Training Workshop on Payments for Ecosystem Services (PES) and Reducing Emissions from Deforestation and Degradation (REDD+) Nairobi, Kenya - August 9th, 2011 Payments for Ecosystem Services: Policy Issues Slayde HawkinsForest Trends/Katoomba Group
Clarity on whether PES are permitted under existing law Ownership and use rights over: Land Natural resources Credits for ecosystem services Application of existing laws and regulations to PES Clarity on who has authority and how legal or policy conflicts will be handled Stability and rule of law Available mechanisms for contract enforcement and appeal Overview: Key Policy Issues for PES
PES may be prohibited by Constitution or law May be bar on selling ecosystem services, as a public good that is held on behalf of all If sale of ES credits prohibited, may nevertheless be legal to contract to provide services that restore or conserve ecosystem services PES Allowed by Law?
LAND TENURE Legal or customary relationship of an individual or group with respect to land and other natural resources. Tenure: Definition Tenure rules determine: WHO can use WHAT resources  For HOW LONG Under what CONDITIONS ,[object Object],[object Object]
Land title not validly vested in local users Land use arrangements poorly defined or recorded Unclear who has rights to ecosystem services revenue or whether transfer is permitted Common Tenure Challenges
Sources of applicable law Framework environmental, water, forestry laws Laws on: Land & natural resources Agriculture Planning and infrastructure Indigenous peoples Key regulatory authorities: Departments or Ministries of Environment & Agriculture Pitfalls: conflicting laws or regulations, overlapping or conflicting authorities Application of Existing Law
May apply to transaction in ecosystem services credits or to underlying project activities E.g. timber harvests, sales generally taxable Types of taxes that may apply: Sales Tax & VAT – On value of transferred good, service Income  Tax – On personal or corporate carbon revenue Property Tax – On property value Duties/tariffs – On value of imported or exported goods Carbon Revenue  Tax – On carbon credits or projects Potential Taxes
Policy Checklist for PES Minimum Threshold Requirements No prohibition on PES Secure, long-term use rights in land, natural resources Governmental bodies at national, local levels with authority over project Discernable regulatory and tax implications for PES projects Adequate levels of social, regulatory stability Contract enforcement mechanisms For more information: www.katoombagroup.org/legal
Beyond minimum threshold for enabling PES, buyers will prefer: More clarity and transparency – clarity in the regulatory framework means lower risks and costs Favorable investment climate in terms of business policies, stability, access to courts – “Ease of Doing Business” Low taxes and regulatory burdens for PES, minimal direct government involvement in projects Policy to Attract Buyers
THANK YOU! Slayde HawkinsForest Trends/Katoomba Groupshawkins@forest-trends.org
Payments for ecosystem services: policy issues

Mais conteúdo relacionado

Mais procurados

Consensus Recommendations on How to Catalyze Low-Income Solar in DC
Consensus Recommendations on How to Catalyze Low-Income Solar in DCConsensus Recommendations on How to Catalyze Low-Income Solar in DC
Consensus Recommendations on How to Catalyze Low-Income Solar in DCGW Solar Institute
 
Fitting Clean Energy into a Reformed Tax Code
Fitting Clean Energy into a Reformed Tax CodeFitting Clean Energy into a Reformed Tax Code
Fitting Clean Energy into a Reformed Tax CodeGW Solar Institute
 
Lawyer in Vietnam Oliver Massmann Solar Power Latest Updates on Draft Laws:
Lawyer in Vietnam Oliver Massmann Solar Power Latest Updates on Draft Laws:Lawyer in Vietnam Oliver Massmann Solar Power Latest Updates on Draft Laws:
Lawyer in Vietnam Oliver Massmann Solar Power Latest Updates on Draft Laws:Dr. Oliver Massmann
 
John mellors mrlg mk2 final
John mellors mrlg mk2 finalJohn mellors mrlg mk2 final
John mellors mrlg mk2 finalmrlgregion
 
What is wrong with Energy Community law enforcement?
What is wrong with Energy Community law enforcement?What is wrong with Energy Community law enforcement?
What is wrong with Energy Community law enforcement?Florence Shool of Regulation
 
Considerations of Invetsing in Solar Energy: Understanding System Siting, Ben...
Considerations of Invetsing in Solar Energy: Understanding System Siting, Ben...Considerations of Invetsing in Solar Energy: Understanding System Siting, Ben...
Considerations of Invetsing in Solar Energy: Understanding System Siting, Ben...The Solar Foundation
 
AECT Electricity 101 2020
AECT Electricity 101 2020AECT Electricity 101 2020
AECT Electricity 101 2020aectnet
 

Mais procurados (9)

Consensus Recommendations on How to Catalyze Low-Income Solar in DC
Consensus Recommendations on How to Catalyze Low-Income Solar in DCConsensus Recommendations on How to Catalyze Low-Income Solar in DC
Consensus Recommendations on How to Catalyze Low-Income Solar in DC
 
Fitting Clean Energy into a Reformed Tax Code
Fitting Clean Energy into a Reformed Tax CodeFitting Clean Energy into a Reformed Tax Code
Fitting Clean Energy into a Reformed Tax Code
 
Uescespc Washington
Uescespc WashingtonUescespc Washington
Uescespc Washington
 
Lawyer in Vietnam Oliver Massmann Solar Power Latest Updates on Draft Laws:
Lawyer in Vietnam Oliver Massmann Solar Power Latest Updates on Draft Laws:Lawyer in Vietnam Oliver Massmann Solar Power Latest Updates on Draft Laws:
Lawyer in Vietnam Oliver Massmann Solar Power Latest Updates on Draft Laws:
 
NCSP Community Solar
NCSP Community SolarNCSP Community Solar
NCSP Community Solar
 
John mellors mrlg mk2 final
John mellors mrlg mk2 finalJohn mellors mrlg mk2 final
John mellors mrlg mk2 final
 
What is wrong with Energy Community law enforcement?
What is wrong with Energy Community law enforcement?What is wrong with Energy Community law enforcement?
What is wrong with Energy Community law enforcement?
 
Considerations of Invetsing in Solar Energy: Understanding System Siting, Ben...
Considerations of Invetsing in Solar Energy: Understanding System Siting, Ben...Considerations of Invetsing in Solar Energy: Understanding System Siting, Ben...
Considerations of Invetsing in Solar Energy: Understanding System Siting, Ben...
 
AECT Electricity 101 2020
AECT Electricity 101 2020AECT Electricity 101 2020
AECT Electricity 101 2020
 

Destaque

Destaque (9)

Guide to structuring a PES project
Guide to structuring a PES projectGuide to structuring a PES project
Guide to structuring a PES project
 
Social and Biodiversity Impact Assessment (SBIA) Stage 3: Project design
Social and Biodiversity Impact Assessment (SBIA) Stage 3: Project designSocial and Biodiversity Impact Assessment (SBIA) Stage 3: Project design
Social and Biodiversity Impact Assessment (SBIA) Stage 3: Project design
 
Evidence of voluntary transactions: Illustrative case studies
Evidence of voluntary transactions: Illustrative case studiesEvidence of voluntary transactions: Illustrative case studies
Evidence of voluntary transactions: Illustrative case studies
 
Rewarding upland farmers for reducing sedimentation: A river care scheme
Rewarding upland farmers for reducing sedimentation: A river care schemeRewarding upland farmers for reducing sedimentation: A river care scheme
Rewarding upland farmers for reducing sedimentation: A river care scheme
 
Key policy issues for PES and REDD+
Key policy issues for PES and REDD+Key policy issues for PES and REDD+
Key policy issues for PES and REDD+
 
01 Om At Training W Kshop Definition B
01 Om At Training W Kshop   Definition B01 Om At Training W Kshop   Definition B
01 Om At Training W Kshop Definition B
 
Social and Biodiversity Impact Assessment - the 7 stages
Social and Biodiversity Impact Assessment  - the 7 stagesSocial and Biodiversity Impact Assessment  - the 7 stages
Social and Biodiversity Impact Assessment - the 7 stages
 
Deforestation in Tanzania’s East Usambaras: Sticks, Carrots and the ‘Crowding...
Deforestation in Tanzania’s East Usambaras: Sticks, Carrots and the ‘Crowding...Deforestation in Tanzania’s East Usambaras: Sticks, Carrots and the ‘Crowding...
Deforestation in Tanzania’s East Usambaras: Sticks, Carrots and the ‘Crowding...
 
Sara Scherr - How can African Farmers Benefit from Carbon Markets? - Aug 2009
Sara Scherr - How can African Farmers Benefit from Carbon Markets? - Aug 2009Sara Scherr - How can African Farmers Benefit from Carbon Markets? - Aug 2009
Sara Scherr - How can African Farmers Benefit from Carbon Markets? - Aug 2009
 

Semelhante a Payments for ecosystem services: policy issues

Taking stock of carbon rights in REDD+ candidate countries: Concept meets rea...
Taking stock of carbon rights in REDD+ candidate countries: Concept meets rea...Taking stock of carbon rights in REDD+ candidate countries: Concept meets rea...
Taking stock of carbon rights in REDD+ candidate countries: Concept meets rea...CIFOR-ICRAF
 
The enforcement of environmental law, policy and sanction
The enforcement of environmental law, policy and sanctionThe enforcement of environmental law, policy and sanction
The enforcement of environmental law, policy and sanctionDara Lynott Consultants LTD.
 
"Delivering Civil Sanctions": Steve Dyer, Environment Agency
"Delivering Civil Sanctions": Steve Dyer, Environment Agency "Delivering Civil Sanctions": Steve Dyer, Environment Agency
"Delivering Civil Sanctions": Steve Dyer, Environment Agency Sustainable Business Partnership
 
Talk at UCC Law and the Environment October 2019
Talk at UCC Law and the Environment October 2019Talk at UCC Law and the Environment October 2019
Talk at UCC Law and the Environment October 2019FP Logue Solicitors
 
2 C Es Ej And The Law [Autosaved]
2 C Es Ej And The Law [Autosaved]2 C Es Ej And The Law [Autosaved]
2 C Es Ej And The Law [Autosaved]casharma
 
Legal Aspects Of Clean Energy Projects
Legal Aspects Of Clean Energy ProjectsLegal Aspects Of Clean Energy Projects
Legal Aspects Of Clean Energy ProjectsMyra Frazier
 
Compensation and incentives for the maintenance of ecosystem services
Compensation and incentives for the maintenance of ecosystem servicesCompensation and incentives for the maintenance of ecosystem services
Compensation and incentives for the maintenance of ecosystem servicesrightsandclimate
 
UN-GGIM Committee of Experts Legal and Policy Report
UN-GGIM Committee of Experts Legal and Policy ReportUN-GGIM Committee of Experts Legal and Policy Report
UN-GGIM Committee of Experts Legal and Policy ReportKevin Pomfret
 
Legal Aspects Of Clean Energy Projects
Legal Aspects Of Clean Energy ProjectsLegal Aspects Of Clean Energy Projects
Legal Aspects Of Clean Energy ProjectsLeonardo ENERGY
 
Penarroyo ARGeo 4 Presentation
Penarroyo ARGeo 4 PresentationPenarroyo ARGeo 4 Presentation
Penarroyo ARGeo 4 PresentationFernando Penarroyo
 
Fundamental Skills for Real Estate Development Professionals II – Project Ent...
Fundamental Skills for Real Estate Development Professionals II – Project Ent...Fundamental Skills for Real Estate Development Professionals II – Project Ent...
Fundamental Skills for Real Estate Development Professionals II – Project Ent...Virtual ULI
 
Implementation of Environmental Justice: Through Dispute Settlement
Implementation of Environmental Justice: Through Dispute SettlementImplementation of Environmental Justice: Through Dispute Settlement
Implementation of Environmental Justice: Through Dispute SettlementPreeti Sikder
 
What is Spatial Law and Why is it Important?
What is Spatial Law and Why is it Important? What is Spatial Law and Why is it Important?
What is Spatial Law and Why is it Important? Kevin Pomfret
 
MOE EBR training slides Dec 2010
MOE EBR training slides Dec 2010MOE EBR training slides Dec 2010
MOE EBR training slides Dec 2010ecocommish
 
Streamlined Permitting for Renewable Energy Transmission
Streamlined Permitting for Renewable Energy TransmissionStreamlined Permitting for Renewable Energy Transmission
Streamlined Permitting for Renewable Energy Transmissiondlbelin
 

Semelhante a Payments for ecosystem services: policy issues (20)

Taking stock of carbon rights in REDD+ candidate countries: Concept meets rea...
Taking stock of carbon rights in REDD+ candidate countries: Concept meets rea...Taking stock of carbon rights in REDD+ candidate countries: Concept meets rea...
Taking stock of carbon rights in REDD+ candidate countries: Concept meets rea...
 
Philippine Re Law Of 2008
Philippine Re Law Of 2008Philippine Re Law Of 2008
Philippine Re Law Of 2008
 
The enforcement of environmental law, policy and sanction
The enforcement of environmental law, policy and sanctionThe enforcement of environmental law, policy and sanction
The enforcement of environmental law, policy and sanction
 
Contracting for ecosystem services
Contracting for ecosystem servicesContracting for ecosystem services
Contracting for ecosystem services
 
Conditions for project success: Economic and Social Feasibility of PES
Conditions for project success: Economic and Social Feasibility of PESConditions for project success: Economic and Social Feasibility of PES
Conditions for project success: Economic and Social Feasibility of PES
 
"Delivering Civil Sanctions": Steve Dyer, Environment Agency
"Delivering Civil Sanctions": Steve Dyer, Environment Agency "Delivering Civil Sanctions": Steve Dyer, Environment Agency
"Delivering Civil Sanctions": Steve Dyer, Environment Agency
 
Talk at UCC Law and the Environment October 2019
Talk at UCC Law and the Environment October 2019Talk at UCC Law and the Environment October 2019
Talk at UCC Law and the Environment October 2019
 
2 C Es Ej And The Law [Autosaved]
2 C Es Ej And The Law [Autosaved]2 C Es Ej And The Law [Autosaved]
2 C Es Ej And The Law [Autosaved]
 
Legal Aspects Of Clean Energy Projects
Legal Aspects Of Clean Energy ProjectsLegal Aspects Of Clean Energy Projects
Legal Aspects Of Clean Energy Projects
 
Compensation and incentives for the maintenance of ecosystem services
Compensation and incentives for the maintenance of ecosystem servicesCompensation and incentives for the maintenance of ecosystem services
Compensation and incentives for the maintenance of ecosystem services
 
UN-GGIM Committee of Experts Legal and Policy Report
UN-GGIM Committee of Experts Legal and Policy ReportUN-GGIM Committee of Experts Legal and Policy Report
UN-GGIM Committee of Experts Legal and Policy Report
 
Legal Aspects Of Clean Energy Projects
Legal Aspects Of Clean Energy ProjectsLegal Aspects Of Clean Energy Projects
Legal Aspects Of Clean Energy Projects
 
Mining law 2017 Training
Mining law 2017 TrainingMining law 2017 Training
Mining law 2017 Training
 
Penarroyo ARGeo 4 Presentation
Penarroyo ARGeo 4 PresentationPenarroyo ARGeo 4 Presentation
Penarroyo ARGeo 4 Presentation
 
National green tribunal
National green tribunalNational green tribunal
National green tribunal
 
Fundamental Skills for Real Estate Development Professionals II – Project Ent...
Fundamental Skills for Real Estate Development Professionals II – Project Ent...Fundamental Skills for Real Estate Development Professionals II – Project Ent...
Fundamental Skills for Real Estate Development Professionals II – Project Ent...
 
Implementation of Environmental Justice: Through Dispute Settlement
Implementation of Environmental Justice: Through Dispute SettlementImplementation of Environmental Justice: Through Dispute Settlement
Implementation of Environmental Justice: Through Dispute Settlement
 
What is Spatial Law and Why is it Important?
What is Spatial Law and Why is it Important? What is Spatial Law and Why is it Important?
What is Spatial Law and Why is it Important?
 
MOE EBR training slides Dec 2010
MOE EBR training slides Dec 2010MOE EBR training slides Dec 2010
MOE EBR training slides Dec 2010
 
Streamlined Permitting for Renewable Energy Transmission
Streamlined Permitting for Renewable Energy TransmissionStreamlined Permitting for Renewable Energy Transmission
Streamlined Permitting for Renewable Energy Transmission
 

Mais de Pro-poor Rewards for Environmental Services in Africa ICRAF

Mais de Pro-poor Rewards for Environmental Services in Africa ICRAF (20)

Report of the FORMAS - PRESA stakeholder workshop - September 2011
Report of the FORMAS - PRESA stakeholder workshop - September 2011Report of the FORMAS - PRESA stakeholder workshop - September 2011
Report of the FORMAS - PRESA stakeholder workshop - September 2011
 
Questions politiques clés pour les pse et le mécanisme redd fr
Questions politiques clés pour les pse et le mécanisme redd   frQuestions politiques clés pour les pse et le mécanisme redd   fr
Questions politiques clés pour les pse et le mécanisme redd fr
 
Pse questions politiques fr
Pse   questions politiques frPse   questions politiques fr
Pse questions politiques fr
 
Preuves des transactions volontaires fr
Preuves des transactions volontaires frPreuves des transactions volontaires fr
Preuves des transactions volontaires fr
 
Preuve que les interventions fondées sur l utilisation des terres
Preuve que les interventions fondées sur l utilisation des terresPreuve que les interventions fondées sur l utilisation des terres
Preuve que les interventions fondées sur l utilisation des terres
 
Introduction aux pse et au mécanisme redd
Introduction aux pse et au mécanisme reddIntroduction aux pse et au mécanisme redd
Introduction aux pse et au mécanisme redd
 
Guide pour la structuration d un projet pse
Guide pour la structuration d un projet pseGuide pour la structuration d un projet pse
Guide pour la structuration d un projet pse
 
Defis institutionnels dans la mise en oeuvre du bassin versant de sasumua au ...
Defis institutionnels dans la mise en oeuvre du bassin versant de sasumua au ...Defis institutionnels dans la mise en oeuvre du bassin versant de sasumua au ...
Defis institutionnels dans la mise en oeuvre du bassin versant de sasumua au ...
 
Contrats pour les services environnementaux fr
Contrats pour les services environnementaux frContrats pour les services environnementaux fr
Contrats pour les services environnementaux fr
 
Conditions de Réussite de Projet: La Faisabilité Economique et Sociale des PSE
Conditions de Réussite de Projet: La Faisabilité Economique et Sociale des PSEConditions de Réussite de Projet: La Faisabilité Economique et Sociale des PSE
Conditions de Réussite de Projet: La Faisabilité Economique et Sociale des PSE
 
Potential ‘value’ of ecosystem services vis-à-vis cost of project implementat...
Potential ‘value’ of ecosystem services vis-à-vis cost of project implementat...Potential ‘value’ of ecosystem services vis-à-vis cost of project implementat...
Potential ‘value’ of ecosystem services vis-à-vis cost of project implementat...
 
Conservation of Critical Chimpanzee Habitats in Bugoma-Budongo Corridor Fores...
Conservation of Critical Chimpanzee Habitats in Bugoma-Budongo Corridor Fores...Conservation of Critical Chimpanzee Habitats in Bugoma-Budongo Corridor Fores...
Conservation of Critical Chimpanzee Habitats in Bugoma-Budongo Corridor Fores...
 
Criteria for a good process flow diagram (PFD)
Criteria for a good process flow diagram (PFD)Criteria for a good process flow diagram (PFD)
Criteria for a good process flow diagram (PFD)
 
Social and Biodiversity Impact Assessment (SBIA) Stage 3: Project design
Social and Biodiversity Impact Assessment (SBIA) Stage 3: Project designSocial and Biodiversity Impact Assessment (SBIA) Stage 3: Project design
Social and Biodiversity Impact Assessment (SBIA) Stage 3: Project design
 
Agenda kenya uganda sia workshop 10-12 aug
Agenda kenya uganda sia workshop 10-12 augAgenda kenya uganda sia workshop 10-12 aug
Agenda kenya uganda sia workshop 10-12 aug
 
Social and Biodiversity Impact Assessment (SBIA) Stage 2: ‘Without Project’ a...
Social and Biodiversity Impact Assessment (SBIA) Stage 2: ‘Without Project’ a...Social and Biodiversity Impact Assessment (SBIA) Stage 2: ‘Without Project’ a...
Social and Biodiversity Impact Assessment (SBIA) Stage 2: ‘Without Project’ a...
 
Introduction to Social Impact Assessment for REDD+ Projects, Nairobi, 10 - 12...
Introduction to Social Impact Assessment for REDD+ Projects, Nairobi, 10 - 12...Introduction to Social Impact Assessment for REDD+ Projects, Nairobi, 10 - 12...
Introduction to Social Impact Assessment for REDD+ Projects, Nairobi, 10 - 12...
 
Social and Biodiversity Impact Assessment (SBIA) Stage 1: Starting conditions...
Social and Biodiversity Impact Assessment (SBIA) Stage 1: Starting conditions...Social and Biodiversity Impact Assessment (SBIA) Stage 1: Starting conditions...
Social and Biodiversity Impact Assessment (SBIA) Stage 1: Starting conditions...
 
Social and Biodiversity Impact Assessment (SBIA) Stage 7: Data collection, an...
Social and Biodiversity Impact Assessment (SBIA) Stage 7: Data collection, an...Social and Biodiversity Impact Assessment (SBIA) Stage 7: Data collection, an...
Social and Biodiversity Impact Assessment (SBIA) Stage 7: Data collection, an...
 
Introduction to PES and REDD+: Implications for participating land managers
Introduction to PES and REDD+: Implications for participating land managersIntroduction to PES and REDD+: Implications for participating land managers
Introduction to PES and REDD+: Implications for participating land managers
 

Último

Modernizing Legacy Systems Using Ballerina
Modernizing Legacy Systems Using BallerinaModernizing Legacy Systems Using Ballerina
Modernizing Legacy Systems Using BallerinaWSO2
 
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider  Progress from Awareness to Implementation.pptxTales from a Passkey Provider  Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider Progress from Awareness to Implementation.pptxFIDO Alliance
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Victor Rentea
 
How to Check CNIC Information Online with Pakdata cf
How to Check CNIC Information Online with Pakdata cfHow to Check CNIC Information Online with Pakdata cf
How to Check CNIC Information Online with Pakdata cfdanishmna97
 
Working together SRE & Platform Engineering
Working together SRE & Platform EngineeringWorking together SRE & Platform Engineering
Working together SRE & Platform EngineeringMarcus Vechiato
 
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...FIDO Alliance
 
Quantum Leap in Next-Generation Computing
Quantum Leap in Next-Generation ComputingQuantum Leap in Next-Generation Computing
Quantum Leap in Next-Generation ComputingWSO2
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Zilliz
 
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)Paige Cruz
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityWSO2
 
Simplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptxSimplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptxMarkSteadman7
 
Introduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxIntroduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxFIDO Alliance
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMKumar Satyam
 
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on ThanabotsContinuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on ThanabotsLeah Henrickson
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...caitlingebhard1
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)Samir Dash
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 
ChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityVictorSzoltysek
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 

Último (20)

Modernizing Legacy Systems Using Ballerina
Modernizing Legacy Systems Using BallerinaModernizing Legacy Systems Using Ballerina
Modernizing Legacy Systems Using Ballerina
 
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider  Progress from Awareness to Implementation.pptxTales from a Passkey Provider  Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
How to Check CNIC Information Online with Pakdata cf
How to Check CNIC Information Online with Pakdata cfHow to Check CNIC Information Online with Pakdata cf
How to Check CNIC Information Online with Pakdata cf
 
Working together SRE & Platform Engineering
Working together SRE & Platform EngineeringWorking together SRE & Platform Engineering
Working together SRE & Platform Engineering
 
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...Hyatt driving innovation and exceptional customer experiences with FIDO passw...
Hyatt driving innovation and exceptional customer experiences with FIDO passw...
 
Quantum Leap in Next-Generation Computing
Quantum Leap in Next-Generation ComputingQuantum Leap in Next-Generation Computing
Quantum Leap in Next-Generation Computing
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Simplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptxSimplifying Mobile A11y Presentation.pptx
Simplifying Mobile A11y Presentation.pptx
 
Introduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxIntroduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptx
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDM
 
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on ThanabotsContinuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
Continuing Bonds Through AI: A Hermeneutic Reflection on Thanabots
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
ChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps Productivity
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 

Payments for ecosystem services: policy issues

  • 1. Training Workshop on Payments for Ecosystem Services (PES) and Reducing Emissions from Deforestation and Degradation (REDD+) Nairobi, Kenya - August 9th, 2011 Payments for Ecosystem Services: Policy Issues Slayde HawkinsForest Trends/Katoomba Group
  • 2. Clarity on whether PES are permitted under existing law Ownership and use rights over: Land Natural resources Credits for ecosystem services Application of existing laws and regulations to PES Clarity on who has authority and how legal or policy conflicts will be handled Stability and rule of law Available mechanisms for contract enforcement and appeal Overview: Key Policy Issues for PES
  • 3. PES may be prohibited by Constitution or law May be bar on selling ecosystem services, as a public good that is held on behalf of all If sale of ES credits prohibited, may nevertheless be legal to contract to provide services that restore or conserve ecosystem services PES Allowed by Law?
  • 4.
  • 5. Land title not validly vested in local users Land use arrangements poorly defined or recorded Unclear who has rights to ecosystem services revenue or whether transfer is permitted Common Tenure Challenges
  • 6. Sources of applicable law Framework environmental, water, forestry laws Laws on: Land & natural resources Agriculture Planning and infrastructure Indigenous peoples Key regulatory authorities: Departments or Ministries of Environment & Agriculture Pitfalls: conflicting laws or regulations, overlapping or conflicting authorities Application of Existing Law
  • 7. May apply to transaction in ecosystem services credits or to underlying project activities E.g. timber harvests, sales generally taxable Types of taxes that may apply: Sales Tax & VAT – On value of transferred good, service Income Tax – On personal or corporate carbon revenue Property Tax – On property value Duties/tariffs – On value of imported or exported goods Carbon Revenue Tax – On carbon credits or projects Potential Taxes
  • 8. Policy Checklist for PES Minimum Threshold Requirements No prohibition on PES Secure, long-term use rights in land, natural resources Governmental bodies at national, local levels with authority over project Discernable regulatory and tax implications for PES projects Adequate levels of social, regulatory stability Contract enforcement mechanisms For more information: www.katoombagroup.org/legal
  • 9. Beyond minimum threshold for enabling PES, buyers will prefer: More clarity and transparency – clarity in the regulatory framework means lower risks and costs Favorable investment climate in terms of business policies, stability, access to courts – “Ease of Doing Business” Low taxes and regulatory burdens for PES, minimal direct government involvement in projects Policy to Attract Buyers
  • 10. THANK YOU! Slayde HawkinsForest Trends/Katoomba Groupshawkins@forest-trends.org

Notas do Editor

  1. Landtenure is the legal or customary relationship of an individual or group with respect to land and other natural resources, such as water and trees. Tenure rules define how access is granted to rights to use, control, and transfer land, and associated responsibilities and restraints. Put simply, land tenure rules determine (1) who can use (2) what resources (3) for how long, and (4) under what conditions. FAO. 2002. Land tenure and rural development, 3.1. Rome: FAO Economic & Social Development Department. http://www.fao.org/DOCREP/005/Y4307E/y4307e00.htm
  2. Rights in the Project Area Project participants who have insufficient rights in land and natural resources in the project area cannot guarantee that project activities will continue as promised, resulting in risks to ecosystem service generation. At a minimum, project participants must have the right to perform project activities and to exclude incompatible uses for the duration of the project Customary rights may provide sufficient legal certainty, depending upon the circumstances. However, a lack of formal tenure rights exposes project participants and potential buyers to higher risk of challenge or conflict.Rights in Ecosystem Services (i.e. carbon, water quality, biodiversity) Rights to sell ecosystem services credits generally must be implied from laws that are not directly applicable, because there are few official rules that explicitly allocate ecosystem services rights. How to treat these rights is often an open question, although they generally are tied to rights in land or natural resources. For example, a land owner may be considered to have the right to sell ecosystem services credits generated on his or her land. Alternately, the person entitled to manage a forest area for timber could have the right to ecosystem service credits generated from that forest, for example, because of improved forest management, decreased logging, or other actions.
  3. In many ecosystems, tenure is unclear or insecure, because land title is not validly vested in local land users, land use arrangements are poorly defined or recorded, or because it is unclear who has rights to ecosystem services revenues, or whether transferring credits to ecosystem services is permitted by law. There may be restrictions on a person or entity’s ability to transfer ecosystem services rights, particularly if natural resources are held by the government in trust for the people as a whole. Transfer restrictions may impair the ability to sell ecosystem services credits, such as carbon credits. If tenure problems are severe, they can make a PES project infeasible because risks to investors or buyers are too high, because relevant standards organizations will not validate and verify credits, and/or because necessary governmental approvals cannot be obtained. Policies and programs that improve titling and registration of tenure rights and provide for demarcation of area that are not officially allocated to local users can be very effective in laying the necessary foundation for PES. The process of demarcating land, however, is likely to be highly politically charged and technically difficult and is not a quick fix, by any means. Beyond minimum requirements, the level of rights in the project area is an important dimension of project risk. In general, the clearer and more secure are project participants’ rights, the lower the risk and the potential for disputes.
  4. To evaluate potential policy options, it is necessary to understand how the existing policy, legal, and regulatory frameworks apply to PES projects. Because laws and regulations were not written with PES in mind, their implications for PES can be difficult to identify with certainty. Nevertheless, sources of applicable law and their likely impacts can – and must – be assessed in light of specific local and national circumstances.In general, applicable laws will be found in a country’s framework environmental, water, and forestry laws, as well as their laws on land and natural resources, agriculture, planning and infrastructure, and indigenous peoples. Depending on the host country, national laws and regulations may be readily available on the internet or at a library. However, “common law,” the law developed by judges through court decisions, is also important in many countries (so-called “common law” countries), and is likely to be significantly more difficult to find and interpret. It will also be important to identify applicable local laws and regulations, which may be harder to find than their national counterparts. Furthermore, legal language can be difficult for a layperson to interpret accurately. A local lawyer should be consulted to help identify the likely effect of all applicable laws and regulations.The government bodies that are most likely to have regulatory authority include those in charge of the environment, agriculture, and forestry. If the host country has a climate change office or Designated National Authority (DNA), this would also be a natural place to look for more information specifically about carbon issues. In most places, applicable laws were not written with PES in mind, meaning that project developers must watch out for gaps or overlaps in regulation and missing or inconsistent legal requirements. For example, the ministries of environment and agriculture, which often have overlapping authority over forests, water resources, and land, may each have a valid claim of regulatory authority over PES. In exercising their authority, they may impose inconsistent or even contradictory requirements on sellers and project developers.
  5. Tax implications of project activities are important to understand because of the effect they can have on the project’s revenue.Carbon revenue taxes are still uncommon, but apply in some places. Guarantee part of carbon revenues to government.Failure to consider the tax consequences of a carbon project or transaction may mean the difference between a profit and loss.The applicability and impact of these and other taxes depends entirely upon the circumstances of the particular project. For example, a project proponent that is a for-profit private enterprise may face very different tax obligation than a community enterprise or NGO. A formal tax analysis, conducted after the completion of project planning (i.e. when the structure of the project and relationships between the parties are clear) will help project participants structure carbon transactions so as to minimize tax liability while ensuring that the project is in full compliance with tax law.