Source: Ministry of New and Renewable Energy, CEA, Aranca Research, Assorted Articles
Note: TWh - Terawatt Hours, GW - Gigawatt
Fifth largest producer
and consumer globally
• With a production of 1,006 TWh, India is the fifth largest producer and consumer of
electricity in the world
Large-scale government
initiated expansion
plans
• The government targets capacity addition of 89 GW under the 12th Five-Year Plan (2012–
17) and around 100 GW under the 13th Five-Year Plan (2017–22)
• Investments of around USD223.9 billion are planned for the power sector during the 12th
Plan Five-Year Plan
Robust growth in
renewables
• Renewable energy capacity additions of 30 GW are planned in the next five years to meet
the growing energy demand
• Wind energy is estimated to contribute 15 GW, followed by solar power at 10 GW
Favourable policy
environment
• The National Tariff Policy (2006) ensured adequate return on investment to companies
engaged in power generation, transmission and distribution and assured electricity to end-
users at affordable and competitive rates
• Launch of Ultra Mega Power Project (UMPP) scheme through tariff-based competitive
bidding
• The engineering sector is delicensed;
100 per cent FDI is allowed in the
sector
• Due to policy support, there was
cumulative FDI of USD14.0 billion into
the sector over April 2000 – February
2012, making up 8.6 per cent of total
FDI into the country in that period
Growing demand
Source: Assorted articles and research material, Aranca Research; KPMG
Notes: FY - Indian Financial Year (April – March); FDI - Foreign Direct Investment, E - Estimates,
CAGR - Compound Annual Growth Rate, TWh - Terawatt-hour, GW - Gigawatt, FY22 estimates as per IEA forecasts
Growing demand
• Expansion in industrial activity to
boost demand for electricity
• Growing population, and
increasing penetration and per-
capita usage to provide further
impetus
• Power consumption is estimated
to increase from 821.2 TWh in
2013 to an estimated 1,433.2
TWh in 2022
Attractive opportunities
• Large capacity additions
(189GW) targeted in the 12th
and 13th Five-Year Plans
• Ambitious projects and
increasing investments across
the value chain
• Diversification into renewable
sources increasing growth
avenues
Policy support
• Elimination of licensing for various
segments; removal of entry barriers
• Cost reduction and rationalisation of
tariffs; development of UMPP
• Fuel supply agreement of power
producers with Coal India
Higher investments
• Total FDI inflows in the power
sector touched USD7.8 billion in
April 2000–March 2013,
accounting for 4 per cent of total
FDI inflow in India
• Major investments earmarked by
public as well as private sector
companies across the value chain
FY12
Total
demand
(TWh):
969.0
FY22E
Total
demand
(TWh):
1915.0
Advantage
India
Source: KPMG, Corporate Catalyst India, IFLR, Aranca Research
• Electricity
(Supply) Act
1948
• Establishment
of semi-
autonomous
State Electricity
Boards (SEBs)
• Industrial Policy
Resolution (1956)
• Generation and
distribution of power
under state
ownership
• Power losses,
subsidies,
infrastructure
bottlenecks and
resource constraints
• Legislative and policy
initiatives (1991)
• Private sector
participation in
generation
• Fast-track clearing
mechanism of private
investment proposals
• Electricity Regulatory
Commissions Act
(1998) for establishing
Central and State
Electricity Regulatory
Commissions and
rationalisation of tariffs
Before 1956
Introductory
Stage
1956–1991
Nationalisation
Stage
1991–2003
Liberalisation Era
2003 onwards
Growth Era
• Electricity Act (2003)
• National Tariff Policy (2006)
• Elimination of licensing for
generation projects
• Increased competition through
international competitive bidding
engaged in power generation,
transmission and distribution
• Launch of UMPP scheme
• Various schemes and initiatives
such as Jawaharlal Nehru National
Solar Mission to promote renewable
energy
• Civil nuclear agreement with the US
for nuclear technology and fuel
• Fuel supply agreement of power
companies with Coal India Ltd (CIL)
• Private equity investments in the
sector have surged since 2010
Source: CIA World Factbook, Aranca Research,
Energy Statistics 2013, Central Electricity Authority (CEA)
Note: TWh - Terawatt Hours
World’s leading electricity producers in 2012 (TWh)With a production of 1,006 TWh, India is the fifth largest
producer and consumer of electricity in the world
Although power generation has grown over 100-fold since
independence, demand growth has been even higher due
to accelerating economic activity
4,700
4,308
1,0521,1041,006615608
China
US
Russia
Japan
India
Germany
Canada
Source: Central Electricity Authority (CEA), Aranca Research;
Notes: FY - Indian Financial Year (April-March), TWh - Terra Watt Hour
Electricity production in India (TWh)Electricity production in India (excluding captive generation)
stood at 911.6 TWh in FY13, a 4 per cent growth over the
previous fiscal
Over FY07–13, electricity production expanded at a CAGR
of 5.5 per cent
The Planning Commission’s 12th Plan projects that total
domestic energy production would reach 669.6 million
tonnes of oil equivalent (MTOE) by 2016–17 and 844 MTOE
by 2021–22
663
705
724
772
811
876
912
FY07 FY08 FY09 FY10 FY11 FY12 FY13
CAGR: 5.5%
Source: Ministry of Coal, NHPC, CEA, The Hindu, Corporate Catalyst India, Aranca Research
Notes: MW - Megawatt, GW - Gigawatt
Hydro
Renewable
Nuclear
Thermal
India has large reserves of coal. As of April 2012, total coal reserves
stood at 293.5 billion tonnes; of this, 118.1 billion tonnes were
proven reserves
India’s proven natural gas reserves measure about 1,074 billion
cubic metres
With a large swathe of rivers and water bodies, India has enormous potential for hydropower; the
12th Five-Year Plan (2012–17) includes additional 30,000 MW of hydro-electric power generation.
Currently, India has 39.6 GW of hydro power generating capacity
Wind energy is the largest renewable energy source in India; projects like the Jawaharlal Nehru
National Solar Mission (aims to generate 20,000 MW of solar power by 2022) is creating a positive
environment among investors keen to exploit India’s potential
Currently, India has 4.8 GW of net electricity generation capacity using nuclear fuels (across 20
reactors) and aims to increase it to 20GW by 2020; with one of the world’s largest reserves of
thorium, India has a huge potential in nuclear energy
Gas
Coal
68%
18%
12%
2%
Source: Ministry of Coal, NHPC,CEA, The Hindu,
Corporate Catalyst India, Aranca Research
Notes: MW - Megawatt, GW - Gigawatt
Installed capacity for different sources of power -
FY13 (GW)
As of April 2013, total thermal installed capacity stood at
151.7GW, while hydro and renewable energy installed
capacity totalled 39.6GW and 27.5GW, respectively.
Nuclear energy capacity remained broadly constant from
that in the previous year, at 4.8GW
For the 12th Five-Year Plan, a total of 88.5 GW of power
capacity addition is targeted, of which 72.3 GW constitutes
thermal power, 10.8GW of hydro power and 5.3GW of
nuclear power
The capacity addition target for 2013–14 is 1,198 MW of
hydro power, 15,234 MW of thermal power and 2,000 MW
of nuclear power. Total capacity target is 18,432 MW
151.7
39.6
27.5
4.8
Thermal Hydro electric Renewable Nuclear
Source: Central Electricity Authority (CEA), Aranca Research
Note: GW - Gigawatt, Data for FY13* is as on April-2013
CAGR - Compound Annual Growth Rate
Installed electricity generation capacity (GW)India’s installed power generation capacity was 223.6 GW
at the end of April 2013
Installed capacity increased steadily over the years, posting
a CAGR of 10.9 per cent in FY09–13
148
159
174
200
224
FY09 FY10 FY11 FY12 FY13
CAGR: 10.9%
Source: Central Electricity Authority (CEA), Aranca Research,
Notes: Data for FY13 is as on April 2013,
CAGR - Compound Annual Growth Rate
Comparison of installed capacity (GW)Among the different sources of power in India, the CAGR in
installed capacity over FY09–13 was
12.8 per cent for thermal power
20.1 per cent for renewable energy, the fastest
among all sources of power
1.8 per cent for hydro power
152
40
28
5
132
39
25
5
94
37
13
4
ThermalHydroRenewableNuclear
FY13 FY12 FY09
Source: Company websites, News Articles, Industry Sources, Aranca Research
Company Business description
• NTPC is India’s largest power producer and the sixth-largest thermal power producer in the world, with
installed capacity of 41,184 MW (including 5,364 MW through JVs). By 2032, NTPC plans to reach 128,000
MW power capacity. Coal-based power accounts for more than 90 per cent of the total capacity
• It has also diversified into hydro power, coal mining, power equipment manufacturing, oil and gas exploration,
power trading and distribution
• Tata Power is India’s largest integrated power company, with significant presence in solar, hydro, wind and
geothermal energy space. The company accounts for 52 per cent of total generation capacity in the private
sector, with an installed capacity of 8,521 MW
• The company has over 35,000 MW of power generation capacity, both operational and under development.
Reliance Power has an operational power generation capacity of 2,500 MW. FY13 saw the development of
the 3,960 MW Sasan UMPP in Madhya Pradesh
• CESC Limited is a vertically integrated player engaged in coal mining, and generation and distribution of
power
• NHPC is the largest hydro power utility in India, with an installed capacity of 5,295MW; it has drawn up a
massive capacity expansion plan of adding 6,697 MW by 2017
• NHPC is constructing nine projects aggregating to a total installed capacity of 4271 MW. NHPC added 1,970
MW and 1,150 MW during the 10th and 11th Plan periods, respectively
Source: Company websites, News Articles, Aranca Research
Notes: NBFC - Non-banking Financial Company
Company Business description
• Power Finance Corporation Limited (PFC) is an NBFC engaged in financing and development activities within
the Indian power sector
• Major products and services include project term loans, lease financing, direct discounting of bills, short-term
loans and consultancy services
• Adani Power is one of India’s largest private thermal power producers, with total capacity of 4,620 MW; the
company aims to generate 20,000 MW of power by 2020
• The company is building one of the world’s largest single-location thermal power plants in Mundra, Gujarat
• Power Grid Corporation of India Limited (PGCIL) is the single largest transmission utility in India; it is
responsible for planning, co-ordination, supervision and control over inter-state transmission systems
• Damodar Valley Corporation is engaged in power generation, distribution and transmission of electric power,
irrigation and flood control
• SJVN Limited is the second largest hydro power company in India
• The company plans to diversify into wind power projects soon
*This list is indicative.
Policy support
Electricity Act (2003):
highly liberal
framework for
generation
Fuel supply
agreement of power
companies with Coal
India Ltd
Development of
UMPPs
Increase in industrial
activity
Increasing investments
Rising FDI inflows
(USD536 million in
FY13)
Growing M&A activity
Large investments in
equipment
manufacture and
power generation
Inviting Resulting
in
Increasing
penetration, per-
capita consumption
Growing middle class
and consumer base
Growing demand
National Tariff Policy
(2006): private
investment through
competitive bidding
Source: Corporate Catalyst India, Ministry of Power, Aranca Research,
Notes: FDI - Foreign Direct Investment, M&A - Merger and Acquisition,
R-APDRP - Restructured Accelerated Power Development and Reform Programme, T&D - Transmission and Distribution
Source: Estimates as per BMI India Power Report Q3 2011,
Aranca Research
Notes: TWh - Terawatt Hours, RGGVY - Rajiv Gandhi Grameen
Vidyutikaran Yojana, Central Electricity Authority (CEA)
Share of industry in electricity consumptionMultiple drivers (industrial expansion, growing per-capita
incomes) are leading to growth in power demand; this is set
to continue in the coming years–
During FY10–15, GDP growth is likely to average
8.0–8.5 per cent
India is set to become a global manufacturing hub
with investments across the value chain
Power consumption is estimated to increase from
821.2 TWh in 2013 to 1,433.2 TWh by 2022
India’s power demand is expected to rise up to 1,915 TWh
by FY22
47.4% 48.1%
48.8%
49.6%
50.3% 51.0%
57.9%
2009 2010 2011E 2012E 2013E 2014E 2015E
Source: Estimates as per BMI India Power Report Q4 2012,
Mckinsey, Aranca Research
Notes: RGGVY - Rajiv Gandhi Grameen Vidyutikaran Yojana
Per-capita electricity consumption (KWh)82GW worth of generation capacity is set to be added
during FY11–FY15; future investments will benefit from
strong demand fundamentals, policy support and increasing
government focus on infrastructure
Residential consumption has grown at a fast pace;
growth was 14 per cent in FY11
Government initiatives like RGGVY and ‘Power for
all’ will further drive the demand
543.2
561.9
583.8
613.1
648.4
680.7
718.1
2010 2011 2012E 2013E 2014E 2015E 2016E
CAGR: 4.8%
Source: KPMG, CRISIL, Ministry of Power, Aranca Research
Notes: R- APDRP - Restructured Accelerated Power Development and Reform Programme,
SERC - State Electricity Regulatory Commission, AT&T - American Telephone & Telegraph Systems
Electricity Act, 2003
• Elimination of licensing for electricity generation projects
• Increased competition through international competitive bidding
• Demarcation of transmission as a separate activity
National Tariff Policy,
2006
• Adequate return on investment to companies engaged in power generation, transmission
and distribution
• Uniform guidelines to SERCs for fixing tariffs
• Assured electricity to consumers at reasonable and competitive rates
Ultra Mega Power
Projects (UMPPs)
• Launch of the UMPP scheme through tariff-based competitive bidding
• Ease of land possession, provision of fuel, water and necessary clearances for enhancing
investor confidence
R-APDRP
• R-APDRP was launched by Ministry of Power with the purpose of reducing AT&T losses
up to 15 per cent by up-gradation of transmission and distribution network
• Linking disbursement of central government funds (to states), with actual reduction in
transmission and distribution losses. Sanctioned projects of more than USD5.8 billion
Fuel Supply Agreement
• Fuel supply agreement with Coal India Ltd will ensure the availability of coal for power
companies over the long term
Source: Union Budget FY13, Various News Articles, Aranca Research,
Note: PSUs - Public Sector Units
Generation-based
incentives
• Government to reintroduce 'generation-based incentives' for wind power projects to boost
capacity addition in the sector
• USD147.3 million would be allocated to the Ministry of New and Renewable Energy
Public Private
Partnership (PPP)
• To reduce dependency on imported coal, a Public Private Partnership (PPP) policy
framework would be devised with Coal India Limited to increase coal production
Liberalised FDI policy
• During FY13, the Government liberalised FDI policy for Power Trading Exchanges
• Foreign Investment in power exchanges registered under the Central Electricity
Regulatory Commission Regulations, 2010, allowed up to 49 per cent (FDI-26 per cent
and FII-23 per cent)
Low-interest funds
• Low-interest–bearing funds to be provided from National Clean Energy Fund (NCEF) to
Indian Renewable Energy Development Agency Ltd (IREDA) for on-lending to viable
renewable energy projects
Growing investments
• The total plan outlay for the power sector for FY14 is estimated at USD1.6 billion, a
significant 27 per cent higher than the revised estimate of USD1.5 billion for FY13
• While the proportion of plan expenditure in the total outlay was 59 per cent in FY13, that
for FY14 is a whopping 96 per cent
Higher capex by PSUs
• The total capex by power PSUs is estimated to be USD9.4 billion in FY14 as against
USD9.3 in FY13
• Power Grid Corporation of India will incur USD3.7 billion of capex in FY14, same as that in
FY13
Source: Union Budget FY13, Various News Articles, Aranca Research
Elimination of customs
duty
• The government has fully exempted basic customs duty and a concessional countervailing
duty (CVD) of 1 per cent to steam coal for a period of two years till FY14
External commercial
borrowings (ECBs)
• Power companies can utilise 40 per cent of fresh ECBs raised towards refinancing of
Rupee loan availed from domestic banks under the approval route.
• The withholding tax on ECBs has been reduced to 5 per cent from 20 per cent till FY15
Higher limit for Tax free
bonds
• The limit for tax-free bonds for the power sector has been increased to USD2 billion from
USD1 billion
• The government has also extended the tax holiday by one year; this allows power
producers to claim tax exemption up to 10 years
Source: Department of Industrial Policy and Promotion,
Aranca Research
FDI inflows into the power sector (USD million)Power is one of the key sectors attracting FDI inflows into
India
During FY06–12, FDI inflows into the sector increased from
a mere USD87 million in FY06 to USD1.7 billion in FY12
FDI inflows stood at USD536 million in FY13
Power accounted for 4 per cent of total inflows in the sector
in FY13
Cumulative FDI inflows into the sector in FY00–13 were
USD7.8 billion
87 157
967 985
1,437
1,252
1,652
536
FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13
Source: Thomson One Banker, Industry News, VC Cicrcle, Aranca Research
Private equity investments in the sector have surged since
2010
Goldman Sachs’ private equity fund invested USD135
million afresh in the privately held wind energy firm ReNew
Power Pvt Ltd It had invested USD200 million in 2011
ReNew Wind Power has several wind projects in the
development stage; one year back, it had commissioned its
first 25.2-MW wind farm at Jasdan in Rajkot, Gujarat.
ReNew had 200 MW of installed wind power portfolio as of
30 April 2013
GSPC Distribution Networks Ltd’s investment of USD674.2
million in Gujarat Gas Co Ltd was the largest PE transaction
in the Indian power sector in 2012
Private Equity deals
Acquirer Target Deal date
Deal
value
(USD
million)
Goldman Sachs
ReNew Wind
Power Pvt Ltd
5 June 2013 135.0
Consortium led by
Deutsche
Investitions, FE
Clean Energy Group
& IFC
NSL Renewable
Power Pvt Ltd
29 April 2013 60.0
Ascent Capital
Advisors India Pvt
Ltd, VenturEast,
Draper Fisher
Jurvetson Intl.
Bharat Light and
Power Pvt Ltd
22 January
2013
18.6
GSPC Distribution
Networks Ltd
Gujarat Gas Co
Ltd
3 October
2012 674.2
Foundation Capital;
Helion Venture
Partners
Azure Power
India Pvt Ltd
7 September
2012
8.0
Notes: FDI - Foreign Direct Investment, PE - Private Equity
Source: Thomson One Banker, Economic Times, Aranca Research
Notes: FDI - Foreign Direct Investment, PE - Private Equity
Global power giants like GDF Suez of France and E.ON of
Germany plan to enter the Indian market
Morgan Stanley Infrastructure’s private equity fund invested
USD425 million in Asian Genco Pvt Ltd, an infrastructure
company which has investments in Indian power generation
assets and engineering services businesses
Private Equity deals
Acquirer Target Deal date
Deal
value
(USD
million)
Athena Capital
Partners LLP
SPS Ispat and
Power Ltd
08 July
2011
67.6
India Infrastructure
Fund
Caparo Energy
(India) Ltd
17 June
2011
78.5
Warburg Pincus
India Pvt Ltd
Diligent Power
Pvt Ltd
11 May
2011
150.0
Blackstone Group
LP
Moser Baer
Projects Pvt Ltd
18 August
2010
300.0
Morgan Stanley
Infrastructure
Asian Genco Pvt
Ltd
18 March
2010
425.0
Source: NTPC website, Annual Reports,
Economic Times, Aranca Research
Note: CAGR - Compound Annual Growth Rate, MW - Megawatt
Revenues and Net Profit (USD billion)During FY07–13, NTPC’s sales increased at a CAGR of
12.3 per cent; CAGR in profits was 10.5 per cent
NTPC accounts for 18.5 per cent of the country’s capacity,
though it contributes 27.4 per cent of total power generation
The company has an installed capacity of 41,184 MW. It
aims to become a 128,000 MW capacity company by 2032
Currently, 17,909 MW of capacity is under construction
It spent approximately USD 2.2billion in FY12, with
plans to spend an additional USD4 billion in FY13 in
expansion activity
The company plans to set up a 800 MW advanced
ultra supercritical plant, a first-of-its-kind in India
1.5
1.9 1.8
1.9
2.1
2.0 2.3
0
2
4
6
8
10
12
14
16
0.0
0.5
1.0
1.5
2.0
2.5
FY07 FY08 FY09 FY10 FY11 FY12 FY13
Net Profit (LHS) Net Sales (RHS)
Source: NTPC website, Annual Reports, Economic Times,
Aranca Research
Notes: PLF - Plant Load Factor,
After Takeover - Figures for FY08, MW - Megawatt
Impact of NTPC takeover of sub-optimal plants (PLF)NTPC has taken over and successfully turned around a
number of sub-optimally performing stations
High operational efficiency (indicated by plant load factor
and availability factor) is NTPC’s trademark
It is a pioneer in high-efficiency supercritical and ultra
supercritical coal-bed power plants in India
NTPC has formulated a business plan for capacity addition
of around 1,000 MW through renewable resources by 2017.
66%
86%
18%
98%
19%
86%
22%
92%
Before takeover After takeover
Badarpur Unchahar Talcher Tanda
Source: NTPC website, Annual Reports, Economic Times,
Aranca Research
Notes: PLF - Plant Load Factor,
After Takeover - Figures for FY08, GW - Gigawatt
NTPC: Capacity additions over the years (GW)Capacity addition at a CAGR of 19 per cent during 1982–
2012
In 2012, NTPC formed a joint venture with Bangladesh for a
1,320-MW plant and was awarded the 800-MW Kudgi-I
project
Highest ever capacity addition of 2,660 MW during
9MFY13, contributing 24 per cent of total addition in the
country
As of December 2012, the company’s total installed power
generation capacity stood at 39.7 GW, which includes 4.9
GW from other group companies
15
20
25
30
35
39.7
FY95 FY03 FY07 FY09 FY12 9M'13
Source: Company website, Annual Reports, Economic Times,
Aranca Research
Note: MW - Megawatt
Net income (USD million)During FY06–12, Tata Power’s profits increased at a CAGR
of 11.5 per cent to USD244.1 million
The company has an installed generation capacity of 8,521
MW in India and is present in all segments of the power
sector
The thermal power generation capacity stands at 7,647
MW, while clean energy generation such as hydro, solar
and wind stands at 852 MW
The company is developing its first 4,000 MW Ultra Mega
Power Project at Mundra (Gujarat) based on supercritical
technology
Its international presence includes a 30 per cent stake in
coal mines and a geothermal project in Indonesia, and a
hydro project in Bhutan in partnership with The Royal
Government of Bhutan.
The company is eyeing the clean energy segment; it
recently acquired stakes in two Australian companies in the
sector
138
154
216
201 198
206
244
FY06 FY07 FY08 FY09 FY10 FY11 FY12
CAGR: 11.5%
Source: Company website, FY17 estimate as per press release, 15th
July 2011
Note: MW - Megawatt, CAGR - Compounded Annual Growth Rate
Installed capacity in mega watts (MW)The company estimates its installed capacity to expand
fivefold in the next five years to 25,000 MW (CAGR of 30
per cent from FY07 and 47 per cent from FY12)
Recognising the enormous potential in renewable energy,
the company intends to increase the share of renewable
sources to 25 per cent of its total generating capacity in the
near future
2,300 3,120 5,297
25,000
FY07 FY11 FY12 FY17E
Source: Reliance Power website, Annual Reports,
Industry News, Aranca Research
Note: MW - Megawatt
Revenues and Net Profit (USD million)Reliance Power has 2,500 MW of operational capacity and
over 20,000 MW under implementation
It won three of the four Ultra Mega Power Projects (UMPPs)
awarded by Government of India, and is constructing India’s
largest 2,400 MW gas-based power plant
It has three captive coal blocks in India, with aggregate coal
reserves of around 2 billion tonnes and three coal
concessions in Indonesia, with estimated coal resources of
another 2 billion tonnes
Planned peak coal production of 95 million tonnes
In FY12, the Rosa plant recorded annual generation of 8
billion units
178
421
577
973
144 167 181 186
FY10 FY11 FY12 FY13 E
Total Income (USD million) Net Profit (USD million)
Source: Reliance Power website, Annual Reports,
Economic Times, Industry News, Aranca Research
Note: MW - Megawatt, E - Estimate
Generating Capacity (million units)Both units of the 600 MW Butibori coal project in
Maharashtra are ready for production
First unit of the 3,960 MW Sasan UMPP project in Madhya
Pradesh was commissioned in March 2013, and coal
production from Moher Mines started in September 2012
At the 2,400-MW gas project in Samalkot, Andhra Pradesh,
four gas turbines are ready for generation
Hydro power projects of 5,292 MW capacity are currently
under development in Arunachal Pradesh (4,220 MW),
Himachal Pradesh (672 MW) and Uttarakhand (400 MW)
70
2,842
4,289
8,012
FY10 FY11 FY12 FY13
Source: International Energy Agency (IEA), Demand
estimates based on IEA forecasts, Aranca Research
Notes: TWh - Terawatt Hour,
CAGR - Compounded Annual Growth Rate
Electricity demand forecast (TWh)Demand for electricity is expected to expand at a CAGR of
7.5 per cent over FY07–22 to 1,915 TWh
Current production levels are not enough to meet demand;
annual demand outstrips supply by about 7.5 per cent
690
969
1,392
1,915
FY07 FY12 FY17E FY22E
CAGR: 7.5%
Source: Business Standard, Capacity addition estimates
by Central Electricity Authority (CEA), Aranca Research
Notes: TWh - Terawatt-hour, E - Estimates
Addition to generation capacity under
Five-Year Plans (GW)
The government is targeting capacity addition of around 89
GW under the 12th (2012–17) and around 100 GW under
the 13th (2017–22) Five-Year Plan
The expected investments in the power sector during the
12th Plan (2012–17) is USD223.9 billion
There is a tangible shift in policy focus on the sources of
power. The government is keen on promotion of hydro,
renewable and gas-based projects, as well as adoption of
clean coal technology
56 55
89
100
8th+9th+10th 11th 12th 13th E
Source: NTPC presentation, Central
Electricity Authority (CEA), Aranca Research
Note: GW - Gigawatt Hour
Addition to generation capacity under
Five-Year Plans (GW)
Peak power requirement in FY12 stood at 130 GW
compared to the capacity of 116 GW
The per-capita electricity consumption of India stood at 819
lower than global average of 2,803 representing enormous
potential for growth
The addition of approximately 106 GW to the existing
capacity is expected to boost GDP growth to 8 per cent by
FY17
87 91
97
104
110
116
101
109 110
119 122
130
8%
10%
12%
14%
16%
18%
0
30
60
90
120
150
FY07 FY08 FY09 FY10 FY11 FY12
Capacity Peak requirement Peak deficit (RHS)
Source: BMI India power report Q3 2011, Aranca Research
Notes: JV - Joint Venture, T&D - Transmission and Distribution, GW - Gigawatt
Generation
Plans to invest USD17.7 billion in power generation by 2014
Coal-fired plant in Tamil Nadu; investment of USD1.3 billionGermac Energy and
Sepco III (JV)
Adani Power
Nuclear power ambition; studying entry strategy with minimum
investment of USD3.0 billion
Tata Power
USD2.5 billion investment in hydro power in Arunachal Pradesh,
with a combined generation capacity of 2.5 GW
Reliance Power
T&D
Loan from ADB of USD600 million for development of high-voltage transmission
system
Developing an integrated national grid, including strengthening of five regional
grids; project investment is worth about USD16 billion
PowerGridCorporation
ofIndiaLtd(PGCIL)
Joint development of an India–Sri Lanka undersea transmission link with the
Ceylon Electricity Board at an estimated cost of USD573 million
Investments
across the
value chain
Source: Renewables 2012 Global Status Report (REN21),
Business Monitor International (BMI),
Aranca Research, Central Electricity Authority
Note: TWh - Tera Watt Hour; GW - Gigawatt
India has the sixth largest renewable (eg, hydro
power) power generation capacity (2012)
As of April 2013, total installed power capacity from
renewable energy sources (excluding Hydro power) was
27.5 GW. This accounts for 12.3 per cent of the total
installed power capacity and forms 6.5 per cent of the total
electricity mix
Wind energy is the largest source of renewable energy in
India; it accounts for an estimated 87 per cent of total
installed capacity (18.3 GW). There are plans to double
wind power generation capacity to 20 GW by 2022
Biomass is the second largest source of renewable energy,
accounting for 12 per cent of total installed capacity in
renewable energy. There is a strong upside potential in
biomass in the coming years
Solar energy accounts for 1 per cent of total renewable
energy installed capacity. The country’s true potential for
solar power stands at an estimated 5,000 TWh per annum
Capacity addition of 30 GW is planned using various
renewable energy technologies during the 12th Five-Year
Plan. Wind Energy is estimated to contribute 15 GW,
followed by solar power at 10 GW and the remaining by
other sources
90
86
71
31 29 24
China US Germany Spain Italy India
India ranks
sixth in the
world
Source: Ministry of New and Renewable Energy, Business
Monitor International, CEA, Aranca Research
Note: GW - Gigawatt; Mwe - Megawatt Electric
PHWR - Pressurised Heavy Water Reactors
BWR - Boling Water Reactors
Nuclear energy production in India in (GW)In 2010, India stood fifth in the Asia-Pacific region in nuclear
electricity net generation (behind Japan, South Korea,
China, Taiwan)
Currently, the country has net installed capacity of 4.8 GW,
using nuclear fuels, across 20 reactors. Of the 20 reactors,
18 are pressurised heavy water reactors (PHWR) and two
are boiling water reactors (BWR)
The government aims to quadruple India’s nuclear power
generation capacity to 20 GW by 2020; currently, seven
nuclear power reactors of 4,890 MWe capacity are under
construction
For FY14, the government plans to add 2GW of installed
nuclear capacity
Nuclear Power Corporation of India Limited (NPCIL) plans
to construct five nuclear energy parks with a capacity of
10,000 Mwe
The (2X1 GW) Kudankulam Atomic power project, Tamil
Nadu, by NPCIL is scheduled for completion by March 2014
4.4
20
2012 2020E
CAGR: 24.0%
Council of Power Utilities
A-2/158, Janakpuri, New Delhi-110058, India
Tel : 91 11 25618472, 45652708
Fax : 25611622
E-mail : cvjvarma@gmail.com, cvjv1933@yahoo.com
Web site: www.indiapower.org
Hydro Power Association (India)
Flat no 6, Green Park Apartment, Shriram Society, Warje,
Pune - 411058, Maharashtra, India
Tel: 91 20 25233338
E-mail: hypaindia@gmail.com, president@hpaindia.org,
secretary@hpaindia.org
Website: http://hpaindia.org/
Bureau of Energy Efficiency (BEE)
Ministry of Power, 4th Floor, SEWA Bhawan, R. K. Puram,
New Delhi – 110066, India
Tel: 91 11 26179699
Fax: 91 11 26178352
E-mail: webmanager-bee@nic.in
Website: http://www.beeindia.in/
Indian Wind Energy Association (INWEA)
PHD House, 3rd Floor, Opp. Asian Games Village, August
Kranti Marg, New Delhi-110016, India
Tel : 91 11 26523042
E-mail : manish@inwea.org
Web site: http://www.inwea.org/
CAGR: Compound Annual Growth Rate
FDI: Foreign Direct Investment
FY: Indian Financial Year (April to March)
So FY10 implies April 2009 to March 2010
GW: Gigawatt
M&A: Merger and Acquisition
MW: Megawatt
NBFC: Non-Banking Financial Company
PE: Private Equity
PLF: Plant Load Factor
R&D: Research and Development
R-APDRP: Restructured Accelerated Power Development and Reform Programme
T&D: Transmission and Distribution
TWh: terawatt-hour
RGGVY: Rajiv Gandhi Grameen Vidyutikaran Yojana
USD: US Dollar
Wherever applicable, numbers have been rounded off to the nearest whole number
Year INR equivalent of one US$
2004-05 44.95
2005-06 44.28
2006-07 45.28
2007-08 40.24
2008-09 45.91
2009-10 47.41
2010-11 45.57
2011-12 47.94
2012-13 54.31
Exchange Rates (Fiscal Year)
Year INR equivalent of one US$
2005 45.55
2006 44.34
2007 39.45
2008 49.21
2009 46.76
2010 45.32
2011 45.64
2012 54.69
2013 54.45
Exchange Rates (Calendar Year)
Average for the year
India Brand Equity Foundation (IBEF) engaged Aranca to prepare this presentation and the same has been prepared by
Aranca in consultation with IBEF.
All rights reserved. All copyright in this presentation and related works is solely and exclusively owned by IBEF. The
same may not be reproduced, wholly or in part in any material form (including photocopying or storing it in any medium
by electronic means and whether or not transiently or incidentally to some other use of this presentation), modified or in
any manner communicated to any third party except with the written approval of IBEF.
This presentation is for information purposes only. While due care has been taken during the compilation of this
presentation to ensure that the information is accurate to the best of Aranca and IBEF’s knowledge and belief, the
content is not to be construed in any manner whatsoever as a substitute for professional advice.
Aranca and IBEF neither recommend nor endorse any specific products or services that may have been mentioned in
this presentation and nor do they assume any liability or responsibility for the outcome of decisions taken as a result of
any reliance placed on this presentation.
Neither Aranca nor IBEF shall be liable for any direct or indirect damages that may arise due to any act or omission on
the part of the user due to any reliance placed or guidance taken from any portion of this presentation.

Mais conteúdo relacionado

Mais procurados

Power transmission sector
Power transmission sectorPower transmission sector
Power transmission sectorRahul Gupta
 
Indian power sector an overview
Indian power sector an overviewIndian power sector an overview
Indian power sector an overviewJasbir Arora
 
Power Sector Developments in India
Power Sector Developments in IndiaPower Sector Developments in India
Power Sector Developments in IndiaIndian Energy Sector
 
Market Research India - Power Sector Market in India 2009
Market Research India - Power Sector Market in India 2009Market Research India - Power Sector Market in India 2009
Market Research India - Power Sector Market in India 2009Netscribes, Inc.
 
Power Sector Reform in India
Power Sector Reform in IndiaPower Sector Reform in India
Power Sector Reform in Indiamohkab1
 
Power sector reforms
Power sector reformsPower sector reforms
Power sector reformsPSPCL
 
Energy sector in india 2017 basics and post budget insights arindam (1)
Energy sector in india 2017 basics and post budget insights  arindam (1)Energy sector in india 2017 basics and post budget insights  arindam (1)
Energy sector in india 2017 basics and post budget insights arindam (1)Mr. Arindam Bhattacharjee
 
Indian Power Sector - Industry Analysis
Indian Power Sector - Industry AnalysisIndian Power Sector - Industry Analysis
Indian Power Sector - Industry AnalysisArjun Yadav
 
ICF ppt India Infrastructure - The road ahead for Power sector 16th May 2016
ICF ppt India Infrastructure - The road ahead for Power sector 16th May 2016ICF ppt India Infrastructure - The road ahead for Power sector 16th May 2016
ICF ppt India Infrastructure - The road ahead for Power sector 16th May 2016Ashish Singla
 
Modern Energy Transport - Country Analysis India
Modern Energy Transport - Country Analysis IndiaModern Energy Transport - Country Analysis India
Modern Energy Transport - Country Analysis IndiaAdityaDesai77
 
2010 11 - Indian Energy Sector by ibef
2010 11 - Indian Energy Sector by ibef2010 11 - Indian Energy Sector by ibef
2010 11 - Indian Energy Sector by ibefBulbtiger Tiger
 
Vibrant Gujarat - Renewable Energy Sector Profile
Vibrant Gujarat - Renewable Energy Sector ProfileVibrant Gujarat - Renewable Energy Sector Profile
Vibrant Gujarat - Renewable Energy Sector ProfileVibrant Gujarat
 

Mais procurados (20)

Power transmission sector
Power transmission sectorPower transmission sector
Power transmission sector
 
Energy industry overview
Energy  industry overviewEnergy  industry overview
Energy industry overview
 
Power Ppt
Power PptPower Ppt
Power Ppt
 
Indian power sector an overview
Indian power sector an overviewIndian power sector an overview
Indian power sector an overview
 
Power Sector Developments in India
Power Sector Developments in IndiaPower Sector Developments in India
Power Sector Developments in India
 
Electricity ppt
Electricity pptElectricity ppt
Electricity ppt
 
Power Sector Report - February 2019
Power Sector Report - February 2019Power Sector Report - February 2019
Power Sector Report - February 2019
 
Indian Energy Sector
Indian Energy SectorIndian Energy Sector
Indian Energy Sector
 
Market Research India - Power Sector Market in India 2009
Market Research India - Power Sector Market in India 2009Market Research India - Power Sector Market in India 2009
Market Research India - Power Sector Market in India 2009
 
Indian Power Sector
Indian Power SectorIndian Power Sector
Indian Power Sector
 
Power Sector Reform in India
Power Sector Reform in IndiaPower Sector Reform in India
Power Sector Reform in India
 
Power sector reforms
Power sector reformsPower sector reforms
Power sector reforms
 
Energy sector in india 2017 basics and post budget insights arindam (1)
Energy sector in india 2017 basics and post budget insights  arindam (1)Energy sector in india 2017 basics and post budget insights  arindam (1)
Energy sector in india 2017 basics and post budget insights arindam (1)
 
Indian Power Sector - Industry Analysis
Indian Power Sector - Industry AnalysisIndian Power Sector - Industry Analysis
Indian Power Sector - Industry Analysis
 
ICF ppt India Infrastructure - The road ahead for Power sector 16th May 2016
ICF ppt India Infrastructure - The road ahead for Power sector 16th May 2016ICF ppt India Infrastructure - The road ahead for Power sector 16th May 2016
ICF ppt India Infrastructure - The road ahead for Power sector 16th May 2016
 
Modern Energy Transport - Country Analysis India
Modern Energy Transport - Country Analysis IndiaModern Energy Transport - Country Analysis India
Modern Energy Transport - Country Analysis India
 
2010 11 - Indian Energy Sector by ibef
2010 11 - Indian Energy Sector by ibef2010 11 - Indian Energy Sector by ibef
2010 11 - Indian Energy Sector by ibef
 
Power Sector Report October 2017
Power Sector Report October 2017Power Sector Report October 2017
Power Sector Report October 2017
 
Vibrant Gujarat - Renewable Energy Sector Profile
Vibrant Gujarat - Renewable Energy Sector ProfileVibrant Gujarat - Renewable Energy Sector Profile
Vibrant Gujarat - Renewable Energy Sector Profile
 
Renewable Energy Sector Report - February 2019
Renewable Energy Sector Report - February 2019Renewable Energy Sector Report - February 2019
Renewable Energy Sector Report - February 2019
 

Destaque

Future of Hydro Power in India- Private Sector Performance
Future of Hydro Power in India- Private Sector PerformanceFuture of Hydro Power in India- Private Sector Performance
Future of Hydro Power in India- Private Sector PerformanceIPPAI
 
The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017LinkedIn
 
Role of power sector abstract
Role of power sector abstractRole of power sector abstract
Role of power sector abstractSuraj Yadav
 
Information technology implementation in power distribution
Information technology implementation in  power distributionInformation technology implementation in  power distribution
Information technology implementation in power distributionDhrubaji Mandal ♛
 
Rural energy considerations (for FMO workshop Jan'11)
Rural energy considerations (for FMO workshop Jan'11)Rural energy considerations (for FMO workshop Jan'11)
Rural energy considerations (for FMO workshop Jan'11)Frank van der Vleuten
 
zeroPoverty launches the pilot phase of its rural electrification in India
zeroPoverty launches the pilot phase of its rural electrification in IndiazeroPoverty launches the pilot phase of its rural electrification in India
zeroPoverty launches the pilot phase of its rural electrification in IndiaArun Amirtham
 
Electricity in india
Electricity in indiaElectricity in india
Electricity in indiaDev Garg
 
Infrastructure and Economic Growth in India
Infrastructure and Economic Growth in IndiaInfrastructure and Economic Growth in India
Infrastructure and Economic Growth in IndiaAniket Hinge
 
Growth of Electricity Sector in India since 1947 to 2015
Growth of Electricity Sector in India since 1947 to 2015Growth of Electricity Sector in India since 1947 to 2015
Growth of Electricity Sector in India since 1947 to 2015Ashish Verma
 
Power Sector India Sample
Power Sector   India   SamplePower Sector   India   Sample
Power Sector India Samplevandalmax
 
Integrated Rural Electrification
Integrated Rural ElectrificationIntegrated Rural Electrification
Integrated Rural ElectrificationLeonardo ENERGY
 
Electricity in India: Developments, Issues, & Remedies
Electricity in India: Developments, Issues, & RemediesElectricity in India: Developments, Issues, & Remedies
Electricity in India: Developments, Issues, & RemediesShardul Kulkarni
 
Rural electrification status of India
Rural electrification status of IndiaRural electrification status of India
Rural electrification status of IndiaPooja Kumari
 
rural electrification
rural electrificationrural electrification
rural electrificationanudeep123
 
Rural electrification by Lakshmi.Nidoni-seminar ppt
Rural electrification by Lakshmi.Nidoni-seminar pptRural electrification by Lakshmi.Nidoni-seminar ppt
Rural electrification by Lakshmi.Nidoni-seminar pptlakshmi nidoni
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in indiaAnkur Mahajan
 
Rural Electrification in India
Rural Electrification in IndiaRural Electrification in India
Rural Electrification in IndiaPiyushkhinvasara
 
Infrastructure development in india
Infrastructure development in indiaInfrastructure development in india
Infrastructure development in indiaMukesh Khinchi
 
Electricity distribution system in india
Electricity distribution system in indiaElectricity distribution system in india
Electricity distribution system in indiaJasgt Singh
 

Destaque (20)

Future of Hydro Power in India- Private Sector Performance
Future of Hydro Power in India- Private Sector PerformanceFuture of Hydro Power in India- Private Sector Performance
Future of Hydro Power in India- Private Sector Performance
 
The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017
 
Role of power sector abstract
Role of power sector abstractRole of power sector abstract
Role of power sector abstract
 
Information technology implementation in power distribution
Information technology implementation in  power distributionInformation technology implementation in  power distribution
Information technology implementation in power distribution
 
Rural energy considerations (for FMO workshop Jan'11)
Rural energy considerations (for FMO workshop Jan'11)Rural energy considerations (for FMO workshop Jan'11)
Rural energy considerations (for FMO workshop Jan'11)
 
zeroPoverty launches the pilot phase of its rural electrification in India
zeroPoverty launches the pilot phase of its rural electrification in IndiazeroPoverty launches the pilot phase of its rural electrification in India
zeroPoverty launches the pilot phase of its rural electrification in India
 
Electricity in india
Electricity in indiaElectricity in india
Electricity in india
 
Infrastructure and Economic Growth in India
Infrastructure and Economic Growth in IndiaInfrastructure and Economic Growth in India
Infrastructure and Economic Growth in India
 
Growth of Electricity Sector in India since 1947 to 2015
Growth of Electricity Sector in India since 1947 to 2015Growth of Electricity Sector in India since 1947 to 2015
Growth of Electricity Sector in India since 1947 to 2015
 
Power Sector India Sample
Power Sector   India   SamplePower Sector   India   Sample
Power Sector India Sample
 
Integrated Rural Electrification
Integrated Rural ElectrificationIntegrated Rural Electrification
Integrated Rural Electrification
 
Electricity in India: Developments, Issues, & Remedies
Electricity in India: Developments, Issues, & RemediesElectricity in India: Developments, Issues, & Remedies
Electricity in India: Developments, Issues, & Remedies
 
Rural electrification status of India
Rural electrification status of IndiaRural electrification status of India
Rural electrification status of India
 
Rural electrification
Rural electrificationRural electrification
Rural electrification
 
rural electrification
rural electrificationrural electrification
rural electrification
 
Rural electrification by Lakshmi.Nidoni-seminar ppt
Rural electrification by Lakshmi.Nidoni-seminar pptRural electrification by Lakshmi.Nidoni-seminar ppt
Rural electrification by Lakshmi.Nidoni-seminar ppt
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in india
 
Rural Electrification in India
Rural Electrification in IndiaRural Electrification in India
Rural Electrification in India
 
Infrastructure development in india
Infrastructure development in indiaInfrastructure development in india
Infrastructure development in india
 
Electricity distribution system in india
Electricity distribution system in indiaElectricity distribution system in india
Electricity distribution system in india
 

Semelhante a India : Power Sector Report_August 2013

Power-August-2014.pdf
Power-August-2014.pdfPower-August-2014.pdf
Power-August-2014.pdfAbhimit Kumar
 
Power sector ,devlopment
Power sector ,devlopmentPower sector ,devlopment
Power sector ,devlopmentBhakti Parida
 
Vibrant Gujarat Summit Profile for Energy Spectrum Sector
Vibrant Gujarat Summit Profile for Energy Spectrum SectorVibrant Gujarat Summit Profile for Energy Spectrum Sector
Vibrant Gujarat Summit Profile for Energy Spectrum SectorVibrant Gujarat
 
Renewable energy industry jan 2016
Renewable energy industry jan 2016Renewable energy industry jan 2016
Renewable energy industry jan 2016arpitgoel075
 
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...libin paul
 
1673948265_Power-Nov2022.pdf
1673948265_Power-Nov2022.pdf1673948265_Power-Nov2022.pdf
1673948265_Power-Nov2022.pdfssuserfbc60b
 
Renewable energy engineering (ala)
Renewable energy engineering (ala)Renewable energy engineering (ala)
Renewable energy engineering (ala)Sonal Upadhyay
 
1659942847_Renewable_Energy-PPT-June_2022.pdf
1659942847_Renewable_Energy-PPT-June_2022.pdf1659942847_Renewable_Energy-PPT-June_2022.pdf
1659942847_Renewable_Energy-PPT-June_2022.pdfssuser387308
 
Vibrant Gujarat Summit Profile for Energy Spectrum Sector
Vibrant Gujarat Summit Profile for Energy Spectrum SectorVibrant Gujarat Summit Profile for Energy Spectrum Sector
Vibrant Gujarat Summit Profile for Energy Spectrum SectorVibrant Gujarat
 

Semelhante a India : Power Sector Report_August 2013 (20)

Power-August-2014.pdf
Power-August-2014.pdfPower-August-2014.pdf
Power-August-2014.pdf
 
Power Sectore Report - December 2016
Power Sectore Report - December 2016Power Sectore Report - December 2016
Power Sectore Report - December 2016
 
Power Sectore Report - January 2017
Power Sectore Report - January 2017Power Sectore Report - January 2017
Power Sectore Report - January 2017
 
Renewable Energy Sector
Renewable Energy SectorRenewable Energy Sector
Renewable Energy Sector
 
Geeta power industry
Geeta power industryGeeta power industry
Geeta power industry
 
Power Sectore Report December 2016
Power Sectore Report December 2016Power Sectore Report December 2016
Power Sectore Report December 2016
 
Power sector ,devlopment
Power sector ,devlopmentPower sector ,devlopment
Power sector ,devlopment
 
Power Sectore Report November 2016
Power Sectore Report November 2016Power Sectore Report November 2016
Power Sectore Report November 2016
 
Power Sectoral Report - October 2016
Power Sectoral Report - October 2016Power Sectoral Report - October 2016
Power Sectoral Report - October 2016
 
Vibrant Gujarat Summit Profile for Energy Spectrum Sector
Vibrant Gujarat Summit Profile for Energy Spectrum SectorVibrant Gujarat Summit Profile for Energy Spectrum Sector
Vibrant Gujarat Summit Profile for Energy Spectrum Sector
 
Energy sector
Energy sectorEnergy sector
Energy sector
 
Power Sector Report February 2018
Power Sector Report February 2018Power Sector Report February 2018
Power Sector Report February 2018
 
Renewable energy industry jan 2016
Renewable energy industry jan 2016Renewable energy industry jan 2016
Renewable energy industry jan 2016
 
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
 
1673948265_Power-Nov2022.pdf
1673948265_Power-Nov2022.pdf1673948265_Power-Nov2022.pdf
1673948265_Power-Nov2022.pdf
 
Renewable energy engineering (ala)
Renewable energy engineering (ala)Renewable energy engineering (ala)
Renewable energy engineering (ala)
 
Power Sector Report March 2018
Power Sector Report March 2018Power Sector Report March 2018
Power Sector Report March 2018
 
PWC renewable energy report India 2012
PWC renewable energy report India 2012PWC renewable energy report India 2012
PWC renewable energy report India 2012
 
1659942847_Renewable_Energy-PPT-June_2022.pdf
1659942847_Renewable_Energy-PPT-June_2022.pdf1659942847_Renewable_Energy-PPT-June_2022.pdf
1659942847_Renewable_Energy-PPT-June_2022.pdf
 
Vibrant Gujarat Summit Profile for Energy Spectrum Sector
Vibrant Gujarat Summit Profile for Energy Spectrum SectorVibrant Gujarat Summit Profile for Energy Spectrum Sector
Vibrant Gujarat Summit Profile for Energy Spectrum Sector
 

Mais de India Brand Equity Foundation

Engineering and Capital Goods Sector Report - April 2019
Engineering and Capital Goods Sector Report - April 2019Engineering and Capital Goods Sector Report - April 2019
Engineering and Capital Goods Sector Report - April 2019India Brand Equity Foundation
 

Mais de India Brand Equity Foundation (20)

Tamil Nadu State report - April 2019
Tamil Nadu State report - April 2019Tamil Nadu State report - April 2019
Tamil Nadu State report - April 2019
 
Steel Sector Report - April 2019
Steel Sector Report - April 2019Steel Sector Report - April 2019
Steel Sector Report - April 2019
 
Services Sector Report - April 2019
Services Sector Report - April 2019Services Sector Report - April 2019
Services Sector Report - April 2019
 
Real Estate Sector Report - April 2019
Real Estate Sector Report - April 2019Real Estate Sector Report - April 2019
Real Estate Sector Report - April 2019
 
Rajasthan State Report - April 2019
Rajasthan State Report - April 2019Rajasthan State Report - April 2019
Rajasthan State Report - April 2019
 
Railways Sector Report April 2019
Railways Sector Report April 2019Railways Sector Report April 2019
Railways Sector Report April 2019
 
Power Sector Report - April 2019
Power Sector Report - April 2019Power Sector Report - April 2019
Power Sector Report - April 2019
 
Nagaland State Report - April 2019
Nagaland State Report - April 2019Nagaland State Report - April 2019
Nagaland State Report - April 2019
 
Meghalaya State Report April 2019
Meghalaya State Report April 2019Meghalaya State Report April 2019
Meghalaya State Report April 2019
 
Infrastructure Sector Report - April 2019
Infrastructure Sector Report - April 2019Infrastructure Sector Report - April 2019
Infrastructure Sector Report - April 2019
 
Media and Entertainment Sector report - April 2019
Media and Entertainment Sector report - April 2019Media and Entertainment Sector report - April 2019
Media and Entertainment Sector report - April 2019
 
Manufacturing Sector Report - April 2019
Manufacturing Sector Report - April 2019Manufacturing Sector Report - April 2019
Manufacturing Sector Report - April 2019
 
Manipur State Report - April 2019
Manipur State Report - April 2019Manipur State Report - April 2019
Manipur State Report - April 2019
 
Himachal Pradesh State Report - April 2019
Himachal Pradesh State Report - April 2019Himachal Pradesh State Report - April 2019
Himachal Pradesh State Report - April 2019
 
Gujarat State Report - April 2019
Gujarat State Report - April 2019Gujarat State Report - April 2019
Gujarat State Report - April 2019
 
Gems and Jewellery Sector Report - April 2019
Gems and Jewellery Sector Report - April 2019Gems and Jewellery Sector Report - April 2019
Gems and Jewellery Sector Report - April 2019
 
Engineering and Capital Goods Sector Report - April 2019
Engineering and Capital Goods Sector Report - April 2019Engineering and Capital Goods Sector Report - April 2019
Engineering and Capital Goods Sector Report - April 2019
 
E Commerce Sector Report - April 2019
E Commerce Sector Report - April 2019E Commerce Sector Report - April 2019
E Commerce Sector Report - April 2019
 
Delhi State Report - April 2019
Delhi State Report - April 2019Delhi State Report - April 2019
Delhi State Report - April 2019
 
Chhattisgarh State Report - April 2019
Chhattisgarh State Report - April 2019Chhattisgarh State Report - April 2019
Chhattisgarh State Report - April 2019
 

Último

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGSujit Pal
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 

Último (20)

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAG
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 

India : Power Sector Report_August 2013

  • 1.
  • 3. Source: Ministry of New and Renewable Energy, CEA, Aranca Research, Assorted Articles Note: TWh - Terawatt Hours, GW - Gigawatt Fifth largest producer and consumer globally • With a production of 1,006 TWh, India is the fifth largest producer and consumer of electricity in the world Large-scale government initiated expansion plans • The government targets capacity addition of 89 GW under the 12th Five-Year Plan (2012– 17) and around 100 GW under the 13th Five-Year Plan (2017–22) • Investments of around USD223.9 billion are planned for the power sector during the 12th Plan Five-Year Plan Robust growth in renewables • Renewable energy capacity additions of 30 GW are planned in the next five years to meet the growing energy demand • Wind energy is estimated to contribute 15 GW, followed by solar power at 10 GW Favourable policy environment • The National Tariff Policy (2006) ensured adequate return on investment to companies engaged in power generation, transmission and distribution and assured electricity to end- users at affordable and competitive rates • Launch of Ultra Mega Power Project (UMPP) scheme through tariff-based competitive bidding
  • 4. • The engineering sector is delicensed; 100 per cent FDI is allowed in the sector • Due to policy support, there was cumulative FDI of USD14.0 billion into the sector over April 2000 – February 2012, making up 8.6 per cent of total FDI into the country in that period Growing demand Source: Assorted articles and research material, Aranca Research; KPMG Notes: FY - Indian Financial Year (April – March); FDI - Foreign Direct Investment, E - Estimates, CAGR - Compound Annual Growth Rate, TWh - Terawatt-hour, GW - Gigawatt, FY22 estimates as per IEA forecasts Growing demand • Expansion in industrial activity to boost demand for electricity • Growing population, and increasing penetration and per- capita usage to provide further impetus • Power consumption is estimated to increase from 821.2 TWh in 2013 to an estimated 1,433.2 TWh in 2022 Attractive opportunities • Large capacity additions (189GW) targeted in the 12th and 13th Five-Year Plans • Ambitious projects and increasing investments across the value chain • Diversification into renewable sources increasing growth avenues Policy support • Elimination of licensing for various segments; removal of entry barriers • Cost reduction and rationalisation of tariffs; development of UMPP • Fuel supply agreement of power producers with Coal India Higher investments • Total FDI inflows in the power sector touched USD7.8 billion in April 2000–March 2013, accounting for 4 per cent of total FDI inflow in India • Major investments earmarked by public as well as private sector companies across the value chain FY12 Total demand (TWh): 969.0 FY22E Total demand (TWh): 1915.0 Advantage India
  • 5. Source: KPMG, Corporate Catalyst India, IFLR, Aranca Research • Electricity (Supply) Act 1948 • Establishment of semi- autonomous State Electricity Boards (SEBs) • Industrial Policy Resolution (1956) • Generation and distribution of power under state ownership • Power losses, subsidies, infrastructure bottlenecks and resource constraints • Legislative and policy initiatives (1991) • Private sector participation in generation • Fast-track clearing mechanism of private investment proposals • Electricity Regulatory Commissions Act (1998) for establishing Central and State Electricity Regulatory Commissions and rationalisation of tariffs Before 1956 Introductory Stage 1956–1991 Nationalisation Stage 1991–2003 Liberalisation Era 2003 onwards Growth Era • Electricity Act (2003) • National Tariff Policy (2006) • Elimination of licensing for generation projects • Increased competition through international competitive bidding engaged in power generation, transmission and distribution • Launch of UMPP scheme • Various schemes and initiatives such as Jawaharlal Nehru National Solar Mission to promote renewable energy • Civil nuclear agreement with the US for nuclear technology and fuel • Fuel supply agreement of power companies with Coal India Ltd (CIL) • Private equity investments in the sector have surged since 2010
  • 6. Source: CIA World Factbook, Aranca Research, Energy Statistics 2013, Central Electricity Authority (CEA) Note: TWh - Terawatt Hours World’s leading electricity producers in 2012 (TWh)With a production of 1,006 TWh, India is the fifth largest producer and consumer of electricity in the world Although power generation has grown over 100-fold since independence, demand growth has been even higher due to accelerating economic activity 4,700 4,308 1,0521,1041,006615608 China US Russia Japan India Germany Canada
  • 7. Source: Central Electricity Authority (CEA), Aranca Research; Notes: FY - Indian Financial Year (April-March), TWh - Terra Watt Hour Electricity production in India (TWh)Electricity production in India (excluding captive generation) stood at 911.6 TWh in FY13, a 4 per cent growth over the previous fiscal Over FY07–13, electricity production expanded at a CAGR of 5.5 per cent The Planning Commission’s 12th Plan projects that total domestic energy production would reach 669.6 million tonnes of oil equivalent (MTOE) by 2016–17 and 844 MTOE by 2021–22 663 705 724 772 811 876 912 FY07 FY08 FY09 FY10 FY11 FY12 FY13 CAGR: 5.5%
  • 8. Source: Ministry of Coal, NHPC, CEA, The Hindu, Corporate Catalyst India, Aranca Research Notes: MW - Megawatt, GW - Gigawatt Hydro Renewable Nuclear Thermal India has large reserves of coal. As of April 2012, total coal reserves stood at 293.5 billion tonnes; of this, 118.1 billion tonnes were proven reserves India’s proven natural gas reserves measure about 1,074 billion cubic metres With a large swathe of rivers and water bodies, India has enormous potential for hydropower; the 12th Five-Year Plan (2012–17) includes additional 30,000 MW of hydro-electric power generation. Currently, India has 39.6 GW of hydro power generating capacity Wind energy is the largest renewable energy source in India; projects like the Jawaharlal Nehru National Solar Mission (aims to generate 20,000 MW of solar power by 2022) is creating a positive environment among investors keen to exploit India’s potential Currently, India has 4.8 GW of net electricity generation capacity using nuclear fuels (across 20 reactors) and aims to increase it to 20GW by 2020; with one of the world’s largest reserves of thorium, India has a huge potential in nuclear energy Gas Coal 68% 18% 12% 2%
  • 9. Source: Ministry of Coal, NHPC,CEA, The Hindu, Corporate Catalyst India, Aranca Research Notes: MW - Megawatt, GW - Gigawatt Installed capacity for different sources of power - FY13 (GW) As of April 2013, total thermal installed capacity stood at 151.7GW, while hydro and renewable energy installed capacity totalled 39.6GW and 27.5GW, respectively. Nuclear energy capacity remained broadly constant from that in the previous year, at 4.8GW For the 12th Five-Year Plan, a total of 88.5 GW of power capacity addition is targeted, of which 72.3 GW constitutes thermal power, 10.8GW of hydro power and 5.3GW of nuclear power The capacity addition target for 2013–14 is 1,198 MW of hydro power, 15,234 MW of thermal power and 2,000 MW of nuclear power. Total capacity target is 18,432 MW 151.7 39.6 27.5 4.8 Thermal Hydro electric Renewable Nuclear
  • 10. Source: Central Electricity Authority (CEA), Aranca Research Note: GW - Gigawatt, Data for FY13* is as on April-2013 CAGR - Compound Annual Growth Rate Installed electricity generation capacity (GW)India’s installed power generation capacity was 223.6 GW at the end of April 2013 Installed capacity increased steadily over the years, posting a CAGR of 10.9 per cent in FY09–13 148 159 174 200 224 FY09 FY10 FY11 FY12 FY13 CAGR: 10.9%
  • 11. Source: Central Electricity Authority (CEA), Aranca Research, Notes: Data for FY13 is as on April 2013, CAGR - Compound Annual Growth Rate Comparison of installed capacity (GW)Among the different sources of power in India, the CAGR in installed capacity over FY09–13 was 12.8 per cent for thermal power 20.1 per cent for renewable energy, the fastest among all sources of power 1.8 per cent for hydro power 152 40 28 5 132 39 25 5 94 37 13 4 ThermalHydroRenewableNuclear FY13 FY12 FY09
  • 12. Source: Company websites, News Articles, Industry Sources, Aranca Research Company Business description • NTPC is India’s largest power producer and the sixth-largest thermal power producer in the world, with installed capacity of 41,184 MW (including 5,364 MW through JVs). By 2032, NTPC plans to reach 128,000 MW power capacity. Coal-based power accounts for more than 90 per cent of the total capacity • It has also diversified into hydro power, coal mining, power equipment manufacturing, oil and gas exploration, power trading and distribution • Tata Power is India’s largest integrated power company, with significant presence in solar, hydro, wind and geothermal energy space. The company accounts for 52 per cent of total generation capacity in the private sector, with an installed capacity of 8,521 MW • The company has over 35,000 MW of power generation capacity, both operational and under development. Reliance Power has an operational power generation capacity of 2,500 MW. FY13 saw the development of the 3,960 MW Sasan UMPP in Madhya Pradesh • CESC Limited is a vertically integrated player engaged in coal mining, and generation and distribution of power • NHPC is the largest hydro power utility in India, with an installed capacity of 5,295MW; it has drawn up a massive capacity expansion plan of adding 6,697 MW by 2017 • NHPC is constructing nine projects aggregating to a total installed capacity of 4271 MW. NHPC added 1,970 MW and 1,150 MW during the 10th and 11th Plan periods, respectively
  • 13. Source: Company websites, News Articles, Aranca Research Notes: NBFC - Non-banking Financial Company Company Business description • Power Finance Corporation Limited (PFC) is an NBFC engaged in financing and development activities within the Indian power sector • Major products and services include project term loans, lease financing, direct discounting of bills, short-term loans and consultancy services • Adani Power is one of India’s largest private thermal power producers, with total capacity of 4,620 MW; the company aims to generate 20,000 MW of power by 2020 • The company is building one of the world’s largest single-location thermal power plants in Mundra, Gujarat • Power Grid Corporation of India Limited (PGCIL) is the single largest transmission utility in India; it is responsible for planning, co-ordination, supervision and control over inter-state transmission systems • Damodar Valley Corporation is engaged in power generation, distribution and transmission of electric power, irrigation and flood control • SJVN Limited is the second largest hydro power company in India • The company plans to diversify into wind power projects soon *This list is indicative.
  • 14. Policy support Electricity Act (2003): highly liberal framework for generation Fuel supply agreement of power companies with Coal India Ltd Development of UMPPs Increase in industrial activity Increasing investments Rising FDI inflows (USD536 million in FY13) Growing M&A activity Large investments in equipment manufacture and power generation Inviting Resulting in Increasing penetration, per- capita consumption Growing middle class and consumer base Growing demand National Tariff Policy (2006): private investment through competitive bidding Source: Corporate Catalyst India, Ministry of Power, Aranca Research, Notes: FDI - Foreign Direct Investment, M&A - Merger and Acquisition, R-APDRP - Restructured Accelerated Power Development and Reform Programme, T&D - Transmission and Distribution
  • 15. Source: Estimates as per BMI India Power Report Q3 2011, Aranca Research Notes: TWh - Terawatt Hours, RGGVY - Rajiv Gandhi Grameen Vidyutikaran Yojana, Central Electricity Authority (CEA) Share of industry in electricity consumptionMultiple drivers (industrial expansion, growing per-capita incomes) are leading to growth in power demand; this is set to continue in the coming years– During FY10–15, GDP growth is likely to average 8.0–8.5 per cent India is set to become a global manufacturing hub with investments across the value chain Power consumption is estimated to increase from 821.2 TWh in 2013 to 1,433.2 TWh by 2022 India’s power demand is expected to rise up to 1,915 TWh by FY22 47.4% 48.1% 48.8% 49.6% 50.3% 51.0% 57.9% 2009 2010 2011E 2012E 2013E 2014E 2015E
  • 16. Source: Estimates as per BMI India Power Report Q4 2012, Mckinsey, Aranca Research Notes: RGGVY - Rajiv Gandhi Grameen Vidyutikaran Yojana Per-capita electricity consumption (KWh)82GW worth of generation capacity is set to be added during FY11–FY15; future investments will benefit from strong demand fundamentals, policy support and increasing government focus on infrastructure Residential consumption has grown at a fast pace; growth was 14 per cent in FY11 Government initiatives like RGGVY and ‘Power for all’ will further drive the demand 543.2 561.9 583.8 613.1 648.4 680.7 718.1 2010 2011 2012E 2013E 2014E 2015E 2016E CAGR: 4.8%
  • 17. Source: KPMG, CRISIL, Ministry of Power, Aranca Research Notes: R- APDRP - Restructured Accelerated Power Development and Reform Programme, SERC - State Electricity Regulatory Commission, AT&T - American Telephone & Telegraph Systems Electricity Act, 2003 • Elimination of licensing for electricity generation projects • Increased competition through international competitive bidding • Demarcation of transmission as a separate activity National Tariff Policy, 2006 • Adequate return on investment to companies engaged in power generation, transmission and distribution • Uniform guidelines to SERCs for fixing tariffs • Assured electricity to consumers at reasonable and competitive rates Ultra Mega Power Projects (UMPPs) • Launch of the UMPP scheme through tariff-based competitive bidding • Ease of land possession, provision of fuel, water and necessary clearances for enhancing investor confidence R-APDRP • R-APDRP was launched by Ministry of Power with the purpose of reducing AT&T losses up to 15 per cent by up-gradation of transmission and distribution network • Linking disbursement of central government funds (to states), with actual reduction in transmission and distribution losses. Sanctioned projects of more than USD5.8 billion Fuel Supply Agreement • Fuel supply agreement with Coal India Ltd will ensure the availability of coal for power companies over the long term
  • 18. Source: Union Budget FY13, Various News Articles, Aranca Research, Note: PSUs - Public Sector Units Generation-based incentives • Government to reintroduce 'generation-based incentives' for wind power projects to boost capacity addition in the sector • USD147.3 million would be allocated to the Ministry of New and Renewable Energy Public Private Partnership (PPP) • To reduce dependency on imported coal, a Public Private Partnership (PPP) policy framework would be devised with Coal India Limited to increase coal production Liberalised FDI policy • During FY13, the Government liberalised FDI policy for Power Trading Exchanges • Foreign Investment in power exchanges registered under the Central Electricity Regulatory Commission Regulations, 2010, allowed up to 49 per cent (FDI-26 per cent and FII-23 per cent) Low-interest funds • Low-interest–bearing funds to be provided from National Clean Energy Fund (NCEF) to Indian Renewable Energy Development Agency Ltd (IREDA) for on-lending to viable renewable energy projects Growing investments • The total plan outlay for the power sector for FY14 is estimated at USD1.6 billion, a significant 27 per cent higher than the revised estimate of USD1.5 billion for FY13 • While the proportion of plan expenditure in the total outlay was 59 per cent in FY13, that for FY14 is a whopping 96 per cent Higher capex by PSUs • The total capex by power PSUs is estimated to be USD9.4 billion in FY14 as against USD9.3 in FY13 • Power Grid Corporation of India will incur USD3.7 billion of capex in FY14, same as that in FY13
  • 19. Source: Union Budget FY13, Various News Articles, Aranca Research Elimination of customs duty • The government has fully exempted basic customs duty and a concessional countervailing duty (CVD) of 1 per cent to steam coal for a period of two years till FY14 External commercial borrowings (ECBs) • Power companies can utilise 40 per cent of fresh ECBs raised towards refinancing of Rupee loan availed from domestic banks under the approval route. • The withholding tax on ECBs has been reduced to 5 per cent from 20 per cent till FY15 Higher limit for Tax free bonds • The limit for tax-free bonds for the power sector has been increased to USD2 billion from USD1 billion • The government has also extended the tax holiday by one year; this allows power producers to claim tax exemption up to 10 years
  • 20. Source: Department of Industrial Policy and Promotion, Aranca Research FDI inflows into the power sector (USD million)Power is one of the key sectors attracting FDI inflows into India During FY06–12, FDI inflows into the sector increased from a mere USD87 million in FY06 to USD1.7 billion in FY12 FDI inflows stood at USD536 million in FY13 Power accounted for 4 per cent of total inflows in the sector in FY13 Cumulative FDI inflows into the sector in FY00–13 were USD7.8 billion 87 157 967 985 1,437 1,252 1,652 536 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13
  • 21. Source: Thomson One Banker, Industry News, VC Cicrcle, Aranca Research Private equity investments in the sector have surged since 2010 Goldman Sachs’ private equity fund invested USD135 million afresh in the privately held wind energy firm ReNew Power Pvt Ltd It had invested USD200 million in 2011 ReNew Wind Power has several wind projects in the development stage; one year back, it had commissioned its first 25.2-MW wind farm at Jasdan in Rajkot, Gujarat. ReNew had 200 MW of installed wind power portfolio as of 30 April 2013 GSPC Distribution Networks Ltd’s investment of USD674.2 million in Gujarat Gas Co Ltd was the largest PE transaction in the Indian power sector in 2012 Private Equity deals Acquirer Target Deal date Deal value (USD million) Goldman Sachs ReNew Wind Power Pvt Ltd 5 June 2013 135.0 Consortium led by Deutsche Investitions, FE Clean Energy Group & IFC NSL Renewable Power Pvt Ltd 29 April 2013 60.0 Ascent Capital Advisors India Pvt Ltd, VenturEast, Draper Fisher Jurvetson Intl. Bharat Light and Power Pvt Ltd 22 January 2013 18.6 GSPC Distribution Networks Ltd Gujarat Gas Co Ltd 3 October 2012 674.2 Foundation Capital; Helion Venture Partners Azure Power India Pvt Ltd 7 September 2012 8.0 Notes: FDI - Foreign Direct Investment, PE - Private Equity
  • 22. Source: Thomson One Banker, Economic Times, Aranca Research Notes: FDI - Foreign Direct Investment, PE - Private Equity Global power giants like GDF Suez of France and E.ON of Germany plan to enter the Indian market Morgan Stanley Infrastructure’s private equity fund invested USD425 million in Asian Genco Pvt Ltd, an infrastructure company which has investments in Indian power generation assets and engineering services businesses Private Equity deals Acquirer Target Deal date Deal value (USD million) Athena Capital Partners LLP SPS Ispat and Power Ltd 08 July 2011 67.6 India Infrastructure Fund Caparo Energy (India) Ltd 17 June 2011 78.5 Warburg Pincus India Pvt Ltd Diligent Power Pvt Ltd 11 May 2011 150.0 Blackstone Group LP Moser Baer Projects Pvt Ltd 18 August 2010 300.0 Morgan Stanley Infrastructure Asian Genco Pvt Ltd 18 March 2010 425.0
  • 23. Source: NTPC website, Annual Reports, Economic Times, Aranca Research Note: CAGR - Compound Annual Growth Rate, MW - Megawatt Revenues and Net Profit (USD billion)During FY07–13, NTPC’s sales increased at a CAGR of 12.3 per cent; CAGR in profits was 10.5 per cent NTPC accounts for 18.5 per cent of the country’s capacity, though it contributes 27.4 per cent of total power generation The company has an installed capacity of 41,184 MW. It aims to become a 128,000 MW capacity company by 2032 Currently, 17,909 MW of capacity is under construction It spent approximately USD 2.2billion in FY12, with plans to spend an additional USD4 billion in FY13 in expansion activity The company plans to set up a 800 MW advanced ultra supercritical plant, a first-of-its-kind in India 1.5 1.9 1.8 1.9 2.1 2.0 2.3 0 2 4 6 8 10 12 14 16 0.0 0.5 1.0 1.5 2.0 2.5 FY07 FY08 FY09 FY10 FY11 FY12 FY13 Net Profit (LHS) Net Sales (RHS)
  • 24. Source: NTPC website, Annual Reports, Economic Times, Aranca Research Notes: PLF - Plant Load Factor, After Takeover - Figures for FY08, MW - Megawatt Impact of NTPC takeover of sub-optimal plants (PLF)NTPC has taken over and successfully turned around a number of sub-optimally performing stations High operational efficiency (indicated by plant load factor and availability factor) is NTPC’s trademark It is a pioneer in high-efficiency supercritical and ultra supercritical coal-bed power plants in India NTPC has formulated a business plan for capacity addition of around 1,000 MW through renewable resources by 2017. 66% 86% 18% 98% 19% 86% 22% 92% Before takeover After takeover Badarpur Unchahar Talcher Tanda
  • 25. Source: NTPC website, Annual Reports, Economic Times, Aranca Research Notes: PLF - Plant Load Factor, After Takeover - Figures for FY08, GW - Gigawatt NTPC: Capacity additions over the years (GW)Capacity addition at a CAGR of 19 per cent during 1982– 2012 In 2012, NTPC formed a joint venture with Bangladesh for a 1,320-MW plant and was awarded the 800-MW Kudgi-I project Highest ever capacity addition of 2,660 MW during 9MFY13, contributing 24 per cent of total addition in the country As of December 2012, the company’s total installed power generation capacity stood at 39.7 GW, which includes 4.9 GW from other group companies 15 20 25 30 35 39.7 FY95 FY03 FY07 FY09 FY12 9M'13
  • 26. Source: Company website, Annual Reports, Economic Times, Aranca Research Note: MW - Megawatt Net income (USD million)During FY06–12, Tata Power’s profits increased at a CAGR of 11.5 per cent to USD244.1 million The company has an installed generation capacity of 8,521 MW in India and is present in all segments of the power sector The thermal power generation capacity stands at 7,647 MW, while clean energy generation such as hydro, solar and wind stands at 852 MW The company is developing its first 4,000 MW Ultra Mega Power Project at Mundra (Gujarat) based on supercritical technology Its international presence includes a 30 per cent stake in coal mines and a geothermal project in Indonesia, and a hydro project in Bhutan in partnership with The Royal Government of Bhutan. The company is eyeing the clean energy segment; it recently acquired stakes in two Australian companies in the sector 138 154 216 201 198 206 244 FY06 FY07 FY08 FY09 FY10 FY11 FY12 CAGR: 11.5%
  • 27. Source: Company website, FY17 estimate as per press release, 15th July 2011 Note: MW - Megawatt, CAGR - Compounded Annual Growth Rate Installed capacity in mega watts (MW)The company estimates its installed capacity to expand fivefold in the next five years to 25,000 MW (CAGR of 30 per cent from FY07 and 47 per cent from FY12) Recognising the enormous potential in renewable energy, the company intends to increase the share of renewable sources to 25 per cent of its total generating capacity in the near future 2,300 3,120 5,297 25,000 FY07 FY11 FY12 FY17E
  • 28. Source: Reliance Power website, Annual Reports, Industry News, Aranca Research Note: MW - Megawatt Revenues and Net Profit (USD million)Reliance Power has 2,500 MW of operational capacity and over 20,000 MW under implementation It won three of the four Ultra Mega Power Projects (UMPPs) awarded by Government of India, and is constructing India’s largest 2,400 MW gas-based power plant It has three captive coal blocks in India, with aggregate coal reserves of around 2 billion tonnes and three coal concessions in Indonesia, with estimated coal resources of another 2 billion tonnes Planned peak coal production of 95 million tonnes In FY12, the Rosa plant recorded annual generation of 8 billion units 178 421 577 973 144 167 181 186 FY10 FY11 FY12 FY13 E Total Income (USD million) Net Profit (USD million)
  • 29. Source: Reliance Power website, Annual Reports, Economic Times, Industry News, Aranca Research Note: MW - Megawatt, E - Estimate Generating Capacity (million units)Both units of the 600 MW Butibori coal project in Maharashtra are ready for production First unit of the 3,960 MW Sasan UMPP project in Madhya Pradesh was commissioned in March 2013, and coal production from Moher Mines started in September 2012 At the 2,400-MW gas project in Samalkot, Andhra Pradesh, four gas turbines are ready for generation Hydro power projects of 5,292 MW capacity are currently under development in Arunachal Pradesh (4,220 MW), Himachal Pradesh (672 MW) and Uttarakhand (400 MW) 70 2,842 4,289 8,012 FY10 FY11 FY12 FY13
  • 30. Source: International Energy Agency (IEA), Demand estimates based on IEA forecasts, Aranca Research Notes: TWh - Terawatt Hour, CAGR - Compounded Annual Growth Rate Electricity demand forecast (TWh)Demand for electricity is expected to expand at a CAGR of 7.5 per cent over FY07–22 to 1,915 TWh Current production levels are not enough to meet demand; annual demand outstrips supply by about 7.5 per cent 690 969 1,392 1,915 FY07 FY12 FY17E FY22E CAGR: 7.5%
  • 31. Source: Business Standard, Capacity addition estimates by Central Electricity Authority (CEA), Aranca Research Notes: TWh - Terawatt-hour, E - Estimates Addition to generation capacity under Five-Year Plans (GW) The government is targeting capacity addition of around 89 GW under the 12th (2012–17) and around 100 GW under the 13th (2017–22) Five-Year Plan The expected investments in the power sector during the 12th Plan (2012–17) is USD223.9 billion There is a tangible shift in policy focus on the sources of power. The government is keen on promotion of hydro, renewable and gas-based projects, as well as adoption of clean coal technology 56 55 89 100 8th+9th+10th 11th 12th 13th E
  • 32. Source: NTPC presentation, Central Electricity Authority (CEA), Aranca Research Note: GW - Gigawatt Hour Addition to generation capacity under Five-Year Plans (GW) Peak power requirement in FY12 stood at 130 GW compared to the capacity of 116 GW The per-capita electricity consumption of India stood at 819 lower than global average of 2,803 representing enormous potential for growth The addition of approximately 106 GW to the existing capacity is expected to boost GDP growth to 8 per cent by FY17 87 91 97 104 110 116 101 109 110 119 122 130 8% 10% 12% 14% 16% 18% 0 30 60 90 120 150 FY07 FY08 FY09 FY10 FY11 FY12 Capacity Peak requirement Peak deficit (RHS)
  • 33. Source: BMI India power report Q3 2011, Aranca Research Notes: JV - Joint Venture, T&D - Transmission and Distribution, GW - Gigawatt Generation Plans to invest USD17.7 billion in power generation by 2014 Coal-fired plant in Tamil Nadu; investment of USD1.3 billionGermac Energy and Sepco III (JV) Adani Power Nuclear power ambition; studying entry strategy with minimum investment of USD3.0 billion Tata Power USD2.5 billion investment in hydro power in Arunachal Pradesh, with a combined generation capacity of 2.5 GW Reliance Power T&D Loan from ADB of USD600 million for development of high-voltage transmission system Developing an integrated national grid, including strengthening of five regional grids; project investment is worth about USD16 billion PowerGridCorporation ofIndiaLtd(PGCIL) Joint development of an India–Sri Lanka undersea transmission link with the Ceylon Electricity Board at an estimated cost of USD573 million Investments across the value chain
  • 34. Source: Renewables 2012 Global Status Report (REN21), Business Monitor International (BMI), Aranca Research, Central Electricity Authority Note: TWh - Tera Watt Hour; GW - Gigawatt India has the sixth largest renewable (eg, hydro power) power generation capacity (2012) As of April 2013, total installed power capacity from renewable energy sources (excluding Hydro power) was 27.5 GW. This accounts for 12.3 per cent of the total installed power capacity and forms 6.5 per cent of the total electricity mix Wind energy is the largest source of renewable energy in India; it accounts for an estimated 87 per cent of total installed capacity (18.3 GW). There are plans to double wind power generation capacity to 20 GW by 2022 Biomass is the second largest source of renewable energy, accounting for 12 per cent of total installed capacity in renewable energy. There is a strong upside potential in biomass in the coming years Solar energy accounts for 1 per cent of total renewable energy installed capacity. The country’s true potential for solar power stands at an estimated 5,000 TWh per annum Capacity addition of 30 GW is planned using various renewable energy technologies during the 12th Five-Year Plan. Wind Energy is estimated to contribute 15 GW, followed by solar power at 10 GW and the remaining by other sources 90 86 71 31 29 24 China US Germany Spain Italy India India ranks sixth in the world
  • 35. Source: Ministry of New and Renewable Energy, Business Monitor International, CEA, Aranca Research Note: GW - Gigawatt; Mwe - Megawatt Electric PHWR - Pressurised Heavy Water Reactors BWR - Boling Water Reactors Nuclear energy production in India in (GW)In 2010, India stood fifth in the Asia-Pacific region in nuclear electricity net generation (behind Japan, South Korea, China, Taiwan) Currently, the country has net installed capacity of 4.8 GW, using nuclear fuels, across 20 reactors. Of the 20 reactors, 18 are pressurised heavy water reactors (PHWR) and two are boiling water reactors (BWR) The government aims to quadruple India’s nuclear power generation capacity to 20 GW by 2020; currently, seven nuclear power reactors of 4,890 MWe capacity are under construction For FY14, the government plans to add 2GW of installed nuclear capacity Nuclear Power Corporation of India Limited (NPCIL) plans to construct five nuclear energy parks with a capacity of 10,000 Mwe The (2X1 GW) Kudankulam Atomic power project, Tamil Nadu, by NPCIL is scheduled for completion by March 2014 4.4 20 2012 2020E CAGR: 24.0%
  • 36. Council of Power Utilities A-2/158, Janakpuri, New Delhi-110058, India Tel : 91 11 25618472, 45652708 Fax : 25611622 E-mail : cvjvarma@gmail.com, cvjv1933@yahoo.com Web site: www.indiapower.org Hydro Power Association (India) Flat no 6, Green Park Apartment, Shriram Society, Warje, Pune - 411058, Maharashtra, India Tel: 91 20 25233338 E-mail: hypaindia@gmail.com, president@hpaindia.org, secretary@hpaindia.org Website: http://hpaindia.org/ Bureau of Energy Efficiency (BEE) Ministry of Power, 4th Floor, SEWA Bhawan, R. K. Puram, New Delhi – 110066, India Tel: 91 11 26179699 Fax: 91 11 26178352 E-mail: webmanager-bee@nic.in Website: http://www.beeindia.in/
  • 37. Indian Wind Energy Association (INWEA) PHD House, 3rd Floor, Opp. Asian Games Village, August Kranti Marg, New Delhi-110016, India Tel : 91 11 26523042 E-mail : manish@inwea.org Web site: http://www.inwea.org/
  • 38. CAGR: Compound Annual Growth Rate FDI: Foreign Direct Investment FY: Indian Financial Year (April to March) So FY10 implies April 2009 to March 2010 GW: Gigawatt M&A: Merger and Acquisition MW: Megawatt NBFC: Non-Banking Financial Company PE: Private Equity PLF: Plant Load Factor R&D: Research and Development
  • 39. R-APDRP: Restructured Accelerated Power Development and Reform Programme T&D: Transmission and Distribution TWh: terawatt-hour RGGVY: Rajiv Gandhi Grameen Vidyutikaran Yojana USD: US Dollar Wherever applicable, numbers have been rounded off to the nearest whole number
  • 40. Year INR equivalent of one US$ 2004-05 44.95 2005-06 44.28 2006-07 45.28 2007-08 40.24 2008-09 45.91 2009-10 47.41 2010-11 45.57 2011-12 47.94 2012-13 54.31 Exchange Rates (Fiscal Year) Year INR equivalent of one US$ 2005 45.55 2006 44.34 2007 39.45 2008 49.21 2009 46.76 2010 45.32 2011 45.64 2012 54.69 2013 54.45 Exchange Rates (Calendar Year) Average for the year
  • 41. India Brand Equity Foundation (IBEF) engaged Aranca to prepare this presentation and the same has been prepared by Aranca in consultation with IBEF. All rights reserved. All copyright in this presentation and related works is solely and exclusively owned by IBEF. The same may not be reproduced, wholly or in part in any material form (including photocopying or storing it in any medium by electronic means and whether or not transiently or incidentally to some other use of this presentation), modified or in any manner communicated to any third party except with the written approval of IBEF. This presentation is for information purposes only. While due care has been taken during the compilation of this presentation to ensure that the information is accurate to the best of Aranca and IBEF’s knowledge and belief, the content is not to be construed in any manner whatsoever as a substitute for professional advice. Aranca and IBEF neither recommend nor endorse any specific products or services that may have been mentioned in this presentation and nor do they assume any liability or responsibility for the outcome of decisions taken as a result of any reliance placed on this presentation. Neither Aranca nor IBEF shall be liable for any direct or indirect damages that may arise due to any act or omission on the part of the user due to any reliance placed or guidance taken from any portion of this presentation.