SlideShare uma empresa Scribd logo
1 de 37
PARKING PROBLEMS IN METRO
CITIES
Gain Knowledge
Share Knowledge
CONTENT
Introduction
Various parking sign
Ill effects of parking
• Congestion
• Accident
• Obstruction to fire-fighting operation
• Effects on environment
Need for the study
Common terms used in parking facilities
Classification of parking facilities
• On-Street or Kerb Parking
• Off –Street Parking
Parking Study and Survey
Division of buildings according to their parking demand
Modern And Creative Methods To Reduce Parking Problems
Conclusion
INTRODUCTION
One of the problems created by road
traffic is PARKING. Not only do
vehicles require street space to
move about, but also do they
require space to park where the
occupants can be loaded and
unloaded.
A systematic study of the PARKING
CHARACTERISTICS and DEMAND and
REGULATORY MEASURES that are
possible for controlling parking is
of great help to a traffic engineer
as well as town planner.
INTRODUCTION CONTINUED . . .
. . . . .• The period over which a car is parked is very great compared with the time it is
in motion. The size of average parking space is 14 m2. It is roughly estimated that
out of 8760 hours in a year, the car runs on an average for only 400 hours,
leaving 8360 hours when it is parked.
• Every car owner would wish to park the car as closely as possible to his
destination so as to minimize his walking. This results in a great demand for
parking space in those areas where the activities are concentrated.
NEEDFOR THE STUDY
Various metro cities like Delhi, Bombay in India is now become a most congested city in India.
High volume of traffic consisting of both fast and slow moving vehicles is plying through the road.
The growth rates are reflected in the growth of traffic volume on the roads, thus leading to congestion
and subsequent reduction in speed. So it has become necessary to project the future traffic growth and
thereby finding out the requirement of increase in carriage way widths required to carry this traffic.
The parking space provided is not sufficient to meet the parking demand. Hence it is necessary to
conduct a detailed analysis of the traffic characteristics and parking demand of the area.
VARIOUS PARKING SIGN
There are various effects of wrong parking
on
society as well as on environment -
CONGESTION ACCIDENTS
OBSTRUCTION
TO FIRE
FIGHTING
OPERATIONS
EFFECT ON
ENVIRONMET
ILL-EFFECTS OF PARKING
CONGESTION
• One of the serious ill-effects of parking is the loss of street space and
the resulting traffic congestions.
• The capacity of the streets is reduced, the journey speed drops down and the journey
time and delay increase. The operational cost of vehicles is thereby increased, causing
serious economic loss to the community.
ACCIDENTS
• The consequences associated with wrong parking and unparking are
known to cause road accidents.
• Careless opening of the doors of parked vehicles, moving out of a parked
position and bringing a car to the parking location from the mainstream of
traffic are some of the common causes of parking accidents.
OBSTRUCTION TO FIRE-FIGHTING
OPERATION
• Parked cars obstruct the movement of fire fighting vehicles and
greatly impede their operations. They block access to hydrants
and access to buildings.
EFFECTS ON ENVIRONMENT
Parked vehicles degrade the environment of the town Centre.
Stopping and starting of vehicles result in noise and fumes.
Cars parked into every little available space debase the visual
aesthetics and “buildings seems to rise from a plinth of cars”.
In spite of the above ill-effects, parking has to be allowed on the
streets or off the streets close to the user’s destination.
The well being of the community and the town Centre demands that
great thought should be bestowed with the parking needs and how
best to fulfill them.
SOME COMMON TERMS USED IN
PARKING FACILITIES
PARKING ACCUMULATION
PARKING VOLUME
PARKING LOAD
PARKING DURATION
Percentage of parking bays actually occupied by parked
vehicles as compared to the theoretical number available.PARKING INDEX
The total number of vehicles parked in an area at a
specified moment.
The number of vehicles parked in a particular area over a given
period of time. It is usually measured in vehicles per day.
The area under the parking accumulation curve during a
specified period.
The length of time spent by a parked vehicle in a parking
space.
CLASSIFICATION
OF PARKING
FACILITIY
ON – STREET OR KERB PARKING
OFF – STREET PARKING
ON-STREET OR KERB PARKING
 In this type of parking vehicles
are parked on the kerb or
sections which may be designed
for parking.
 Kerb parking is quite
convenient for those who could
find a suitable space to park
their vehicles near to the place
they wish to stop, but for others
who could not find a parking
space it is a problem and often
they may have to park their
vehicles at a far off place you
know and walk done to
destination.
PARALLEL
PARKING
THE VARIOUS PATTERNS OF
“KERB PARKING”
OFF-STREET PARKING
On-street parking can only solve a part of the paring problem. For a
satisfactory solution various types of off-street parking facilities are also
be considered. The types of off-street facilitates commonly considered
are :
 SURFACE CAR PARKS
 ROOF PARKS
 MECHANICAL PARKS
 UNDERGROUND CAR PARKS
SURFACE CAR PARKS
 Surface car parks properly
located and developed on a
piece of vacant land.
 Great care is needed in their
design and operation. A variety
of layouts is possible depending
upon the area.
 A stall size of 2.5 x 5m is
probably adequate for INDIAN
CONDITIONS , predominated
by small size cars.
 for AMERICAN CONDITIONS
2.6 x 5.5m is recommended
ROOF CAR PARKS
 A very popular method of solving
the parking problems adopted in
many cities is to park the vehicles
on ROOF -TOPS.
 Access ramps or mechanical lifts
provide the necessary access to
roofs.
 To economies, many roofs may be
linked together served by a single
access ramp.
 An extensive system of linked car
parks at roof level, integrated with
multi level, integrated with
multistoried parking garages is in
use.
The great advantage of
underground car parks is that ,
least inappropriate welcome
they cause to the aesthetics of a
place.
These parking can be built in
the basement of any
multistoried building or below
open spaces.
Since the work involves large
quantities of excavation,
construction of retaining walls,
ventilation and lighting such car
parks tend to be very costly.
UNDERGROUND CAR
PARKS
PERIPHERAL PARKING SCHEMES
There are some alternatives parking options which
serves better parking facilities in the area, having
less space. These are : -
 PARK AND WALK
 PARK AND RIDE
PARK and WALK
 Under this scheme the motorist are made to park their vehicles at
the outskirts of the town.
 After that the rider / driver have to walk down to the town
Centre.
 The attraction is in the form of lower parking charges at the
periphery than at the town Centre or no parking charges at all.
 The less charges and other attractions should be very much
attractive if the scheme has to succeed.
 This scheme provide for peripheral parking facilities and public transport
side to the destinations in the town centre.
 This is an attractive scheme and has been tried with success in many
towns.
 For success, the total travel time including parking time, waiting time at
the bus stop and travel time by bus should not be excessively high to make
him look at it with disfavour and decide to bring the car to the town centre
in spite of the high parking charges there.
 Also, the cost of peripheral parking plus the charges for his journey by
bus should be less than the cost of travel by his car plus the charges for
parking at the town centre.
PARK and RIDE
Parking studies usually are prerequisite to developing
new or expanded parking programs. The studies should
be designed to :
Inventory of existing parking space supply and measure current
levels of space usage (accumulation and space turn over).
Identify salient parking characteristics (duration, purpose, trip
destination and walking distances to destination).
Qualify demands and needs.
Estimate facility capital and operating costs, usage and revenues.
PARKING STUDIES
and
SURVEYS
 Parking studies provide the data essential to develop programs to meet
parking needs.
A parking study may be concerned with an individual trip generator or facility,
such as a hospital or office building, or with the entire CBD. It should
determine not only where motorists can and do park, but also where they
would like to park and how there parking practices affect other transportation
facilities.
Full scale, comprehensive parking studies involving extensive data collection
through parker interviews and other means, and detailed analysis provide a
sound basis for estimating parking usage and determining appropriate actions.
A limited parking study may rely on measuring parking usage by hourly
accumulation counts of parked vehicles or facility occupancy checks.
PARKING STUDIES
The types of parking surveys are usually conducted
as follows:
Parking Space in inventory
Parking Usage Survey by Patrol
Questionnaire Type Parking Usage Survey
Cordon Count
PARKING SURVEYS
The first step in a parking survey is to collect data and amount,
type and location of space actually or potentially available for
parking in an area.The area to be surveyed should first
described.The Central Business District [CBD] is usually the
area where the parking survey is needed.The items to be
recorded include the following :
Parking Space in inventory
 FREQUENCY OF PATROL : Generally half N hour.
 METHOD OF OBSERVATION : A tape recorded may also be used to record
the registration numbers of vehicles.
 TIMING OF THE SURVEY : During working days.
 EQUIPMENT AND FORM OF RECORDING : Each observer will be equipped
with a watch, pencil, supply of forms, a map of the street and a form.
The questionnaire Type Parking usage survey involves interviews with
the drivers who use the parking facilities.
As a result it is possible to collect information on the extend to which
existing facilities are being used, the parking requirements at the
process existing at the time of survey, the distribution of demand over
the area and time and journey purposes of car parkers.
In this interview of actual parkers, the information collected should
include:
Questionnaire Type Parking usage survey
• Address of origin of trip
• Address of destination of trip
• Trip purpose
• Time of arrival at the parking place
• Time of departure from the parking place
• Type of parking space used
• Type of vehicle used
Land use survey
Parking mainly depends upon the land-use pattern.Shopping centers
attract more people towards them than most other land-uses. But, the
parking requirements of different Commercial centers are not the same.
They vary from one to one. Some Commercial centre attracts more
customers to it.
Commercial centers are classified into two :
 Customer attractive Commercial centers
 Non-customer attractive Commercial centers
The nature of the Commercial centre was decided by making observations at the
particular site for 1 hour. Commercial centre in which more than 5 customers visited
within 1 hour was taken as CUSTOMER ATTRACTIVE COMMERCIAL CENTRE ;
otherwise it was taken as NON-CUSTOMER ATTRACTIVE COMMERCIAL CENTRE.
Shops like textiles attracted more customers whereas in Beauty Parlors, Printing shops
etc. customers were less.
DIVISION OF BUILDINGS
ACCORDING TO PARKING DEMAND
For all the sections need parking the buildings are
divided into :
 Customer Attractive Shops (CAS)
 Non-customer Attractive Shops (NCAS)
 Customer Attractive Office (CAO)
 Non-customer Attractive Office (NCAO)
No Customer attractive Shops Non-Customer attractive shops
1 Textile Electricals
2 Vegetable Shop Printing Shop
3 Restaurant Furniture
4 Stationery Grocery Shop
5 Flower marts Beauty Parlour
6 Fancy Shop Tailoring Shop
7 Internet café Hotel
8 Photostat shop Mill
9 STD Booth Appliances
10 Bakery Electronics Shop
Number Customer attractive Office Non-Customer attractive Office
1 Bank School
2 Post Office Government Offices
 In some offices, there was not any customer whereas customers in addition to employees
were seen in some other offices. The parking space required for the latter type is more.
Based on this the offices are classified as customer attractive and Non-customer attractive
offices -
MODERN AND CREATIVE METHODS
TO REDUCE PARKING PROBLEM IN
METRO CITIES
Basically there are two method which are largely adopting in various
metropolitan cities like Delhi , Noida , Bangalore and Mumbai etc.
 Multistoried Car Parks
 Puzzle Car Parking
 Multistoried parking garages are
restored to when the floor space
available for the parking garage is
less and is very costly.
 It is possible to construct
multistoried garages to park a large
number of cars at a time.
 It is necessary to provide the inter
floor travel facility for the vehicles,
such as elevators, ramps, etc.
 Multistoried car parks are
designed for a capacity of about
400 to 500 cars.
MULTISTORIED CAR
PARKS
Some of the desirable standards for
designing of the multistoried car parks
are :
 GRADIENT OF THE RAMP : 1 in 10 generally and 1 in 8 for very short ramps
 PARKING STALL DIMENSIONS : 2.5m x 5m
 CLEAR HEIGHT BETWEEN FLOORS : 2.1m
 INSIDE RADIUS OF CURVES : 7m
 WIDTH OF TRAFFIC LANE ON RAMPS AND ENTRANCES : 3.75m
 GRADIENT OF SLOPPING FLOORS : Not steeper than 1 in 20
PUZZLE CAR PARKING
CONTD. .
• This System Is
Electromechanically
Operated. Fast IN & OUT
Of The Cars Is Possible.
• Combination Of Multiple
Levels Vertically &
Horizontally Is Possible
• Mostly Preferred In
Residential Complexes, IT
Parks Commercial
Complexes, Malls, Hotels
Etc.
Suitable for :
Sedan Car For All levels &
SUV Car For only ground level.
CONCLUSION
As we know, The Numbers of vehicles are going on increasing at an
alarming rate and commercialization of the area is also happening at a
fast rate, thus demanding more parking spaces near the destination. All
these factors correspond to generate various parking
problems.Consequently it have various Congestion, Accidental problems
and it adversely affect the fire-fighting operation and Nature.
Thus Parking structures will need to be reconsider the
technology especially if they are located in heavy traffic areas. The
available legal parking spaces will have to be utilized to highest
efficiency. We have to follow the various parking policy while meeting
some parking needs and also lower the personal vehicle travel and urban-
peak traffic to reduce congestion, accidents and pollution. Now there is a
need of modifying existing parking facilities and construction of new
parking facilities such as puzzle car parking, Multilevel Parking
facilities, Underground parking and Roof Car Park etc.
THANK YOU 

Mais conteúdo relacionado

Mais procurados (20)

On street and off street parking
On street and off street parkingOn street and off street parking
On street and off street parking
 
O & d survey
O & d survey O & d survey
O & d survey
 
Car Parking Design in Urban Planning
Car Parking Design in Urban PlanningCar Parking Design in Urban Planning
Car Parking Design in Urban Planning
 
TYPES OF PARKING
TYPES OF PARKINGTYPES OF PARKING
TYPES OF PARKING
 
Ill effects of parking
Ill effects of parking Ill effects of parking
Ill effects of parking
 
ROAD SAFETY AUDIT
ROAD SAFETY AUDITROAD SAFETY AUDIT
ROAD SAFETY AUDIT
 
Parking studies
Parking studiesParking studies
Parking studies
 
Travel demand management
Travel demand managementTravel demand management
Travel demand management
 
vehicle parking
vehicle parkingvehicle parking
vehicle parking
 
Presentation on parking problem in sector v
Presentation on parking problem in sector vPresentation on parking problem in sector v
Presentation on parking problem in sector v
 
Crash Investigation and Black Spot Assessment
Crash Investigation and Black Spot AssessmentCrash Investigation and Black Spot Assessment
Crash Investigation and Black Spot Assessment
 
Parking study
Parking studyParking study
Parking study
 
Road Safety Auditing
Road Safety AuditingRoad Safety Auditing
Road Safety Auditing
 
Roadway condition presentation grp 04
Roadway condition presentation grp 04Roadway condition presentation grp 04
Roadway condition presentation grp 04
 
Revision of parking code for IRC
Revision of parking code for IRCRevision of parking code for IRC
Revision of parking code for IRC
 
Car parking
Car parkingCar parking
Car parking
 
Origin & destination survey
Origin & destination surveyOrigin & destination survey
Origin & destination survey
 
Traffic control devices
Traffic control devicesTraffic control devices
Traffic control devices
 
Urban Roads
Urban RoadsUrban Roads
Urban Roads
 
Smart parking 2020 vision
Smart parking 2020 vision Smart parking 2020 vision
Smart parking 2020 vision
 

Destaque

Socio economic effects of RTAs - ghana (by dr ma adu-darko)
Socio economic effects of RTAs - ghana (by dr ma adu-darko)Socio economic effects of RTAs - ghana (by dr ma adu-darko)
Socio economic effects of RTAs - ghana (by dr ma adu-darko)Mikel Adu-Darko
 
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...Shahadat Hossain Shakil
 
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...Shahadat Hossain Shakil
 
Parking Case Study Presentation
Parking Case Study PresentationParking Case Study Presentation
Parking Case Study PresentationTyler Hauck
 
Parking study traffic eng
Parking study traffic engParking study traffic eng
Parking study traffic engamira688
 
Pricing methods..
Pricing methods..Pricing methods..
Pricing methods..Sujith Nair
 
Contoh Desain Slide Presentasi Ilmiah Kreatif dan Menarik #3
Contoh Desain Slide Presentasi Ilmiah Kreatif dan Menarik #3Contoh Desain Slide Presentasi Ilmiah Kreatif dan Menarik #3
Contoh Desain Slide Presentasi Ilmiah Kreatif dan Menarik #3Arry Rahmawan
 

Destaque (13)

EXPLORING PARKING PRICING FOR CONGESTION MANAGEMENT USING THE SFCTA ACTIVITY-...
EXPLORING PARKING PRICING FOR CONGESTION MANAGEMENT USING THE SFCTA ACTIVITY-...EXPLORING PARKING PRICING FOR CONGESTION MANAGEMENT USING THE SFCTA ACTIVITY-...
EXPLORING PARKING PRICING FOR CONGESTION MANAGEMENT USING THE SFCTA ACTIVITY-...
 
Socio economic effects of RTAs - ghana (by dr ma adu-darko)
Socio economic effects of RTAs - ghana (by dr ma adu-darko)Socio economic effects of RTAs - ghana (by dr ma adu-darko)
Socio economic effects of RTAs - ghana (by dr ma adu-darko)
 
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
 
On-street Parking
On-street ParkingOn-street Parking
On-street Parking
 
Parking Lots to Parks Kansas City
Parking Lots to Parks Kansas CityParking Lots to Parks Kansas City
Parking Lots to Parks Kansas City
 
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
Parking Demand & Supply Analysis of Different Commercial Land Uses Along Mirp...
 
Parking Case Study Presentation
Parking Case Study PresentationParking Case Study Presentation
Parking Case Study Presentation
 
Parking final
Parking finalParking final
Parking final
 
Parking study traffic eng
Parking study traffic engParking study traffic eng
Parking study traffic eng
 
Traffic jam 0
Traffic jam 0Traffic jam 0
Traffic jam 0
 
Pricing methods..
Pricing methods..Pricing methods..
Pricing methods..
 
TRAFFIC JAM
TRAFFIC JAMTRAFFIC JAM
TRAFFIC JAM
 
Contoh Desain Slide Presentasi Ilmiah Kreatif dan Menarik #3
Contoh Desain Slide Presentasi Ilmiah Kreatif dan Menarik #3Contoh Desain Slide Presentasi Ilmiah Kreatif dan Menarik #3
Contoh Desain Slide Presentasi Ilmiah Kreatif dan Menarik #3
 

Semelhante a Parking Problems in Metro cities and their Effecient Handling

DNCC-DSCC.RoadSide.&.Towered.Parking.Solution.ppt
DNCC-DSCC.RoadSide.&.Towered.Parking.Solution.pptDNCC-DSCC.RoadSide.&.Towered.Parking.Solution.ppt
DNCC-DSCC.RoadSide.&.Towered.Parking.Solution.pptMahmudur Rahman Sakib
 
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIA STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIIRJET Journal
 
pptparking-160731172031 (1).pdf
pptparking-160731172031 (1).pdfpptparking-160731172031 (1).pdf
pptparking-160731172031 (1).pdfYashKoli22
 
Construction of multi storied machanised (semi-automatic) car
Construction of multi storied machanised (semi-automatic) carConstruction of multi storied machanised (semi-automatic) car
Construction of multi storied machanised (semi-automatic) carDar Hilal
 
IRJET- Study of Multilevel Vehicular Parking
IRJET- Study of Multilevel Vehicular ParkingIRJET- Study of Multilevel Vehicular Parking
IRJET- Study of Multilevel Vehicular ParkingIRJET Journal
 
thesis Prestation design
thesis Prestation designthesis Prestation design
thesis Prestation designSispap1
 
Guidance on parking reform in Indian cities
Guidance on parking reform in Indian cities Guidance on parking reform in Indian cities
Guidance on parking reform in Indian cities Anupama Krishnan
 
Parking presentation outline oct 17
Parking presentation outline oct 17Parking presentation outline oct 17
Parking presentation outline oct 17Adina Levin
 
MULTIPLE BENEFITS OF MULTILEVEL CAR PARKING SYSTEMS.pptx
MULTIPLE BENEFITS OF MULTILEVEL CAR PARKING SYSTEMS.pptxMULTIPLE BENEFITS OF MULTILEVEL CAR PARKING SYSTEMS.pptx
MULTIPLE BENEFITS OF MULTILEVEL CAR PARKING SYSTEMS.pptxWohr Parking Systems Pvt. Ltd.
 
Eville pkg wkshp_111617
Eville pkg wkshp_111617Eville pkg wkshp_111617
Eville pkg wkshp_111617E'ville Eye
 
Enterprise Architecture in a Car Park
Enterprise Architecture in a Car ParkEnterprise Architecture in a Car Park
Enterprise Architecture in a Car ParkRowan Mountford
 
Final town of windsor parking planning study presentation 040109
Final town of windsor parking planning study presentation 040109Final town of windsor parking planning study presentation 040109
Final town of windsor parking planning study presentation 040109David Kelley, MBA
 
IRJET- I-Parker-A New Smart Car Parking System
IRJET- I-Parker-A New Smart Car Parking SystemIRJET- I-Parker-A New Smart Car Parking System
IRJET- I-Parker-A New Smart Car Parking SystemIRJET Journal
 

Semelhante a Parking Problems in Metro cities and their Effecient Handling (20)

akash.pptx
akash.pptxakash.pptx
akash.pptx
 
Smart parking
Smart parkingSmart parking
Smart parking
 
Analysis of Parking Facilities
Analysis of Parking Facilities Analysis of Parking Facilities
Analysis of Parking Facilities
 
DNCC-DSCC.RoadSide.&.Towered.Parking.Solution.ppt
DNCC-DSCC.RoadSide.&.Towered.Parking.Solution.pptDNCC-DSCC.RoadSide.&.Towered.Parking.Solution.ppt
DNCC-DSCC.RoadSide.&.Towered.Parking.Solution.ppt
 
Parking geometry
Parking geometryParking geometry
Parking geometry
 
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVIA STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
A STUDY ON PROVISION OF PARK AND RIDE FACILITY FOR SMART CITY BELAGAVI
 
pptparking-160731172031 (1).pdf
pptparking-160731172031 (1).pdfpptparking-160731172031 (1).pdf
pptparking-160731172031 (1).pdf
 
Construction of multi storied machanised (semi-automatic) car
Construction of multi storied machanised (semi-automatic) carConstruction of multi storied machanised (semi-automatic) car
Construction of multi storied machanised (semi-automatic) car
 
IRJET- Study of Multilevel Vehicular Parking
IRJET- Study of Multilevel Vehicular ParkingIRJET- Study of Multilevel Vehicular Parking
IRJET- Study of Multilevel Vehicular Parking
 
thesis Prestation design
thesis Prestation designthesis Prestation design
thesis Prestation design
 
Guidance on parking reform in Indian cities
Guidance on parking reform in Indian cities Guidance on parking reform in Indian cities
Guidance on parking reform in Indian cities
 
Parking presentation outline oct 17
Parking presentation outline oct 17Parking presentation outline oct 17
Parking presentation outline oct 17
 
MULTIPLE BENEFITS OF MULTILEVEL CAR PARKING SYSTEMS.pptx
MULTIPLE BENEFITS OF MULTILEVEL CAR PARKING SYSTEMS.pptxMULTIPLE BENEFITS OF MULTILEVEL CAR PARKING SYSTEMS.pptx
MULTIPLE BENEFITS OF MULTILEVEL CAR PARKING SYSTEMS.pptx
 
Parking policy sdmc
Parking policy  sdmcParking policy  sdmc
Parking policy sdmc
 
Eville pkg wkshp_111617
Eville pkg wkshp_111617Eville pkg wkshp_111617
Eville pkg wkshp_111617
 
group 1.pptx
group 1.pptxgroup 1.pptx
group 1.pptx
 
Enterprise Architecture in a Car Park
Enterprise Architecture in a Car ParkEnterprise Architecture in a Car Park
Enterprise Architecture in a Car Park
 
Parking standards
Parking standardsParking standards
Parking standards
 
Final town of windsor parking planning study presentation 040109
Final town of windsor parking planning study presentation 040109Final town of windsor parking planning study presentation 040109
Final town of windsor parking planning study presentation 040109
 
IRJET- I-Parker-A New Smart Car Parking System
IRJET- I-Parker-A New Smart Car Parking SystemIRJET- I-Parker-A New Smart Car Parking System
IRJET- I-Parker-A New Smart Car Parking System
 

Último

247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 

Último (20)

247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 

Parking Problems in Metro cities and their Effecient Handling

  • 1. PARKING PROBLEMS IN METRO CITIES Gain Knowledge Share Knowledge
  • 2. CONTENT Introduction Various parking sign Ill effects of parking • Congestion • Accident • Obstruction to fire-fighting operation • Effects on environment Need for the study Common terms used in parking facilities Classification of parking facilities • On-Street or Kerb Parking • Off –Street Parking Parking Study and Survey Division of buildings according to their parking demand Modern And Creative Methods To Reduce Parking Problems Conclusion
  • 3. INTRODUCTION One of the problems created by road traffic is PARKING. Not only do vehicles require street space to move about, but also do they require space to park where the occupants can be loaded and unloaded. A systematic study of the PARKING CHARACTERISTICS and DEMAND and REGULATORY MEASURES that are possible for controlling parking is of great help to a traffic engineer as well as town planner.
  • 4. INTRODUCTION CONTINUED . . . . . . . .• The period over which a car is parked is very great compared with the time it is in motion. The size of average parking space is 14 m2. It is roughly estimated that out of 8760 hours in a year, the car runs on an average for only 400 hours, leaving 8360 hours when it is parked. • Every car owner would wish to park the car as closely as possible to his destination so as to minimize his walking. This results in a great demand for parking space in those areas where the activities are concentrated.
  • 5. NEEDFOR THE STUDY Various metro cities like Delhi, Bombay in India is now become a most congested city in India. High volume of traffic consisting of both fast and slow moving vehicles is plying through the road. The growth rates are reflected in the growth of traffic volume on the roads, thus leading to congestion and subsequent reduction in speed. So it has become necessary to project the future traffic growth and thereby finding out the requirement of increase in carriage way widths required to carry this traffic. The parking space provided is not sufficient to meet the parking demand. Hence it is necessary to conduct a detailed analysis of the traffic characteristics and parking demand of the area.
  • 7. There are various effects of wrong parking on society as well as on environment - CONGESTION ACCIDENTS OBSTRUCTION TO FIRE FIGHTING OPERATIONS EFFECT ON ENVIRONMET ILL-EFFECTS OF PARKING
  • 8. CONGESTION • One of the serious ill-effects of parking is the loss of street space and the resulting traffic congestions. • The capacity of the streets is reduced, the journey speed drops down and the journey time and delay increase. The operational cost of vehicles is thereby increased, causing serious economic loss to the community.
  • 9. ACCIDENTS • The consequences associated with wrong parking and unparking are known to cause road accidents. • Careless opening of the doors of parked vehicles, moving out of a parked position and bringing a car to the parking location from the mainstream of traffic are some of the common causes of parking accidents.
  • 10. OBSTRUCTION TO FIRE-FIGHTING OPERATION • Parked cars obstruct the movement of fire fighting vehicles and greatly impede their operations. They block access to hydrants and access to buildings.
  • 11. EFFECTS ON ENVIRONMENT Parked vehicles degrade the environment of the town Centre. Stopping and starting of vehicles result in noise and fumes. Cars parked into every little available space debase the visual aesthetics and “buildings seems to rise from a plinth of cars”. In spite of the above ill-effects, parking has to be allowed on the streets or off the streets close to the user’s destination. The well being of the community and the town Centre demands that great thought should be bestowed with the parking needs and how best to fulfill them.
  • 12. SOME COMMON TERMS USED IN PARKING FACILITIES PARKING ACCUMULATION PARKING VOLUME PARKING LOAD PARKING DURATION Percentage of parking bays actually occupied by parked vehicles as compared to the theoretical number available.PARKING INDEX The total number of vehicles parked in an area at a specified moment. The number of vehicles parked in a particular area over a given period of time. It is usually measured in vehicles per day. The area under the parking accumulation curve during a specified period. The length of time spent by a parked vehicle in a parking space.
  • 13. CLASSIFICATION OF PARKING FACILITIY ON – STREET OR KERB PARKING OFF – STREET PARKING
  • 14. ON-STREET OR KERB PARKING  In this type of parking vehicles are parked on the kerb or sections which may be designed for parking.  Kerb parking is quite convenient for those who could find a suitable space to park their vehicles near to the place they wish to stop, but for others who could not find a parking space it is a problem and often they may have to park their vehicles at a far off place you know and walk done to destination. PARALLEL PARKING
  • 15. THE VARIOUS PATTERNS OF “KERB PARKING”
  • 16. OFF-STREET PARKING On-street parking can only solve a part of the paring problem. For a satisfactory solution various types of off-street parking facilities are also be considered. The types of off-street facilitates commonly considered are :  SURFACE CAR PARKS  ROOF PARKS  MECHANICAL PARKS  UNDERGROUND CAR PARKS
  • 17. SURFACE CAR PARKS  Surface car parks properly located and developed on a piece of vacant land.  Great care is needed in their design and operation. A variety of layouts is possible depending upon the area.  A stall size of 2.5 x 5m is probably adequate for INDIAN CONDITIONS , predominated by small size cars.  for AMERICAN CONDITIONS 2.6 x 5.5m is recommended
  • 18. ROOF CAR PARKS  A very popular method of solving the parking problems adopted in many cities is to park the vehicles on ROOF -TOPS.  Access ramps or mechanical lifts provide the necessary access to roofs.  To economies, many roofs may be linked together served by a single access ramp.  An extensive system of linked car parks at roof level, integrated with multi level, integrated with multistoried parking garages is in use.
  • 19. The great advantage of underground car parks is that , least inappropriate welcome they cause to the aesthetics of a place. These parking can be built in the basement of any multistoried building or below open spaces. Since the work involves large quantities of excavation, construction of retaining walls, ventilation and lighting such car parks tend to be very costly. UNDERGROUND CAR PARKS
  • 20. PERIPHERAL PARKING SCHEMES There are some alternatives parking options which serves better parking facilities in the area, having less space. These are : -  PARK AND WALK  PARK AND RIDE
  • 21. PARK and WALK  Under this scheme the motorist are made to park their vehicles at the outskirts of the town.  After that the rider / driver have to walk down to the town Centre.  The attraction is in the form of lower parking charges at the periphery than at the town Centre or no parking charges at all.  The less charges and other attractions should be very much attractive if the scheme has to succeed.
  • 22.  This scheme provide for peripheral parking facilities and public transport side to the destinations in the town centre.  This is an attractive scheme and has been tried with success in many towns.  For success, the total travel time including parking time, waiting time at the bus stop and travel time by bus should not be excessively high to make him look at it with disfavour and decide to bring the car to the town centre in spite of the high parking charges there.  Also, the cost of peripheral parking plus the charges for his journey by bus should be less than the cost of travel by his car plus the charges for parking at the town centre. PARK and RIDE
  • 23. Parking studies usually are prerequisite to developing new or expanded parking programs. The studies should be designed to : Inventory of existing parking space supply and measure current levels of space usage (accumulation and space turn over). Identify salient parking characteristics (duration, purpose, trip destination and walking distances to destination). Qualify demands and needs. Estimate facility capital and operating costs, usage and revenues. PARKING STUDIES and SURVEYS
  • 24.  Parking studies provide the data essential to develop programs to meet parking needs. A parking study may be concerned with an individual trip generator or facility, such as a hospital or office building, or with the entire CBD. It should determine not only where motorists can and do park, but also where they would like to park and how there parking practices affect other transportation facilities. Full scale, comprehensive parking studies involving extensive data collection through parker interviews and other means, and detailed analysis provide a sound basis for estimating parking usage and determining appropriate actions. A limited parking study may rely on measuring parking usage by hourly accumulation counts of parked vehicles or facility occupancy checks. PARKING STUDIES
  • 25. The types of parking surveys are usually conducted as follows: Parking Space in inventory Parking Usage Survey by Patrol Questionnaire Type Parking Usage Survey Cordon Count PARKING SURVEYS
  • 26. The first step in a parking survey is to collect data and amount, type and location of space actually or potentially available for parking in an area.The area to be surveyed should first described.The Central Business District [CBD] is usually the area where the parking survey is needed.The items to be recorded include the following : Parking Space in inventory  FREQUENCY OF PATROL : Generally half N hour.  METHOD OF OBSERVATION : A tape recorded may also be used to record the registration numbers of vehicles.  TIMING OF THE SURVEY : During working days.  EQUIPMENT AND FORM OF RECORDING : Each observer will be equipped with a watch, pencil, supply of forms, a map of the street and a form.
  • 27. The questionnaire Type Parking usage survey involves interviews with the drivers who use the parking facilities. As a result it is possible to collect information on the extend to which existing facilities are being used, the parking requirements at the process existing at the time of survey, the distribution of demand over the area and time and journey purposes of car parkers. In this interview of actual parkers, the information collected should include: Questionnaire Type Parking usage survey • Address of origin of trip • Address of destination of trip • Trip purpose • Time of arrival at the parking place • Time of departure from the parking place • Type of parking space used • Type of vehicle used
  • 28. Land use survey Parking mainly depends upon the land-use pattern.Shopping centers attract more people towards them than most other land-uses. But, the parking requirements of different Commercial centers are not the same. They vary from one to one. Some Commercial centre attracts more customers to it. Commercial centers are classified into two :  Customer attractive Commercial centers  Non-customer attractive Commercial centers The nature of the Commercial centre was decided by making observations at the particular site for 1 hour. Commercial centre in which more than 5 customers visited within 1 hour was taken as CUSTOMER ATTRACTIVE COMMERCIAL CENTRE ; otherwise it was taken as NON-CUSTOMER ATTRACTIVE COMMERCIAL CENTRE. Shops like textiles attracted more customers whereas in Beauty Parlors, Printing shops etc. customers were less.
  • 29. DIVISION OF BUILDINGS ACCORDING TO PARKING DEMAND For all the sections need parking the buildings are divided into :  Customer Attractive Shops (CAS)  Non-customer Attractive Shops (NCAS)  Customer Attractive Office (CAO)  Non-customer Attractive Office (NCAO)
  • 30. No Customer attractive Shops Non-Customer attractive shops 1 Textile Electricals 2 Vegetable Shop Printing Shop 3 Restaurant Furniture 4 Stationery Grocery Shop 5 Flower marts Beauty Parlour 6 Fancy Shop Tailoring Shop 7 Internet café Hotel 8 Photostat shop Mill 9 STD Booth Appliances 10 Bakery Electronics Shop Number Customer attractive Office Non-Customer attractive Office 1 Bank School 2 Post Office Government Offices  In some offices, there was not any customer whereas customers in addition to employees were seen in some other offices. The parking space required for the latter type is more. Based on this the offices are classified as customer attractive and Non-customer attractive offices -
  • 31. MODERN AND CREATIVE METHODS TO REDUCE PARKING PROBLEM IN METRO CITIES Basically there are two method which are largely adopting in various metropolitan cities like Delhi , Noida , Bangalore and Mumbai etc.  Multistoried Car Parks  Puzzle Car Parking
  • 32.  Multistoried parking garages are restored to when the floor space available for the parking garage is less and is very costly.  It is possible to construct multistoried garages to park a large number of cars at a time.  It is necessary to provide the inter floor travel facility for the vehicles, such as elevators, ramps, etc.  Multistoried car parks are designed for a capacity of about 400 to 500 cars. MULTISTORIED CAR PARKS
  • 33. Some of the desirable standards for designing of the multistoried car parks are :  GRADIENT OF THE RAMP : 1 in 10 generally and 1 in 8 for very short ramps  PARKING STALL DIMENSIONS : 2.5m x 5m  CLEAR HEIGHT BETWEEN FLOORS : 2.1m  INSIDE RADIUS OF CURVES : 7m  WIDTH OF TRAFFIC LANE ON RAMPS AND ENTRANCES : 3.75m  GRADIENT OF SLOPPING FLOORS : Not steeper than 1 in 20
  • 35. CONTD. . • This System Is Electromechanically Operated. Fast IN & OUT Of The Cars Is Possible. • Combination Of Multiple Levels Vertically & Horizontally Is Possible • Mostly Preferred In Residential Complexes, IT Parks Commercial Complexes, Malls, Hotels Etc. Suitable for : Sedan Car For All levels & SUV Car For only ground level.
  • 36. CONCLUSION As we know, The Numbers of vehicles are going on increasing at an alarming rate and commercialization of the area is also happening at a fast rate, thus demanding more parking spaces near the destination. All these factors correspond to generate various parking problems.Consequently it have various Congestion, Accidental problems and it adversely affect the fire-fighting operation and Nature. Thus Parking structures will need to be reconsider the technology especially if they are located in heavy traffic areas. The available legal parking spaces will have to be utilized to highest efficiency. We have to follow the various parking policy while meeting some parking needs and also lower the personal vehicle travel and urban- peak traffic to reduce congestion, accidents and pollution. Now there is a need of modifying existing parking facilities and construction of new parking facilities such as puzzle car parking, Multilevel Parking facilities, Underground parking and Roof Car Park etc.