Overview and Background ESTMAP project
Frank Meinke-Hubeny, Vito/EnergyVille
Evaluation of the role of energy storages in Europe with TIMES PanEU
Markus Blesl and Julia Welsch, IER University of Stuttgart
Analysis of the role of energy storages in Germany with TIMES PanEU
Julia Welsch and Markus Blesl, IER University of Stuttgart
Analysis of the role of energy storages in Belgium and Netherlands with TIMES
Larissa P. N. de Oliveira and Jan Duerinck; Vito/EnergyVille
Overview of Powerfys Model results (Ecofys)
Frank Meinke-Hubeny, Vito/EnergyVille
Discussion
GRAND ENERGY CHALLENGES
• Establish a clean, low carbon energy system based on renewable resources
• Ensure continuation of stable and high quality energy services
• Keep energy generation cost efficient and affordable for all EU citizens
ENERGY STORAGE IS A KEY ENABLER
• Flexibility for an energy system in which electricity generation increases
• Mitigation of consequences from increasing share of intermittent energy
sources
• Solutions for declining base load and shift to decentralized generation
Energy Storage Mapping And Planning
Key knowledge and information on Europe’s energy storage potential
Spatial energy storage database for electricity, gas and heat technologies
Case demonstration of European energy systems analysis and planning
Contribute to Energy Storage development
TANKS
LAKES
RESERVOIRS
SALT
HOST ROCK
AQUIFERS
MODULAR
ESTMAP DATA SCOPE
PUMPED
HYDRO STORAGE
NATURAL GAS STORAGE
HYDROGEN STORAGE
HYDROGEN STORAGE
NATURAL GAS STORAGE
COMPRESSED AIR ENERGY STORAGE
NATURAL GAS STORAGE
THERMAL ENERGY STORAGE
COMPRESSED AIR ENERGY STORAGE
UNDERGROUND PUMPED HYDRO STORAGE
BATTERIES
FLYWHEEL
CAPACITATORS
LNG
HYDROGEN STORAGE
UNDERGROUND
THERMAL ENERGY STORAGE
Reservoirs
Technologies
Subsurface / Above ground
Existing / Potential
Electricity, Gas, Heat
Subsurface data collection
Above ground data collection (PHS)
Geographical energy storage database
> 4200 potential and proven natural energy storage capacities
> 700 planned and developed energy storage facilities
Number of potential
storage sites
Schematic overview of
interrelations in
Modelling WP
Flow of information for energy systems analysis and planning
DBase
ESTMAP
Geographical
database Salt
Formation
depth
height
area
Select potentially suitable
reservoirs for analysis input
Storage site and reservoirs
database
reservoir
characteristics
Salt
Formation
Define notional storage
facilities per technology
Site characterization
Feasibility determination
Reservoir properties
Generic technical design
parameters
Site-specific performance
parameters
Analysis input deck
Future potential capacities
+
Proven capacities in
existing facilities
intake
discharge
efficiency
capex
opex
etc.
GIS, TIMES and PowerFys have been combined to
demonstrate potential analysis on ESTMAP database
Database GIS mapping TIMES model PowerFys model
Description
• Compile a
database with
existing and future
potential energy
storage
• Integrate
contributions from
geological and
technical
institutes and
open source
information
• EU
• Calculate
connection costs
for future storage
facilities
• Develop storage
maps depicting
analysis results,
after TIMES and
PowerFys model
runs
TIMES PanEU:
• Optimize
configuration of
storage sites &
power plants
• Time resolution of
day, night and
peak time slices
• EU-28, NO, CH
• 2010 – 2050
TIMES regional:
• Time resolution of
280 (GER) and
60 (BE & NL) time
slices
• DE, BE & NL
• Optimize
operation of
energy storage
and power
generation assets
• Optimize storage
use
• Assess cross-
border electricity
flow & congestion
• Calculate marginal
energy costs
• Hourly resolution
• DE, BE and NL
• 2050
Outcomes
• Storage locations
• Storage
specifications
• Storage connection
costs
• Optimal
configuration of
storage sites and
power plants
• Hourly storage use
• Generation mix
• Marginal costs
Scenario Definitions
2030 2050
Combined binding
emissions target
(2030)
Renewable target
2030
Combined emissions
target (2050)
Renewable target
2050*
% vs. 1990
% gross final energy
consumption
% vs. 1990
% gross final energy
consumption
EU -40% 27% -80% 75%*
Sources: (COM, 2013 (169)) and (COM, (2011) 885)
Note: * based on 'High Renewable Energy Sources (RES)' scenario, Roadmap 2050
Baseline Scenario
PV Scenario
• Predefined PV generation capacity : 50% higher compared to the baseline results in 2050
BattCost Scenario
Baseline Scenario BattCost Scenario
Investment costs Investment costs
2010 2050 2010 2050
Battery Lithium Ion Input 100
€
𝑘𝑘
30
€
𝑘𝑘
100
€
𝑘𝑘
60
€
𝑘𝑘
Battery Lithium Ion Storage 752
€
𝑘𝑘𝑘
85
€
𝑘𝑘𝑘
752
€
𝑘𝑘𝑘
170
€
𝑘𝑘𝑘
Battery Lithium Ion Output 100
€
𝑘𝑘
30
€
𝑘𝑘
100
€
𝑘𝑘
60
€
𝑘𝑘
General Assumption
• Spirit of a true ‘Energy Union’ till 2050
• Guidance from EU policy H2020, Roadmaps 2030 and 2050
Further information about ESTMAP …
• Vito, IER
• Project Flyer
• Website (http://estmap.eu)
Frank Meinke-Hubeny frank.meinke-hubeny@vito.be
Larissa Pupo Nogueira de Oliveira larissa.oliveira@vito.be
Jan Duerinck jan.duerinck@vito.be
Overview and Background ESTMAP project
Frank Meinke-Hubeny, Vito/EnergyVille
Evaluation of the role of energy storages in Europe with TIMES PanEU
Markus Blesl and Julia Welsch, IER University of Stuttgart
Analysis of the role of energy storages in Germany with TIMES PanEU
Julia Welsch and Markus Blesl, IER University of Stuttgart
Analysis of the role of energy storages in Belgium and Netherlands with TIMES
Larissa P. N. de Oliveira and Jan Duerinck; Vito/EnergyVille
Overview of Powerfys Model results (Ecofys)
Frank Meinke-Hubeny, Vito/EnergyVille
Discussion
Belgium and Netherlands TIMES Model -
Methodology: Temporal resolution
Jan Duerinck
Belgium and Netherlands TIMES Model -
Methodology and Results
Larissa Pupo Nogueira de Oliveira
Methodology
Main Structure for Storage Processes
BE & NL: disaggregated approach DE & PanEU: aggregated approach~FI_Process
Sets Region TechName TechDesc Tact Tcap Tslvl
*Process Set Membership
Region
Name
Technology
Name Technology Description
Activity
Unit
Capacity
Unit
TimeSlice
level of
Process
Activity
.ELE.CEN.TCH.STGTSS. BE STGSPH1L1 FFAC_PHS_1LAKE_001 - Storage PJa PJa DAYNITE
.ELE.CEN.TCH.STGTSS. NL STGSLCSA245 FFAC_LCCAES_SALT_245 - Storage PJa PJa DAYNITE
.ELE.CEN.TCH.STGTSS. NL STGSLCSA246 FFAC_LCCAES_SALT_246 - Storage PJa PJa DAYNITE
.ELE.CEN.TCH.STGTSS. NL STGSLCSA247 FFAC_LCCAES_SALT_247 - Storage PJa PJa DAYNITE
.ELE.CEN.TCH.STGTSS. NL STGSLCSA248 FFAC_LCCAES_SALT_248 - Storage PJa PJa DAYNITE
.ELE.CEN.TCH.STGTSS. NL STGSLCSA249 FFAC_LCCAES_SALT_249 - Storage PJa PJa DAYNITE
…
.PRE.CEN.TCH.STGTSS. NL STGSUGRE307 FFAC_UGS_RES_307 - Storage PJa PJa DAYNITE
.PRE.CEN.TCH.STGTSS. NL STGSUGRE308 FFAC_UGS_RES_308 - Storage PJa PJa DAYNITE
.PRE.CEN.TCH.STGTSS. NL STGSUGRE309 FFAC_UGS_RES_309 - Storage PJa PJa DAYNITE
.PRE.CEN.TCH.STGTSS. NL STGSUGRE310 FFAC_UGS_RES_310 - Storage PJa PJa DAYNITE
.PRE.CEN.TCH.STGTSS. NL STGSUGRE311 FFAC_UGS_RES_311 - Storage PJa PJa DAYNITE
…
.PRE.CEN.TCH.STGTSS. NL STGSUGSA245 FFAC_UGS_SALT_245 - Storage PJa PJa DAYNITE
.PRE.CEN.TCH.STGTSS. NL STGSUGSA246 FFAC_UGS_SALT_246 - Storage PJa PJa DAYNITE
.PRE.CEN.TCH.STGTSS. NL STGSUGSA247 FFAC_UGS_SALT_247 - Storage PJa PJa DAYNITE
.PRE.CEN.TCH.STGTSS. NL STGSUGSA248 FFAC_UGS_SALT_248 - Storage PJa PJa DAYNITE
…
.PRE.CEN.TCH.STGTSS. NL STGSH2SA245 FFAC_H2_SALT_245 - Storage PJa PJa DAYNITE
.PRE.CEN.TCH.STGTSS. NL STGSH2SA246 FFAC_H2_SALT_246 - Storage PJa PJa DAYNITE
.PRE.CEN.TCH.STGTSS. NL STGSH2SA247 FFAC_H2_SALT_247 - Storage PJa PJa DAYNITE
.PRE.CEN.TCH.STGTSS. NL STGSH2SA248 FFAC_H2_SALT_248 - Storage PJa PJa DAYNITE
.PRE.CEN.TCH.STGTSS. NL STGSH2SA249 FFAC_H2_SALT_249 - Storage PJa PJa DAYNITE
.PRE.CEN.TCH.STGTSS. NL STGSH2SA250 FFAC_H2_SALT_250 - Storage PJa PJa DAYNITE
~FI_Process
Sets TechName TechDesc Tact Tcap Tslvl
.ELE.CEN.TCH.STGTSS. EUSTGPSN01 Pump Storage PJ PJa Daynite
.ELE.CEN.TCH.STGTSS. EUSTGPSN01_S Pump Storage Seasonal PJ PJa Season
.ELE.CEN.TCH.STGTSS. EUSTGCAESADIA01 CAES adiaba (salt caverns) PJ PJa Daynite
.ELE.CEN.TCH.STGTSS. EUSTGCAESDIA01 CAES diabat (salt caverns) PJ PJa Daynite
.ELE.CEN.TCH.STGTSS. EUSTGCAESADIA01_O CAES adiabat (tanks) PJ GW Daynite
-Database can be used with both approaches!
- In addition to the exercise of evaluating
regions with different dimensions and
potentials.
Methodology
Storage Potential Database
Pump Storage – one reservoir Pump Storage – two reservoir
Country
Potential
[GWh]
Connecting
Cost �
€
𝒌𝒌𝒌𝒌
�
Country
Potential
[GWh]
Connecting
Cost �
€
𝒌𝒌𝒌𝒌
�
AT 409 6,2 IE 30 5,9
BE 0 - IT 1.626 6,7
BG 378 6,9 LT 0 -
CH 0 - LU 0 -
CY 51 5,7 LV 0 -
CZ 183 6,5 MT 0 -
DE 297 6 NL 0 -
DK 0 - NO 6.616 23,5
EE 0 - PL 47 5
ES 0 - PT 1.229 4,4
FI 104 8 RO 0 -
FR 1.913 5,2 SE 1.098 11,6
GR 288 11,6 SI 18 5,6
HR 291 7,5 SK 0 -
HU 3 5,5 UK 1.702 8,4
Country
Potential
[GWh]
Connecting
Cost �
€
𝒌𝒌𝒌𝒌
�
Country
Potential
[GWh]
Connecting
Cost �
€
𝒌𝒌𝒌𝒌
�
AT 16 6,2 IE 0 -
BE 0 - IT 86 7,7
BG 0 - LT 0 -
CH 0 - LU 0 -
CY 0 - LV 0 -
CZ 3 6 MT 0 -
DE 5 15,2 NL 0 -
DK 0 - NO 212 11,7
EE 0 - PL 0 -
ES 0 - PT 28 5,6
FI 0 - RO 0 -
FR 49 2,9 SE 0 -
GR 0 - SI 0 -
HR 0 - SK 0 -
HU 0 - UK 85 4
Methodology
Storage Potential Database
Compressed Air Natural Gas
Country
Potential
[GWh]
Connecting
Cost �
€
𝒌𝒌𝒌𝒌
�
Country
Potential
[GWh]
Connecting
Cost �
€
𝒌𝒌𝒌𝒌
�
BG 5,4 6 NL 30 7,7
DE 575 7,9 PL 3 16,6
DK 32 8,6 GR 19 21,7
RO 22 8,4
Country
Potential
reservoir
[million m
3
]
Potential
cavern
[million m
3
]
Country
Potential
reservoir
[million m
3
]
Potential
cavern
[million
m
3
]
AT 9.264 0 GR 0,002 4.000
BG 0 1.460 IT 8.863 0
DE 172.000 221.000 HU 29.011 0
DK 0 12.000 NL 65.250 12.000
DE 0 0 PL 2.000 4.000
DK 0 0 RO 3.000 8.000
HR 25 0 SI 306 0
UK 34 0,004
Optimized electricity output of power plants in Belgium
-20
0
20
40
60
80
100
120
Statistics
Base
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
2010 2015 2020 2025 2030 2035 2040 2045 2050
TWh
Net Electricity ElectricityStorage(excl.PumpHydro)
Netimports
Others/Wastenon-ren.
Hydrogen
OtherRenewables
Biomass/Wasteren.
Solar
Windoffshore
WindOnshore
Hydro(incl.PumpStorage)
Nuclear
GasCCS
Gasw/oCCS
Oil
LigniteCCS
Lignitew/oCCS
CoalCCS
Coalw/oCCS
• Major transition in the years from 2020 to 2030, during phase out of nuclear generation
• Nuclear phase out is compensated mainly through
• Increase in gas generation plant output,
• Decline in energy demand and
• Massive increase in net energy import from neighbouring countries
Optimized electricity capacity of power plants in Belgium
0
5
10
15
20
25
30
35
40
45
50
Statistics
Base
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
2010 2015 2020 2025 2030 2035 2040 2045 2050
GW
Capacity
ElectricityStorage(excl.PumpStorage)
Others/Wastenon-ren.
OtherRenewables
Biomass/WasteRen.
Solar
Wind
Hydro(incl.PumpStorage)
Nuclear
NaturalGas
Oil
Lignite
Coal
• Overall capacity increases from 2030 to 2050
• Most growth can be attributed to the increasing wind generation capacity
• ‘Imposed’ higher PV generation capacity (MorePV scenario) results in a reduction of 2 GW of
wind capacity (14 GW in baseline scenario to 12 GW in MorePV scenario)
• Majority of additional PV capacity does not replace other RES capacity, but is added to
overall capacity
0
1
2
3
4
5
6
7
8
9
10 Statistics
Base
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
2010 2015 2020 2025 2030 2035 2040 2045 2050
GWh
Storage Content
Pump Storage
Optimized amount and types of storage sites in Belgium
• New capacity in electrical storage output does not play a role in Belgium in the model results
• Storage is limited to the existing pumped hydro storage with a steady 6.5 GWh of storage content
Optimized electricity output of power plants in Netherlands
-20
30
80
130
180
230
Statistics
Base
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
2010 2015 2020 2025 2030 2035 2040 2045 2050
TWh
Net Electricity ElectricityStorage(excl.PumpHydro)
Netimports
Others/Wastenon-ren.
Hydrogen
OtherRenewables
Biomass/Wasteren.
Solar
Windoffshore
WindOnshore
Hydro(incl.PumpStorage)
Nuclear
GasCCS
Gasw/oCCS
Oil
LigniteCCS
Lignitew/oCCS
CoalCCS
Coalw/oCCS
• Netherlands largely differs from the Belgium - only 4 TWh originate from nuclear generation
• Majority of generated by gas and coal plants in base year
• Transition to a more RES based energy system starts with offshore wind energy, in later years
onshore wind and solar generation
• Net transfer capacity from the year 2035 onwards (approx. 12 TWh in 2035,
increasing to 19-20 TWh in 2040, 21 TWh in 2045 approximately)
Optimized electricity capacity of power plants in Netherlands
0
10
20
30
40
50
60
70
80
90
100
Statistics
Base
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
2010 2015 2020 2025 2030 2035 2040 2045 2050
GW
Capacity
ElectricityStorage(excl.PumpStorage)
Others/Wastenon-ren.
OtherRenewables
Biomass/WasteRen.
Solar
Wind
Hydro(incl.PumpStorage)
Nuclear
NaturalGas
Oil
Lignite
Coal
• Transition to a more RES based energy system starts with
• Growing share of offshore wind energy,
• Onshore wind and solar generation in later years
Optimized amount and types of storage sites in Netherlands
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
Statistics
Base
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
2010 2015 2020 2025 2030 2035 2040 2045 2050
GWh
Storage Content
Battery Redox Flow
Battery Lead Acid
Battery Lithium Ion
CAES Adiabatic
CAES Diabatic
Pump Storage
• Reliance on import goes hand in hand with no investments in storage capacities
• Exception being results in the MorePV scenario
• Lithium-ion storage content in the year 2050 of 0.28 GWh
Optimized amount and types of storage sites in Netherlands
• Hydrogen storage is chosen in the Dutch context
• For 2050 H2 storage of approximately 13 GWh in the Base and BattCost scenario
• 18 GWh in the MorePV scenario
• Potential sites for hydrogen storage are based on the ESTMAP database.
0
2
4
6
8
10
12
14
16
18
20
Statistics
Base
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
Base
MorePV
BatteryCost
2010 2015 2020 2025 2030 2035 2040 2045 2050
GWh
H2 Storage Content
H2 Storage
Germany, Belgium & Netherlands Model -
PowerFys dispatch model (Ecofys)
Frank Meinke-Hubeny
Schematic representation of
the inputs and outputs of the PowerFys model
PowerFys –
Adaptation of the load variation curve
Snapshot of the first week of January 2050, Germany
date
05-Jun 06-Jun 07-Jun 08-Jun
MW
10
4
-2
0
2
4
6
8
10
12
20160720_Baseline_update_v2 - DE+NL+BE elektra
Storage release
RE
Oil
OilCC
Coal
Lignite
Gas
GasCC
curt. RE
Storage filling
Curtailment
Load
PowerFys
Example of power dispatch for a three-day period in June
PowerFys
Destination of surplus renewables
% of total renewable generation
0 2 4 6 8 10 12 14 16 18 20
TOTAL
BE
NL
DE
20160720_Baseline_update_v2 - Surplus Renewables
avoided curtailment - to export
avoided curtailment - to storage
curtailment
TIMES analysis in the context of large scale energy storage
Challenges / Critical self-reflection
• Underestimation of LSES demand due to low time slice
resolution and ‘last moment investments (e.g. >2040)
• Avoidance of ‘marginally expensive’ technologies, like
storage, due to ‘perfect foresight’
• Secondary business cases or ‘irrational behaviour’ only
implemented as exogenous input
• Interaction with electricity market price difficult to
model
• Transmission capacity investments are used in multi-
region models and compete (or replace?) storage in
small countries (like Belgium)
TIMES analysis in the context of large scale energy storage
Lessons learned
• Various storage technologies play a role in the outcomes
– the mix is important and country-specific
• Not a ‘one solution fits all’ result
• ‘Competition’ among technologies play a key role
- see GER example
• Need for a better understanding of the energy systems:
Power - Heat – Storage - Flexibility/DSM
• Transmission capacity and willingness for an Energy
Union have a significant impact on small countries (BE)
• Knowledge of current and future technologies is key
(solar, wind, storage, …): Technical, Economic, Potential
aspects

Mais conteúdo relacionado

Mais procurados

Impacts of green hydrogen on the Italian power system by 2030
Impacts of green hydrogen on the Italian power system by 2030Impacts of green hydrogen on the Italian power system by 2030
Impacts of green hydrogen on the Italian power system by 2030IEA-ETSAP
 
Long-term energy system modelling with improved resolution to address short-t...
Long-term energy system modelling with improved resolution to address short-t...Long-term energy system modelling with improved resolution to address short-t...
Long-term energy system modelling with improved resolution to address short-t...IEA-ETSAP
 
Evaluation of the French Energy Transition for Green Growth Law with Times-FR
Evaluation of the French Energy Transition for Green Growth Law with Times-FREvaluation of the French Energy Transition for Green Growth Law with Times-FR
Evaluation of the French Energy Transition for Green Growth Law with Times-FRIEA-ETSAP
 
Analysis of distribution grid tariffs in the Norwegian energy system
Analysis of distribution grid tariffs in the Norwegian energy systemAnalysis of distribution grid tariffs in the Norwegian energy system
Analysis of distribution grid tariffs in the Norwegian energy systemIEA-ETSAP
 
Climate policy Engagement in Brazil: how delayed action might lead to CCS as ...
Climate policy Engagement in Brazil: how delayed action might lead to CCS as ...Climate policy Engagement in Brazil: how delayed action might lead to CCS as ...
Climate policy Engagement in Brazil: how delayed action might lead to CCS as ...IEA-ETSAP
 
Grid Features in the TIMES-based Japan Model
Grid Features in the TIMES-based Japan ModelGrid Features in the TIMES-based Japan Model
Grid Features in the TIMES-based Japan ModelIEA-ETSAP
 
Spatial flexibility in redispatch: Supporting low carbon energy systems with ...
Spatial flexibility in redispatch: Supporting low carbon energy systems with ...Spatial flexibility in redispatch: Supporting low carbon energy systems with ...
Spatial flexibility in redispatch: Supporting low carbon energy systems with ...IEA-ETSAP
 
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...IEA-ETSAP
 
How do changes to future technology and fuel developments affect the optimal ...
How do changes to future technology and fuel developments affect the optimal ...How do changes to future technology and fuel developments affect the optimal ...
How do changes to future technology and fuel developments affect the optimal ...IEA-ETSAP
 
Modelling different Thermal Energy Storage (TES) options in a TIMES model
Modelling different Thermal Energy Storage (TES) options in a TIMES modelModelling different Thermal Energy Storage (TES) options in a TIMES model
Modelling different Thermal Energy Storage (TES) options in a TIMES modelIEA-ETSAP
 
ETSAP-TIAM update and re-calibration
ETSAP-TIAM update and re-calibrationETSAP-TIAM update and re-calibration
ETSAP-TIAM update and re-calibrationIEA-ETSAP
 
V2G: Measuring Electric Vehicle Drivers’ Willingness to Co-create Flexibility...
V2G: Measuring Electric Vehicle Drivers’ Willingness to Co-create Flexibility...V2G: Measuring Electric Vehicle Drivers’ Willingness to Co-create Flexibility...
V2G: Measuring Electric Vehicle Drivers’ Willingness to Co-create Flexibility...IEA-ETSAP
 
Modelling flexible electric vehicle charging in local energy communities
Modelling flexible electric vehicle charging in local energy communitiesModelling flexible electric vehicle charging in local energy communities
Modelling flexible electric vehicle charging in local energy communitiesIEA-ETSAP
 
Energy Research at the Paul Scherrer Institut
Energy Research at the Paul Scherrer InstitutEnergy Research at the Paul Scherrer Institut
Energy Research at the Paul Scherrer InstitutIEA-ETSAP
 
TIMES Course for Master Students in DTU: Reflections and Way Forward
TIMES Course for Master Students in DTU: Reflections and Way ForwardTIMES Course for Master Students in DTU: Reflections and Way Forward
TIMES Course for Master Students in DTU: Reflections and Way ForwardIEA-ETSAP
 
A Spatio-temporal Optimization Model for the Analysis of Future Energy System...
A Spatio-temporal Optimization Model for the Analysis of Future Energy System...A Spatio-temporal Optimization Model for the Analysis of Future Energy System...
A Spatio-temporal Optimization Model for the Analysis of Future Energy System...IEA-ETSAP
 
Ongoing Macro-Stand Alone and CGE modelling approaches at UCL Energy Institute
Ongoing Macro-Stand Alone and CGE modelling approaches at UCL Energy InstituteOngoing Macro-Stand Alone and CGE modelling approaches at UCL Energy Institute
Ongoing Macro-Stand Alone and CGE modelling approaches at UCL Energy InstituteIEA-ETSAP
 
Mitigation Pathways to well below 2C in ETSAP-TIAM
Mitigation Pathways to well below 2C in ETSAP-TIAMMitigation Pathways to well below 2C in ETSAP-TIAM
Mitigation Pathways to well below 2C in ETSAP-TIAMIEA-ETSAP
 
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...IEA-ETSAP
 
Cost development of renewable energy technologies
Cost development of renewable energy technologiesCost development of renewable energy technologies
Cost development of renewable energy technologiesLeonardo ENERGY
 

Mais procurados (20)

Impacts of green hydrogen on the Italian power system by 2030
Impacts of green hydrogen on the Italian power system by 2030Impacts of green hydrogen on the Italian power system by 2030
Impacts of green hydrogen on the Italian power system by 2030
 
Long-term energy system modelling with improved resolution to address short-t...
Long-term energy system modelling with improved resolution to address short-t...Long-term energy system modelling with improved resolution to address short-t...
Long-term energy system modelling with improved resolution to address short-t...
 
Evaluation of the French Energy Transition for Green Growth Law with Times-FR
Evaluation of the French Energy Transition for Green Growth Law with Times-FREvaluation of the French Energy Transition for Green Growth Law with Times-FR
Evaluation of the French Energy Transition for Green Growth Law with Times-FR
 
Analysis of distribution grid tariffs in the Norwegian energy system
Analysis of distribution grid tariffs in the Norwegian energy systemAnalysis of distribution grid tariffs in the Norwegian energy system
Analysis of distribution grid tariffs in the Norwegian energy system
 
Climate policy Engagement in Brazil: how delayed action might lead to CCS as ...
Climate policy Engagement in Brazil: how delayed action might lead to CCS as ...Climate policy Engagement in Brazil: how delayed action might lead to CCS as ...
Climate policy Engagement in Brazil: how delayed action might lead to CCS as ...
 
Grid Features in the TIMES-based Japan Model
Grid Features in the TIMES-based Japan ModelGrid Features in the TIMES-based Japan Model
Grid Features in the TIMES-based Japan Model
 
Spatial flexibility in redispatch: Supporting low carbon energy systems with ...
Spatial flexibility in redispatch: Supporting low carbon energy systems with ...Spatial flexibility in redispatch: Supporting low carbon energy systems with ...
Spatial flexibility in redispatch: Supporting low carbon energy systems with ...
 
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
Enhancement to the TIMES Source Code: Enabling REGIONS and TIME-SLICES to be ...
 
How do changes to future technology and fuel developments affect the optimal ...
How do changes to future technology and fuel developments affect the optimal ...How do changes to future technology and fuel developments affect the optimal ...
How do changes to future technology and fuel developments affect the optimal ...
 
Modelling different Thermal Energy Storage (TES) options in a TIMES model
Modelling different Thermal Energy Storage (TES) options in a TIMES modelModelling different Thermal Energy Storage (TES) options in a TIMES model
Modelling different Thermal Energy Storage (TES) options in a TIMES model
 
ETSAP-TIAM update and re-calibration
ETSAP-TIAM update and re-calibrationETSAP-TIAM update and re-calibration
ETSAP-TIAM update and re-calibration
 
V2G: Measuring Electric Vehicle Drivers’ Willingness to Co-create Flexibility...
V2G: Measuring Electric Vehicle Drivers’ Willingness to Co-create Flexibility...V2G: Measuring Electric Vehicle Drivers’ Willingness to Co-create Flexibility...
V2G: Measuring Electric Vehicle Drivers’ Willingness to Co-create Flexibility...
 
Modelling flexible electric vehicle charging in local energy communities
Modelling flexible electric vehicle charging in local energy communitiesModelling flexible electric vehicle charging in local energy communities
Modelling flexible electric vehicle charging in local energy communities
 
Energy Research at the Paul Scherrer Institut
Energy Research at the Paul Scherrer InstitutEnergy Research at the Paul Scherrer Institut
Energy Research at the Paul Scherrer Institut
 
TIMES Course for Master Students in DTU: Reflections and Way Forward
TIMES Course for Master Students in DTU: Reflections and Way ForwardTIMES Course for Master Students in DTU: Reflections and Way Forward
TIMES Course for Master Students in DTU: Reflections and Way Forward
 
A Spatio-temporal Optimization Model for the Analysis of Future Energy System...
A Spatio-temporal Optimization Model for the Analysis of Future Energy System...A Spatio-temporal Optimization Model for the Analysis of Future Energy System...
A Spatio-temporal Optimization Model for the Analysis of Future Energy System...
 
Ongoing Macro-Stand Alone and CGE modelling approaches at UCL Energy Institute
Ongoing Macro-Stand Alone and CGE modelling approaches at UCL Energy InstituteOngoing Macro-Stand Alone and CGE modelling approaches at UCL Energy Institute
Ongoing Macro-Stand Alone and CGE modelling approaches at UCL Energy Institute
 
Mitigation Pathways to well below 2C in ETSAP-TIAM
Mitigation Pathways to well below 2C in ETSAP-TIAMMitigation Pathways to well below 2C in ETSAP-TIAM
Mitigation Pathways to well below 2C in ETSAP-TIAM
 
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
Overview of Hydrogen TCP, Task 41. Introduce discussion points from the hydro...
 
Cost development of renewable energy technologies
Cost development of renewable energy technologiesCost development of renewable energy technologies
Cost development of renewable energy technologies
 

Destaque

Value of the interconnectors in the Nordic countries
Value of the interconnectors in the Nordic countriesValue of the interconnectors in the Nordic countries
Value of the interconnectors in the Nordic countriesIEA-ETSAP
 
Second ETSAP book
Second ETSAP book Second ETSAP book
Second ETSAP book IEA-ETSAP
 
Model archaeology
Model archaeologyModel archaeology
Model archaeologyIEA-ETSAP
 
Development of the pathways to achieve SE4ALL 2030 objectives
Development of the pathways to achieve SE4ALL 2030 objectivesDevelopment of the pathways to achieve SE4ALL 2030 objectives
Development of the pathways to achieve SE4ALL 2030 objectivesIEA-ETSAP
 
VEDAViz for ETSAP partners
VEDAViz for ETSAP partnersVEDAViz for ETSAP partners
VEDAViz for ETSAP partnersIEA-ETSAP
 
Demonstrating RES visualisation software
Demonstrating RES visualisation softwareDemonstrating RES visualisation software
Demonstrating RES visualisation softwareIEA-ETSAP
 
Modelling the demand in Spain with Med-Pro
Modelling the demand in Spain with Med-ProModelling the demand in Spain with Med-Pro
Modelling the demand in Spain with Med-ProIEA-ETSAP
 
Residential heat pumps in the future Danish energy system
Residential heat pumps in the future Danish energy systemResidential heat pumps in the future Danish energy system
Residential heat pumps in the future Danish energy systemIEA-ETSAP
 
Impacts of Czech brown coal mines enlargement: assessment by energy model TIM...
Impacts of Czech brown coal mines enlargement: assessment by energy model TIM...Impacts of Czech brown coal mines enlargement: assessment by energy model TIM...
Impacts of Czech brown coal mines enlargement: assessment by energy model TIM...IEA-ETSAP
 
Comparing hard-linking (TIMES-MSA) and soft-linking (TIMES-HERMES) methodolog...
Comparing hard-linking (TIMES-MSA) and soft-linking (TIMES-HERMES) methodolog...Comparing hard-linking (TIMES-MSA) and soft-linking (TIMES-HERMES) methodolog...
Comparing hard-linking (TIMES-MSA) and soft-linking (TIMES-HERMES) methodolog...IEA-ETSAP
 
ETSAP R&D Proposals
ETSAP R&D ProposalsETSAP R&D Proposals
ETSAP R&D ProposalsIEA-ETSAP
 
Power systems reliability assessment in prospective analyses
Power systems reliability assessment in prospective analysesPower systems reliability assessment in prospective analyses
Power systems reliability assessment in prospective analysesIEA-ETSAP
 
National energy system modelling with TIMES - an MSc course in DTU
National energy system modelling with TIMES - an MSc course in DTUNational energy system modelling with TIMES - an MSc course in DTU
National energy system modelling with TIMES - an MSc course in DTUIEA-ETSAP
 
Integrated Water Modelling in TIMES Moving towards best practice
Integrated Water Modelling in TIMES Moving towards best practiceIntegrated Water Modelling in TIMES Moving towards best practice
Integrated Water Modelling in TIMES Moving towards best practiceIEA-ETSAP
 
Methodology for incorporating modal choice behaviour in bottom-up energy syst...
Methodology for incorporating modal choice behaviour in bottom-up energy syst...Methodology for incorporating modal choice behaviour in bottom-up energy syst...
Methodology for incorporating modal choice behaviour in bottom-up energy syst...IEA-ETSAP
 
Modelling Economically optimal heat supply to low energy building areas – The...
Modelling Economically optimal heat supply to low energy building areas – The...Modelling Economically optimal heat supply to low energy building areas – The...
Modelling Economically optimal heat supply to low energy building areas – The...IEA-ETSAP
 
Linking TIAM and KLEM: Economic Impacts of WB2D mitigation pathways
Linking TIAM and KLEM: Economic Impacts of WB2D mitigation pathwaysLinking TIAM and KLEM: Economic Impacts of WB2D mitigation pathways
Linking TIAM and KLEM: Economic Impacts of WB2D mitigation pathwaysIEA-ETSAP
 
Addressing Uncertainty in TIMES Using Monte Carlo Analysis
Addressing Uncertainty in TIMES Using Monte Carlo AnalysisAddressing Uncertainty in TIMES Using Monte Carlo Analysis
Addressing Uncertainty in TIMES Using Monte Carlo AnalysisIEA-ETSAP
 
Introducing Electricity Dispatchability Features in TIMES modelling Framework
Introducing Electricity Dispatchability Features in TIMES modelling FrameworkIntroducing Electricity Dispatchability Features in TIMES modelling Framework
Introducing Electricity Dispatchability Features in TIMES modelling FrameworkIEA-ETSAP
 
Decarbonise and Electrify – Is it Enough to Meet Emission Targets a Case Stud...
Decarbonise and Electrify – Is it Enough to Meet Emission Targets a Case Stud...Decarbonise and Electrify – Is it Enough to Meet Emission Targets a Case Stud...
Decarbonise and Electrify – Is it Enough to Meet Emission Targets a Case Stud...IEA-ETSAP
 

Destaque (20)

Value of the interconnectors in the Nordic countries
Value of the interconnectors in the Nordic countriesValue of the interconnectors in the Nordic countries
Value of the interconnectors in the Nordic countries
 
Second ETSAP book
Second ETSAP book Second ETSAP book
Second ETSAP book
 
Model archaeology
Model archaeologyModel archaeology
Model archaeology
 
Development of the pathways to achieve SE4ALL 2030 objectives
Development of the pathways to achieve SE4ALL 2030 objectivesDevelopment of the pathways to achieve SE4ALL 2030 objectives
Development of the pathways to achieve SE4ALL 2030 objectives
 
VEDAViz for ETSAP partners
VEDAViz for ETSAP partnersVEDAViz for ETSAP partners
VEDAViz for ETSAP partners
 
Demonstrating RES visualisation software
Demonstrating RES visualisation softwareDemonstrating RES visualisation software
Demonstrating RES visualisation software
 
Modelling the demand in Spain with Med-Pro
Modelling the demand in Spain with Med-ProModelling the demand in Spain with Med-Pro
Modelling the demand in Spain with Med-Pro
 
Residential heat pumps in the future Danish energy system
Residential heat pumps in the future Danish energy systemResidential heat pumps in the future Danish energy system
Residential heat pumps in the future Danish energy system
 
Impacts of Czech brown coal mines enlargement: assessment by energy model TIM...
Impacts of Czech brown coal mines enlargement: assessment by energy model TIM...Impacts of Czech brown coal mines enlargement: assessment by energy model TIM...
Impacts of Czech brown coal mines enlargement: assessment by energy model TIM...
 
Comparing hard-linking (TIMES-MSA) and soft-linking (TIMES-HERMES) methodolog...
Comparing hard-linking (TIMES-MSA) and soft-linking (TIMES-HERMES) methodolog...Comparing hard-linking (TIMES-MSA) and soft-linking (TIMES-HERMES) methodolog...
Comparing hard-linking (TIMES-MSA) and soft-linking (TIMES-HERMES) methodolog...
 
ETSAP R&D Proposals
ETSAP R&D ProposalsETSAP R&D Proposals
ETSAP R&D Proposals
 
Power systems reliability assessment in prospective analyses
Power systems reliability assessment in prospective analysesPower systems reliability assessment in prospective analyses
Power systems reliability assessment in prospective analyses
 
National energy system modelling with TIMES - an MSc course in DTU
National energy system modelling with TIMES - an MSc course in DTUNational energy system modelling with TIMES - an MSc course in DTU
National energy system modelling with TIMES - an MSc course in DTU
 
Integrated Water Modelling in TIMES Moving towards best practice
Integrated Water Modelling in TIMES Moving towards best practiceIntegrated Water Modelling in TIMES Moving towards best practice
Integrated Water Modelling in TIMES Moving towards best practice
 
Methodology for incorporating modal choice behaviour in bottom-up energy syst...
Methodology for incorporating modal choice behaviour in bottom-up energy syst...Methodology for incorporating modal choice behaviour in bottom-up energy syst...
Methodology for incorporating modal choice behaviour in bottom-up energy syst...
 
Modelling Economically optimal heat supply to low energy building areas – The...
Modelling Economically optimal heat supply to low energy building areas – The...Modelling Economically optimal heat supply to low energy building areas – The...
Modelling Economically optimal heat supply to low energy building areas – The...
 
Linking TIAM and KLEM: Economic Impacts of WB2D mitigation pathways
Linking TIAM and KLEM: Economic Impacts of WB2D mitigation pathwaysLinking TIAM and KLEM: Economic Impacts of WB2D mitigation pathways
Linking TIAM and KLEM: Economic Impacts of WB2D mitigation pathways
 
Addressing Uncertainty in TIMES Using Monte Carlo Analysis
Addressing Uncertainty in TIMES Using Monte Carlo AnalysisAddressing Uncertainty in TIMES Using Monte Carlo Analysis
Addressing Uncertainty in TIMES Using Monte Carlo Analysis
 
Introducing Electricity Dispatchability Features in TIMES modelling Framework
Introducing Electricity Dispatchability Features in TIMES modelling FrameworkIntroducing Electricity Dispatchability Features in TIMES modelling Framework
Introducing Electricity Dispatchability Features in TIMES modelling Framework
 
Decarbonise and Electrify – Is it Enough to Meet Emission Targets a Case Stud...
Decarbonise and Electrify – Is it Enough to Meet Emission Targets a Case Stud...Decarbonise and Electrify – Is it Enough to Meet Emission Targets a Case Stud...
Decarbonise and Electrify – Is it Enough to Meet Emission Targets a Case Stud...
 

Semelhante a Analysis of the role of energy storages in Belgium and Netherlands with TIMES

Vision and initial feasibility of a recarbonised Finnish energy system for 2050
Vision and initial feasibility of a recarbonised Finnish energy system for 2050Vision and initial feasibility of a recarbonised Finnish energy system for 2050
Vision and initial feasibility of a recarbonised Finnish energy system for 2050Lappeenranta University of Technology, LUT
 
Hydrogen electrolyser capacity investment in the Australian context: optimiza...
Hydrogen electrolyser capacity investment in the Australian context: optimiza...Hydrogen electrolyser capacity investment in the Australian context: optimiza...
Hydrogen electrolyser capacity investment in the Australian context: optimiza...IEA-ETSAP
 
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...Global CCS Institute
 
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...Global CCS Institute
 
ERIKS Know+How Issue 23, Energy Conservation
ERIKS Know+How Issue 23, Energy ConservationERIKS Know+How Issue 23, Energy Conservation
ERIKS Know+How Issue 23, Energy ConservationERIKS UK
 
Renewable Energy and Storage Systems
Renewable Energy and Storage SystemsRenewable Energy and Storage Systems
Renewable Energy and Storage SystemsEnel S.p.A.
 
Scarabeus Project
Scarabeus ProjectScarabeus Project
Scarabeus ProjectAbengoa
 
Bulk Solar Electricity Generation
Bulk Solar Electricity GenerationBulk Solar Electricity Generation
Bulk Solar Electricity Generationfernando nuño
 
Bulk Solar Power Generation :CSP and CPV technologies
Bulk Solar Power Generation :CSP and CPV technologiesBulk Solar Power Generation :CSP and CPV technologies
Bulk Solar Power Generation :CSP and CPV technologiesLeonardo ENERGY
 
Energy storage system to reduce peak demand of domestic consumers
Energy storage system to reduce peak demand of domestic consumersEnergy storage system to reduce peak demand of domestic consumers
Energy storage system to reduce peak demand of domestic consumersKevin Koshy Varghese
 
Development of a concept for the modular design and sizing of a pv ice making...
Development of a concept for the modular design and sizing of a pv ice making...Development of a concept for the modular design and sizing of a pv ice making...
Development of a concept for the modular design and sizing of a pv ice making...Ricardo Faerron Guzmán
 
CCS as least-cost options for integrating intermittent renewables in low-carb...
CCS as least-cost options for integrating intermittent renewables in low-carb...CCS as least-cost options for integrating intermittent renewables in low-carb...
CCS as least-cost options for integrating intermittent renewables in low-carb...Global CCS Institute
 
SMi Group's 3rd annual Utility Energy Storage Europe conference
SMi Group's 3rd annual Utility Energy Storage Europe conferenceSMi Group's 3rd annual Utility Energy Storage Europe conference
SMi Group's 3rd annual Utility Energy Storage Europe conferenceDale Butler
 
Drivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP marketDrivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP marketLeonardo ENERGY
 
Presentation J.W.M.M. Van Hellenberg Hubar Mid Term Colloquium 2011 07 13
Presentation J.W.M.M. Van Hellenberg Hubar Mid Term Colloquium 2011 07 13Presentation J.W.M.M. Van Hellenberg Hubar Mid Term Colloquium 2011 07 13
Presentation J.W.M.M. Van Hellenberg Hubar Mid Term Colloquium 2011 07 13Jeroenvanhellenberghubar
 
Jrc115923 stationary fuel_cells_16042019_final_pubsy_online
Jrc115923 stationary fuel_cells_16042019_final_pubsy_onlineJrc115923 stationary fuel_cells_16042019_final_pubsy_online
Jrc115923 stationary fuel_cells_16042019_final_pubsy_onlineEnzo Ochoa Montes
 

Semelhante a Analysis of the role of energy storages in Belgium and Netherlands with TIMES (20)

Vision and initial feasibility of a recarbonised Finnish energy system for 2050
Vision and initial feasibility of a recarbonised Finnish energy system for 2050Vision and initial feasibility of a recarbonised Finnish energy system for 2050
Vision and initial feasibility of a recarbonised Finnish energy system for 2050
 
Hydrogen electrolyser capacity investment in the Australian context: optimiza...
Hydrogen electrolyser capacity investment in the Australian context: optimiza...Hydrogen electrolyser capacity investment in the Australian context: optimiza...
Hydrogen electrolyser capacity investment in the Australian context: optimiza...
 
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
 
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
Webinar: The cost effectiveness of natural gas combined cycle power plants wi...
 
ERIKS Know+How Issue 23, Energy Conservation
ERIKS Know+How Issue 23, Energy ConservationERIKS Know+How Issue 23, Energy Conservation
ERIKS Know+How Issue 23, Energy Conservation
 
NMRESGI_Optimized Integration of PV with Battery Storage_Hawkins
NMRESGI_Optimized Integration of PV with Battery Storage_HawkinsNMRESGI_Optimized Integration of PV with Battery Storage_Hawkins
NMRESGI_Optimized Integration of PV with Battery Storage_Hawkins
 
Renewable Energy and Storage Systems
Renewable Energy and Storage SystemsRenewable Energy and Storage Systems
Renewable Energy and Storage Systems
 
Scarabeus Project
Scarabeus ProjectScarabeus Project
Scarabeus Project
 
Green Belt Project V2
Green Belt Project V2Green Belt Project V2
Green Belt Project V2
 
Bulk Solar Electricity Generation
Bulk Solar Electricity GenerationBulk Solar Electricity Generation
Bulk Solar Electricity Generation
 
Bulk Solar Power Generation :CSP and CPV technologies
Bulk Solar Power Generation :CSP and CPV technologiesBulk Solar Power Generation :CSP and CPV technologies
Bulk Solar Power Generation :CSP and CPV technologies
 
Energy storage system to reduce peak demand of domestic consumers
Energy storage system to reduce peak demand of domestic consumersEnergy storage system to reduce peak demand of domestic consumers
Energy storage system to reduce peak demand of domestic consumers
 
System integration of heat and electricity – how?
System integration of heat and electricity – how?System integration of heat and electricity – how?
System integration of heat and electricity – how?
 
Development of a concept for the modular design and sizing of a pv ice making...
Development of a concept for the modular design and sizing of a pv ice making...Development of a concept for the modular design and sizing of a pv ice making...
Development of a concept for the modular design and sizing of a pv ice making...
 
CCS as least-cost options for integrating intermittent renewables in low-carb...
CCS as least-cost options for integrating intermittent renewables in low-carb...CCS as least-cost options for integrating intermittent renewables in low-carb...
CCS as least-cost options for integrating intermittent renewables in low-carb...
 
SMi Group's 3rd annual Utility Energy Storage Europe conference
SMi Group's 3rd annual Utility Energy Storage Europe conferenceSMi Group's 3rd annual Utility Energy Storage Europe conference
SMi Group's 3rd annual Utility Energy Storage Europe conference
 
Drivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP marketDrivers and Barriers in the current CSP market
Drivers and Barriers in the current CSP market
 
Presentation J.W.M.M. Van Hellenberg Hubar Mid Term Colloquium 2011 07 13
Presentation J.W.M.M. Van Hellenberg Hubar Mid Term Colloquium 2011 07 13Presentation J.W.M.M. Van Hellenberg Hubar Mid Term Colloquium 2011 07 13
Presentation J.W.M.M. Van Hellenberg Hubar Mid Term Colloquium 2011 07 13
 
Jrc115923 stationary fuel_cells_16042019_final_pubsy_online
Jrc115923 stationary fuel_cells_16042019_final_pubsy_onlineJrc115923 stationary fuel_cells_16042019_final_pubsy_online
Jrc115923 stationary fuel_cells_16042019_final_pubsy_online
 
Guida europea risparmio energetico 2013
Guida europea risparmio energetico 2013Guida europea risparmio energetico 2013
Guida europea risparmio energetico 2013
 

Mais de IEA-ETSAP

Variable Renewable Energy in China's Transition
Variable Renewable Energy in China's TransitionVariable Renewable Energy in China's Transition
Variable Renewable Energy in China's TransitionIEA-ETSAP
 
The Nordics as a hub for green electricity and fuels
The Nordics as a hub for green electricity and fuelsThe Nordics as a hub for green electricity and fuels
The Nordics as a hub for green electricity and fuelsIEA-ETSAP
 
The role of Norwegian offshore wind in the energy system transition
The role of Norwegian offshore wind in the energy system transitionThe role of Norwegian offshore wind in the energy system transition
The role of Norwegian offshore wind in the energy system transitionIEA-ETSAP
 
Detail representation of molecule flows and chemical sector in TIMES-BE: prog...
Detail representation of molecule flows and chemical sector in TIMES-BE: prog...Detail representation of molecule flows and chemical sector in TIMES-BE: prog...
Detail representation of molecule flows and chemical sector in TIMES-BE: prog...IEA-ETSAP
 
Green hydrogen trade from North Africa to Europe: optional long-term scenario...
Green hydrogen trade from North Africa to Europe: optional long-term scenario...Green hydrogen trade from North Africa to Europe: optional long-term scenario...
Green hydrogen trade from North Africa to Europe: optional long-term scenario...IEA-ETSAP
 
Optimal development of the Canadian forest sector for both climate change mit...
Optimal development of the Canadian forest sector for both climate change mit...Optimal development of the Canadian forest sector for both climate change mit...
Optimal development of the Canadian forest sector for both climate change mit...IEA-ETSAP
 
Presentation on IEA Net Zero Pathways/Roadmap
Presentation on IEA Net Zero Pathways/RoadmapPresentation on IEA Net Zero Pathways/Roadmap
Presentation on IEA Net Zero Pathways/RoadmapIEA-ETSAP
 
Flexibility with renewable(low-carbon) hydrogen
Flexibility with renewable(low-carbon) hydrogenFlexibility with renewable(low-carbon) hydrogen
Flexibility with renewable(low-carbon) hydrogenIEA-ETSAP
 
Bioenergy in energy system models with flexibility
Bioenergy in energy system models with flexibilityBioenergy in energy system models with flexibility
Bioenergy in energy system models with flexibilityIEA-ETSAP
 
Reframing flexibility beyond power - IEA Bioenergy TCP
Reframing flexibility beyond power - IEA Bioenergy TCPReframing flexibility beyond power - IEA Bioenergy TCP
Reframing flexibility beyond power - IEA Bioenergy TCPIEA-ETSAP
 
Decarbonization of heating in the buildings sector: efficiency first vs low-c...
Decarbonization of heating in the buildings sector: efficiency first vs low-c...Decarbonization of heating in the buildings sector: efficiency first vs low-c...
Decarbonization of heating in the buildings sector: efficiency first vs low-c...IEA-ETSAP
 
The Regionalization Tool: spatial representation of TIMES-BE output data in i...
The Regionalization Tool: spatial representation of TIMES-BE output data in i...The Regionalization Tool: spatial representation of TIMES-BE output data in i...
The Regionalization Tool: spatial representation of TIMES-BE output data in i...IEA-ETSAP
 
Synthetic methane production prospective modelling up to 2050 in the European...
Synthetic methane production prospective modelling up to 2050 in the European...Synthetic methane production prospective modelling up to 2050 in the European...
Synthetic methane production prospective modelling up to 2050 in the European...IEA-ETSAP
 
Energy Transition in global Aviation - ETSAP Workshop Turin
Energy Transition in global Aviation - ETSAP Workshop TurinEnergy Transition in global Aviation - ETSAP Workshop Turin
Energy Transition in global Aviation - ETSAP Workshop TurinIEA-ETSAP
 
Integrated Energy and Climate plans: approaches, practices and experiences
Integrated Energy and Climate plans: approaches, practices and experiencesIntegrated Energy and Climate plans: approaches, practices and experiences
Integrated Energy and Climate plans: approaches, practices and experiencesIEA-ETSAP
 
Updates on Veda provided by Amit Kanudia from KanORS-EMR
Updates on Veda provided by Amit Kanudia from KanORS-EMRUpdates on Veda provided by Amit Kanudia from KanORS-EMR
Updates on Veda provided by Amit Kanudia from KanORS-EMRIEA-ETSAP
 
Energy system modeling activities in the MAHTEP Group
Energy system modeling activities in the MAHTEP GroupEnergy system modeling activities in the MAHTEP Group
Energy system modeling activities in the MAHTEP GroupIEA-ETSAP
 
Applying science fiction to approach the future
Applying science fiction to approach the futureApplying science fiction to approach the future
Applying science fiction to approach the futureIEA-ETSAP
 
Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...
Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...
Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...IEA-ETSAP
 
Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...
Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...
Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...IEA-ETSAP
 

Mais de IEA-ETSAP (20)

Variable Renewable Energy in China's Transition
Variable Renewable Energy in China's TransitionVariable Renewable Energy in China's Transition
Variable Renewable Energy in China's Transition
 
The Nordics as a hub for green electricity and fuels
The Nordics as a hub for green electricity and fuelsThe Nordics as a hub for green electricity and fuels
The Nordics as a hub for green electricity and fuels
 
The role of Norwegian offshore wind in the energy system transition
The role of Norwegian offshore wind in the energy system transitionThe role of Norwegian offshore wind in the energy system transition
The role of Norwegian offshore wind in the energy system transition
 
Detail representation of molecule flows and chemical sector in TIMES-BE: prog...
Detail representation of molecule flows and chemical sector in TIMES-BE: prog...Detail representation of molecule flows and chemical sector in TIMES-BE: prog...
Detail representation of molecule flows and chemical sector in TIMES-BE: prog...
 
Green hydrogen trade from North Africa to Europe: optional long-term scenario...
Green hydrogen trade from North Africa to Europe: optional long-term scenario...Green hydrogen trade from North Africa to Europe: optional long-term scenario...
Green hydrogen trade from North Africa to Europe: optional long-term scenario...
 
Optimal development of the Canadian forest sector for both climate change mit...
Optimal development of the Canadian forest sector for both climate change mit...Optimal development of the Canadian forest sector for both climate change mit...
Optimal development of the Canadian forest sector for both climate change mit...
 
Presentation on IEA Net Zero Pathways/Roadmap
Presentation on IEA Net Zero Pathways/RoadmapPresentation on IEA Net Zero Pathways/Roadmap
Presentation on IEA Net Zero Pathways/Roadmap
 
Flexibility with renewable(low-carbon) hydrogen
Flexibility with renewable(low-carbon) hydrogenFlexibility with renewable(low-carbon) hydrogen
Flexibility with renewable(low-carbon) hydrogen
 
Bioenergy in energy system models with flexibility
Bioenergy in energy system models with flexibilityBioenergy in energy system models with flexibility
Bioenergy in energy system models with flexibility
 
Reframing flexibility beyond power - IEA Bioenergy TCP
Reframing flexibility beyond power - IEA Bioenergy TCPReframing flexibility beyond power - IEA Bioenergy TCP
Reframing flexibility beyond power - IEA Bioenergy TCP
 
Decarbonization of heating in the buildings sector: efficiency first vs low-c...
Decarbonization of heating in the buildings sector: efficiency first vs low-c...Decarbonization of heating in the buildings sector: efficiency first vs low-c...
Decarbonization of heating in the buildings sector: efficiency first vs low-c...
 
The Regionalization Tool: spatial representation of TIMES-BE output data in i...
The Regionalization Tool: spatial representation of TIMES-BE output data in i...The Regionalization Tool: spatial representation of TIMES-BE output data in i...
The Regionalization Tool: spatial representation of TIMES-BE output data in i...
 
Synthetic methane production prospective modelling up to 2050 in the European...
Synthetic methane production prospective modelling up to 2050 in the European...Synthetic methane production prospective modelling up to 2050 in the European...
Synthetic methane production prospective modelling up to 2050 in the European...
 
Energy Transition in global Aviation - ETSAP Workshop Turin
Energy Transition in global Aviation - ETSAP Workshop TurinEnergy Transition in global Aviation - ETSAP Workshop Turin
Energy Transition in global Aviation - ETSAP Workshop Turin
 
Integrated Energy and Climate plans: approaches, practices and experiences
Integrated Energy and Climate plans: approaches, practices and experiencesIntegrated Energy and Climate plans: approaches, practices and experiences
Integrated Energy and Climate plans: approaches, practices and experiences
 
Updates on Veda provided by Amit Kanudia from KanORS-EMR
Updates on Veda provided by Amit Kanudia from KanORS-EMRUpdates on Veda provided by Amit Kanudia from KanORS-EMR
Updates on Veda provided by Amit Kanudia from KanORS-EMR
 
Energy system modeling activities in the MAHTEP Group
Energy system modeling activities in the MAHTEP GroupEnergy system modeling activities in the MAHTEP Group
Energy system modeling activities in the MAHTEP Group
 
Applying science fiction to approach the future
Applying science fiction to approach the futureApplying science fiction to approach the future
Applying science fiction to approach the future
 
Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...
Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...
Will it leak?: Discussions of leakage risk from subsurface storage of carbon ...
 
Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...
Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...
Long-Term Decarbonization Pathways In Emerging Economies: Insights From 12 Mo...
 

Último

Computer science Sql cheat sheet.pdf.pdf
Computer science Sql cheat sheet.pdf.pdfComputer science Sql cheat sheet.pdf.pdf
Computer science Sql cheat sheet.pdf.pdfSayantanBiswas37
 
Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...nirzagarg
 
+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...
+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...
+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...Health
 
Kings of Saudi Arabia, information about them
Kings of Saudi Arabia, information about themKings of Saudi Arabia, information about them
Kings of Saudi Arabia, information about themeitharjee
 
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...nirzagarg
 
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi ArabiaIn Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabiaahmedjiabur940
 
Top Call Girls in Balaghat 9332606886Call Girls Advance Cash On Delivery Ser...
Top Call Girls in Balaghat  9332606886Call Girls Advance Cash On Delivery Ser...Top Call Girls in Balaghat  9332606886Call Girls Advance Cash On Delivery Ser...
Top Call Girls in Balaghat 9332606886Call Girls Advance Cash On Delivery Ser...kumargunjan9515
 
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制vexqp
 
Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...
Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...
Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...gragchanchal546
 
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...Bertram Ludäscher
 
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...nirzagarg
 
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With OrangePredicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With OrangeThinkInnovation
 
Vadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book now
Vadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book nowVadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book now
Vadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book nowgargpaaro
 
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptxRESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptxronsairoathenadugay
 
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...HyderabadDolls
 
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...Klinik kandungan
 
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...nirzagarg
 
如何办理英国诺森比亚大学毕业证(NU毕业证书)成绩单原件一模一样
如何办理英国诺森比亚大学毕业证(NU毕业证书)成绩单原件一模一样如何办理英国诺森比亚大学毕业证(NU毕业证书)成绩单原件一模一样
如何办理英国诺森比亚大学毕业证(NU毕业证书)成绩单原件一模一样wsppdmt
 

Último (20)

Computer science Sql cheat sheet.pdf.pdf
Computer science Sql cheat sheet.pdf.pdfComputer science Sql cheat sheet.pdf.pdf
Computer science Sql cheat sheet.pdf.pdf
 
Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Purnia [ 7014168258 ] Call Me For Genuine Models We...
 
+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...
+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...
+97470301568>>weed for sale in qatar ,weed for sale in dubai,weed for sale in...
 
Kings of Saudi Arabia, information about them
Kings of Saudi Arabia, information about themKings of Saudi Arabia, information about them
Kings of Saudi Arabia, information about them
 
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
 
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi ArabiaIn Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
 
Top Call Girls in Balaghat 9332606886Call Girls Advance Cash On Delivery Ser...
Top Call Girls in Balaghat  9332606886Call Girls Advance Cash On Delivery Ser...Top Call Girls in Balaghat  9332606886Call Girls Advance Cash On Delivery Ser...
Top Call Girls in Balaghat 9332606886Call Girls Advance Cash On Delivery Ser...
 
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
 
Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...
Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...
Gulbai Tekra * Cheap Call Girls In Ahmedabad Phone No 8005736733 Elite Escort...
 
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
 
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
 
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With OrangePredicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
 
Vadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book now
Vadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book nowVadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book now
Vadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book now
 
Abortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get CytotecAbortion pills in Jeddah | +966572737505 | Get Cytotec
Abortion pills in Jeddah | +966572737505 | Get Cytotec
 
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptxRESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
RESEARCH-FINAL-DEFENSE-PPT-TEMPLATE.pptx
 
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
Sonagachi * best call girls in Kolkata | ₹,9500 Pay Cash 8005736733 Free Home...
 
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
 
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
 
如何办理英国诺森比亚大学毕业证(NU毕业证书)成绩单原件一模一样
如何办理英国诺森比亚大学毕业证(NU毕业证书)成绩单原件一模一样如何办理英国诺森比亚大学毕业证(NU毕业证书)成绩单原件一模一样
如何办理英国诺森比亚大学毕业证(NU毕业证书)成绩单原件一模一样
 

Analysis of the role of energy storages in Belgium and Netherlands with TIMES

  • 1. Energy Storage Mapping And Planning Modelling Work Package Vito/EnergyVille Frank Meinke-Hubeny Larissa Pupo Nogueira de Oliveira Jan Duerinck IER Stuttgart Markus Blesl Julia Welsch ETSAP Workshop CIEMAT – Madrid 17.11.2016
  • 2. Overview and Background ESTMAP project Frank Meinke-Hubeny, Vito/EnergyVille Evaluation of the role of energy storages in Europe with TIMES PanEU Markus Blesl and Julia Welsch, IER University of Stuttgart Analysis of the role of energy storages in Germany with TIMES PanEU Julia Welsch and Markus Blesl, IER University of Stuttgart Analysis of the role of energy storages in Belgium and Netherlands with TIMES Larissa P. N. de Oliveira and Jan Duerinck; Vito/EnergyVille Overview of Powerfys Model results (Ecofys) Frank Meinke-Hubeny, Vito/EnergyVille Discussion
  • 3. GRAND ENERGY CHALLENGES • Establish a clean, low carbon energy system based on renewable resources • Ensure continuation of stable and high quality energy services • Keep energy generation cost efficient and affordable for all EU citizens
  • 4. ENERGY STORAGE IS A KEY ENABLER • Flexibility for an energy system in which electricity generation increases • Mitigation of consequences from increasing share of intermittent energy sources • Solutions for declining base load and shift to decentralized generation
  • 5. Energy Storage Mapping And Planning Key knowledge and information on Europe’s energy storage potential Spatial energy storage database for electricity, gas and heat technologies Case demonstration of European energy systems analysis and planning Contribute to Energy Storage development
  • 6.
  • 7. TANKS LAKES RESERVOIRS SALT HOST ROCK AQUIFERS MODULAR ESTMAP DATA SCOPE PUMPED HYDRO STORAGE NATURAL GAS STORAGE HYDROGEN STORAGE HYDROGEN STORAGE NATURAL GAS STORAGE COMPRESSED AIR ENERGY STORAGE NATURAL GAS STORAGE THERMAL ENERGY STORAGE COMPRESSED AIR ENERGY STORAGE UNDERGROUND PUMPED HYDRO STORAGE BATTERIES FLYWHEEL CAPACITATORS LNG HYDROGEN STORAGE UNDERGROUND THERMAL ENERGY STORAGE Reservoirs Technologies Subsurface / Above ground Existing / Potential Electricity, Gas, Heat
  • 9. Above ground data collection (PHS)
  • 10. Geographical energy storage database > 4200 potential and proven natural energy storage capacities > 700 planned and developed energy storage facilities Number of potential storage sites
  • 12. Flow of information for energy systems analysis and planning DBase ESTMAP Geographical database Salt Formation depth height area Select potentially suitable reservoirs for analysis input Storage site and reservoirs database reservoir characteristics Salt Formation Define notional storage facilities per technology Site characterization Feasibility determination Reservoir properties Generic technical design parameters Site-specific performance parameters Analysis input deck Future potential capacities + Proven capacities in existing facilities intake discharge efficiency capex opex etc.
  • 13. GIS, TIMES and PowerFys have been combined to demonstrate potential analysis on ESTMAP database Database GIS mapping TIMES model PowerFys model Description • Compile a database with existing and future potential energy storage • Integrate contributions from geological and technical institutes and open source information • EU • Calculate connection costs for future storage facilities • Develop storage maps depicting analysis results, after TIMES and PowerFys model runs TIMES PanEU: • Optimize configuration of storage sites & power plants • Time resolution of day, night and peak time slices • EU-28, NO, CH • 2010 – 2050 TIMES regional: • Time resolution of 280 (GER) and 60 (BE & NL) time slices • DE, BE & NL • Optimize operation of energy storage and power generation assets • Optimize storage use • Assess cross- border electricity flow & congestion • Calculate marginal energy costs • Hourly resolution • DE, BE and NL • 2050 Outcomes • Storage locations • Storage specifications • Storage connection costs • Optimal configuration of storage sites and power plants • Hourly storage use • Generation mix • Marginal costs
  • 14. Scenario Definitions 2030 2050 Combined binding emissions target (2030) Renewable target 2030 Combined emissions target (2050) Renewable target 2050* % vs. 1990 % gross final energy consumption % vs. 1990 % gross final energy consumption EU -40% 27% -80% 75%* Sources: (COM, 2013 (169)) and (COM, (2011) 885) Note: * based on 'High Renewable Energy Sources (RES)' scenario, Roadmap 2050 Baseline Scenario PV Scenario • Predefined PV generation capacity : 50% higher compared to the baseline results in 2050 BattCost Scenario Baseline Scenario BattCost Scenario Investment costs Investment costs 2010 2050 2010 2050 Battery Lithium Ion Input 100 € 𝑘𝑘 30 € 𝑘𝑘 100 € 𝑘𝑘 60 € 𝑘𝑘 Battery Lithium Ion Storage 752 € 𝑘𝑘𝑘 85 € 𝑘𝑘𝑘 752 € 𝑘𝑘𝑘 170 € 𝑘𝑘𝑘 Battery Lithium Ion Output 100 € 𝑘𝑘 30 € 𝑘𝑘 100 € 𝑘𝑘 60 € 𝑘𝑘 General Assumption • Spirit of a true ‘Energy Union’ till 2050 • Guidance from EU policy H2020, Roadmaps 2030 and 2050
  • 15. Further information about ESTMAP … • Vito, IER • Project Flyer • Website (http://estmap.eu) Frank Meinke-Hubeny frank.meinke-hubeny@vito.be Larissa Pupo Nogueira de Oliveira larissa.oliveira@vito.be Jan Duerinck jan.duerinck@vito.be
  • 16. Overview and Background ESTMAP project Frank Meinke-Hubeny, Vito/EnergyVille Evaluation of the role of energy storages in Europe with TIMES PanEU Markus Blesl and Julia Welsch, IER University of Stuttgart Analysis of the role of energy storages in Germany with TIMES PanEU Julia Welsch and Markus Blesl, IER University of Stuttgart Analysis of the role of energy storages in Belgium and Netherlands with TIMES Larissa P. N. de Oliveira and Jan Duerinck; Vito/EnergyVille Overview of Powerfys Model results (Ecofys) Frank Meinke-Hubeny, Vito/EnergyVille Discussion
  • 17. Belgium and Netherlands TIMES Model - Methodology: Temporal resolution Jan Duerinck
  • 18. Belgium and Netherlands TIMES Model - Methodology and Results Larissa Pupo Nogueira de Oliveira
  • 19. Methodology Main Structure for Storage Processes BE & NL: disaggregated approach DE & PanEU: aggregated approach~FI_Process Sets Region TechName TechDesc Tact Tcap Tslvl *Process Set Membership Region Name Technology Name Technology Description Activity Unit Capacity Unit TimeSlice level of Process Activity .ELE.CEN.TCH.STGTSS. BE STGSPH1L1 FFAC_PHS_1LAKE_001 - Storage PJa PJa DAYNITE .ELE.CEN.TCH.STGTSS. NL STGSLCSA245 FFAC_LCCAES_SALT_245 - Storage PJa PJa DAYNITE .ELE.CEN.TCH.STGTSS. NL STGSLCSA246 FFAC_LCCAES_SALT_246 - Storage PJa PJa DAYNITE .ELE.CEN.TCH.STGTSS. NL STGSLCSA247 FFAC_LCCAES_SALT_247 - Storage PJa PJa DAYNITE .ELE.CEN.TCH.STGTSS. NL STGSLCSA248 FFAC_LCCAES_SALT_248 - Storage PJa PJa DAYNITE .ELE.CEN.TCH.STGTSS. NL STGSLCSA249 FFAC_LCCAES_SALT_249 - Storage PJa PJa DAYNITE … .PRE.CEN.TCH.STGTSS. NL STGSUGRE307 FFAC_UGS_RES_307 - Storage PJa PJa DAYNITE .PRE.CEN.TCH.STGTSS. NL STGSUGRE308 FFAC_UGS_RES_308 - Storage PJa PJa DAYNITE .PRE.CEN.TCH.STGTSS. NL STGSUGRE309 FFAC_UGS_RES_309 - Storage PJa PJa DAYNITE .PRE.CEN.TCH.STGTSS. NL STGSUGRE310 FFAC_UGS_RES_310 - Storage PJa PJa DAYNITE .PRE.CEN.TCH.STGTSS. NL STGSUGRE311 FFAC_UGS_RES_311 - Storage PJa PJa DAYNITE … .PRE.CEN.TCH.STGTSS. NL STGSUGSA245 FFAC_UGS_SALT_245 - Storage PJa PJa DAYNITE .PRE.CEN.TCH.STGTSS. NL STGSUGSA246 FFAC_UGS_SALT_246 - Storage PJa PJa DAYNITE .PRE.CEN.TCH.STGTSS. NL STGSUGSA247 FFAC_UGS_SALT_247 - Storage PJa PJa DAYNITE .PRE.CEN.TCH.STGTSS. NL STGSUGSA248 FFAC_UGS_SALT_248 - Storage PJa PJa DAYNITE … .PRE.CEN.TCH.STGTSS. NL STGSH2SA245 FFAC_H2_SALT_245 - Storage PJa PJa DAYNITE .PRE.CEN.TCH.STGTSS. NL STGSH2SA246 FFAC_H2_SALT_246 - Storage PJa PJa DAYNITE .PRE.CEN.TCH.STGTSS. NL STGSH2SA247 FFAC_H2_SALT_247 - Storage PJa PJa DAYNITE .PRE.CEN.TCH.STGTSS. NL STGSH2SA248 FFAC_H2_SALT_248 - Storage PJa PJa DAYNITE .PRE.CEN.TCH.STGTSS. NL STGSH2SA249 FFAC_H2_SALT_249 - Storage PJa PJa DAYNITE .PRE.CEN.TCH.STGTSS. NL STGSH2SA250 FFAC_H2_SALT_250 - Storage PJa PJa DAYNITE ~FI_Process Sets TechName TechDesc Tact Tcap Tslvl .ELE.CEN.TCH.STGTSS. EUSTGPSN01 Pump Storage PJ PJa Daynite .ELE.CEN.TCH.STGTSS. EUSTGPSN01_S Pump Storage Seasonal PJ PJa Season .ELE.CEN.TCH.STGTSS. EUSTGCAESADIA01 CAES adiaba (salt caverns) PJ PJa Daynite .ELE.CEN.TCH.STGTSS. EUSTGCAESDIA01 CAES diabat (salt caverns) PJ PJa Daynite .ELE.CEN.TCH.STGTSS. EUSTGCAESADIA01_O CAES adiabat (tanks) PJ GW Daynite -Database can be used with both approaches! - In addition to the exercise of evaluating regions with different dimensions and potentials.
  • 20. Methodology Storage Potential Database Pump Storage – one reservoir Pump Storage – two reservoir Country Potential [GWh] Connecting Cost � € 𝒌𝒌𝒌𝒌 � Country Potential [GWh] Connecting Cost � € 𝒌𝒌𝒌𝒌 � AT 409 6,2 IE 30 5,9 BE 0 - IT 1.626 6,7 BG 378 6,9 LT 0 - CH 0 - LU 0 - CY 51 5,7 LV 0 - CZ 183 6,5 MT 0 - DE 297 6 NL 0 - DK 0 - NO 6.616 23,5 EE 0 - PL 47 5 ES 0 - PT 1.229 4,4 FI 104 8 RO 0 - FR 1.913 5,2 SE 1.098 11,6 GR 288 11,6 SI 18 5,6 HR 291 7,5 SK 0 - HU 3 5,5 UK 1.702 8,4 Country Potential [GWh] Connecting Cost � € 𝒌𝒌𝒌𝒌 � Country Potential [GWh] Connecting Cost � € 𝒌𝒌𝒌𝒌 � AT 16 6,2 IE 0 - BE 0 - IT 86 7,7 BG 0 - LT 0 - CH 0 - LU 0 - CY 0 - LV 0 - CZ 3 6 MT 0 - DE 5 15,2 NL 0 - DK 0 - NO 212 11,7 EE 0 - PL 0 - ES 0 - PT 28 5,6 FI 0 - RO 0 - FR 49 2,9 SE 0 - GR 0 - SI 0 - HR 0 - SK 0 - HU 0 - UK 85 4
  • 21. Methodology Storage Potential Database Compressed Air Natural Gas Country Potential [GWh] Connecting Cost � € 𝒌𝒌𝒌𝒌 � Country Potential [GWh] Connecting Cost � € 𝒌𝒌𝒌𝒌 � BG 5,4 6 NL 30 7,7 DE 575 7,9 PL 3 16,6 DK 32 8,6 GR 19 21,7 RO 22 8,4 Country Potential reservoir [million m 3 ] Potential cavern [million m 3 ] Country Potential reservoir [million m 3 ] Potential cavern [million m 3 ] AT 9.264 0 GR 0,002 4.000 BG 0 1.460 IT 8.863 0 DE 172.000 221.000 HU 29.011 0 DK 0 12.000 NL 65.250 12.000 DE 0 0 PL 2.000 4.000 DK 0 0 RO 3.000 8.000 HR 25 0 SI 306 0 UK 34 0,004
  • 22. Optimized electricity output of power plants in Belgium -20 0 20 40 60 80 100 120 Statistics Base Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost 2010 2015 2020 2025 2030 2035 2040 2045 2050 TWh Net Electricity ElectricityStorage(excl.PumpHydro) Netimports Others/Wastenon-ren. Hydrogen OtherRenewables Biomass/Wasteren. Solar Windoffshore WindOnshore Hydro(incl.PumpStorage) Nuclear GasCCS Gasw/oCCS Oil LigniteCCS Lignitew/oCCS CoalCCS Coalw/oCCS • Major transition in the years from 2020 to 2030, during phase out of nuclear generation • Nuclear phase out is compensated mainly through • Increase in gas generation plant output, • Decline in energy demand and • Massive increase in net energy import from neighbouring countries
  • 23. Optimized electricity capacity of power plants in Belgium 0 5 10 15 20 25 30 35 40 45 50 Statistics Base Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost 2010 2015 2020 2025 2030 2035 2040 2045 2050 GW Capacity ElectricityStorage(excl.PumpStorage) Others/Wastenon-ren. OtherRenewables Biomass/WasteRen. Solar Wind Hydro(incl.PumpStorage) Nuclear NaturalGas Oil Lignite Coal • Overall capacity increases from 2030 to 2050 • Most growth can be attributed to the increasing wind generation capacity • ‘Imposed’ higher PV generation capacity (MorePV scenario) results in a reduction of 2 GW of wind capacity (14 GW in baseline scenario to 12 GW in MorePV scenario) • Majority of additional PV capacity does not replace other RES capacity, but is added to overall capacity
  • 24. 0 1 2 3 4 5 6 7 8 9 10 Statistics Base Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost 2010 2015 2020 2025 2030 2035 2040 2045 2050 GWh Storage Content Pump Storage Optimized amount and types of storage sites in Belgium • New capacity in electrical storage output does not play a role in Belgium in the model results • Storage is limited to the existing pumped hydro storage with a steady 6.5 GWh of storage content
  • 25. Optimized electricity output of power plants in Netherlands -20 30 80 130 180 230 Statistics Base Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost 2010 2015 2020 2025 2030 2035 2040 2045 2050 TWh Net Electricity ElectricityStorage(excl.PumpHydro) Netimports Others/Wastenon-ren. Hydrogen OtherRenewables Biomass/Wasteren. Solar Windoffshore WindOnshore Hydro(incl.PumpStorage) Nuclear GasCCS Gasw/oCCS Oil LigniteCCS Lignitew/oCCS CoalCCS Coalw/oCCS • Netherlands largely differs from the Belgium - only 4 TWh originate from nuclear generation • Majority of generated by gas and coal plants in base year • Transition to a more RES based energy system starts with offshore wind energy, in later years onshore wind and solar generation • Net transfer capacity from the year 2035 onwards (approx. 12 TWh in 2035, increasing to 19-20 TWh in 2040, 21 TWh in 2045 approximately)
  • 26. Optimized electricity capacity of power plants in Netherlands 0 10 20 30 40 50 60 70 80 90 100 Statistics Base Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost 2010 2015 2020 2025 2030 2035 2040 2045 2050 GW Capacity ElectricityStorage(excl.PumpStorage) Others/Wastenon-ren. OtherRenewables Biomass/WasteRen. Solar Wind Hydro(incl.PumpStorage) Nuclear NaturalGas Oil Lignite Coal • Transition to a more RES based energy system starts with • Growing share of offshore wind energy, • Onshore wind and solar generation in later years
  • 27. Optimized amount and types of storage sites in Netherlands 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 Statistics Base Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost 2010 2015 2020 2025 2030 2035 2040 2045 2050 GWh Storage Content Battery Redox Flow Battery Lead Acid Battery Lithium Ion CAES Adiabatic CAES Diabatic Pump Storage • Reliance on import goes hand in hand with no investments in storage capacities • Exception being results in the MorePV scenario • Lithium-ion storage content in the year 2050 of 0.28 GWh
  • 28. Optimized amount and types of storage sites in Netherlands • Hydrogen storage is chosen in the Dutch context • For 2050 H2 storage of approximately 13 GWh in the Base and BattCost scenario • 18 GWh in the MorePV scenario • Potential sites for hydrogen storage are based on the ESTMAP database. 0 2 4 6 8 10 12 14 16 18 20 Statistics Base Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost Base MorePV BatteryCost 2010 2015 2020 2025 2030 2035 2040 2045 2050 GWh H2 Storage Content H2 Storage
  • 29. Germany, Belgium & Netherlands Model - PowerFys dispatch model (Ecofys) Frank Meinke-Hubeny
  • 30. Schematic representation of the inputs and outputs of the PowerFys model
  • 31. PowerFys – Adaptation of the load variation curve Snapshot of the first week of January 2050, Germany
  • 32. date 05-Jun 06-Jun 07-Jun 08-Jun MW 10 4 -2 0 2 4 6 8 10 12 20160720_Baseline_update_v2 - DE+NL+BE elektra Storage release RE Oil OilCC Coal Lignite Gas GasCC curt. RE Storage filling Curtailment Load PowerFys Example of power dispatch for a three-day period in June
  • 33. PowerFys Destination of surplus renewables % of total renewable generation 0 2 4 6 8 10 12 14 16 18 20 TOTAL BE NL DE 20160720_Baseline_update_v2 - Surplus Renewables avoided curtailment - to export avoided curtailment - to storage curtailment
  • 34. TIMES analysis in the context of large scale energy storage Challenges / Critical self-reflection • Underestimation of LSES demand due to low time slice resolution and ‘last moment investments (e.g. >2040) • Avoidance of ‘marginally expensive’ technologies, like storage, due to ‘perfect foresight’ • Secondary business cases or ‘irrational behaviour’ only implemented as exogenous input • Interaction with electricity market price difficult to model • Transmission capacity investments are used in multi- region models and compete (or replace?) storage in small countries (like Belgium)
  • 35. TIMES analysis in the context of large scale energy storage Lessons learned • Various storage technologies play a role in the outcomes – the mix is important and country-specific • Not a ‘one solution fits all’ result • ‘Competition’ among technologies play a key role - see GER example • Need for a better understanding of the energy systems: Power - Heat – Storage - Flexibility/DSM • Transmission capacity and willingness for an Energy Union have a significant impact on small countries (BE) • Knowledge of current and future technologies is key (solar, wind, storage, …): Technical, Economic, Potential aspects