, operates a publicly-owned asset for a specified term. Ownership of the asset remains with the
public entity.
• Management contract: A private entity contracts to manage a Government owned entity and manages the
marketing and provision of a service.
• Lease and operate contract: A private operator contracts to lease and assume all management and operation of
a government owned facility and associated services, and may invest further in developing the service and
provide the service for a fixed term.
• Design-Build-Finance-Operate (DBFO): The private sector designs, finances and constructs a new facility
under a long-term lease, and operates the facility during the term of the lease. The private partner transfers the
new facility to the public sector at the end of the lease term.
• Build-Operate-Transfer (BOT): A private entity receives a franchise to finance, design, build and operate a
facility (and to charge user fees) for a specified period, after which ownership is transferred back to the public
sector. This has been used in telecommunications service contracts.
• Buy-Build-Operate (BBO): Transfer of a public asset to a private or quasi-public entity usually under contract
that the assets are to be upgraded and operated for a specified period of time. Public control is exercised
through the contract at the time of transfer.
Place of Power Sector in Public-Private Partnership: A Veritable Tool To…..
| IJMER | ISSN: 2249–6645 www.ijmer.com | Vol. 7 | Iss. 7 | July. 2017 | 34 |
• Build-Own-Operate (BOO): The private sector finances, builds, owns and operates a facility or service in
perpetuity. The public constraints are stated in the original agreement and through on-going regulatory
obligations.
• Build-Own-Operate & Transfer (BOOT): The Private Sector builds, owns, operates a facility for a specified
period as agreed in the contract and then transfers to the Public.
• Operating License: A private operator receives a license or rights to build and operate a public service, usually
for a specified term. Similar to BBO arrangement. This is often used in telecommunications and ICT projects.
• Finance Only: A private entity, usually a financial services company, funds a project directly or uses various
mechanisms such as a long-term lease or bond issue. (Dominic E. Obozuwa
Wali-Uwais & Co.2013)
IV. Public-Private Partnerships and Power Infrastructural Development in Nigeria.
Inadequate supply of electric power has been a big problem confronting Nigeria. It has led to high cost
of using generator as an alternative supply of power. Less than 40% of the Nigerian population is supplied with
electricity leaving the rest without. The generating capacity of electricity in Nigeria in year 2000 when the
reform started was 2000MW. By generating less than 4,000MW of electricity, the Nigeria’s per capita
consumption was 0.03kw.This per capita consumption of electricity evidences the level of industrial activity
going on in the country, hence the level of development and the standard of living of people in this country. The
problem was attributed to lack of increase in the existing generating units from 1990 to 2000, lack of
overhauling for up to a period of 15 years, and rapidly decaying of existing generating infrastructure and under
pricing of electricity services. To tackle the problem the Federal Government embarked on transformation of the
sector through some reform processes. The transformation agenda includes maintenance, rehabilitation and
upgrading of existing units in the 8 power stations in Nigeria.
The government embarked on construction of four thermal power stations in various parts of the
country; the unbundling of NEPA into18 companies and establishing PHCN in 2005. The 18 successor
companies created consist of: 6 power generation, 1 transmission and 11 distribution companies. Approval was
also given for the construction of seven new power stations in the Niger Delta in order to take advantage of the
huge gas resources in that area. As part of the reform programme, the Federal Government embarked on the
process of deregulating the power sector and therefore encouraged private sector participation in generation of
electricity under the Independent Power Producers (IPP) arrangement so that the IPPs would generate power and
sell to PHCN under power purchase agreement. The administration’s target then was to generate up to
10,000MW by the year 2007 when it would hand over power to another government but this objective was not
achieved. The Public Private Partnership (PPP) is now being extended to the distribution of power in the
country. Involvement of the private sector becomes imperative because Nigerian Government alone cannot
afford the capital requirements for development of the electricity sector in the country. The welcome
development in the participation of public private partnership in the sector would provide growth for the sector,
give financial discipline, reduce corruption in the public sector, and reduce the financial burden of
infrastructural provision on the national budget. The reform gave rise to the establishment of the Nigerian
Electricity Regulatory Commission (NERC) to regulate and control tariffs by providing different pricing options
for arriving at tariffs to power generators via the Multi-Year Tariff Order {MYTO}.(Grace N. O, and Steve E.
E,2013).
Table 2: Public Private Partnership Power Infrastructure in Nigeria
Power
Station
Fuel Type Installed
Capacity(MW)
Ave. Actual
Gen Capability(MW)
Ownership
Place of Power Sector in Public-Private Partnership: A Veritable Tool To…..
| IJMER | ISSN: 2249–6645 www.ijmer.com | Vol. 7 | Iss. 7 | July. 2017 | 35 |
Egbin Gas/HPFO 1320 756 S C
Ibom Power Gas 35 30 IPP
Delta Gas 960 388 S C
Geregu Gas 414 156 FGN
Omotosho Gas 335 56 FGN
Kainji Hydro 760 393 S C
Afam Gas 623 86 S C
Calabar Diesel 5 0
Afam VI (Shell) Gas 625 400 IPP
Ajokuta(ASCO) Gas 80 0 IPP
Okpai Gas 480 337 IPP
Omoku Gas 150 54 IPP
AES Gas 300 192 IPP
Source: ((Nigerian Electricity Regulatory Commission, 2010)
V. Benefits of Public Private Partnership
The advantages of Public Private Partnerships (PPP's) include the following:
 Speedy, efficient and cost effective delivery of projects.
 Value for money for the taxpayer through optimal risk transfer and risk management.
 Efficiencies from integrating design and construction of public infrastructure with financing, operation and
maintenance/upgrading.
 Creation of added value through synergies between public authorities and private sector companies, in
particular, through the integration and cross transfer of public and private sector skills, knowledge and
expertise.
 Alleviation of capacity constraints and bottlenecks in the economy through higher productivity of labour
and capital resources in the delivery of projects.
 Competition and greater construction capacity (including the participation of overseas firms, especially in
joint ventures and partnering arrangements).
 Accountability for the provision and delivery of quality public services through performance incentive
management/regulatory regime.
 Innovation and diversity in the provision of public services.
 Effective utilization of state assets to the benefit of all users of public services.
 Faster implementation.
OF NIGERIA’S I
VI. VI. Challenges of Public-Private Partnership in Nigeria
Public Private Partnerships in Nigeria are face with challenges such as: financial limitations,
dominance of public companies, corruption, inability of private companies to access local currency and
affordable long term loan. Others include, incessant changes in relevant political office holders and the Chief
Executives of Regulatory agencies is also a major problem with PPP projects. For example many of the Chief
Executives officers in Nigeria agencies have different policies, divergent opinions and perspectives on
Concession Agreement and concession itself. In the same time, the sizes of the Nigerian banks pose a problem
to the survival of such projects as they are unable to give a long term loan, when such loans are available, the
interests on them will be too high to cope with. Many of the banks officials also lack experience in project
financing .There is no sound legal and institutional frame work backing Public Private Partnership in the
country, in a situation where there is problem with the arrangement(s) the private sector or investors are left to
bear the brunt financially and otherwise (Dabak, Panmun Dantala, 2014).
VII. CONCLUSION
With the current state of dilapidated infrastructure in our economy development for the past 50 years of
our National existence, it is cleared that public and private sectors of our economy would seize the opportunities
provided by evolving global partnerships to create enduring infrastructures and development in Nigeria.
The bane of our national development has been a dearth in infrastructures. This must change and as the parties
take practical steps in this regard by harnessing the PPPs strategy, while tailoring them to the needs of the
different sectors of the economy, they must look critically at the legal implications of such arrangements to
further mutually beneficial partnerships.
Finally, In order to guarantee value for money, the relative strengths and weaknesses of each PPP
scheme should be considered. Depending on the sector of application, some models are better suited than others
in delivering targeted outputs and in ensuring accurate risk management. Choosing the wrong model or
Place of Power Sector in Public-Private Partnership: A Veritable Tool To…..
| IJMER | ISSN: 2249–6645 www.ijmer.com | Vol. 7 | Iss. 7 | July. 2017 | 36 |
inaccurately evaluating the risk management capacities of each party may have extremely costly consequences
and a negative impact on public accounts.
VIII. RECOMMENDATIONS
 There is need for a wide representative participatory decision-making process that takes into account
concerns of all concerned stakeholders including those who may be adversely affected.
 There should be a fair and transparent rule-base administrative process by which projects are developed and
procured.
 An enabling environment such as security, good road and power should be put in place that will guarantee
effective management of the PPP projects.
 There is need for a long term policies that will favour the PPP by government to guide against incessant
changes which usually occurs anytime there is change in the leadership.
 An arrangement for project delivery that ensures efficient utilization of human, financial, natural and other
resources without sacrificing the needs of the future generations.
REFERENCES
[1]. Ikpefan, Ochei. Ailemen, (2015): Challenges Of Public-Private Partnership In Infrastructural Financing
In Nigeria
[2]. eprints.covenantuniversity.edu.ng/id/file/22798
[3]. Dominic E. Obozuwa Wali-Uwais & Co. (2013):PPP as a tool for Development in Nigeria.
[4]. www.fpppn.org/index.php/articles-a.../231-national-development.Accessed27/08/2015.
[5]. Dabak, Panmun Dantala, (2014): Public-Private Partnership: The Answer to Nigeria’s Development
Challenges. Journal of Economics and Sustainable Development.
[6]. Egbewole Qasim A, (2011): Examining Public Private Partnership In Nigeria: Potentials and
Challenges. resourcedat.com/.../Examining-Public-Private-Partnership-in-Nigeria1.pd
[7]. Grace N. Steve E. E, (2013): Recovery of Cost of Electricity Supply in the Nigerian Power Sector.
Research Journal of Finance and Accounting.Vol.4, No.17. www.iiste.org
[8]. Nigerian Electricity Regulatory Commission, (2010): Electric Power Sector: Current Status And Future
Perspectives.
*Adeleke D.A. "Place of Power Sector in Public-Private Partnership: A Veritable Tool To Promote
Sustainable Delivery of Infrastural And Economic Development in Nigeria." International Journal Of
Modern Engineering Research (IJMER) 7.7 (2017): 32-36.

Mais conteúdo relacionado

Mais procurados

Public private partnership
Public private partnershipPublic private partnership
Public private partnership
Md_Helal_Uddin
 
Public Private Partnerships
Public Private PartnershipsPublic Private Partnerships
Public Private Partnerships
jamesrobinsonjnr
 
Public private partnership sustainable growth
Public private partnership sustainable growthPublic private partnership sustainable growth
Public private partnership sustainable growth
Rutvij Bhutaiya
 

Mais procurados (20)

Public private partnership
Public private partnershipPublic private partnership
Public private partnership
 
Public-Private Partnerships - Business & Legal Issues
Public-Private Partnerships - Business & Legal IssuesPublic-Private Partnerships - Business & Legal Issues
Public-Private Partnerships - Business & Legal Issues
 
Public private partnership
Public private partnershipPublic private partnership
Public private partnership
 
Public private partnership
Public private partnershipPublic private partnership
Public private partnership
 
Public private partnership(PPP) and Safety,Risk & Benefit Analysis
Public private partnership(PPP) and Safety,Risk & Benefit AnalysisPublic private partnership(PPP) and Safety,Risk & Benefit Analysis
Public private partnership(PPP) and Safety,Risk & Benefit Analysis
 
Presentation Public Private Partnership (PPP)
Presentation Public Private Partnership (PPP) Presentation Public Private Partnership (PPP)
Presentation Public Private Partnership (PPP)
 
Public Private Patnership
Public Private Patnership Public Private Patnership
Public Private Patnership
 
Private public partnership (ppp)
Private public partnership (ppp)Private public partnership (ppp)
Private public partnership (ppp)
 
Public private partnerships in India
Public private partnerships in IndiaPublic private partnerships in India
Public private partnerships in India
 
public private partnership
 public private partnership public private partnership
public private partnership
 
Public private partnerships
Public private partnershipsPublic private partnerships
Public private partnerships
 
Public Private Partnerships
Public Private PartnershipsPublic Private Partnerships
Public Private Partnerships
 
Public-Private Partnerships (PPP): Funding Infrastructure for Ghana
Public-Private Partnerships (PPP): Funding Infrastructure for GhanaPublic-Private Partnerships (PPP): Funding Infrastructure for Ghana
Public-Private Partnerships (PPP): Funding Infrastructure for Ghana
 
Public Private Partnership
Public Private PartnershipPublic Private Partnership
Public Private Partnership
 
Public private partnership
Public private partnershipPublic private partnership
Public private partnership
 
Public private partnership in the philippines by miner generalao
Public private partnership in the philippines by miner generalaoPublic private partnership in the philippines by miner generalao
Public private partnership in the philippines by miner generalao
 
Public private partnership sustainable growth
Public private partnership sustainable growthPublic private partnership sustainable growth
Public private partnership sustainable growth
 
1 ppp presentation
1 ppp presentation1 ppp presentation
1 ppp presentation
 
PUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTOR
PUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTORPUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTOR
PUBLIC PRIVATE PARTNERSHIP IN HEALTH SECTOR
 
Ppp
PppPpp
Ppp
 

Semelhante a Place of Power Sector in Public-Private Partnership: A Veritable Tool to Promote Sustainable Delivery of Infrastructural and Economic Development in Nigeria

Semelhante a Place of Power Sector in Public-Private Partnership: A Veritable Tool to Promote Sustainable Delivery of Infrastructural and Economic Development in Nigeria (20)

Chapter19 financinginfrastructureprojects
Chapter19 financinginfrastructureprojectsChapter19 financinginfrastructureprojects
Chapter19 financinginfrastructureprojects
 
Public-Private Partnerships
Public-Private PartnershipsPublic-Private Partnerships
Public-Private Partnerships
 
ASSESSING THE RELEVANCE OF QUANTITY SURVEYORS IN PUBLIC PRIVATE PARTNERSHIP I...
ASSESSING THE RELEVANCE OF QUANTITY SURVEYORS IN PUBLIC PRIVATE PARTNERSHIP I...ASSESSING THE RELEVANCE OF QUANTITY SURVEYORS IN PUBLIC PRIVATE PARTNERSHIP I...
ASSESSING THE RELEVANCE OF QUANTITY SURVEYORS IN PUBLIC PRIVATE PARTNERSHIP I...
 
Nigeria Infrastructure Deficit: Beyond the Limitation of Finance in Public Pr...
Nigeria Infrastructure Deficit: Beyond the Limitation of Finance in Public Pr...Nigeria Infrastructure Deficit: Beyond the Limitation of Finance in Public Pr...
Nigeria Infrastructure Deficit: Beyond the Limitation of Finance in Public Pr...
 
THE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdf
THE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdfTHE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdf
THE SIMPLE MICROECONOMICS OF PUBLIC-PRIVATE PARTNERSHIPS.pdf
 
Pgpm14 infrastructure development
Pgpm14 infrastructure developmentPgpm14 infrastructure development
Pgpm14 infrastructure development
 
208 - Geopolitics & World Economic Systems unit3
208 - Geopolitics & World Economic Systems unit3208 - Geopolitics & World Economic Systems unit3
208 - Geopolitics & World Economic Systems unit3
 
PPP models.pptx
 PPP models.pptx PPP models.pptx
PPP models.pptx
 
UNDERSTANDING_PPPs.pdf
UNDERSTANDING_PPPs.pdfUNDERSTANDING_PPPs.pdf
UNDERSTANDING_PPPs.pdf
 
Public private partnership in the phil by miner generalao
Public  private partnership in the phil by miner generalaoPublic  private partnership in the phil by miner generalao
Public private partnership in the phil by miner generalao
 
Public- Private Partnership (Ppp) As Catalyst for Sustainable Infrasstructura...
Public- Private Partnership (Ppp) As Catalyst for Sustainable Infrasstructura...Public- Private Partnership (Ppp) As Catalyst for Sustainable Infrasstructura...
Public- Private Partnership (Ppp) As Catalyst for Sustainable Infrasstructura...
 
What is ppp and when to use ppp
What is ppp and when to use pppWhat is ppp and when to use ppp
What is ppp and when to use ppp
 
Boot model
Boot modelBoot model
Boot model
 
Public private partnership in agriculture in india
Public private partnership in agriculture in indiaPublic private partnership in agriculture in india
Public private partnership in agriculture in india
 
Public private patnerships
Public private patnershipsPublic private patnerships
Public private patnerships
 
Corporate & Government Partnering (PPPs and other formats) for Societal Impa...
Corporate & Government Partnering (PPPs and other formats) for Societal Impa...Corporate & Government Partnering (PPPs and other formats) for Societal Impa...
Corporate & Government Partnering (PPPs and other formats) for Societal Impa...
 
Public Private Partnerships - - Copy.docx
Public Private Partnerships - - Copy.docxPublic Private Partnerships - - Copy.docx
Public Private Partnerships - - Copy.docx
 
Public Private Partnerships -.docx
Public Private Partnerships -.docxPublic Private Partnerships -.docx
Public Private Partnerships -.docx
 
12-Public Private Partnerships.docx
12-Public Private Partnerships.docx12-Public Private Partnerships.docx
12-Public Private Partnerships.docx
 
Ppp 22102020
Ppp  22102020Ppp  22102020
Ppp 22102020
 

Mais de IJMERJOURNAL

Application of Customer Relationship Management (Crm) Dimensions: A Critical ...
Application of Customer Relationship Management (Crm) Dimensions: A Critical ...Application of Customer Relationship Management (Crm) Dimensions: A Critical ...
Application of Customer Relationship Management (Crm) Dimensions: A Critical ...
IJMERJOURNAL
 
Investigating The Performance of A Steam Power Plant
Investigating The Performance of A Steam Power PlantInvestigating The Performance of A Steam Power Plant
Investigating The Performance of A Steam Power Plant
IJMERJOURNAL
 

Mais de IJMERJOURNAL (20)

Modeling And Simulation Swash Plate Pump Response Characteristics in Load Sen...
Modeling And Simulation Swash Plate Pump Response Characteristics in Load Sen...Modeling And Simulation Swash Plate Pump Response Characteristics in Load Sen...
Modeling And Simulation Swash Plate Pump Response Characteristics in Load Sen...
 
Generation of Electricity Through A Non-Municipal Solid Waste Heat From An In...
Generation of Electricity Through A Non-Municipal Solid Waste Heat From An In...Generation of Electricity Through A Non-Municipal Solid Waste Heat From An In...
Generation of Electricity Through A Non-Municipal Solid Waste Heat From An In...
 
A New Two-Dimensional Analytical Model of Small Geometry GaAs MESFET
A New Two-Dimensional Analytical Model of Small Geometry GaAs MESFETA New Two-Dimensional Analytical Model of Small Geometry GaAs MESFET
A New Two-Dimensional Analytical Model of Small Geometry GaAs MESFET
 
Design a WSN Control System for Filter Backwashing Process
Design a WSN Control System for Filter Backwashing ProcessDesign a WSN Control System for Filter Backwashing Process
Design a WSN Control System for Filter Backwashing Process
 
Application of Customer Relationship Management (Crm) Dimensions: A Critical ...
Application of Customer Relationship Management (Crm) Dimensions: A Critical ...Application of Customer Relationship Management (Crm) Dimensions: A Critical ...
Application of Customer Relationship Management (Crm) Dimensions: A Critical ...
 
Comparisons of Shallow Foundations in Different Soil Condition
Comparisons of Shallow Foundations in Different Soil ConditionComparisons of Shallow Foundations in Different Soil Condition
Comparisons of Shallow Foundations in Different Soil Condition
 
Study of Part Feeding System for Optimization in Fms & Force Analysis Using M...
Study of Part Feeding System for Optimization in Fms & Force Analysis Using M...Study of Part Feeding System for Optimization in Fms & Force Analysis Using M...
Study of Part Feeding System for Optimization in Fms & Force Analysis Using M...
 
Investigating The Performance of A Steam Power Plant
Investigating The Performance of A Steam Power PlantInvestigating The Performance of A Steam Power Plant
Investigating The Performance of A Steam Power Plant
 
Study of Time Reduction in Manufacturing of Screws Used in Twin Screw Pump
Study of Time Reduction in Manufacturing of Screws Used in Twin Screw PumpStudy of Time Reduction in Manufacturing of Screws Used in Twin Screw Pump
Study of Time Reduction in Manufacturing of Screws Used in Twin Screw Pump
 
Mitigation of Voltage Imbalance in A Two Feeder Distribution System Using Iupqc
Mitigation of Voltage Imbalance in A Two Feeder Distribution System Using IupqcMitigation of Voltage Imbalance in A Two Feeder Distribution System Using Iupqc
Mitigation of Voltage Imbalance in A Two Feeder Distribution System Using Iupqc
 
Adsorption of Methylene Blue From Aqueous Solution with Vermicompost Produced...
Adsorption of Methylene Blue From Aqueous Solution with Vermicompost Produced...Adsorption of Methylene Blue From Aqueous Solution with Vermicompost Produced...
Adsorption of Methylene Blue From Aqueous Solution with Vermicompost Produced...
 
Analytical Solutions of simultaneous Linear Differential Equations in Chemica...
Analytical Solutions of simultaneous Linear Differential Equations in Chemica...Analytical Solutions of simultaneous Linear Differential Equations in Chemica...
Analytical Solutions of simultaneous Linear Differential Equations in Chemica...
 
Experimental Investigation of the Effect of Injection of OxyHydrogen Gas on t...
Experimental Investigation of the Effect of Injection of OxyHydrogen Gas on t...Experimental Investigation of the Effect of Injection of OxyHydrogen Gas on t...
Experimental Investigation of the Effect of Injection of OxyHydrogen Gas on t...
 
Hybrid Methods of Some Evolutionary Computations AndKalman Filter on Option P...
Hybrid Methods of Some Evolutionary Computations AndKalman Filter on Option P...Hybrid Methods of Some Evolutionary Computations AndKalman Filter on Option P...
Hybrid Methods of Some Evolutionary Computations AndKalman Filter on Option P...
 
An Efficient Methodology To Develop A Secured E-Learning System Using Cloud C...
An Efficient Methodology To Develop A Secured E-Learning System Using Cloud C...An Efficient Methodology To Develop A Secured E-Learning System Using Cloud C...
An Efficient Methodology To Develop A Secured E-Learning System Using Cloud C...
 
Nigerian Economy and the Impact of Alternative Energy.
Nigerian Economy and the Impact of Alternative Energy.Nigerian Economy and the Impact of Alternative Energy.
Nigerian Economy and the Impact of Alternative Energy.
 
CASE STUDY
CASE STUDYCASE STUDY
CASE STUDY
 
Validation of Maintenance Policy of Steel Plant Machine Shop By Analytic Hier...
Validation of Maintenance Policy of Steel Plant Machine Shop By Analytic Hier...Validation of Maintenance Policy of Steel Plant Machine Shop By Analytic Hier...
Validation of Maintenance Policy of Steel Plant Machine Shop By Analytic Hier...
 
li-fi: the future of wireless communication
li-fi: the future of wireless communicationli-fi: the future of wireless communication
li-fi: the future of wireless communication
 
The Comprehensive Computation Model of Gas Permeability Based on Fuzzy Comple...
The Comprehensive Computation Model of Gas Permeability Based on Fuzzy Comple...The Comprehensive Computation Model of Gas Permeability Based on Fuzzy Comple...
The Comprehensive Computation Model of Gas Permeability Based on Fuzzy Comple...
 

Último

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Último (20)

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 

Place of Power Sector in Public-Private Partnership: A Veritable Tool to Promote Sustainable Delivery of Infrastructural and Economic Development in Nigeria

  • 1. International OPEN ACCESS Journal Of Modern Engineering Research (IJMER) | IJMER | ISSN: 2249–6645 www.ijmer.com | Vol. 7 | Iss. 7 | July. 2017 | 32 | Place of Power Sector in Public-Private Partnership: A Veritable Tool to Promote Sustainable Delivery of Infrastructural and Economic Development in Nigeria 1* Lawal M., 2 Adeleke D.A.,3 Chukwunyeaka C., 4 Ejura G.J, 5 Nafisa M.A Energy Commission of Nigeria I. INTRODUCTION Public Private Partnership is a prescribe arrangement which is formed between public and private sector partners which involve the private sector in the development, financing, ownership, or operation of a public facility or service to make available adequate infrastructure through public private partnership development. In such a partnership, public and private resources are position and divided so that the partners ’efforts are complementary. The private sector partner usually makes a substantial cash or equity investment in the project and the public sector gains access to new revenue or service delivery capacity, and this arrangement between the public and private sector differ from service contracting. Egbewole Qasim A, (2011) In general, PPP refers to form of cooperation between public authorities and the private sector to finance, construct, renovate, manage, operate or maintain an infrastructure or service. It also involves some form of risk sharing between the public and private sector to provide the infrastructure or services. The allocation of sizable and, at times significant, elements of risk to the private partner is essential in distinguishing a PPP from the more traditional public sector model of public service delivery. There are two basic forms of PPP: contractual and institutional. Although institutional PPP have been quite successful in some circumstances, particularly in countries with well-developed institutional and regulatory capacities, contractual PPP are significantly more common, especially in developing economies. Risks are distributed between the public partner and private partner and are allocated to the party best positioned to manage each individual risk. PPP are complex structures, involving multiple parties and relatively high transaction costs. PPP is a procurement tool where the focus is payment for the successful delivery of the service. In PPP arrangements, the private partner is typically compensated through either: User-based payments (i.e., toll roads, airport or port charges) Availability payments from the public authority [i.e., PFI, power purchase agreements (PPAs), water purchase agreements (WPAs)] A combination of the above in user-based payment structures, the government or public authority often needs to provide some financial support to the project to reduce specific risks, such as demand risk, or to ensure that full cost recovery is compatible with affordability . Government support mechanisms can take many forms, such as contributions, investments, guarantees and subsidies, but they should be carefully designed and implemented to allow for optimal risk allocation between the public and private sectors. When government supports are present, the objective is to increase private capital mobilization per unit of public sector. Egbewole Qasim A, (2011). ABSTRACT: Public Private Partnership involves private sector engagement in infrastructural development. Though in the past, the country infrastructure had been experiencing a decline in the system, this is because, government had been the sole contributor to infrastructural finance and had often taken responsibility for implementation, operations and maintenance as well. This decline in the system is caused by escalating population growth depending on available infrastructure, decaying of existing power infrastructure, political instability and corruption in the system. The ongoing reform is about bringing the system to a lime light. Hence, Public Private Partnership participation in the infrastructural development in Nigeria, will create favorable environment for an investors, provide job opportunities, long time policy, decision making and efficient use of the available resources. This paper therefore dwells on overview of the public private partnership with regards to energy and other infrastructural development of Nigeria. Challenges of the partnership and possible solutions towards subduing the problems are proffered. Keyword: Infrastructure, Energy, Economy, Public-Private, Partnership, Power.
  • 2. Place of Power Sector in Public-Private Partnership: A Veritable Tool To….. | IJMER | ISSN: 2249–6645 www.ijmer.com | Vol. 7 | Iss. 7 | July. 2017 | 33 | Table 1: Nigeria Infrastructural Project Undergoing PPP Development S/N Project PPP Model 1 Rehabilitation and upgrade of Muritala Airport Road Build Operate and transfer(BOT) 2 2nd Niger Bridge Build Operate and transfer(BOT) 3 River Niger Bridge at Nupeko Build Operate and transfer(BOT) 4 Small and Medium Hydro Power Projects Rehabilitate/Build Operate Transfer (RBOT) mode 5 PHCN 3 Large Hydro Power Plants Build Operate and transfer(BOT) 6 25 Silos complexes Rehabilitate/Build Operate Transfer (RBOT) mode 7 National Centre for Women Development Rehabilitation Lease and Transfer (RLT) 8 Rehabilitation and Upgrade of Kiri Kiri Lighter Terminals I & II Landlord Port Model” for the Nigerian ports in line with the ports reform programme 9 Development of Katampe District Build Operate and transfer(BOT) 10 Development of Four Districts Design, Build, Finance, Operate and Transfer (DBFOT) Source: (Infrastructure Regulatory Commission, 2012) II. Why Public Private Partnership in Infrastructural Development in Nigeria In the past the government has been the sole financial of infrastructure finance and has often taken responsibility for implementation, operations and maintenance as well. There is a gradual recognition which is the best way to execute/finance these projects. This recognition is based on considerations such as cost efficiency, equity considerations, allocation efficiency, and fiscal prudence, most countries have adopted the PPP policy about two or three decades ago as a way of fixing their infrastructural gap and at the same time, delivering good welfare for their citizens. From the World Bank report, since 1984, 86 industrialized and developing countries have privatized 547 infrastructures in developing countries. This is far beyond the public sector’s capacity and clearly highlights the opportunities for private sector involvement. In the light of this many developing countries including Nigeria have therefore begun a review of previously natural monopolies in order to create opportunities for the private sector to add value in the provision of infrastructure and to provide relief to their already overstretched budgets. The restructuring of public enterprises is an efficient strategy and an important first step towards private provision of infrastructure. Through reform and privatization of public enterprises, new private infrastructure companies will emerge, with incentives to seek additional opportunities for further development. (Ikpefan, Ochei. Ailemen, 2015). III. Models of Public-Private Partnerships  The following terms are developed from commonly used terms to describe PPP agreements globally as in Nigeria. • Design-Build (DB) or “Turnkey” contract: The private sector designs and builds infrastructure to meet public sector performance specifications, often for a fixed price, so the risk of cost overruns is transferred to the private sector. (Many do not consider DB’s to be within the spectrum of PPP’s). • Service Provision (e.g., Specific customer services or operation & maintenance) contract: A private operator, under contract, operates a publicly-owned asset for a specified term. Ownership of the asset remains with the public entity. • Management contract: A private entity contracts to manage a Government owned entity and manages the marketing and provision of a service. • Lease and operate contract: A private operator contracts to lease and assume all management and operation of a government owned facility and associated services, and may invest further in developing the service and provide the service for a fixed term. • Design-Build-Finance-Operate (DBFO): The private sector designs, finances and constructs a new facility under a long-term lease, and operates the facility during the term of the lease. The private partner transfers the new facility to the public sector at the end of the lease term. • Build-Operate-Transfer (BOT): A private entity receives a franchise to finance, design, build and operate a facility (and to charge user fees) for a specified period, after which ownership is transferred back to the public sector. This has been used in telecommunications service contracts. • Buy-Build-Operate (BBO): Transfer of a public asset to a private or quasi-public entity usually under contract that the assets are to be upgraded and operated for a specified period of time. Public control is exercised through the contract at the time of transfer.
  • 3. Place of Power Sector in Public-Private Partnership: A Veritable Tool To….. | IJMER | ISSN: 2249–6645 www.ijmer.com | Vol. 7 | Iss. 7 | July. 2017 | 34 | • Build-Own-Operate (BOO): The private sector finances, builds, owns and operates a facility or service in perpetuity. The public constraints are stated in the original agreement and through on-going regulatory obligations. • Build-Own-Operate & Transfer (BOOT): The Private Sector builds, owns, operates a facility for a specified period as agreed in the contract and then transfers to the Public. • Operating License: A private operator receives a license or rights to build and operate a public service, usually for a specified term. Similar to BBO arrangement. This is often used in telecommunications and ICT projects. • Finance Only: A private entity, usually a financial services company, funds a project directly or uses various mechanisms such as a long-term lease or bond issue. (Dominic E. Obozuwa Wali-Uwais & Co.2013) IV. Public-Private Partnerships and Power Infrastructural Development in Nigeria. Inadequate supply of electric power has been a big problem confronting Nigeria. It has led to high cost of using generator as an alternative supply of power. Less than 40% of the Nigerian population is supplied with electricity leaving the rest without. The generating capacity of electricity in Nigeria in year 2000 when the reform started was 2000MW. By generating less than 4,000MW of electricity, the Nigeria’s per capita consumption was 0.03kw.This per capita consumption of electricity evidences the level of industrial activity going on in the country, hence the level of development and the standard of living of people in this country. The problem was attributed to lack of increase in the existing generating units from 1990 to 2000, lack of overhauling for up to a period of 15 years, and rapidly decaying of existing generating infrastructure and under pricing of electricity services. To tackle the problem the Federal Government embarked on transformation of the sector through some reform processes. The transformation agenda includes maintenance, rehabilitation and upgrading of existing units in the 8 power stations in Nigeria. The government embarked on construction of four thermal power stations in various parts of the country; the unbundling of NEPA into18 companies and establishing PHCN in 2005. The 18 successor companies created consist of: 6 power generation, 1 transmission and 11 distribution companies. Approval was also given for the construction of seven new power stations in the Niger Delta in order to take advantage of the huge gas resources in that area. As part of the reform programme, the Federal Government embarked on the process of deregulating the power sector and therefore encouraged private sector participation in generation of electricity under the Independent Power Producers (IPP) arrangement so that the IPPs would generate power and sell to PHCN under power purchase agreement. The administration’s target then was to generate up to 10,000MW by the year 2007 when it would hand over power to another government but this objective was not achieved. The Public Private Partnership (PPP) is now being extended to the distribution of power in the country. Involvement of the private sector becomes imperative because Nigerian Government alone cannot afford the capital requirements for development of the electricity sector in the country. The welcome development in the participation of public private partnership in the sector would provide growth for the sector, give financial discipline, reduce corruption in the public sector, and reduce the financial burden of infrastructural provision on the national budget. The reform gave rise to the establishment of the Nigerian Electricity Regulatory Commission (NERC) to regulate and control tariffs by providing different pricing options for arriving at tariffs to power generators via the Multi-Year Tariff Order {MYTO}.(Grace N. O, and Steve E. E,2013). Table 2: Public Private Partnership Power Infrastructure in Nigeria Power Station Fuel Type Installed Capacity(MW) Ave. Actual Gen Capability(MW) Ownership
  • 4. Place of Power Sector in Public-Private Partnership: A Veritable Tool To….. | IJMER | ISSN: 2249–6645 www.ijmer.com | Vol. 7 | Iss. 7 | July. 2017 | 35 | Egbin Gas/HPFO 1320 756 S C Ibom Power Gas 35 30 IPP Delta Gas 960 388 S C Geregu Gas 414 156 FGN Omotosho Gas 335 56 FGN Kainji Hydro 760 393 S C Afam Gas 623 86 S C Calabar Diesel 5 0 Afam VI (Shell) Gas 625 400 IPP Ajokuta(ASCO) Gas 80 0 IPP Okpai Gas 480 337 IPP Omoku Gas 150 54 IPP AES Gas 300 192 IPP Source: ((Nigerian Electricity Regulatory Commission, 2010) V. Benefits of Public Private Partnership The advantages of Public Private Partnerships (PPP's) include the following:  Speedy, efficient and cost effective delivery of projects.  Value for money for the taxpayer through optimal risk transfer and risk management.  Efficiencies from integrating design and construction of public infrastructure with financing, operation and maintenance/upgrading.  Creation of added value through synergies between public authorities and private sector companies, in particular, through the integration and cross transfer of public and private sector skills, knowledge and expertise.  Alleviation of capacity constraints and bottlenecks in the economy through higher productivity of labour and capital resources in the delivery of projects.  Competition and greater construction capacity (including the participation of overseas firms, especially in joint ventures and partnering arrangements).  Accountability for the provision and delivery of quality public services through performance incentive management/regulatory regime.  Innovation and diversity in the provision of public services.  Effective utilization of state assets to the benefit of all users of public services.  Faster implementation. OF NIGERIA’S I VI. VI. Challenges of Public-Private Partnership in Nigeria Public Private Partnerships in Nigeria are face with challenges such as: financial limitations, dominance of public companies, corruption, inability of private companies to access local currency and affordable long term loan. Others include, incessant changes in relevant political office holders and the Chief Executives of Regulatory agencies is also a major problem with PPP projects. For example many of the Chief Executives officers in Nigeria agencies have different policies, divergent opinions and perspectives on Concession Agreement and concession itself. In the same time, the sizes of the Nigerian banks pose a problem to the survival of such projects as they are unable to give a long term loan, when such loans are available, the interests on them will be too high to cope with. Many of the banks officials also lack experience in project financing .There is no sound legal and institutional frame work backing Public Private Partnership in the country, in a situation where there is problem with the arrangement(s) the private sector or investors are left to bear the brunt financially and otherwise (Dabak, Panmun Dantala, 2014). VII. CONCLUSION With the current state of dilapidated infrastructure in our economy development for the past 50 years of our National existence, it is cleared that public and private sectors of our economy would seize the opportunities provided by evolving global partnerships to create enduring infrastructures and development in Nigeria. The bane of our national development has been a dearth in infrastructures. This must change and as the parties take practical steps in this regard by harnessing the PPPs strategy, while tailoring them to the needs of the different sectors of the economy, they must look critically at the legal implications of such arrangements to further mutually beneficial partnerships. Finally, In order to guarantee value for money, the relative strengths and weaknesses of each PPP scheme should be considered. Depending on the sector of application, some models are better suited than others in delivering targeted outputs and in ensuring accurate risk management. Choosing the wrong model or
  • 5. Place of Power Sector in Public-Private Partnership: A Veritable Tool To….. | IJMER | ISSN: 2249–6645 www.ijmer.com | Vol. 7 | Iss. 7 | July. 2017 | 36 | inaccurately evaluating the risk management capacities of each party may have extremely costly consequences and a negative impact on public accounts. VIII. RECOMMENDATIONS  There is need for a wide representative participatory decision-making process that takes into account concerns of all concerned stakeholders including those who may be adversely affected.  There should be a fair and transparent rule-base administrative process by which projects are developed and procured.  An enabling environment such as security, good road and power should be put in place that will guarantee effective management of the PPP projects.  There is need for a long term policies that will favour the PPP by government to guide against incessant changes which usually occurs anytime there is change in the leadership.  An arrangement for project delivery that ensures efficient utilization of human, financial, natural and other resources without sacrificing the needs of the future generations. REFERENCES [1]. Ikpefan, Ochei. Ailemen, (2015): Challenges Of Public-Private Partnership In Infrastructural Financing In Nigeria [2]. eprints.covenantuniversity.edu.ng/id/file/22798 [3]. Dominic E. Obozuwa Wali-Uwais & Co. (2013):PPP as a tool for Development in Nigeria. [4]. www.fpppn.org/index.php/articles-a.../231-national-development.Accessed27/08/2015. [5]. Dabak, Panmun Dantala, (2014): Public-Private Partnership: The Answer to Nigeria’s Development Challenges. Journal of Economics and Sustainable Development. [6]. Egbewole Qasim A, (2011): Examining Public Private Partnership In Nigeria: Potentials and Challenges. resourcedat.com/.../Examining-Public-Private-Partnership-in-Nigeria1.pd [7]. Grace N. Steve E. E, (2013): Recovery of Cost of Electricity Supply in the Nigerian Power Sector. Research Journal of Finance and Accounting.Vol.4, No.17. www.iiste.org [8]. Nigerian Electricity Regulatory Commission, (2010): Electric Power Sector: Current Status And Future Perspectives. *Adeleke D.A. "Place of Power Sector in Public-Private Partnership: A Veritable Tool To Promote Sustainable Delivery of Infrastural And Economic Development in Nigeria." International Journal Of Modern Engineering Research (IJMER) 7.7 (2017): 32-36.